Upload
hoangphuc
View
213
Download
0
Embed Size (px)
Citation preview
65
DAFTAR PUSTAKA
Amabile, T.M., Schatzel, E.A., Moneta, G.B., dan Kramer, S.J. (2004). Leader Behaviours and the Work Environment for Creativity: Perceived Leader Support. Leadership Quarterly, 15, 5-32.
Ancok, D. (2012). Psikologi Kepemimpinan dan Inovasi. Jakarta: Erlangga.
Bank Indonesia. (2014). Laporan Nusantara Mei 2014, dalam http://www.bi.go.id/id/publikasi/kajian-ekonomi-regional/laporan-nusantara/Pages/lapnus_0514.aspx, diunduh pada tanggal 20 Mei 2015 pukul 15.00 WIB.
______ (2014). Laporan Nusantara November 2014, dalam http://www.bi.go.id/id/publikasi/kajian-ekonomi-regional/laporan-nusantara/Default.aspx, diunduh pada tanggal 20 Mei 2015 pukul 15.00 WIB.
______ (2014). Kajian Ekonomi Regional Provinsi Jawa Timur Tw I 2014, dalam http://www.bi.go.id/id/publikasi/kajian-ekonomi-regional/jatim/Pages/Kajian-Ekonomi-Regional-Provinsi-Jawa-Timur-Tw-I-2014.aspx, diunduh pada tanggal 20 Mei 2015 pukul 15.00 WIB.
______ (2015). Laporan Nusantara Mei 2015, dalam http://www.bi.go.id/id/publikasi/kajian-ekonomi-regional/laporan-nusantara/Pages/Laporan-Nusantara-Mei-2015.aspx, diunduh pada tanggal 7 Agustus 2015 pukul 22.00 WIB.
______ (2015). Kajian Ekonomi Keuangan Regional Jawa Timur Triwulan I 2015, dalam http://www.bi.go.id/id/publikasi/kajian-ekonomi-regional/jatim/Pages/Kajian-Ekonomi-Keuangan-Regional-Jawa-Timur-Triwulan-I-2015.aspx, diunduh pada tanggal 7 Agustus 2015 pukul 22.00 WIB.
Baron, R.M. dan Kenny, D.A. (1986). The Moderator-Mediator Variable Distinction in Social Psychological Research: Conceptual, Strategic, and Statistical Considerations. Journal of Personality and Social Psychological, 51, 1173-1182.
Bass, B.M. (1999). Two Decades of Research and Development in Transformational Leadership. European Journal of Work and Organizational Psychology, 8, 9-32.
Cooper, D.R. dan Schindler, P.S. (2014). Business Research Method, 11th edition. New York: McGraw-Hill.
Cummings, T.G. dan Worley, C.G. (2005). Organization Development and Change, 8th edition. Ohio: South-Western Thompson Corporation.
66
Informasi BTN (2014). BTN Info, dalam http://www.btn.co.id/id/content/BTN-Info/Tentang-Kami/Visi-Misi, diunduh pada tanggal 20 Oktober 2015 pukul 22.00 WIB.
Jafar, M. (2013). Pengaruh Efikasi Diri dan Kepemimpinan Pemberdaya terhadap Perilaku Inovatif Guru SMA Negeri 1 Bulukumba. Tesis Program Magister Manajemen Universitas Gadjah Mada. Tidak Dipublikasi.
Janssen, O., De Vliert, E.V. dan West, M. (2004). The Bright and Dark Sides of Individual and Group Innovation: A Special Issue Introduction. Journal of Organizational Behavior, 25, 129-145.
Janssen, O. (2000). Job Demands, Perceptions of Efford-reward Fairness and Innovative Work Behavior. Journal of Occupational and Organizational Psychology, 73, 287–302
Jha, S. (2012). Transformational Leadership and Psychological Empowerment. South Asian Journal of Global Business Research, 3, 18-35.
Jimenez, D.J. dan Valle, R.S. (2008). Could HRM Support Organizational Innovation?. The International Journal of Human Resources Management, 19, 1208-1221.
Jogiyanto. (2008). Metodologi Penelitian Sistem Informasi. Yogyakarta: Penerbit ANDI.
Jong, J.P.J. dan Hartog, D.N.D. (2008). Innovation Work Behavior: Measurement and Validation, SCALES Scientific AnaLysis of Entrepreneurship and SMEs.
Jong, J.P.J. dan Hartog, D.N.D. (2007). How Leader Influence Employees’ Creative Behavior. Europen Journal of Innovation Management 10, 41-64.
Kim, J.G. dan Lee, S.Y. (2012). Effect of Transformational and Transactional Leadership on Employees’ Creative Behavior: Mediating Effects of Work Motivation and Job Satisfaction. Asian Journal of Technology Innovation, 19, 233-247.
Laporan Tahunan BTN 2014 (2014). BTN Terdepan GCG Rumahkoe, Laporan Tahunan 2014, dalam http://www.btn.co.id/BTN/files/76/76881512-0d7e-42bf-8ae5-4c8cc79c5019.pdf, diunduh pada tanggal 20 Oktober 2015 pukul 22.00 WIB.
Malik, M.A.R., Butt, A.N. dan Choi, J.N. (2015). Rewards and Employee Creative Performance: Moderating Effect of Creative Self-Efficacy, Reward Importance, and Locus of Control. Journal of Organization Behavior, 36, 59-74.
67
Oldham, G.R. dan Cumming, A. (1996). Employee Creativity: Personal and Contextual Factors at Work. Academy of Management Journal, 39, 607-634.
Otoritas Jasa Keuangan (2015). Target Pertumbuhan Kredit 16,46 Persen Relevan, dalam http://www.antaranews.com/berita/474624/target-pertumbuhan-kredit-1646-persen-relevan, diunduh pada tanggal 17 Juni 2015 pukul 16.00 WIB.
Park, Y.K., Song, J.H., Yoon, S.W. dan Kim, J. (2014). Learning Organization and Innovative Behavior. The Mediating Effect of Work Engagement. European Journal of Training and Development, 38, 75-94.
Pieterse, A. N., Knippenberg, D.V., Schippers, M. dan Stam, D. (2010). Transformational and Transactional Leadership and Innovative Behavior: The Moderating Role of Psychological Empowerment. Journal of Organization Behavior, 31, 610-633.
Riduan dan Sunarto (2013). Pengantar Statistika untuk Penelitian Pendidikan, Sosial, Ekonomi, Komunikasi, dan Bisnis. Bandung: Alfabeta.
Sekaran, U. dan Bougie , R. (2010). Research Methods for Business, A Skill Building Approach. West Sussex: John Willey & Sons Ltd.
Si, S. dan Wei, F. (2011). Transformational and Transactional Leadership, Empowerment Climate, and Innovation Kinerjance: A Multilevel Analysis in the Chinese Context. European Journal of Work and Organizational Psychology, 21, 299-320.
Situmorang, L.V. (2011). Pengaruh Kepemimpinan Transformasional terhadap Komitmen Organisasional di Mediasi oleh Pemberdayaan Psikologis: Studi pada Bank BUMN di DIY. Tesis Program Magister Sains dan Doktor Ilmu-Ilmu Ekonomi Universitas Gadjah Mada: Tidak Dipublikasi.
Spreitzer, G.M. (1995). Psychological Empowerment in the Workplace: Dimensions, Measurement, and Validation. Academy of Management Journal, 38, 1442-1465.
Stoker, J.I., Looise, J.C., Fisscher, O.A.M., dan De Jong, R.D. (2010). Leadership and Innovation: Relations Between Leadership, Individual Characteristics and the Function of R&D Teams. The International Journal of Human Resources Management, 12, 1141-1151.
Thomas, K.W. dan Velthouse, B.A. (1990). Cognitive Elements of Empowerment: An “Interpretive” Model of Intrinsic Task Motivation. Academy of Management Review, 15, 243-295.
