48
Report Date: 05/27/2016 DOE: 8 Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00 Country: USA State: TEXAS Field: WOLFCAMP EAST Supervisors: LARRY TERRELL / N/A Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY 002 Spud Date: 11/28/2015 DOL: 2 AFE Days: Last BOP T.: Release Date: Report Number: Daily Operations Report Onshore CSG Test: Rig: Rig Phone: KB(ft): 2,664.01 POB: 11 Event: COMPLETION LAND Location: Lat: Long: Safety Meeting Topic: 31° 1' 30.33092 N 101° 9' 22.17900 W Manhours: 64.00 API #: 4210542309 Current Activity: TOE PREP-STANDBY FOR ADJACENT WELL OPERATIONS. 24 Hr Summary: PREP PAD FOR FRAC OPS, CUT RAT HOLE BELOW B SECTION, MODIFY CELLAR SKIRTING STANDBY FOR ADJACENT WELL OPERATIONS. 24 Hr Forecast: OPERATION DETAILS DESCRIPTION PHASE HRS TO FROM CODE OP CODE ACTIVITY 06:00 07:00 1.00 P SITEPRE 44 WOD WAITING FOR DAYLIGHT TO RESUME OPERATIONS 07:00 07:30 0.50 P SITEPRE 28 SFTYMTG HELD SAFETY MEETING AND REVIEWED JSA WITH CONSTRUCTION CREW ON OPERATIONS 07:30 14:00 6.50 P SITEPRE 18 OTHR INSTALL ROCK TO REPAIR LOCATION 14:00 14:30 0.50 P SITEPRE 28 SFTYMTG HELD SAFETY MEETING AND REVIEWED JSA WITH LEASE CREWS ON OPERATIONS. PERFORMED HOT WORK PERMIT AND CONFINED SPACE ENTRY PERMIT. 14:30 17:30 3.00 P SITEPRE 09 EQRP CUT RAT HOLE BELOW CASING VALVES. WELDED CAP ON TOP. MODIFIED CELLAR SKIRTING, CUTTING THE SIDE SLIGHTLY TO BE ABLE TO INSTALL FLOWBACK EQUIPMENT ON CASING VALVES 17:30 06:00 12.50 P SITEPRE 73 WOOWO STANDBY FOR COMPLETION OF 41-10-OH TOE PREP Daily Operations Comments: NO SPILLS, INJURIES OR OFFICIAL VISITS. CASING Size(in) MD(ft)/TVD(ft) LOT(ppg) / / / / 14.000 67.00 67.00 / 9.625 1,005.00 1,005.00 FLOWBACK Gas Rate: Choke Size: Avg. Tbg. Press: Avg. Csg. Press: Fluid Rate (Water): Fluid Rate (Oil): Tot. Load Recovered: FLUIDS Fluids Co: Fluids Eng: Brine Type: Pit Temp: Density: Viscosity: Gel Type: Nitrogen: NTU: COMPLETION STRING DETAILS Down Hole Tool Co: Tool Sup: Qty Description ID OD Top Set PERFORATIONS Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments 5/28/2016 8:02:21AM Printed: Page 1 of 1

Daily Operations Report Number: Well Name/Wellbore No

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Report Date: 05/27/2016

DOE: 8

Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00

Country: USAState: TEXASField: WOLFCAMP EAST

Supervisors: LARRY TERRELL / N/A

Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY

002

Spud Date: 11/28/2015

DOL: 2 AFE Days: Last BOP T.:

Release Date:

Report Number:Daily Operations

Report Onshore

CSG Test:

Rig:

Rig Phone:KB(ft): 2,664.01

POB: 11

Event: COMPLETION LAND

Location: Lat:

Long:

Safety Meeting Topic:

31° 1' 30.33092 N

101° 9' 22.17900 W Manhours: 64.00

API #: 4210542309

Current Activity: TOE PREP-STANDBY FOR ADJACENT WELL OPERATIONS.

24 Hr Summary: PREP PAD FOR FRAC OPS, CUT RAT HOLE BELOW B SECTION, MODIFY CELLAR SKIRTING

STANDBY FOR ADJACENT WELL OPERATIONS.24 Hr Forecast:

OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY

06:00 07:00 1.00 P SITEPRE 44 WOD WAITING FOR DAYLIGHT TO RESUME OPERATIONS

07:00 07:30 0.50 P SITEPRE 28 SFTYMTG HELD SAFETY MEETING AND REVIEWED JSA WITH CONSTRUCTION CREW ON OPERATIONS

07:30 14:00 6.50 P SITEPRE 18 OTHR INSTALL ROCK TO REPAIR LOCATION

14:00 14:30 0.50 P SITEPRE 28 SFTYMTG HELD SAFETY MEETING AND REVIEWED JSA WITH LEASE CREWS ON OPERATIONS.

PERFORMED HOT WORK PERMIT AND CONFINED SPACE ENTRY PERMIT.

14:30 17:30 3.00 P SITEPRE 09 EQRP CUT RAT HOLE BELOW CASING VALVES. WELDED CAP ON TOP. MODIFIED CELLAR SKIRTING,

CUTTING THE SIDE SLIGHTLY TO BE ABLE TO INSTALL FLOWBACK EQUIPMENT ON CASING

VALVES

17:30 06:00 12.50 P SITEPRE 73 WOOWO STANDBY FOR COMPLETION OF 41-10-OH TOE PREP

Daily Operations Comments:

NO SPILLS, INJURIES OR OFFICIAL VISITS.

CASING

Size(in) MD(ft)/TVD(ft) LOT(ppg)

/

/

/

/ 14.000 67.00 67.00

/ 9.625 1,005.00 1,005.00

FLOWBACK

Gas Rate:

Choke Size:

Avg. Tbg. Press:

Avg. Csg. Press:

Fluid Rate (Water):

Fluid Rate (Oil):

Tot. Load Recovered:

FLUIDSFluids Co:

Fluids Eng:

Brine Type:

Pit Temp:

Density:

Viscosity:

Gel Type:

Nitrogen:

NTU:

COMPLETION STRING DETAILS

Down Hole Tool Co: Tool Sup:

Qty Description ID OD Top Set

PERFORATIONS

Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments

5/28/2016 8:02:21AMPrinted: Page 1 of 1

Report Date: 05/29/2016

DOE: 10

Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00

Country: USAState: TEXASField: WOLFCAMP EAST

Supervisors: LARRY TERRELL / N/A

Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY

003

Spud Date: 11/28/2015

DOL: 3 AFE Days: Last BOP T.:

Release Date:

Report Number:Daily Operations

Report Onshore

CSG Test:

Rig:

Rig Phone:KB(ft): 2,664.01

POB: 30

Event: COMPLETION LAND

Location: Lat:

Long:

Safety Meeting Topic:

31° 1' 30.33092 N

101° 9' 22.17900 W Manhours: 204.00

API #: 4210542309

Current Activity: TOE PREP- WAITING ON DAYLIGHT TO RUN RISERS TO ZIPPER MANIFOLD

24 Hr Summary: NU FRAC STACK, MIRU ELU, MIRU PUMPDOWN EQUIPMENT

RUN RISERS TO ZIPPER, TEST FRAC STACK AND ZIPPER24 Hr Forecast:

OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY

06:00 07:00 1.00 P MIRU 44 WOD WAITING ON DAYLIGHT TO RESUME OPERATIONS

07:00 08:00 1.00 P MIRU 28 SFTYMTG HELD SAFETY MEETING AND REVIEWED JSA'S ON OPERATIONS. HELD ORIENTATIONS ON

LOCATION

08:00 12:00 4.00 P MIRU 01 MIRU MIRU LAFAYETTE CRANE. UNLOAD FRAC WELL CONTROL EQUIPMENT

12:00 20:00 8.00 P WHDTRE 16 NUND INSTALLED FRAC STACK CONSISTING OF 7-1/16" 10K: MANUAL MASTER VALVE, HYDRAULIC

MASTER VALVE, 3"X2" FLOW CROSS, FRAC HEAD, HYDRAULIC CROWN VALVE. ASSEMBLED

ZIPPER MANIFOLD

20:00 06:00 P WHDTRE 18 OTHR SDFN

Daily Operations Comments:

NO SPILLS, INJURIES OR OFFICIAL VISITS.

CASING

Size(in) MD(ft)/TVD(ft) LOT(ppg)

/

/

/

/ 14.000 67.00 67.00

/ 9.625 1,005.00 1,005.00

FLOWBACK

Gas Rate:

Choke Size:

Avg. Tbg. Press:

Avg. Csg. Press:

Fluid Rate (Water):

Fluid Rate (Oil):

Tot. Load Recovered:

FLUIDSFluids Co:

Fluids Eng:

Brine Type:

Pit Temp:

Density:

Viscosity:

Gel Type:

Nitrogen:

NTU:

COMPLETION STRING DETAILS

Down Hole Tool Co: Tool Sup:

Qty Description ID OD Top Set

PERFORATIONS

Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments

5/30/2016 8:01:11AMPrinted: Page 1 of 1

Report Date: 05/31/2016

DOE: 12

Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00

Country: USAState: TEXASField: WOLFCAMP EAST

Supervisors: LARRY TERRELL / N/A

Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY

004

Spud Date: 11/28/2015

DOL: 4 AFE Days: Last BOP T.:

Release Date:

Report Number:Daily Operations

Report Onshore

CSG Test:

Rig:

Rig Phone:KB(ft): 2,664.01

POB: 14

Event: COMPLETION LAND

Location: Lat:

Long:

Safety Meeting Topic:

31° 1' 30.33092 N

101° 9' 22.17900 W Manhours: 84.00

API #: 4210542309

Current Activity: TOE PREP- MONITORINF SURFACE CASING ANNULUS

24 Hr Summary: TESTED PRODUCTION CASING, SHIFTED TOE SLEEVE

AWAITING RISER INSTALATION24 Hr Forecast:

OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY

06:00 13:00 7.00 P WHDTRE 73 WOOWO WAITING FOR COMPLETION OF ADJACENT WELL OPERATIONS

13:00 16:30 3.50 P WHDTRE 16 NUND REPLACED 7 1/16" 10K CROWN VALVE DUE TO PACKING LEAKING. TESTED FRAC STACK TO 250

PSI LOW AND 10,000 PSI HIGH. ALL TESTS GOOD.

16:30 19:30 3.00 P WBP 08 DHEQ PRIMED FTSI PUMPS. TESTED LINES TO 9,500 PSI. OPENED WELL. TESTED CASING TO 250 PSI

LOW, 7,700 AND 8,000 PSI HIGH. HELD FOR EACH FOR 15 MINS. ALL TESTS GOOD. PRESSURED

UP TO 8,200 PSI. WAITED 2 MINS. WALKED PRESSURE TO 8,400 PSI. WAITED 2 MINS. WALKED

PRESSURE TO 8,600 PSI. WALKED PRESSURE TO 8,800 PSI. WAITED 2 MINS. WALKED

PRESSURE TO 8,929 PSI SHIFTING SLEEVE. ESTABLISHED INJECTION RATE OF 10 BPM @4,800

PSI.

ISIP- 2,809 PSI

1 MIN- 2,160 PSI

3 MIN- 2,003 PSI

5 MIN- 1,965 PSI

SHUT WELL IN. PRESSURED UP ON 9 5/8" ANNULUS TO 1,500 PSI. PRESSURE BLED BACK TO

960. PRESSURED BACK UP TO 1,500 PSI.

1 MIN 1,488 PSI

3 MIN 1,430 PSI

5 MIN 1,407 PSI

CONTACTED HOUSTON. DECISION WAS MADE TO LEAVE PRESSURE ON SURFACE TO MONITOR

OVERNIGHT.

19:30 06:00 10.50 P WBP 18 OTHR SWIFN

Daily Operations Comments:

NO SPILLS, INJURIES OR OFFICIAL VISITS.

CASING

Size(in) MD(ft)/TVD(ft) LOT(ppg)

/

/

/

/ 14.000 67.00 67.00

/ 9.625 1,005.00 1,005.00

FLOWBACK

Gas Rate:

Choke Size:

Avg. Tbg. Press:

Avg. Csg. Press:

Fluid Rate (Water):

Fluid Rate (Oil):

Tot. Load Recovered:

FLUIDSFluids Co:

Fluids Eng:

Brine Type:

Pit Temp:

Density:

Viscosity:

Gel Type:

Nitrogen:

NTU:

COMPLETION STRING DETAILS

Down Hole Tool Co: Tool Sup:

Qty Description ID OD Top Set

PERFORATIONS

Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments

5/31/2016 8:04:07AMPrinted: Page 1 of 1

Report Date: 06/02/2016

DOE: 14

Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00

Country: USAState: TEXASField: WOLFCAMP EAST

Supervisors: LARRY TERRELL / N/A

Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY

011

Spud Date: 11/28/2015

DOL: 7 AFE Days: Last BOP T.:

Release Date:

Report Number:Daily Operations

Report Onshore

CSG Test:

Rig:

Rig Phone:KB(ft): 2,664.01

POB: 0

Event: COMPLETION LAND

Location: Lat:

Long:

Safety Meeting Topic:

31° 1' 30.33092 N

101° 9' 22.17900 W Manhours: 0.00

API #: 4210542309

Current Activity: AWAITING DAYLIGHT TO RESUME OPERATIONS

24 Hr Summary: INSTALLED RISERS FROM FRAC HEAD TO ZIPPER MANAFOLD

REPLACE THREADED RISERS, RETEST ZIPPER24 Hr Forecast:

OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY

06:00 10:00 4.00 P WHDTRE 18 OTHR STARTING LATE DUE TO WORKING LATE NIGHT BEFORE

10:00 10:30 0.50 P WHDTRE 28 SFTYMTG HELD SAFETY MEETING AND REVIEWED JSA'S ON OPERATIONS

10:30 21:30 11.00 P WHDTRE 30 SEQP INSTALLED RISERS TO ZIPPER FROM FRAC HEAD. TESTED TO 250 PSI LOW AND ATTEMPTED TO

TEST TO 9,500 PSI HIGH. THREADED PEICE OF 3" FLOWBACK IRON SEPERATED.

21:30 06:00 8.50 P WHDTRE 18 OTHR SDFN

Daily Operations Comments:

NO SPILLS, INJURIES OR OFFICIAL VISITS.

CASING

Size(in) MD(ft)/TVD(ft) LOT(ppg)

/

/

/

/ 14.000 67.00 67.00

/ 9.625 1,005.00 1,005.00

FLOWBACK

Gas Rate:

Choke Size:

Avg. Tbg. Press:

Avg. Csg. Press:

Fluid Rate (Water):

Fluid Rate (Oil):

Tot. Load Recovered:

FLUIDSFluids Co:

Fluids Eng:

Brine Type:

Pit Temp:

Density:

Viscosity:

Gel Type:

Nitrogen:

NTU:

COMPLETION STRING DETAILS

Down Hole Tool Co: Tool Sup:

Qty Description ID OD Top Set

PERFORATIONS

Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments

6/2/2016 8:05:06AMPrinted: Page 1 of 1

Report Date: 06/03/2016

DOE: 15

Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00

Country: USAState: TEXASField: WOLFCAMP EAST

Supervisors: LARRY TERRELL / N/A

Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY

012

Spud Date: 11/28/2015

DOL: 8 AFE Days: Last BOP T.:

Release Date:

Report Number:Daily Operations

Report Onshore

CSG Test:

Rig:

Rig Phone:KB(ft): 2,664.01

POB: 0

Event: COMPLETION LAND

Location: Lat:

Long:

Safety Meeting Topic:

31° 1' 30.33092 N

101° 9' 22.17900 W Manhours: 0.00

API #: 4210542309

Current Activity: WAITING ON DAYLIGHT TO INSTALL REPLACEMENT RISER IRON

24 Hr Summary: INSPECTED RISER IRON, RD RISER IRON

REPLACE RISERS, AND 2" FLOWBACK IRON, RETEST ZIPPER24 Hr Forecast:

OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY

06:00 07:00 1.00 N WHDTRE 30 SEQP WAITING ON DAYLIGHT TO RESUME OPERATIONS

07:00 07:30 0.50 N WHDTRE 28 SFTYMTG HELD SAFETY MEETING AND REVIEWED JSA'S ON OPERATIONS

07:30 14:00 6.50 N WHDTRE 30 SEQP INSPECTED EVERY JOINT OF SPARTAN IRON AGAINST CERTIFICATIONS. DECISION WAS MADE

TO REPLACE ALL RISER AND FLOWBACK IRON.

14:00 19:30 5.50 N WHDTRE 30 SEQP RDMO ALL SPARTAN 3" RISER IRON AND 2" FLOWBACK IRON

19:30 06:00 10.50 N WHDTRE 18 OTHR SDFN

Daily Operations Comments:

NO SPILLS, INJURIES OR OFFICIAL VISITS.

CASING

Size(in) MD(ft)/TVD(ft) LOT(ppg)

/

/

/

/ 14.000 67.00 67.00

/ 9.625 1,005.00 1,005.00

FLOWBACK

Gas Rate:

Choke Size:

Avg. Tbg. Press:

Avg. Csg. Press:

Fluid Rate (Water):

Fluid Rate (Oil):

Tot. Load Recovered:

FLUIDSFluids Co:

Fluids Eng:

Brine Type:

Pit Temp:

Density:

Viscosity:

Gel Type:

Nitrogen:

NTU:

COMPLETION STRING DETAILS

Down Hole Tool Co: Tool Sup:

Qty Description ID OD Top Set

PERFORATIONS

Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments

6/3/2016 8:06:42AMPrinted: Page 1 of 1

Report Date: 06/04/2016

DOE: 16

Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00

Country: USAState: TEXASField: WOLFCAMP EAST

Supervisors: LARRY TERRELL / N/A

Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY

013

Spud Date: 11/28/2015

DOL: 9 AFE Days: Last BOP T.:

Release Date:

Report Number:Daily Operations

Report Onshore

CSG Test:

Rig:

Rig Phone:KB(ft): 2,664.01

POB: 0

Event: COMPLETION LAND

Location: Lat:

Long:

Safety Meeting Topic:

31° 1' 30.33092 N

101° 9' 22.17900 W Manhours: 0.00

API #: 4210542309

Current Activity: TOR PREP COMPLETE AWAITING FRAC OPS

24 Hr Summary: REINSTALLED RISERS TO ZIPPER AND TEST

MIRU FTSI24 Hr Forecast:

OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY

06:00 06:30 0.50 N WHDTRE 44 WOD WAITING ON DAYLIGHT TO RESUME OPERATIONS

06:30 07:00 0.50 N WHDTRE 28 SFTYMTG HELD SAFETY MEETING AND REVIEWED JSA'S ON OPERATIONS.

07:00 01:30 18.50 N WHDTRE 16 NUND INSTALLED RISERS FROM FRAC TREE TO ZIPPER MANIFOLD. VERIFIED ALL CAPS ON ZIPPER

MANIFOLD WERE TIGHT. REPOSITIONED ACCUMULATORS TO MIRU CRANE. TEST RISERS TO

250 PSI LOW HELD FOR 5 MINS. ATTEMPT TO TEST TO 8,500 PSI HIGH. IDENTIFIED MULTIPLE

LEAKS IN RISER IRON. REPLACED WECO SEALS. FLANGE ALSO LEAKING ON FRAC HEAD

RISER FLANGE ON ZIPPER. RETORQUED THE HEAD. SHELL TEST ALL ZIPPER AND RISER

COMPONENTS TOGETHER (ALL THREE WELLS) TO 250 PSI LOW HELD FOR 5 MINS. AND 8,500

PSI HIGH FOR 15 MINS. BOTH TESTS WERE GOOD.TEST MANUAL VALVES ON ZIPPER TO 250

LOW FOR 5 MINS AND 8,500 PSI HIGH FOR 15 MINS. ALL TESTS GOOD. TEST HYDRAULIC

VALVES ON ZIPPER TO 250 LOW FOR 5 MINS AND 8,500 PSI HIGH FOR 15 MINS. ALL TESTS

GOOD. BLED ALL PRESSURE FROM ZIPPER AND SECURED WELL BY BLOSING ALL VALVES ON

TREE AND ZIPPER.

01:30 06:00 4.50 P WHDTRE 18 OTHR FINAL REPORT- AWAITING FRAC MIRU

Daily Operations Comments:

NO SPILLS, INJURIES OR OFFICIAL VISITS.

CASING

Size(in) MD(ft)/TVD(ft) LOT(ppg)

/

/

/

/ 14.000 67.00 67.00

/ 9.625 1,005.00 1,005.00

FLOWBACK

Gas Rate:

Choke Size:

Avg. Tbg. Press:

Avg. Csg. Press:

Fluid Rate (Water):

Fluid Rate (Oil):

Tot. Load Recovered:

FLUIDSFluids Co:

Fluids Eng:

Brine Type:

Pit Temp:

Density:

Viscosity:

Gel Type:

Nitrogen:

NTU:

COMPLETION STRING DETAILS

Down Hole Tool Co: Tool Sup:

Qty Description ID OD Top Set

PERFORATIONS

Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments

6/4/2016 8:03:09AMPrinted: Page 1 of 1

Report Date: 06/08/2016

DOE: 20

Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00

Country: USAState: TEXASField: WOLFCAMP EAST

Supervisors: R. MULL/TERREL, L. / J. CASTILLO/ GOSS, DJ

Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY

015

Spud Date: 11/28/2015

DOL: 11 AFE Days: Last BOP T.:

Release Date:

Report Number:Daily Operations

Report Onshore

CSG Test:

Rig:

Rig Phone:KB(ft): 2,664.01

POB: 78

Event: COMPLETION LAND

Location: Lat:

Long:

Safety Meeting Topic:

31° 1' 30.33092 N

101° 9' 22.17900 W Manhours: 312.00

API #: 4210542309

Current Activity: RIG UP FRAC

24 Hr Summary: RIG UP FRAC

START FRAC OPERATIONS24 Hr Forecast:

OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY

06:00 06:30 0.50 P MIRU 28 SFTYMTG HSM - GO OVER ALL JSA'S, HELP KEYS, STOP WORK RESPONSIBILTY, HEAT AND HYDRATION

06:30 17:30 11.00 P MIRU 01 MIRU SET SAND SILOS, MIRU FTSI FRAC SPREAD. MIRU FTSI WIRELINE AND ASSOCIATED

EQUIPMENT. tEST 3" RISERS, STACK & ZIPPER TO 9500 PSI. TEST WIRELINE BOP TO 8000 PSI.

17:30 06:00 12.50 P MIRU 01 MIRU RIG UP AND TEST FRAC AND WIRELINE EQUIPMENT

Daily Operations Comments:

NO SPILLS, INJURIES OR OFFICIAL VISITS.

