Upload
vandien
View
214
Download
0
Embed Size (px)
Citation preview
Board Summary Date: March 16, 2017
Main Location: Carson City, Nevada
Business Type: New County: Lyon County Development Authority Representative: Stan Thomas, EDAWN
APPLICATION HIGHLIGHTS
PROFILE
SIGNIFICANCE OF ABATEMENTS IN THE COMPANY'S DECISION TO RELOCATE/EXPAND
REQUIREMENTS Statutory Application Sufficient % Over / Under
Job Creation 10 231 Yes 2210% Average Wage $18.96 $15.18 No -20% Equipment Capex (SU & MBT) $250,000 $26,806,710 Yes 10623% Equipment Capex (PP) $1,000,000 $26,806,710 Yes 2581%
INCENTIVES Requested Terms Estimated $ Amount Sales Tax Abmt. Abated to 2% for 2 years $1,367,142 Modified Business Tax Abmt. 50% for 4 years $176,079 Personal Property Tax Abmt. 50% for 10 years $974,316 Total $2,517,537
JOB CREATION Contracted 24-Month Projection 5-Year Projection10 231 268
OTHER CAPITAL INVESTMENT Land Building Purchase BTS / Building Improvements$0 $0 $0
ECONOMIC IMPACT ESTIMATES (10-Year Cumulative) Total Construction
Total Jobs Supported 322 0 Total Payroll Supported $102,637,169 $0 Total Output Estimate $295,421,449 $0
Estimate includes jobs, payroll & output by the company assisted as well as the secondary impacts to other local businesses.
NEW TAX REVENUE ESTIMATES (10-Year Cumulative) Direct Indirect Total Local Taxes Property $2,098,062 $3,514,505 $5,612,567 Sales $0 $886,556 $886,556 Lodging $0 $12,172 $12,172 State Taxes Property $103,834 $318,359 $422,193 Sales $536,134 $636,351 $1,172,485 Modified Business $875,321 $301,289 $1,176,610 Lodging $0 $507 $507 Total $3,613,351 $5,669,739 $9,283,090
IMPACT ASSESSMENT Economic Impact per Abated Dollar New Total Tax per Abated Dollar
$117 $3.69
EMPLOYEE BENEFITS
- Health care package cost per employee - $7,000 annually with options for dependents. - Overtime, PTO/Sick/Vacation
NOTES - Percentage of market outside of Nevada: 100%.
Daehan Solution Nevada, LLC
Daehan Solution is an award winning company specializing in the design, engineering and manufacturing of Noise, Vibration and Harshness (NVH) products and other automotive components for Automakers. The company's NVH products reduce vehicular interior and exterior noise and neutralize noise influencers from the early stages of vehicle development. Daehan Solution's Nevada, LLC's Lyon County facility will produce automotive components and will be equipped with high performance machinery, presses, ovens, waterjets and, assembly robots. The company's current customers include Chevrolet, Kia Motors, Hyundai, General Motors, Chrysler, and Toyota. Daehan is a Tier #1 Supplier for Hyundai Motor’s first US plant in Alabama. Source: Daehan Solution Nevada, LLC
- Daehan Solution Nevada, LLC is a subsidiary of Daehan Solution. The parent company was established in 1983 and is headquarted in Incheon, Korea. The company employs 5,985 staff across its plants in Korea, USA, China, Mexico, and Indonesia.
- The company plans to hire and train employees from the local area and commence operations by the target date of March 2017.
- The company will lease a 323,520 square foot facility in Lyon County.
- Percentage of health insurance plan covered by company: 70%.
Deahan Solution's decision to locate operations in Lyon County is due to several factors, including the business tax structure, cost of living, and logistical advantages offered by the region. In addition, the company is aware of the benefits of Nevada's incentive programs, and this is a critical factor in deciding to locate the automotive components operations to the state. Source: Daehan Solution Nevada, LLC
Manufacturing Yong Kee Chun, President
9101 County Road 26, Hope Hull, AL 36043
�
�� ����
January 17, 2017
Director Steve Hill Governor’s Office of Economic Development 808 West Nye Lane Carson City, NV 89703
Re: Daehan Solution Nevada, LLC
Dear Steve:
EDAWN hereby supports the application of Daehan Solution Nevada, LLC. for the Sales & Use Tax Abatement, Modified Business Tax Abatement, and Personal Property Tax Abatement incentives.