68
Tidd, J. dan Bessant, J. (2011). Managing Innovation. Integrating Technological, Market and Organizational Change. West Sussex: John Willey & Sons Ltd.
Yukl, G. (2002). Leadership in Organization, 5th edition. New Jersey: Prentice-Hall.
Zhang, X. dan Bartol, K.M. (2010). Linking Empowerment Leadership and Employee Creativity: The Influence of Psychological Empowerment, Intrinsic Motivation, and Creative Process Engagement. Academy of Management Journal, 53, 107-128.
69
Lampiran 1: Daftar Responden
No Nama JK Umur (Th)
Pendidikan Terakhir Dept. Kerja
Lama Kerja
1 Responden 1 L 31-40 SMA Pendukung <2 th
2 Responden 2 L 31-41 D3 Pendukung 4-6 th
3 Responden 3 L 20-30 SMA Pendukung 2-4 th
4 Responden 4 L 20-30 SMA Pendukung <2 th
5 Responden 5 L 20-30 SMA Pendukung <2 th
6 Responden 6 L 20-30 S1 Bisnis 4-6 th
7 Responden 7 L 20-30 D3 Pendukung <2 th
8 Responden 8 L 20-30 S1 Bisnis <2 th
9 Responden 9 L 20-30 S1 Pendukung <2 th
10 Responden 10 L 20-30 S1 Pendukung 2-4 th
11 Responden 11 L 20-30 D3 Pendukung 2-4 th
12 Responden 12 L 41-50 SMA Pendukung >6 th
13 Responden 13 L 20-30 SMA Pendukung <2 th
14 Responden 14 L 31-40 SMA Pendukung <2 th
15 Responden 15 L 20-30 S1 Pendukung 4-6 th
16 Responden 16 L 20-30 SMA Pendukung <2 th
17 Responden 17 P 20-30 S1 Bisnis 2-4 th
18 Responden 18 P 20-30 S2 Bisnis 2-4 th
19 Responden 19 L 20-30 SMA Pendukung <2 th
20 Responden 20 L 20-30 S1 Pendukung 2-4 th
21 Responden 21 L 20-30 S1 Kepatuhan <2 th
22 Responden 22 L 20-30 SMA Bisnis <2 th
23 Responden 23 L 20-30 S1 Pendukung <2 th
24 Responden 24 P 20-30 S1 Pendukung <2 th
25 Responden 25 L 20-30 S1 Pendukung <2 th
26 Responden 26 L 20-30 D3 Bisnis <2 th
27 Responden 27 L 41-50 S1 Bisnis >6 th
28 Responden 28 P 20-30 S1 Pendukung 2-4 th
29 Responden 29 P 20-30 S1 Bisnis 2-4 th
30 Responden 30 P 20-30 S1 Bisnis 4-6 th
31 Responden 31 P 20-30 D3 Pendukung 2-4 th
32 Responden 32 L 20-30 D3 Pendukung 4-6 th
33 Responden 33 P 20-30 S1 Pendukung 2-4 th
34 Responden 34 P 20-30 S1 Bisnis 2-4 th
35 Responden 35 L 20-30 S1 Bisnis 2-4 th
70
No Nama JK Umur (Th)
Pendidikan Terakhir Dept. Kerja
Lama Kerja
36 Responden 36 L 20-30 S1 Bisnis 2-4 th
37 Responden 37 L 20-30 SMA Pendukung 2-4 th
38 Responden 38 P 31-40 S1 Bisnis >6 th
39 Responden 39 P 20-30 SMA Pendukung 2-4 th
40 Responden 40 L 20-30 SMA Pendukung 2-4 th
41 Responden 41 P 31-40 S1 Bisnis 4-6 th
42 Responden 42 L 20-30 S2 Bisnis >6 th
43 Responden 43 L 20-30 D3 Pendukung 2-4 th
44 Responden 44 L 31-40 SMA Pendukung 4-6 th
45 Responden 45 L 31-40 SMA Pendukung 2-4 th
46 Responden 46 P 20-30 SMA Pendukung 2-4 th
47 Responden 47 L 20-30 S1 Pendukung <2 th
48 Responden 48 L 20-30 S1 Pendukung 2-4 th
49 Responden 49 L 20-30 S1 Hukum 2-4 th
50 Responden 50 L 41-50 S1 Manajemen resiko >6 th
51 Responden 51 L 41-50 S2 Manajemen aset >6 th
52 Responden 52 P 20-30 S1 Manajemen aset 2-4 th
53 Responden 53 L 20-30 S1 Manajemen aset <2 th
54 Responden 54 L 51-55 S1 Arcall >6 th
55 Responden 55 L 41-50 D3 Manajemen aset >6 th
56 Responden 56 P 20-30 S1 Bisnis 2-4 th
57 Responden 57 L 20-30 D3 Bisnis 4-6 th
58 Responden 58 L 20-30 S1 Bisnis 2-4 th
59 Responden 59 P 20-30 D3 Bisnis 4-6 th
60 Responden 60 P 20-30 SMA Bisnis 2-4 th
61 Responden 61 L 51-55 S1 Bisnis >6 th
62 Responden 62 L 51-55 S1 Bisnis >6 th
63 Responden 63 L 20-30 S1 Bisnis 2-4 th
64 Responden 64 L 20-30 S1 Pendukung 4-6 th
65 Responden 65 P 20-30 S1 Pendukung 4-6 th
66 Responden 66 P 20-30 S1 Bisnis <2 th
67 Responden 67 L 20-30 SMA Pendukung 4-6 th
68 Responden 68 L 20-30 S1 Bisnis 4-6 th
69 Responden 69 L 20-30 SMA Pendukung 2-4 th
70 Responden 70 P 20-30 S1 Bisnis 2-4 th
71 Responden 71 L 51-55 S1 Bisnis >6 th
71
No Nama JK Umur (Th)
Pendidikan Terakhir Dept. Kerja
Lama Kerja
72 Responden 72 P 20-30 D3 Pendukung 2-4 th
73 Responden 73 P 20-30 D3 Bisnis 4-6 th
74 Responden 74 P 41-50 S1 Bisnis >6 th
75 Responden 75 P 20-30 S1 Pendukung 2-4 th
76 Responden 76 P 51-55 S1 Bisnis >6 th
77 Responden 77 P 20-30 S1 Pendukung 4-6 th
78 Responden 78 L 20-30 D3 Bisnis 2-4 th
79 Responden 79 L 31-40 S1 Bisnis >6 th
80 Responden 80 L 51-55 S1 Bisnis >6 th
81 Responden 81 P 20-30 S1 Pendukung <2 th
82 Responden 82 P 20-30 S1 Bisnis 2-4 th
83 Responden 83 P 20-30 S1 Pendukung 4-6 th
72
Lampiran 2: Kuesioner Penelitian
Yogyakarta, 7 Agustus 2015
Kepada yang Terhormat
Karyawan Bank BTN Cabang Sidoarjo
Di Tempat
Dengan hormat,
Saya adalah mahasiswa Magister Manajemen Universitas Gadjah Mada
Yogyakarta. Saya memohon kesediaan bapak/ibu/saudara/saudari untuk mengisi
kuesioner ini, guna mengumpulkan data penelitian untuk menyelesaikan tugas akhir
saya di Program Studi Magister Manajemen Universitas Gadjah Mada, Konsentrasi
Human Resources and Organization.
Tujuan penelitian ini adalah untuk mengidentifikasi peran moderasi
pemberdayaan psikologis pada hubungan kepemimpinan transformasional dan
transaksional dengan perilaku inovatif karyawan Bank BTN Cabang Sidoarjo.
Ketulusan dan kerelaan bapak/ibu/saudara/saudari dalam menjawab kuesioner ini
dengan sejujur-jujurnya sangat saya harapkan. Jawaban yang bapak/ibu/saudara/saudari
berikan hanya untuk keperluan akademik dan dapat dijamin kerahasiaannya.
