Project Manual for
DACC Main Campus Roof Replacement – Various Buildings
DACC Technical Trades Building DACC Classroom Building
DACC Learning Resources Building
NEW MEXICO STATE UNIVERSITY LAS CRUCES, NM
May 22, 2017
100% CONSTRUCTION DOCUMENTS
NINE DEGREES ARCHITECTURE
+ DESIGN, INC.
T O C Page 1 of 2
DACC MAIN CAMPUS ROOF REPLACEMENT VARIOUS BUILDINGS DACC Technical Trades Building DACC Classroom Building DACC Learning Resources Building
NEW MEXICO STATE UNIVERSITY Las Cruces, NM BIDDING DOCUMENTS (BY NMSU) CONTRACT FORMS (BY NMSU) CONTRACT CONDITIONS (BY NMSU)
TECHNICAL SPECIFICATIONS DIVISION 1 - GENERAL REQUIREMENTS Section 011000 – Summary Section 012200 – Unit Prices Section 012300 – Alternates Section 012500 – Substitution Procedures Section 012600 – Contract Modification Procedures Section 012900 – Payment Procedures Section 013100 – Project Management and Coordination Section 013200 – Construction Progress Documentation Section 013300 – Submittal Procedures Section 014000 – Quality Requirements Section 015000 – Temporary Facilities and Controls Section 016000 – Product Requirements Section 017300 – Execution
T O C Page 2 of 2
Section 017700 – Closeout Procedures Section 017823 – Operation and Maintenance Data Section 017839 – Project Record Documents
DIVISION 5 - METALS Section 055000 – Metal Fabrications DIVISION 6 - WOOD AND PLASTICS Section 061053 – Miscellaneous Rough Carpentry DIVISION 7 - THERMAL AND MOISTURE PROTECTION Section 070150 – Preparation for Reroofing Section 072200 – Roof Deck and Insulation Section 072419 – Polymer Based Exterior Insulation and Finish System Section 077260 – Roof Hatch Safety Rail System Section 075423 – Thermoplastic Polyolefin (TPO) Roof Section 076200 – Sheet Metal Flashing and Trim Section 077100 – Manufactured Roof Specialties Section 079200 – Joint Sealants Section 086200 – Unit Skylights DIVISION 9 - FINISHES Section 092200 – Portland Cement Plaster Section 099000 – Painting END OF TABLE OF CONTENTS
DACC Main Campus Roof Replacement – Various Buildings
SUMMARY 011000 - 1
SECTION 011000
SUMMARY
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes the following:
1. Work covered by the Contract Documents.
2. Type of the Contract.
3. Use of premises.
4. Owner's occupancy requirements.
5. Work restrictions.
6. Specification formats and conventions.
B. Related Sections include the following:
1. Division 01 Section "Temporary Facilities and Controls" for limitations and procedures
governing temporary use of Owner's facilities.
1.3 WORK COVERED BY CONTRACT DOCUMENTS
A. Project Identification: DACC Main Campus Roof Replacement – Various Buildings
1. Project Location: Las Cruces, New Mexico
B. Owner: New Mexico State University
1. Owner's Representative: Leo Lucero, Project Manager
Facilities and Services Department
C. Architect: NINE DEGREES Architecture + Design, Inc.
D. Contractor: _________________________________________ has been engaged as Contractor
for this Project.
E. Construction Manager: N/A.
F. Project Manager: Leo Lucero
DACC Main Campus Roof Replacement – Various Buildings
SUMMARY 011000 - 2
G. Work shall also include all HVAC and electrical, piping disconnect and re-connection.
Installation shall be as per NRCA, SMACNA, ANSI/SPRI, specifications, details and
manufacturer's guidelines.
1.4 TYPE OF CONTRACT
A. Project will be constructed under a single prime contract for all four roofs in same time frame
from date of notice to proceed, to final completion.
1.5 USE OF PREMISES
A. General:
1. Contractor shall have full use of premises for construction operations, including use of
Project site, during construction period. Contractor's use of premises is limited only by
Owner's right to perform work or to retain other contractors on portions of Project.
B. Use of Site: Limit use of premises to exterior of buildings and roof. Do not disturb portions of
Project site beyond areas in which the Work is indicated.
1. Owner Occupancy: Allow for Owner occupancy of Project site and use by the public.
2. Driveways and Entrances: Keep driveways and entrances serving premises clear and
available to Owner, Owner's employees, and emergency vehicles at all times. Do not use
these areas for parking or storage of materials.
a. Schedule deliveries to minimize use of driveways and entrances.
b. Schedule deliveries to minimize space and time requirements for storage of
materials and equipment on-site.
C. Use of Existing Buildings:
1. Maintain existing building in a weather-tight condition throughout roofing activities until
roofs have been accepted by Owner/Architect.
2. Repair damage caused to roofs, buildings, landscaping, sidewalks and asphalt roads by
construction operations. Protect existing facilities and its occupants during roofing
activities.
1.6 OWNER'S OCCUPANCY REQUIREMENTS
A. Full Owner Occupancy: Owner will occupy site and existing building during entire construction
period. Cooperate with Owner during construction operations to minimize conflicts and
facilitate Owner usage. Perform the Work so as not to interfere with Owner's day-to-day
operations. Maintain existing exits, unless otherwise indicated.
1. The Contractor is advised that the Owner will occupy the buildings at all times, and the
Contractor must provide all safeguards required to protect personnel and to keep noise
levels as low as reasonably possible for each operation.
DACC Main Campus Roof Replacement – Various Buildings
SUMMARY 011000 - 3
2. Maintain access to existing walkways, corridors, and other adjacent occupied or used
facilities. Do not close or obstruct walkways, corridors, or other occupied or used
facilities without written permission from Owner and authorities having jurisdiction.
3. Provide not less than 72 hours' notice to Owner of activities that will affect Owner's
operations.
4. The Contractor shall:
a. Coordinate work in such a manner as to not interfere with the normal operation of
the building.
b. Assume full responsibility for protection and safekeeping of products stored on
premises.
c. Agree to hold the Owner harmless in any and all liability of every nature and
description that may be suffered through bodily injuries, including death of any
persons by reason of negligence of the Contractor, agents, employees,
subcontractors and vendors.
d. The Contractor and all subcontractors shall take all necessary precautions to
prevent the use of alcoholic beverages and control substances on the Owner’s
premises.
1.7 WORK RESTRICTIONS
A. On-Site Work Hours: Work shall be generally performed inside the existing building during
normal business working hours of 7:30 a.m. to 11 p.m., Monday through Friday, except
otherwise indicated.
1. Weekend Hours: 8 a.m. to 7 p.m.
2. Hours for Utility Shutdowns: coordinate with Owner.
B. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or
others unless permitted under the following conditions and then only after arranging to provide
temporary utility services according to requirements indicated:
1. Notify Architect and Owner not less than two days in advance of proposed utility
interruptions.
2. Do not proceed with utility interruptions without Owner's written permission.
C. A Working Day: Is defined as a calendar day, not including Saturdays, Sundays, or legal holidays, in which weather or other conditions not under the control of the company will permit the performance of the principal units of work underway for a continuous period of not less than seven (7) hours between 7:00 A.M. and 6:00 P.M. For every Saturday on which the company chooses to work, one day will be charged against the working time when weather conditions will permit seven (7) hours of work as delineated above. A principal unit of work shall be that unit which controls the completion time of the agreement. Nothing in this item shall be construed as prohibiting the company from working on Saturdays if it so desires. If Sunday work is permitted by the Owner, working time will be charged on the same basis as weekdays.
1.8 SPECIFICATION FORMATS AND CONVENTIONS
A. Specification Format: The Specifications are organized into Divisions and Sections using the
50-division format and CSI/CSC's "MasterFormat" numbering system.
DACC Main Campus Roof Replacement – Various Buildings
SUMMARY 011000 - 4
1. Section Identification: The Specifications use Section numbers and titles to help cross-
referencing in the Contract Documents. Sections in the Project Manual are in numeric
sequence; however, the sequence is incomplete because all available Section numbers are
not used. Consult the table of contents at the beginning of the Project Manual to
determine numbers and names of Sections in the Contract Documents.
2. Division 01: Sections in Division 01 govern the execution of the Work of all Sections in
the Specifications.
B. Specification Content: The Specifications use certain conventions for the style of language and
the intended meaning of certain terms, words, and phrases when used in particular situations.
These conventions are as follows:
1. Abbreviated Language: Language used in the Specifications and other Contract
Documents is abbreviated. Words and meanings shall be interpreted as appropriate.
Words implied, but not stated, shall be inferred as the sense requires. Singular words
shall be interpreted as plural and plural words shall be interpreted as singular where
applicable as the context of the Contract Documents indicates.
2. Imperative mood and streamlined language are generally used in the Specifications.
Requirements expressed in the imperative mood are to be performed by Contractor.
Occasionally, the indicative or subjunctive mood may be used in the Section Text for
clarity to describe responsibilities that must be fulfilled indirectly by Contractor or by
others when so noted.
a. The words "shall," "shall be," or "shall comply with," depending on the context,
are implied where a colon (:) is used within a sentence or phrase.
1.9 PROTECTION OF PERSONS AND PROPERTY
A. Safety Precautions and Programs: The contractor shall be responsible for initiating,
maintaining and supervising all safety precautions and programs in connection with the
performance of the Contract.
B. Safety of Persons and Property: The contractor shall take reasonable precautions for
safety of, and shall provide reasonable protection to prevent damage, injury or loss to:
1. Employees on the work and other persons who may be affected thereby.
2. The work, materials and equipment to be incorporated therein, whether in stor-
age on or off the site, under care, custody or control of the contractor or
the contractor’s Subcontractors or Sub-subcontractors.
3. Other property at the site or adjacent thereto, such as trees, shrubs, lawns,
walks, pavements, roadways, structures and utilities not designated for re-
moval, relocation or replacement in the course of construction.
4. The Contractor and all Subcontractors shall take all necessary precautions to keep
the premises free of fire and safety hazards. The Contractor shall prevent all agents,
employees, licensees and invitees of the contractor from smoking on the Owner’s
premises.
5. The Contractor shall provide 6’ chainlink fence with gates as needed for staging
areas and office trailer.
C. The contractor shall give notices and comply with applicable laws, ordinances, rules,
regulations and lawful orders of public authorities bearing on safety of persons or property
or their protection from damage, injury or loss.
DACC Main Campus Roof Replacement – Various Buildings
SUMMARY 011000 - 5
D. The contractor shall erect and maintain, as required by existing conditions and performance of
the contract, reasonable safeguards for safety and protection, including posting danger signs
and other warnings against hazards, promulgating safety regulations and notifying owners
and users of adjacent sites and utilities.
E. The contractor shall comply to all OSHA requirements and any other local, state or federal
regulations pertaining to protection and safety of persons or property. All equipment to be
used for this project shall comply with OSHA standards.
F. The contractor and all Subcontractors shall take all necessary precautions to keep the premises
free of fire and safety hazards. The contractor shall prevent all agents, employees,
licensees and invitees of the contractor from smoking on the Owner’s premises and from
operating or using any flame, sparks or explosion hazard producing devices anywhere on
or about the premises without the written approval of the Owner’s representative.
G. The contractor shall designate a responsible member of the contractor’s organization at
the site whose duty shall be the prevention of accidents. This person shall be the contractor’s
superintendent unless otherwise designated by the contractor in writing to the Owner’s
representative.
H. The contractor shall not load or permit any part of the construction or site to be loaded so
as to endanger its safety.
I. The contractor shall at all times keep the heating tar kettle secured with a 6’ high chainlink
fence with door size as required. Door shall be maintained closed at all times and locked after
hours of operation.
1.10 SAFETY
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 011000
DACC Main Campus Roof Replacement – Various Buildings
UNIT PRICES 012200 - 1
SECTION 012200
UNIT PRICES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes administrative and procedural requirements for unit prices.
B. Related Sections include the following:
1. Division 01 Section "Contract Modification Procedures" for procedures for submitting
and handling Change Orders.
2. Division 01 Section "Quality Requirements" for general testing and inspecting
requirements.
1.3 DEFINITIONS
A. Unit price is an amount proposed by bidders, stated on the Bid Form, as a price per unit of
measurement for materials or services added to or deducted from the Contract Sum by
appropriate modification, if estimated quantities of Work required by the Contract Documents
are increased or decreased.
1.4 PROCEDURES
A. Unit prices include all necessary material, plus cost for delivery, installation, insurance,
overhead, and profit.
B. Measurement and Payment: Refer to individual Specification Sections and this section for work
that requires establishment of unit prices. Methods of measurement and payment for unit prices
are specified in those Sections.
C. Owner reserves the right to reject Contractor's measurement of work-in-place that involves use
of established unit prices and to have this work measured, at Owner's expense, by an
independent surveyor acceptable to Contractor.
D. List of Unit Prices: A list of unit prices is included in Part 3. Specification Sections referenced
in the schedule contain requirements for materials described under each unit price.
DACC Main Campus Roof Replacement – Various Buildings
UNIT PRICES 012200 - 2
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
A. Unit Price No. One (1) – Repair of existing Metal Deck Type “B”
1. Description: Contractor shall propose a Unit Price for the repair of the existing roof
metal deck. This item shall be utilized once the existing roofing system is removed and
the condition of the metal deck is exposed.
2. Unit of Measurement: Cost-per-square-foot.
3. Metal Deck Repair Procedures:
a. Field verify and document extent of damaged roof deck.
b. Remove damaged roof deck to nearest solid area of deck (min. 20 ga.) and nearest
roof joist.
c. Provide patch of same metal roof deck section, gauge and material as existing;
provide minimum 6” overlap on all sides between deck patch and existing roof
deck.
d. Attach metal roof deck patch to existing roof deck with zinc-coated tek 5 screws,
minimum one screw per deck rib.
___________ per square foot (Metal Deck Type B)
___________ per square 100 sq ft (Metal Deck Type B)
B. Unit Price No. Two (2) – Repair of existing Metal Deck Type “A”
1. Description: Contractor shall propose a Unit Price for the repair of the existing roof
metal deck. This item shall be utilized once the existing roofing system is removed and
the condition of the metal deck is exposed.
2. Unit of Measurement: Cost-per-square-foot.
3. Metal Deck Repair Procedures:
a. Field verify and document extent of damaged roof deck.
b. Remove damaged roof deck to nearest solid area of deck (min. 22 ga.) and nearest
roof joist.
c. Provide patch of same metal roof deck section, gauge and material as existing;
provide minimum 6” overlap on all sides between deck patch and existing roof
deck.
d. Attach metal roof deck patch to existing roof deck with zinc-coated tek 5 screws,
minimum one screw per deck rib.
___________ per square foot (Metal Deck Type A)
___________ per square 100 sq ft (Metal Deck Type A)
C. Unit Price No. Three (3) – Repair of existing EIFS Insulation:
1. Description: Contractor shall propose a Unit Price for the repair of the existing EIFS.
This item shall be utilized once the existing roofing system is removed and the condition
of the insulation board is exposed.
DACC Main Campus Roof Replacement – Various Buildings
UNIT PRICES 012200 - 3
2. Unit of Measurement: Cost-per-square-foot.
3. Insulation Repair Procedures:
a. Field verify and document extent of damaged insulation and finish system.
b. Remove damaged insulation to nearest solid area of insulation.
c. Provide patch of EIFS Insulation. Cut 6” further of damaged area in square
position.
d. Attach insulation board into existing wall with zinc-coated plates and screws with
minimum of five per patch. One at each corner and one on center. Finish patch to
match adjacent system thickness, color, and texture.
___________ per square foot
___________ per square 100 sq ft
D. Unit Price No. Three (4) – Repair of existing 3-COAT Stucco Plaster System over gypsum
sheathing:
1. Description: Contractor shall propose a Unit Price for the repair of the existing stucco
plaster system. This item shall be utilized once the existing roofing system is removed
and the condition of the stucco plaster system is examined.
2. Unit of Measurement: Cost-per-square-foot.
3. Plaster Replacement/ Repair Procedures:
a. Field verify and document extent of damaged stucco plaster system.
b. Remove damaged stucco plaster to nearest solid area of insulation.
c. Provide patch of 3-coat stucco system. Cut 6” further of damaged area in square
position.
___________ per square foot
___________ per square 100 sq ft
END OF SECTION 012200
DACC Main Campus Roof Replacement – Various Buildings
ALTERNATES 012300 - 1
SECTION 012300
ALTERNATES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes administrative and procedural requirements for alternates.
1.3 DEFINITIONS
A. Alternate: An amount proposed by bidders and stated on the Bid Form for certain work defined
in the Bidding Requirements that may be added to or deducted from the Base Bid amount if
Owner decides to accept a corresponding change either in the amount of construction to be
completed or in the products, materials, equipment, systems, or installation methods described
in the Contract Documents.
1. The cost or credit for each alternate is the net addition to or deduction from the Contract
Sum to incorporate alternate into the Work. No other adjustments are made to the
Contract Sum.
1.4 PROCEDURES
A. Coordination: Modify or adjust affected adjacent work as necessary to completely integrate
work of the alternate into Project.
1. Include as part of each alternate, miscellaneous devices, accessory objects, and similar
items incidental to or required for a complete installation whether or not indicated as part
of alternate.
B. Notification: Immediately following award of the Contract, notify each party involved, in
writing, of the status of each alternate. Indicate if alternates have been accepted, rejected, or
deferred for later consideration. Include a complete description of negotiated modifications to
alternates.
C. Execute accepted alternates under the same conditions as other work of the Contract.
D. Schedule: A Schedule of Alternates is included at the end of this Section. Specification Sections
referenced in schedule contain requirements for materials necessary to achieve the work
described under each alternate.
DACC Main Campus Roof Replacement – Various Buildings
ALTERNATES 012300 - 2
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 SCHEDULE OF ALTERNATES
A. Alternate No. One (1): Roof Replacement for Classroom Building as noted on plans. Include
removal and re-installation of equipment, extension of vents, extension of heat stacks,
installation of new metal coping and miscellaneous work. Refer to plans and specs for further
insight and clarification of scope of work included in this alternate.
END OF SECTION 012300
DACC Main Campus Roof Replacement – Various Buildings
SUBSTITUTION PROCEDURES 012500 - 1
SECTION 012500
SUBSTITUTION PROCEDURES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes administrative and procedural requirements for substitutions.
B. Related Requirements:
1. Section 016000 "Product Requirements" for requirements for submitting comparable
product submittals for products by listed manufacturers.
1.3 DEFINITIONS
A. Substitutions: Changes in products, materials, equipment, and methods of construction from
those required by the Contract Documents and proposed by Contractor.
1. Substitutions for Cause: Changes proposed by Contractor that are required due to
changed Project conditions, such as unavailability of product, regulatory changes, or
unavailability of required warranty terms.
2. Substitutions for Convenience: Changes proposed by Contractor or Owner that are not
required in order to meet other Project requirements but may offer advantage to
Contractor or Owner.
1.4 ACTION SUBMITTALS
A. Substitution Requests: Submit three copies of each request for consideration. Identify product
or fabrication or installation method to be replaced. Include Specification Section number and
title, Drawing numbers and titles.
1. Substitution Request Form: Use CSI Form 13.1A.
2. Documentation: Show compliance with requirements for substitutions and the following,
as applicable:
a. Statement indicating why specified product or fabrication or installation cannot be
provided, if applicable.
b. Coordination information, including a list of changes or revisions needed to other
parts of the Work and to construction performed by Owner and separate
contractors that will be necessary to accommodate proposed substitution.
DACC Main Campus Roof Replacement – Various Buildings
SUBSTITUTION PROCEDURES 012500 - 2
c. Detailed comparison of significant qualities of proposed substitution with those of
the Work specified. Include annotated copy of applicable Specification Section.
Significant qualities may include attributes such as performance, weight, size,
durability, visual effect, sustainable design characteristics, warranties, and specific
features and requirements indicated. Indicate deviations, if any, from the Work
specified.
d. Product Data, including drawings and descriptions of products and fabrication and
installation procedures.
e. Samples, where applicable or requested.
f. Certificates and qualification data, where applicable or requested.
g. List of similar installations for completed projects with project names and
addresses and names and addresses of architects and owners.
h. Material test reports from a qualified testing agency indicating and interpreting test
results for compliance with requirements indicated.
i. Research reports evidencing compliance with building code in effect for Project,
from International Building Code 2006.
j. Detailed comparison of Contractor's construction schedule using proposed
substitution with products specified for the Work, including effect on the overall
Contract Time. If specified product or method of construction cannot be provided
within the Contract Time, include letter from manufacturer, on manufacturer's
letterhead, stating date of receipt of purchase order, lack of availability, or delays
in delivery.
k. Cost information, including a proposal of change, if any, in the Contract Sum.
l. Contractor's certification that proposed substitution complies with requirements in
the Contract Documents except as indicated in substitution request, is compatible
with related materials, and is appropriate for applications indicated.
m. Contractor's waiver of rights to additional payment or time that may subsequently
become necessary because of failure of proposed substitution to produce indicated
results.
3. Architect's Action: If necessary, Architect will request additional information or
documentation for evaluation within seven days of receipt of a request for substitution.