Daehan Solution Nevada, LLC develops, designs, manufactures and sells noise vibration and harshness (NVH) products for the automotive industry. The company is looking to open a production operation in Lyon County.
The company will be investing approximately $26,806,710 for capital equipment in the first 2 years and plans to hire 231 employees within the first 2 years at an average wage of $15.18 per hour.
The company’s compensation package includes medical and dental benefits, overtime, PTO/sick/vacation, bonus, retirement plan /401K. Employee health insurance is covered 70% by the company and commences on the date of hire.
EDAWN supports this application as the company meets two of three incentive requirements. Your consideration and support of the incentive application for Daehan Solution Nevada, LLC is a significant factor in their pending decision to expand in northern Nevada and speaks favorably to the State’s business-friendly environment.
Sincerely,
Stan Thomas EDAWN, Executive Vice-President Business Development
www.edawn.org | 5190 Neil Road, Suite 110 | Reno, NV 89502 | (p) 775.829.3700 or 800-256-9761 | (f) 775-829-3710�
��
�
12 Januar
Governor'808 WestCarson Ci
Dear Com
Daehan Sselling NVThe plan iarea, andoperations
Daehan SAssemblyincluding tDaehan Scritical fac
The locatiinvestmenaverage hopportunitoffer our cin what wi
Sincerely,
Yong KeePresidentDaehan S
ry, 2017
's Office of EcNye Lane
ity, NV 89703
mmission Mem
Solution NevadVH (Noise Vibis to locate inbegin to man
s to commenc
Solution Nevady Robot and sothe business
Solution Nevadctor in decidin
on plan to Lyonts. In order tohourly rate of tties presentedcompany. In cill be increase
e Chun ,
Solution Nevad
Da
conomic Deve
3
mbers:
da, LLC is engration and HaLyon County
nufacture autoce is March 20
da, LLC has fo on. The dectax structure,da, LLC is awg to locate the
on County invo staff and opthe employeed by this locatconjunction wied growth for D
da, LLC
aehan Solu
elopment
gaged in the barshness) prod
Nevada. Weomotive comp017.
facilities suchcision to locate
cost of livingware of the bene automotive
volves producerate our ope
es is projectedtion and the ath Nevada's bDaehan Solut
ution Nev
business of dducts and othplan to hire aonents at the
as PU Dispere operation toand logistic anefits of the Scomponents
ction operationerations, the pd to be $ 15.18dvantages thabusiness friention Nevada,
vada, LLC
eveloping, deher automotiveand train emp Lyon County
rsing Machineo Lyon Countyadvantages ofState Incentiveoperations to
n of automotivplan is to hire 8. We are excat locating thi
ndly environmLLC.
esigning, mane componentsloyees from th
y facility. The t
e, Press, Ovey was due to sffered by the e Program, an Lyon County
ve componena total of 231cited about this facility in Lyent, we see th
nufacturing ans for Automakhe local Renotarget date fo
en, Waterjet,several factorregion. In addnd this also wy.
ts for facility a employees. Te market
yon County whis as a first s
dkers.oor the
rs,dition,
was a
andThe
illstep
Company is an / a: (check one)Incentive Application New location in Nevada
Expansion of a Nevada company
Other:
Yes No
Headquarters Service ProviderTechnology Distribution / FulfillmentBack Office Operations ManufacturingResearch & Development / Intellectual Property Other:
Same as above
Manufacturing
Recycling Real Property Tax AbatementModified Business Tax AbatementPersonal Property Tax Abatement
Section 1 - Type of Incentives
Company Name: Date of Application:
Sales & Use Tax Abatement
334 398 1154
If Yes, list the program awarded, date of approval, and status of the accounts (attach separate sheet if necessary):
COMPANY NAME (Legal name under which business will be transacted in Nevada)
CORPORATE ADDRESS
MAILING ADDRESS TO RECEIVE DOCUMENTS (If different from above)
WEBSITE
COMPANY CONTACT TITLE
http://www.dhsol.com/
COMPANY CONTACT NAME
business.