CASING

Size(in) MD(ft)/TVD(ft) LOT(ppg)

/

/

/

/ 14.000 67.00 67.00

/ 9.625 1,005.00 1,005.00

FLOWBACK

Gas Rate:

Choke Size:

Avg. Tbg. Press:

Avg. Csg. Press:

Fluid Rate (Water):

Fluid Rate (Oil):

Tot. Load Recovered:

FLUIDSFluids Co:

Fluids Eng:

Brine Type:

Pit Temp:

Density:

Viscosity:

Gel Type:

Nitrogen:

NTU:

COMPLETION STRING DETAILS

Down Hole Tool Co: Tool Sup:

Qty Description ID OD Top Set

PERFORATIONS

Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments

6/8/2016 8:03:47AMPrinted: Page 1 of 1

Report Date: 06/09/2016

DOE: 21

Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00

Country: USAState: TEXASField: WOLFCAMP EAST

Supervisors: R. MULL/TERREL, L. / J. CASTILLO/ GOSS, DJ

Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY

016

Spud Date: 11/28/2015

DOL: 12 AFE Days: Last BOP T.:

Release Date:

Report Number:Daily Operations

Report Onshore

CSG Test:

Rig:

Rig Phone:KB(ft): 2,664.01

POB: 78

Event: COMPLETION LAND

Location: Lat:

Long:

Safety Meeting Topic:

31° 1' 30.33092 N

101° 9' 22.17900 W Manhours: 312.00

API #: 4210542309

Current Activity: WIRELINE POH

24 Hr Summary: 1 WIRELINE

START FRAC OPERATIONS24 Hr Forecast:

OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY

06:00 06:30 0.50 P MIRU 28 SFTYMTG HSM - GO OVER ALL JSA'S, HELP KEYS, STOP WORK RESPONSIBILTY, HEAT AND HYDRATION,

AND FALL PROTECTION

06:30 08:30 2.00 P MIRU 01 MIRU CONTINUE RIG UP AND TESTING SURFACE EQUIPMENT

08:30 09:30 1.00 P MIRU 28 SFTYMTG HELD PRE-PAD MEETING WITH PROJECT ENGINEER, OPERATIONS SUPERVISOR, AND ALL

ASSOCIATED SUPERVISION ON LOCATION. GO OVER WELL PROCEDURES AS WELL AS SAFETY

AND ADMINISTRATIVE NOTES.

09:30 14:00 4.50 P MIRU 01 MIRU CONTINUE RIG UP AND TESTING SURFACE EQUIPMENT

14:00 20:00 6.00 P STG01 73 WOOWO WOOWO

20:00 01:40 5.67 P STG01 35 STIM TOE PREPARATION: PUMPED 20 BBL INJECTION 13 BPM @ 7,350; 30 BBL HCL;ACID HIT PSI

DROPPED TO 6,700 PROCEED WITH FLUSH, 36 BPM @ 6,800; 517 TOTAL FLUID.

01:40 04:45 3.08 P STG01 21 PERF WL STAGE # 1. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ DUMMY PLUG & 8 - 1' x 3

1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/ MARKER JT AT

5,823'. PU & PERF STAGE # 1 ON THE FLY AT 16,465' - 16,632' O/A. POH TO 500' & STANDBY

FOR FRAC. POH. ALL SHOTS FIRED. PUMPED 1059 BBLS

04:45 06:00 1.25 P STG01 73 WOOWO STANDBY FOR ADJACENT WELL OPERATIONS

Daily Operations Comments:

NO SPILLS, INJURIES OR OFFICIAL VISITS.

CASING

Size(in) MD(ft)/TVD(ft) LOT(ppg)

/

/

/

/ 14.000 67.00 67.00

/ 9.625 1,005.00 1,005.00

FLOWBACK

Gas Rate:

Choke Size:

Avg. Tbg. Press:

Avg. Csg. Press:

Fluid Rate (Water):

Fluid Rate (Oil):

Tot. Load Recovered:

FLUIDSFluids Co:

Fluids Eng:

Brine Type:

Pit Temp:

Density:

Viscosity:

Gel Type:

Nitrogen:

NTU:

COMPLETION STRING DETAILS

Down Hole Tool Co: Tool Sup:

Qty Description ID OD Top Set

PERFORATIONS

Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments

6/9/2016 8:02:41AMPrinted: Page 1 of 1

Report Date: 06/10/2016

DOE: 22

Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00

Country: USAState: TEXASField: WOLFCAMP EAST

Supervisors: R. MULL/TERREL, L. / J. CASTILLO/ GOSS, DJ

Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY

017

Spud Date: 11/28/2015

DOL: 13 AFE Days: Last BOP T.:

Release Date:

Report Number:Daily Operations

Report Onshore

CSG Test:**Data shared on this report is CONFIDENTIAL**

Rig:

Rig Phone:KB(ft): 2,664.01

POB: 78

Event: COMPLETION LAND

Location: Lat:

Long:

Safety Meeting Topic:

31° 1' 30.33092 N

101° 9' 22.17900 W Manhours: 312.00

API #: 4210542309

Current Activity: WOOWO

24 Hr Summary: 1 FRAC, 1 WIRELINE

START FRAC OPERATIONS24 Hr Forecast:

OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY

06:00 06:30 0.50 P STG01 28 SFTYMTG HSM - GO OVER ALL JSA'S, HELP KEYS, STOP WORK RESPONSIBILTY, HEAT AND HYDRATION,

AND FALL PROTECTION

06:30 11:00 4.50 P STG01 35 STIM FRAC STAGE # 1 SLICKWATER - SICP 2,110. PUMP 60 BBLS 15% ACID. PUMP 293,000 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 6.631. ATR 72.9. MTP 8.213.

MTR 92.2. ISIP 2,635. FG 0.86 TCF 7,446 BBLS.

11:00 19:20 8.33 P STG02 73 WOOWO WOOWO

19:20 23:30 4.17 P STG02 21 PERF WL STAGE # 2. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ MAGNUM CPB & 6 - 1' x 3

1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 36 SHOTS. CORRELATE W/ MARKER JT AT

5,823'. SET PLUG @ 16,448' PU & PERF STAGE # 2 ON THE FLY AT 16,314' - 16,432' O/A. POH

TO 500' & STANDBY FOR FRAC. POH. ALL SHOTS FIRED. PUMPED 857 BBLS

23:30 06:00 6.50 P STG02 73 WOOWO STANDBY FOR ADJACENT WELL OPERATIONS

Daily Operations Comments:

NO SPILLS, INJURIES OR OFFICIAL VISITS.

CASING

Size(in) MD(ft)/TVD(ft) LOT(ppg)

/

/

/

/ 14.000 67.00 67.00

/ 9.625 1,005.00 1,005.00

FLOWBACK

Gas Rate:

Choke Size:

Avg. Tbg. Press:

Avg. Csg. Press:

Fluid Rate (Water):

Fluid Rate (Oil):

Tot. Load Recovered:

FLUIDSFluids Co:

Fluids Eng:

Brine Type:

Pit Temp:

Density:

Viscosity:

Gel Type:

Nitrogen:

NTU:

COMPLETION STRING DETAILS

Down Hole Tool Co: Tool Sup:

Qty Description ID OD Top Set

PERFORATIONS

Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments

6/10/2016 8:03:28AMPrinted: Page 1 of 1

Report Date: 06/11/2016

DOE: 23

Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00

Country: USAState: TEXASField: WOLFCAMP EAST

Supervisors: R. MULL/TERREL, L. / J. CASTILLO/ GOSS, DJ

Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY

018

Spud Date: 11/28/2015

DOL: 14 AFE Days: Last BOP T.:

Release Date:

Report Number:Daily Operations

Report Onshore

CSG Test:**Data shared on this report is CONFIDENTIAL**

Rig:

Rig Phone:KB(ft): 2,664.01

POB: 78

Event: COMPLETION LAND

Location: Lat:

Long:

Safety Meeting Topic:

31° 1' 30.33092 N

101° 9' 22.17900 W Manhours: 312.00

API #: 4210542309

Current Activity: WOOWO

24 Hr Summary: 3 FRACS, 2 WIRELINE

CONTINUE FRAC OPERATIONS24 Hr Forecast:

OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY

06:00 06:30 0.50 P STG02 28 SFTYMTG HSM - GO OVER ALL JSA'S, HELP KEYS, STOP WORK RESPONSIBILTY, HEAT AND HYDRATION,

AND FALL PROTECTION

06:30 09:30 3.00 P STG02 35 STIM FRAC STAGE # 2 SLICKWATER - SICP 1,960. PUMP 30 BBLS 15% ACID. PUMP 293,000 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 6,276. ATR 76.4. MTP 7,762.

MTR 9.1.4. ISIP 2,971. FG 0.91 TCF 7,034 BBLS.

09:30 12:30 3.00 P STG03 21 PERF WL STAGE # 3. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ MAGNUM CPB & 8 - 1' x 3

1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/ MARKER JT AT

5,823'. SET PLUG @ 16,448' PU & PERF STAGE # 3 ON THE FLY AT 16,233' - 16,282' O/A GUN 4-8

DID NOT FIRE. POH TO 500' & STANDBY FOR FRAC. POH. PUMPED 954 BBLS

NOTE: ONLY THREE GUNS FIRED.

12:30 14:00 1.50 N STG03 09 EQRP LAY DOWN LIVE GUNS, RE-HEAD WIRELINE TOOLS

14:00 17:45 3.75 N STG03 21 PERF CONTINUE WL STAGE # 3. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ DUMMY PLUG &

5 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 30 SHOTS. CORRELATE W/

MARKER JT AT 5,823'. CONT PERF STAGE # 3 ON THE FLY AT 16,114' - 16,215' (TOTAL STG 3

PERFS 16,114'-16,282') O/A. POH TO 500' & STANDBY FOR FRAC. POH. ALL SHOTS FIRED.

PUMPED 563 BBLS

17:45 22:55 5.17 P STG03 35 STIM FRAC STAGE # 3 SLICKWATER - SICP 2,218. PUMP 30 BBLS 15% ACID. PUMP 293,000 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 6,107. ATR 74.1. MTP 7,628.

MTR 91.5. ISIP 3,258. FG 0.95 TCF 6,846 BBLS.

22:55 01:00 2.08 P STG04 21 PERF WL STAGE # 4. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ MAGNUM CPB & 8 - 1' x 3

1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/ MARKER JT AT

5,823'. SET PLUG @ 16,097' PU & PERF STAGE # 4 ON THE FLY AT 15,915' - 16,081' . POH TO

500' & STANDBY FOR FRAC. POH. PUMPED 871 BBLS

01:00 02:00 1.00 P STG04 73 WOOWO STAND BY FOR ADJACENT WELL OPERATIONS

02:00 04:00 2.00 P STG04 35 STIM FRAC STAGE # 4 SLICKWATER - SICP 2,281. PUMP 60 BBLS 15% ACID.30 PUMP 293,000 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 6,048. ATR 73.8. MTP 7,717

MTR 90.6. ISIP 3,236. FG 0.95 TCF 6,353 BBLS.

04:00 06:00 2.00 P STG04 73 WOOWO WOOWO

Daily Operations Comments:

NO SPILLS, INJURIES OR OFFICIAL VISITS.

CASING

Size(in) MD(ft)/TVD(ft) LOT(ppg)

/

/

/

/ 14.000 67.00 67.00

/ 9.625 1,005.00 1,005.00

FLOWBACK

Gas Rate:

Choke Size:

Avg. Tbg. Press:

Avg. Csg. Press:

Fluid Rate (Water):

Fluid Rate (Oil):

Tot. Load Recovered:

FLUIDSFluids Co:

Fluids Eng:

Brine Type:

Pit Temp:

Density:

Viscosity:

Gel Type:

Nitrogen:

NTU:

COMPLETION STRING DETAILS

Down Hole Tool Co: Tool Sup:

Qty Description ID OD Top Set

PERFORATIONS

Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments

6/12/2016 8:07:05AMPrinted: Page 1 of 1

Report Date: 06/12/2016

DOE: 24

Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00

Country: USAState: TEXASField: WOLFCAMP EAST

Supervisors: R. MULL/ H. RAMIREZ / J. CASTILLO/ J. GARCIA

Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY

019

Spud Date: 11/28/2015

DOL: 15 AFE Days: Last BOP T.:

Release Date:

Report Number:Daily Operations

Report Onshore

CSG Test:**Data shared on this report is CONFIDENTIAL**

Rig:

Rig Phone:KB(ft): 2,664.01

POB: 78

Event: COMPLETION LAND

Location: Lat:

Long:

Safety Meeting Topic:

31° 1' 30.33092 N

101° 9' 22.17900 W Manhours: 312.00

API #: 4210542309

Current Activity: WOOWO

24 Hr Summary: FRAC STG 5

CONTINUE FRAC OPERATIONS24 Hr Forecast:

OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY

06:00 06:30 0.50 P STG05 28 SFTYMTG HSM - GO OVER ALL JSA'S, HELP KEYS, STOP WORK RESPONSIBILTY, HEAT AND HYDRATION,

AND FALL PROTECTION

06:30 09:00 2.50 P STG05 73 WOOWO WOOWO

09:00 11:00 2.00 P STG05 21 PERF WL STAGE # 5. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ MAGNUM CPB & 8 - 1' x 3

1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/ MARKER JT AT

5,823'. SET PLUG @ 15,897' PU & PERF ON THE FLY AT 15,715' - 15,881' . POH TO 500' &

STANDBY FOR FRAC. POH. PUMPED 888 BBLS

11:00 12:00 1.00 P STG05 43 WOW SHUT DOWN DUE TO LIGHTENING

12:00 18:30 6.50 P STG05 73 WOOWO WOOWO

18:30 20:30 2.00 P STG05 35 STIM FRAC STAGE # 5 SLICKWATER - SICP 2,103. PUMP 60 BBLS 15% ACID.30 PUMP 293,000 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,636. ATR 73.8. MTP 7,541

MTR 90.7. ISIP 3,336. FG 0.97 TCF 6,673 BBLS.

20:30 21:00 0.50 P STG06 73 WOOWO WOOWO

21:00 22:30 1.50 P STG06 21 PERF WL STAGE # 6. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ W/ 5.5 TC CFP & 8 - 1' x 3

1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/ MARKER JT AT

5,823'. SET PLUG @ 15,698' PU & PERF ON THE FLY AT 15,516' - 15,679' . POH TO 500' &

STANDBY FOR FRAC. POH. PUMPED 623 BBLS

22:30 06:00 7.50 P STG06 73 WOOWO WOOWO

Daily Operations Comments:

NO SPILLS, INJURIES OR OFFICIAL VISITS.

CASING

Size(in) MD(ft)/TVD(ft) LOT(ppg)

/

/

/

/ 14.000 67.00 67.00

/ 9.625 1,005.00 1,005.00

FLOWBACK

Gas Rate:

Choke Size:

Avg. Tbg. Press:

Avg. Csg. Press:

Fluid Rate (Water):

Fluid Rate (Oil):

Tot. Load Recovered:

FLUIDSFluids Co:

Fluids Eng:

Brine Type:

Pit Temp:

Density:

Viscosity:

Gel Type:

Nitrogen:

NTU:

COMPLETION STRING DETAILS

Down Hole Tool Co: Tool Sup:

Qty Description ID OD Top Set

PERFORATIONS

Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments

6/12/2016 8:02:51AMPrinted: Page 1 of 1

Report Date: 06/13/2016

DOE: 25

Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00

Country: USAState: TEXASField: WOLFCAMP EAST

Supervisors: R. MULL/ H. RAMIREZ / J. CASTILLO/ J. GARCIA

Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY

020

Spud Date: 11/28/2015

DOL: 16 AFE Days: Last BOP T.:

Release Date:

Report Number:Daily Operations

Report Onshore

CSG Test:**Data shared on this report is CONFIDENTIAL**

Rig:

Rig Phone:KB(ft): 2,664.01

POB: 78

Event: COMPLETION LAND

Location: Lat:

Long:

Safety Meeting Topic:

31° 1' 30.33092 N

101° 9' 22.17900 W Manhours: 312.00

API #: 4210542309

Current Activity: WOOWO

24 Hr Summary: FRAC STG 6

CONTINUE FRAC OPERATIONS24 Hr Forecast:

OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY

06:00 06:30 0.50 P STG06 28 SFTYMTG HSM - GO OVER ALL JSA'S, HELP KEYS, STOP WORK RESPONSIBILTY, HEAT AND HYDRATION,

AND FALL PROTECTION

06:30 08:30 2.00 P STG06 43 WOW SHUT DOWN DUE TO LIFGTENING AND SEVERE STORM

08:30 20:00 11.50 P STG06 73 WOOWO WOOWO

20:00 22:00 2.00 P STG06 35 STIM FRAC STAGE # 6 SLICKWATER - SICP 1,928. PUMP 30 BBLS 15% ACID.30 PUMP 293,000 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,567. ATR 71.9. MTP 7,193

MTR 92. ISIP 3,371. FG 0.97 TCF 6,697 BBLS.

22:00 06:00 8.00 P STG07 73 WOOWO WOOWO

Daily Operations Comments:

NO SPILLS, INJURIES OR OFFICIAL VISITS.

CASING

Size(in) MD(ft)/TVD(ft) LOT(ppg)

/

/

/

/ 14.000 67.00 67.00

/ 9.625 1,005.00 1,005.00

FLOWBACK

Gas Rate:

Choke Size:

Avg. Tbg. Press:

Avg. Csg. Press:

Fluid Rate (Water):

Fluid Rate (Oil):

Tot. Load Recovered:

FLUIDSFluids Co:

Fluids Eng:

Brine Type:

Pit Temp:

Density:

Viscosity:

Gel Type:

Nitrogen:

NTU:

COMPLETION STRING DETAILS

Down Hole Tool Co: Tool Sup:

Qty Description ID OD Top Set

PERFORATIONS

Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments

6/13/2016 8:01:31AMPrinted: Page 1 of 1

Report Date: 06/14/2016

DOE: 26

Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00

Country: USAState: TEXASField: WOLFCAMP EAST

Supervisors: R. MULL/ H. RAMIREZ / J. CASTILLO/ J. GARCIA

Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY

021

Spud Date: 11/28/2015

DOL: 17 AFE Days: Last BOP T.:

Release Date:

Report Number:Daily Operations

Report Onshore

CSG Test:**Data shared on this report is CONFIDENTIAL**

Rig:

Rig Phone:KB(ft): 2,664.01

POB: 78

Event: COMPLETION LAND

Location: Lat:

Long:

Safety Meeting Topic:

31° 1' 30.33092 N

101° 9' 22.17900 W Manhours: 312.00

API #: 4210542309

Current Activity: WOOWO

24 Hr Summary: WOOWO

CONTINUE FRAC OPERATIONS24 Hr Forecast:

OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY

06:00 06:30 0.50 P STG06 28 SFTYMTG HSM - GO OVER ALL JSA'S, HELP KEYS, STOP WORK RESPONSIBILTY, HEAT AND HYDRATION,

AND FALL PROTECTION

06:30 06:00 23.50 P STG07 73 WOOWO WOOWO

Daily Operations Comments:

NO SPILLS, INJURIES OR OFFICIAL VISITS.

CASING

Size(in) MD(ft)/TVD(ft) LOT(ppg)

/

/

/

/ 14.000 67.00 67.00

/ 9.625 1,005.00 1,005.00

FLOWBACK

Gas Rate:

Choke Size:

Avg. Tbg. Press:

Avg. Csg. Press:

Fluid Rate (Water):

Fluid Rate (Oil):

Tot. Load Recovered:

FLUIDSFluids Co:

Fluids Eng:

Brine Type:

Pit Temp:

Density:

Viscosity:

Gel Type:

Nitrogen:

NTU:

COMPLETION STRING DETAILS

Down Hole Tool Co: Tool Sup:

Qty Description ID OD Top Set

PERFORATIONS

Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments

6/14/2016 8:02:07AMPrinted: Page 1 of 1

Report Date: 06/15/2016

DOE: 27

Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00

Country: USAState: TEXASField: WOLFCAMP EAST

Supervisors: R. MULL/ H. RAMIREZ / J. CASTILLO/ J. GARCIA

Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY

022

Spud Date: 11/28/2015

DOL: 18 AFE Days: Last BOP T.:

Release Date:

Report Number:Daily Operations

Report Onshore

CSG Test:**Data shared on this report is CONFIDENTIAL**

Rig:

Rig Phone:KB(ft): 2,664.01

POB: 78

Event: COMPLETION LAND

Location: Lat:

Long:

Safety Meeting Topic:

31° 1' 30.33092 N

101° 9' 22.17900 W Manhours: 312.00

API #: 4210542309

Current Activity: WOOWO

24 Hr Summary: 1 FRAC, 1 WIRELINE

STANDBY FOR CT OPERATIONS ON 4110 OH24 Hr Forecast:

OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY

06:00 06:30 0.50 P STG07 28 SFTYMTG HSM - GO OVER ALL JSA'S, HELP KEYS, STOP WORK RESPONSIBILTY, HEAT AND HYDRATION,

AND FALL PROTECTION

06:30 20:30 14.00 P STG07 73 WOOWO WOOWO

20:30 23:30 3.00 P STG07 21 PERF WL STAGE # 7. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ ECO BOSSHOG CPB & 8 - 1'

x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/ MARKER JT

AT 5,823'. SET PLUG @ 15,498' PU & PERF STAGE # 4 ON THE FLY AT 15,314' - 15,478' . POOH

TO 500' & STANDBY FOR FRAC. POH. PUMPED 765 BBLS

23:30 02:00 2.50 P STG07 35 STIM FRAC STAGE # 7 SLICKWATER - SICP 1,879. PUMP 30 BBLS 15% ACID. PUMP 293,000 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,957. ATR 69.3. MTP 8,046.

MTR 89.2. ISIP 3,548 FG 1 TCF 6,681 BBLS.

02:00 06:00 4.00 P STG08 73 WOOWO WOOWO-STANDBY FOR CT OPERATIONS ON 4110 OH

Daily Operations Comments:

NO SPILLS, INJURIES OR OFFICIAL VISITS.

CASING

Size(in) MD(ft)/TVD(ft) LOT(ppg)

/

/

/

/ 14.000 67.00 67.00

/ 9.625 1,005.00 1,005.00

FLOWBACK

Gas Rate:

Choke Size:

Avg. Tbg. Press:

Avg. Csg. Press:

Fluid Rate (Water):

Fluid Rate (Oil):

Tot. Load Recovered:

FLUIDSFluids Co:

Fluids Eng:

Brine Type:

Pit Temp:

Density:

Viscosity:

Gel Type:

Nitrogen:

NTU:

COMPLETION STRING DETAILS

Down Hole Tool Co: Tool Sup:

Qty Description ID OD Top Set

PERFORATIONS

Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments

6/15/2016 8:01:04AMPrinted: Page 1 of 1

Report Date: 06/16/2016

DOE: 28

Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00

Country: USAState: TEXASField: WOLFCAMP EAST

Supervisors: R. MULL/ H. RAMIREZ / J. CASTILLO/ J. GARCIA

Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY

023

Spud Date: 11/28/2015

DOL: 19 AFE Days: Last BOP T.:

Release Date:

Report Number:Daily Operations

Report Onshore

CSG Test:**Data shared on this report is CONFIDENTIAL**

Rig:

Rig Phone:KB(ft): 2,664.01

POB: 78

Event: COMPLETION LAND

Location: Lat:

Long:

Safety Meeting Topic:

31° 1' 30.33092 N

101° 9' 22.17900 W Manhours: 312.00

API #: 4210542309

Current Activity: WOOWO

24 Hr Summary: WOOWO

STANDBY FOR CT OPERATIONS ON 4110 OH24 Hr Forecast:

OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY

06:00 06:30 0.50 P STG07 28 SFTYMTG HSM - GO OVER ALL JSA'S, HELP KEYS, STOP WORK RESPONSIBILTY, HEAT AND HYDRATION,

AND FALL PROTECTION

06:30 06:00 23.50 P STG07 73 WOOWO WOOWO

Daily Operations Comments:

NO SPILLS, INJURIES OR OFFICIAL VISITS.