Apabila bapak/ibu/saudara/saudari mengalami kesulitan dalam menjawab
kuesioner ini dapat disampaikan langsung kepada saya atau menyampaikan melalui e-
mail dengan alamat [email protected].
Atas kesediaan dan partisipasi bapak/ibu/saudara/saudari dalam mengisi
kuesioner ini saya ucapkan terima kasih.
Hormat saya,
ttd
Abdul Malik Sayuti
13/360453/PEK/18979
73
LEMBAR KUESIONER
Judul: Hubungan Tipe Kepemimpinan dan Perilaku Inovatif Karyawan dengan
Pemberdayaan Psikologis sebagai Variabel Pemoderasi (Studi pada Karyawan
Bank BTN Cabang Sidoarjo).
1. Nama : .....................................
2. Jenis kelamin : a) Laki-laki b) Perempuan
3. Umur : a) 20-30 thn b) 31-40 thn c)41-50 thn d)51-55 thn
4. Pendidikan terakhir : a) SMA b) D3 c) S1 d) S2
5. Departemen kerja : …….
6. Lama kerja : a) <2 tahun b) 2-4 tahun c) 4-6 tahun d)>6 tahun
7. Telah bekerja dibawah pengawasan supervisor/ penyelia saat ini selama: ......
bulan/ tahun* (coret yang tidak perlu).
Petunjuk pengisian kuesioner:
1. Responden diharapkan membaca kuesioner dengan teliti dan memberi jawaban
yang paling sesuai menurut responden dengan menulis tanda silang (X) pada
kolom pilihan jawaban.
2. Responden hanya diperkenankan memilih satu jawaban dari lima pilihan jawaban
pada masing-masing pernyataan.
3. Apabila responden ingin mengganti pilihan jawabannya, maka pilihan jawaban
tersebut cukup dicoret kemudian responden menulis kembali tanda silang (X) pada
kolom jawaban baru yang dipilih.
4. Responden diharapkan mengisi semua pernyataan dalam kuesioner demi
kelengkapan data penelitian.
5. Terima kasih atas partisipasinya.
74
No Pernyataan Sangat Tidak Setuju (STS)
Tidak Setuju (TS)
Netral (N)
Setuju (S)
Sangat Setuju (SS)
1 Atasan saya menanamkan kepercayaan diri yang kuat pada saya sebagai bawahan
2 Atasan saya mengabaikan kepentingan pribadi demi kebaikan kelompok
3 Atasan saya sikapnya membangun rasa hormat saya
4 Atasan saya memperlihatkan kekuasaan dan keyakinannya
5 Atasan saya mengkaji ulang dengan menanyakan apakah ada cara yang lebih baik untuk mengerjakan sesuatu
6 Atasan saya mencari perspektif yang berbeda dalam menyelesaikan masalah-masalah
7 Atasan saya mengajak saya untuk melihat suatu masalah dari sudut pandang yang lainnya
8 Atasan saya menyarankan cara-cara baru dalam melihat bagaimana menyelesaikan suatu masalah
9 Atasan saya meluangkan waktu untuk memberi tahu tentang bagaimana mengerjakan sesuatu
10 Atasan saya memperlakukan saya lebih secara individu daripada sekedar sebagai anggota kelompok
75
No Pernyataan Sangat Tidak Setuju (STS)
Tidak Setuju (TS)
Netral (N)
Setuju (S)
Sangat Setuju (SS)
11 Atasan saya memperhatikan perbedaan kebutuhan, kemampuan, dan aspirasi saya terhadap sesuatu dibandingkan dengan teman sekerja lainnya
12 Atasan saya membantu saya dalam mengembangkan kelebihan saya
13 Atasan saya bicara optimis mengenai masa depan
14 Atasan saya mengemukakan dengan penuh semangat tentang hal-hal yang perlu dicapai
15 Atasan saya pandai mengarahkan pada visi ke depan
16 Atasan saya menekankan keyakinannya bahwa target-target akan tercapai
17 Atasan saya memberi saya bantuan sebagai imbalan usaha-usaha saya
18 Atasan saya membicarakan dengan jelas siapa yang bertanggung jawab untuk mencapai target-target yang ditetapkan
19 Atasan saya memberitahu dengan jelas apa imbalan yang diperoleh kalau seseorang mencapai tujuan kerjanya
20 Atasan saya menyatakan kepuasannya bila saya mencapai harapannya
76
No Pernyataan Sangat Tidak Setuju (STS)
Tidak Setuju (TS)
Netral (N)
Setuju (S)
Sangat Setuju (SS)
21 Atasan saya tidak melibatkan dirinya untuk ikut menangani masalah sebelum masalah menjadi serius
22 Atasan saya menunggu dan baru mengambil tindakan kalau sudah terjadi kesalahan
23 Atasan saya menunjukkan keyakinan bahwa “kalau sesuatu cara kerja masih berjalan baik, cara itu tidak perlu diperbaiki”
24 Atasan saya menekankan bahwa masalah-masalah akan menjadi makin parah kalau tidak segera ditangani
25 Atasan saya memusatkan perhatiannya pada ketidakteraturan, kesalahan, pengecualian, dan penyimpangan-penyimpangan standar
26 Atasan saya perhatiannya terpusat pada kesalahan, keluhan, dan kegagalan
27 Atasan saya mengikuti dengan seksama kesalahan-kesalahan yang terjadi dalam kerja
28 Atasan saya mengajak saya untuk memperhatikan kesalahan/ kegagalan untuk mencapai standar keberhasilan pengerjaan tugas
29 Pekerjaan yang saya lakukan sangat penting bagi saya
77
No Pernyataan Sangat Tidak Setuju (STS)
Tidak Setuju (TS)
Netral (N)
Setuju (S)
Sangat Setuju (SS)
30 Kegiatan saya dalam pekerjaan sangat berarti bagi saya secara pribadi
31 Pekerjaan yang saya lakukan berarti bagi saya
32 Saya yakin dengan kemampuan saya untuk melakukan tugas saya
33 Saya meyakinkan diri mengenai kemampuan saya untuk melaksanakan kegiatan kerja saya
34 Saya memiliki keahlian yang diperlukan dalam pekerjaan saya
35 Saya memiliki otonomi dalam menentukan cara kerja saya
36 Saya bisa memutuskan sendiri bagaimana cara menyelesaikan pekerjaan saya
37 Saya memiliki cukup kesempatan untuk tidak bergantung dan bebas menentukan bagaimana saya melakukan tugas saya
38 Dampak saya pada apa yang terjadi dalam departemen/ bagian saya sangat besar
39 Saya memiliki kendali yang besar atas hal-hal yang terjadi dalam departemen saya
40 Saya memiliki pengaruh yang signifikan terhadap hal-hal yang terjadi di departemen saya
78
No Pernyataan Sangat Tidak Setuju (STS)
Tidak Setuju (TS)
Netral (N)
Setuju (S)
Sangat Setuju (SS)
41 Saya menciptakan ide-ide baru untuk perbaikan
42 Saya mencari metode-metode, teknik-teknik, atau alat kerja baru
43 Saya menemukan jalan keluar terhadap masalah-masalah yang ada
44 Saya memobilisasi dukungan terhadap ide-ide inovatif
45 Saya mendapatkan persetujuan terhadap ide-ide inovatif
46 Saya membuat para anggota penting dalam tim antusias terhadap ide-ide inovatif
47 Saya mengubah ide-ide inovatif menjadi aplikasi-aplikasi yang bermanfaat
48 Saya memperkenalkan ide-ide yang inovatif di lingkungan kerja secara sistematis
49 Saya melakukan evaluasi terhadap penggunaan dari ide-ide inovatif
79
Lampiran 3: Hasil Uji Validitas Variabel
a) Variabel Kepemimpinan Transformasional
KMO and Bartlett’s Test
Kaiser-Meyer-Olkin Measure of Sampling Adequacy.