Sales & Use Tax DeferralPlease check all that the company is applying for on this application:
CITY / TOWNHope Hull
STATE / PROVINCEAL 36043
FEDERAL TAX ID #Daehan Solution, LLC
9101 County Rd 26ZIP
CITY / TOWN STATE / PROVINCE ZIP
INDUSTRY TYPE
COUNTY ZIP
334 404 5000
Yong Kee Chun
President
March, 2017100%NAICS CODE / SIC
Has your company ever applied and been approved for incentives available by the Governor's Office of Economic Development?
in rural areas, the average hourly wage will equal or exceed the lesser of the county-wide average hourly wage or statewide average hourly
Note: Criteria is different depending on whether the business is in a county whose population is 100,000 or more or a city whose population is 60,000 or more (i.e., “urban” area), or if the business is in a county whose population is less than 100,000 or a city whose population is less than 60,000 (i.e., “rural” area).
greater.
wage.
E-MAIL ADDRESS PREFERRED PHONE NUMBER
Section 3 - Program Requirements (EDAWN )
Please check two of the boxes below; the company must meet at least two of the three program requirements:
businesses. In cases of expanding businesses, the capital investment must equal at least 20% of the value of the tangible property owned by the
New businesses locating in urban areas require fifty (50) or more permanent, full-time employees on its payroll by the eighth calendar quarter
In urban areas, the average hourly wage that will be paid by the business to its new employees is at least 100% of the average statewide hourly
A capital investment of $1,000,000 in eligible equipment in urban areas or $250,000 in eligible equipment in rural areas are required. This criteria is
quarter in which the abatement becomes effective. In rural areas, the requirement is ten (10) or more. For an expansion, the business must increase employees on its payroll by 10% more than its existing employees prior to expansion, or by 25 (urban) or 6 (rural) employees, whichever is
Section 4 - Nevada Facility
WHAT OTHER STATES / REGIONS / CITIES ARE BEING CONSIDERED FOR YOUR COMPANY'S RELOCATION / EXPANSION / STARTUP?None
CITY / TOWNFernley Lyon County 89408
Production operations for automotive componentsDESCRIPTION OF COMPANY'S NEVADA OPERATIONS
DAEHAN SOLUTION NEVADA , LLC
January 12, 2017
Section 2 - Corporate Information
PROPOSED / ACTUAL NEVADA FACILITY ADDRESS1600 E. Newlands Dr,
PERCENT OF COMPANY'S NEVADA LOCATION MARKET OUTSIDE OF NEVADA EXPECTED DATE OF NEW / EXPANDED OPERATIONS (MONTH / YEAR)
Type of Facility:
TELEPHONE NUMBER
SMP
Y
1
5 (A) Equipment List5 (B) Employment Schedule5 (C) Evaluation of Health Plan
When to break ground, if building (month, year)?Estimated completion date, if building (month, year):
How much space (sq. ft.)?
When to make improvements (month, year)?
$1,389,883.75If No, skip to Part 3. If Yes, continue below:
How much space (sq. ft.)?What year(s)?
new facility in Nevada?If Yes * , continue below:
buying an owner occupied facility in Nevada? No
If No, skip to Part 3. If Yes, continue below:
Part 3. Do you plan on building or buying a
If No, skip to Part 3. If Yes * , continue below:When to make improvements (month, year)?
BRIEF DESCRIPTION OF CONSTRUCTION PROJECT AND ITS PROJECTED IMPACT ON THE LOCAL ECONOMY (Attach a separate sheet if necessary):
* Please complete Section 7 - Capital Investment for New Operations / Startup. * Please complete Section 7 - Capital Investment for Expansions below.
If Yes * , continue below:
How much space (sq. ft.)?
If No, skip to Part 3. If Yes * , continue below:
Due to expansion, will you be making building improvements?
Current assessed value of real property?
When to make improvements (month, year)?
Part 3. Are you currently/planning onbuilding a build-to-suit facility in Nevada? No
Part 2. Are you currently operating at an
How much space (sq. ft.)?
owner occupied building in Nevada?
Purchase date, if buying (month, year):
Purchase date, if buying (month, year):When to break ground, if building (month, year)?
TBD
Estimated completion date, if building (month, year):
If No, skip to Part 3. If Yes * , continue below:
Do you plan on making building improvements?
Check the applicable box when form has been completed.