CASING

Size(in) MD(ft)/TVD(ft) LOT(ppg)

/

/

/

/ 14.000 67.00 67.00

/ 9.625 1,005.00 1,005.00

FLOWBACK

Gas Rate:

Choke Size:

Avg. Tbg. Press:

Avg. Csg. Press:

Fluid Rate (Water):

Fluid Rate (Oil):

Tot. Load Recovered:

FLUIDSFluids Co:

Fluids Eng:

Brine Type:

Pit Temp:

Density:

Viscosity:

Gel Type:

Nitrogen:

NTU:

COMPLETION STRING DETAILS

Down Hole Tool Co: Tool Sup:

Qty Description ID OD Top Set

PERFORATIONS

Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments

6/16/2016 8:01:59AMPrinted: Page 1 of 1

Report Date: 06/17/2016

DOE: 29

Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00

Country: USAState: TEXASField: WOLFCAMP EAST

Supervisors: R. MULL/ H. RAMIREZ / J. CASTILLO/ J. GARCIA

Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY

024

Spud Date: 11/28/2015

DOL: 20 AFE Days: Last BOP T.:

Release Date:

Report Number:Daily Operations

Report Onshore

CSG Test:**Data shared on this report is CONFIDENTIAL**

Rig:

Rig Phone:KB(ft): 2,664.01

POB: 78

Event: COMPLETION LAND

Location: Lat:

Long:

Safety Meeting Topic:

31° 1' 30.33092 N

101° 9' 22.17900 W Manhours: 312.00

API #: 4210542309

Current Activity: FRAC IN PROGRESS

24 Hr Summary: 2- FRAC 3- WIRELINE

STANDBY FOR CT OPERATIONS ON 4110 OH24 Hr Forecast:

OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY

06:00 06:30 0.50 P STG08 28 SFTYMTG HSM - GO OVER ALL JSA'S, HELP KEYS, STOP WORK RESPONSIBILTY, HEAT AND HYDRATION,

AND FALL PROTECTION

06:30 10:30 4.00 P STG08 73 WOOWO WOOWO

10:30 12:30 2.00 P MIRU 01 MIRU MIRU WLU AND ASSOCIATED EQUIP TO RESUME SIM-OPS

12:30 15:45 3.25 P STG08 21 PERF WL STAGE # 8. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB & 7 -

1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 42 SHOTS. CORRELATE W/ MARKER

JT AT 5,823'. SET PLUG @ 15,299' PU & PERF ON THE FLY AT 15,118' - 15,253' . POOH TO 500' &

STANDBY FOR FRAC. POH. PUMPED 540 BBLS

15:45 18:00 2.25 P STG08 35 STIM FRAC STAGE # 8 SLICKWATER - SICP 1,866. PUMP 30 BBLS 15% ACID. PUMP 293,000 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,550. ATR 71.2. MTP 7,785.

MTR 95.5. ISIP 3,179 FG .94 TCF 7,299 BBLS.

18:00 19:00 1.00 P STG09 73 WOOWO WOOWO

19:00 19:30 0.50 P STG09 18 OTHR WATER TRANSFER PROBLEM

19:30 21:30 2.00 P STG09 21 PERF WL STAGE # 9. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB & 7 -

1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 42 SHOTS. CORRELATE W/ MARKER

JT AT 5,823'. SET PLUG @ 15,099' PU & PERF ON THE FLY AT 14,917' - 15,084' . POOH TO 500' &

STANDBY FOR FRAC. POH. PUMPED 520 BBLS

21:30 22:45 1.25 P STG09 73 WOOWO WOOWO

22:45 00:45 2.00 P STG09 35 STIM FRAC STAGE # 9 SLICKWATER - SICP 2,296. PUMP 30 BBLS 15% ACID. PUMP 293,000 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,988. ATR 62.5. MTP 8,037.

MTR 89.4. ISIP 3,512 FG 1.0 TCF 6,776 BBLS.

00:45 03:00 2.25 P STG10 21 PERF WL STAGE # 10. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB & 7

- 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 42 SHOTS. CORRELATE W/ MARKER

JT AT 5,823'. SET PLUG @ 14,900' PU & PERF ON THE FLY AT 14,741' - 14,860' . POOH TO 500' &

STANDBY FOR FRAC. POH. PUMPED 640 BBLS

03:00 04:00 1.00 P STG10 73 WOOWO WOOWO

04:00 06:00 2.00 P STG10 35 STIM FRAC IN PROGRESS

Daily Operations Comments:

NO SPILLS, INJURIES OR OFFICIAL VISITS.

CASING

Size(in) MD(ft)/TVD(ft) LOT(ppg)

/

/

/

/ 14.000 67.00 67.00

/ 9.625 1,005.00 1,005.00

FLOWBACK

Gas Rate:

Choke Size:

Avg. Tbg. Press:

Avg. Csg. Press:

Fluid Rate (Water):

Fluid Rate (Oil):

Tot. Load Recovered:

FLUIDSFluids Co:

Fluids Eng:

Brine Type:

Pit Temp:

Density:

Viscosity:

Gel Type:

Nitrogen:

NTU:

COMPLETION STRING DETAILS

Down Hole Tool Co: Tool Sup:

Qty Description ID OD Top Set

PERFORATIONS

Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments

6/17/2016 8:02:06AMPrinted: Page 1 of 1

Report Date: 06/18/2016

DOE: 30

Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00

Country: USAState: TEXASField: WOLFCAMP EAST

Supervisors: R. MULL/ H. RAMIREZ / J. CASTILLO/ J. GARCIA

Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY

025

Spud Date: 11/28/2015

DOL: 21 AFE Days: Last BOP T.:

Release Date:

Report Number:Daily Operations

Report Onshore

CSG Test:**Data shared on this report is CONFIDENTIAL**

Rig:

Rig Phone:KB(ft): 2,664.01

POB: 78

Event: COMPLETION LAND

Location: Lat:

Long:

Safety Meeting Topic:

31° 1' 30.33092 N

101° 9' 22.17900 W Manhours: 312.00

API #: 4210542309

Current Activity: WOOWO

24 Hr Summary: 1 WL

STANDBY FOR CT OPERATIONS ON 4110 OH24 Hr Forecast:

OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY

06:00 06:30 0.50 P STG11 28 SFTYMTG HSM - GO OVER ALL JSA'S, HELP KEYS, STOP WORK RESPONSIBILTY, HEAT AND HYDRATION,

AND FALL PROTECTION

06:30 09:30 3.00 P STG11 21 PERF WL STAGE # 11. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB & 8

- 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/ MARKER

JT AT 5,823'. SET PLUG @ 14,700' PU & PERF ON THE FLY AT 14,518' - 14,686' . POOH TO 500' &

STANDBY FOR FRAC. POH. PUMPED 533 BBLS

09:30 06:00 P STG11 73 WOOWO WOOWO

Daily Operations Comments:

NO SPILLS, INJURIES OR OFFICIAL VISITS.

CASING

Size(in) MD(ft)/TVD(ft) LOT(ppg)

/

/

/

/ 14.000 67.00 67.00

/ 9.625 1,005.00 1,005.00

FLOWBACK

Gas Rate:

Choke Size:

Avg. Tbg. Press:

Avg. Csg. Press:

Fluid Rate (Water):

Fluid Rate (Oil):

Tot. Load Recovered:

FLUIDSFluids Co:

Fluids Eng:

Brine Type:

Pit Temp:

Density:

Viscosity:

Gel Type:

Nitrogen:

NTU:

COMPLETION STRING DETAILS

Down Hole Tool Co: Tool Sup:

Qty Description ID OD Top Set

PERFORATIONS

Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments

6/19/2016 8:03:49AMPrinted: Page 1 of 1

Report Date: 06/19/2016

DOE: 31

Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00

Country: USAState: TEXASField: WOLFCAMP EAST

Supervisors: H. RAMIREZ / M. SHIELD / G. ALLGOOD / J. GARCIA / L. TERRELL

Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY

026

Spud Date: 11/28/2015

DOL: 22 AFE Days: Last BOP T.:

Release Date:

Report Number:Daily Operations

Report Onshore

CSG Test:**Data shared on this report is CONFIDENTIAL**

Rig:

Rig Phone:KB(ft): 2,664.01

POB: 78

Event: COMPLETION LAND

Location: Lat:

Long:

Safety Meeting Topic:

31° 1' 30.33092 N

101° 9' 22.17900 W Manhours: 312.00

API #: 4210542309

Current Activity: FRAC OPS- WAITING ON COMPLETION OF ADJACENT WELL OPERATIONS

24 Hr Summary: WAITING ON COMPLETION OF ADJACENT WELL OPERATIONS, FRAC STAGE 11

CONTINUE FRAC OPERATIONS24 Hr Forecast:

OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY

06:00 17:30 11.50 P STG11 73 WOOWO STAND BY FOR CT OPERATIONS ON THE "OH" WELL.

17:30 18:00 0.50 P STG11 28 SFTYMTG HELD SAFETY MEETING WITH NIGHT SHIFT PERSONNEL.

18:00 03:00 9.00 P STG11 73 WOOWO STAND BY FOR OPERATIONS ON THE "OH" WELL.

03:00 06:00 3.00 P STG11 35 STIM FRAC STAGE # 11 SLICKWATER - SICP 1,329. PUMP 30 BBLS 15% ACID. PUMP 293,000 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,883. ATR 68.3. MTP 7,810.

MTR 94.1. ISIP 3,041 FG .92 TCF 6,855 BBLS.

Daily Operations Comments:

NO SPILLS, INJURIES OR OFFICIAL VISITS.

CASING

Size(in) MD(ft)/TVD(ft) LOT(ppg)

/

/

/

/ 14.000 67.00 67.00

/ 9.625 1,005.00 1,005.00

FLOWBACK

Gas Rate:

Choke Size:

Avg. Tbg. Press:

Avg. Csg. Press:

Fluid Rate (Water):

Fluid Rate (Oil):

Tot. Load Recovered:

FLUIDSFluids Co:

Fluids Eng:

Brine Type:

Pit Temp:

Density:

Viscosity:

Gel Type:

Nitrogen:

NTU:

COMPLETION STRING DETAILS

Down Hole Tool Co: Tool Sup:

Qty Description ID OD Top Set

PERFORATIONS

Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments

6/20/2016 8:06:25AMPrinted: Page 1 of 1

Report Date: 06/20/2016

DOE: 32

Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00

Country: USAState: TEXASField: WOLFCAMP EAST

Supervisors: H. RAMIREZ / G. ALLGOOD / J. GARCIA / L. TERRELL

Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY

027

Spud Date: 11/28/2015

DOL: 23 AFE Days: Last BOP T.:

Release Date:

Report Number:Daily Operations

Report Onshore

CSG Test:**Data shared on this report is CONFIDENTIAL**

Rig:

Rig Phone:KB(ft): 2,664.01

POB: 78

Event: COMPLETION LAND

Location: Lat:

Long:

Safety Meeting Topic:

31° 1' 30.33092 N

101° 9' 22.17900 W Manhours: 312.00

API #: 4210542309

Current Activity: FRAC OPS- WL STAGE 13

24 Hr Summary: WL STAGES 12-13, FRAC STAGE 12

CONTINUE FRAC OPERATIONS24 Hr Forecast:

OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY

06:00 15:15 9.25 P STG12 73 WOOWO STANDBY FOR ADJACENT WELL OPERATIONS.

15:15 17:15 2.00 P STG12 21 PERF WL STAGE # 12. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &

5 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 30 SHOTS. CORRELATE W/

MARKER JT AT 5,970'. SET PLUG @ 14,501' PU & PERF ON THE FLY AT 14,342' - 14,438'. POOH

TO 500' & STANDBY FOR FRAC. POH. ALL SHOTS FIRED. PUMPED 518 BBLS.

17:15 18:30 1.25 P WHDTRE 09 EQRP SCHEUDLED MAIINTENANCE - GREASE ZIPPER VALVES AND HYDRAULIC MASTER VALVE.

18:30 20:30 2.00 P STG12 35 STIM FRAC STAGE # 12 SLICKWATER - SICP 1,644. PUMP 30 BBLS 15% ACID.30 PUMP 293,000 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,567. ATR 71.9. MTP 7,193

MTR 92. ISIP 3,371. FG 0.97 TCF 6,775 BBLS.

20:30 03:30 7.00 P STG13 73 WOOWO STANDBY FOR "OH" AND "NH" OPERATIONS.

03:30 05:30 2.00 P STG13 21 PERF WL STAGE # 13. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &

6 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 30 SHOTS. CORRELATE W/

MARKER JT AT 5,970'. SET PLUG @ 14,325' PU & PERF ON THE FLY AT 14,143' - 14,287'. POOH

TO 500' & STANDBY FOR FRAC. POH. ALL SHOTS FIRED. PUMPED 581 BBLS.

05:30 06:00 0.50 P STG13 28 SFTYMTG HELD SAFETY MEETING AND REVIEWED JSA'S ON OPERATIONS WITH THE DAY CREW

Daily Operations Comments:

NO SPILLS, INJURIES OR OFFICIAL VISITS.

CASING

Size(in) MD(ft)/TVD(ft) LOT(ppg)

/

/

/

/ 14.000 67.00 67.00

/ 9.625 1,005.00 1,005.00

FLOWBACK

Gas Rate:

Choke Size:

Avg. Tbg. Press:

Avg. Csg. Press:

Fluid Rate (Water):

Fluid Rate (Oil):

Tot. Load Recovered:

FLUIDSFluids Co:

Fluids Eng:

Brine Type:

Pit Temp:

Density:

Viscosity:

Gel Type:

Nitrogen:

NTU:

COMPLETION STRING DETAILS

Down Hole Tool Co: Tool Sup:

Qty Description ID OD Top Set

PERFORATIONS

Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments

6/20/2016 8:01:50AMPrinted: Page 1 of 1

Report Date: 06/21/2016

DOE: 33

Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00

Country: USAState: TEXASField: WOLFCAMP EAST

Supervisors: H. RAMIREZ / G. ALLGOOD / J. GARCIA / L. TERRELL

Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY

028

Spud Date: 11/28/2015

DOL: 24 AFE Days: Last BOP T.:

Release Date:

Report Number:Daily Operations

Report Onshore

CSG Test:**Data shared on this report is CONFIDENTIAL**

Rig:

Rig Phone:KB(ft): 2,664.01

POB: 78

Event: COMPLETION LAND

Location: Lat:

Long:

Safety Meeting Topic:

31° 1' 30.33092 N

101° 9' 22.17900 W Manhours: 312.00

API #: 4210542309

Current Activity: FRAC OPS- WL STAGE 15

24 Hr Summary: WL STAGES 14-15, FRAC STAGE 13-14

CONTINUE FRAC OPERATIONS24 Hr Forecast:

OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY

06:00 07:00 1.00 P STG13 21 PERF SB FOR "OH" FRAC STG 10. FINISH POH. LD WL. ALL SHOTS FIRED.

07:00 09:00 2.00 P STG13 35 STIM FRAC STAGE # 13 SLICKWATER - SICP 1,990. PUMP 30 BBLS 15% ACID.30 PUMP 293,000 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,400. ATR 70.6. MTP 7,726

MTR 90.9. ISIP 2,864. FG 0.89 TCF 7,062 BBLS

09:00 15:00 6.00 P STG14 73 WOOWO STANDBY FOR "OH" AND "NH" FRAC AND WL OPERATIONS.

15:00 17:30 2.50 P STG14 21 PERF WL STAGE # 14. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &

6 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 36 SHOTS. CORRELATE W/

MARKER JT AT 5,970'. SET PLUG @ 14,125' PU & PERF ON THE FLY AT 13,943' - 14,063'. POOH

TO 500' & STANDBY FOR FRAC. PUMPED 516 BBLS.

17:30 19:30 2.00 P STG14 35 STIM FRAC STAGE # 14 SLICKWATER - SICP 1,646. PUMP 30 BBLS 15% ACID.30 PUMP 293,000 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,400. ATR 70.6. MTP 7,726

MTR 90.9. ISIP 2,864. FG 0.89 TCF 7,167 BBLS

19:30 01:30 6.00 P STG15 73 WOOWO STANDBY FOR "OH" AND "NH" FRAC AND WL OPERATIONS.

01:30 02:00 0.50 P STG15 18 OTHR REHEAD WIRELINE ROPE SOCKET.

02:00 05:30 3.50 P STG15 21 PERF WL STAGE # 15. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &

6 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 36 SHOTS. CORRELATE W/

MARKER JT AT 5,970'. SET PLUG @ 13,926' PU & PERF ON THE FLY AT 13,742' - 13,911'. POOH

TO 500' & STANDBY FOR FRAC. PUMPED 549 BBLS.

05:30 06:00 0.50 P STG15 28 SFTYMTG HELD SAFETY MEETING AND REVIEW JSA'S ON OPERATIONS WITH DAY CREW

Daily Operations Comments:

NO SPILLS, INJURIES OR OFFICIAL VISITS.

CASING

Size(in) MD(ft)/TVD(ft) LOT(ppg)

/

/

/

/ 14.000 67.00 67.00

/ 9.625 1,005.00 1,005.00

FLOWBACK

Gas Rate:

Choke Size:

Avg. Tbg. Press:

Avg. Csg. Press:

Fluid Rate (Water):

Fluid Rate (Oil):

Tot. Load Recovered:

FLUIDSFluids Co:

Fluids Eng:

Brine Type:

Pit Temp:

Density:

Viscosity:

Gel Type:

Nitrogen:

NTU:

COMPLETION STRING DETAILS

Down Hole Tool Co: Tool Sup:

Qty Description ID OD Top Set

PERFORATIONS

Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments

6/22/2016 8:04:20AMPrinted: Page 1 of 1

Report Date: 06/22/2016

DOE: 34

Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00

Country: USAState: TEXASField: WOLFCAMP EAST

Supervisors: H. RAMIREZ / G. ALLGOOD / J. GARCIA / R.MULL

Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY

029

Spud Date: 11/28/2015

DOL: 25 AFE Days: Last BOP T.:

Release Date:

Report Number:Daily Operations

Report Onshore

CSG Test:**Data shared on this report is CONFIDENTIAL**

Rig:

Rig Phone:KB(ft): 2,664.01

POB: 78

Event: COMPLETION LAND

Location: Lat:

Long:

Safety Meeting Topic:

31° 1' 30.33092 N

101° 9' 22.17900 W Manhours: 312.00

API #: 4210542309

Current Activity: READY TO PERF STAGE 18

24 Hr Summary: COMPLETE STAGE 15-17

CONTINUE FRAC OPERATIONS24 Hr Forecast:

OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY

06:00 08:00 2.00 P STG15 35 STIM FRAC STAGE # 15 SLICKWATER - SICP 1,790. PUMP 60 BBLS 15% ACID.30 PUMP 293,000 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,737. ATR 71.2. MTP 7,666

MTR 95.5. ISIP 3,156. FG 0.94 TCF 6,941 BBLS

08:00 14:00 6.00 P STG16 73 WOOWO STANDBY FOR "OH" AND "NH" OPERATIONS.

14:00 16:15 2.25 P STG16 21 PERF WL STAGE # 16. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &

8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 36 SHOTS. CORRELATE W/

MARKER JT AT 5,970'. SET PLUG @ 13,926' PU & PERF ON THE FLY AT 13,546' - 13,712'. POOH

TO 500' & STANDBY FOR FRAC. PUMPED 487 BBLS.

16:15 16:45 0.50 P STG16 73 WOOWO STANDBY FOR WL TO REHEAD AND START WL ON "OH".

16:45 19:00 2.25 P STG16 35 STIM FRAC STAGE # 16 SLICKWATER - SICP 2,171. PUMP 60 BBLS 15% ACID.30 PUMP 293,000 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,737. ATR 71.2. MTP 7,666

MTR 95.5. ISIP 3,156. FG 0.94 TCF 7,024 BBLS

19:00 22:00 3.00 P STG17 73 WOOWO STANDBY FOR "OH" AND "NH" OPERATIONS.

22:00 00:30 2.50 P STG17 21 PERF WL STAGE # 17. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &

8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 36 SHOTS. CORRELATE W/

MARKER JT AT 5,970'. SET PLUG @ 13,527' PU & PERF ON THE FLY AT 13,345' - 13,512'. POOH

TO 500' & STANDBY FOR FRAC. PUMPED 547 BBLS.

00:30 03:00 2.50 P STG17 35 STIM FRAC STAGE # 17 SLICKWATER - SICP 2,395 PUMP 60 BBLS 15% ACID.30 PUMP 293,000 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,737. ATR 71.2. MTP 7,666

MTR 95.5. ISIP 3,156. FG 0.94 TCF 7,214 BBLS

03:00 05:30 2.50 P STG18 73 WOOWO STANDBY FOR "OH" AND "NH" OPERATIONS.

05:30 06:00 P STG18 28 SFTYMTG HELD SAFETY MEETING AND JSA REVIEW WITH DAY SHIFT PERSONNEL. ( REHEAD WIRELINE.)

Daily Operations Comments:

NO SPILLS, INJURIES OR OFFICIAL VISITS.

CASING

Size(in) MD(ft)/TVD(ft) LOT(ppg)

/

/

/

/ 14.000 67.00 67.00

/ 9.625 1,005.00 1,005.00

FLOWBACK

Gas Rate:

Choke Size:

Avg. Tbg. Press:

Avg. Csg. Press:

Fluid Rate (Water):

Fluid Rate (Oil):

Tot. Load Recovered:

FLUIDSFluids Co:

Fluids Eng:

Brine Type:

Pit Temp:

Density:

Viscosity:

Gel Type:

Nitrogen:

NTU:

COMPLETION STRING DETAILS

Down Hole Tool Co: Tool Sup:

Qty Description ID OD Top Set

PERFORATIONS

Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments

6/23/2016 8:02:28AMPrinted: Page 1 of 1

Report Date: 06/23/2016

DOE: 35

Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00

Country: USAState: TEXASField: WOLFCAMP EAST

Supervisors: H. RAMIREZ / G. ALLGOOD / J. GARCIA / R.MULL

Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY

030

Spud Date: 11/28/2015

DOL: 26 AFE Days: Last BOP T.:

Release Date:

Report Number:Daily Operations

Report Onshore

CSG Test:**Data shared on this report is CONFIDENTIAL**

Rig:

Rig Phone:KB(ft): 2,664.01

POB: 78

Event: COMPLETION LAND

Location: Lat:

Long:

Safety Meeting Topic:

31° 1' 30.33092 N

101° 9' 22.17900 W Manhours: 312.00

API #: 4210542309

Current Activity: FRAC STG 20 IN PROGRESS

24 Hr Summary: COMPLETE STAGE 18-19, WIRELINE STAGE 20

CONTINUE FRAC OPERATIONS24 Hr Forecast:

OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY

06:00 08:30 2.50 P STG18 21 PERF WL STAGE # 18. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &

8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/

MARKER JT AT 5,970'. SET PLUG @ 13,327' PU & PERF ON THE FLY AT 13,145' - 13,312'. POOH

TO 500' & STANDBY FOR FRAC. PUMPED 498 BBLS.