Architect will notify Contractor of acceptance or rejection of proposed substitution within
fifteen days of receipt of request, or seven days of receipt of additional information or
documentation, whichever is later.
a. Forms of Acceptance: Change Order, Construction Change Directive, or
Architect's Supplemental Instructions for minor changes in the Work.
b. Use product specified if Architect does not issue a decision on use of a proposed
substitution within time allocated.
1.5 QUALITY ASSURANCE
A. Compatibility of Substitutions: Investigate and document compatibility of proposed
substitution with related products and materials. Engage a qualified testing agency to perform
compatibility tests recommended by manufacturers.
DACC Main Campus Roof Replacement – Various Buildings
SUBSTITUTION PROCEDURES 012500 - 3
1.6 PROCEDURES
A. Substitution request including all required documentation must be delivered to the
Owner's Representative's office no later than the date indicated in the specifications.
Requests submitted late will not be considered.
B. The Individual or Firm requesting a substitution must document that the requested
substitution is equal or superior to the specified product. Failure to provide clear,
accurate, and adequate documentation will be grounds for rejection.
C. Required documentation shall consist of applicable information which would aid
the Owner's Representative in making an informed decision. Include side by side
product comparisons, technical data, laboratory test results, product drawings, etc.
D. If use of the proposed product would result in changes to the design intent, the
submittal shall describe fully the changes required to the drawings or specifications.
Any cost differences resulting from modifications to the drawings and specifications
and the cost of making the changes shall not be borne by the Owner
PART 2 PRODUCTS
2.1 SUBSTITUTIONS
A. Review this article with Owner to confirm what is considered a substitution by Owner and to
coordinate Owner's role in approving substitutions. If substitution requests are restricted to
before bid opening, include requirements in the Instructions to Bidders.
B. Substitutions for Cause: Submit requests for substitution immediately on discovery of need for
change, but not later than fifteen days prior to time required for preparation and review of
related submittals.
1. Conditions: Architect will consider Contractor's request for substitution when the
following conditions are satisfied. If the following conditions are not satisfied, Architect
will return requests without action, except to record noncompliance with these
requirements:
a. Requested substitution is consistent with the Contract Documents and will produce
indicated results.
b. Requested substitution provides sustainable design characteristics that specified
product provided.
c. Substitution request is fully documented and properly submitted.
d. Requested substitution will not adversely affect Contractor's construction schedule.
e. Requested substitution has received necessary approvals of authorities having
jurisdiction.
f. Requested substitution is compatible with other portions of the Work.
g. Requested substitution has been coordinated with other portions of the Work.
h. Requested substitution provides specified warranty.
DACC Main Campus Roof Replacement – Various Buildings
SUBSTITUTION PROCEDURES 012500 - 4
i. If requested substitution involves more than one contractor, requested substitution
has been coordinated with other portions of the Work, is uniform and consistent, is
compatible with other products, and is acceptable to all contractors involved.
PART 2 - EXECUTION (Not Used)
END OF SECTION 012500
DACC Main Campus Roof Replacement – Various Buildings
CONTRACT MODIFICATION PROCEDURES 012600 - 1
SECTION 012600
CONTRACT MODIFICATION PROCEDURES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section specifies administrative and procedural requirements for handling and processing
Contract modifications.
B. Related Sections include the following:
1. Division 01 Section "Unit Prices" for administrative requirements for using unit prices.
2. Division 01 Section "Product Requirements" for administrative procedures for handling
requests for substitutions made after Contract award.
1.3 MINOR CHANGES IN THE WORK
A. Architect will issue supplemental instructions authorizing Minor Changes in the Work, not
involving adjustment to the Contract Sum or the Contract Time, on AIA Document G710,
"Architect's Supplemental Instructions."
1.4 PROPOSAL REQUESTS
A. Owner-Initiated Proposal Requests: Architect will issue a detailed description of proposed
changes in the Work that may require adjustment to the Contract Sum or the Contract Time. If
necessary, the description will include supplemental or revised Drawings and Specifications.
1. Proposal Requests issued by Architect are for information only. Do not consider them
instructions either to stop work in progress or to execute the proposed change.
2. Within time specified in Proposal Request after receipt of Proposal Request, submit a
quotation estimating cost adjustments to the Contract Sum and the Contract Time
necessary to execute the change.
a. Include a list of quantities of products required or eliminated and unit costs, with
total amount of purchases and credits to be made. If requested, furnish survey data
to substantiate quantities.
b. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade
discounts.
c. Include costs of labor and supervision directly attributable to the change.
d. Include an updated Contractor's Construction Schedule that indicates the effect of
the change, including, but not limited to, changes in activity duration, start and
DACC Main Campus Roof Replacement – Various Buildings
CONTRACT MODIFICATION PROCEDURES 012600 - 2
finish times, and activity relationship. Use available total float before requesting
an extension of the Contract Time.
B. Contractor-Initiated Proposals: If latent or unforeseen conditions require modifications to the
Contract, Contractor may propose changes by submitting a request for a change to Architect.
1. Include a statement outlining reasons for the change and the effect of the change on the
Work. Provide a complete description of the proposed change. Indicate the effect of the
proposed change on the Contract Sum and the Contract Time.
2. Include a list of quantities of products required or eliminated and unit costs, with total
amount of purchases and credits to be made. If requested, furnish survey data to
substantiate quantities.
3. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade
discounts.
4. Include costs of labor and supervision directly attributable to the change.
5. Include an updated Contractor's Construction Schedule that indicates the effect of the
change, including, but not limited to, changes in activity duration, start and finish times,
and activity relationship. Use available total float before requesting an extension of the
Contract Time.
6. Comply with requirements in Division 01 Section "Product Requirements" if the
proposed change requires substitution of one product or system for product or system
specified.
C. Proposal Request Form: Use AIA Document G709 for Proposal Requests.
1.5 CHANGE ORDER PROCEDURES
A. On Owner's approval of a Proposal Request, Architect will issue a Change Order for signatures
of Owner and Contractor on AIA Document G701.
1.6 CONSTRUCTION CHANGE DIRECTIVE
A. Construction Change Directive: Architect may issue a construction Change Directive on
AIA Document G714. Construction Change Directive instructs Contractor to proceed with a
change in the Work, for subsequent inclusion in a Change Order.
1. Construction Change Directive contains a complete description of change in the Work. It
also designates method to be followed to determine change in the Contract Sum or the
Contract Time.
B. Documentation: Maintain detailed records on a time and material basis of work required by the
Construction Change Directive.
1. After completion of change, submit an itemized account and supporting data necessary to
substantiate cost and time adjustments to the Contract.
DACC Main Campus Roof Replacement – Various Buildings
CONTRACT MODIFICATION PROCEDURES 012600 - 3
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 012600
DACC Main Campus Roof Replacement – Various Buildings
PAYMENT PROCEDURES 012900 - 1
SECTION 012900
PAYMENT PROCEDURES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section specifies administrative and procedural requirements necessary to prepare and
process Applications for Payment.
B. Related Sections include the following:
1. Division 01 Section "Contract Modification Procedures" for administrative procedures
for handling changes to the Contract.
2. Division 01 Section "Unit Prices" for administrative requirements governing use of unit
prices.
3. Division 01 Section "Construction Progress Documentation" for administrative
requirements governing preparation and submittal of Contractor's Construction Schedule
and Submittals Schedule.
1.3 DEFINITIONS
A. Schedule of Values: A statement furnished by Contractor allocating portions of the Contract
Sum to various portions of the Work and used as the basis for reviewing Contractor's
Applications for Payment.
1.4 SCHEDULE OF VALUES
A. Coordination: Coordinate preparation of the Schedule of Values with preparation of
Contractor's Construction Schedule.
1. Correlate line items in the Schedule of Values with other required administrative forms
and schedules, including the following:
a. Application for Payment forms with Continuation Sheets.
b. Submittal Register.
c. Contractor's Construction Schedule.
2. Submit the Schedule of Values to Architect at earliest possible date but no later than
seven days before the date scheduled for submittal of initial Applications for Payment.
DACC Main Campus Roof Replacement – Various Buildings
PAYMENT PROCEDURES 012900 - 2
3. Sub-schedules: Provide a separate schedule per roof building separately for phased
payments. Provide sub-schedules showing values correlated with each phase of payment.
B. Format and Content: Use the Project Manual table of contents as a guide to establish line items
for the Schedule of Values. Provide at least one line item for each Specification Section.
1. Identification: Include the following Project identification on the Schedule of Values:
a. Project name and location.
b. Name of Architect.
c. Architect's project number.
d. Contractor's name and address.
e. Date of submittal.
2. Submit draft of AIA Document G703 Continuation Sheets.
3. Arrange the Schedule of Values in tabular form with separate columns to indicate the
following for each item listed:
a. Related Specification Section or Division.
b. Description of the Work.
c. Name of subcontractor.
d. Name of manufacturer or fabricator.
e. Name of supplier.
f. Change Orders (numbers) that affect value.
g. Reflect 5% retainage for each line item.
h. Dollar value.
1) Percentage of the Contract Sum to nearest one-hundredth percent, adjusted
to total 100 percent.
4. Provide a breakdown of the Contract Sum in enough detail to facilitate continued
evaluation of Applications for Payment and progress reports. Coordinate with the Project
Manual table of contents. Provide several line items for principal subcontract amounts,
where appropriate.
5. Round amounts to nearest whole dollar; total shall equal the Contract Sum.
6. Provide a separate line item in the Schedule of Values for each part of the Work where
Applications for Payment may include materials or equipment purchased or fabricated
and stored, but not yet installed.
a. Differentiate between items stored on-site and items stored off-site. If specified,
include evidence of insurance or bonded warehousing.
7. Provide separate line items in the Schedule of Values for initial cost of materials, for each
subsequent stage of completion, and for total installed value of that part of the Work.
8. Allowances: Provide a separate line item in the Schedule of Values for each allowance.
Show line-item value of unit-cost allowances, as a product of the unit cost, multiplied by
measured quantity. Use information indicated in the Contract Documents to determine
quantities.
9. Each item in the Schedule of Values and Applications for Payment shall be complete.
Include total cost and proportionate share of general overhead and profit for each item.
DACC Main Campus Roof Replacement – Various Buildings
PAYMENT PROCEDURES 012900 - 3
a. Temporary facilities and other major cost items that are not direct cost of actual
work-in-place shall be shown as separate line item in the Schedule of Values from
general overhead expense.
10. Schedule Updating: Update and submit the Schedule of Values before the next
Applications for Payment when Change Orders or Construction Change Directives result
in a change in the Contract Sum.
1.5 APPLICATIONS FOR PAYMENT
A. Each Application for Payment shall be consistent with previous applications and payments as
certified by Architect and paid for by Owner.
1. Initial Application for Payment, Application for Payment at time of Substantial
Completion, and final Application for Payment involve additional requirements.
B. Payment Application Times: The date for each progress payment is indicated in the Agreement
between Owner and Contractor. The period of construction Work covered by each Application
for Payment is the period indicated in the Agreement.
C. Payment Application Times: Progress payments shall be submitted to Architect by the Twenty
Fifth day of the month. The period covered by each Application for Payment is one month,
ending on the last day of the month.
D. Payment Application Forms: Use AIA Document G702 and AIA Document G703 Continuation
Sheets as form for Applications for Payment.
E. (not used)
F. Application Preparation: Complete every entry on form. Notarize and execute by a person
authorized to sign legal documents on behalf of Contractor. Architect will return incomplete
applications without action.
1. Entries shall match data on the Schedule of Values and Contractor's Construction
Schedule. Use updated schedules if revisions were made.
2. Include amounts of Change Orders and Construction Change Directives issued before last
day of construction period covered by application.
G. Transmittal: Submit 3 signed and notarized original copies of each Application for Payment to
Architect by a method ensuring receipt within 24 hours. Owner’s and Architect’s copy shall
include waivers of lien from all subcontractors and suppliers paid in previous Application for
Payment and other required attachments.
1. Transmit each copy with a transmittal form listing attachments and recording appropriate
information about application.
H. Waivers of Mechanic's Lien: With each Application for Payment, submit waivers of mechanic's
lien from every entity who is lawfully entitled to file a mechanic's lien arising out of the
Contract and related to the Work covered by the payment.
DACC Main Campus Roof Replacement – Various Buildings
PAYMENT PROCEDURES 012900 - 4
1. Submit partial waivers on each item for amount requested in previous application, after
deduction for retainage, on each item.
2. When an application shows completion of an item, submit final or full waivers.
3. Owner reserves the right to designate which entities involved in the Work must submit
waivers.
4. Waiver Forms: Submit waivers of lien on forms, executed in a manner acceptable to
Owner.
I. Waivers of Mechanic's Lien: With each Application for Payment, submit waivers of mechanic's
liens from subcontractors, sub-subcontractors, and suppliers for construction period covered by
the previous application.
1. Submit partial waivers on each item for amount requested in previous application, after
deduction for retainage, on each item.
2. When an application shows completion of an item, submit final or full waivers.
3. Owner reserves the right to designate which entities involved in the Work must submit
waivers.
4. Submit final Application for Payment with or preceded by final waivers from every entity
involved with performance of the Work covered by the application who is lawfully
entitled to a lien.
5. Waiver Forms: Submit waivers of lien on forms, executed in a manner acceptable to
Owner.
J. Initial Application for Payment: Administrative actions and submittals that must precede or
coincide with submittal of first Application for Payment include the following:
1. List of subcontractors.
2. Schedule of Values.
3. Contractor's Construction Schedule (preliminary if not final).
4. Products list.
5. Schedule of unit prices.
6. Submittals Register (preliminary if not final).
7. List of Contractor's staff assignments.
8. List of Contractor's principal consultants.
9. Copies of building permits.
10. Copies of authorizations and licenses from authorities having jurisdiction for
performance of the Work.
11. Initial progress report.
12. Report of preconstruction conference.
13. Certificates of insurance and insurance policies.
14. Performance and payment bonds.
15. Data needed to acquire Owner's insurance.
16. Initial settlement survey and damage report if required.
K. Application for Payment at Substantial Completion: After issuing the Certificate of Substantial
Completion, submit an Application for Payment showing 100 percent completion for portion of
the Work claimed as substantially complete.
1. Include documentation supporting claim that the Work is substantially complete and a
statement showing an accounting of changes to the Contract Sum.
DACC Main Campus Roof Replacement – Various Buildings
PAYMENT PROCEDURES 012900 - 5
2. This application shall reflect Certificates of Partial Substantial Completion issued
previously for Owner occupancy of designated portions of the Work.
L. Final Payment Application: Submit final Application for Payment with releases and supporting
documentation not previously submitted and accepted, including, but not limited, to the
following:
1. Evidence of completion of Project closeout requirements.
2. Insurance certificates for products and completed operations where required and proof
that taxes, fees, and similar obligations were paid.
3. Updated final statement, accounting for final changes to the Contract Sum.
4. AIA Document G706, "Contractor's Affidavit of Payment of Debts and Claims."
5. AIA Document G706A, "Contractor's Affidavit of Release of Liens."
6. AIA Document G707, "Consent of Surety to Final Payment."
7. Evidence that claims have been settled.
8. Final meter readings for utilities, a measured record of stored fuel, and similar data as of
date of Substantial Completion or when Owner took possession of and assumed
responsibility for corresponding elements of the Work.
9. Final, liquidated damages settlement statement.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 012900
DACC Main Campus Roof Replacement – Various Buildings
PROJECT MANAGEMENT AND COORDINATION 013100 - 1
SECTION 013100
PROJECT MANAGEMENT AND COORDINATION
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes administrative provisions for coordinating construction operations on
Project including, but not limited to, the following:
1. Coordination Drawings.
2. Administrative and supervisory personnel.
3. Project meetings.
4. Requests for Interpretation (RFIs).
B. Each contractor shall participate in coordination requirements. Certain areas of responsibility
will be assigned to a specific contractor.
C. Related Sections include the following:
1. Division 01 Section "Construction Progress Documentation" for preparing and
submitting Contractor's Construction Schedule.
2. Division 01 Section "Execution" for procedures for coordinating general installation and
field-engineering services, including establishment of benchmarks and control points.
3. Division 01 Section "Closeout Procedures" for coordinating closeout of the Contract.
1.3 DEFINITIONS
A. RFI: Request from Contractor seeking interpretation or clarification of the Contract
Documents.
1.4 COORDINATION
A. Coordination: Coordinate construction operations included in different Sections of the
Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate
construction operations, included in different Sections that depend on each other for proper
installation, connection, and operation.
B. Coordination: Each contractor shall coordinate its construction operations with those of other
contractors and entities to ensure efficient and orderly installation of each part of the Work.
Each contractor shall coordinate its operations with operations, included in different Sections,
that depend on each other for proper installation, connection, and operation.
DACC Main Campus Roof Replacement – Various Buildings
PROJECT MANAGEMENT AND COORDINATION 013100 - 2
1. Schedule construction operations in sequence required to obtain the best results where
installation of one part of the Work depends on installation of other components, before
or after its own installation.
2. Coordinate installation of different components with other contractors to ensure
maximum accessibility for required maintenance, service, and repair.
3. Make adequate provisions to accommodate items scheduled for later installation.
4. Where availability of space is limited, coordinate installation of different components to
ensure maximum performance and accessibility for required maintenance, service, and
repair of all components, including mechanical and electrical.
C. Prepare memoranda for distribution to each party involved, outlining special procedures
required for coordination. Include such items as required notices, reports, and list of attendees
at meetings.
1. Prepare similar memoranda for Owner and separate contractors if coordination of their
Work is required.
D. Administrative Procedures: Coordinate scheduling and timing of required administrative
procedures with other construction activities and activities of other contractors to avoid conflicts
and to ensure orderly progress of the Work. Such administrative activities include, but are not
limited to, the following:
1. Preparation of Contractor's Construction Schedule.
2. Preparation of the Schedule of Values.
3. Installation and removal of temporary facilities and controls.
4. Delivery and processing of submittals.
5. Progress meetings.
6. Preinstallation conferences.
7. Project closeout activities.
8. Startup and adjustment of systems.
9. Project closeout activities.
E. Conservation: Coordinate construction activities to ensure that operations are carried out with
consideration given to conservation of energy, water, and materials.
1. Salvage materials and equipment involved in performance of, but not actually
incorporated into, the Work. Refer to other Sections for disposition of salvaged materials
that are designated as Owner's property.
1.5 SUBMITTALS
A. Coordination Drawings: Prepare Coordination Drawings if limited space availability
necessitates maximum utilization of space for efficient installation of different components or if
coordination is required for installation of products and materials fabricated by separate entities.
1. Content: Project-specific information, drawn accurately to scale. Do not base
Coordination Drawings on reproductions of the Contract Documents or standard printed
data. Include the following information, as applicable:
DACC Main Campus Roof Replacement – Various Buildings
PROJECT MANAGEMENT AND COORDINATION 013100 - 3
a. Indicate functional and spatial relationships of components of architectural,
structural, civil, mechanical, and electrical systems.
b. Indicate required installation sequences.
c. Indicate dimensions shown on the Contract Drawings and make specific note of
dimensions that appear to be in conflict with submitted equipment and minimum
clearance requirements. Provide alternate sketches to Architect for resolution of
such conflicts. Minor dimension changes and difficult installations will not be
considered changes to the Contract.
2. Sheet Size: At least 11 by 17 inches (215 by 280 mm) but no larger than 30 by 40 inches
(750 by 1000 mm).
3. Number of Copies: Submit Three opaque copies of each submittal. Architect will return
one copy.
a. Submit five copies where Coordination Drawings are required for operation and
maintenance manuals. Architect will retain two copies; remainder will be
returned. Mark up and retain one returned copy as a Project Record Drawing.
4. Refer to individual Sections for Coordination Drawing requirements for Work in those
Sections.
B. Key Personnel Names: Within Seven days of starting construction operations, submit a list of
key personnel assignments, including superintendent and other personnel in attendance at
Project site. Identify individuals and their duties and responsibilities; list addresses and
telephone numbers, including home and office telephone numbers. Provide names, addresses,
and telephone numbers of individuals assigned as standbys in the absence of individuals
assigned to Project.
1. Post copies of list in Project meeting room, in temporary field office, and by each
temporary telephone. Keep list current at all times.
1.6 ADMINISTRATIVE AND SUPERVISORY PERSONNEL
A. General: In addition to General Project Superintendent, provide other administrative and
supervisory personnel as required for proper performance of the Work per building.
1. Include special personnel required for coordination of operations with other contractors
for each building. All buildings shall have a superintendent on site at all times during
construction.
1.7 PROJECT MEETINGS
A. General: Schedule and conduct meetings and conferences at Project site, unless otherwise
indicated.
1. Attendees: Inform participants and others involved, and individuals whose presence is
required, of date and time of each meeting. Notify Owner and Architect of scheduled
meeting dates and times.
2. Agenda: Prepare the meeting agenda. Distribute the agenda to all invited attendees.
DACC Main Campus Roof Replacement – Various Buildings
PROJECT MANAGEMENT AND COORDINATION 013100 - 4
3. Minutes: Record significant discussions and agreements achieved. Distribute the
meeting minutes to everyone concerned, including Owner and Architect, within two days
of the meeting.
B. Preconstruction Conference: Schedule a preconstruction conference before starting
construction, at a time convenient to Owner and Architect, but no later than five days after
execution of the Agreement. Hold the conference at Project site or another convenient location.