If No, skip to Part 2. If Yes, continue below:
Part 1. Are you currently/planning on
Annual lease cost of space:
What year(s)? 7
Section 6 - Real Estate & Construction (Fill in either New Operations/Startup or Expansion, not both.)
Yes
Expansions - Plans Over the Next 10 YearsNew Operations / Start Up - Plans Over the Next Ten Years
leasing space in Nevada? Yes
How much space (sq. ft.)?Due to expansion, will you lease additional space?
Do you plan on making building tenant improvements?
How much expanded space (sq. ft.)?Annual lease cost of expanded space:
If No, skip to Part 2. If Yes * , continue below: Expanding at the current facility or a new facility?
Part 2. Are you currently/planning on
Annual lease cost at current space:323,520
What year(s)?
How much space (sq. ft.)?
Do you plan on making building tenant improvements?
When to make improvements (month, year)?
Section 5 - Complete Forms (see additional tabs at the bottom of this sheet for each form listed below)
If No, skip to Part 3. If Yes * , continue below:
March,2017
Part 1. Are you currently leasing space in Nevada?If No, skip to Part 2. If Yes, continue below:
2
Overtime Merit increases Tuition assistance BonusPTO / Sick / Vacation COLA adjustments Retirement Plan / Profit Sharing / 401(k) Other:
No
Medical Vision DentalQualified after (check one):
Upon employment Three months after hire date Six months after hire date Other:
Health Insurance Costs: Percentage of health insurance coverage by:Cost of health insurance for company (annual amount per employee): Company: 70%Health Plan annual out-of-pocket maximum (individual): Employee: 30%
Building Costs (if building / making improvements):
How much capital investment is planned? (Breakout below):
TBD$0$0
$0
Total number of employees after expansion:
OTHER COMPENSATION (Check all that apply):
BRIEF DESCRIPTION OF ADDITIONAL COMPENSATION PROGRAMS AND ELIGIBILITY REQUIREMENTS (Attach a separate sheet if necessary):
[SIGNATURE PAGE FOLLOWS]
Expansions
Building Purchase (if buying): Building Purchase (if buying):
end of the first eighth quarter of new operations?:
Other:
Equipment Cost:Total:
Land:$26,806,710
Section 7 - Capital Investment (Fill in either New Operations/Startup or Expansion, not both.)New Operations / Start Up
$0 $0Land:
$26,806,710
Expansions
Current assessed value of personal property in NV:
How much capital investment is planned? (Breakout below):
$0Equipment Cost:
Total:
How many full-time equivalent (FTE*) employees will be created by the
Section 8 - Employment (Fill in either New Operations/Startup or Expansion, not both.)
How many full-time equivalent (FTE*) employees will be created by the
Building Costs (if building / making improvements):
Is the equipment purchase for replacement of existing equipment?
TBD
How many FTE employees prior to expansion?:
$1,750
Average hourly wage of these new employees: $15.18
Is health insurance for employees and an option for dependents offered?: Yes (copy of benefit plan must be attached)
* FTE represents a permanent employee who works an average of 30 hours per week or more, is eligible for health care coverage, and whose position is a "primary job" as set forth in NAC 360.474.
(Must attach the most recent assessment from the County Assessor's Office.)
$7,000
Package includes (check all that apply):
Section 9 - Employee Health Insurance Benefit Program
Average hourly wage of these existing employees:
231
New Operations / Start Up
Average hourly wage of these new employees:end of the first eighth quarter of expanded operations?:
$0
3
Site Selection FactorsCompany Name: County:
Section 1 - Site Selection Ratings
Availability of qualified workforce: 4 Transportation infrastructure: 5Labor costs: 4 Transportation costs: 5
Real estate availability: 4 State and local tax structure: 4Real estate costs: 4 State and local incentives: 5
Utility infrastructure: 5 Business permitting & regulatory structure: 5Utility costs: 5 Access to higher education resources: 4
DAEHAN SOLUTION NEVADA , LLC Lyon County
Directions: Please rate the select factors by importance to the company's business (1 = very low; 5 = very high). Attach this form to the Incentives Application.