08:30 09:00 0.50 P STG18 72 DRLCMT WOOWO

09:00 11:00 2.00 P STG18 35 STIM FRAC STAGE # 18 SLICKWATER - SICP 2,395 PUMP 30 BBLS 15% ACID. PUMP 293,000 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,339. ATR 73. MTP 6,617 MTR

92.8. ISIP 3,371. FG 0.97 TCF 6,965 BBLS

11:00 11:30 0.50 P STG19 18 OTHR "NH" STACK DOWN FOR LEAK REPAIR. DECIDE TO MOVE TO "MH" AND WL STAGE 19.

11:30 13:45 2.25 P STG19 21 PERF WL STAGE # 19. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &

7 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 42 SHOTS. CORRELATE W/

MARKER JT AT 5,970'. SET PLUG @ 13,128' PU & PERF ON THE FLY AT 12,946' - 13,111'. POOH

TO 500' & STANDBY FOR FRAC. PUMPED 465 BBLS.

13:45 18:30 4.75 P STG19 72 DRLCMT WOOWO

18:30 19:30 1.00 P WHDTRE 09 EQRP SCHEDULED MAINTENANCE - TORQUE AND GREASE FRAC STACK AND ZIPPER

19:30 22:00 2.50 P STG19 35 STIM FRAC STAGE # 19 SLICKWATER - SICP 2,243 PUMP 30 BBLS 15% ACID. PUMP 293,000 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,339. ATR 73. MTP 6,617 MTR

92.8. ISIP 3,371. FG 0.97 TCF 6,825 BBLS

22:00 23:00 1.00 P STG20 72 DRLCMT WOOWO

23:00 02:00 3.00 P STG20 21 PERF WL STAGE # 20. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &

8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/

MARKER JT AT 5,970'. SET PLUG @ 12,926' PU & PERF ON THE FLY AT 12,746' - 12,913'. POOH

TO 500' & STANDBY FOR FRAC. PUMPED 496 BBLS.

02:00 05:00 3.00 P STG20 72 DRLCMT WOOWO

05:00 06:00 1.00 P STG20 35 STIM FRAC STG 20 IN PROGRESS

Daily Operations Comments:

NO SPILLS, INJURIES OR OFFICIAL VISITS.

CASING

Size(in) MD(ft)/TVD(ft) LOT(ppg)

/

/

/

/ 14.000 67.00 67.00

/ 9.625 1,005.00 1,005.00

FLOWBACK

Gas Rate:

Choke Size:

Avg. Tbg. Press:

Avg. Csg. Press:

Fluid Rate (Water):

Fluid Rate (Oil):

Tot. Load Recovered:

FLUIDSFluids Co:

Fluids Eng:

Brine Type:

Pit Temp:

Density:

Viscosity:

Gel Type:

Nitrogen:

NTU:

COMPLETION STRING DETAILS

Down Hole Tool Co: Tool Sup:

Qty Description ID OD Top Set

PERFORATIONS

Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments

6/23/2016 8:07:33AMPrinted: Page 1 of 1

Report Date: 06/24/2016

DOE: 36

Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00

Country: USAState: TEXASField: WOLFCAMP EAST

Supervisors: H. RAMIREZ / G. ALLGOOD / J. GARCIA / R.MULL

Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY

031

Spud Date: 11/28/2015

DOL: 27 AFE Days: Last BOP T.:

Release Date:

Report Number:Daily Operations

Report Onshore

CSG Test:**Data shared on this report is CONFIDENTIAL**

Rig:

Rig Phone:KB(ft): 2,664.01

POB: 78

Event: COMPLETION LAND

Location: Lat:

Long:

Safety Meeting Topic:

31° 1' 30.33092 N

101° 9' 22.17900 W Manhours: 312.00

API #: 4210542309

Current Activity: WOOWO

24 Hr Summary: COMPLETE STAGE 20-22, WIRELINE STAGE 23

CONTINUE FRAC OPERATIONS24 Hr Forecast:

OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY

06:00 08:45 2.75 P STG20 35 STIM FRAC STAGE # 20 SLICKWATER - SICP 2,193 PUMP 30 BBLS 15% ACID. PUMP 293,000 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,202. ATR 74. MTP 6,824 MTR

90. ISIP 3,398. FG 0.98 TCF 7,010 BBLS

08:45 11:45 3.00 P STG21 21 PERF WL STAGE # 21. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &

6 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 36 SHOTS. CORRELATE W/

MARKER JT AT 5,970'. SET PLUG @ 12,727'. PU & PERF ON THE FLY AT 12,547' - 12,667'. PUH

TO 500' & STANDBY FOR FRAC. POH. LD WL. ALL SHOT. PUMPED 434 BBLS.

11:45 14:30 2.75 P STG21 73 WOOWO STAND BY FOR "NH" FRAC AND "OH" WL.

14:30 17:00 2.50 P STG21 35 STIM FRAC STAGE # 21 SLICKWATER - SICP 2,333 PUMP 30 BBLS 15% ACID. PUMP 293,000 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,418. ATR 72.6. MTP 6,646

MTR 90.9. ISIP 3,146. FG 0.94 TCF 6,897 BBLS

17:00 19:30 2.50 P STG22 21 PERF WL STAGE # 22. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &

8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/

MARKER JT AT 5,970'. SET PLUG @ 12,527'. PU & PERF ON THE FLY AT 12,347' - 12,516'. PUH

TO 500' & STANDBY FOR FRAC. POH. LD WL. ALL SHOT. PUMPED 410 BBLS.

19:30 21:30 2.00 P STG22 73 WOOWO STAND BY FOR "NH" FRAC AND "OH" WL.

21:30 00:00 2.50 P STG22 35 STIM FRAC STAGE # 22 SLICKWATER - SICP 1,915 PUMP 30 BBLS 15% ACID. PUMP 293,000 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,438. ATR 75.9. MTP 7,158

MTR 91.0. ISIP 3,364. FG 0.97 TCF 6,501 BBLS

00:00 03:00 3.00 P STG23 21 PERF WL STAGE # 23. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &

8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/

MARKER JT AT 5,970'. SET PLUG @ 12,327'. PU & PERF ON THE FLY AT 12,148' - 12,315'. PUH

TO 500' & STANDBY FOR FRAC. POH. LD WL. ALL SHOT. PUMPED 434 BBLS.

03:00 06:00 3.00 P STG22 73 WOOWO STAND BY FOR "NH" FRAC AND "OH" WL.

Daily Operations Comments:

NO SPILLS, INJURIES OR OFFICIAL VISITS.

CASING

Size(in) MD(ft)/TVD(ft) LOT(ppg)

/

/

/

/ 14.000 67.00 67.00

/ 9.625 1,005.00 1,005.00

FLOWBACK

Gas Rate:

Choke Size:

Avg. Tbg. Press:

Avg. Csg. Press:

Fluid Rate (Water):

Fluid Rate (Oil):

Tot. Load Recovered:

FLUIDSFluids Co:

Fluids Eng:

Brine Type:

Pit Temp:

Density:

Viscosity:

Gel Type:

Nitrogen:

NTU:

COMPLETION STRING DETAILS

Down Hole Tool Co: Tool Sup:

Qty Description ID OD Top Set

PERFORATIONS

Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments

6/25/2016 8:01:43AMPrinted: Page 1 of 1

Report Date: 06/25/2016

DOE: 37

Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00

Country: USAState: TEXASField: WOLFCAMP EAST

Supervisors: H. RAMIREZ / G. ALLGOOD / J. GARCIA / R.MULL

Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY

032

Spud Date: 11/28/2015

DOL: 28 AFE Days: Last BOP T.:

Release Date:

Report Number:Daily Operations

Report Onshore

CSG Test:**Data shared on this report is CONFIDENTIAL**

Rig:

Rig Phone:KB(ft): 2,664.01

POB: 78

Event: COMPLETION LAND

Location: Lat:

Long:

Safety Meeting Topic:

31° 1' 30.33092 N

101° 9' 22.17900 W Manhours: 312.00

API #: 4210542309

Current Activity: WAITING @ 500' & STANDBY FOR "OH" FRAC

24 Hr Summary: COMPLETE STAGE 23-25, WIRELINE STAGE 26

CONTINUE FRAC OPERATIONS24 Hr Forecast:

OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY

06:00 08:30 2.50 P STG23 35 STIM FRAC STAGE # 23 SLICKWATER - SICP 2,051 PUMP 30 BBLS 15% ACID. PUMP 293,000 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,274. ATR 72.3. MTP 7,543

MTR .97. ISIP 3,380. FG 0.97 TCF 6,882 BBLS

08:30 11:45 3.25 P STG24 21 PERF WL STAGE # 24. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &

8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/

MARKER JT AT 5,970'. SET PLUG @ 12,133'. PU & PERF ON THE FLY AT 11,948' - 12,116'. PUH

TO 500' & STANDBY FOR "OH" FRAC. POH. LD WL. ALL SHOT. PUMPED 378 BBLS.

11:45 15:00 3.25 P STG24 73 WOOWO STANDBY FOR ADJACENT WELL FRAC AND WL OPERATIONS.

15:00 17:30 2.50 P STG24 35 STIM FRAC STAGE # 24 SLICKWATER - SICP 2,051 PUMP 30 BBLS 15% ACID. PUMP 293,000 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,476. ATR 73.1. MTP 7,319

MTR .91.1. ISIP 3,137. FG 0.94 TCF 6,902 BBLS

17:30 18:00 0.50 P STG25 28 SFTYMTG HELD SAFETY MEETING AND JSA REVIEW WITH NIGHT SHIFT PERSONNEL.

18:00 19:00 1.00 P STG25 18 OTHR GREASE WELLHEAD & ZIPPER VALVES

19:00 22:30 3.50 P STG25 21 PERF WL STAGE # 25. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &

8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/

MARKER JT AT 5,970'. SET PLUG @ 11,931'. PU & PERF ON THE FLY AT 11,749' - 11,916'. PUH TO

500' & STANDBY FOR "OH" FRAC. POH. LD WL. ALL SHOT. PUMPED 416 BBLS.

22:30 01:30 3.00 P STG25 73 WOOWO STANDBY FOR ADJACENT WELL FRAC AND WL OPERATIONS.

01:30 04:30 3.00 P STG25 35 STIM FRAC STAGE # 25 SLICKWATER - SICP 2,102 PUMP 30 BBLS 15% ACID. PUMP 293,000 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,720. ATR 69.3. MTP 8,037

MTR .91.6. ISIP 3,215. FG 0.94 TCF 7,153 BBLS

04:30 06:00 1.50 P STG26 21 PERF WL STAGE # 26. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &

8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/

MARKER JT AT 5,970'. SET PLUG @ 11,731'. PU & PERF ON THE FLY AT 11,549' - 11,717'. PUH TO

500' & STANDBY FOR "OH" FRAC.

Daily Operations Comments:

NO SPILLS, INJURIES OR OFFICIAL VISITS.

CASING

Size(in) MD(ft)/TVD(ft) LOT(ppg)

/

/

/

/ 14.000 67.00 67.00

/ 9.625 1,005.00 1,005.00

FLOWBACK

Gas Rate:

Choke Size:

Avg. Tbg. Press:

Avg. Csg. Press:

Fluid Rate (Water):

Fluid Rate (Oil):

Tot. Load Recovered:

FLUIDSFluids Co:

Fluids Eng:

Brine Type:

Pit Temp:

Density:

Viscosity:

Gel Type:

Nitrogen:

NTU:

COMPLETION STRING DETAILS

Down Hole Tool Co: Tool Sup:

Qty Description ID OD Top Set

PERFORATIONS

Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments

6/26/2016 8:03:00AMPrinted: Page 1 of 1

Report Date: 06/26/2016

DOE: 38

Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00

Country: USAState: TEXASField: WOLFCAMP EAST

Supervisors: J. CASTILLO / G. ALLGOOD / J. GARCIA / R.MULL

Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY

033

Spud Date: 11/28/2015

DOL: 29 AFE Days: Last BOP T.:

Release Date:

Report Number:Daily Operations

Report Onshore

CSG Test:**Data shared on this report is CONFIDENTIAL**

Rig:

Rig Phone:KB(ft): 2,664.01

POB: 78

Event: COMPLETION LAND

Location: Lat:

Long:

Safety Meeting Topic:

31° 1' 30.33092 N

101° 9' 22.17900 W Manhours: 312.00

API #: 4210542309

Current Activity: READY TO FRAC STAGE 28

24 Hr Summary: COMPLETE STAGE 26-27, WIRELINE STAGE 28

CONTINUE FRAC OPERATIONS24 Hr Forecast:

OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY

06:00 10:00 4.00 P STG26 21 PERF STANDING BY AT 500' FOR "OH" FRAC. POH. LD WL. ALL SHOT. PUMPED 418 BBLS.

10:00 12:00 2.00 P STG26 35 STIM FRAC STAGE # 26 SLICKWATER - SICP 2,218 PUMP 60 BBLS 15% ACID. PUMP 293,000 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,113. ATR 71.7. MTP 7,050

MTR 91.1. ISIP 3,328. FG 0.96 TCF 6,391 BBLS.

12:00 12:30 0.50 P WLWORK 09 EQRP SCHEDULED MAINTENANCE - REHEAD WL.

12:30 15:00 2.50 P STG27 21 PERF WL STAGE # 27. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &

8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/

MARKER JT AT 5,970'. SET PLUG @ 11,532'. PU & PERF ON THE FLY AT 11,350' - 11,517'. PUH TO

500' & STANDBY FOR "OH" FRAC. FINISH POH. LD WL. ALL SHOTS FIRED. PUMPED 349 BBLS.

15:00 17:30 2.50 P STG27 73 WOOWO STAND BY FOR ADJACENT WELL FRAC AND WIRELINE OPERATIONS.

17:30 18:00 0.50 P STG27 28 SFTYMTG HELD SAFETY MEETING AND JSA REVIEW WITH NIGHT SHIFT PERSONNEL.

18:00 19:00 1.00 P STG27 18 OTHR RE-TORQ WELLHEAD & ZIPPER VALVES

19:00 22:00 3.00 P STG27 35 STIM FRAC STAGE # 27 SLICKWATER - SICP 2,277 PUMP 60 BBLS 15% ACID. PUMP 293,000 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,250. ATR 73.7. MTP 7,263

MTR 93.1. ISIP 3,460. FG 0.93.2 TCF 6,713 BBLS.

22:00 23:30 1.50 N STG28 43 WOW SHUT DOWN FOR LIGHTENING & HIGH WIND

23:30 00:30 1.00 P STG28 73 WOOWO STAND BY FOR ADJACENT WELL OPERATIONS.

00:30 02:30 2.00 P STG28 21 PERF WL STAGE # 28. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &

8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/

MARKER JT AT 5,970'. SET PLUG @ 11,332'. PU & PERF ON THE FLY AT 11,174' - 11,318'. PUH TO

500' & STANDBY FOR "OH" FRAC. FINISH POH. LD WL. ALL SHOTS FIRED. PUMPED 394 BBLS.

02:30 05:30 3.00 P STG28 73 WOOWO STAND BY FOR ADJACENT WELL OPERATIONS.

05:30 06:00 P STG28 28 SFTYMTG HELD SAFETY MEETING AND JSA REVIEW WITH DAY SHIFT PERSONNEL.

Daily Operations Comments:

NO SPILLS, INJURIES OR OFFICIAL VISITS.

CASING

Size(in) MD(ft)/TVD(ft) LOT(ppg)

/

/

/

/ 14.000 67.00 67.00

/ 9.625 1,005.00 1,005.00

FLOWBACK

Gas Rate:

Choke Size:

Avg. Tbg. Press:

Avg. Csg. Press:

Fluid Rate (Water):

Fluid Rate (Oil):

Tot. Load Recovered:

FLUIDSFluids Co:

Fluids Eng:

Brine Type:

Pit Temp:

Density:

Viscosity:

Gel Type:

Nitrogen:

NTU:

COMPLETION STRING DETAILS

Down Hole Tool Co: Tool Sup:

Qty Description ID OD Top Set

PERFORATIONS

Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments

6/27/2016 8:02:29AMPrinted: Page 1 of 1

Report Date: 06/27/2016

DOE: 39

Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00

Country: USAState: TEXASField: WOLFCAMP EAST

Supervisors: J. CASTILLO / G. ALLGOOD / J. GARCIA / R.MULL

Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY

034

Spud Date: 11/28/2015

DOL: 30 AFE Days: Last BOP T.:

Release Date:

Report Number:Daily Operations

Report Onshore

CSG Test:**Data shared on this report is CONFIDENTIAL**

Rig:

Rig Phone:KB(ft): 2,664.01

POB: 78

Event: COMPLETION LAND

Location: Lat:

Long:

Safety Meeting Topic:

31° 1' 30.33092 N

101° 9' 22.17900 W Manhours: 312.00

API #: 4210542309

Current Activity: WOWOW

24 Hr Summary: FRAC STAGE 28, PERF STAGE 29

CONTINUE FRAC OPERATIONS24 Hr Forecast:

OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY

06:00 14:30 8.50 P STG28 73 WOOWO STAND BY FOR ADJACENT WELL OPERATIONS.

14:30 16:30 2.00 P STG28 35 STIM FRAC STAGE # 28 SLICKWATER - SICP 2,053 PUMP 30 BBLS 15% ACID. PUMP 293,000 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,432. ATR 69.7. MTP 7,179

MTR 91.4. ISIP 3,283. FG 0.96 TCF 6,569 BBLS.

16:30 17:30 1.00 N STG29 43 WOW LIGHTENING INDICATED NEARBY. LD WL LUBRICATOR AND BOOM DOWN CRANE. STAND BY

FOR WEATHER TO PASS.

17:30 18:00 0.50 N STG29 28 SFTYMTG HELD SAFETY MEETING AND JSA REVIEW WITH NIGHT SHIFT PERSONNEL.

18:00 02:00 8.00 N STG29 43 WOW LIGHTENING INDICATED NEARBY. LD WL LUBRICATOR AND BOOM DOWN CRANE. STAND BY

FOR WEATHER TO PASS.

02:00 04:30 2.50 P STG29 21 PERF WL STAGE # 29. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &

8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/

MARKER JT AT 5,970'. SET PLUG @ 11,150'. PU & PERF ON THE FLY AT 10,975' - 11,071'. PUH

TO 500' & STANDBY FOR "OH" FRAC. FINISH POH. LD WL. ALL SHOTS FIRED. PUMPED 378

BBLS.

04:30 05:30 1.00 P STG29 73 WOOWO WOOWO.

05:30 06:00 0.50 P STG29 28 SFTYMTG HELD SAFETY MEETING WITH DAY SHIFT PERSONNEL.

Daily Operations Comments:

NO SPILLS, INJURIES OR OFFICIAL VISITS.

CASING

Size(in) MD(ft)/TVD(ft) LOT(ppg)

/

/

/

/ 14.000 67.00 67.00

/ 9.625 1,005.00 1,005.00

FLOWBACK

Gas Rate:

Choke Size:

Avg. Tbg. Press:

Avg. Csg. Press:

Fluid Rate (Water):

Fluid Rate (Oil):

Tot. Load Recovered:

FLUIDSFluids Co:

Fluids Eng:

Brine Type:

Pit Temp:

Density:

Viscosity:

Gel Type:

Nitrogen:

NTU:

COMPLETION STRING DETAILS

Down Hole Tool Co: Tool Sup:

Qty Description ID OD Top Set

PERFORATIONS

Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments

6/27/2016 8:04:41AMPrinted: Page 1 of 1

Report Date: 06/28/2016

DOE: 40

Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00

Country: USAState: TEXASField: WOLFCAMP EAST

Supervisors: J. CASTILLO / G. ALLGOOD / L. TERRELL / R.MULL

Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY

035

Spud Date: 11/28/2015

DOL: 31 AFE Days: Last BOP T.:

Release Date:

Report Number:Daily Operations

Report Onshore

CSG Test:**Data shared on this report is CONFIDENTIAL**

Rig:

Rig Phone:KB(ft): 2,664.01

POB: 78

Event: COMPLETION LAND

Location: Lat:

Long:

Safety Meeting Topic:

31° 1' 30.33092 N

101° 9' 22.17900 W Manhours: 312.00

API #: 4210542309

Current Activity: RIH W/DUMMY PLUG BHA

24 Hr Summary: FRAC STAGE 29-30, PERF STAGE 31 & LOST GUN BHA

CONTINUE FRAC OPERATIONS24 Hr Forecast:

OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY

06:00 07:00 1.00 P STG29 73 WOOWO STAND BY FOR ADJACENT WELL OPERATIONS.

07:00 09:00 2.00 N STG29 43 WOW WAITING ON LIGHTNING TO CLEAR AREA.

09:00 11:15 2.25 P STG29 35 STIM FRAC STAGE # 29 SLICKWATER - SICP 1,631 PUMP 30 BBLS 15% ACID. PUMP 293,000 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,802. ATR 66.3. MTP 7,579

MTR 90.2. ISIP 3,100. FG 0.93 TCF 6,519 BBLS.

11:15 15:00 3.75 P STG30 73 WOOWO STAND BY FOR ADJACENT WELL OPERATIONS.

15:00 17:30 2.50 P STG30 21 PERF WL STAGE # 30. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &

8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/

MARKER JT AT 5,970'. SET PLUG @ 10,960'. PU & PERF ON THE FLY AT 10,775' - 10,942'. PUH

TO 500' & STANDBY FOR "NH" FRAC. FINISH POH. LD WL. ALL SHOTS FIRED. PUMPED 288

BBLS.

17:30 18:00 0.50 P STG30 28 SFTYMTG HELD SAFETY MEETING AND JSA REVIEW WITH NIGHT SHIFT PERSONNEL.

18:00 20:30 2.50 P STG30 35 STIM FRAC STAGE # 30 SLICKWATER - SICP 1,965 PUMP 30 BBLS 15% ACID. PUMP 293,000 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 98,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP 5,500. ATR 76.6. MTP 7,203

MTR 92.8. ISIP 3,384. FG 0.97 TCF 6,191 BBLS.

20:30 23:30 3.00 P STG31 73 WOOWO STAND BY FOR ADJACENT WELL OPERATIONS.

23:30 01:20 1.83 P STG31 21 PERF WL STAGE # 31. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &

5 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/

MARKER JT AT 5,970'. SET PLUG @ 10,758'. PU & PERF ON THE FLY AT 10,671' & 10,743'.

CONTINUE PU 10' & HUNG UP WITH CCL @ 10,700' CCL DEPTH, PUTTING SETTING SLEEVE @

APPROX 10,722'. PUMPED BACK DOWN TO 10,750'EOT DEPTH. PULLED BACK UP TO 10,700' CCL

DEPTH AND STILL HUNG UP. REPEAT PROCESS SEVERAL TIMES WITH SAME RESULT.