,832
Bartlett's Test of Sphericity
Approx. Chi-Square 604,486
Df 120
Sig. ,000
Anti-image Matrices
X1Q1 X1Q2 X1Q3 X1Q4 X1Q5 X1Q6
Anti-image Covariance
X1Q1 ,512 -,013 -,201 -,124 -,074 ,066
X1Q2 -,013 ,519 -,118 ,017 -,012 -,100
X1Q3 -,201 -,118 ,465 ,040 -,069 -,007
X1Q4 -,124 ,017 ,040 ,686 ,010 -,108
X1Q5 -,074 -,012 -,069 ,010 ,496 -,137
X1Q6 ,066 -,100 -,007 -,108 -,137 ,451
X1Q7 -,003 ,055 -,124 ,037 ,054 -,145
X1Q8 -,048 -,037 -,051 -,042 ,048 -,007
X1Q9 ,042 -,118 ,019 ,107 -,013 ,052
X1Q10 ,032 ,093 -,013 -,248 -,054 ,013
X1Q11 -,038 -,134 ,074 ,009 -,106 ,053
X1Q12 ,020 -,002 -,050 -,005 -,011 -,058
X1Q13 ,009 ,066 ,029 ,053 -,036 ,011
X1Q14 ,058 ,011 ,006 -,108 -,012 ,024
X1Q15 -,073 -,042 ,068 ,035 -,064 -,083
X1Q16 -,084 ,031 -,002 -,067 -,020 ,027
Anti-image Correlation
X1Q1 ,826a -,026 -,411 -,210 -,147 ,137
X1Q2 -,026 ,841a -,240 ,028 -,024 -,207
X1Q3 -,411 -,240 ,818a ,071 -,144 -,015
X1Q4 -,210 ,028 ,071 ,530a ,017 -,194
X1Q5 -,147 -,024 -,144 ,017 ,908a -,290
X1Q6 ,137 -,207 -,015 -,194 -,290 ,851a
X1Q7 -,007 ,130 -,310 ,077 ,131 -,369
X1Q8 -,095 -,074 -,106 -,073 ,098 -,015
X1Q9 ,094 -,259 ,044 ,206 -,028 ,122
X1Q10 ,053 ,153 -,022 -,355 -,091 ,023
X1Q11 -,074 -,262 ,153 ,014 -,212 ,112
X1Q12 ,049 -,006 -,127 -,011 -,027 -,148
X1Q13 ,020 ,150 ,070 ,106 -,085 ,028
X1Q14 ,119 ,022 ,014 -,191 -,025 ,053
X1Q15 -,176 -,102 ,173 ,074 -,157 -,212
X1Q16 -,184 ,067 -,005 -,126 -,044 ,063
80
Anti-image Matrices
X1Q7 X1Q8 X1Q9 X1Q10 X1Q11 X1Q12
Anti-image Covariance
X1Q1 -,003 -,048 ,042 ,032 -,038 ,020
X1Q2 ,055 -,037 -,118 ,093 -,134 -,002
X1Q3 -,124 -,051 ,019 -,013 ,074 -,050
X1Q4 ,037 -,042 ,107 -,248 ,009 -,005
X1Q5 ,054 ,048 -,013 -,054 -,106 -,011
X1Q6 -,145 -,007 ,052 ,013 ,053 -,058
X1Q7 ,343 -,093 -,086 ,004 -,114 ,122
X1Q8 -,093 ,495 -,067 -,008 ,069 -,056
X1Q9 -,086 -,067 ,397 -,029 -,017 -,130
X1Q10 ,004 -,008 -,029 ,713 -,146 -,049
X1Q11 -,114 ,069 -,017 -,146 ,506 -,156
X1Q12 ,122 -,056 -,130 -,049 -,156 ,336
X1Q13 -,061 -,039 ,046 ,068 ,053 -,177
X1Q14 -,026 -,003 -,022 ,029 -,014 ,054
X1Q15 -,003 -,098 -,041 -,004 ,043 -,015
X1Q16 -,087 ,085 -,057 -,011 ,026 ,009
Anti-image Correlation
X1Q1 -,007 -,095 ,094 ,053 -,074 ,049
X1Q2 ,130 -,074 -,259 ,153 -,262 -,006
X1Q3 -,310 -,106 ,044 -,022 ,153 -,127
X1Q4 ,077 -,073 ,206 -,355 ,014 -,011
X1Q5 ,131 ,098 -,028 -,091 -,212 -,027
X1Q6 -,369 -,015 ,122 ,023 ,112 -,148
X1Q7 ,806a -,227 -,233 ,009 -,274 ,358
X1Q8 -,227 ,903a -,150 -,013 ,137 -,138
X1Q9 -,233 -,150 ,869a -,055 -,038 -,355
X1Q10 ,009 -,013 -,055 ,616a -,243 -,100
X1Q11 -,274 ,137 -,038 -,243 ,747a -,378
X1Q12 ,358 -,138 -,355 -,100 -,378 ,755a
X1Q13 -,172 -,091 ,121 ,132 ,122 -,503
X1Q14 -,064 -,006 -,051 ,050 -,030 ,137
X1Q15 -,009 -,241 -,112 -,008 ,105 -,045
X1Q16 -,231 ,189 -,142 -,021 ,058 ,024
81
Anti-image Matrices
X1Q13 X1Q14 X1Q15 X1Q16
Anti-image Covariance
X1Q1 ,009 ,058 -,073 -,084
X1Q2 ,066 ,011 -,042 ,031
X1Q3 ,029 ,006 ,068 -,002
X1Q4 ,053 -,108 ,035 -,067
X1Q5 -,036 -,012 -,064 -,020
X1Q6 ,011 ,024 -,083 ,027
X1Q7 -,061 -,026 -,003 -,087
X1Q8 -,039 -,003 -,098 ,085
X1Q9 ,046 -,022 -,041 -,057
X1Q10 ,068 ,029 -,004 -,011
X1Q11 ,053 -,014 ,043 ,026
X1Q12 -,177 ,054 -,015 ,009
X1Q13 ,368 -,161 ,017 -,086
X1Q14 -,161 ,464 -,114 -,052
X1Q15 ,017 -,114 ,336 -,106
X1Q16 -,086 -,052 -,106 ,410
Anti-image Correlation
X1Q1 ,020 ,119 -,176 -,184
X1Q2 ,150 ,022 -,102 ,067
X1Q3 ,070 ,014 ,173 -,005
X1Q4 ,106 -,191 ,074 -,126
X1Q5 -,085 -,025 -,157 -,044
X1Q6 ,028 ,053 -,212 ,063
X1Q7 -,172 -,064 -,009 -,231
X1Q8 -,091 -,006 -,241 ,189
X1Q9 ,121 -,051 -,112 -,142
X1Q10 ,132 ,050 -,008 -,021
X1Q11 ,122 -,030 ,105 ,058
X1Q12 -,503 ,137 -,045 ,024
X1Q13 ,785a -,389 ,049 -,220
X1Q14 -,389 ,853a -,288 -,118
X1Q15 ,049 -,288 ,890a -,284
X1Q16 -,220 -,118 -,284 ,890a
a. Measures of Sampling Adequacy(MSA)
82
b) Variabel Kepemimpinan Transaksional
KMO and Bartlett's Test
Kaiser-Meyer-Olkin Measure of Sampling Adequacy.