OTHER FACTORS & RATINGS:
5
5(A) Capital Equipment ListCompany Name: DAEHAN SOLUTION NEVADA , LLC County:
( b) (c) (d)# of Units Price per Unit Total Cost
5 $150,000.00 $750,000.005 $130,000.00 $650,000.005 $170,000.00 $850,000.009 $180,000.00 $1,620,000.002 $250,000.00 $500,000.009 $150,000.00 $1,350,000.008 $120,000.00 $960,000.006 $160,000.00 $960,000.00
13 $180,000.00 $2,340,000.009 $270,000.00 $2,430,000.009 $25,000.00 $225,000.00
22 $57,000.00 $1,254,000.0012 $60,000.00 $720,000.0025 $13,000.00 $325,000.002 $80,000.00 $160,000.002 $250,000.00 $500,000.002 $50,000.00 $100,000.002 $90,000.00 $180,000.002 $240,000.00 $480,000.002 $165,000.00 $330,000.002 $175,000.00 $350,000.002 $140,000.00 $280,000.002 $65,000.00 $130,000.002 $100,000.00 $200,000.001 $1,070,000.00 $1,070,000.001 $2,245,680.00 $2,245,680.00
2,420 $1,450.00 $3,509,000.0046 $12,380.00 $569,480.001 $100,000.00 $100,000.00
76 $7,770.00 $590,520.001 $520,000.00 $520,000.00
19 $5,010.00 $95,190.00203 $2,280.00 $462,840.00
$26,806,710.00Yes No
Assembly robot
Is any of this equipment* to be acquired under an operating lease?*Certain lease hold equipment does not qualify for tax abatements
TOTAL EQUIPMENT COST
Transport fee &Facilities (Racks)Facilities (Others)
Furnitrue & Fixture
Lyon County
Waterjet
(a)
Carpet cooling jig machineCarpet auto-assembly machine and sub machines
Directions: Please provide an estimated list of the equipment [columns (a) through (c)] which the company intends to purchase over the two-year allowable period. For example, if the effective date of new / expanded operations begins April 1, 2015, the two-year period would be until March 31, 2017. Add an additional page if needed. For guidelines on classifying equipment, visit: tax.nv.gov/LocalGovt/PolicyPub/ArchiveFiles/Personal_Property_Manuals. Attach this form to the Incentives Application.
PU dispersing machineEquipment Name/Description
Section 1 - Capital Equipment List
Chillar ( for forming press )
Carpet High Frequency Welding machine
ERP SystemsNetworks (EDI, CCTV, Soft ware Programs)Test Eqipments
Parcel Shelf assembly machineParcel Shelf vibration welding machineParcel Shelf punching machine
Press 50 Ton Oven 1step mesh belt ( TPE Forming etc ) Oven 2step mesh belt ( TPE Forming etc )
Waterjet jigWaterjet robot
PU dispersing machine robotPU dispersing machine carosol , demold agent spray system , etc Press 200 Ton Press 200 Ton moving Press 150 Ton
Dash inr assembly machine
Vehicles
Parcel Shelf bending machineUtility
Trunk carpet assembly machineTrunk side trim assembly machine
Y N
6
Company Name: County:
(b) ( c ) (d) (e) (f)Number of Positions
Average Hourly Wage
Average Weekly Hours
Annual Wage per Position Total Annual Wages
2 $71.60 40 $148,928.00 $297,856.008 $43.30 40 $90,064.00 $720,512.00
15 $30.80 40 $64,064.00 $960,960.00206 $12.40 40 $25,792.00 $5,313,152.00
231 $15.18 $7,292,480.00
(a) Year
3-Year 4-Year 5-Year
Directions: Please provide an estimated list of full time employees [columns (a) through (d)] that will be hired and employed by the company by the end of the first eighth quarter of new / expanded operations. For example, if the effective date of new / expanded operations is April 1, 2015, the date would fall in Q2, 2015. The end of the first eighth quarter would be the last day of Q2, 2017 (i.e., June 30, 2017). Attach this form to the Incentives Application. A qualified employee must be employed at the site of a qualified project, scheduled to work an average minimum of 30 per week, if offered coverage under a plan of health insurance provided by his or her employer, is eligible for health care coverage, and whose position of a “primary job” as set forth in NAC 360.474.