01:20 05:30 4.17 N STG31 55 PERFPROB NOTIFIED OPERATIONS SUPERVISOR & CONTACTED PROJECT ENGINEER TO INFORM OF

SITUATION AND OFFER OPTIONS. PUMPED BACK DOWN AND SURGED WELL TO FB TANK. BHA

CAME FREE. CONTINUED PERFORATING. FOURTH GUN SHOT AND WHEN ATTEMPTING TO

SHOOT FIFTH GUN WENT TO SHORT AND WE LOST CCL. PULLED UP 50' AND PUMPED BACK

DOWN TO ENSURE WE STILL HAD BHA. CONTINUE POOH EASY. TOOL STRING LOST IN WELL

WIRE APPEARED TO BE CUT BY PERF SHOT. CONTACTED HOUSTON. THE DECISION WAS

MADE BETWEEN THE PROJECT ENGINEER AND COMPLETION MANAGER TO PUMP GUNS TO

BOTTOM. RUNNING DUMMY TO CFP# 32 SETTING DEPTH AT REPORT TIME, AND ABANDON

STAGE. WL TOOLS WERE LOST @ 10,666' AND AFTER PUMPING THEM DOWN THEY SHOULD BE

@ 10,930' TOF

05:30 06:00 P STG31 28 SFTYMTG HELD SAFETY MEETING WITH DAY SHIFT PERSONNEL.

Daily Operations Comments:

NO SPILLS, INJURIES OR OFFICIAL VISITS.

CASING

Size(in) MD(ft)/TVD(ft) LOT(ppg)

/

/

/

/ 14.000 67.00 67.00

/ 9.625 1,005.00 1,005.00

FLOWBACK

Gas Rate:

Choke Size:

Avg. Tbg. Press:

Avg. Csg. Press:

Fluid Rate (Water):

Fluid Rate (Oil):

Tot. Load Recovered:

FLUIDSFluids Co:

Fluids Eng:

Brine Type:

Pit Temp:

Density:

Viscosity:

Gel Type:

Nitrogen:

NTU:

COMPLETION STRING DETAILS

Down Hole Tool Co: Tool Sup:

Qty Description ID OD Top Set

PERFORATIONS

Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments

6/28/2016 8:01:34AMPrinted: Page 1 of 1

Report Date: 06/29/2016

DOE: 41

Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00

Country: USAState: TEXASField: WOLFCAMP EAST

Supervisors: J. CASTILLO / G. ALLGOOD / L. TERRELL / R.MULL

Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY

036

Spud Date: 11/28/2015

DOL: 32 AFE Days: Last BOP T.:

Release Date:

Report Number:Daily Operations

Report Onshore

CSG Test:**Data shared on this report is CONFIDENTIAL**

Rig:

Rig Phone:KB(ft): 2,664.01

POB: 78

Event: COMPLETION LAND

Location: Lat:

Long:

Safety Meeting Topic:

31° 1' 30.33092 N

101° 9' 22.17900 W Manhours: 312.00

API #: 4210542309

Current Activity: CHANGING OUT BLENDER, READY TO FRAC STAGE 33

24 Hr Summary: FRAC STAGE 32, PERF STAGE 33

CONTINUE FRAC OPERATIONS24 Hr Forecast:

OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY

06:00 07:30 1.50 N WLWORK 58 DHEQF RIH W/ DUMMY RUN - 3 1/8" WEIGHT BAR, CCL, 4.37" DUMMY PLUG - 18.5' O/A. PUMP DOWN TO

10,640' W/ NO PROBLEM. ALL CLEAR. POH W/ WL. PUMPED 277 BBLS.

07:30 09:15 1.75 P STG32 21 PERF WL STAGE # 32. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &

6 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 36 SHOTS. CORRELATE W/

MARKER JT AT 5,970'. SET PLUG @ 10,620'. PU & PERF ON THE FLY AT 10,447' - 10,567'. POH.

LD WL. ALL SHOTS FIRED. PUMPED 256 BBLS.

09:15 17:30 8.25 P STG32 73 WOOWO STAND BY FOR ADJACENT WELL OPERATIONS.

17:30 18:00 0.50 P STG32 28 SFTYMTG HELD SAFETY MEETING AND JSA REVIEW WITH NIGHT SHIFT PERSONNEL.

18:00 21:00 3.00 P STG32 73 WOOWO STAND BY FOR ADJACENT WELL OPERATIONS.

21:00 00:00 3.00 P STG32 35 STIM FRAC STAGE # 32 SLICKWATER - SICP: 1,747 PUMP 60 BBLS 15% ACID. PUMP 308,000 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 103,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP: 5,340. ATR: 73.7. MTP: 7,291

MTR: 92.7. ISIP: 3,310. FG 0.97 TCF: 6,529 BBLS.

00:00 02:30 2.50 P STG33 21 PERF WL STAGE # 33. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &

8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/

MARKER JT AT 5,970'. SET PLUG @ 10,428'. PU & PERF ON THE FLY AT 10,248' - 10,416'. POH.

LD WL. ALL SHOTS FIRED. PUMPED 355 BBLS.

02:30 05:30 3.00 P STG33 73 WOOWO STAND BY FOR ADJACENT WELL OPERATIONS.

05:30 06:00 P STG33 28 SFTYMTG HELD SAFETY MEETING WITH DAY SHIFT PERSONNEL.

Daily Operations Comments:

NO SPILLS, INJURIES OR OFFICIAL VISITS.

CASING

Size(in) MD(ft)/TVD(ft) LOT(ppg)

/

/

/

/ 14.000 67.00 67.00

/ 9.625 1,005.00 1,005.00

FLOWBACK

Gas Rate:

Choke Size:

Avg. Tbg. Press:

Avg. Csg. Press:

Fluid Rate (Water):

Fluid Rate (Oil):

Tot. Load Recovered:

FLUIDSFluids Co:

Fluids Eng:

Brine Type:

Pit Temp:

Density:

Viscosity:

Gel Type:

Nitrogen:

NTU:

COMPLETION STRING DETAILS

Down Hole Tool Co: Tool Sup:

Qty Description ID OD Top Set

PERFORATIONS

Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments

6/29/2016 8:07:13AMPrinted: Page 1 of 1

Report Date: 06/30/2016

DOE: 42

Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00

Country: USAState: TEXASField: WOLFCAMP EAST

Supervisors: J. CASTILLO / G. ALLGOOD / L. TERRELL / R.MULL

Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY

037

Spud Date: 11/28/2015

DOL: 33 AFE Days: Last BOP T.:

Release Date:

Report Number:Daily Operations

Report Onshore

CSG Test:**Data shared on this report is CONFIDENTIAL**

Rig:

Rig Phone:KB(ft): 2,664.01

POB: 78

Event: COMPLETION LAND

Location: Lat:

Long:

Safety Meeting Topic:

31° 1' 30.33092 N

101° 9' 22.17900 W Manhours: 312.00

API #: 4210542309

Current Activity: WL STAGE # 36 IN PROGRESS

24 Hr Summary: COMPLETE STAGES 34-35

CONTINUE FRAC OPERATIONS24 Hr Forecast:

OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY

06:00 08:45 2.75 N STG33 09 EQRP REPLACE FRAC BLENDER.

08:45 11:00 2.25 P STG33 35 STIM FRAC STAGE # 33 SLICKWATER - SICP: 2,060 PUMP 30 BBLS 15% ACID. PUMP 308,000 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 103,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP: 5,091. ATR: 72.2. MTP: 7,528

MTR: 89.1. ISIP: 3,470. FG 0.98 TCF: 6,729 BBLS

11:00 14:00 3.00 P STG34 21 PERF WL STAGE # 34. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &

8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/

MARKER JT AT 5,970'. SET PLUG @ 10,034'. PU & PERF ON THE FLY AT 10,048' - 10,216'. PUH

TO 500' AND STAND BY FOR "OH" FRAC. LD WL. ALL SHOTS FIRED. PUMPED 279 BBLS.

14:00 17:30 3.50 P STG34 73 WOOWO STAND BY FOR ADJACENT WELL OPERATIONS.

17:30 18:00 0.50 P STG34 28 SFTYMTG HELD SAFETY MEETING WITH NIGHT SHIFT PERSONNEL.

18:00 20:30 2.50 P STG34 35 STIM FRAC STAGE # 34 SLICKWATER - SICP: 1,785 PUMP 30 BBLS 15% ACID. PUMP 308,000 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 103,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP: 5,477. ATR: 74.5. MTP: 7,668

MTR: 94.8. ISIP: 3,275. FG 0.95 TCF: 6,753 BBLS

20:30 21:30 1.00 P STG35 09 EQRP RE-HEAD WIRELINE TOOLS

21:30 00:00 2.50 P STG35 21 PERF WL STAGE # 35. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &

8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/

MARKER JT AT 5,970'. SET PLUG @ 10,034'. PU & PERF ON THE FLY AT 9,849' - 10,016'. PUH TO

500' AND STAND BY FOR "OH" FRAC. LD WL. ALL SHOTS FIRED. PUMPED 322 BBLS.

00:00 02:30 2.50 P STG35 73 WOOWO STAND BY FOR ADJACENT WELL OPERATIONS.

02:30 05:00 2.50 P STG35 35 STIM FRAC STAGE # 35 SLICKWATER - SICP: 2,055 PUMP 30 BBLS 15% ACID. PUMP 308,000 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 103,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP: 5,605. ATR: 77.1. MTP: 7,233

MTR: 93.9. ISIP: 3,211. FG 0.94 TCF: 6,757 BBLS

05:00 05:30 0.50 P STG36 21 PERF WL STAGE # 36. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &

8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/

MARKER JT AT 5,970'. SET PLUG @ 9.832'. PU & PERF ON THE FLY AT 9,649' - 9,817'. PUH TO

500' AND STAND BY FOR "OH" FRAC. LD WL. ALL SHOTS FIRED. PUMPED 283 BBLS.

05:30 06:00 P STG35 28 SFTYMTG HELD SAFETY MEETING WITH DAY SHIFT PERSONNEL.

Daily Operations Comments:

NO SPILLS, INJURIES OR OFFICIAL VISITS.

CASING

Size(in) MD(ft)/TVD(ft) LOT(ppg)

/

/

/

/ 14.000 67.00 67.00

/ 9.625 1,005.00 1,005.00

FLOWBACK

Gas Rate:

Choke Size:

Avg. Tbg. Press:

Avg. Csg. Press:

Fluid Rate (Water):

Fluid Rate (Oil):

Tot. Load Recovered:

FLUIDSFluids Co:

Fluids Eng:

Brine Type:

Pit Temp:

Density:

Viscosity:

Gel Type:

Nitrogen:

NTU:

COMPLETION STRING DETAILS

Down Hole Tool Co: Tool Sup:

Qty Description ID OD Top Set

PERFORATIONS

Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments

6/30/2016 8:05:23AMPrinted: Page 1 of 1

Report Date: 07/01/2016

DOE: 43

Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00

Country: USAState: TEXASField: WOLFCAMP EAST

Supervisors: CASTILLO, J./ GARCIA, J. / RAMIREZ, H./ MULL, R.

Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY

038

Spud Date: 11/28/2015

DOL: 34 AFE Days: Last BOP T.:

Release Date:

Report Number:Daily Operations

Report Onshore

CSG Test:**Data shared on this report is CONFIDENTIAL**

Rig:

Rig Phone:KB(ft): 2,664.01

POB: 78

Event: COMPLETION LAND

Location: Lat:

Long:

Safety Meeting Topic:

31° 1' 30.33092 N

101° 9' 22.17900 W Manhours: 312.00

API #: 4210542309

Current Activity: FRAC STAGE 38 IN PROGRESS

24 Hr Summary: FRAC STAGES 36-37, PERF STAGE 38

CONTINUE FRAC OPERATIONS24 Hr Forecast:

OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY

06:00 06:30 0.50 P STG36 28 SFTYMTG SAFETY MEETING:FOCUSED ON H.E.L.P.

06:30 12:00 5.50 P STG36 73 WOOWO WOOWO

12:00 14:30 2.50 P STG36 35 STIM FRAC STAGE # 36 SLICKWATER - SICP: 1,846 PUMP 30 BBLS 15% ACID. PUMP 308,000 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 103,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP: 5,024. ATR: 71. MTP: 6,893

MTR: 95.1. ISIP: 3,320. FG 0..96 TCF: 6,732 BBLS

14:30 17:30 3.00 P STG37 21 PERF WL STAGE # 37. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &

8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/

MARKER JT AT 5,970'. SET PLUG @ 9,632'. PU & PERF ON THE FLY AT 9,450' - 9,616'. PUH TO

500' AND STAND BY FOR "OH" FRAC. LD WL. ALL SHOTS FIRED. PUMPED 246 BBLS.

17:30 18:00 0.50 P STG37 28 SFTYMTG HELD SAFETY MEETING WITH NIGHT SHIFT PERSONNEL.

18:00 20:30 2.50 P STG37 73 WOOWO WOOWO

20:30 23:00 2.50 P STG37 35 STIM FRAC STAGE # 37 SLICKWATER - SICP: 1,984 PUMP 30 BBLS 15% ACID. PUMP 308,000 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 103,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP: 4,995. ATR: 77.1. MTP: 6,880

MTR: 92.2. ISIP: 3,098. FG 0..93 TCF: 6,801 BBLS

23:00 23:30 0.50 P STG38 09 EQRP RE-HEAD WIRELINE TOOLS

23:30 02:00 2.50 P STG38 21 PERF WL STAGE # 38. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &

8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/

MARKER JT AT 5,970'. SET PLUG @ 9,433'. PU & PERF ON THE FLY AT 9,250' - 9,416'. PUH TO

500' AND STAND BY FOR FRAC. LD WL. ALL SHOTS FIRED. PUMPED 244 BBLS.

02:00 04:15 2.25 P STG38 73 WOOWO WOOWO

04:15 05:30 1.25 P STG38 35 STIM FRAC STAGE # 38 IN PROGRESS

05:30 06:00 P STG38 28 SFTYMTG HELD SAFETY MEETING WITH DAY SHIFT PERSONNEL.

Daily Operations Comments:

NO SPILLS, INJURIES OR OFFICIAL VISITS.

CASING

Size(in) MD(ft)/TVD(ft) LOT(ppg)

/

/

/

/ 14.000 67.00 67.00

/ 9.625 1,005.00 1,005.00

FLOWBACK

Gas Rate:

Choke Size:

Avg. Tbg. Press:

Avg. Csg. Press:

Fluid Rate (Water):

Fluid Rate (Oil):

Tot. Load Recovered:

FLUIDSFluids Co:

Fluids Eng:

Brine Type:

Pit Temp:

Density:

Viscosity:

Gel Type:

Nitrogen:

NTU:

COMPLETION STRING DETAILS

Down Hole Tool Co: Tool Sup:

Qty Description ID OD Top Set

PERFORATIONS

Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments

7/1/2016 8:05:06AMPrinted: Page 1 of 1

Report Date: 07/02/2016

DOE: 44

Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00

Country: USAState: TEXASField: WOLFCAMP EAST

Supervisors: CASTILLO, J./ GARCIA, J. / RAMIREZ, H./ MULL, R.

Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY

039

Spud Date: 11/28/2015

DOL: 35 AFE Days: Last BOP T.:

Release Date:

Report Number:Daily Operations

Report Onshore

CSG Test:**Data shared on this report is CONFIDENTIAL**

Rig:

Rig Phone:KB(ft): 2,664.01

POB: 78

Event: COMPLETION LAND

Location: Lat:

Long:

Safety Meeting Topic:

31° 1' 30.33092 N

101° 9' 22.17900 W Manhours: 312.00

API #: 4210542309

Current Activity: BEGIN FRAC STAGE 41

24 Hr Summary: FRAC STAGES 38-40, PERF STAGE 41

CONTINUE FRAC OPERATIONS24 Hr Forecast:

OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY

06:00 07:00 1.00 P STG38 35 STIM FRAC STAGE # 38 SLICKWATER - SICP: 1,809 PUMP 30 BBLS 15% ACID. PUMP 308,000 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 103,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP: 5,222. ATR: 75.1. MTP: 7,391

MTR: 93.2. ISIP: 3,391. FG 0..97 TCF: 6,830 BBLS

07:00 09:30 2.50 P STG39 21 PERF WL STAGE # 39. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &

8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/

MARKER JT AT 5,970'. SET PLUG @ 9,233'. PU & PERF ON THE FLY AT 9,051' - 9,214'. PUH TO

500' AND STAND BY FOR "OH" FRAC. LD WL. ALL SHOTS FIRED. PUMPED 219 BBLS.

09:30 12:30 3.00 P STG39 72 DRLCMT WOOWO

12:30 14:30 2.00 P STG39 35 STIM FRAC STAGE # 39 SLICKWATER - SICP: 2,053 PUMP 30 BBLS 15% ACID. PUMP 308,000 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 103,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP: 3,142. ATR: 73.8. MTP: 6,167

MTR: 94.7. ISIP: 3,578. FG 1.0 TCF: 6,632 BBLS

14:30 17:30 3.00 P STG40 21 PERF WL STAGE # 40. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &

8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/

MARKER JT AT 5,970'. SET PLUG @ 9,034'. PU & PERF ON THE FLY AT 8,851' - 9,018'. PUH TO

500' AND STAND BY FOR "OH" FRAC. LD WL. ALL SHOTS FIRED. PUMPED 212 BBLS.

17:30 18:00 0.50 P STG40 28 SFTYMTG HELD SAFETY MEETING WITH NIGHT SHIFT PERSONNEL.

18:00 22:30 4.50 P STG40 72 DRLCMT WOOWO

22:30 01:00 2.50 P STG40 35 STIM FRAC STAGE # 40 SLICKWATER - SICP: 2,340 PUMP 30 BBLS 15% ACID. PUMP 308,000 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 103,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP: 4,696. ATR: 73.3. MTP: 6,370

MTR: 91.6. ISIP: 3,478. FG .99 TCF: 6,996 BBLS

01:00 03:30 2.50 P STG41 21 PERF WL STAGE # 41. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &

7 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 42 SHOTS. CORRELATE W/

MARKER JT AT 5,970'. SET PLUG @ 8,834'. PU & PERF ON THE FLY AT 8,654' - 8,796'. PUH TO

500' AND STAND BY FOR "OH" FRAC. LD WL. ALL SHOTS FIRED. PUMPED 204 BBLS.

03:30 05:30 2.00 P STG41 72 DRLCMT WOOWO

05:30 06:00 P STG41 28 SFTYMTG HELD SAFETY MEETING WITH DAY SHIFT PERSONNEL.

Daily Operations Comments:

NO SPILLS, INJURIES OR OFFICIAL VISITS.

CASING

Size(in) MD(ft)/TVD(ft) LOT(ppg)

/

/

/

/ 14.000 67.00 67.00

/ 9.625 1,005.00 1,005.00

FLOWBACK

Gas Rate:

Choke Size:

Avg. Tbg. Press:

Avg. Csg. Press:

Fluid Rate (Water):

Fluid Rate (Oil):

Tot. Load Recovered:

FLUIDSFluids Co:

Fluids Eng:

Brine Type:

Pit Temp:

Density:

Viscosity:

Gel Type:

Nitrogen:

NTU:

COMPLETION STRING DETAILS

Down Hole Tool Co: Tool Sup:

Qty Description ID OD Top Set

PERFORATIONS

Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments

7/3/2016 8:07:59AMPrinted: Page 1 of 1

Report Date: 07/03/2016

DOE: 45

Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00

Country: USAState: TEXASField: WOLFCAMP EAST

Supervisors: CASTILLO, J./ GARCIA, J. / RAMIREZ, H./ MULL, R.

Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY

040

Spud Date: 11/28/2015

DOL: 36 AFE Days: Last BOP T.:

Release Date:

Report Number:Daily Operations

Report Onshore

CSG Test:**Data shared on this report is CONFIDENTIAL**

Rig:

Rig Phone:KB(ft): 2,664.01

POB: 78

Event: COMPLETION LAND

Location: Lat:

Long:

Safety Meeting Topic:

31° 1' 30.33092 N

101° 9' 22.17900 W Manhours: 312.00

API #: 4210542309

Current Activity: READY TO FRAC STAGE 44

24 Hr Summary: FRAC STAGES 41-43, PERF STAGE 44

CONTINUE FRAC OPERATIONS24 Hr Forecast:

OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY

06:00 08:00 2.00 P STG41 35 STIM FRAC STAGE # 41 SLICKWATER - SICP: 1,852 PUMP 30 BBLS 15% ACID. PUMP 308,000 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 103,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP: 4,602. ATR: 73.9. MTP: 6,022

MTR: 89.7. ISIP: 3,633. FG 1.01 TCF: 6,451 BBLS

08:00 09:00 1.00 P STG42 73 WOOWO TORQUE, GREASE AND RE-HEAD

09:00 12:00 3.00 P STG42 21 PERF WL STAGE # 42. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &

8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/

MARKER JT AT 5,970'. SET PLUG @ 8,635'. PU & PERF ON THE FLY AT 8,452' - 8,619'. PUH TO

500' AND STAND BY FOR "OH" FRAC. LD WL. ALL SHOTS FIRED. PUMPED 178 BBLS.

12:00 15:15 3.25 P STG42 73 WOOWO WOOWO

15:15 17:00 1.75 P STG42 35 STIM FRAC STAGE # 42 SLICKWATER - SICP: 2,020 PUMP 30 BBLS 15% ACID. PUMP 308,000 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 103,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP: 5,025. ATR: 69.8. MTP: 6,650

MTR: 92.1. ISIP: 3,748. FG 1.03 TCF: 6,814 BBLS

17:00 17:30 0.50 P STG43 73 WOOWO WOOWO

17:30 18:00 0.50 P STG43 28 SFTYMTG HELD SAFETY MEETING WITH NIGHT SHIFT PERSONNEL.

18:00 20:00 2.00 P STG43 73 WOOWO WOOWO

20:00 22:30 2.50 P STG43 21 PERF WL STAGE # 43. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &

8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/

MARKER JT AT 5,970'. SET PLUG @ 8,435'. PU & PERF ON THE FLY AT 8,253' - 8,420'. PUH TO

500' AND STAND BY FOR "OH" FRAC. LD WL. ALL SHOTS FIRED. PUMPED 170 BBLS.

22:30 01:00 2.50 P STG43 35 STIM FRAC STAGE # 43 SLICKWATER - SICP: 2,287 PUMP 30 BBLS 15% ACID. PUMP 308,000 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 103,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP: 4,961. ATR: 77.1. MTP: 7,330

MTR: 93.2. ISIP: 3,126. FG .93 TCF: 6,972 BBLS

01:00 03:30 2.50 P STG44 73 WOOWO WOOWO

03:30 05:30 2.00 P STG44 21 PERF WL STAGE # 44. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &

5 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 30 SHOTS. CORRELATE W/

MARKER JT AT 5,970'. SET PLUG @ 8,236'. PU & PERF ON THE FLY AT 8,054' - 8,221'. PUH TO

500' AND STAND BY FOR "OH" FRAC. LD WL. ALL SHOTS FIRED. PUMPED 160 BBLS.

05:30 06:00 P STG44 28 SFTYMTG HELD SAFETY MEETING WITH DAY SHIFT PERSONNEL.

Daily Operations Comments:

NO SPILLS, INJURIES OR OFFICIAL VISITS.