,614
Bartlett's Test of Sphericity
Approx. Chi-Square 298,320
df 66
Sig. ,000
Anti-image Matrices
X2Q1 X2Q2 X2Q3 X2Q4 X2Q5 X2Q6
Anti-image Covariance
X2Q1 ,559 -,083 -,312 ,033 -,111 ,039
X2Q2 -,083 ,535 -,051 -,281 ,024 ,076
X2Q3 -,312 -,051 ,561 -,085 ,038 ,002
X2Q4 ,033 -,281 -,085 ,594 ,010 -,035
X2Q5 -,111 ,024 ,038 ,010 ,523 -,236
X2Q6 ,039 ,076 ,002 -,035 -,236 ,348
X2Q7 -,098 -,022 ,020 -,020 ,080 -,221
X2Q8 ,014 -,077 -,031 -,001 -,008 ,075
X2Q9 -,029 -,029 ,073 -,010 -,081 ,020
X2Q10 ,035 -,106 -,042 ,144 ,029 -,110
X2Q11 -,069 -,012 ,046 -,062 -,016 ,025
X2Q12 -,010 -,020 -,038 ,001 ,140 -,079
Anti-image Correlation
X2Q1 ,590a -,152 -,558 ,057 -,205 ,089
X2Q2 -,152 ,685a -,092 -,499 ,044 ,177
X2Q3 -,558 -,092 ,647a -,147 ,070 ,004
X2Q4 ,057 -,499 -,147 ,645a ,017 -,076
X2Q5 -,205 ,044 ,070 ,017 ,635a -,552
X2Q6 ,089 ,177 ,004 -,076 -,552 ,637a
X2Q7 -,162 -,038 ,034 -,032 ,137 -,466
X2Q8 ,021 -,122 -,048 -,001 -,013 ,146
X2Q9 -,054 -,055 ,134 -,019 -,154 ,047
X2Q10 ,074 -,230 -,089 ,297 ,064 -,296
X2Q11 -,118 -,020 ,078 -,103 -,028 ,054
X2Q12 -,016 -,033 -,061 ,001 ,230 -,160
83
Anti-image Matrices
X2Q7 X2Q8 X2Q9 X2Q10 X2Q11 X2Q12
Anti-image Covariance
X2Q1 -,098 ,014 -,029 ,035 -,069 -,010
X2Q2 -,022 -,077 -,029 -,106 -,012 -,020
X2Q3 ,020 -,031 ,073 -,042 ,046 -,038
X2Q4 -,020 -,001 -,010 ,144 -,062 ,001
X2Q5 ,080 -,008 -,081 ,029 -,016 ,140
X2Q6 -,221 ,075 ,020 -,110 ,025 -,079
X2Q7 ,645 -,016 ,004 -,026 ,086 -,013
X2Q8 -,016 ,747 -,136 ,116 -,183 ,008
X2Q9 ,004 -,136 ,531 -,258 ,110 -,137
X2Q10 -,026 ,116 -,258 ,394 -,185 ,087
X2Q11 ,086 -,183 ,110 -,185 ,612 -,275
X2Q12 -,013 ,008 -,137 ,087 -,275 ,713
Anti-image Correlation
X2Q1 -,162 ,021 -,054 ,074 -,118 -,016
X2Q2 -,038 -,122 -,055 -,230 -,020 -,033
X2Q3 ,034 -,048 ,134 -,089 ,078 -,061
X2Q4 -,032 -,001 -,019 ,297 -,103 ,001
X2Q5 ,137 -,013 -,154 ,064 -,028 ,230
X2Q6 -,466 ,146 ,047 -,296 ,054 -,160
X2Q7 ,658a -,024 ,006 -,051 ,136 -,020
X2Q8 -,024 ,695a -,216 ,215 -,270 ,010
X2Q9 ,006 -,216 ,575a -,563 ,193 -,222
X2Q10 -,051 ,215 -,563 ,551a -,376 ,163
X2Q11 ,136 -,270 ,193 -,376 ,526a -,416
X2Q12 -,020 ,010 -,222 ,163 -,416 ,535a
a. Measures of Sampling Adequacy(MSA)
c) Variabel Pemberdayaan Psikologis
KMO and Bartlett's Test
Kaiser-Meyer-Olkin Measure of Sampling Adequacy.
,722
Bartlett's Test of Sphericity
Approx. Chi-Square 388,431
df 66
Sig. ,000
84
Anti-image Matrices
MVQ1 MVQ2 MVQ3 MVQ4 MVQ5
Anti-image Covariance MVQ1 ,661 -,080 -,059 -,017 -,057
MVQ2 -,080 ,388 -,244 ,027 -,028
MVQ3 -,059 -,244 ,403 -,131 -,012
MVQ4 -,017 ,027 -,131 ,566 -,174
MVQ5 -,057 -,028 -,012 -,174 ,529
MVQ6 -,026 -,106 ,073 -,130 -,189
MVQ7 -,077 -,004 ,014 -,022 -,029
MVQ8 -,051 -,030 -,060 ,066 ,091
MVQ9 ,159 ,026 ,042 -,039 -,076
MVQ10 ,005 -,013 ,014 -,009 -,028
MVQ11 -,029 ,050 -,033 ,038 -,018
MVQ12 ,040 ,004 ,031 -,076 ,042
Anti-image Correlation MVQ1 ,820a -,157 -,115 -,027 -,097
MVQ2 -,157 ,717a -,618 ,058 -,062
MVQ3 -,115 -,618 ,680a -,274 -,025
MVQ4 -,027 ,058 -,274 ,770a -,319
MVQ5 -,097 -,062 -,025 -,319 ,757a
MVQ6 -,044 -,235 ,159 -,239 -,359
MVQ7 -,120 -,007 ,027 -,037 -,051
MVQ8 -,098 -,075 -,147 ,137 ,196
MVQ9 ,299 ,064 ,101 -,078 -,160
MVQ10 ,009 -,029 ,031 -,017 -,052
MVQ11 -,057 ,126 -,083 ,081 -,039
MVQ12 ,071 ,010 ,072 -,147 ,085
Anti-image Matrices
MVQ6 MVQ7 MVQ8 MVQ9 MVQ10
Anti-image Covariance
MVQ1 -,026 -,077 -,051 ,159 ,005
MVQ2 -,106 -,004 -,030 ,026 -,013
MVQ3 ,073 ,014 -,060 ,042 ,014
MVQ4 -,130 -,022 ,066 -,039 -,009
MVQ5 -,189 -,029 ,091 -,076 -,028
MVQ6 ,527 -,060 -,048 ,066 -,018
MVQ7 -,060 ,633 -,168 -,111 ,053
MVQ8 -,048 -,168 ,407 -,226 -,037
MVQ9 ,066 -,111 -,226 ,430 -,065
MVQ10 -,018 ,053 -,037 -,065 ,533
MVQ11 -,088 ,006 ,018 -,039 -,184
MVQ12 ,044 4,012E-5 -,094 ,070 -,078
Anti-image Correlation
MVQ1 -,044 -,120 -,098 ,299 ,009
MVQ2 -,235 -,007 -,075 ,064 -,029
MVQ3 ,159 ,027 -,147 ,101 ,031
85
MVQ6 MVQ7 MVQ8 MVQ9 MVQ10
MVQ4 -,239 -,037 ,137 -,078 -,017
MVQ5 -,359 -,051 ,196 -,160 -,052
MVQ6 ,749a -,103 -,103 ,139 -,035
MVQ7 -,103 ,774a -,330 -,213 ,091
MVQ8 -,103 -,330 ,651a -,539 -,079
MVQ9 ,139 -,213 -,539 ,647a -,136
MVQ10 -,035 ,091 -,079 -,136 ,818a
MVQ11 -,192 ,012 ,044 -,095 -,399
MVQ12 ,088 7,316E-5 -,214 ,155 -,156
Anti-image Matrices
MVQ11 MVQ12
Anti-image Covariance MVQ1 -,029 ,040
MVQ2 ,050 ,004
MVQ3 -,033 ,031
MVQ4 ,038 -,076
MVQ5 -,018 ,042
MVQ6 -,088 ,044
MVQ7 ,006 4,012E-5
MVQ8 ,018 -,094
MVQ9 -,039 ,070
MVQ10 -,184 -,078
MVQ11 ,399 -,228
MVQ12 -,228 ,475
Anti-image Correlation MVQ1 -,057 ,071
MVQ2 ,126 ,010
MVQ3 -,083 ,072
MVQ4 ,081 -,147
MVQ5 -,039 ,085
MVQ6 -,192 ,088
MVQ7 ,012 7,316E-5
MVQ8 ,044 -,214
MVQ9 -,095 ,155
MVQ10 -,399 -,156
MVQ11 ,689a -,523
MVQ12 -,523 ,699a
a. Measures of Sampling Adequacy(MSA)
86
d) Variabel Perilaku Inovatif
KMO and Bartlett's Test
Kaiser-Meyer-Olkin Measure of Sampling Adequacy.