(a)
New Hire Position Title/Description
DirectorManagerOffice WorkerProduction Worker
5(B) Employment ScheduleDAEHAN SOLUTION NEVADA , LLC Lyon County
Section 1 - Full-Time Equivalent (FTE) Employees
TOTAL
Section 2 - Employment Projections
Directions: Please estimate full-time job growth in Section 2, complete [columns (b) through (c)]. These estimates are used for state economic impact and net tax revenue analysis that this agency is required to report. The company will not be required to reach these estimated levels of employment.
(b) Number of FTE(s) Projected
(c) Average Hourly Wage
(d) Payroll
268 $15.92 $8,872,988.50
243 $15.42 $7,793,884.80255 $15.67 $8,309,628.29
7
Mis
sion
Sta
tem
ent
Cus
tom
er S
atis
fact
ion
Com
pany
Sat
isfa
ctio
nE
mpl
oyee
Sat
isfa
ctio
n
Mot
toH
arm
ony
Cha
lleng
eC
reat
ive
Visi
on“W
orld
Bes
t Su
pplie
r in
Aut
omot
ive
Indu
stry
”
Dae
han
Solu
tion,
as a
man
ufac
ture
r of a
utom
otiv
e co
mpo
nent
s an
d a
supp
lier o
f N
.V.H
. sys
tem
s, o
ffers
full
satis
fact
ion
to th
e cu
stom
ers
�Fo
unde
d A
pril
23rd
, 198
3
�A
nnua
lized
Tur
nove
r : $
835
mill
ions
(201
3)
�Em
ploy
ee :
5,9
85
�H
eadq
uart
ers
& P
lant
s-H
eadq
uarte
rs: I
nche
on, K
orea
-Pla
nts:
10
plan
ts in
Kor
ea4
plan
ts in
US
A.(
AL,
GA
,MI a
nd 1
new
pla
nt)
1 pl
ant i
n C
hina
.1
plan
t in
Indo
nesi
a.1
plan
t in
Mex
ico
�B
usin
ess
Scop
e-N
.V.H
. Sys
tem
Eng
inee
ring
-Int
erio
r Trim
Pro
duct
s(C
arpe
t . H
eadl
iner
. NV
H p
arts
. et
c )
-Tru
nk T
rim P
rodu
cts
-Bum
p S
topp
er
-
Wire
har
ness
-Raw
mat
eria
ls
-
Tool
ing
& J
ig
�S
ales
by
Cus
tom
ers
�S
ales
by
Year
�C
urre
nt C
usto
mer
s
465
625
735
816
835
010
020
030
040
050
060
070
080
090
0
2009
Y20
10Y
2011
Y20
12Y
2013
Y
KO
REA U
lsan
Sal
es O
ffice
Pack
ard
Kor
ea
Chu
n A
n
5th
Plan
tK
yung
San
3rd
Plan
tK
orea
Mat
eria
l
Dan
g Ji
n
Pose
ung
DM
tech
4th
Plan
tIn
cheo
n
HQ
& 1
stPl
ant &
R&
D
Kor
ea M
ater
ial
Don
gbo
Indu
stry
6th
Plan
tK
wan
gju
Ther
e A
re 1
0 Pl
ants
In K
orea
.
Tech
nica
l Lic
ense
Hyp
erla
st
Tech
nica
l Lic
ense
Per
sico
Yant
ai, C
hina
Jaka
rta, I
ndon
esia
Ala
bam
a,U
SA2
Geo
rgia
, USA
Not
e: H
yper
last
–B
ump
Stop
per
Pers
ico
–To
olin
g &
Pro
cess
Dae
han
Gro
up H
as G
loba
l Man
ufac
turin
g Fo
ot P
rints
Mal
aysi
a
Italy
Gre
at B
ritai
n,
Plan
ts
Tech
nica
l Lic
ense
Mon
terr
ey ,
Mex
ico
.
Hea
dlin
er
Das
h In
sula
tion
Pad
Pack
age
Tray
Car
pet
Das
h O
uter
Hoo
dTr
unk
Side
Trim
Lugg
age
Box
Trun
k M
at
Engi
ne C
over
Trun
k Li
d
Pilla
r
Sun
viso
r
Boo
t Ass
embl
y
Aux
iliar
y M
atW
ater
D
efle
ctor
Bat
tery
C
over
Whe
el H
ouse
�Es
tabl
ishe
d: A
pril
4 ,2
003
�C
apita
l : 1
0.8
Mil.