Conduct the meeting to review responsibilities and personnel assignments.
1. Attendees: Authorized representatives of Owner, Architect, and their consultants;
Contractor and its superintendent; major subcontractors; suppliers; and other concerned
parties shall attend the conference. All participants at the conference shall be familiar
with Project and authorized to conclude matters relating to the Work.
2. Agenda: Discuss items of significance that could affect progress, including the
following:
a. Tentative construction schedule.
b. Phasing.
c. Critical work sequencing and long-lead items.
d. Designation of key personnel and their duties.
e. Procedures for processing field decisions and Change Orders.
f. Procedures for RFIs.
g. Procedures for testing and inspecting.
h. Procedures for processing Applications for Payment.
i. Distribution of the Contract Documents.
j. Submittal procedures.
k. Preparation of Record Documents.
l. Use of the premises.
m. Work restrictions.
n. Owner's occupancy requirements.
o. Responsibility for temporary facilities and controls.
p. Construction waste management.
q. Parking availability.
r. Office, work, and storage areas.
s. Equipment deliveries and priorities.
t. First aid.
u. Security.
v. Progress cleaning.
w. Working hours.
x. Use of control substance and smoking on premises
3. Minutes: Record and distribute meeting minutes.
C. Preinstallation Conferences: Conduct a preinstallation conference at Project site before each
construction activity that requires coordination with other construction.
1. Attendees: Installer and representatives of manufacturers and fabricators involved in or
affected by the installation and its coordination or integration with other materials and
installations that have preceded or will follow, shall attend the meeting. Advise Architect
of scheduled meeting dates.
DACC Main Campus Roof Replacement – Various Buildings
PROJECT MANAGEMENT AND COORDINATION 013100 - 5
2. Agenda: Review progress of other construction activities and preparations for the
particular activity under consideration, including requirements for the following:
a. The Contract Documents.
b. Options.
c. Related RFIs.
d. Related Change Orders.
e. Purchases.
f. Deliveries.
g. Submittals.
h. Review of mockups.
i. Possible conflicts.
j. Compatibility problems.
k. Time schedules.
l. Weather limitations.
m. Manufacturer's written recommendations.
n. Warranty requirements.
o. Compatibility of materials.
p. Acceptability of substrates.
q. Temporary facilities and controls.
r. Space and access limitations.
s. Regulations of authorities having jurisdiction.
t. Testing and inspecting requirements.
u. Installation procedures.
v. Coordination with other work.
w. Required performance results.
x. Protection of adjacent work.
y. Protection of construction and personnel.
3. Record significant conference discussions, agreements, and disagreements, including
required corrective measures and actions.
4. Reporting: Distribute minutes of the meeting to each party present and to parties who
should have been present.
5. Do not proceed with installation if the conference cannot be successfully concluded.
Initiate whatever actions are necessary to resolve impediments to performance of the
Work and reconvene the conference at earliest feasible date.
D. Progress Meetings: Conduct progress meetings at weekly intervals. Coordinate dates of
meetings with preparation of payment requests.
1. Attendees: In addition to representatives of Owner and Architect, each contractor,
subcontractor, supplier, and other entity concerned with current progress or involved in
planning, coordination, or performance of future activities shall be represented at these
meetings. All participants at the conference shall be familiar with Project and authorized
to conclude matters relating to the Work.
2. Agenda: Review and correct or approve minutes of previous progress meeting. Review
other items of significance that could affect progress. Include topics for discussion as
appropriate to status of Project.
a. Contractor's Construction Schedule: Review progress since the last meeting.
Determine whether each activity is on time, ahead of schedule, or behind schedule,
DACC Main Campus Roof Replacement – Various Buildings
PROJECT MANAGEMENT AND COORDINATION 013100 - 6
in relation to Contractor's Construction Schedule. Determine how construction
behind schedule will be expedited; secure commitments from parties involved to
do so. Discuss whether schedule revisions are required to ensure that current and
subsequent activities will be completed within the Contract Time.
1) Review schedule for next period.
b. Review present and future needs of each entity present, including the following:
1) Interface requirements.
2) Sequence of operations.
3) Status of submittals.
4) Deliveries.
5) Off-site fabrication.
6) Access.
7) Site utilization.
8) Temporary facilities and controls.
9) Work hours.
10) Hazards and risks.
11) Progress cleaning.
12) Quality and work standards.
13) Status of correction of deficient items.
14) Field observations.
15) RFIs.
16) Status of proposal requests.
17) Pending changes.
18) Status of Change Orders.
19) Pending claims and disputes.
20) Documentation of information for payment requests.
3. Minutes: Record the meeting minutes.
4. Reporting: Distribute minutes of the meeting to each party present and to parties who
should have been present.
a. Schedule Updating: Revise Contractor's Construction Schedule after each progress
meeting where revisions to the schedule have been made or recognized. Issue
revised schedule concurrently with the report of each meeting.
E. Coordination Meetings: Conduct Project coordination meetings at necessary intervals. Project
coordination meetings are in addition to specific meetings held for other purposes, such as
progress meetings and preinstallation conferences.
1. Attendees: In addition to representatives of Owner and Architect, each contractor,
subcontractor, supplier, and other entity concerned with current progress or involved in
planning, coordination, or performance of future activities shall be represented at these
meetings. All participants at the conference shall be familiar with Project and authorized
to conclude matters relating to the Work.
2. Agenda: Review and correct or approve minutes of the previous coordination meeting.
Review other items of significance that could affect progress. Include topics for
discussion as appropriate to status of Project.
DACC Main Campus Roof Replacement – Various Buildings
PROJECT MANAGEMENT AND COORDINATION 013100 - 7
a. Combined Contractor's Construction Schedule: Review progress since the last
coordination meeting. Determine whether each contract is on time, ahead of
schedule, or behind schedule, in relation to Combined Contractor's Construction
Schedule. Determine how construction behind schedule will be expedited; secure
commitments from parties involved to do so. Discuss whether schedule revisions
are required to ensure that current and subsequent activities will be completed
within the Contract Time.
b. Schedule Updating: Revise Combined Contractor's Construction Schedule after
each coordination meeting where revisions to the schedule have been made or
recognized. Issue revised schedule concurrently with report of each meeting.
c. Review present and future needs of each contractor present, including the
following:
1) Interface requirements.
2) Sequence of operations.
3) Status of submittals.
4) Deliveries.
5) Off-site fabrication.
6) Access.
7) Site utilization.
8) Temporary facilities and controls.
9) Work hours.
10) Hazards and risks.
11) Progress cleaning.
12) Quality and work standards.
13) Change Orders.
3. Reporting: Record meeting results and distribute copies to everyone in attendance and to
others affected by decisions or actions resulting from each meeting.
1.8 REQUESTS FOR INTERPRETATION (RFIs)
A. Procedure: Immediately on discovery of the need for interpretation of the Contract Documents,
and if not possible to request interpretation at Project meeting, prepare and submit an RFI in the
form specified.
1. RFIs shall originate with Contractor. RFIs submitted by entities other than Contractor
will be returned with no response.
2. Coordinate and submit RFIs in a prompt manner so as to avoid delays in Contractor's
work or work of subcontractors.
B. Content of the RFI: Include a detailed, legible description of item needing interpretation and
the following:
1. Project name.
2. Date.
3. Name of Contractor.
4. Name of Architect .
5. RFI number, numbered sequentially.
6. Specification Section number and title and related paragraphs, as appropriate.
DACC Main Campus Roof Replacement – Various Buildings
PROJECT MANAGEMENT AND COORDINATION 013100 - 8
7. Drawing number and detail references, as appropriate.
8. Field dimensions and conditions, as appropriate.
9. Contractor's suggested solution(s). If Contractor's solution(s) impact the Contract Time
or the Contract Sum, Contractor shall state impact in the RFI.
10. Contractor's signature.
11. Attachments: Include drawings, descriptions, measurements, photos, Product Data, Shop
Drawings, and other information necessary to fully describe items needing interpretation.
a. Supplementary drawings prepared by Contractor shall include dimensions,
thicknesses, structural grid references, and details of affected materials,
assemblies, and attachments.
C. Hard-Copy RFIs: CSI Form 13.2A.
1. Identify each page of attachments with the RFI number and sequential page number.
D. Software-Generated RFIs: Software-generated form with substantially the same content as
indicated above.
1. Attachments shall be electronic files in Adobe Acrobat PDF format.
E. Architect's Action: Architect will review each RFI, determine action required, and return it.
Allow two working days for Architect's response for each RFI. RFIs received after 1:00 p.m.
will be considered as received the following working day.
1. The following RFIs will be returned without action:
a. Requests for approval of submittals.
b. Requests for approval of substitutions.
c. Requests for coordination information already indicated in the Contract
Documents.
d. Requests for adjustments in the Contract Time or the Contract Sum.
e. Requests for interpretation of Architect's actions on submittals.
f. Incomplete RFIs or RFIs with numerous errors.
2. Architect's action may include a request for additional information, in which case
Architect's time for response will start again.
3. Architect's action on RFIs that may result in a change to the Contract Time or the
Contract Sum may be eligible for Contractor to submit Change Proposal according to
Division 01 Section "Contract Modification Procedures."
a. If Contractor believes the RFI response warrants change in the Contract Time or
the Contract Sum, notify Architect in writing within five days of receipt of the RFI
response.
F. On receipt of Architect's action, update the RFI log and immediately distribute the RFI response
to affected parties. Review response and notify Architect within three days if Contractor
disagrees with response.
G. RFI Log: Prepare, maintain, and submit a tabular log of RFIs organized by the RFI number.
Submit log weekly. Use CSI Log Form 13.2B., Include the following:
DACC Main Campus Roof Replacement – Various Buildings
PROJECT MANAGEMENT AND COORDINATION 013100 - 9
1. Project name.
2. Name and address of Contractor.
3. Name and address of Architect.
4. RFI number including RFIs that were dropped and not submitted.
5. RFI description.
6. Date the RFI was submitted.
7. Date Architect's response was received.
8. Identification of related Minor Change in the Work, Construction Change Directive, and
Proposal Request, as appropriate.
9. Identification of related Field Order, Work Change Directive, and Proposal Request, as
appropriate.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 013100
DACC Main Campus Roof Replacement – Various Buildings
CONSTRUCTION PROGRESS DOCUMENTATION 013200 - 1
SECTION 013200 - CONSTRUCTION PROGRESS DOCUMENTATION
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes administrative and procedural requirements for documenting the progress
of construction during performance of the Work, including the following:
1. Preliminary Construction Schedule.
2. Contractor's Construction Schedule.
3. Submittals Schedule.
4. Daily construction reports.
5. Material location reports.
6. Field condition reports.
7. Special reports.
B. Related Sections include the following:
1. Division 01 Section "Payment Procedures" for submitting the Schedule of Values.
2. Division 01 Section "Project Management and Coordination" for submitting and
distributing meeting and conference minutes.
3. Division 01 Section "Submittal Procedures" for submitting schedules and reports.
4. Division 01 Section "Quality Requirements" for submitting a schedule of tests and
inspections.
1.3 DEFINITIONS
A. Activity: A discrete part of a project that can be identified for planning, scheduling, monitoring,
and controlling the construction project. Activities included in a construction schedule consume
time and resources.
1. Critical activities are activities on the critical path. They must start and finish on the
planned early start and finish times.
2. Predecessor Activity: An activity that precedes another activity in the network.
3. Successor Activity: An activity that follows another activity in the network.
B. Cost Loading: The allocation of the Schedule of Values for the completion of an activity as
scheduled. The sum of costs for all activities must equal the total Contract Sum, unless
otherwise approved by Architect.
DACC Main Campus Roof Replacement – Various Buildings
CONSTRUCTION PROGRESS DOCUMENTATION 013200 - 2
C. CPM: Critical path method, which is a method of planning and scheduling a construction
project where activities are arranged based on activity relationships. Network calculations
determine when activities can be performed and the critical path of Project.
D. Critical Path: The longest connected chain of interdependent activities through the network
schedule that establishes the minimum overall Project duration and contains no float.
E. Event: The starting or ending point of an activity.
F. Float: The measure of leeway in starting and completing an activity.
1. Float time is not for the exclusive use or benefit of either Owner or Contractor, but is a
jointly owned, expiring Project resource available to both parties as needed to meet
schedule milestones and Contract completion date.
2. Free float is the amount of time an activity can be delayed without adversely affecting the
early start of the successor activity.
3. Total float is the measure of leeway in starting or completing an activity without
adversely affecting the planned Project completion date.
G. Fragment: A partial or fragmentary network that breaks down activities into smaller activities
for greater detail.
H. Major Area: A story of construction, a separate building, or a similar significant construction
element.
I. Milestone: A key or critical point in time for reference or measurement.
J. Network Diagram: A graphic diagram of a network schedule, showing activities and activity
relationships.
K. Resource Loading: The allocation of manpower and equipment necessary for the completion of
an activity as scheduled.
1.4 SUBMITTALS
A. Qualification Data: For scheduling consultant.
B. Submittals Schedule: Submit three copies of schedule. Arrange the following information in a
tabular format:
1. Scheduled date for first submittal.
2. Specification Section number and title.
3. Submittal category (action or informational).
4. Name of subcontractor.
5. Description of the Work covered.
6. Scheduled date for Architect's final release or approval.
C. Preliminary Construction Schedule: Submit two opaque copies.
DACC Main Campus Roof Replacement – Various Buildings
CONSTRUCTION PROGRESS DOCUMENTATION 013200 - 3
1. Approval of cost-loaded preliminary construction schedule will not constitute approval of
Schedule of Values for cost-loaded activities.
D. Contractor's Construction Schedule: Submit two opaque copies of initial schedule, large
enough to show entire schedule for entire construction period.
1. Submit an electronic copy of schedule, using software indicated, on CD-R, and labeled to
comply with requirements for submittals. Include type of schedule (Initial or Updated)
and date on label.
E. Field Condition Reports: Submit two copies at time of discovery of differing conditions.
F. Special Reports: Submit two copies at time of unusual event.
1.5 QUALITY ASSURANCE
A. Prescheduling Conference: Conduct conference at Project site to comply with requirements in
Division 01 Section "Project Management and Coordination." Review methods and procedures
related to the Preliminary Construction Schedule and Contractor's Construction Schedule,
including, but not limited to, the following:
1. Review software limitations and content and format for reports.
2. Verify availability of qualified personnel needed to develop and update schedule.
3. Discuss constraints, including phasing, work stages, area separations, interim milestones.
4. Review delivery dates for Owner-furnished products.
5. Review schedule for work of Owner's separate contracts.
6. Review time required for review of submittals and resubmittals.
7. Review requirements for tests and inspections by independent testing and inspecting
agencies.
8. Review time required for completion and startup procedures.
9. Review and finalize list of construction activities to be included in schedule.
10. Review submittal requirements and procedures.
11. Review procedures for updating schedule.
1.6 COORDINATION
A. Coordinate preparation and processing of schedules and reports with performance of
construction activities and with scheduling and reporting of separate contractors.
B. Coordinate Contractor's Construction Schedule with the Schedule of Values, list of
subcontracts, Submittals Schedule, progress reports, payment requests, and other required
schedules and reports.
1. Secure time commitments for performing critical elements of the Work from parties
involved.
2. Coordinate each construction activity in the network with other activities and schedule
them in proper sequence.
DACC Main Campus Roof Replacement – Various Buildings
CONSTRUCTION PROGRESS DOCUMENTATION 013200 - 4
PART 2 - PRODUCTS
2.1 SUBMITTALS SCHEDULE
A. Preparation: Submit a schedule of submittals, arranged in chronological order by dates required
by construction schedule. Include time required for review, resubmittal, ordering,
manufacturing, fabrication, and delivery when establishing dates.
1. Coordinate Submittals Schedule with list of subcontracts, the Schedule of Values, and
Contractor's Construction Schedule.
2. Initial Submittal: Submit concurrently with preliminary bar-chart schedule. Include
submittals required during the first 60 days of construction. List those required to
maintain orderly progress of the Work and those required early because of long lead time
for manufacture or fabrication.
a. At Contractor's option, show submittals on the Preliminary Construction Schedule,
instead of tabulating them separately.
3. Final Submittal: Submit concurrently with the first complete submittal of Contractor's
Construction Schedule.
2.2 CONTRACTOR'S CONSTRUCTION SCHEDULE, GENERAL
A. Procedures: Comply with procedures contained in AGC's "Construction Planning &
Scheduling."
B. Time Frame: Extend schedule from date established for the Notice to Proceed to date of Final
Completion in accordance to the phasing schedule for the project.
1. Contract completion date shall not be changed by submission of a schedule that shows an
early completion date, unless specifically authorized by Change Order.
C. Activities: Treat each story or separate area as a separate numbered activity for each principal
element of the Work. Comply with the following:
1. Activity Duration: Define activities so no activity is longer than 20 days, unless
specifically allowed by Architect.
2. Procurement Activities: Include procurement process activities for the following long
lead items and major items, requiring a cycle of more than 60 days, as separate activities
in schedule. Procurement cycle activities include, but are not limited to, submittals,
approvals, purchasing, fabrication, and delivery.
a. Insert list of major items or pieces of equipment.
3. Submittal Review Time: Include review and resubmittal times indicated in Division 01
Section "Submittal Procedures" in schedule. Coordinate submittal review times in
Contractor's Construction Schedule with Submittals Schedule.
DACC Main Campus Roof Replacement – Various Buildings
CONSTRUCTION PROGRESS DOCUMENTATION 013200 - 5
4. Substantial Completion: Indicate completion in advance of date established for
Substantial Completion, and allow time for Architect's administrative procedures
necessary for certification of Substantial Completion.
D. Milestones: Include milestones indicated in the Contract Documents in schedule, including, but
not limited to, the Notice to Proceed, Substantial Completion, and Final CompletionFirst
paragraph below establishes progress measured in dollar volume of the Work.
E. Contract Modifications: For each proposed contract modification and concurrent with its
submission, prepare a time-impact analysis using fragnets to demonstrate the effect of the
proposed change on the overall project schedule.
F. Computer Software: Prepare schedules using a program that has been developed specifically to
manage construction schedules.
G. Owner’s preferred scheduling method: It is the Owner’s preference, given the particulars of this
project, to utilize a Gantt Chart Schedule. Please refer to section 2.4.
2.3 PRELIMINARY CONSTRUCTION SCHEDULE
A. Bar-Chart Schedule: Submit preliminary horizontal bar-chart-type construction schedule within
five days of date established for the Notice to Proceed.
B. Preparation: Indicate each significant construction activity separately. Identify first workday of
each week with a continuous vertical line. Outline significant construction activities for first
thirty days of construction. Include skeleton diagram for the remainder of the Work and a cash
requirement prediction based on indicated activities.
2.4 CONTRACTOR'S CONSTRUCTION SCHEDULE (GANTT CHART)
A. Gantt-Chart Schedule: Submit a comprehensive, fully developed, horizontal Gantt-chart-type,
Contractor's Construction Schedule within ten days of date established for the Notice to
Proceed. Base schedule on the Preliminary Construction Schedule and whatever updating and
feedback was received since the start of Project.
B. Preparation: Indicate each significant construction activity separately. Identify first workday of
each week with a continuous vertical line.
1. For construction activities that require 3 months or longer to complete, indicate an
estimated completion percentage in ten percent increments within time bar.
2.5 REPORTS
A. Daily Construction Reports: Prepare a daily construction report recording the following
information concerning events at Project site:
1. List of subcontractors at Project site.
2. List of separate contractors at Project site.
DACC Main Campus Roof Replacement – Various Buildings
CONSTRUCTION PROGRESS DOCUMENTATION 013200 - 6
3. Approximate count of personnel at Project site.
4. Equipment at Project site.
5. Material deliveries.
6. High and low temperatures and general weather conditions.
7. Accidents.
8. Meetings and significant decisions.
9. Unusual events (refer to special reports).
10. Stoppages, delays, shortages, and losses.
11. Meter readings and similar recordings.
12. Emergency procedures.
13. Orders and requests of authorities having jurisdiction.
14. Change Orders received and implemented.
15. Construction Change Directives received and implemented.
16. Services connected and disconnected.
17. Equipment or system tests and startups.
18. Partial Completions and occupancies.
19. Substantial Completions authorized.
B. Field Condition Reports: Immediately on discovery of a difference between field conditions
and the Contract Documents, prepare and submit a detailed report. Submit with a request for
interpretation on CSI Form 13.2A. Include a detailed description of the differing conditions,
together with recommendations for changing the Contract Documents.
2.6 SPECIAL REPORTS
A. General: Submit special reports directly to Owner within one day of an occurrence. Distribute
copies of report to parties affected by the occurrence.
B. Reporting Unusual Events: When an event of an unusual and significant nature occurs at
Project site, whether or not related directly to the Work, prepare and submit a special report.
List chain of events, persons participating, response by Contractor's personnel, evaluation of
results or effects, and similar pertinent information. Advise Owner in advance when these
events are known or predictable.
PART 3 - EXECUTION
3.1 CONTRACTOR'S CONSTRUCTION SCHEDULE
A. Contractor's Construction Schedule Updating: At monthly intervals, update schedule to reflect
actual construction progress and activities. Issue schedule one week before each regularly
scheduled progress meeting.