,726
Bartlett's Test of Sphericity
Approx. Chi-Square 197,987
df 36
Sig. ,000
Anti-image Matrices
YQ1 YQ2 YQ3 YQ4 YQ5 YQ6
Anti-image Covariance
YQ1 ,484 -,244 -,080 -,229 -,058 ,093
YQ2 -,244 ,575 -,139 ,036 ,002 -,014
YQ3 -,080 -,139 ,719 -,083 -,076 ,010
YQ4 -,229 ,036 -,083 ,701 -,122 -,014
YQ5 -,058 ,002 -,076 -,122 ,805 -,179
YQ6 ,093 -,014 ,010 -,014 -,179 ,556
YQ7 -,051 ,064 -,078 -,003 -,021 -,229
YQ8 -,027 -,115 -,010 ,053 ,035 -,019
YQ9 -,029 -,020 -,028 -,028 ,069 -,201
Anti-image Correlation
YQ1 ,691a -,462 -,136 -,392 -,093 ,179
YQ2 -,462 ,719a -,216 ,056 ,003 -,025
YQ3 -,136 -,216 ,870a -,116 -,100 ,016
YQ4 -,392 ,056 -,116 ,726a -,162 -,023
YQ5 -,093 ,003 -,100 -,162 ,747a -,268
YQ6 ,179 -,025 ,016 -,023 -,268 ,665a
YQ7 -,101 ,116 -,127 -,005 -,032 -,424
YQ8 -,051 -,203 -,016 ,085 ,052 -,034
YQ9 -,049 -,031 -,039 -,040 ,091 -,321
Anti-image Matrices
YQ7 YQ8 YQ9
Anti-image Covariance YQ1 -,051 -,027 -,029
YQ2 ,064 -,115 -,020
YQ3 -,078 -,010 -,028
YQ4 -,003 ,053 -,028
YQ5 -,021 ,035 ,069
YQ6 -,229 -,019 -,201
YQ7 ,526 -,227 ,045
YQ8 -,227 ,560 -,180
YQ9 ,045 -,180 ,708
Anti-image Correlation YQ1 -,101 -,051 -,049
YQ2 ,116 -,203 -,031
87
YQ7 YQ8 YQ9
YQ3 -,127 -,016 -,039
YQ4 -,005 ,085 -,040
YQ5 -,032 ,052 ,091
YQ6 -,424 -,034 -,321
YQ7 ,697a -,417 ,074
YQ8 -,417 ,747a -,287
YQ9 ,074 -,287 ,745a
a. Measures of Sampling Adequacy(MSA)
88
Lampiran 4: Hasil Uji Reliabilitas Variabel
a) Variabel Kepemimpinan Transformasional
Reliability Statistics
Cronbach's Alpha N of Items
,882 16
Item-Total Statistics
Scale Mean if Item Deleted
Scale Variance if
Item Deleted
Corrected Item-Total Correlation
Cronbach's Alpha if Item
Deleted
X1Q1 54,4578 39,861 ,511 ,876 X1Q2 54,6988 40,481 ,484 ,877 X1Q3 54,3012 40,920 ,540 ,875 X1Q4 54,6386 43,087 ,177 ,889 X1Q5 54,3976 38,974 ,647 ,870 X1Q6 54,5060 39,643 ,632 ,871 X1Q7 54,4337 39,273 ,657 ,870 X1Q8 54,4699 39,569 ,609 ,872 X1Q9 54,5301 38,447 ,629 ,871
X1Q10 54,6867 42,462 ,197 ,890 X1Q11 54,6627 40,251 ,466 ,878 X1Q12 54,6145 39,289 ,608 ,872
X1Q13 54,3614 39,648 ,530 ,875 X1Q14 54,3012 40,628 ,517 ,876 X1Q15 54,4940 38,302 ,722 ,867 X1Q16 54,2530 39,167 ,634 ,871
b) Variabel Kepemimpinan Transaksional
Reliability Statistics
Cronbach's Alpha N of Items
,613 12
Item Total Statistics
Scale Mean if Item Deleted
Scale Variance if
Item Deleted
Corrected Item-Total Correlation
Cronbach's Alpha if Item
Deleted
X2Q1 36,5904 14,562 ,371 ,572 X2Q2 36,1928 15,011 ,304 ,585 X2Q3 36,4458 15,079 ,239 ,597 X2Q4 36,2048 15,994 ,109 ,619 X2Q5 36,8193 14,955 ,203 ,605 X2Q6 36,8675 14,116 ,255 ,597 X2Q7 36,6145 14,801 ,278 ,589
89
Scale Mean if Item Deleted
Scale Variance if
Item Deleted
Corrected Item-Total Correlation
Cronbach's Alpha if Item
Deleted
X2Q8 36,1205 16,376 ,060 ,625 X2Q9 36,6265 14,091 ,385 ,566
X2Q10 36,7470 13,996 ,409 ,562 X2Q11 36,4940 14,790 ,307 ,584 X2Q12 36,2892 14,989 ,250 ,595
c) Variabel Pemberdayaan Psikologis
Reliability Statistics
Cronbach's Alpha N of Items
,727 12
Item-Total Statistics
Scale Mean if Item Deleted
Scale Variance if
Item Deleted
Corrected Item-Total Correlation
Cronbach's Alpha if Item
Deleted
MVQ1 41,2169 17,562 ,164 ,734 MVQ2 41,3373 17,080 ,302 ,716 MVQ3 41,2289 17,154 ,317 ,715 MVQ4 41,1446 16,515 ,368 ,708 MVQ5 41,1446 16,906 ,368 ,709 MVQ6 41,3494 16,547 ,464 ,700 MVQ7 41,5783 16,271 ,427 ,701 MVQ8 41,6145 14,801 ,467 ,693 MVQ9 41,7108 15,964 ,276 ,727
MVQ10 41,6265 15,969 ,447 ,698 MVQ11 41,8072 15,670 ,457 ,696 MVQ12 41,7590 16,234 ,344 ,712
d) Variabel Perilaku Inovatif
Reliability Statistics
Cronbach's Alpha N of Items
,763 9
90
Item-Total Statistics
Scale Mean if Item Deleted
Scale Variance if
Item Deleted
Corrected Item-Total Correlation
Cronbach's Alpha if Item
Deleted
YQ1 30,3494 7,133 ,512 ,729 YQ2 30,3614 7,258 ,462 ,737 YQ3 30,2169 7,391 ,480 ,735 YQ4 30,2892 7,623 ,371 ,751 YQ5 30,4940 7,521 ,340 ,758 YQ6 30,3735 7,432 ,420 ,744 YQ7 30,2169 6,977 ,501 ,731 YQ8 30,2048 7,409 ,516 ,731 YQ9 30,1687 7,727 ,397 ,747
91
Lampiran 5: Karakteristik Responden
a) Janis Kelamin
Jenis Kelamin Karyawan
Frequency Percent Valid Percent Cumulative
Percent
Valid Laki-laki 54 65,1 65,1 65,1
Wanita 29 34,9 34,9 100,0
Total 83 100,0 100,0
b) Umur
Umur Karyawan
92
Frequency Percent Valid Percent Cumulative
Percent
Valid 20-30 tahun 63 75,9 75,9 75,9
31-40 tahun 8 9,6 9,6 85,5
41-50 tahun 6 7,2 7,2 92,8
51-55 tahun 6 7,2 7,2 100,0
Total 83 100,0 100,0
c) Pendidikan Terakhir
Pendidikan Terakhir
Frequency Percent Valid Percent
Cumulative
Percent
Valid SMA 19 22,9 22,9 22,9
D3 13 15,7 15,7 38,6
S1 48 57,8 57,8 96,4
S2 3 3,6 3,6 100,0
Total 83 100,0 100,0
93
d) Departemen/ Divisi Kerja
Departemen Kerja
Frequency Percent Valid Percent Cumulative
Percent
Valid Business 34 41,0 41,0 41,0
Supporting 41 49,4 49,4 90,4
Compliance 1 1,2 1,2 91,6
Branch Legal 1 1,2 1,2 92,8
Business Risk 1 1,2 1,2 94,0
Arcall 1 1,2 1,2 95,2
Asset Management 4 4,8 4,8 100,0
Total 83 100,0 100,0
e) Lama Kerja
Lama Bekerja
Frequency Percent Valid Percent Cumulative
Percent
Valid < 2 tahun 20 24,1 24,1 24,1
2-4 tahun 32 38,6 38,6 62,7
4-6 tahun 16 19,3 19,3 81,9
> 6 tahun 15 18,1 18,1 100,0
Total 83 100,0 100,0
94
95
Lampiran 6: Hasil Analisis Deskriptif Instrumen Penelitian
Item Deskripsi Pertanyaan Mean Standard Deviasi
Variabel X1: Kepemimpinan Transformasional X1Q1 Atasan saya menanamkan kepercayaan diri yang kuat
pada saya sebagai bawahan 3,66 0,73
X1Q2 Atasan saya mengabaikan kepentingan pribadi demi kebaikan kelompok
3,42 0,68
X1Q3 Atasan saya sikapnya membangun rasa hormat saya 3,82 0,57
X1Q4 Atasan saya memperlihatkan kekuasaan dan keyakinannya
3,48 0,69