CASING

Size(in) MD(ft)/TVD(ft) LOT(ppg)

/

/

/

/ 14.000 67.00 67.00

/ 9.625 1,005.00 1,005.00

FLOWBACK

Gas Rate:

Choke Size:

Avg. Tbg. Press:

Avg. Csg. Press:

Fluid Rate (Water):

Fluid Rate (Oil):

Tot. Load Recovered:

FLUIDSFluids Co:

Fluids Eng:

Brine Type:

Pit Temp:

Density:

Viscosity:

Gel Type:

Nitrogen:

NTU:

COMPLETION STRING DETAILS

Down Hole Tool Co: Tool Sup:

Qty Description ID OD Top Set

PERFORATIONS

Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments

7/4/2016 8:03:14AMPrinted: Page 1 of 1

Report Date: 07/04/2016

DOE: 46

Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00

Country: USAState: TEXASField: WOLFCAMP EAST

Supervisors: CASTILLO, J./ GARCIA, J. / RAMIREZ, H./ MULL, R.

Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY

041

Spud Date: 11/28/2015

DOL: 37 AFE Days: Last BOP T.:

Release Date:

Report Number:Daily Operations

Report Onshore

CSG Test:**Data shared on this report is CONFIDENTIAL**

Rig:

Rig Phone:KB(ft): 2,664.01

POB: 78

Event: COMPLETION LAND

Location: Lat:

Long:

Safety Meeting Topic:

31° 1' 30.33092 N

101° 9' 22.17900 W Manhours: 312.00

API #: 4210542309

Current Activity: FRAC STAGE # 47 IN PROGRESS

24 Hr Summary: FRAC STAGES 44-46, PERF STAGE 47

CONTINUE FRAC OPERATIONS24 Hr Forecast:

OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY

06:00 08:15 2.25 P STG44 35 STIM FRAC STAGE # 44 SLICKWATER - SICP: 1,859 PUMP 30 BBLS 15% ACID. PUMP 308,000 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 103,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP: 4,671. ATR: 73.7. MTP: 6,767

MTR: 89.9. ISIP: 3,408. FG .98 TCF: 6,869 BBLS

08:15 11:00 2.75 P STG45 73 WOOWO WOOWO

11:00 14:00 3.00 P STG45 21 PERF WL STAGE # 45. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &

6 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 36 SHOTS. CORRELATE W/

MARKER JT AT 5,970'. SET PLUG @ 8,036'. PU & PERF ON THE FLY AT 7,845' - 8,020'. PUH TO

500' AND STAND BY FOR "NH" FRAC. LD WL. ALL SHOTS FIRED. PUMPED 128 BBLS.

14:00 15:45 1.75 P STG45 35 STIM FRAC STAGE # 45 SLICKWATER - SICP: 1,910 PUMP 30 BBLS 15% ACID. PUMP 308,000 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 103,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP: 4,447. ATR: 73.4. MTP: 6,829

MTR: 89.3. ISIP: 3,388. FG .97 TCF: 6,680 BBLS

15:45 17:30 1.75 P STG46 73 WOOWO WOOWO

17:30 18:00 0.50 P STG46 28 SFTYMTG HELD SAFETY MEETING AND JSA REVIEW WITH NIGHT SHIFT PERSONNEL.

18:00 20:30 2.50 P STG46 21 PERF WL STAGE # 46. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &

8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/

MARKER JT AT 5,970'. SET PLUG @ 7,837'. PU & PERF ON THE FLY AT 7,654' - 7,822'. PUH TO

500' AND STAND BY FOR "NH" FRAC. LD WL. ALL SHOTS FIRED. PUMPED 126 BBLS.

20:30 23:00 2.50 P STG46 35 STIM FRAC STAGE # 46 SLICKWATER - SICP: 2,090 PUMP 30 BBLS 15% ACID. PUMP 308,000 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 103,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP: 4,922. ATR: 78.2 MTP: 7,352

MTR: 91.7. ISIP: 3,077. FG .92 TCF: 7,005 BBLS

23:00 02:00 3.00 P STG46 73 WOOWO WOOWO

02:00 04:15 2.25 P STG47 21 PERF WL STAGE # 47. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &

8 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 48 SHOTS. CORRELATE W/

MARKER JT AT 5,970'. SET PLUG @ 7,637'. PU & PERF ON THE FLY AT 7,455' - 7,622'. PUH TO

500' AND STAND BY FOR "NH" FRAC. LD WL. ALL SHOTS FIRED. PUMPED 114 BBLS.

04:15 05:30 1.25 P STG47 35 STIM FRAC STAGE # 47 IN PROGRESS

05:30 06:00 0.50 P STG47 28 SFTYMTG SAFETY MEETING

Daily Operations Comments:

NO SPILLS, INJURIES OR OFFICIAL VISITS.

CASING

Size(in) MD(ft)/TVD(ft) LOT(ppg)

/

/

/

/ 14.000 67.00 67.00

/ 9.625 1,005.00 1,005.00

FLOWBACK

Gas Rate:

Choke Size:

Avg. Tbg. Press:

Avg. Csg. Press:

Fluid Rate (Water):

Fluid Rate (Oil):

Tot. Load Recovered:

FLUIDSFluids Co:

Fluids Eng:

Brine Type:

Pit Temp:

Density:

Viscosity:

Gel Type:

Nitrogen:

NTU:

COMPLETION STRING DETAILS

Down Hole Tool Co: Tool Sup:

Qty Description ID OD Top Set

PERFORATIONS

Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments

7/5/2016 8:05:07AMPrinted: Page 1 of 1

Report Date: 07/05/2016

DOE: 47

Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00

Country: USAState: TEXASField: WOLFCAMP EAST

Supervisors: CASTILLO, J./ GARCIA, J. / RAMIREZ, H./ MULL, R.

Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY

042

Spud Date: 11/28/2015

DOL: 38 AFE Days: Last BOP T.:

Release Date:

Report Number:Daily Operations

Report Onshore

CSG Test:**Data shared on this report is CONFIDENTIAL**

Rig:

Rig Phone:KB(ft): 2,664.01

POB: 78

Event: COMPLETION LAND

Location: Lat:

Long:

Safety Meeting Topic:

31° 1' 30.33092 N

101° 9' 22.17900 W Manhours: 312.00

API #: 4210542309

Current Activity: READY TO FRAC STAGE 49

24 Hr Summary: FRAC STAGES 47-48, PERF STAGE 49

CONTINUE FRAC OPERATIONS24 Hr Forecast:

OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY

06:00 06:30 0.50 P STG47 35 STIM FRAC STAGE # 47 SLICKWATER - SICP: 1,808 PUMP 30 BBLS 15% ACID. PUMP 308,000 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 103,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP: 4,878. ATR: 77.8 MTP: 7,363

MTR: 91. ISIP: 3,148. FG .93 TCF: 6,651 BBLS

06:30 08:30 2.00 P STG48 73 WOOWO WOOWO

08:30 10:30 2.00 P STG48 21 PERF WL STAGE # 48. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &

6 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 36 SHOTS. CORRELATE W/

MARKER JT AT 5,970'. SET PLUG @ 7,436'. PU & PERF ON THE FLY AT 7,255' - 7,374'. PUH TO

500'. ALL SHOTS FIRED. PUMPED 76 BBLS.

10:30 17:30 7.00 P STG48 73 WOOWO WOOWO

17:30 18:00 0.50 P STG48 28 SFTYMTG HELD SAFETY MEETING AND JSA REVIEW WITH NIGHT SHIFT PERSONNEL.

18:00 22:00 4.00 P STG48 73 WOOWO WOOWO

22:00 01:00 3.00 P STG48 35 STIM FRAC STAGE # 48 SLICKWATER - SICP: 1,586 PUMP 30 BBLS 15% ACID. PUMP 308,000 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 103,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP: 4,720. ATR: 78.2 MTP: 6,338

MTR: 92.1. ISIP: 3,114. FG .93 TCF: 6,994 BBLS

01:00 01:30 0.50 P STG49 73 WOOWO WOOWO

01:30 03:30 2.00 P STG49 21 PERF WL STAGE # 49. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &

6 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 36 SHOTS. CORRELATE W/

MARKER JT AT 5,970'. SET PLUG @ 7,230'. PU & PERF ON THE FLY AT 7,056' - 7,176'. PUH TO

500'. ALL SHOTS FIRED. PUMPED 86 BBLS.

03:30 05:30 2.00 P STG49 73 WOOWO WOOWO

05:30 06:00 P STG49 28 SFTYMTG HELD SAFETY MEETING WITH DAY SHIFT PERSONNEL.

Daily Operations Comments:

NO SPILLS, INJURIES OR OFFICIAL VISITS.

CASING

Size(in) MD(ft)/TVD(ft) LOT(ppg)

/

/

/

/ 14.000 67.00 67.00

/ 9.625 1,005.00 1,005.00

FLOWBACK

Gas Rate:

Choke Size:

Avg. Tbg. Press:

Avg. Csg. Press:

Fluid Rate (Water):

Fluid Rate (Oil):

Tot. Load Recovered:

FLUIDSFluids Co:

Fluids Eng:

Brine Type:

Pit Temp:

Density:

Viscosity:

Gel Type:

Nitrogen:

NTU:

COMPLETION STRING DETAILS

Down Hole Tool Co: Tool Sup:

Qty Description ID OD Top Set

PERFORATIONS

Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments

7/5/2016 8:05:56AMPrinted: Page 1 of 1

Report Date: 07/06/2016

DOE: 48

Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00

Country: USAState: TEXASField: WOLFCAMP EAST

Supervisors: CASTILLO, J./ GARCIA, J. / RAMIREZ, H./ MULL, R.

Engineer/Manager: MEDINA, JAVIER / LLOYD, BARRY

043

Spud Date: 11/28/2015

DOL: 39 AFE Days: Last BOP T.:

Release Date:

Report Number:Daily Operations

Report Onshore

CSG Test:**Data shared on this report is CONFIDENTIAL**

Rig:

Rig Phone:KB(ft): 2,664.01

POB: 78

Event: COMPLETION LAND

Location: Lat:

Long:

Safety Meeting Topic:

31° 1' 30.33092 N

101° 9' 22.17900 W Manhours: 312.00

API #: 4210542309

Current Activity: CONTINUE RDMO FRAC SPREAD

24 Hr Summary: FRAC STAGES 49-51, SET KILL PLUG

CONTINUE FRAC OPERATIONS24 Hr Forecast:

OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY

06:00 08:00 2.00 P STG49 73 WOOWO WOOWO

08:00 10:00 2.00 P STG49 35 STIM FRAC STAGE # 49 SLICKWATER - SICP: 1,689 PUMP 30 BBLS 15% ACID. PUMP 308,000 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 103,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP: 5,233. ATR: 70.1 MTP: 7,629

MTR: 92.2. ISIP: 3,319. FG ..96 TCF: 6,986 BBLS

10:00 12:30 2.50 P STG50 21 PERF WL STAGE # 50. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &

6 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 36 SHOTS. CORRELATE W/

MARKER JT AT 5,970'. SET PLUG @ 7,039'. PU & PERF ON THE FLY AT 6,856' - 7,023'. PUH TO

500'. ALL SHOTS FIRED. PUMPED 64 BBLS.

12:30 15:30 3.00 P STG50 73 WOOWO WOOWO

15:30 17:30 2.00 P STG50 35 STIM FRAC STAGE # 50 SLICKWATER - SICP: 1,549 PUMP 30 BBLS 15% ACID. PUMP 308,000 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 103,000 LBS 40/70 @ 1.0 - 2.5 PPA. ATP: 4,665. ATR: 73.5 MTP: 7,520

MTR: 95.3. ISIP: 3,718. FG .1.02 TCF: 6,832 BBLS

17:30 18:00 0.50 P STG51 28 SFTYMTG HELD SAFETY MEETING AND JSA REVIEW WITH NIGHT SHIFT PERSONNEL.

18:00 20:00 2.00 P STG51 21 PERF WL STAGE # 51. RU WL ON WELL. TEST WLPCE TO 8000 PSI. RIH W/ BOSSHOG ECONO CPB &

7 - 1' x 3 1/8" HSC LOADED 6 SPF, 60 DEG, 23 GR CHARGES, 42 SHOTS. CORRELATE W/

MARKER JT AT 5,970'. SET PLUG @ 6,839'. PU & PERF ON THE FLY AT 6,657' - 6,825'. PUH TO

500'. ALL SHOTS FIRED. PUMPED 57 BBLS.

20:00 22:00 2.00 P STG51 35 STIM FRAC STAGE # 51 SLICKWATER - SICP: 1,453 PUMP 30 BBLS 15% ACID. PUMP 325,034 LBS 100

MESH @ .5 - 2.5 PPA; FLUSH W/ 350 BBLS SLICK WATER, PUMP 190 BBLS VISC ACID, FLUSH W/

230 SLICK WATER; PUMP 105,330 LBS 40/70 @ 1.0 - 2.5 PPA. ATP: 3,897. ATR: 71.2 MTP: 5,522

MTR: 96.7. ISIP: 3,920. FG 0.96 TCF: 6,451 BBLS

22:00 23:30 1.50 P STG51 73 WOOWO WOOWO

23:30 01:30 2.00 P STG51 27 SETP RU WL ON WELL. TEST WLPCE TO 8,000 PSI. RIH W/ 4.375" ECO SOLID CBP. CORRELATED

WITH MJ @ 6,269'5,970 SET PLUG @ 6,005'. WITH 1,495 PSI UNDERNEATH THE BRIDGE PLUG.

POH & PRESSURE TEST PLUG TO 7,000#. HOLD FOR 15 MINS (OK). BLEED OFF PRESSURE &

SHUT THE MANUAL MASTER VALVE

01:30 06:00 4.50 P RDMO 02 RDMO RDMO FRAC SPREAD

Daily Operations Comments:

NO SPILLS, INJURIES OR OFFICIAL VISITS.

CASING

Size(in) MD(ft)/TVD(ft) LOT(ppg)

/

/

/

/ 14.000 67.00 67.00

/ 9.625 1,005.00 1,005.00

FLOWBACK

Gas Rate:

Choke Size:

Avg. Tbg. Press:

Avg. Csg. Press:

Fluid Rate (Water):

Fluid Rate (Oil):

Tot. Load Recovered:

FLUIDSFluids Co:

Fluids Eng:

Brine Type:

Pit Temp:

Density:

Viscosity:

Gel Type:

Nitrogen:

NTU:

COMPLETION STRING DETAILS

Down Hole Tool Co: Tool Sup:

Qty Description ID OD Top Set

PERFORATIONS

Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments

7/6/2016 8:03:37AMPrinted: Page 1 of 1

Report Date: 07/08/2016

DOE: 50

Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00

Country: USAState: TEXASField: WOLFCAMP EAST

Supervisors: DJ GOSS / BARRY BROUSSARD

Engineer/Manager: SCHMELTZ, PETER / LLOYD, BARRY

044

Spud Date: 11/28/2015

DOL: 40 AFE Days: Last BOP T.:

Release Date:

Report Number:Daily Operations

Report Onshore

CSG Test:**Data shared on this report is CONFIDENTIAL**

Rig:

Rig Phone:KB(ft): 2,664.01

POB: 43

Event: COMPLETION LAND

Location: Lat:

Long:

Safety Meeting Topic:

31° 1' 30.33092 N

101° 9' 22.17900 W Manhours: 400.00

API #: 4210542309

Current Activity: RIGGING UP RISER

24 Hr Summary: MIRU COIL UNIT

TEST BOP'S, DRILL PLUGS24 Hr Forecast:

OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY

06:00 10:00 4.00 P CTU 16 NUND NU LUBRICATOR, LUBE IN TUBING HANGER AND BPV, ND UMV AND LMV, PULL TUBING

HANGER AND BPV

10:00 15:00 5.00 P CTU 16 NUND MOVE IN FRAC TANKS AND OPEN TOPS AND SUPPORT EQUIPMENT, CONT PREPARING

LOCATION FOR CTU DRILL OUT

15:00 18:00 3.00 P MIRU 01 MIRU MIRU COIL UNIT, AND ALL SUPPORT EQUIPMENT.

18:00 06:00 12.00 P MIRU 01 MIRU MIRU 40 BBL CHEMICAL MIXING PLANT, 2’ DUAL HYD MANIFOLD 10K WITH FLOWBACK IRON

AND SAFETY RESTRAINTS, PLUG CATCHER AND GAS BUSTERS. FILLED FRAC TANKS WITH

FRESH WATER FROM LEASE POND AND CLEAN OUT CELLARS AND HAULED OFF FLUIDS FOR

DISPOSAL.

Daily Operations Comments:

NO SPILLS, INJURIES OR OFFICIAL VISITS.

CASING

Size(in) MD(ft)/TVD(ft) LOT(ppg)

/

/

/

/ 14.000 67.00 67.00

/ 9.625 1,005.00 1,005.00

FLOWBACK

Gas Rate:

Choke Size:

Avg. Tbg. Press:

Avg. Csg. Press:

Fluid Rate (Water):

Fluid Rate (Oil):

Tot. Load Recovered:

FLUIDSFluids Co:

Fluids Eng:

Brine Type:

Pit Temp:

Density:

Viscosity:

Gel Type:

Nitrogen:

NTU:

COMPLETION STRING DETAILS

Down Hole Tool Co: Tool Sup:

Qty Description ID OD Top Set

PERFORATIONS

Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments

7/8/2016 8:06:10AMPrinted: Page 1 of 1

Report Date: 07/09/2016

DOE: 51

Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00

Country: USAState: TEXASField: WOLFCAMP EAST

Supervisors: DJ GOSS / BARRY BROUSSARD

Engineer/Manager: SCHMELTZ, PETER / LLOYD, BARRY

045

Spud Date: 11/28/2015

DOL: 41 AFE Days: Last BOP T.:

Release Date:

Report Number:Daily Operations

Report Onshore

CSG Test:**Data shared on this report is CONFIDENTIAL**

Rig:

Rig Phone:KB(ft): 2,664.01

POB: 43

Event: COMPLETION LAND

Location: Lat:

Long:

Safety Meeting Topic:

31° 1' 30.33092 N

101° 9' 22.17900 W Manhours: 400.00

API #: 4210542309

Current Activity: SHORT TRIP

24 Hr Summary: DRILLED PLUGS 1-9

TEST BOP'S, DRILL PLUGS24 Hr Forecast:

OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY

06:00 16:20 10.33 P MIRU 01 MIRU PRIMED FLUID PUMPS AND LOADED COIL UNIT REEL WITH WORKING FLUIDS, NU 3 X 10’

RISER TO COIL UNIT INJECTOR. INSTALLED COIL CONN WITH TEST PLATE AND PULLED TESTED

TO 25K & 35K,60K. PRESSURE UP ON COIL AND PRESSURE TESTED COIL CONN TO 5,000 PSI.

PRESSURE TESTED COIL CONN TO 250 PSI LOW AND 5,000 PSI HIGH.NIPPLE UP COIL UNIT 10K

BOP’S AND REMOVED PULL PLATE AND INSTALLED WASH TIP ON COIL CONN. TESTED BOPS

TO 250 PSI-LOW AND 9,000 PSI-HIGH - ALL TESTED GOOD AND CHARTED. (BOP TESTING

INCLUDES TESTING - BLINDS, 2 5/8’ PIPE RAMS, 2 5/8’ SECONDARY PIPE RAMS, BOTH SETS OF

WING VALUES ON BOP CROSSOVER, BOTH VALVES OF BOP KILL LINE, INSIDE THE REEL PLUG

VALVE, MANIFOLD ON COIL UNIT, ALL VALVES ON WELLHEAD FLOWCROSS, SHELL TESTING

ALL FLOW IRON, PLUG CATCHER AND 2’ HYD MANIFOLD )REMOVED WASH TIP AND INSTALLED

DUAL FLAPPER VALVE. PRESSURE UP AND TESTED BPV TO 5,000. – TEST GOOD AND CHARTED.

VERIFY BALL SIZE AND ALL DRIFTS FOR THE HYD DISCONN. MU AND BHA OF CONN, DUAL

FLAPPER VALVE, HYD JARS, HYD DISCONN, AGITATOR, 3 1/8” MOTOR WITH 4 3/4” INCH ROCK

BIT STAB INJECTOR HEAD ON BOPS, SHELL TEST TO 9,000 PSI -TEST GOOD. BLED DOWN

PRESSURE AND EQUALIZED BETWEEN SICP ON WELLHEAD AND COIL UNIT. OPEN WELL

WAITED TO BREAK CIR INTO FRAC TANKS, STARTED RIH @ 5 FPM PASSING WELLHEAD TREE

THEN INCREASING TO 60 - 80 FPM THEIR AFTER PUMPING & RETURNS @ 1 BPM. EOC @ KOP –

INCREASED PUMP RATE TO 4 BPM AND RETURNS TO 5 BPM, CONT RIH TO FIRST PLUG

LEAKS ON STEP UNIT AND LEAKS ON FLOW BACK

16:20 17:49 1.48 P CTU 40 WASH SHELL TEST TO 9,000 PSI -TEST GOOD. BLED DOWN PRESSURE AND EQUALIZED BETWEEN

SICP ON WELLHEAD AND COIL UNIT. OPEN WELL WAITED TO BREAK CIR INTO FRAC TANKS,

STARTED RIH @ 5 FPM PASSING WELLHEAD TREE THEN INCREASING TO 60 - 80 FPM THEIR

AFTER PUMPING & RETURNS @ 1 BPM. EOC @ KOP – INCREASED PUMP RATE TO 4 BPM AND

RETURNS TO 5 BPM, CONT RIH TO FIRST PLUG

17:49 18:12 0.38 P CTU 40 WASH TAG KILL PLUG @ 6,010' - 6 MIN , CIRC 3,800 PSI, WHP 500 PSI, PUMP RATE 5 BPM, RETURN

RATE 5 BPM, CONT TO NEXT PLUG.

18:12 18:33 0.35 P CTU 40 WASH TAG PLUG #1@ 6,670' - 1 MIN , CIRC 3,600 PSI, WHP 100 PSI, PUMP RATE 5 BPM, RETURN RATE

4.5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

18:33 19:08 0.58 P CTU 40 WASH TAG PLUG #2@ 6,840' - 4 MIN , CIRC 3,600 PSI, WHP 350 PSI, PUMP RATE 5 BPM, RETURN RATE

4.5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

19:08 19:38 0.50 P CTU 40 WASH TAG PLUG #3@ 7,040' - 5 MIN , CIRC 3,500 PSI, WHP 0 PSI, PUMP RATE 5 BPM, RETURN RATE 4.8

BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

19:38 00:06 4.47 P CTU 40 WASH TAG PLUG #4, PUMPED A 10 BBL GEL SWEEP 50 VIS. WAITED TILL SWEEP REACH EOT, THEN

STARTED MAKING THE SHORT TRIP TO TOP OF CURVE PUMPING ADDITIONAL GEL SWEEPS AS

NEEDED.