1. Revise schedule immediately after each meeting or other activity where revisions have
been recognized or made. Issue updated schedule concurrently with the report of each
such meeting.
2. Include a report with updated schedule that indicates every change, including, but not
limited to, changes in logic, durations, actual starts and finishes, and activity durations.
3. As the Work progresses, indicate Actual Completion percentage for each activity.
DACC Main Campus Roof Replacement – Various Buildings
CONSTRUCTION PROGRESS DOCUMENTATION 013200 - 7
B. Distribution: Distribute copies of approved schedule to Architect, Owner, separate contractors,
testing and inspecting agencies, and other parties identified by Contractor with a need-to-know
schedule responsibility.
1. Post copies in Project meeting rooms and temporary field offices.
2. When revisions are made, distribute updated schedules to the same parties and post in the
same locations. Delete parties from distribution when they have completed their assigned
portion of the Work and are no longer involved in performance of construction activities.
END OF SECTION 013200
DACC Main Campus Roof Replacement – Various Buildings
SUBMITTAL PROCEDURES 013300 - 1
SECTION 013300
SUBMITTAL PROCEDURES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes administrative and procedural requirements for submitting Shop
Drawings, Product Data, Samples, and other submittals.
B. Related Sections include the following:
1. Division 01 Section "Payment Procedures" for submitting Applications for Payment and
the Schedule of Values.
2. Division 01 Section "Project Management and Coordination" for submitting and
distributing meeting and conference minutes and for submitting Coordination Drawings.
3. Division 01 Section "Construction Progress Documentation" for submitting schedules
and reports, including Contractor's Construction Schedule and the Submittals Schedule.
4. Division 01 Section "Quality Requirements" for submitting test and inspection reports.
5. Division 01 Section "Closeout Procedures" for submitting warranties.
6. Division 01 Section "Project Record Documents" for submitting Record Drawings,
Record Specifications, and Record Product Data.
7. Division 01 Section "Operation and Maintenance Data" for submitting operation and
maintenance manuals.
1.3 DEFINITIONS
A. Action Submittals: Written and graphic information that requires Architect's responsive action.
B. Informational Submittals: Written information that does not require Architect's responsive
action. Submittals may be rejected for not complying with requirements.
1.4 SUBMITTAL PROCEDURES
A. General: Electronic copies of CAD Drawings of the Contract Drawings will not be provided by
Architect for Contractor's use in preparing submittals.
B. Coordination: Coordinate preparation and processing of submittals with performance of
construction activities.
DACC Main Campus Roof Replacement – Various Buildings
SUBMITTAL PROCEDURES 013300 - 2
C. Submittals Register: Comply with requirements in Division 01 Section "Construction Progress
Documentation" for list of submittals and time requirements for scheduled performance of
related construction activities.
D. Processing Time: Allow enough time for submittal review, including time for re-submittals, as
follows. Time for review shall commence on Architect's receipt of submittal. No extension of
the Contract Time will be authorized because of failure to transmit submittals enough in
advance of the Work to permit processing, including re-submittals.
1. Initial Review: Allow 7 days for initial review of each submittal. Allow additional time
if coordination with subsequent submittals is required. Architect will advise Contractor
when a submittal being processed must be delayed for coordination.
2. Intermediate Review: If intermediate submittal is necessary, process it in same manner
as initial submittal.
3. Re-submittal Review: Allow 7 days for review of each re-submittal.
4. Sequential Review: Where sequential review of submittals by Architect's consultants,
Owner, or other parties is indicated, allow 21 days for initial review of each submittal.
E. Identification: Place a permanent label or title block on each submittal for identification.
1. Indicate name of firm or entity that prepared each submittal on label or title block.
2. Provide a space approximately 6 by 8 inches on label or beside title block to record
Contractor's review and approval markings and action taken by Architect.
3. Include the following information on label for processing and recording action taken:
a. Project name.
b. Date.
c. Name and address of Architect.
d. Name and address of Contractor.
e. Name and address of subcontractor.
f. Name and address of supplier.
g. Name of manufacturer.
h. Submittal number or other unique identifier, including revision identifier.
1) Submittal number shall use Specification Section number followed by a
decimal point and then a sequential number (e.g., 06100.01). Resubmittals
shall include an alphabetic suffix after another decimal point (e.g.,
06100.01.A).
i. Number and title of appropriate Specification Section.
j. Drawing number and detail references, as appropriate.
k. Location(s) where product is to be installed, as appropriate.
l. Other necessary identification.
F. Deviations: Highlight or otherwise specifically identify deviations from the Contract
Documents on submittals.
G. Transmittal: Package each submittal individually and appropriately for transmittal and
handling. Transmit each submittal using a transmittal form. Architect will return submittals,
without review, received from sources other than Contractor.
DACC Main Campus Roof Replacement – Various Buildings
SUBMITTAL PROCEDURES 013300 - 3
H. Re-submittals: Make re-submittals in same form and number of copies as initial submittal.
1. Note date and content of previous submittal.
2. Note date and content of revision in label or title block and clearly indicate extent of
revision.
3. Resubmit submittals until they are marked "Reviewed” or “Reviewed As Noted”.
I. Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers,
fabricators, installers, authorities having jurisdiction, and others as necessary for performance of
construction activities. Show distribution on transmittal forms.
J. Use for Construction: Use only final submittals with mark indicating "Reviewed” or
“Reviewed As Noted” taken by Architect.
PART 2 - PRODUCTS
2.1 ACTION SUBMITTALS
A. General: Prepare and submit Action Submittals required by individual Specification Sections.
1. Submit electronic submittals directly to extranet specifically established for Project.
B. Product Data: Collect information into a single submittal for each element per building
construction and type of product.
1. If information must be specially prepared for submittal because standard printed data are
not suitable for use, submit as Shop Drawings, not as Product Data.
2. Include the following information, as applicable:
a. Manufacturer's written recommendations.
b. Manufacturer's product specifications.
c. Manufacturer's installation instructions.
d. Standard color charts.
e. Manufacturer's catalog cuts.
f. Standard product operation and maintenance manuals.
g. Compliance with specified referenced standards.
h. Testing by recognized testing agency.
i. Application of testing agency labels and seals.
3. Submit Product Data before or concurrent with Samples.
4. Number of Copies: Submit three copies of Product Data, unless otherwise indicated.
Architect will return two copies. Mark up and retain one returned copy as a Project
Record Document.
C. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base
Shop Drawings on reproductions of the Contract Documents or standard printed data.
1. Preparation: Fully illustrate requirements in the Contract Documents. Include the
following information, as applicable:
DACC Main Campus Roof Replacement – Various Buildings
SUBMITTAL PROCEDURES 013300 - 4
a. Dimensions.
b. Identification of products.
c. Fabrication and installation drawings.
d. Seal and signature of professional engineer if specified.
2. Approved applicator must submit a roof drawing which will be employed in the project
if proposed drawing differs from that included with this proposal package.
3. Shop Drawings and Product Data:
a. Manufacturer's Details: All termination details and other details normally
required by the membrane manufacturer's Technical Specifications, including
both standard details and special details, shall be furnished by the Contractor
and shall be approved in writing by the manufacturer, the company project
manager, and the Owner's representative prior to final installation.
b. Minimum drawing size shall be eleven inches by seventeen inches (11 x 17").
c. Submit sufficient copies of manufacturer's descriptive data including catalog
sheets for materials, equipment and fixtures, showing dimensions,
performance characteristics and capacities, diagrams and controls, schedules,
and other pertinent information required.
d. Submit brochures and other submittal data that cannot be reproduced
economically, in such quantities to allow the Owner to retain four copies of
each after review. Mark product data to show the name of project, Owner,
Contractor, originating Subcontractor, manufacturer or supplier, and separate
details if pertinent.
e. Product data shall completely identify specification sections and locations at
which materials or equipment are to be installed.
f. Accompany each submittal with a separate transmittal letter in duplicate,
containing date, project title and number, Contractor's name and address,
number of each shop drawing, product data and samples submitted, and
notification of deviations from Contract Documents.
4. Detailed project sequencing, staging, material loading, manpower plans, and detailed
project construction schedule for approval.
5. Sample of warranty that shall be part of submittal packages.
6. Submit list of all mechanical, electrical, rigging, sheet metal, and other
Subcontractors with evidence of Subcontractor's insurance coverage in compliance
with contract requirements.
7. Contractor shall submit written statement that their company or any Subcontractor
they may use is not employing workers classified as undocumented workers on this
project.
8. Samples of all materials not supplied or prior approved by the roofing membrane
manufacturer shall be submitted to the manufacturer for written approval prior to
installation start.
9. Sheet Size: Except for templates, patterns, and similar full-size drawings, submit Shop
Drawings on sheets half size scale drawings, but no larger than 30 by 40 inches.
10. Number of Copies: Submit three white copies of each submittal. Architect will return
one copy.
D. Samples:
1. Identification: Attach label on unexposed side of Samples that includes the following:
a. Generic description of Sample.
DACC Main Campus Roof Replacement – Various Buildings
SUBMITTAL PROCEDURES 013300 - 5
b. Product name and name of manufacturer.
c. Sample source.
d. Number and title of appropriate Specification Section.
2. Disposition: Maintain sets of approved Samples at Project site, available for quality-
control comparisons throughout the course of construction activity. Sample sets may be
used to determine final acceptance of construction associated with each set.
a. Samples that may be incorporated into the Work are indicated in individual
Specification Sections. Such Samples must be in an undamaged condition at time
of use.
b. Samples not incorporated into the Work, or otherwise designated as Owner's
property, are the property of Contractor.
3. Samples for Initial Selection: Submit manufacturer's color charts consisting of units or
sections of units showing the full range of colors, textures, and patterns available.
a. Number of Samples: Submit one full set(s) of available choices where color,
pattern, texture, or similar characteristics are required to be selected from
manufacturer's product line. Architect will return submittal with options selected.
E. Submittals Schedule: Comply with requirements specified in Division 01 Section "Construction
Progress Documentation."
F. Installer Certificates: Prepare written statements on manufacturer's letterhead certifying that
Installer complies with requirements in the Contract Documents and, where required, is
authorized by manufacturer for this specific Project.
G. Manufacturer Certificates: Prepare written statements on manufacturer's letterhead certifying
that manufacturer complies with requirements in the Contract Documents. Include evidence of
manufacturing experience where required.
H. Product Certificates: Prepare written statements on manufacturer's letterhead certifying that
product complies with requirements in the Contract Documents.
I. Material Certificates: Prepare written statements on manufacturer's letterhead certifying that
material complies with requirements in the Contract Documents.
J. Material Test Reports: Prepare reports written by a qualified testing agency, on testing agency's
standard form, indicating and interpreting test results of material for compliance with
requirements in the Contract Documents.
K. Product Test Reports: Prepare written reports indicating current product produced by
manufacturer complies with requirements in the Contract Documents. Base reports on
evaluation of tests performed by manufacturer and witnessed by a qualified testing agency, or
on comprehensive tests performed by a qualified testing agency.
L. Compatibility Test Reports: Prepare reports written by a qualified testing agency, on testing
agency's standard form, indicating and interpreting results of compatibility tests performed
before installation of product. Include written recommendations for primers and substrate
preparation needed for adhesion.
DACC Main Campus Roof Replacement – Various Buildings
SUBMITTAL PROCEDURES 013300 - 6
M. Field Test Reports: Prepare reports written by a qualified testing agency, on testing agency's
standard form, indicating and interpreting results of field tests performed either during
installation of product or after product is installed in its final location, for compliance with
requirements in the Contract Documents.
N. Maintenance Data: Prepare written and graphic instructions and procedures for operation and
normal maintenance of products and equipment. Comply with requirements specified in
Division 01 Section "Operation and Maintenance Data."
O. Design Data: Prepare written and graphic information, including, but not limited to,
performance and design criteria, list of applicable codes and regulations, and calculations.
Include list of assumptions and other performance and design criteria and a summary of loads.
Include load diagrams if applicable. Provide name and version of software, if any, used for
calculations. Include page numbers.
P. Manufacturer's Instructions: Prepare written or published information that documents
manufacturer's recommendations, guidelines, and procedures for installing or operating a
product or equipment. Include name of product and name, address, and telephone number of
manufacturer. Include the following, as applicable:
1. Preparation of substrates.
2. Required substrate tolerances.
3. Sequence of installation or erection.
4. Required installation tolerances.
5. Required adjustments.
6. Recommendations for cleaning and protection.
Q. Manufacturer's Field Reports: Prepare written information documenting factory-authorized
service representative's tests and inspections. Include the following, as applicable:
1. Name, address, and telephone number of factory-authorized service representative
making report.
2. Statement on condition of substrates and their acceptability for installation of product.
3. Statement that products at Project site comply with requirements.
4. Summary of installation procedures being followed, whether they comply with
requirements and, if not, what corrective action was taken.
5. Results of operational and other tests and a statement of whether observed performance
complies with requirements.
6. Statement whether conditions, products, and installation will affect warranty.
7. Other required items indicated in individual Specification Sections.
R. Insurance Certificates and Bonds: Prepare written information indicating current status of
insurance or bonding coverage. Include name of entity covered by insurance or bond, limits of
coverage, amounts of deductibles, if any, and term of the coverage.
S. Construction: Comply with requirements specified in Division 01 Section "Photographic
Documentation" If applicable.
T. Material Safety Data Sheets (MSDSs): Submit information directly to Owner; do not submit to
Architect, as required in "Action Submittals" Article.
DACC Main Campus Roof Replacement – Various Buildings
SUBMITTAL PROCEDURES 013300 - 7
1. Architect will not review submittals that include MSDSs and will return the entire
submittal for re-submittal.
2.2 DELEGATED DESIGN
A. Performance and Design Criteria: Where professional design services or certifications by a
design professional are specifically required of Contractor by the Contract Documents, provide
products and systems complying with specific performance and design criteria indicated.
1. If criteria indicated are not sufficient to perform services or certification required, submit
a written request for additional information to Architect.
B. Delegated-Design Submittal: In addition to Shop Drawings, Product Data, and other required
submittals, submit three copies of a statement, signed and sealed by the responsible design
professional, for each product and system specifically assigned to Contractor to be designed or
certified by a design professional.
1. Indicate that products and systems comply with performance and design criteria in the
Contract Documents. Include list of codes, loads, and other factors used in performing
these services.
PART 3 - EXECUTION
3.1 CONTRACTOR'S REVIEW
A. Review each submittal and check for coordination with other Work of the Contract and for
compliance with the Contract Documents. Note corrections and field dimensions. Mark with
approval stamp before submitting to Architect.
B. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name
and location, submittal number, Specification Section title and number, name of reviewer, date
of Contractor's approval, and statement certifying that submittal has been reviewed, checked,
and approved for compliance with the Contract Documents.
3.2 ARCHITECT'S ACTION
A. General: Architect will not review submittals that do not bear Contractor's approval stamp and
will return them without action.
B. Action Submittals: Architect will review each submittal, make marks to indicate corrections or
modifications required, and return it. Architect will stamp each submittal with an action stamp
and will mark stamp appropriately to indicate action taken, as follows:
1. “Reviewed”, “Reviewed as noted”, “Revise and Resubmit”, “Rejected”.
C. Informational Submittals: Architect will review each submittal and will not return it, or will
return it if it does not comply with requirements. Architect will forward each submittal to
appropriate party.
DACC Main Campus Roof Replacement – Various Buildings
SUBMITTAL PROCEDURES 013300 - 8
D. Partial submittals are not acceptable, will be considered nonresponsive, and will be returned
without review.
E. Submittals not required by the Contract Documents may not be reviewed and may be discarded.
END OF SECTION 013300
DACC Main Campus Roof Replacement – Various Buildings
QUALITY REQUIREMENTS 014000 - 1
SECTION 014000
QUALITY REQUIREMENTS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes administrative and procedural requirements for quality assurance and
quality control.
B. Testing and inspecting services are required to verify compliance with requirements specified or
indicated. These services do not relieve Contractor of responsibility for compliance with the
Contract Document requirements.
1. Specific quality-assurance and -control requirements for individual construction activities
are specified in the Sections that specify those activities. Requirements in those Sections
may also cover production of standard products.
2. Specified tests, inspections, and related actions do not limit Contractor's other quality-
assurance and -control procedures that facilitate compliance with the Contract Document
requirements.
3. Requirements for Contractor to provide quality-assurance and -control services required
by Architect, Owner, or authorities having jurisdiction are not limited by provisions of
this Section.
C. Related Sections include the following:
1. Division 01 Section "Construction Progress Documentation" for developing a schedule of
required tests and inspections.
1.3 DEFINITIONS
A. Quality-Assurance Services: Activities, actions, and procedures performed before and during
execution of the Work to guard against defects and deficiencies and substantiate that proposed
construction will comply with requirements.
B. Quality-Control Services: Tests, inspections, procedures, and related actions during and after
execution of the Work to evaluate that actual products incorporated into the Work and
completed construction comply with requirements. Services do not include contract
enforcement activities performed by Architect.
C. Mockups: Full-size, physical assemblies that are constructed on-site. Mockups are used to
verify selections made under sample submittals, to demonstrate aesthetic effects and, where
DACC Main Campus Roof Replacement – Various Buildings
QUALITY REQUIREMENTS 014000 - 2
indicated, qualities of materials and execution, and to review construction, coordination, testing,
or operation; they are not Samples. Approved mockups establish the standard by which the
Work will be judged.
D. Preconstruction Testing: Tests and inspections that are performed specifically for the Project
before products and materials are incorporated into the Work to verify performance or
compliance with specified criteria.
E. Product Testing: Tests and inspections that are performed by an NRTL, an NVLAP, or a testing
agency qualified to conduct product testing and acceptable to authorities having jurisdiction, to
establish product performance and compliance with industry standards.
F. Source Quality-Control Testing: Tests and inspections that are performed at the source, i.e.,
plant, mill, factory, or shop.
G. Field Quality-Control Testing: Tests and inspections that are performed on-site for installation
of the Work and for completed Work.
H. Testing Agency: An entity engaged to perform specific tests, inspections, or both. Testing
laboratory shall mean the same as testing agency.
I. Installer/Applicator/Erector: Contractor or another entity engaged by Contractor as an
employee, Subcontractor, or Sub-subcontractor, to perform a particular construction operation,
including installation, erection, application, and similar operations.
1. Using a term such as "carpentry" does not imply that certain construction activities must
be performed by accredited or unionized individuals of a corresponding generic name,
such as "carpenter." It also does not imply that requirements specified apply exclusively
to tradespeople of the corresponding generic name.
J. Experienced: When used with an entity, "experienced" means having successfully completed a
minimum of five previous projects similar in size and scope to this Project; being familiar with
special requirements indicated; and having complied with requirements of authorities having
jurisdiction.
1.4 CONFLICTING REQUIREMENTS
A. General: If compliance with two or more standards is specified and the standards establish
different or conflicting requirements for minimum quantities or quality levels, comply with the
most stringent requirement. Refer uncertainties and requirements that are different, but
apparently equal, to Architect for a decision before proceeding.
B. Minimum Quantity or Quality Levels: The quantity or quality level shown or specified shall be
the minimum provided or performed. The actual installation may comply exactly with the
minimum quantity or quality specified, or it may exceed the minimum within reasonable limits.
To comply with these requirements, indicated numeric values are minimum or maximum, as
appropriate, for the context of requirements. Refer uncertainties to Architect for a decision
before proceeding.
DACC Main Campus Roof Replacement – Various Buildings
QUALITY REQUIREMENTS 014000 - 3
1.5 SUBMITTALS
A. Qualification Data: For testing agencies specified in "Quality Assurance" Article to
demonstrate their capabilities and experience. Include proof of qualifications in the form of a
recent report on the inspection of the testing agency by a recognized authority.
B. Permits, Licenses, and Certificates: For Owner's records, submit copies of permits, licenses,
certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee
payments, judgments, correspondence, records, and similar documents, established for
compliance with standards and regulations bearing on performance of the Work.
1.6 QUALITY ASSURANCE
A. General: Qualifications paragraphs in this Article establish the minimum qualification levels
required; individual Specification Sections specify additional requirements.
B. Installer Qualifications: A firm or individual experienced in installing, erecting, or assembling
work similar in material, design, and extent to that indicated for this Project, whose work has
resulted in construction with a record of successful in-service performance.
C. Manufacturer Qualifications: A firm experienced in manufacturing products or systems similar
to those indicated for this Project and with a record of successful in-service performance, as
well as sufficient production capacity to produce required units.
D. Fabricator Qualifications: A firm experienced in producing products similar to those indicated
for this Project and with a record of successful in-service performance, as well as sufficient
production capacity to produce required units.
E. Professional Engineer Qualifications: A professional engineer who is legally qualified to
practice in jurisdiction where Project is located and who is experienced in providing
engineering services of the kind indicated. Engineering services are defined as those performed
for installations of the system, assembly, or product that are similar to those indicated for this
Project in material, design, and extent.
F. Specialists: Certain sections of the Specifications require that specific construction activities
shall be performed by entities who are recognized experts in those operations. Specialists shall
satisfy qualification requirements indicated and shall be engaged for the activities indicated.
1. Requirement for specialists shall not supersede building codes and regulations governing
the Work.