X1Q5 Atasan saya mengkaji ulang dengan menanyakan apakah ada cara yang lebih baik untuk mengerjakan sesuatu
3,72 0,70
X1Q6 Atasan saya mencari perspektif yang berbeda dalam menyelesaikan masalah-masalah
3,61 0,64
X1Q7 Atasan saya mengajak saya untuk melihat suatu masalah dari sudut pandang yang lainnya
3,69 0,66
X1Q8 Atasan saya menyarankan cara-cara baru dalam melihat bagaimana menyelesaikan suatu masalah
3,65 0,67
X1Q9 Atasan saya meluangkan waktu untuk memberi tahu tentang bagaimana mengerjakan sesuatu
3,59 0,78
X1Q10 Atasan saya memperlakukan saya lebih secara individu daripada sekedar sebagai anggota kelompok
3,43 0,80
X1Q11 Atasan saya memperhatikan perbedaan kebutuhan, kemampuan, dan aspirasi saya terhadap sesuatu dibandingkan dengan teman sekerja lainnya
3,46 0,74
X1Q12 Atasan saya membantu saya dalam mengembangkan kelebihan saya
3,51 0,70
X1Q13 Atasan saya bicara optimis mengenai masa depan 3,76 0,74 X1Q14 Atasan saya mengemukakan dengan penuh semangat
tentang hal-hal yang perlu dicapai 3,82 0,63
X1Q15 Atasan saya pandai mengarahkan pada visi ke depan 3,63 0,71 X1Q16 Atasan saya menekankan keyakinannya bahwa
target-target akan tercapai 3,87 0,69
Variabel X2: Kepemimpinan Transaksional X2Q1 Atasan saya memberi saya bantuan sebagai imbalan
usaha-usaha saya 3,23 0,72
X2Q2 Atasan saya membicarakan dengan jelas siapa yang bertanggung jawab untuk mencapai target-target yang ditetapkan
3,63 0,69
X2Q3 Atasan saya memberitahu dengan jelas apa imbalan yang diperoleh kalau seseorang mencapai tujuan kerjanya
3,37 0,78
X2Q4 Atasan saya menyatakan kepuasannya bila saya mencapai harapannya
3,61 0,71
X2Q5 Atasan saya tidak melibatkan dirinya untuk ikut 3,00 0,88
96
Item Deskripsi Pertanyaan Mean Standard Deviasi
menangani masalah sebelum masalah menjadi serius X2Q6 Atasan saya menunggu dan baru mengambil tindakan
kalau sudah terjadi kesalahan 2,95 1,02
X2Q7 Atasan saya menunjukkan keyakinan bahwa “kalau sesuatu cara kerja masih berjalan baik, cara itu tidak perlu diperbaiki”
3,20 0,79
X2Q8 Atasan saya menekankan bahwa masalah-masalah akan menjadi makin parah kalau tidak segera ditangani
3,70 0,66
X2Q9 Atasan saya memusatkan perhatiannya pada ketidakteraturan, kesalahan, pengecualian, dan penyimpangan-penyimpangan standar
3,19 0,82
X2Q10 Atasan saya perhatiannya terpusat pada kesalahan, keluhan, dan kegagalan
3,07 0,81
X2Q11 Atasan saya mengikuti dengan seksama kesalahan-kesalahan yang terjadi dalam kerja
3,33 0,75
X2Q12 Atasan saya mengajak saya untuk memperhatikan kesalahan/ kegagalan untuk mencapai standar keberhasilan pengerjaan tugas
3,53 0,77
Variabel MV: Pemberdayaan Psikologis MVQ1 Pekerjaan yang saya lakukan sangat penting bagi
saya 4,01 0,71
MVQ2 Kegiatan saya dalam pekerjaan sangat berarti bagi saya secara pribadi
3.89 0,62
MVQ3 Pekerjaan yang saya lakukan berarti bagi saya 4,00 0,58 MVQ4 Saya yakin dengan kemampuan saya untuk
melakukan tugas saya 4,08 0,68
MVQ5 Saya meyakinkan diri mengenai kemampuan saya untuk melaksanakan kegiatan kerja saya
4,08 0,59
MVQ6 Saya memiliki keahlian yang diperlukan dalam pekerjaan saya
3,88 0,57
MVQ7 Saya memiliki otonomi dalam menentukan cara kerja saya
3,65 0,67
MVQ8 Saya bisa memutuskan sendiri bagaimana cara menyelesaikan pekerjaan saya
3,61 0,93
MVQ9 Saya memiliki cukup kesempatan untuk tidak bergantung dan bebas menentukan bagaimana saya melakukan tugas saya
3,52 0,97
MVQ10 Dampak saya pada apa yang terjadi dalam departemen/ bagian saya sangat besar
3,60 0,71
MVQ11 Saya memiliki kendali yang besar atas hal-hal yang terjadi dalam departemen saya
3,42 0,77
MVQ12 Saya memiliki pengaruh yang signifikan terhadap hal-hal yang terjadi di departemen saya
3,47 0,79
Variabel Y: Perilaku Inovatif YQ1 Saya menciptakan ide-ide baru untuk perbaikan 3,73 0,59 YQ2 Saya mencari metode-metode, teknik-teknik, atau
alat kerja baru 3,72 0,59
97
Item Deskripsi Pertanyaan Mean Standard Deviasi
YQ3 Saya menemukan jalan keluar terhadap masalah-masalah yang ada
3,87 0,54
YQ4 Saya memobilisasi dukungan terhadap ide-ide inovatif
3,80 0,56
YQ5 Saya mendapatkan persetujuan terhadap ide-ide inovatif
3,59 0,63
YQ6 Saya membuat para anggota penting dalam tim antusias terhadap ide-ide inovatif
3,71 0,57
YQ7 Saya mengubah ide-ide inovatif menjadi aplikasi-aplikasi yang bermanfaat
3,87 0,64
YQ8 Saya memperkenalkan ide-ide yang inovatif di lingkungan kerja secara sistematis
3,88 0,50
YQ9 Saya melakukan evaluasi terhadap penggunaan dari ide-ide inovatif
3,92 0,50
98
Lampiran 7: Hasil Statistik Deskriptif Variabel
Statistics
jenis kelamin
karyawan umur
karyawan pendidikan
terakhir departemen
kerja lama
bekerja
N Valid 83 83 83 83 83
Missing 0 0 0 0 0 Mean 1,3494 1,4578 2,4217 1,9518 2,3133 Std. Deviation ,47968 ,91467 ,88511 1,41338 1,03509 Minimum 1,00 1,00 1,00 1,00 1,00 Maximum 2,00 4,00 4,00 7,00 4,00
Statistics
RataX1 RataX2 RataMV RataY
N Valid 83 83 83 83
Missing 0 0 0 0 Mean 3,6340 3,3183 3,7693 3,7878 Std. Deviation ,41970 ,34499 ,36398 ,33509 Minimum 2,38 2,58 2,75 3,22 Maximum 4,56 4,50 4,83 5,00
Keterangan: RataX1: Kepemimpinan Transformasional RataX2: Kepemimpinan Transaksional RataMV: Pemberdayaan Psikologis RataY: Perilaku Inovatif
99
Lampiran 8: Hasil Uji Korelasi dan Uji Regresi
Correlations
RataY RataX1 RataX2 RataMV X1MV X2MV
Pearson Correlation
RataY 1,000 ,371 ,191 ,443 ,527 ,411
RataX1 ,371 1,000 ,271 ,195 ,827 ,304
RataX2 ,191 ,271 1,000 ,215 ,320 ,803
RataMV ,443 ,195 ,215 1,000 ,707 ,751
X1MV ,527 ,827 ,320 ,707 1,000 ,648
X2MV ,411 ,304 ,803 ,751 ,648 1,000
Sig. (1-tailed) RataY . ,000 ,042 ,000 ,000 ,000
RataX1 ,000 . ,007 ,039 ,000 ,003
RataX2 ,042 ,007 . ,025 ,002 ,000
RataMV ,000 ,039 ,025 . ,000 ,000
X1MV ,000 ,000 ,002 ,000 . ,000
X2MV ,000 ,003 ,000 ,000 ,000 .