US
D�
Land
: 25
Acr
es�
Bui
ldin
g: 1
84,0
00 S
q ft
�Pr
oduc
tion
Cap
acity
: 400
,000
veh
icle
/yea
r�
Prod
uct:
N.V
.H P
acka
ge fo
r Son
ata
&
E
lant
ra�
Empl
oyee
s: 3
05�
2013
Sal
es :
$105
Mill
ion
�Lo
catio
n: M
ontg
omer
y, A
L
�Es
tabl
ishe
d: A
pril
4 ,2
003
�C
apita
l : 1
0.8
Mil.
US
D�
Land
: 25
Acr
es�
Bui
ldin
g: 1
84,0
00 S
q ft
�Pr
oduc
tion
Cap
acity
: 400
,000
veh
icle
/yea
r�
Prod
uct:
N.V
.H P
acka
ge fo
r Son
ata
&
E
lant
ra�
Empl
oyee
s: 3
05�
2013
Sal
es :
$105
Mill
ion
�Lo
catio
n: M
ontg
omer
y, A
L
Dae
han
Solu
tion
Ala
bam
a LL
C
Dae
han
Solu
tion
Geo
rgia
LLC
�Es
tabl
ishe
d: A
pril
4 ,2
008
�C
apita
l: 8
Mil.
US
D�
Land
: 35
Acr
es�
Bui
ldin
g: 2
62,0
00 S
q ft
�Pr
oduc
tion
Cap
acity
: 400
,000
veh
icle
/yea
r�
Prod
uct:
N.V
.H P
acka
ge fo
r Sor
ento
,
San
tafe
& O
ptim
a�
Empl
oyee
s:27
0�
2013
Sal
es :
$135
Milli
on�
Loca
tion
: Wes
t Poi
nt, G
A
�Es
tabl
ishe
d: A
pril
4 ,2
008
�C
apita
l: 8
Mil.
US
D�
Land
: 35
Acr
es�
Bui
ldin
g: 2
62,0
00 S
q ft
�Pr
oduc
tion
Cap
acity
: 400
,000
veh
icle
/yea
r�
Prod
uct:
N.V
.H P
acka
ge fo
r Sor
ento
,
San
tafe
& O
ptim
a�
Empl
oyee
s:27
0�
2013
Sal
es :
$135
Milli
on�
Loca
tion
: Wes
t Poi
nt, G
A
Loca
tion
Atlan
ta
Birm
ingh
am
Mobi
le
HMMA
Selm
a
KMMG
Daeh
an S
olut
ion
Geor
gia L
LC
GA H
wy18
GA H
wy10
3Da
ehan
Sol
utio
n Al
abam
a LLC
GAAL
I-85 E
xit 2
I-65 E
xit 15
8
�IS
O14
001
�C
ertif
icat
ion
: D
ecem
ber
2001
�IS
O/T
S169
49�
Cer
tific
atio
n:
Janu
ary
200
4
DSC
(Kor
ea)
DSG
(Geo
rgia
)D
SA (A
laba
ma)
�IS
O/T
S169
49 &
ISO
1400
1�
Cer
tific
atio
n:
Oct
ober
201
3
�O
HSA
S180
01�
Cer
tific
atio
n:
Nov
embe
r 20
13
�IS
O/T
S169
49 &
1SO
`400
1�
Cer
tific
atio
n:
May
200
7
�O
HSA
S180
01�
Cer
tific
atio
n:
Nov
embe
r 20
13
�O
HSA
S180
01�
Cer
tific
atio
n:
2013
(pla
n)
Env
ironm
enta
l Cha
mbe
rIn
flam
mab
ility
Test
erC
ycle
Cha
mbe
rU
nive
rsal
Test
ing
M/C
Dry
Cha
mbe
r
uC
ertif
icat
e IS
O/T
S 1
6949
-Per
iod
: May
23,
200
7 ~
-Aut
omot
ive
NV
H P
rodu
ctio
nu
Cer
tific
ate
ISO
140
01
-Per
iod
: Aug
23,
201
3 ~
-Aut
omot
ive
NV
H P
rodu
ctio
n u
Cer
tific
ate
OH
SA
S 1
8001
-P
erio
d: A
ug 2
3, 2
013
~