G. Testing Agency Qualifications: An NRTL, an NVLAP, or an independent agency with the
experience and capability to conduct testing and inspecting indicated, as documented according
to ASTM E 548; and with additional qualifications specified in individual Sections; and where
required by authorities having jurisdiction, that is acceptable to authorities.
1. NRTL: A nationally recognized testing laboratory according to 29 CFR 1910.7.
2. NVLAP: A testing agency accredited according to NIST's National Voluntary
Laboratory Accreditation Program.
DACC Main Campus Roof Replacement – Various Buildings
QUALITY REQUIREMENTS 014000 - 4
H. Factory-Authorized Service Representative Qualifications: An authorized representative of
manufacturer who is trained and approved by manufacturer to inspect installation of
manufacturer's products that are similar in material, design, and extent to those indicated for this
Project.
I. Preconstruction Testing: Where testing agency is indicated to perform preconstruction testing
for compliance with specified requirements for performance and test methods, comply with the
following:
1. Contractor responsibilities include the following:
a. Provide test specimens representative of proposed products and construction.
b. Submit specimens in a timely manner with sufficient time for testing and analyzing
results to prevent delaying the Work.
c. Provide sizes and configurations of test assemblies, mockups, and laboratory
mockups to adequately demonstrate capability of products to comply with
performance requirements.
d. Build site-assembled test assemblies and mockups using installers who will
perform same tasks for Project.
e. Build laboratory mockups at testing facility using personnel, products, and
methods of construction indicated for the completed Work.
f. When testing is complete, remove test specimens, assemblies, mockups, and
laboratory mockups; do not reuse products on Project.
2. Testing Agency Responsibilities: Submit a certified written report of each test,
inspection, and similar quality-assurance service to Architect with copy to Contractor.
Interpret tests and inspections and state in each report whether tested and inspected work
complies with or deviates from the Contract Documents.
J. Mockups: Before installing portions of the Work requiring mockups, build mockups for each
form of construction and finish required to comply with the following requirements, using
materials indicated for the completed Work:
1. Build mockups in location and of size indicated or, if not indicated, as directed by
Architect .
2. Notify Architect five days in advance of dates and times when mockups will be
constructed.
3. Demonstrate the proposed range of aesthetic effects and workmanship.
4. Obtain Architect's approval of mockups before starting work, fabrication, or construction.
a. Allow five days for initial review and each re-review of each mockup.
5. Maintain mockups during construction in an undisturbed condition as a standard for
judging the completed Work.
6. Demolish and remove mockups when directed, unless otherwise indicated.
1.7 QUALITY CONTROL
A. Owner Responsibilities: Where quality-control services are indicated as Owner's responsibility,
Owner will engage a qualified testing agency to perform these services.
DACC Main Campus Roof Replacement – Various Buildings
QUALITY REQUIREMENTS 014000 - 5
1. Owner will furnish Contractor with names, addresses, and telephone numbers of testing
agencies engaged and a description of types of testing and inspecting they are engaged to
perform.
2. Payment for these services will be made from testing and inspecting allowances, as
authorized by Change Orders.
3. Costs for retesting and re-inspecting construction that replaces or is necessitated by work
that failed to comply with the Contract Documents will be charged to Contractor and the
Contract Sum will be adjusted by Change Order.
B. Tests and inspections not explicitly assigned to Owner are Contractor's responsibility. Unless
otherwise indicated, provide quality-control services specified and those required by authorities
having jurisdiction. Perform quality-control services required of Contractor by authorities
having jurisdiction, whether specified or not.
1. Where services are indicated as Contractor's responsibility, engage a qualified testing
agency to perform these quality-control services.
a. Contractor shall not employ same entity engaged by Owner, unless agreed to in
writing by Owner.
2. Notify testing agencies at least 24 hours in advance of time when Work that requires
testing or inspecting will be performed.
3. Where quality-control services are indicated as Contractor's responsibility, submit a
certified written report, in duplicate, of each quality-control service.
4. Testing and inspecting requested by Contractor and not required by the Contract
Documents are Contractor's responsibility.
5. Submit additional copies of each written report directly to authorities having jurisdiction,
when they so direct.
C. Manufacturer's Field Services: Where indicated, engage a factory-authorized service
representative to inspect field-assembled components and equipment installation, including
service connections. Report results in writing as specified in Division 01 Section "Submittal
Procedures."
D. Retesting/Re-inspecting: Regardless of whether original tests or inspections were Contractor's
responsibility, provide quality-control services, including retesting and reinspecting, for
construction that replaced Work that failed to comply with the Contract Documents.
E. Testing Agency Responsibilities: Cooperate with Architect and Contractor in performance of
duties. Provide qualified personnel to perform required tests and inspections.
1. Notify Architect and Contractor promptly of irregularities or deficiencies observed in the
Work during performance of its services.
2. Determine the location from which test samples will be taken and in which in-situ tests
are conducted.
3. Conduct and interpret tests and inspections and state in each report whether tested and
inspected work complies with or deviates from requirements.
4. Submit a certified written report, in duplicate, of each test, inspection, and similar
quality-control service through Contractor.
5. Do not release, revoke, alter, or increase the Contract Document requirements or approve
or accept any portion of the Work.
DACC Main Campus Roof Replacement – Various Buildings
QUALITY REQUIREMENTS 014000 - 6
6. Do not perform any duties of Contractor.
F. Associated Services: Cooperate with agencies performing required tests, inspections, and
similar quality-control services, and provide reasonable auxiliary services as requested. Notify
agency sufficiently in advance of operations to permit assignment of personnel. Provide the
following:
1. Access to the Work.
2. Incidental labor and facilities necessary to facilitate tests and inspections.
3. Adequate quantities of representative samples of materials that require testing and
inspecting. Assist agency in obtaining samples.
4. Facilities for storage and field curing of test samples.
5. Delivery of samples to testing agencies.
6. Preliminary design mix proposed for use for material mixes that require control by testing
agency.
7. Security and protection for samples and for testing and inspecting equipment at Project
site.
G. Coordination: Coordinate sequence of activities to accommodate required quality-assurance
and -control services with a minimum of delay and to avoid necessity of removing and
replacing construction to accommodate testing and inspecting.
1. Schedule times for tests, inspections, obtaining samples, and similar activities.
H. Schedule of Tests and Inspections: Prepare a schedule of tests, inspections, and similar quality-
control services required by the Contract Documents. Submit schedule within 15 days of date
established for the Notice to Proceed.
1. Distribution: Distribute schedule to Owner, Architect, testing agencies, and each party
involved in performance of portions of the Work where tests and inspections are required.
1.8 SPECIAL TESTS AND INSPECTIONS
A. Special Tests and Inspections: Owner will engage a qualified testing agency and/ or special
inspector to conduct special tests and inspections required by authorities having jurisdiction as
the responsibility of Owner, and as follows:
B. Special Tests and Inspections: Conducted by a qualified testing agency and/ or special
inspector as required by authorities having jurisdiction, as indicated in individual Specification
Sections, and as follows:
1. Verifying that manufacturer maintains detailed fabrication and quality-control procedures
and reviewing the completeness and adequacy of those procedures to perform the Work.
2. Notifying Architect and Contractor promptly of irregularities and deficiencies observed
in the Work during performance of its services.
3. Submitting a certified written report of each test, inspection, and similar quality-control
service to Architect with copy to Contractor and to authorities having jurisdiction.
4. Submitting a final report of special tests and inspections at Substantial Completion,
which includes a list of unresolved deficiencies.
DACC Main Campus Roof Replacement – Various Buildings
QUALITY REQUIREMENTS 014000 - 7
5. Interpreting tests and inspections and stating in each report whether tested and inspected
work complies with or deviates from the Contract Documents.
6. Retesting and reinspecting corrected work.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 TEST AND INSPECTION LOG
A. Prepare a record of tests and inspections. Include the following:
1. Date test or inspection was conducted.
2. Description of the Work tested or inspected.
3. Date test or inspection results were transmitted to Architect.
4. Identification of testing agency or special inspector conducting test or inspection.
B. Maintain log at Project site. Post changes and modifications as they occur. Provide access to
test and inspection log for Architect's reference during normal working hours.
3.2 REPAIR AND PROTECTION
A. General: On completion of testing, inspecting, sample taking, and similar services, repair
damaged construction and restore substrates and finishes.
1. Provide materials and comply with installation requirements specified in other
Specification Sections. Restore patched areas and extend restoration into adjoining areas
with durable seams that are as invisible as possible.
2. Comply with the Contract Document requirements for Division 01 Section "Cutting and
Patching."
B. Protect construction exposed by or for quality-control service activities.
C. Repair and protection are Contractor's responsibility, regardless of the assignment of
responsibility for quality-control services.
END OF SECTION 014000
DACC Main Campus Roof Replacement – Various Buildings
TEMPORARY FACILITIES AND CONTROLS 015000 - 1
SECTION 015000
TEMPORARY FACILITIES AND CONTROLS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes requirements for temporary utilities, support facilities, and security and
protection facilities.
B. Related Sections include the following:
1. Division 01 Section "Summary" for limitations on utility interruptions and other work
restrictions.
2. Division 01 Section "Submittal Procedures" for procedures for submitting copies of
implementation and termination schedule and utility reports.
3. Division 01 Section "Execution" for progress cleaning requirements.
1.3 DEFINITIONS
A. Permanent Enclosure: As determined by Architect, permanent or temporary roofing is
complete, insulated, and weathertight; exterior walls are insulated and weathertight; and all
openings are closed with permanent construction or substantial temporary closures.
1.4 USE CHARGES
A. General: Cost or use charges for temporary facilities shall be included in the Contract Sum.
Allow other entities to use temporary services and facilities without cost, including, but not
limited to,Architect,testing agencies, and authorities having jurisdiction.
B. Sewer Service: Pay sewer service use charges for sewer usage by all entities for construction
operations.
C. Water Service: Pay water service use charges for water used by all entities for construction
operations.
D. Electric Power Service: Pay electric power service use charges for electricity used by all
entities for construction operations.
E. Sewer, Water, and Electric Power Service: Use charges are specified in Division 01 Section
"Multiple Contract Summary."
DACC Main Campus Roof Replacement – Various Buildings
TEMPORARY FACILITIES AND CONTROLS 015000 - 2
F. Water Service: Water from Owner's existing water system is available for use without metering
and without payment of use charges. Provide connections and extensions of services as
required for construction operations.
G. Electric Power Service: Electric power from Owner's existing system is available for use
without metering and without payment of use charges. Provide connections and extensions of
services as required for construction operations.
1.5 SUBMITTALS
A. Site Plan: Show temporary facilities, utility hookups, staging areas, and parking areas for
construction personnel.
1.6 QUALITY ASSURANCE
A. Electric Service: Comply with NECA, NEMA, and UL standards and regulations for temporary
electric service. Install service to comply with NFPA 70.
B. Tests and Inspections: Arrange for authorities having jurisdiction to test and inspect each
temporary utility before use. Obtain required certifications and permits.
1.7 PROJECT CONDITIONS
A. Temporary Use of Permanent Facilities: Installer of each permanent service shall assume
responsibility for operation, maintenance, and protection of each permanent service during its
use as a construction facility before Owner's acceptance, regardless of previously assigned
responsibilities.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Pavement: N/A.
B. Chain-Link Fencing: Minimum 2-inch , 0.148-inch thick, galvanized steel, chain-link fabric
fencing; minimum 6 feet high with galvanized steel pipe posts; minimum 2-3/8-inch- OD line
posts and 2-7/8-inch- OD corner and pull posts, with 1-5/8-inch- OD top rails.
C. Portable Chain-Link Fencing: Minimum 2-inch , 9-gage, galvanized steel, chain-link fabric
fencing; minimum 6 feet high with galvanized steel pipe posts; minimum 2-3/8-inch- OD line
posts and 2-7/8-inch- OD corner and pull posts, with 1-5/8-inch- OD top and bottom rails.
Provide concrete or galvanized steel bases for supporting posts.
D. Wood Enclosure Fence: N/A.
E. Lumber and Plywood: Comply with requirements in Division 06 Section "Rough Carpentry,
Miscellaneous Rough Carpentry"
DACC Main Campus Roof Replacement – Various Buildings
TEMPORARY FACILITIES AND CONTROLS 015000 - 3
F. Gypsum Board: Minimum 1/2 inch thick by 48 inches wide by maximum available lengths;
regular-type panels with tapered edges. Comply with ASTM C 36/C 36M.
G. Insulation: Unfaced mineral-fiber blanket, manufactured from glass, slag wool, or rock wool;
with maximum flame-spread and smoke-developed indexes of 25 and 50, respectively.
H. Paint: Comply with requirements in Division 09 painting Sections.
2.2 TEMPORARY FACILITIES
A. Field Offices, General: Prefabricated or mobile units with serviceable finishes, temperature
controls, and foundations adequate for normal loading.
B. Common-Use Field Office: Of sufficient size to accommodate needs of construction personnel.
Keep office clean and orderly. Furnish and equip offices as follows:
1. Furniture required for Project-site documents including file cabinets, plan tables, plan
racks, and bookcases.
2. Conference room of sufficient size to accommodate meetings of 10 individuals. Provide
electrical power service and 120-V ac duplex receptacles, with not less than 1 receptacle
on each wall. Furnish room with conference table, chairs, and 4-foot- square tack board.
3. Drinking water and private toilet.
4. Coffee machine and supplies.
5. Heating and cooling equipment necessary to maintain a uniform indoor temperature of 68
to 72 deg F.
6. Lighting fixtures capable of maintaining average illumination of 20 fc at desk height.
C. Storage and Fabrication Sheds: Provide sheds sized, furnished, and equipped to accommodate
materials and equipment for construction operations.
1. Store combustible materials apart and away from building.
2.3 EQUIPMENT
A. Fire Extinguishers: Portable, UL rated; with class and extinguishing agent as required by
locations and classes of fire exposures.
PART 3 - EXECUTION
3.1 INSTALLATION, GENERAL
A. Locate facilities where they will serve Project adequately and result in minimum interference
with performance of the Work. Relocate and modify facilities as required by progress of the
Work.
B. Provide each facility ready for use when needed to avoid delay. Do not remove until facilities
are no longer needed or are replaced by authorized use of completed permanent facilities.
DACC Main Campus Roof Replacement – Various Buildings
TEMPORARY FACILITIES AND CONTROLS 015000 - 4
3.2 TEMPORARY UTILITY INSTALLATION
A. General: Install temporary service or connect to existing service.
1. Arrange with utility company, Owner, and existing users for time when service can be
interrupted, if necessary, to make connections for temporary services or reconnection of
existing mechanical units.
B. Sewers and Drainage: Provide temporary utilities to remove effluent lawfully.
1. Connect temporary sewers to as directed by authorities having jurisdiction.
C. Water Service: Install water service and distribution piping in sizes and pressures adequate for
construction.
D. Water Service: Use of Owner's existing water service facilities will be permitted, as long as
facilities are cleaned and maintained in a condition acceptable to Owner. At Substantial
Completion, restore these facilities to condition existing before initial use.
1. Where installations below an outlet might be damaged by spillage or leakage, provide a
drip pan of suitable size to minimize water damage. Drain accumulated water promptly
from pans.
E. Sanitary Facilities: Provide temporary toilets, wash facilities, and drinking water for use of
construction personnel. Comply with authorities having jurisdiction for type, number, location,
operation, and maintenance of fixtures and facilities.
1. Toilets: Use of Owner's existing toilet facilities will be permitted, as long as facilities are
cleaned and maintained in a condition acceptable to Owner. At Substantial Completion,
restore these facilities to condition existing before initial use.
F. Heating and Cooling (as required): Provide temporary heating and cooling required by
construction activities for curing or drying of completed installations or for protecting installed
construction from adverse effects of low temperatures or high humidity. Select equipment that
will not have a harmful effect on completed installations or elements being installed.
G. Ventilation and Humidity Control (as required): Provide temporary ventilation required by
construction activities for curing or drying of completed installations or for protecting installed
construction from adverse effects of high humidity. Select equipment that will not have a
harmful effect on completed installations or elements being installed. Coordinate ventilation
requirements to produce ambient condition required and minimize energy consumption.
H. Electric Power Service: Use of Owner's existing electric power service will be permitted, as
long as equipment is maintained in a condition acceptable to Owner.
I. Electric Power Service (If required): Provide electric power service and distribution system of
sufficient size, capacity, and power characteristics required for construction operations.
1. Install electric power service overhead or underground, unless otherwise indicated.
2. Connect temporary service to Owner's existing power source, as directed by Owner.
DACC Main Campus Roof Replacement – Various Buildings
TEMPORARY FACILITIES AND CONTROLS 015000 - 5
J. Lighting (If required): Provide temporary lighting with local switching that provides adequate
illumination for construction operations, observations, inspections, and traffic conditions.
1. Install and operate temporary lighting that fulfills security and protection requirements
without operating entire system.
2. Install lighting for Project identification sign.
K. Telephone Service: Provide temporary telephone service in common-use facilities for use by all
construction personnel. Install one telephone line(s) for each field office.
1. Provide additional telephone lines for the following:
a. Provide a dedicated telephone line for each facsimile machine and computer in
each field office.
2. At each telephone, post a list of important telephone numbers.
a. Police and fire departments.
b. Ambulance service.
c. Contractor's home office.
d. Architect's office.
e. Engineers' offices.
f. Owner's office.
g. Principal subcontractors' field and home offices.
3. Provide superintendent with cellular telephone or portable two-way radio for use when
away from field office.
L. Electronic Communication Service: Provide temporary electronic communication service,
including electronic mail, in common-use facilities.
1. Provide internet service in primary field office.
3.3 SUPPORT FACILITIES INSTALLATION
A. General: Comply with the following:
1. Provide incombustible construction for offices, shops, and sheds located within
construction area or within 30 feet of building lines. Comply with NFPA 241.
2. Maintain support facilities until near Substantial Completion. Remove before Substantial
Completion. Personnel remaining after Substantial Completion will be permitted to use
permanent facilities, under conditions acceptable to Owner.
B. Traffic Controls: Comply with requirements of authorities having jurisdiction.
1. Protect existing site improvements to remain including curbs, pavement, and utilities.
2. Maintain access for fire-fighting equipment and access to fire hydrants.
C. Parking: Use designated areas of Owner's existing parking areas for construction personnel.
DACC Main Campus Roof Replacement – Various Buildings
TEMPORARY FACILITIES AND CONTROLS 015000 - 6
D. Project Identification and Temporary Signs: Provide Project identification and other signs as
directed by Owner (If required). Install signs where indicated to inform public and individuals
seeking entrance to Project. Unauthorized signs are not permitted.
1. Provide temporary, directional signs for construction personnel and visitors.
2. Maintain and touchup signs so they are legible at all times.
E. Lifts and Hoists: Provide facilities necessary for hoisting materials and personnel.
1. Truck cranes and similar devices used for hoisting materials are considered "tools and
equipment" and not temporary facilities.
F. Existing Access Hatch Usage: Use of Owner's existing access hatch will not be permitted.
3.4 SECURITY AND PROTECTION FACILITIES INSTALLATION
A. Environmental Protection: Provide protection, operate temporary facilities, and conduct
construction in ways and by methods that comply with environmental regulations and that
minimize possible air, waterway, and subsoil contamination or pollution or other undesirable
effects.
1. Comply with work restrictions specified in Division 01 Section "Summary."
B. Site Enclosure Fence: Before contract operations begin, furnish and install site enclosure fence
in a manner that will prevent people and animals from easily entering site except by entrance
gates.
1. Extent of Fence: As required to enclose entire Project site or portion determined
sufficient to accommodate construction operations.
2. Maintain security by limiting number of keys and restricting distribution to authorized
personnel.
C. Barricades, Warning Signs, and Lights: Comply with requirements of authorities having
jurisdiction for erecting structurally adequate barricades, including warning signs and lighting.
D. Covered Walkway: Erect structurally adequate, protective, covered walkway for passage of
individuals along adjacent public street(s). Coordinate with entrance gates, other facilities, and
obstructions. Comply with regulations of authorities having jurisdiction.
1. Construct covered walkways using scaffold or shoring framing to protect all existing
building entrances and exits.
2. Provide wood-plank overhead decking, protective plywood enclosure walls, handrails,
barricades, warning signs, lights, safe and well-drained walkways, and similar provisions
for protection and safe passage.
3. Extend back wall beyond the structure to complete enclosure fence.
4. Paint and maintain in a manner approved by Owner and Architect.
E. Temporary Fire Protection: Install and maintain temporary fire-protection facilities of types
needed to protect against reasonably predictable and controllable fire losses. Comply with
NFPA 241.
DACC Main Campus Roof Replacement – Various Buildings
TEMPORARY FACILITIES AND CONTROLS 015000 - 7
1. Prohibit smoking in construction areas.
2. Supervise welding operations, combustion-type temporary heating units, and similar
sources of fire ignition according to requirements of authorities having jurisdiction.
3. Develop and supervise an overall fire-prevention and -protection program for personnel
at Project site. Review needs with local fire department and establish procedures to be
followed. Instruct personnel in methods and procedures. Post warnings and information.
4. Provide temporary standpipes and hoses for fire protection. Hang hoses with a warning
sign stating that hoses are for fire-protection purposes only and are not to be removed.
Match hose size with outlet size and equip with suitable nozzles.