N RataY 83 83 83 83 83 83
RataX1 83 83 83 83 83 83
RataX2 83 83 83 83 83 83
RataMV 83 83 83 83 83 83
X1MV 83 83 83 83 83 83
X2MV 83 83 83 83 83 83
Variables Entered/Removed
a
Model Variables Entered
Variables Removed Method
1 Mean centered JumlahX2, Mean centered JumlahX1
b
. Enter
2 Mean centered JumlahMV
b
. Enter
3 c_X2MV, c_X1MV
b
. Enter
a. Dependent Variable: Mean centered JumlahY b. All requested variables entered.
Model Summary
Model R R Square Adjusted R
Square Std. Error of the Estimate
Change Statistics
R Square Change F Change df1
1 .384a .147 .126 2.81650 .147 6.921 2
2 .531b .282 .255 2.60054 .135 14.838 1
3 .574c .329 .286 2.54617 .047 2.705 2
100
Model Summary
Model
Change Statistics
df2 Sig. F Change
1 80 .002
2 79 .000
3 77 .073
a. Predictors: (Constant), Mean centered JumlahX2, Mean centered JumlahX1 b. Predictors: (Constant), Mean centered JumlahX2, Mean centered JumlahX1, Mean centered JumlahMV c. Predictors: (Constant), Mean centered JumlahX2, Mean centered JumlahX1, Mean centered JumlahMV, c_X2MV, c_X1MV
ANOVA
a
Model Sum of Squares df Mean Square F Sig.
1 Regression 109.797 2 54.899 6.921 .002b
Residual 634.613 80 7.933 Total 744.410 82
2 Regression 210.146 3 70.049 10.358 .000c
Residual 534.264 79 6.763 Total 744.410 82
3 Regression 245.219 5 49.044 7.565 .000d
Residual 499.191 77 6.483 Total 744.410 82
a. Dependent Variable: Mean centered JumlahY b. Predictors: (Constant), Mean centered JumlahX2, Mean centered JumlahX1 c. Predictors: (Constant), Mean centered JumlahX2, Mean centered JumlahX1, Mean centered JumlahMV d. Predictors: (Constant), Mean centered JumlahX2, Mean centered JumlahX1, Mean centered JumlahMV, c_X2MV, c_X1MV
Coefficients
a
Model
Unstandardized Coefficients Standardized Coefficients
t Sig. B Std. Error Beta
1 (Constant) -2.917E-15 .309 .000 1.000
Mean centered JumlahX1 .154 .048 .344 3.211 .002
Mean centered JumlahX2 .073 .078 .100 .935 .353
2 (Constant) -3.668E-15 .285 .000 1.000
Mean centered JumlahX1 .130 .045 .289 2.892 .005
Mean centered JumlahX2 .024 .073 .033 .331 .742
Mean centered JumlahMV
.262 .068 .380 3.852 .000
101
3 (Constant) -.154 .288 -.537 .593
Mean centered JumlahX1 .113 .046 .251 2.433 .017
Mean centered JumlahX2 -.020 .075 -.027 -.266 .791
Mean centered JumlahMV
.270 .067 .391 4.020 .000
c_X1MV .007 .009 .080 .781 .437
c_X2MV .030 .016 .195 1.931 .057
Coefficientsa
Model
Collinearity Statistics
Tolerance VIF
1 (Constant) Mean centered JumlahX1 .926 1.080
Mean centered JumlahX2 .926 1.080
2 (Constant) Mean centered JumlahX1 .907 1.102
Mean centered JumlahX2 .898 1.113
Mean centered JumlahMV .934 1.071
3 (Constant) Mean centered JumlahX1 .816 1.225
Mean centered JumlahX2 .831 1.203
Mean centered JumlahMV .920 1.087
c_X1MV .829 1.206
c_X2MV .851 1.175
a. Dependent Variable: Mean centered JumlahY
Ket: Mean centered JumlahX1: Kepemimpinan Transformasional Mean centered JumlahX2: Kepemimpinan Transaksional Mean centered JumlahMV: Pemberdayaan Psikologis Mean centered JumlahY: Perilaku Inovatif C_X1MV: Kepemimpinan Transformasional x Pemberdayaan Psikologis C_X2MV: Kepemimpinan Transaksional x Pemberdayaan Psikologis
102
Lampiran 9: Hasil Perhitungan Macro Process by Andrew F. Hayes
Conditional effect of X on Y at values of the moderator(s): c_JMV Effect se t p LLCI ULCI -4.36 .07 .06 1.13 .26 -.05 .18 .00 .11 .05 2.18 .03 .01 .22 4.36 .16 .10 1.60 .11 -.04 .36 Values for quantitative moderators are the mean and plus/minus one SD from mean. Values for dichotomous moderators are the two values of the moderator.
Kepemimpinan transformasional
Pemberdayaan psikologis
Rendah Rata-rata Tinggi
Rendah (1 SD Below) -1,70 -0,82 0,06
Rata-rata (Mean) -1,27 -0,06 1,14
Tinggi (1 SD Above) -0,83 0,70 2,23
103
Conditional effect of X on Y at values of the moderator(s): c_JMV Effect se t p LLCI ULCI -4.36 -.13 .14 -.98 .33 -.40 .14 .00 .02 .09 .28 .78 -.15 .20 4.36 .18 .18 1.01 .32 -.18 .54 Values for quantitative moderators are the mean and plus/minus one SD from mean. Values for dichotomous moderators are the two values of the moderator.
Kepemimpinan transaksional
Pemberdayaan psikologis
Rendah Rata-rata Tinggi
Rendah (1 SD Below) -0,86 -0,24 0,38
Rata-rata (Mean) -1,41 -0,14 1,13
Tinggi (1 SD Above) -1,95 -0,04 1,88