00:06 00:29 0.38 P CTU 40 WASH TAG PLUG #4@ 7,227' - 4 MIN , CIRC 3,700 PSI, WHP 0 PSI, PUMP RATE 5 BPM, RETURN RATE 3.8

BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

00:29 01:08 0.65 P CTU 40 WASH TAG PLUG #5@ 7,432' - 15 MIN , CIRC 3,600 PSI, WHP 0 PSI, PUMP RATE 5 BPM, RETURN RATE

3.8 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

01:08 01:58 0.83 P CTU 40 WASH TAG PLUG #6@ 7,634' - 26 MIN , CIRC 3,500 PSI, WHP 0 PSI, PUMP RATE 5 BPM, RETURN RATE

3.3 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

01:58 02:50 0.87 P CTU 40 WASH TAG PLUG #7@ 7,833' - 34 MIN , CIRC 3,600 PSI, WHP 0 PSI, PUMP RATE 5 BPM, RETURN RATE

3.5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

02:50 03:17 0.45 P CTU 40 WASH TAG PLUG #8@ 8,033' - 10 MIN , CIRC 3,700 PSI, WHP 0 PSI, PUMP RATE 5 BPM, RETURN RATE

4.5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

03:17 04:00 0.72 P CTU 40 WASH TAG PLUG #9@ 8,232' - 10 MIN , CIRC 3,700 PSI, WHP 0 PSI, PUMP RATE 5 BPM, RETURN RATE

4.7 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

04:00 06:00 2.00 P CTU 40 WASH TAG PLUG #10, PUMPED A 10 BBL GEL SWEEP 50 VIS. WAITED TILL SWEEP REACH EOT, THEN

STARTED MAKING THE SHORT TRIP TO TOP OF CURVE PUMPING ADDITIONAL GEL SWEEPS AS

NEEDED.

Daily Operations Comments:

NO SPILLS, INJURIES OR OFFICIAL VISITS.

CASING

Size(in) MD(ft)/TVD(ft) LOT(ppg)

/

/

/

/ 14.000 67.00 67.00

/ 9.625 1,005.00 1,005.00

FLOWBACK

Gas Rate:

Choke Size:

Avg. Tbg. Press:

Avg. Csg. Press:

Fluid Rate (Water):

Fluid Rate (Oil):

Tot. Load Recovered:

FLUIDSFluids Co:

Fluids Eng:

Brine Type:

Pit Temp:

Density:

Viscosity:

Gel Type:

Nitrogen:

NTU:

COMPLETION STRING DETAILS

Down Hole Tool Co: Tool Sup:

Qty Description ID OD Top Set

PERFORATIONS

Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments

7/9/2016 8:05:05AMPrinted: Page 1 of 1

Report Date: 07/10/2016

DOE: 52

Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00

Country: USAState: TEXASField: WOLFCAMP EAST

Supervisors: DJ GOSS / BARRY BROUSSARD

Engineer/Manager: SCHMELTZ, PETER / LLOYD, BARRY

046

Spud Date: 11/28/2015

DOL: 42 AFE Days: Last BOP T.:

Release Date:

Report Number:Daily Operations

Report Onshore

CSG Test:**Data shared on this report is CONFIDENTIAL**

Rig:

Rig Phone:KB(ft): 2,664.01

POB: 43

Event: COMPLETION LAND

Location: Lat:

Long:

Safety Meeting Topic:

31° 1' 30.33092 N

101° 9' 22.17900 W Manhours: 400.00

API #: 4210542309

Current Activity: GIH TO TOP OF FISH

24 Hr Summary: DRILLED PLUGS 10-21

RETRIEVE FISH, DRILL PLUGS24 Hr Forecast:

OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY

06:00 06:45 0.75 P CTU 40 WASH CONT RIH TO PLUG 10

06:45 07:20 0.58 P CTU 40 WASH TAG PLUG #10@ 8,435' - 15 MIN , CIRC 3,700 PSI, WHP 0 PSI, PUMP RATE 5 BPM, RETURN RATE

4.7 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

07:20 08:00 0.67 P CTU 40 WASH TAG PLUG #11@ 8,635' - 38 MIN , CIRC 3,700 PSI, WHP 0 PSI, PUMP RATE 5 BPM, RETURN RATE

4.7 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

08:00 08:40 0.67 P CTU 40 WASH TAG PLUG #12@ 8,834' - 14 MIN , CIRC 3,700 PSI, WHP 0 PSI, PUMP RATE 5 BPM, RETURN RATE

4.7 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

08:40 08:40 0.00 P CTU 40 WASH TAG PLUG #13@ 9,034' - 10 MIN , CIRC 3,700 PSI, WHP 0 PSI, PUMP RATE 5 BPM, RETURN RATE

4.7 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

08:40 09:20 0.67 P CTU 40 WASH TAG PLUG #14@ 9,233' - 06 MIN , CIRC 3,700 PSI, WHP 0 PSI, PUMP RATE 5 BPM, RETURN RATE

4.7 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

09:20 10:00 0.67 P CTU 40 WASH TAG PLUG #15@ 9,434' - 15 MIN , CIRC 3,700 PSI, WHP 0 PSI, PUMP RATE 5 BPM, RETURN RATE

4.7 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

10:00 10:35 0.58 P CTU 40 WASH TAG PLUG #16@ 9,632' - 16 MIN , CIRC 3,700 PSI, WHP 0 PSI, PUMP RATE 5 BPM, RETURN RATE

4.7 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

10:35 11:13 0.63 P CTU 40 WASH TAG PLUG #17@ 9,832' - 15 MIN , CIRC 3,700 PSI, WHP 0 PSI, PUMP RATE 5 BPM, RETURN RATE

4.7 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

11:13 11:52 0.65 P CTU 40 WASH TAG PLUG #18@ 10,034' - 10 MIN , CIRC 3,700 PSI, WHP 0 PSI, PUMP RATE 5 BPM, RETURN RATE

4.7 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

11:52 15:42 3.83 P CTU 40 WASH TAG PLUG #19@ 10,227' - 185 MIN , CIRC 3,700 PSI, WHP 250 PSI, PUMP RATE 5 BPM, RETURN

RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

15:42 00:52 9.17 P CTU 40 WASH TAG PLUG #20@ 10,428' - 288 MIN , CIRC 3,700 PSI, WHP 400 PSI, PUMP RATE 5 BPM, RETURN

RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

00:52 06:00 5.13 P CTU 40 WASH TAG PLUG #21@ 10,607' - 159 MIN , CIRC 3,700 PSI, WHP 500 PSI, PUMP RATE 5 BPM, RETURN

RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO TOP OF FISH.

Daily Operations Comments:

NO SPILLS, INJURIES OR OFFICIAL VISITS.

CASING

Size(in) MD(ft)/TVD(ft) LOT(ppg)

/

/

/

/ 14.000 67.00 67.00

/ 9.625 1,005.00 1,005.00

FLOWBACK

Gas Rate:

Choke Size:

Avg. Tbg. Press:

Avg. Csg. Press:

Fluid Rate (Water):

Fluid Rate (Oil):

Tot. Load Recovered:

FLUIDSFluids Co:

Fluids Eng:

Brine Type:

Pit Temp:

Density:

Viscosity:

Gel Type:

Nitrogen:

NTU:

COMPLETION STRING DETAILS

Down Hole Tool Co: Tool Sup:

Qty Description ID OD Top Set

PERFORATIONS

Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments

7/11/2016 8:06:17AMPrinted: Page 1 of 1

Report Date: 07/11/2016

DOE: 53

Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00

Country: USAState: TEXASField: WOLFCAMP EAST

Supervisors: DJ GOSS / BARRY BROUSSARD

Engineer/Manager: SCHMELTZ, PETER / LLOYD, BARRY

047

Spud Date: 11/28/2015

DOL: 43 AFE Days: Last BOP T.:

Release Date:

Report Number:Daily Operations

Report Onshore

CSG Test:**Data shared on this report is CONFIDENTIAL**

Rig:

Rig Phone:KB(ft): 2,664.01

POB: 43

Event: COMPLETION LAND

Location: Lat:

Long:

Safety Meeting Topic:

31° 1' 30.33092 N

101° 9' 22.17900 W Manhours: 400.00

API #: 4210542309

Current Activity: GOING IN HOLE WITH OVERSHOT ASSEMBLY

24 Hr Summary: WASHED OVER FISH.

RETRIEVE FISH, DRILL PLUGS24 Hr Forecast:

OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY

06:00 09:45 3.75 P CTU 40 WASH CONT POOH

09:45 10:30 0.75 P CTU 40 WASH COIL AT SURFACE

10:30 11:00 0.50 P CTU 16 NUND BREAKING OFF BHA

11:00 12:30 1.50 P CTU 16 NUND NU 8- 5 1/8 10K RISERS

12:30 16:00 3.50 P CTU 16 NUND PUT ON NEW BHA FOR FISHING JOB PER ON CALL ENGINEER

16:00 16:30 0.50 P CTU 16 NUND TEST MOTOR ON SURFACE

16:30 17:30 1.00 P CTU 16 NUND SHELL TEST

17:30 21:29 3.98 P CTU 40 WASH RIH TO TOP OF FISH

21:29 04:00 6.52 P CTU 40 WASH TAG FISH AT 10,617' CTM. INCREASE PUMP RATE AND WASH DOWN TO 10,621' CTM. LOWER

PUMP RATE, PULL UP AND SAW 2/4K OVER PULLS 10' ABOVE FISH. GO IN HOLE AND TAG AT

10,617' CTM. INCREASE PUMP RATE AND WASH DOWN AGAIN TO 10,621' CTM. LOWER PUMP

RATE AND PICK UP 50'. RUN BACK IN HOLE AND TAGGED AT 10,617' CTM. INCREASED PUMP

RATE AND WASHED DOWN AGAIN TO 10,621' CTM. LOWER PUMP RATE TO 1 BBL AND PUSHED

DOWN ON FISH. PULL OUT OF HOLE SLOWLY. WE PULLED INTO DEBRIS A FEW TIMES WHILE

PULLING OUT OF HOLE.

04:00 06:00 2.00 P CTU 40 WASH OUT OF HOLE. LAY DOWN BHA. FOUND ALL INDICATER PINS LAYED DOWN AND A SHINY

RUBBED SPOT APPROXIMATLY 18' INSIDE OF WASH PIPE. WE APPEARED TO HAVE WASHED

OVER ENTIRE FISH. PICK UP OVER SHOT ASSEMBLY. TEST LUBRICATOR TO 9,000 PSI.

Daily Operations Comments:

NO SPILLS, INJURIES OR OFFICIAL VISITS.

CASING

Size(in) MD(ft)/TVD(ft) LOT(ppg)

/

/

/

/ 14.000 67.00 67.00

/ 9.625 1,005.00 1,005.00

FLOWBACK

Gas Rate:

Choke Size:

Avg. Tbg. Press:

Avg. Csg. Press:

Fluid Rate (Water):

Fluid Rate (Oil):

Tot. Load Recovered:

FLUIDSFluids Co:

Fluids Eng:

Brine Type:

Pit Temp:

Density:

Viscosity:

Gel Type:

Nitrogen:

NTU:

COMPLETION STRING DETAILS

Down Hole Tool Co: Tool Sup:

Qty Description ID OD Top Set

PERFORATIONS

Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments

7/11/2016 8:03:45AMPrinted: Page 1 of 1

Report Date: 07/12/2016

DOE: 54

Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00

Country: USAState: TEXASField: WOLFCAMP EAST

Supervisors: DJ GOSS / BARRY BROUSSARD

Engineer/Manager: SCHMELTZ, PETER / LLOYD, BARRY

048

Spud Date: 11/28/2015

DOL: 44 AFE Days: Last BOP T.:

Release Date:

Report Number:Daily Operations

Report Onshore

CSG Test:**Data shared on this report is CONFIDENTIAL**

Rig:

Rig Phone:KB(ft): 2,664.01

POB: 43

Event: COMPLETION LAND

Location: Lat:

Long:

Safety Meeting Topic:

31° 1' 30.33092 N

101° 9' 22.17900 W Manhours: 400.00

API #: 4210542309

Current Activity: P.O.O.H.

24 Hr Summary: ATTEMPT TO FISH TOOLS.

RETRIEVE FISH, DRILL PLUGS24 Hr Forecast:

OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY

06:00 09:15 3.25 P CTU 40 WASH CONT RIH TO TOF @ 10,617'

09:15 13:10 3.92 P CTU 40 WASH TAG TOF, WORKED PIPE SEVERAL TIMES UP AND DOWN ON FISH, PULLED HEAVY, SAT BACK

DOWN ON TOF, POOH

13:10 14:00 0.83 P CTU 40 WASH BUMPED UP, RUN PIPE DOWN, NO FISH

14:00 16:35 2.58 P CTU 40 WASH MU NEW BHA PER ENGINEER PROCEDURE. SHELL TEST TO 9K, OPEN WELL, RIH

16:35 19:45 3.17 P CTU 40 WASH TAG AT 6,591' CTM. COULD NOT GET DOWN WITH CUT LIP GUIDE.

19:45 22:00 2.25 P CTU 40 WASH PULL OUT OF HOLE.

22:00 23:00 1.00 P CTU 40 WASH LAY DOWN BHA. PICK UP VENTURI, STUMP CATCHER, AND SHOE ASSEMBLY. TEST

LUBRICATOR TO 9,000 PSI.

23:00 02:50 3.83 P CTU 40 WASH OPEN WELL. GO IN HOLE.

02:50 03:00 0.17 P CTU 40 WASH TAG FISH AT 10,613' CTM. GAINED 300 PSI DIFFERENTIAL PRESSURE. PICK UP 20'.

03:00 04:00 1.00 P CTU 40 WASH TAG FISH AT 10,613' CTM. GAINED 350 PSI PRESSURE. SIT ON FISH FOR 30 MIN. PICK UP 20'

AND HAD A 2K OVERPULL. TAG FISH AT 10,613'. SIT ON FISH WITH MAXIMUM ALLOWED WEIGHT

FOR 30 MIN. PICK UP AND HAD A 4K OVERPULL.

04:00 06:00 2.00 P CTU 40 WASH PULL OUT OF HOLE.

Daily Operations Comments:

NO SPILLS, INJURIES OR OFFICIAL VISITS.

CASING

Size(in) MD(ft)/TVD(ft) LOT(ppg)

/

/

/

/ 14.000 67.00 67.00

/ 9.625 1,005.00 1,005.00

FLOWBACK

Gas Rate:

Choke Size:

Avg. Tbg. Press:

Avg. Csg. Press:

Fluid Rate (Water):

Fluid Rate (Oil):

Tot. Load Recovered:

FLUIDSFluids Co:

Fluids Eng:

Brine Type:

Pit Temp:

Density:

Viscosity:

Gel Type:

Nitrogen:

NTU:

COMPLETION STRING DETAILS

Down Hole Tool Co: Tool Sup:

Qty Description ID OD Top Set

PERFORATIONS

Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments

7/12/2016 8:01:47AMPrinted: Page 1 of 1

Report Date: 07/13/2016

DOE: 55

Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00

Country: USAState: TEXASField: WOLFCAMP EAST

Supervisors: DJ GOSS / BARRY BROUSSARD

Engineer/Manager: SCHMELTZ, PETER / LLOYD, BARRY

049

Spud Date: 11/28/2015

DOL: 45 AFE Days: Last BOP T.:

Release Date:

Report Number:Daily Operations

Report Onshore

CSG Test:**Data shared on this report is CONFIDENTIAL**

Rig:

Rig Phone:KB(ft): 2,664.01

POB: 43

Event: COMPLETION LAND

Location: Lat:

Long:

Safety Meeting Topic:

31° 1' 30.33092 N

101° 9' 22.17900 W Manhours: 400.00

API #: 4210542309

Current Activity: GOING IN HOLE.

24 Hr Summary: RETRIEVED MOTOR ASSEMBLY. DRILLED PLUG TO TOP OF GUN FISH.

RETRIEVE FISH, DRILL PLUGS24 Hr Forecast:

OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY

06:00 07:45 1.75 P CTU 40 WASH CONT POOH

07:45 08:00 0.25 P CTU 40 WASH BUMPED UP, SHUT IN WELL

08:00 08:20 0.33 P CTU 40 WASH RIH, FISH OUT OF HOLE

08:20 09:10 0.83 P CTU 40 WASH BREAK DOWN FISHING BHA, MU DRILL OUT BHA, SHELL TEST, OPEN WELL RIH

09:10 12:50 3.67 P CTU 40 WASH RIH TO TOP OF FISH

12:50 13:10 0.33 P CTU 40 WASH TAGGED PLUG @ 10,635, CONT RIH TO TOP OF FISH @ 10,730'

13:10 16:55 3.75 P CTU 40 WASH POOH

16:55 00:00 7.08 P CTU 40 WASH BUMPED UP, NOTICED PIN HOLE IN PIPE AT 830', CUT 900' OF PIPE

00:00 04:00 4.00 P CTU 40 WASH MAKE UP NEW COIL CONNECTOR AND BHA. DUAL FLAPPER VALVE. PRESSURE UP AND

TESTED BPV TO 5,000. – TEST GOOD AND CHARTED. VERIFY BALL SIZE AND ALL DRIFTS FOR

THE HYD DISCONN. MU AND BHA OF CONN, DUAL FLAPPER VALVE, ACCELERATOR, HYD JARS,

HYD DISCONN, AGITATOR, 3 1/8” MOTOR, VENTURI, WASH PIPE, STUMP CATCHER. STAB ON

WELL. SHELL TEST TO 9,000 PSI.

04:00 06:00 2.00 P CTU 40 WASH OPEN WELL. GO IN HOLE.

Daily Operations Comments:

NO SPILLS, INJURIES OR OFFICIAL VISITS.

CASING

Size(in) MD(ft)/TVD(ft) LOT(ppg)

/

/

/

/ 14.000 67.00 67.00

/ 9.625 1,005.00 1,005.00

FLOWBACK

Gas Rate:

Choke Size:

Avg. Tbg. Press:

Avg. Csg. Press:

Fluid Rate (Water):

Fluid Rate (Oil):

Tot. Load Recovered:

FLUIDSFluids Co:

Fluids Eng:

Brine Type:

Pit Temp:

Density:

Viscosity:

Gel Type:

Nitrogen:

NTU:

COMPLETION STRING DETAILS

Down Hole Tool Co: Tool Sup:

Qty Description ID OD Top Set

PERFORATIONS

Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments

7/13/2016 8:04:14AMPrinted: Page 1 of 1

Report Date: 07/14/2016

DOE: 56

Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00

Country: USAState: TEXASField: WOLFCAMP EAST

Supervisors: DJ GOSS / BARRY BROUSSARD

Engineer/Manager: SCHMELTZ, PETER / LLOYD, BARRY

050

Spud Date: 11/28/2015

DOL: 46 AFE Days: Last BOP T.:

Release Date:

Report Number:Daily Operations

Report Onshore

CSG Test:**Data shared on this report is CONFIDENTIAL**

Rig:

Rig Phone:KB(ft): 2,664.01

POB: 43

Event: COMPLETION LAND

Location: Lat:

Long:

Safety Meeting Topic:

31° 1' 30.33092 N

101° 9' 22.17900 W Manhours: 400.00

API #: 4210542309

Current Activity: GOING IN HOLE.

24 Hr Summary: ATTEMPTED TO FISH W/L TOOLS.

RETRIEVE FISH, DRILL PLUGS24 Hr Forecast:

OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY

06:00 07:15 1.25 P CTU 40 WASH CONT RIH TO TOP OF FISH

07:15 09:20 2.08 P CTU 40 WASH TAG TOP OF FISH @ 10,739', WORKED PIPE ON FISH SEVERAL TIMES, SEEN PSI INCREASE

09:20 12:40 3.33 P CTU 40 WASH POOH TO SURFACE

12:40 13:00 0.33 P CTU 40 WASH COIL AT SURFACE

13:00 13:20 0.33 P CTU 40 WASH REMOVED BHA, NO FISH, VENTURI FULL OF SLIPS AND PLUG PARTS AND SAND

13:20 15:40 2.33 P CTU 40 WASH MAKE UP NEW BHA

15:40 19:00 3.33 P CTU 40 WASH NU ON WELL, SHELL TEST, OPEN WELL, RIH TO TOP OF FISH

19:00 20:23 1.38 P CTU 40 WASH TAG FISH AT 10,733' CTM. INCREASE PUMP RATE. PICK UP 20'. TAG FISH AT 10,733'. KILL PUMP.

PICK UP 20'. TAG FISH 10,733'. INCREASE PUMP RATE TO 4 BBL PER MIN. ROTATE ON FISH FOR

30 MIN AND LOST SET DOWN WEIGHT. MILL DOWN TO 10,735'. COULD NOT GAIN ANY MORE

FOOTAGE.

20:23 00:00 3.62 P CTU 40 WASH PULL OUT OF HOLE.

00:00 01:00 1.00 P CTU 40 WASH LAY DOWN BHA. FOUND 1' OF WIRELINE INSIDE OF SHOE. WE DID NOT LAY DOWN INDICATOR

PIN 5' INSIDE OF SHOE.

01:00 04:18 3.30 P CTU 40 WASH CUT 100' OF COIL. INSTALL NEW COIL CONNECTOR AND BHA. DUEL FLAPPER, ACCELERATOR,

BI-DI JAR, DISCONNECT, TOE TAPPER, MOTOR, WASH PIPE, 4.625'' OD STANDARD SHOE.

04:18 06:00 1.70 N CTU 54 RIGPROB REPAIR LEVEL WIND ON COIL UNIT.

Daily Operations Comments:

NO SPILLS, INJURIES OR OFFICIAL VISITS.

CASING

Size(in) MD(ft)/TVD(ft) LOT(ppg)

/

/

/

/ 14.000 67.00 67.00

/ 9.625 1,005.00 1,005.00

FLOWBACK

Gas Rate:

Choke Size:

Avg. Tbg. Press:

Avg. Csg. Press:

Fluid Rate (Water):

Fluid Rate (Oil):

Tot. Load Recovered:

FLUIDSFluids Co:

Fluids Eng:

Brine Type:

Pit Temp:

Density:

Viscosity:

Gel Type:

Nitrogen:

NTU:

COMPLETION STRING DETAILS

Down Hole Tool Co: Tool Sup:

Qty Description ID OD Top Set

PERFORATIONS

Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments

7/14/2016 8:09:11AMPrinted: Page 1 of 1

Report Date: 07/15/2016

DOE: 57

Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00

Country: USAState: TEXASField: WOLFCAMP EAST

Supervisors: DJ GOSS / BARRY BROUSSARD

Engineer/Manager: SCHMELTZ, PETER / LLOYD, BARRY

051

Spud Date: 11/28/2015

DOL: 47 AFE Days: Last BOP T.:

Release Date:

Report Number:Daily Operations

Report Onshore

CSG Test:**Data shared on this report is CONFIDENTIAL**

Rig:

Rig Phone:KB(ft): 2,664.01

POB: 43

Event: COMPLETION LAND

Location: Lat:

Long:

Safety Meeting Topic:

31° 1' 30.33092 N

101° 9' 22.17900 W Manhours: 400.00

API #: 4210542309

Current Activity: P.O.O.H.