3.5 OPERATION, TERMINATION, AND REMOVAL
A. Supervision: Enforce strict discipline in use of temporary facilities. To minimize waste and
abuse, limit availability of temporary facilities to essential and intended uses.
B. Maintenance: Maintain facilities in good operating condition until removal.
1. Maintain operation of temporary enclosures, heating, cooling, humidity control,
ventilation, and similar facilities on a 24-hour basis where required to achieve indicated
results and to avoid possibility of damage.
C. Operate Project-identification-sign lighting daily from dusk until 12:00 midnight.
D. Temporary Facility Changeover: Do not change over from using temporary security and
protection facilities to permanent facilities until Substantial Completion.
E. Termination and Removal: Remove each temporary facility when need for its service has
ended, when it has been replaced by authorized use of a permanent facility, or no later than
Substantial Completion. Complete or, if necessary, restore permanent construction that may
have been delayed because of interference with temporary facility. Repair damaged Work,
clean exposed surfaces, and replace construction that cannot be satisfactorily repaired.
1. Materials and facilities that constitute temporary facilities are property of Contractor.
Owner reserves right to take possession of Project identification signs.
2. Remove temporary paving not intended for or acceptable for integration into permanent
paving. Where area is intended for landscape development, remove soil and aggregate
fill that do not comply with requirements for fill or subsoil. Remove materials
contaminated with road oil, asphalt and other petrochemical compounds, and other
substances that might impair growth of plant materials or lawns. Repair or replace street
paving, curbs, and sidewalks at temporary entrances, as required by authorities having
jurisdiction.
3. At Substantial Completion, clean and renovate permanent facilities used during
construction period. Comply with final cleaning requirements specified in Division 01
Section "Closeout Procedures."
END OF SECTION 015000
DACC Main Campus Roof Replacement – Various Buildings
PRODUCT REQUIREMENTS 016000 - 1
SECTION 016000 - PRODUCT REQUIREMENTS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes administrative and procedural requirements for selection of products for
use in Project; product delivery, storage, and handling; manufacturers' standard warranties on
products; special warranties; product substitutions; and comparable products.
B. Related Sections include the following:
1. Division 01 Section "References" for applicable industry standards for products
specified.
2. Division 01 Section "Closeout Procedures" for submitting warranties for Contract
closeout.
3. Divisions 02 through 49 Sections for specific requirements for warranties on products
and installations specified to be warranted.
1.3 DEFINITIONS
A. Products: Items purchased for incorporating into the Work, whether purchased for Project or
taken from previously purchased stock. The term "product" includes the terms "material,"
"equipment," "system," and terms of similar intent.
1. Named Products: Items identified by manufacturer's product name, including make or
model number or other designation shown or listed in manufacturer's published product
literature, that is current as of date of the Contract Documents.
2. New Products: Items that have not previously been incorporated into another project or
facilityProducts salvaged or recycled from other projects are not considered new
products.
3. Comparable Product: Product that is demonstrated and approved through submittal
process, or where indicated as a product substitution, to have the indicated qualities
related to type, function, dimension, in-service performance, physical properties,
appearance, and other characteristics that equal or exceed those of specified product.
B. Substitutions: Changes in products, materials, equipment, and methods of construction from
those required by the Contract Documents and proposed by Contractor.
C. Basis-of-Design Product Specification: Where a specific manufacturer's product is named and
accompanied by the words "basis of design," including make or model number or other
designation, to establish the significant qualities related to type, function, dimension, in-service
DACC Main Campus Roof Replacement – Various Buildings
PRODUCT REQUIREMENTS 016000 - 2
performance, physical properties, appearance, and other characteristics for purposes of
evaluating comparable products of other named manufacturers.
1.4 SUBMITTALS
A. Product List: Submit a list, in tabular from, showing specified products. Include generic names
of products required. Include manufacturer's name and proprietary product names for each
product.
1. Coordinate product list with Contractor's Construction Schedule and the Submittals
Schedule.
2. Form: Tabulate information for each product under the following column headings:
a. Specification Section number and title.
b. Generic name used in the Contract Documents.
c. Proprietary name, model number, and similar designations.
d. Manufacturer's name and address.
e. Supplier's name and address.
f. Installer's name and address.
g. Projected delivery date or time span of delivery period.
h. Identification of items that require early submittal approval for scheduled delivery
date.
3. Initial Submittal: Within 10 days after date of commencement of the Work, submit 3
copies of initial product list. Include a written explanation for omissions of data and for
variations from Contract requirements.
a. At Contractor's option, initial submittal may be limited to product selections and
designations that must be established early in Contract period.
4. Completed List: Within 20 days after date of commencement of the Work, submit 3
copies of completed product list. Include a written explanation for omissions of data and
for variations from Contract requirements.
5. Architect's Action: Architect will respond in writing to Contractor within 10 days of
receipt of completed product list. Architect's response will include a list of unacceptable
product selections and a brief explanation of reasons for this action. Architect's response,
or lack of response, does not constitute a waiver of requirement to comply with the
Contract Documents.
B. Substitution Requests: Submit three copies of each request for consideration. Identify product
or fabrication or installation method to be replaced. Include Specification Section number and
title and Drawing numbers and titles.
1. Substitution Request Form: Use CSI Form 13.1A
2. Documentation: Show compliance with requirements for substitutions and the following,
as applicable:
a. Statement indicating why specified material or product cannot be provided.
DACC Main Campus Roof Replacement – Various Buildings
PRODUCT REQUIREMENTS 016000 - 3
b. Coordination information, including a list of changes or modifications needed to
other parts of the Work and to construction performed by Owner and separate
contractors, that will be necessary to accommodate proposed substitution.
c. Detailed comparison of significant qualities of proposed substitution with those of
the Work specified. Significant qualities may include attributes such as
performance, weight, size, durability, visual effect, and specific features and
requirements indicated.
d. Product Data, including drawings and descriptions of products and fabrication and
installation procedures.
e. Samples, where applicable or requested.
f. List of similar installations for completed projects with project names and
addresses and names and addresses of architects and owners.
g. Material test reports from a qualified testing agency indicating and interpreting test
results for compliance with requirements indicated.
h. Research/evaluation reports evidencing compliance with building code in effect for
Project, from a model code organization acceptable to authorities having
jurisdiction.
i. Detailed comparison of Contractor's Construction Schedule using proposed
substitution with products specified for the Work, including effect on the overall
Contract Time. If specified product or method of construction cannot be provided
within the Contract Time, include letter from manufacturer, on manufacturer's
letterhead, stating lack of availability or delays in delivery.
j. Cost information, including a proposal of change, if any, in the Contract Sum.
k. Contractor's certification that proposed substitution complies with requirements in
the Contract Documents and is appropriate for applications indicated.
l. Contractor's waiver of rights to additional payment or time that may subsequently
become necessary because of failure of proposed substitution to produce indicated
results.
3. Architect's Action: If necessary, Architect will request additional information or
documentation for evaluation within 7 days of receipt of a request for substitution.
Architect will notify Contractorof acceptance or rejection of proposed substitution within
15 days of receipt of request, or 7 days of receipt of additional information or
documentation, whichever is later.
a. Form of Acceptance: Change Order.
b. Use product specified if Architect cannot make a decision on use of a proposed
substitution within time allocated.
C. Comparable Product Requests: Submit three copies of each request for consideration. Identify
product or fabrication or installation method to be replaced. Include Specification Section
number and title and Drawing numbers and titles.
1. Architect's Action: If necessary, Architect will request additional information or
documentation for evaluation within one week of receipt of a comparable product
request. Architect will notify Contractor of approval or rejection of proposed comparable
product request within 15 days of receipt of request, or 7 days of receipt of additional
information or documentation, whichever is later.
a. Form of Approval: As specified in Division 01 Section "Submittal Procedures."
DACC Main Campus Roof Replacement – Various Buildings
PRODUCT REQUIREMENTS 016000 - 4
b. Use product specified if Architect cannot make a decision on use of a comparable
product request within time allocated.
D. Basis-of-Design Product Specification Submittal: Comply with requirements in Division 01
Section "Submittal Procedures." Show compliance with requirements.
1.5 QUALITY ASSURANCE
A. Compatibility of Options: If Contractor is given option of selecting between two or more
products for use on Project, product selected shall be compatible with products previously
selected, even if previously selected products were also options.
1. Each contractor is responsible for providing products and construction methods
compatible with products and construction methods of other contractors.
2. If a dispute arises between contractors over concurrently selectable but incompatible
products, Architect will determine which products shall be used.
1.6 PRODUCT DELIVERY, STORAGE, AND HANDLING
A. Deliver, store, and handle products using means and methods that will prevent damage,
deterioration, and loss, including theft. Comply with manufacturer's written instructions.
B. Delivery and Handling:
1. Schedule delivery to minimize long-term storage at Project site and to prevent
overcrowding of construction spaces.
2. Coordinate delivery with installation time to ensure minimum holding time for items that
are flammable, hazardous, easily damaged, or sensitive to deterioration, theft, and other
losses.
3. Deliver products to Project site in an undamaged condition in manufacturer's original
sealed container or other packaging system, complete with labels and instructions for
handling, storing, unpacking, protecting, and installing.
4. Inspect products on delivery to ensure compliance with the Contract Documents and to
ensure that products are undamaged and properly protected.
C. Storage:
1. Store products to allow for inspection and measurement of quantity or counting of units.
2. Store materials in a manner that will not endanger Project structure.
3. Store products that are subject to damage by the elements, under cover in a weathertight
enclosure above ground, with ventilation adequate to prevent condensation.
4. Store cementitious products and materials on elevated platforms.
5. Store foam plastic from exposure to sunlight, except to extent necessary for period of
installation and concealment.
6. Comply with product manufacturer's written instructions for temperature, humidity,
ventilation, and weather-protection requirements for storage.
7. Protect stored products from damage and liquids from freezing.
8. Provide a secure location and enclosure at Project site for storage of materials and
equipment by Owner's construction forces. Coordinate location with Owner.
DACC Main Campus Roof Replacement – Various Buildings
PRODUCT REQUIREMENTS 016000 - 5
1.7 PRODUCT WARRANTIES
A. Warranties specified in other Sections shall be in addition to, and run concurrent with, other
warranties required by the Contract Documents. Manufacturer's disclaimers and limitations on
product warranties do not relieve Contractor of obligations under requirements of the Contract
Documents.
1. Manufacturer's Warranty: Preprinted written warranty published by individual
manufacturer for a particular product and specifically endorsed by manufacturer to
Owner.
2. Special Warranty: Written warranty required by or incorporated into the Contract
Documents, either to extend time limit provided by manufacturer's warranty or to provide
more rights for Owner.
B. Special Warranties: Prepare a written document that contains appropriate terms and
identification, ready for execution. Submit a draft for approval before final execution.
1. Manufacturer's Standard Form: Modified to include Project-specific information and
properly executed.
2. Specified Form: When specified forms are included with the Specifications, prepare a
written document using appropriate form properly executed.
3. Refer to Divisions 02 through 49 Sections for specific content requirements and
particular requirements for submitting special warranties.
C. Submittal Time: Comply with requirements in Division 01 Section "Closeout Procedures."
PART 2 - PRODUCTS
2.1 PRODUCT SELECTION PROCEDURES
A. General Product Requirements: Provide products that comply with the Contract Documents,
that are undamaged and, unless otherwise indicated, that are new at time of installation.
1. Provide products complete with accessories, trim, finish, fasteners, and other items
needed for a complete installation and indicated use and effect.
2. Standard Products: If available, and unless custom products or nonstandard options are
specified, provide standard products of types that have been produced and used
successfully in similar situations on other projects.
3. Owner reserves the right to limit selection to products with warranties not in conflict with
requirements of the Contract Documents.
4. Where products are accompanied by the term "as selected," Architect will make
selection.
5. Where products are accompanied by the term "match sample," sample to be matched is
Architect's.
6. Descriptive, performance, and reference standard requirements in the Specifications
establish "salient characteristics" of products.
7. Or Equal: Where products are specified by name and accompanied by the term "or
equal" or "or approved equal" or "or approved," comply with provisions in Part 2
"Comparable Products" Article to obtain approval for use of an unnamed product.
DACC Main Campus Roof Replacement – Various Buildings
PRODUCT REQUIREMENTS 016000 - 6
B. Product Selection Procedures:
1. Product: Where Specifications name a single product and manufacturer, provide the
named product that complies with requirements.
2. Manufacturer/Source: Where Specifications name a single manufacturer or source,
provide a product by the named manufacturer or source that complies with requirements.
3. Products: Where Specifications include a list of names of both products and
manufacturers, provide one of the products listed that complies with requirements.
4. Manufacturers: Where Specifications include a list of manufacturers' names, provide a
product by one of the manufacturers listed that complies with requirements.
5. Available Products: Where Specifications include a list of names of both products and
manufacturers, provide one of the products listed, or an unnamed product, that complies
with requirements. Comply with provisions in Part 2 "Comparable Products" Article for
consideration of an unnamed product.
6. Available Manufacturers: Where Specifications include a list of manufacturers, provide a
product by one of the manufacturers listed, or an unnamed manufacturer, that complies
with requirements. Comply with provisions in Part 2 "Comparable Products" Article for
consideration of an unnamed product.
7. Product Options: Where Specifications indicate that sizes, profiles, and dimensional
requirements on Drawings are based on a specific product or system, provide the
specified product or system. Comply with provisions in Part 2 "Product Substitutions"
Article for consideration of an unnamed product or system.
8. Basis-of-Design Product: Where Specifications name a product and include a list of
manufacturers, provide the specified product or a comparable product by one of the other
named manufacturers. Drawings and Specifications indicate sizes, profiles, dimensions,
and other characteristics that are based on the product named. Comply with provisions in
Part 2 "Comparable Products" Article for consideration of an unnamed product by the
other named manufacturers.
9. Visual Matching Specification: Where Specifications require matching an established
Sample, select a product that complies with requirements and matches Architect's sample.
Architect's decision will be final on whether a proposed product matches.
a. If no product available within specified category matches and complies with other
specified requirements, comply with provisions in Part 2 "Product Substitutions"
Article for proposal of product.
10. Visual Selection Specification: Where Specifications include the phrase "as selected
from manufacturer's colors, patterns, textures" or a similar phrase, select a product that
complies with other specified requirements.
a. Standard Range: Where Specifications include the phrase "standard range of
colors, patterns, textures" or similar phrase, Architect will select color, pattern,
density, or texture from manufacturer's product line that does not include premium
items.
b. Full Range: Where Specifications include the phrase "full range of colors,
patterns, textures" or similar phrase, Architect will select color, pattern, density, or
texture from manufacturer's product line that includes both standard and premium
items.
DACC Main Campus Roof Replacement – Various Buildings
PRODUCT REQUIREMENTS 016000 - 7
2.2 PRODUCT SUBSTITUTIONS
A. Timing: Architect will consider requests for substitution if received within 20 days after the
Notice to Proceed. Requests received after that time may be considered or rejected at discretion
of Architect.
B. Conditions: Architect will consider Contractor's request for substitution when the following
conditions are satisfied. If the following conditions are not satisfied, Architect will return
requests without action, except to record noncompliance with these requirements:
1. Requested substitution offers Owner a substantial advantage in cost, time, energy
conservation, or other considerations, after deducting additional responsibilities Owner
must assume. Owner's additional responsibilities may include compensation to Architect
for redesign and evaluation services, increased cost of other construction by Owner, and
similar considerations.
2. Requested substitution does not require extensive revisions to the Contract Documents.
3. Requested substitution is consistent with the Contract Documents and will produce
indicated results.
4. Substitution request is fully documented and properly submitted.
5. Requested substitution will not adversely affect Contractor's Construction Schedule.
6. Requested substitution has received necessary approvals of authorities having
jurisdiction.
7. Requested substitution is compatible with other portions of the Work.
8. Requested substitution has been coordinated with other portions of the Work.
9. Requested substitution provides specified warranty.
10. If requested substitution involves more than one contractor, requested substitution has
been coordinated with other portions of the Work, is uniform and consistent, is
compatible with other products, and is acceptable to all contractors involved.
2.3 COMPARABLE PRODUCTS
A. Conditions: Architect will consider Contractor's request for comparable product when the
following conditions are satisfied. If the following conditions are not satisfied, Architect will
return requests without action, except to record noncompliance with these requirements:
1. Evidence that the proposed product does not require extensive revisions to the Contract
Documents, that it is consistent with the Contract Documents and will produce the
indicated results, and that it is compatible with other portions of the Work.
2. Detailed comparison of significant qualities of proposed product with those named in the
Specifications. Significant qualities include attributes such as performance, weight, size,
durability, visual effect, and specific features and requirements indicated.
3. Evidence that proposed product provides specified warranty.
4. List of similar installations for completed projects with project names and addresses and
names and addresses of architects and owners, if requested.
5. Samples, if requested.
DACC Main Campus Roof Replacement – Various Buildings
PRODUCT REQUIREMENTS 016000 - 8
PART 3 - EXECUTION (Not Used)
END OF SECTION 016000
DACC Main Campus Roof Replacement – Various Buildings
EXECUTION 017300 - 1
SECTION 017300
EXECUTION
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes general procedural requirements governing execution of the Work
including, but not limited to, the following:
1. Progress cleaning.
2. Protection of installed construction.
3. Correction of the Work.
B. Related Sections include the following:
1. Division 01 Section "Project Management and Coordination" for procedures for
coordinating field engineering with other construction activities.
2. Division 01 Section "Submittal Procedures" for submitting surveys.
3. Division 01 Section "Closeout Procedures" for submitting final property survey with
Project Record Documents, recording of Owner-accepted deviations from indicated lines
and levels, and final cleaning.
1.3 SUBMITTALS
A. Landfill Receipts: Submit copy of receipts issued by a landfill facility, licensed to accept waste
disposal.
1.4 QUALITY ASSURANCE
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 EXAMINATION
A. Existing Conditions: The existence and location of site improvements, utilities, and other
construction indicated as existing are not guaranteed. Before beginning work, investigate and
DACC Main Campus Roof Replacement – Various Buildings
EXECUTION 017300 - 2
verify the existence and location of mechanical and electrical systems and other construction
affecting the Work.
B. Acceptance of Conditions: Examine substrates, areas, and conditions, with Installer or
Applicator present where indicated, for compliance with requirements for installation tolerances
and other conditions affecting performance. Record observations.
1. Written Report: Where a written report listing conditions detrimental to performance of
the Work is required by other Sections, include the following:
a. Description of the Work.
b. List of detrimental conditions, including substrates.
c. List of unacceptable installation tolerances.
d. Recommended corrections.
2. Verify compatibility with and suitability of substrates.
3. Examine roofs for suitable conditions where products and systems are to be installed.
4. Proceed with installation only after unsatisfactory conditions have been corrected.
Proceeding with the Work indicates acceptance of surfaces and conditions.
3.2 PREPARATION
A. Field Measurements: Take field measurements as required to fit the Work properly. Recheck
measurements before installing each product. Where portions of the Work are indicated to fit to
other construction, verify dimensions of other construction by field measurements before
fabrication. Coordinate fabrication schedule with construction progress to avoid delaying the
Work.
B. Space Requirements: Verify space requirements and dimensions of items shown
diagrammatically on Drawings.
C. Review of Contract Documents and Field Conditions: Immediately on discovery of the need for
clarification of the Contract Documents, submit a request for information to Architect. Include
a detailed description of problem encountered, together with recommendations for changing the
Contract Documents. Submit requests on CSI Form 13.2A, "Request for Interpretation."
3.3 INSTALLATION
A. Comply with manufacturer's written instructions and recommendations for installing products in
applications indicated.
B. Install products at the time and under conditions that will ensure the best possible results.
Maintain conditions required for product performance.
C. Tools and Equipment: Do not use tools or equipment that produce harmful noise levels.
D. Anchors and Fasteners: Provide anchors and fasteners as required to anchor each component
securely in place, accurately located and aligned with other portions of the Work.
DACC Main Campus Roof Replacement – Various Buildings
EXECUTION 017300 - 3
1. Mounting Heights: Where mounting heights are not indicated, mount components at
heights directed by Architect.
2. Allow for building movement, including thermal expansion and contraction.
E. Hazardous Materials: Use products, cleaners, and installation materials that are not considered
hazardous.
3.4 PROGRESS CLEANING
A. General: Clean Project site and work areas daily, including common areas. Coordinate
progress cleaning for joint-use areas where more than one installer has worked. Enforce
requirements strictly. Dispose of materials lawfully.
1. Comply with requirements in NFPA 241 for removal of combustible waste materials and
debris.
B. Site: Maintain Project site free of waste materials and debris.
C. Work Areas: Clean areas where work is in progress to the level of cleanliness necessary for
proper execution of the Work.
1. Remove liquid spills promptly.
2. Where dust would impair proper execution of the Work, broom-clean or vacuum the
entire work area, as appropriate.
D. Installed Work: Keep installed work clean. Clean installed surfaces according to written
instructions of manufacturer or fabricator of product installed.
E. Concealed Spaces: Remove debris from concealed spaces before enclosing the space.
F. Exposed Surfaces in Finished Areas: Clean exposed surfaces and protect as necessary to ensure
freedom from damage and deterioration at time of Substantial Completion.
G. Waste Disposal: Burying or burning waste materials on-site will not be permitted. Washing
waste materials down sewers or into waterways will not be permitted.
H. Limiting Exposures: Supervise construction operations to assure that no part of the
construction, completed or in progress, is subject to harmful, dangerous, damaging, or otherwise
deleterious exposure during the construction period.
3.5 STARTING AND ADJUSTING
A. Start equipment and operating components to confirm proper operation.
B. Adjust operating components for proper operation without binding. Adjust equipment for
proper operation.
C. Test each piece of equipment to verify proper operation. Test and adjust controls and safeties.
DACC Main Campus Roof Replacement – Various Buildings
EXECUTION 017300 - 4
3.6 PROTECTION OF INSTALLED CONSTRUCTION
A. Provide final protection and maintain conditions that ensure installed Work is without damage
or deterioration at time of Substantial Completion.
3.7 CORRECTION OF THE WORK
A. Repair or remove and replace defective construction. Restore damaged substrates and finishes.
END OF SECTION 017300
DACC Main Campus Roof Replacement – Various Buildings
CLOSEOUT PROCEDURES 017700 - 1
SECTION 017700
CLOSEOUT PROCEDURES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes administrative and procedural requirements for contract closeout,
including, but not limited to, the following:
1. Inspection procedures.
2. Warranties.
3. Final cleaning.
B. Related Sections include the following:
1. Division 01 Section "Execution" for progress cleaning of Project site.
2. Division 01 Section "Project Record Documents" for submitting Record Drawings,
Record Specifications, and Record Product Data.
3. Division 01 Section "Operation and Maintenance Data" for operation and maintenance
manual requirements.
4. Divisions 02 through 49 Sections for specific closeout and special cleaning requirements
for the Work in those Sections.
1.3 SUBSTANTIAL COMPLETION
A. Preliminary Procedures: Before requesting inspection for determining date of Substantial
Completion, complete the following. List items below that are incomplete in request.
1. Prepare a list of items to be completed and corrected (punch list), the value of items on
the list, and reasons why the Work is not complete.
2. Advise Owner of pending insurance changeover requirements.
3. Submit specific warranties, workmanship bonds, maintenance service agreements, final
certifications, and similar documents.
4. Obtain and submit releases permitting Owner unrestricted use of the Work and access to
services and utilities. Include occupancy permits, operating certificates, and similar
releases.
5. Prepare and submit Project Record Documents, operation and maintenance manuals,
damage or settlement surveys, and similar final record information.
6. Deliver tools, spare parts, extra materials, and similar items to location designated by
Owner. Label with manufacturer's name and model number where applicable.
7. Advise Owner's personnel of changeover in security provisions.
8. Complete startup testing of re-installed a/c systems.
DACC Main Campus Roof Replacement – Various Buildings
CLOSEOUT PROCEDURES 017700 - 2
9. Terminate and remove temporary facilities from Project site, along with mockups,
construction tools, and similar elements.
10. Complete final roof cleaning requirements.
11. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual
defects.
B. Inspection: Submit a written request for inspection for Substantial Completion. On receipt of
request, Architect will either proceed with inspection or notify Contractor of unfulfilled
requirements. Architect will prepare the Certificate of Substantial Completion after inspection
or will notify Contractor of items, either on Contractor's list or additional items identified by
Architect, that must be completed or corrected before certificate will be issued.
1. Re-inspection: Request re-inspection when the Work identified in previous inspections
as incomplete is completed or corrected.
2. Results of completed inspection will form the basis of requirements for Final
Completion.
1.4 FINAL COMPLETION
A. Preliminary Procedures: Before requesting final inspection for determining date of Final
Completion, complete the following:
1. Submit a final Application for Payment according to Division 01 Section "Payment
Procedures."
2. Submit certified copy of Architect's Substantial Completion inspection list of items to be
completed or corrected (punch list), endorsed and dated by Architect. The certified copy
of the list shall state that each item has been completed or otherwise resolved for
acceptance.
3. Submit evidence of final, continuing insurance coverage complying with insurance
requirements.
4. Submit pest-control final inspection report and warranty.
5. Instruct Owner's personnel in operation, adjustment, and maintenance of products,
equipment, and systems as applicable.
B. Inspection: Submit a written request for final inspection for acceptance. On receipt of request,
Architect will either proceed with inspection or notify Contractor of unfulfilled requirements.
Architect will prepare a final Certificate for Payment after inspection or will notify Contractor
of construction that must be completed or corrected before certificate will be issued.
1. Re-inspection: Request re-inspection when the Work identified in previous inspections
as incomplete is completed or corrected.
1.5 LIST OF INCOMPLETE ITEMS (ROOF PUNCH LIST)
A. Preparation: Submit list and include name of each roof per building.
1. Organize list of areas in sequential order
2. Organize items applying to each area by major element.
3. Include the following information at the top of each page:
DACC Main Campus Roof Replacement – Various Buildings
CLOSEOUT PROCEDURES 017700 - 3
a. Project name.
b. Date.
c. Name of Architect.
d. Name of Contractor.
e. Page number.
1.6 WARRANTIES
A. Submittal Time: Submit written warranties on request of Architect for designated portions of
the Work where commencement of warranties other than date of Substantial Completion is
indicated.
B. Organize warranty documents into an orderly sequence based on the table of contents of the
Project Manual.
1. Bind warranties and bonds in 3-ring, vinyl-covered, loose-leaf binders, thickness as
necessary to accommodate contents, and sized to receive 8-1/2-by-11-inch paper.
2. Provide dividers with plastic-covered tabs for each separate warranty. Mark tab to
identify the product or installation. Provide a typed description of the product or
installation, including the name of the product and the name, address, and telephone
number of Installer.
3. Identify each binder on the front and spine with the typed or printed title
"WARRANTIES," Project name, and name of Contractor.
C. Provide additional copies of each warranty to include in operation and maintenance manuals.
PART 2 - PRODUCTS
2.1 MATERIALS-NOT USED
PART 3 - EXECUTION
3.1 FINAL CLEANING
A. General: Provide final cleaning. Conduct cleaning and waste-removal operations to comply
with local laws and ordinances and Federal and local environmental and antipollution
regulations.
B. Cleaning: Clean each roof to condition expected in an average commercial building cleaning
and maintenance program. Comply with manufacturer's written instructions.
1. Complete the following cleaning operations before requesting inspection for certification
of Substantial Completion for entire Project or for a portion of Project:
DACC Main Campus Roof Replacement – Various Buildings
CLOSEOUT PROCEDURES 017700 - 4
a. Clean Project site, yard, and grounds, in areas disturbed by construction activities,
including landscape development areas, of rubbish, waste material, litter, and other
foreign substances.
b. Sweep paved areas and staging areas broom clean.
c. Rake grounds that are neither planted nor paved to a smooth, even-textured surface
to it’s original stage.
d. Remove tools, construction equipment, machinery, and surplus material from
Project site.
e. Clean exposed exterior landscaping to a dirt-free condition.
f. Clean debris from all roofs.
g. Leave Project clean and ready.
C. Comply with safety standards for cleaning. Do not burn waste materials. Do not bury debris or
excess materials on Owner's property. Do not discharge volatile, harmful, or dangerous
materials into drainage systems. Remove waste materials from Project site and dispose of
lawfully.
END OF SECTION 017700
DACC Main Campus Roof Replacement – Various Buildings
OPERATION AND MAINTENANCE DATA 017823 - 1
SECTION 017823
OPERATION AND MAINTENANCE DATA
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes administrative and procedural requirements for preparing operation and
maintenance manuals, including the following:
1. Maintenance documentation directory.
2. Maintenance manuals for the care and maintenance of Roofing and associated systems.
B. Related Sections include the following:
1. Division 01 Section "Submittal Procedures" for submitting copies of submittals for
operation and maintenance manuals.
2. Division 01 Section "Closeout Procedures" for submitting operation and maintenance
manuals.
3. Division 01 Section "Project Record Documents" for preparing Record Drawings for
operation and maintenance manuals.
4. Divisions 02 through 49 Sections for specific operation and maintenance manual
requirements for the Work in those Sections.
1.3 DEFINITIONS
A. System: An organized collection of parts, equipment, or subsystems united by regular
interaction.
B. Subsystem: A portion of a system with characteristics similar to a system.
1.4 SUBMITTALS
A. Initial Submittal: Submit two draft copies of each manual at least 15 days before requesting
inspection for Substantial Completion. Include a complete operation and maintenance
directory. Architect will return one copy of draft and mark whether general scope and content
of manual are acceptable.
B. Final Submittal: Submit one copy of each manual in final form at least 15 days before final
inspection. Architect will return copy with comments within 15 days after final inspection.
1. Correct or modify each manual to comply with Architect's comments. Submit three
copies of each corrected manual within 15 days of receipt of Architect's comments.
DACC Main Campus Roof Replacement – Various Buildings
OPERATION AND MAINTENANCE DATA 017823 - 2
1.5 COORDINATION
A. Where operation and maintenance documentation includes information on installations by more
than one factory-authorized service representative, assemble and coordinate information
furnished by representatives and prepare manuals.
PART 2 - PRODUCTS
2.1 OPERATION AND MAINTENANCE DOCUMENTATION DIRECTORY
A. Organization: Include a section in the directory for each of the following:
1. List of documents.
2. List of systems.
3. List of equipment.
4. Table of contents.
B. List of Systems and Subsystems: List systems alphabetically. Include references to operation
and maintenance manuals that contain information about each system.
C. List of Equipment: List equipment for each system, organized alphabetically by system. For
pieces of equipment not part of system, list alphabetically in separate list.
D. Tables of Contents: Include a table of contents for each emergency, operation, and maintenance
manual.
E. Identification: In the documentation directory and in each operation and maintenance manual,
identify each system, subsystem, and piece of equipment with same designation used in the
Contract Documents. If no designation exists, assign a designation according to
ASHRAE Guideline 4, "Preparation of Operating and Maintenance Documentation for Building
Systems."
2.2 MANUALS, GENERAL
A. Organization: Unless otherwise indicated, organize each manual into a separate section for each
system and subsystem, and a separate section for each piece of equipment not part of a system.
Each manual shall contain the following materials, in the order listed:
1. Title page.
2. Table of contents.
3. Manual contents.
B. Title Page: Enclose title page in transparent plastic sleeve. Include the following information:
1. Subject matter included in manual.
2. Name and address of Project.
3. Name and address of Owner.
4. Date of submittal.
5. Name, address, and telephone number of Contractor.
DACC Main Campus Roof Replacement – Various Buildings
OPERATION AND MAINTENANCE DATA 017823 - 3
6. Name and address of Architect.
7. Cross-reference to related systems in other operation and maintenance manuals.
C. Table of Contents: List each product included in manual, identified by product name, indexed
to the content of the volume, and cross-referenced to Specification Section number in Project
Manual.
1. If operation or maintenance documentation requires more than one volume to
accommodate data, include comprehensive table of contents for all volumes in each
volume of the set.
D. Manual Contents: Organize into sets of manageable size. Arrange contents alphabetically by
system, subsystem, and equipment. If possible, assemble instructions for subsystems,
equipment, and components of one system into a single binder.
1. Binders: Heavy-duty, 3-ring, vinyl-covered, loose-leaf binders, in thickness necessary to
accommodate contents, sized to hold 8-1/2-by-11-inch paper; with clear plastic sleeve on
spine to hold label describing contents and with pockets inside covers to hold folded
oversize sheets.
a. If two or more binders are necessary to accommodate data of a system, organize
data in each binder into groupings by subsystem and related components. Cross-
reference other binders if necessary to provide essential information for proper
operation or maintenance of equipment or system.
b. Identify each binder on front and spine, with printed title "OPERATION AND
MAINTENANCE MANUAL," Project title or name, and subject matter of
contents. Indicate volume number for multiple-volume sets.
2. Dividers: Heavy-paper dividers with plastic-covered tabs for each section. Mark each
tab to indicate contents. Include typed list of products and major components of
equipment included in the section on each divider, cross-referenced to Specification
Section number and title of Project Manual.
3. Protective Plastic Sleeves: Transparent plastic sleeves designed to enclose diagnostic
software diskettes for computerized electronic equipment.
4. Supplementary Text: Prepared on 8-1/2-by-11-inch white bond paper.
5. Drawings: Attach reinforced, punched binder tabs on drawings and bind with text.
a. If oversize drawings are necessary, fold drawings to same size as text pages and
use as foldouts.
b. If drawings are too large to be used as foldouts, fold and place drawings in labeled
envelopes and bind envelopes in rear of manual. At appropriate locations in
manual, insert typewritten pages indicating drawing titles, descriptions of contents,
and drawing locations.
2.3 PRODUCT MAINTENANCE MANUAL
A. Content: Organize manual into a separate section for each product, material, and finish.
Include source information, product information, maintenance procedures, repair materials and
sources, and warranties and bonds, as described below.
DACC Main Campus Roof Replacement – Various Buildings
OPERATION AND MAINTENANCE DATA 017823 - 4
B. Source Information: List each product included in manual, identified by product name and
arranged to match manual's table of contents. For each product, list name, address, and
telephone number of Installer or supplier and maintenance service agent, and cross-reference
Specification Section number and title in Project Manual.
C. Product Information: Include the following, as applicable:
1. Product name and model number.
2. Manufacturer's name.
3. Color, pattern, and texture.
4. Material and chemical composition.
5. Reordering information for specially manufactured products.
D. Maintenance Procedures: Include manufacturer's written recommendations and the following:
1. Inspection procedures.
2. Types of cleaning agents to be used and methods of cleaning.
3. List of cleaning agents and methods of cleaning detrimental to product.
4. Schedule for routine cleaning and maintenance.
5. Repair instructions.
E. Repair Materials and Sources: Include lists of materials and local sources of materials and
related services.
F. Warranties and Bonds: Include copies of warranties and bonds and lists of circumstances and
conditions that would affect validity of warranties or bonds.
1. Include procedures to follow and required notifications for warranty claims.
2.4 SYSTEMS AND EQUIPMENT MAINTENANCE MANUAL
A. Comply with Division 01 Section "Closeout Procedures" for schedule for submitting operation
and maintenance documentation.
END OF SECTION 017823
DACC Main Campus Roof Replacement – Various Buildings
PROJECT RECORD DOCUMENTS 017839 - 1
SECTION 017839
PROJECT RECORD DOCUMENTS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes administrative and procedural requirements for Project Record
Documents, including the following:
1. Record Drawings.
2. Record Specifications.
3. Record Product Data.
B. Related Sections include the following:
1. Division 01 Section "Closeout Procedures" for general closeout procedures.
2. Division 01 Section "Operation and Maintenance Data" for operation and maintenance
manual requirements.
3. Divisions 02 through 49 Sections for specific requirements for Project Record
Documents of the Work in those Sections.
1.3 SUBMITTALS
A. Record Drawings: Comply with the following:
1. Number of Copies: Submit one set of marked-up Record Prints.
2. Number of Copies: Submit copies of Record Drawings as follows:
a. Initial Submittal: Submit one set of corrected Record Transparencies and one set
of marked-up Record Prints. Architect will initial and date each transparency and
mark whether general scope of changes, additional information recorded, and
quality of drafting are acceptable. Architect will return transparencies and prints
for organizing into sets, printing, binding, and final submittal.
b. Final Submittal: Submit one set of marked-up Record Prints, one set of Record
Transparencies, and three copies printed from Record Transparencies. Print each
Drawing, whether or not changes and additional information were recorded.
B. Record Specifications: Submit one copy of Project's Specifications, including addenda and
contract modifications.
C. Record Product Data: Submit one copy of each Product Data submittal.
DACC Main Campus Roof Replacement – Various Buildings
PROJECT RECORD DOCUMENTS 017839 - 2
1. Where Record Product Data is required as part of operation and maintenance manuals,
submit marked-up Product Data as an insert in manual instead of submittal as Record
Product Data.
PART 2 - PRODUCTS
2.1 RECORD DRAWINGS
A. Record Prints: Maintain one set of blue- or black-line white prints of the Contract Drawings
and Shop Drawings.
1. Preparation: Mark Record Prints to show the actual installation where installation varies
from that shown originally. Require individual or entity who obtained record data,
whether individual or entity is Installer, subcontractor, or similar entity, to prepare the
marked-up Record Prints.
a. Give particular attention to information on concealed elements that would be
difficult to identify or measure and record later.
b. Accurately record information in an understandable drawing technique.
c. Record data as soon as possible after obtaining it. Record and check the markup
before enclosing concealed installations.
2. Content: Types of items requiring marking include, but are not limited to, the following:
a. Dimensional changes to Drawings.
b. Revisions to details shown on Drawings.
c. Revisions to routing of piping and conduits.
d. Revisions to electrical circuitry.
e. Actual equipment locations.
f. Locations of concealed internal utilities.
g. Changes made by Change Order or Construction Change Directive.
h. Changes made following Architect's written orders.
i. Details not on the original Contract Drawings.
j. Field records for variable and concealed conditions.
k. Record information on the Work that is shown only schematically.
3. Mark the Contract Drawings or Shop Drawings, whichever is most capable of showing
actual physical conditions, completely and accurately. If Shop Drawings are marked,
show cross-reference on the Contract Drawings.
4. Mark record sets with erasable, red-colored pencil. Use other colors to distinguish
between changes for different categories of the Work at same location.
5. Mark important additional information that was either shown schematically or omitted
from original Drawings.
6. Note Construction Change Directive numbers, alternate numbers, Change Order
numbers, and similar identification, where applicable.
DACC Main Campus Roof Replacement – Various Buildings
PROJECT RECORD DOCUMENTS 017839 - 3
2.2 RECORD SPECIFICATIONS
A. Preparation: Mark Specifications to indicate the actual product installation where installation
varies from that indicated in Specifications, addenda, and contract modifications.
1. Give particular attention to information on concealed products and installations that
cannot be readily identified and recorded later.
2. Mark copy with the proprietary name and model number of products, materials, and
equipment furnished, including substitutions and product options selected.
3. Record the name of manufacturer, supplier, Installer, and other information necessary to
provide a record of selections made.
4. For each principal product, indicate whether Record Product Data has been submitted in
operation and maintenance manuals instead of submitted as Record Product Data.
5. Note related Change Orders, Record Product Data and Record Drawings where
applicable.
2.3 RECORD PRODUCT DATA
A. Preparation: Mark Product Data to indicate the actual product installation where installation
varies substantially from that indicated in Product Data submittal.
1. Give particular attention to information on concealed products and installations that
cannot be readily identified and recorded later.
2. Include significant changes in the product delivered to Project site and changes in
manufacturer's written instructions for installation.
3. Note related Change Orders, Record Specifications, and Record Drawings where
applicable.
2.4 MISCELLANEOUS RECORD SUBMITTALS
A. Assemble miscellaneous records required by other Specification Sections for miscellaneous
record keeping and submittal in connection with actual performance of the Work. Bind or file
miscellaneous records and identify each, ready for continued use and reference.
PART 3 - EXECUTION
3.1 RECORDING AND MAINTENANCE
A. Recording: Maintain one copy of each submittal during the construction period for Project
Record Document purposes. Post changes and modifications to Project Record Documents as
they occur; do not wait until the end of Project.
B. Maintenance of Record Documents and Samples: Store Record Documents and Samples in the
field office apart from the Contract Documents used for construction. Do not use Project
Record Documents for construction purposes. Maintain Record Documents in good order and
in a clean, dry, legible condition, protected from deterioration and loss. Provide access to
Project Record Documents for Architect's reference during normal working hours.
END OF SECTION 017839
DACC Main Campus Roof Replacement – Various Buildings
METAL FABRICATIONS 055000 - 1
SECTION 055000
METAL FABRICATIONS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes the following:
1. Steel framing and supports for mechanical and electrical equipment.
2. Steel framing and supports for applications where framing and supports are not specified
in other Sections.
3. Loose bearing and leveling plates.
4. Rain diverter angles.
5. Aluminum termination bars.
B. Products furnished, but not installed, under this Section include the following:
1. Anchor bolts, steel pipe sleeves, and wedge-type inserts indicated to be cast into concrete
or built into unit masonry.
C. Related Sections include the following:
1. Division 06 Section "Rough Carpentry” for metal framing anchors.
1.3 PERFORMANCE REQUIREMENTS
A. Structural Performance of Ladders: Provide ladders capable of withstanding the effects of loads
and stresses within limits and under conditions specified in ANSI A14.3.
B. Thermal Movements: Provide exterior metal fabrications that allow for thermal movements
resulting from the following maximum change (range) in ambient and surface temperatures by
preventing buckling, opening of joints, overstressing of components, failure of connections, and
other detrimental effects. Base engineering calculation on surface temperatures of materials due
to both solar heat gain and nighttime-sky heat loss.
1. Temperature Change (Range): 120 deg F, ambient; 180 deg F, material surfaces.
1.4 SUBMITTALS
A. Shop Drawings: Show fabrication and installation details for metal fabrications.
1. Include plans, elevations, sections, and details of metal fabrications and their
connections. Show anchorage and accessory items.
DACC Main Campus Roof Replacement – Various Buildings
METAL FABRICATIONS 055000 - 2
2. Provide templates for anchors and bolts specified for installation under other Sections.
3. For installed products indicated to comply with design loads, include structural analysis
data signed and sealed by the qualified professional engineer responsible for their
preparation.