24 Hr Summary: CLEAN OVER FISH. ATTEMPT TO LATCH FISH.

RETRIEVE FISH, DRILL PLUGS24 Hr Forecast:

OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY

06:00 08:40 2.67 P CTU 40 WASH CONT RIH TO TOP OF FISH

08:40 09:30 0.83 P CTU 40 WASH TAG TOP OF FISH @ 10,740' WASHED DOWN TO 10,761, POOH

09:30 12:30 3.00 P CTU 40 WASH COIL AT SURFACE, SHUT IN WELL

12:30 13:00 0.50 P CTU 40 WASH NO FISH, INDICATOR PINS SHOW WE WASHED 24 FEET OVER THE TOP OF FISH

13:00 16:20 3.33 P CTU 40 WASH MU FISHING BHA

16:20 16:30 0.17 P CTU 40 WASH DURING PRESSURE TEST NOTICED PIN HOLE IN PIPE

16:30 18:00 1.50 P CTU 40 WASH REMOVE TOOLS AND CUT 500 FEET OF PIPE

18:00 00:15 6.25 P CTU 40 WASH MU FISHING BHA, TEST COIL CONNECTOR AND BACK PRESSURE VALVE, EQUALIZE WELL, RIH

TO TOP OF FISH

00:15 01:20 1.08 P CTU 40 WASH TAG FISH AT 10,744' CTM. SET DOWN 2K AND KICK PUMP ON TO LATCH FISH. PICK UP 20'. NO

FISH. TAG FISH. SET DOWN 8K. KICK PUMP ON. GO IN HOLE 7'. SET DOWN 8K. LOST SET DOWN

WEIGHT. GO IN HOLE TO 10,781'. PICK UP TO 10,755'. GO IN HOLE TO 10,784'. SET DOWN 10K.

KICK ON PUMP. PULL UP 20' KICK PUMP ON. NO PRESSURE INCREASE. GO IN HOLE PUMPING

3 BBL PER MIN TO 10,797'. SWALLOW FISH. PULL UP 20' WHILE PULLING 15K OVER. KICK IN

PUMP AND HAD OVERPRESSURE.

01:20 06:00 4.67 P CTU 40 WASH PULL OUT OF HOLE SLOWLY WHILE PULLING OVER PICK UP WEIGHT.

Daily Operations Comments:

NO SPILLS, INJURIES OR OFFICIAL VISITS.

CASING

Size(in) MD(ft)/TVD(ft) LOT(ppg)

/

/

/

/ 14.000 67.00 67.00

/ 9.625 1,005.00 1,005.00

FLOWBACK

Gas Rate:

Choke Size:

Avg. Tbg. Press:

Avg. Csg. Press:

Fluid Rate (Water):

Fluid Rate (Oil):

Tot. Load Recovered:

FLUIDSFluids Co:

Fluids Eng:

Brine Type:

Pit Temp:

Density:

Viscosity:

Gel Type:

Nitrogen:

NTU:

COMPLETION STRING DETAILS

Down Hole Tool Co: Tool Sup:

Qty Description ID OD Top Set

PERFORATIONS

Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments

7/15/2016 8:07:02AMPrinted: Page 1 of 1

Report Date: 07/16/2016

DOE: 58

Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00

Country: USAState: TEXASField: WOLFCAMP EAST

Supervisors: DJ GOSS / BARRY BROUSSARD

Engineer/Manager: SCHMELTZ, PETER / LLOYD, BARRY

052

Spud Date: 11/28/2015

DOL: 48 AFE Days: Last BOP T.:

Release Date:

Report Number:Daily Operations

Report Onshore

CSG Test:**Data shared on this report is CONFIDENTIAL**

Rig:

Rig Phone:KB(ft): 2,664.01

POB: 43

Event: COMPLETION LAND

Location: Lat:

Long:

Safety Meeting Topic:

31° 1' 30.33092 N

101° 9' 22.17900 W Manhours: 400.00

API #: 4210542309

Current Activity: DRILLING PLUGS

24 Hr Summary: DRILL PLUGS 22-35

RETRIEVE FISH, DRILL PLUGS24 Hr Forecast:

OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY

06:00 10:00 4.00 P CTU 40 WASH CONT POOH TO SURFACE

10:00 10:30 0.50 P CTU 40 WASH COIL AT SURFACE, BLED OFF ALL LINES

10:30 16:15 5.75 P CTU 40 WASH RUN PIPE DOWN, FISH WAS CAUGHT, ND RISIERS AND BHA, NU BHA AND TEST

16:15 22:10 5.92 P CTU 40 WASH OPEN WELL AND RIH

22:10 22:31 0.35 P CTU 40 WASH TAG PLUG #22 @ 10,758' - 1 MIN , CIRC 3,000 PSI, WHP 500 PSI, PUMP RATE 4.5 BPM, RETURN

RATE 4.5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

22:31 22:58 0.45 P CTU 40 WASH TAG PLUG #23 @ 10,964' - 5 MIN , CIRC 3,400 PSI, WHP 600 PSI, PUMP RATE 5 BPM, RETURN

RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

22:58 23:31 0.55 P CTU 40 WASH TAG PLUG #24 @ 11,150' - 6 MIN , CIRC 3,700 PSI, WHP 500 PSI, PUMP RATE 5 BPM, RETURN

RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

23:31 00:01 0.50 P CTU 40 WASH TAG PLUG #25 @ 11,335' - 4 MIN , CIRC 3,600 PSI, WHP 500 PSI, PUMP RATE 5 BPM, RETURN

RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

00:01 00:20 0.32 P CTU 40 WASH TAG PLUG #26 @ 11,538' - 3 MIN , CIRC 3,800 PSI, WHP 475 PSI, PUMP RATE 5 BPM, RETURN

RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

00:20 00:42 0.37 P CTU 40 WASH TAG PLUG #27 @ 11,736' - 2 MIN , CIRC 3,600 PSI, WHP 400 PSI, PUMP RATE 5 BPM, RETURN

RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

00:42 01:10 0.47 P CTU 40 WASH TAG PLUG #28 @ 11,938' - 4 MIN , CIRC 3,600 PSI, WHP 300 PSI, PUMP RATE 5 BPM, RETURN

RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

01:10 01:39 0.48 P CTU 40 WASH TAG PLUG #29 @ 12,141' - 3 MIN , CIRC 3,400 PSI, WHP 300 PSI, PUMP RATE 5 BPM, RETURN

RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

01:39 02:13 0.57 P CTU 40 WASH TAG PLUG #30 @ 12,327' - 3 MIN , CIRC 3,400 PSI, WHP 300 PSI, PUMP RATE 5 BPM, RETURN

RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

02:13 02:46 0.55 P CTU 40 WASH TAG PLUG #31 @ 12,527' - 3 MIN , CIRC 3,400 PSI, WHP 300 PSI, PUMP RATE 5 BPM, RETURN

RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

02:46 03:23 0.62 P CTU 40 WASH TAG PLUG #32 @ 12,727' - 3 MIN , CIRC 3,400 PSI, WHP 300 PSI, PUMP RATE 5 BPM, RETURN

RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

03:23 04:04 0.68 P CTU 40 WASH TAG PLUG #33 @ 12,926' - 3 MIN , CIRC 3,400 PSI, WHP 300 PSI, PUMP RATE 5 BPM, RETURN

RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

04:04 04:44 0.67 P CTU 40 WASH TAG PLUG #34 @ 13,128' - 4 MIN , CIRC 3,400 PSI, WHP 300 PSI, PUMP RATE 5 BPM, RETURN

RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

04:44 05:30 0.77 P CTU 40 WASH TAG PLUG #35 @ 13,327' - 5 MIN , CIRC 3,400 PSI, WHP 300 PSI, PUMP RATE 5 BPM, RETURN

RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

05:30 06:00 0.50 P CTU 40 WASH TAG PLUG #36 @ 13,527' - 4 MIN , CIRC 3,400 PSI, WHP 300 PSI, PUMP RATE 5 BPM, RETURN

RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

Daily Operations Comments:

NO SPILLS, INJURIES OR OFFICIAL VISITS.

CASING

Size(in) MD(ft)/TVD(ft) LOT(ppg)

/

/

/

/ 14.000 67.00 67.00

/ 9.625 1,005.00 1,005.00

FLOWBACK

Gas Rate:

Choke Size:

Avg. Tbg. Press:

Avg. Csg. Press:

Fluid Rate (Water):

Fluid Rate (Oil):

Tot. Load Recovered:

FLUIDSFluids Co:

Fluids Eng:

Brine Type:

Pit Temp:

Density:

Viscosity:

Gel Type:

Nitrogen:

NTU:

COMPLETION STRING DETAILS

Down Hole Tool Co: Tool Sup:

Qty Description ID OD Top Set

PERFORATIONS

Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments

7/17/2016 8:07:57AMPrinted: Page 1 of 1

Report Date: 07/17/2016

DOE: 59

Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00

Country: USAState: TEXASField: WOLFCAMP EAST

Supervisors: DJ GOSS / BARRY BROUSSARD

Engineer/Manager: SCHMELTZ, PETER / LLOYD, BARRY

053

Spud Date: 11/28/2015

DOL: 49 AFE Days: Last BOP T.:

Release Date:

Report Number:Daily Operations

Report Onshore

CSG Test:**Data shared on this report is CONFIDENTIAL**

Rig:

Rig Phone:KB(ft): 2,664.01

POB: 43

Event: COMPLETION LAND

Location: Lat:

Long:

Safety Meeting Topic:

31° 1' 30.33092 N

101° 9' 22.17900 W Manhours: 400.00

API #: 4210542309

Current Activity: RIGGING DOWN.

24 Hr Summary: DRILL PLUGS 37-51.

MOVE IN WIRELINE.24 Hr Forecast:

OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY

06:00 06:10 0.17 P CTU 40 WASH CONT WASHING DOWN TO PLUG 37

06:10 06:50 0.67 P CTU 40 WASH TAG PLUG #37 @ 13,726' - 5 MIN , CIRC 3,400 PSI, WHP 300 PSI, PUMP RATE 5 BPM, RETURN

RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

06:50 07:30 0.67 P CTU 40 WASH TAG PLUG #38 @ 13,926' - 3 MIN , CIRC 3,400 PSI, WHP 300 PSI, PUMP RATE 5 BPM, RETURN

RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

07:30 08:25 0.92 P CTU 40 WASH TAG PLUG #39 @ 14,125' - 7 MIN , CIRC 3,400 PSI, WHP 300 PSI, PUMP RATE 5 BPM, RETURN

RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

08:25 09:10 0.75 P CTU 40 WASH TAG PLUG #40 @ 14,325' - 5 MIN , CIRC 3,400 PSI, WHP 300 PSI, PUMP RATE 5 BPM, RETURN

RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

09:10 09:55 0.75 P CTU 40 WASH TAG PLUG #41 @ 14,501' - 8 MIN , CIRC 3,400 PSI, WHP 300 PSI, PUMP RATE 5 BPM, RETURN

RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

09:55 10:53 0.97 P CTU 40 WASH TAG PLUG #42 @ 14,700' - 7 MIN , CIRC 3,400 PSI, WHP 300 PSI, PUMP RATE 5 BPM, RETURN

RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

10:53 11:53 1.00 P CTU 40 WASH TAG PLUG #43 @ 14,900' - 6 MIN , CIRC 3,700 PSI, WHP 300 PSI, PUMP RATE 5 BPM, RETURN

RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

11:53 13:00 1.12 P CTU 40 WASH TAG PLUG #44 @ 15,104' - 4 MIN , CIRC 3,600 PSI, WHP 300 PSI, PUMP RATE 5 BPM, RETURN

RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

13:00 14:09 1.15 P CTU 40 WASH TAG PLUG #45 @ 15,307' - 4 MIN , CIRC 3,400 PSI, WHP 300 PSI, PUMP RATE 5 BPM, RETURN

RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

14:09 15:03 0.90 P CTU 40 WASH TAG PLUG #46 @ 15,506' - 5 MIN , CIRC 3,800 PSI, WHP 500 PSI, PUMP RATE 5 BPM, RETURN

RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

15:03 15:54 0.85 P CTU 40 WASH TAG PLUG #47 @ 15,701' - 4 MIN , CIRC 3,600 PSI, WHP 450 PSI, PUMP RATE 5 BPM, RETURN

RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

15:54 16:58 1.07 P CTU 40 WASH TAG PLUG #48 @ 15,914' - 5 MIN , CIRC 3,700 PSI, WHP 500 PSI, PUMP RATE 5 BPM, RETURN

RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

16:58 17:48 0.83 P CTU 40 WASH TAG PLUG #49 @ 16,114' - 1 MIN , CIRC 3,900 PSI, WHP 400 PSI, PUMP RATE 5 BPM, RETURN

RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

17:48 18:30 0.70 P CTU 40 WASH TAG PLUG #50 @ 16,316' - 1 MIN , CIRC 3,900 PSI, WHP 400 PSI, PUMP RATE 5 BPM, RETURN

RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO NEXT PLUG.

18:30 19:30 1.00 P CTU 40 WASH TAG PLUG #51 @ 16,465' - 1 MIN , CIRC 3,300 PSI, WHP 450 PSI, PUMP RATE 5 BPM, RETURN

RATE 5 BPM, PUMPED A 5 BBL GEL SWEEP 50 VIS AND CONT TO TOE SLEEVE.

19:30 20:30 1.00 P CTU 40 WASH STOP AT P.B.T.D. PUMP SWEEPS. PULL OUT OF HOLE PUMPING SWEEPS AS NEEDED.

20:30 03:54 7.40 P CTU 40 WASH OUT OF HOLE WITH COIL. BULLHEAD 200 BBLS OF 2% KCL.

03:54 06:00 2.10 P CTU 40 WASH RIG DOWN AND RELEASE ALL EQUIPMENT.

Daily Operations Comments:

NO SPILLS, INJURIES OR OFFICIAL VISITS.

CASING

Size(in) MD(ft)/TVD(ft) LOT(ppg)

/

/

/

/ 14.000 67.00 67.00

/ 9.625 1,005.00 1,005.00

FLOWBACK

Gas Rate:

Choke Size:

Avg. Tbg. Press:

Avg. Csg. Press:

Fluid Rate (Water):

Fluid Rate (Oil):

Tot. Load Recovered:

FLUIDSFluids Co:

Fluids Eng:

Brine Type:

Pit Temp:

Density:

Viscosity:

Gel Type:

Nitrogen:

NTU:

COMPLETION STRING DETAILS

Down Hole Tool Co: Tool Sup:

Qty Description ID OD Top Set

PERFORATIONS

Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments

7/18/2016 8:03:02AMPrinted: Page 1 of 1

Report Date: 07/21/2016

DOE: 63

Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00

Country: USAState: TEXASField: WOLFCAMP EAST

Supervisors: DJ GOSS / BARRY BROUSSARD

Engineer/Manager: SCHMELTZ, PETER / LLOYD, BARRY

056

Spud Date: 11/28/2015

DOL: 52 AFE Days: Last BOP T.:

Release Date:

Report Number:Daily Operations

Report Onshore

CSG Test:**Data shared on this report is CONFIDENTIAL**

Rig:

Rig Phone:KB(ft): 2,664.01

POB: 43

Event: COMPLETION LAND

Location: Lat:

Long:

Safety Meeting Topic:

31° 1' 30.33092 N

101° 9' 22.17900 W Manhours: 400.00

API #: 4210542309

Current Activity: WORKING ON NH WELL.

24 Hr Summary: TUBE UP WELL.

WAITING ON FLOWBACK.24 Hr Forecast:

OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY

06:00 09:00 3.00 P WOR 25 RCST CONT TESTING BOP'S

09:00 16:00 7.00 P WOR 25 RCST MAKE UP ON/OFF TOOL, 1 JT. 2 7/8" 6,5# J-55 TBG, 1ST, GLV, CONTINUE IN HOLE PICKING UP

TBG. INSTALLING GLV AS PER DESIGN. TO TOP OF PKR. AT 6,250'.

16:00 18:00 2.00 P WOR 25 RCST CONTINUE IN HOLE LATCH PKR. PULL TEST TO 20K OVER PIPE WT. SET 10K DOWN ON PKR.

PRESSURE UP BACK SIDE TO 1,000 PSI PRESS ON TBG. 1,000 PSI HOLD FOR 15 MIN. CHART

SAME. PRESS UP TBG. TO 1,000 PSI BLEED PRESS. OFF OF CSG. TO "0" PSI, AND MONITOR

TBG. AND CSG. FOR 15 MINUTES. RELEASE PRESS. ON TBG. RELEASE ON/OFF TOOL SPACE

OUT LAND TBG. WITH 10K COMPRESSION, RUN IN HOLD DOWN PINS, INSTALL BPV

18:00 21:00 3.00 P WOR 25 RCST RIG DOWN RIG FLOOR, NIPPLE DOWN BOPS AND FINAL FRAC VALVE, NIPPLE UP PROD. TREE,

PULL BPV, INSTALL 2 WAY CHECK, TEST VOID TO 250 LOW AND 5,000 PSI HIGH AND MONITOR

SAME FOR 15 MIN. TEST TREE TO 250 LOW AND 5,000 PSI HIGH AND CHART SAME FOR 15 MIN.

BLOW OUT PLUG AT 2,200 PSI.

21:00 06:00 9.00 P WOR 16 NUND MOVE RIG TO NH WELL.

Daily Operations Comments:

NO SPILLS, INJURIES OR OFFICIAL VISITS.

CASING

Size(in) MD(ft)/TVD(ft) LOT(ppg)

/

/

/

/ 14.000 67.00 67.00

/ 9.625 1,005.00 1,005.00

FLOWBACK

Gas Rate:

Choke Size:

Avg. Tbg. Press:

Avg. Csg. Press:

Fluid Rate (Water):

Fluid Rate (Oil):

Tot. Load Recovered:

FLUIDSFluids Co:

Fluids Eng:

Brine Type:

Pit Temp:

Density:

Viscosity:

Gel Type:

Nitrogen:

NTU:

COMPLETION STRING DETAILS

Down Hole Tool Co: Tool Sup:

Qty Description ID OD Top Set

PERFORATIONS

Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments

7/21/2016 8:04:25AMPrinted: Page 1 of 1

Report Date: 07/22/2016

DOE: 64

Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00

Country: USAState: TEXASField: WOLFCAMP EAST

Supervisors: GARY WILHITE / N/A

Engineer/Manager: SCHMELTZ, PETER / LLOYD, BARRY

057

Spud Date: 11/28/2015

DOL: 53 AFE Days: Last BOP T.:

Release Date:

Report Number:Daily Operations

Report Onshore

CSG Test:**Data shared on this report is CONFIDENTIAL**

Rig:

Rig Phone:KB(ft): 2,664.01

POB: 43

Event: COMPLETION LAND

Location: Lat:

Long:

Safety Meeting Topic:

31° 1' 30.33092 N

101° 9' 22.17900 W Manhours: 400.00

API #: 4210542309

Current Activity: MIRU FLOWBACK EQUIPMENT

24 Hr Summary: MIRU FLOWBACK EQUIPMENT

CONTINUE RIGGING UP FLOWBACK EQUIPMENT24 Hr Forecast:

OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY

06:00 09:00 3.00 P MIRU 42 WOEP WAITING ON PERSONNEL

09:00 09:30 0.50 P MIRU 28 SFTYMTG HELD PREJOB SAFETY MEETING. DISCUSSED RIG UP SAFETY

09:30 12:30 3.00 P MIRU 18 OTHR BREAK FOR LUNCH

12:30 15:00 2.50 P MIRU 01 MIRU CONTINUE RIGGING UP FLOWBACK EQUIPMENT TAKING BREAKS AS NEEDED AND STAYING

HYDRATED.

15:00 18:00 3.00 P MIRU 18 OTHR SHUT DOWN

18:00 06:00 12.00 P MIRU 18 OTHR SECURE WELL FOR THE NIGHT

Daily Operations Comments:

NO SPILLS, INJURIES OR OFFICIAL VISITS.

CASING

Size(in) MD(ft)/TVD(ft) LOT(ppg)

/

/

/

/ 14.000 67.00 67.00

/ 9.625 1,005.00 1,005.00

FLOWBACK

Gas Rate:

Choke Size:

Avg. Tbg. Press:

Avg. Csg. Press:

Fluid Rate (Water):

Fluid Rate (Oil):

Tot. Load Recovered:

FLUIDSFluids Co:

Fluids Eng:

Brine Type:

Pit Temp:

Density:

Viscosity:

Gel Type:

Nitrogen:

NTU:

COMPLETION STRING DETAILS

Down Hole Tool Co: Tool Sup:

Qty Description ID OD Top Set

PERFORATIONS

Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments

7/23/2016 8:05:34AMPrinted: Page 1 of 1

Report Date: 08/05/2016

DOE: 78

Well Name/Wellbore No.: UNIVERSITY EAST 4110MH/00

Country: USAState: TEXASField: WOLFCAMP EAST

Supervisors: DAVID STRUTTON / N/A

Engineer/Manager: SCHMELTZ, PETER / LLOYD, BARRY

071

Spud Date: 11/28/2015

DOL: 67 AFE Days: Last BOP T.:

Release Date:

Report Number:Daily Operations

Report Onshore

CSG Test:**Data shared on this report is CONFIDENTIAL**

Rig:

Rig Phone:KB(ft): 2,664.01

POB: 3

Event: COMPLETION LAND

Location: Lat:

Long:

Safety Meeting Topic:

31° 1' 30.33092 N

101° 9' 22.17900 W Manhours: 28.00

API #: 4210542309

Current Activity: FLOWBACK OPERATIONS DAY 14

24 Hr Summary: FLOWBACK WELL THROUGH PRODUCTION EQUIPMENT / GAS LIFTING

FLOWBACK OPERATIONS24 Hr Forecast:

OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY

06:00 06:30 0.50 P FB 28 SFTYMTG JSA SAFETY MEETING (PPE)

06:30 18:00 11.50 P FB 23 PRDT FLOWBACK OPERATIONS

18:00 18:30 0.50 P FB 28 SFTYMTG JSA SAFETY MEETING (NORM)

18:30 06:00 11.50 P FB 23 PRDT 05:00, TP 189 PSI, CSG 903 PSI, 64/64 CK, 262 BOPD, 2,064 BWPD, TOR 1,345 BBLS, TFR 28,971

BBLS, 8.50% RCV'D, CHL 59,259, H2S 0.3 PPM, CO2 1%, API 40.7, 888 MCFD, 552 MCFD (INJ.),

336 MCFD (FORM) TURN WELL OVER TO PRODUCTION AT 5:00 AM

24 HR VOLUMES:

OIL 280 BBLS

H2O 2,113 BBLS

FORMATION GAS 334 MCFD

Daily Operations Comments:

NO SPILLS, INJURIES OR OFFICIAL VISITS.

CASING

Size(in) MD(ft)/TVD(ft) LOT(ppg)

/

/

/

/ 14.000 67.00 67.00

/ 9.625 1,005.00 1,005.00

FLOWBACK

Gas Rate:

Choke Size:

Avg. Tbg. Press:

Avg. Csg. Press:

Fluid Rate (Water):

Fluid Rate (Oil):

Tot. Load Recovered:

FLUIDSFluids Co:

Fluids Eng:

Brine Type:

Pit Temp:

Density:

Viscosity:

Gel Type:

Nitrogen:

NTU:

COMPLETION STRING DETAILS

Down Hole Tool Co: Tool Sup:

Qty Description ID OD Top Set

PERFORATIONS

Date Stage Top Bottom SPF(ft) FG/BHP(ft) Separation Method Comments

8/5/2016 8:06:06AMPrinted: Page 1 of 1