B. Mill Certificates: Signed by manufacturers of stainless-steel sheet certifying that products
furnished comply with requirements.
C. Welding certificates.
D. Qualification Data: For professional engineer.
1.5 QUALITY ASSURANCE
A. Welding: Qualify procedures and personnel according to the following:
1. AWS D1.1, "Structural Welding Code--Steel."
2. AWS D1.2, "Structural Welding Code--Aluminum."
3. AWS D1.3, "Structural Welding Code--Sheet Steel."
4. AWS D1.6, "Structural Welding Code--Stainless Steel."
1.6 PROJECT CONDITIONS
A. Field Measurements: Verify actual locations of walls and other construction contiguous with
metal fabrications by field measurements before fabrication and indicate measurements on Shop
Drawings.
1. Established Dimensions: Where field measurements cannot be made without delaying
the Work, establish dimensions and proceed with fabricating metal fabrications without
field measurements. Coordinate wall and other contiguous construction to ensure that
actual dimensions correspond to established dimensions.
2. Provide allowance for trimming and fitting at site.
1.7 COORDINATION
A. Coordinate installation of anchorages for metal fabrications. Furnish setting drawings,
templates, and directions for installing anchorages, including sleeves, concrete inserts, anchor
bolts, and items with integral anchors, that are to be embedded in concrete or masonry. Deliver
such items to Project site in time for installation.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. In other Part 2 articles where titles below introduce lists, the following requirements apply to
product selection:
DACC Main Campus Roof Replacement – Various Buildings
METAL FABRICATIONS 055000 - 3
1. Available Products: Subject to compliance with requirements, products that may be
incorporated into the Work include, but are not limited to, products specified.
2. Products: Subject to compliance with requirements, provide one of the products
specified.
3. Available Manufacturers: Subject to compliance with requirements, manufacturers
offering products that may be incorporated into the Work include, but are not limited to,
manufacturers specified.
4. Manufacturers: Subject to compliance with requirements, provide products by one of the
manufacturers specified.
2.2 METALS, GENERAL
A. Metal Surfaces, General: Provide materials with smooth, flat surfaces, unless otherwise
indicated. For metal fabrications exposed to view in the completed Work, provide materials
without seam marks, roller marks, rolled trade names, or blemishes.
2.3 FERROUS METALS
A. Steel Plates, Shapes, and Bars: ASTM A 36/A 36M.
B. Stainless-Steel Sheet, Strip, Plate, and Flat Bars: ASTM A 666, Type 304.
C. Stainless-Steel Bars and Shapes: ASTM A 276, Type 304.
D. Rolled-Steel Floor Plate: ASTM A 786/A 786M, rolled from plate complying with
ASTM A 36/A 36M or ASTM A 283/A 283M, Grade C or D.
E. Rolled-Stainless-Steel Floor Plate: ASTM A 793.
F. Steel Tubing: ASTM A 500, cold-formed steel tubing.
G. Steel Pipe: ASTM A 53/A 53M, standard weight (Schedule 40), unless another weight is
indicated or required by structural loads.
H. Cast Iron: ASTM A 48/A 48M, Class 30, unless another class is indicated or required by
structural loads.
2.4 NONFERROUS METALS
A. Aluminum Plate and Sheet: ASTM B 209, Alloy 6061-T6.
B. Aluminum Extrusions: ASTM B 221, Alloy 6063-T6.
C. Aluminum-Alloy Rolled Tread Plate: ASTM B 632/B 632M, Alloy 6061-T6.
D. Aluminum Castings: ASTM B 26/B 26M, Alloy 443.0-F.
DACC Main Campus Roof Replacement – Various Buildings
METAL FABRICATIONS 055000 - 4
2.5 FASTENERS
A. General: Unless otherwise indicated, provide Type 316 stainless-steel fasteners for exterior use
and zinc-plated fasteners with coating complying with ASTM B 633, Class Fe/Zn 5, at exterior
walls. Provide stainless-steel fasteners for fastening aluminum. Select fasteners for type, grade,
and class required.
B. Steel Bolts and Nuts: Regular hexagon-head bolts, ASTM A 307, Grade A; with hex nuts,
ASTM A 563; and, where indicated, flat washers.
C. Stainless-Steel Bolts and Nuts: Regular hexagon-head annealed stainless-steel bolts, nuts and,
where indicated, flat washers; ASTM F 593 for bolts and ASTM F 594 for nuts, Alloy
Group A1.
D. Anchor Bolts: ASTM F 1554, Grade 36.
1. Provide hot-dip or mechanically deposited, zinc-coated anchor bolts where item being
fastened is indicated to be galvanized.
E. Eyebolts: ASTM A 489.
F. Machine Screws: ASME B18.6.3.
G. Lag Bolts: ASME B18.2.1.
H. Wood Screws: Flat head, ASME B18.6.1.
I. Plain Washers: Round, ASME B18.22.1 .
J. Lock Washers: Helical, spring type, ASME B18.21.1.
K. Expansion Anchors: Anchor bolt and sleeve assembly with capability to sustain, without
failure, a load equal to six times the load imposed when installed in unit masonry and four times
the load imposed when installed in concrete, as determined by testing according to
ASTM E 488, conducted by a qualified independent testing agency.
1. Material for Anchors in Interior Locations: Carbon-steel components zinc-plated to
comply with ASTM B 633, Class Fe/Zn 5.
2. Material for Anchors in Exterior Locations: Alloy Group A1 stainless-steel bolts
complying with ASTM F 593 and nuts complying with ASTM F 594.
2.6 MISCELLANEOUS MATERIALS
A. Welding Rods and Bare Electrodes: Select according to AWS specifications for metal alloy
welded.
B. Shop Primers: Provide primers that comply with Division 09 painting Sections.
C. Universal Shop Primer: Fast-curing, lead- and chromate-free, universal modified-alkyd primer
complying with MPI#79.
DACC Main Campus Roof Replacement – Various Buildings
METAL FABRICATIONS 055000 - 5
1. Use primer with a VOC content of 420 g/L (3.5 lb/gal.) or less when calculated according
to 40 CFR 59, Subpart D (EPA Method 24).
2. Use primer containing pigments that make it easily distinguishable from zinc-rich primer.
D. Zinc-Rich Primer: Complying with SSPC-Paint 20 or SSPC-Paint 29 and compatible with
topcoat.
1. Use primer with a VOC content of 420 g/L (3.5 lb/gal.) or less when calculated according
to 40 CFR 59, Subpart D (EPA Method 24).
2. Products:
a. Benjamin Moore & Co.; Epoxy Zinc-Rich Primer CM18/19.
b. Carboline Company; Carbozinc 621.
c. ICI Devoe Coatings; Catha-Coat 313.
d. International Coatings Limited; Interzinc 315 Epoxy Zinc-Rich Primer.
e. PPG Architectural Finishes, Inc.; Aquapon Zinc-Rich Primer 97-670.
f. Sherwin-Williams Company (The); Corothane I GalvaPac Zinc Primer.
g. Tnemec Company, Inc.; Tneme-Zinc 90-97.
E. Galvanizing Repair Paint: High-zinc-dust-content paint for regalvanizing welds in steel,
complying with SSPC-Paint 20.
F. Bituminous Paint: Cold-applied asphalt emulsion complying with ASTM D 1187.
G. Nonshrink, Metallic Grout: Factory-packaged, ferrous-aggregate grout complying with
ASTM C 1107, specifically recommended by manufacturer for heavy-duty loading applications.
H. Nonshrink, Nonmetallic Grout: Factory-packaged, nonstaining, noncorrosive, nongaseous grout
complying with ASTM C 1107. Provide grout specifically recommended by manufacturer for
interior and exterior applications.
I. Concrete Materials and Properties: Comply with requirements in Division 03 Section "Cast-in-
Place Concrete" for normal-weight, air-entrained, ready-mix concrete with a minimum 28-day
compressive strength of 3000 psi, unless otherwise indicated.
2.7 FABRICATION, GENERAL
A. Shop Assembly: Preassemble items in the shop to greatest extent possible. Disassemble units
only as necessary for shipping and handling limitations. Use connections that maintain
structural value of joined pieces. Clearly mark units for reassembly and coordinated
installation.
B. Cut, drill, and punch metals cleanly and accurately. Remove burrs and ease edges to a radius of
approximately 1/32 inch, unless otherwise indicated. Remove sharp or rough areas on exposed
surfaces.
C. Form bent-metal corners to smallest radius possible without causing grain separation or
otherwise impairing work.
D. Form exposed work true to line and level with accurate angles and surfaces and straight edges.
DACC Main Campus Roof Replacement – Various Buildings
METAL FABRICATIONS 055000 - 6
E. Weld corners and seams continuously to comply with the following:
1. Use materials and methods that minimize distortion and develop strength and corrosion
resistance of base metals.
2. Obtain fusion without undercut or overlap.
3. Remove welding flux immediately.
4. At exposed connections, finish exposed welds and surfaces smooth and blended so no
roughness shows after finishing and contour of welded surface matches that of adjacent
surface.
F. Form exposed connections with hairline joints, flush and smooth, using concealed fasteners
where possible. Where exposed fasteners are required, use Phillips flat-head (countersunk)
screws or bolts, unless otherwise indicated. Locate joints where least conspicuous.
G. Fabricate seams and other connections that will be exposed to weather in a manner to exclude
water. Provide weep holes where water may accumulate.
H. Cut, reinforce, drill, and tap metal fabrications as indicated to receive finish hardware, screws,
and similar items.
I. Provide for anchorage of type indicated; coordinate with supporting structure. Space anchoring
devices to secure metal fabrications rigidly in place and to support indicated loads.
1. Where units are indicated to be cast into concrete or built into masonry, equip with
integrally welded steel strap anchors, 1/8 by 1-1/2 inches, with a minimum 6-inch
embedment and 2-inch hook, not less than 8 inches (200 mm) from ends and corners of
units and 24 inches o.c., unless otherwise indicated.
2.8 MISCELLANEOUS FRAMING AND SUPPORTS
A. General: Provide steel framing and supports not specified in other Sections as needed to
complete the Work.
B. Fabricate units from steel shapes, plates, and bars of welded construction, unless otherwise
indicated. Fabricate to sizes, shapes, and profiles indicated and as necessary to receive adjacent
construction retained by framing and supports. Cut, drill, and tap units to receive hardware,
hangers, and similar items.
1. Fabricate units from slotted channel framing where indicated.
2. Furnish inserts if units are installed after concrete is placed.
C. Galvanize miscellaneous framing and supports where indicated.
D. Prime miscellaneous framing and supports with zinc-rich primer where indicated.
2.9 Aluminum Termination Bars
A. Termination bar minimum dimensions shall be 3/8" thick x 2" width x 12' long. Coordinate
other bar requirements with roofing system manufacturer.
DACC Main Campus Roof Replacement – Various Buildings
METAL FABRICATIONS 055000 - 7
2.10 MISCELLANEOUS STEEL TRIM
A. Unless otherwise indicated, fabricate units from steel shapes, plates, and bars of profiles shown
with continuously welded joints and smooth exposed edges. Miter corners and use concealed
field splices where possible.
B. Provide cutouts, fittings, and anchorages as needed to coordinate assembly and installation with
other work.
1. Provide with integrally welded steel strap anchors for embedding in concrete or masonry
construction.
C. Galvanize exterior miscellaneous steel trim.
2.11 FINISHES, GENERAL
A. Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for
recommendations for applying and designating finishes.
B. Finish metal fabrications after assembly.
2.12 STEEL AND IRON FINISHES
A. Galvanizing: Hot-dip galvanize items as indicated to comply with applicable standard listed
below:
1. ASTM A 123/A 123M, for galvanizing steel and iron products.
2. ASTM A 153/A 153M, for galvanizing steel and iron hardware.
B. Preparation for Shop Priming: Prepare uncoated ferrous-metal surfaces to comply with
minimum requirements indicated below for SSPC surface preparation specifications and
environmental exposure conditions of installed metal fabrications:
1. Exteriors (SSPC Zone 1B) : SSPC-SP 6/NACE No. 3, "Commercial Blast Cleaning."
2. Interiors (SSPC Zone 1A): SSPC-SP 3, "Power Tool Cleaning."
C. Shop Priming: Apply shop primer to uncoated surfaces of metal fabrications, except those with
galvanized finishes and those to be embedded in concrete, sprayed-on fireproofing, or masonry,
unless otherwise indicated. Comply with SSPC-PA 1, "Paint Application Specification No. 1:
Shop, Field, and Maintenance Painting of Steel," for shop painting.
1. Stripe paint corners, crevices, bolts, welds, and sharp edges.
DACC Main Campus Roof Replacement – Various Buildings
METAL FABRICATIONS 055000 - 8
PART 3 - EXECUTION
3.1 INSTALLATION, GENERAL
A. Cutting, Fitting, and Placement: Perform cutting, drilling, and fitting required for installing
metal fabrications. Set metal fabrications accurately in location, alignment, and elevation; with
edges and surfaces level, plumb, true, and free of rack; and measured from established lines and
levels.
B. Fit exposed connections accurately together to form hairline joints. Weld connections that are
not to be left as exposed joints but cannot be shop welded because of shipping size limitations.
Do not weld, cut, or abrade surfaces of exterior units that have been hot-dip galvanized after
fabrication and are for bolted or screwed field connections.
C. Field Welding: Comply with the following requirements:
1. Use materials and methods that minimize distortion and develop strength and corrosion
resistance of base metals.
2. Obtain fusion without undercut or overlap.
3. Remove welding flux immediately.
4. At exposed connections, finish exposed welds and surfaces smooth and blended so no
roughness shows after finishing and contour of welded surface matches that of adjacent
surface.
D. Fastening to In-Place Construction: Provide anchorage devices and fasteners where metal
fabrications are required to be fastened to in-place construction. Provide threaded fasteners for
use with concrete and masonry inserts, toggle bolts, through bolts, lag bolts, wood screws, and
other connectors.
E. Provide temporary bracing or anchors in formwork for items that are to be built into concrete,
masonry, or similar construction.
F. Corrosion Protection: Coat concealed surfaces of aluminum that will come into contact with
grout, concrete, masonry, wood, or dissimilar metals with a heavy coat of bituminous paint.
3.2 INSTALLING MISCELLANEOUS FRAMING AND SUPPORTS
A. General: Install framing and supports to comply with requirements of items being supported,
including manufacturers' written instructions and requirements indicated on Shop Drawings.
B. Anchor supports for operable partitions securely to and rigidly brace from building structure.
C. Support steel girders on solid grouted masonry, concrete, or steel pipe columns. Secure girders
with anchor bolts embedded in grouted masonry or concrete or with bolts through top plates of
pipe columns.
1. Where grout space under bearing plates is indicated for girders supported on concrete or
masonry, install as specified in "Installing Bearing and Leveling Plates" Article.
DACC Main Campus Roof Replacement – Various Buildings
METAL FABRICATIONS 055000 - 9
D. Install pipe columns on concrete footings with grouted baseplates. Position and grout column
baseplates as specified in "Installing Bearing and Leveling Plates" Article.
1. Grout baseplates of columns supporting steel girders after girders are installed and
leveled.
3.3 Termination Bar Installation
A. Install in accordance with roof system manufacturer.
3.4 ADJUSTING AND CLEANING
A. Touchup Painting: Immediately after erection, clean field welds, bolted connections, and
abraded areas. Paint uncoated and abraded areas with the same material as used for shop
painting to comply with SSPC-PA 1 for touching up shop-painted surfaces.
1. Apply by brush or spray to provide a minimum 2.0-mil (0.05-mm) dry film thickness.
B. Touchup Painting: Cleaning and touchup painting of field welds, bolted connections, and
abraded areas of shop paint are specified in Division 09 painting Sections.
C. Galvanized Surfaces: Clean field welds, bolted connections, and abraded areas and repair
galvanizing to comply with ASTM A 780.
END OF SECTION 055000
DACC Main Campus Roof Replacement – Various Buildings
MISCELLANEOUS ROUGH CARPENTRY 061053 - 1
SECTION 061053
MISCELLANEOUS ROUGH CARPENTRY
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes the following:
1. Rooftop equipment bases and support curbs.
2. Wood blocking, cants, and nailers.
1.3 DEFINITIONS
A. Dimension Lumber: Lumber of 2 inches nominal or greater but less than 5 inches nominal in
least dimension.
B. Lumber grading agencies, and the abbreviations used to reference them, include the following:
1. NeLMA: Northeastern Lumber Manufacturers' Association.
2. NHLA: National Hardwood Lumber Association.
3. NLGA: National Lumber Grades Authority.
4. SPIB: The Southern Pine Inspection Bureau.
5. WCLIB: West Coast Lumber Inspection Bureau.
6. WWPA: Western Wood Products Association.
1.4 SUBMITTALS
A. Product Data: For each type of process and factory-fabricated product. Indicate component
materials and dimensions and include construction and application details.
1. Include data for wood-preservative treatment from chemical treatment manufacturer and
certification by treating plant that treated materials comply with requirements. Indicate
type of preservative used and net amount of preservative retained.
2. Include data for fire-retardant treatment from chemical treatment manufacturer and
certification by treating plant that treated materials comply with requirements. Include
physical properties of treated materials based on testing by a qualified independent
testing agency.
3. For fire-retardant treatments specified to be High-Temperature (HT) type include
physical properties of treated lumber both before and after exposure to elevated
temperatures, based on testing by a qualified independent testing agency according to
ASTM D 5664.
DACC Main Campus Roof Replacement – Various Buildings
MISCELLANEOUS ROUGH CARPENTRY 061053 - 2
4. For products receiving a waterborne treatment, include statement that moisture content of
treated materials was reduced to levels specified before shipment to Project site.
5. Include copies of warranties from chemical treatment manufacturers for each type of
treatment.
B. Research/Evaluation Reports: For the following, showing compliance with building code in
effect for Project:
1. Preservative-treated wood.
2. Fire-retardant-treated wood.
3. Power-driven fasteners.
4. Powder-actuated fasteners.
5. Expansion anchors.
6. Metal framing anchors.
1.5 QUALITY ASSURANCE
A. Forest Certification: For the following wood products, provide materials produced from wood
obtained from forests certified by an FSC-accredited certification body to comply with FSC 1.2,
"Principles and Criteria":
1. Dimension lumber framing.
2. Miscellaneous lumber.
3. Interior wood trim.
4. Shelving and clothes rods.
1.6 DELIVERY, STORAGE, AND HANDLING
A. Stack lumber flat with spacers between each bundle to provide air circulation. Provide for air
circulation around stacks and under coverings.
B. Deliver interior wood materials that are to be exposed to view only after building is enclosed
and weatherproof, wet work other than painting is dry, and HVAC system is operating and
maintaining temperature and humidity at occupancy levels.
PART 2 - PRODUCTS
2.1 WOOD PRODUCTS, GENERAL
A. Lumber: DOC PS 20 and applicable rules of grading agencies indicated. If no grading agency
is indicated, provide lumber that complies with the applicable rules of any rules-writing agency
certified by the ALSC Board of Review. Provide lumber graded by an agency certified by the
ALSC Board of Review to inspect and grade lumber under the rules indicated.
1. Factory mark each piece of lumber with grade stamp of grading agency.
2. For exposed lumber indicated to receive a stained or natural finish, mark grade stamp on
end or back of each piece.
DACC Main Campus Roof Replacement – Various Buildings
MISCELLANEOUS ROUGH CARPENTRY 061053 - 3
3. Where nominal sizes are indicated, provide actual sizes required by DOC PS 20 for
moisture content specified. Where actual sizes are indicated, they are minimum dressed
sizes for dry lumber.
4. Provide dressed lumber, S4S, unless otherwise indicated.
2.2 WOOD-PRESERVATIVE-TREATED MATERIALS
A. Preservative Treatment by Pressure Process: AWPA C2, except that lumber that is not in
contact with the ground and is continuously protected from liquid water may be treated
according to AWPA C31 with inorganic boron (SBX).
1. Preservative Chemicals: Acceptable to authorities having jurisdiction and containing no
arsenic or chromium.
2. For exposed items indicated to receive a stained or natural finish, use chemical
formulations that do not require incising, contain colorants, bleed through, or otherwise
adversely affect finishes.
B. Kiln-dry lumber after treatment to a maximum moisture content of 19 percent. Do not use
material that is warped or does not comply with requirements for untreated material.
C. Mark lumber with treatment quality mark of an inspection agency approved by the ALSC Board
of Review.
D. Application: Treat all miscellaneous carpentry, unless otherwise indicated:
1. Wood cants, nailers, curbs, equipment support bases, blocking, stripping, and similar
members in connection with roofing, flashing, vapor barriers, and waterproofing.
2. Wood sills, sleepers, blocking, and similar concealed members in contact with masonry
or concrete.
3. Wood framing and furring attached directly to the interior of below-grade exterior
masonry or concrete walls.
4. Wood framing members that are less than 18 inches above the ground in crawl spaces or
unexcavated areas.
5. Wood floor plates that are installed over concrete slabs-on-grade.
2.3 FIRE-RETARDANT-TREATED MATERIALS
A. General: Comply with performance requirements in AWPA C20 (lumber).
1. Use treatment that does not promote corrosion of metal fasteners.
2. Use Exterior type for exterior locations and where indicated.
3. Use Interior Type A, High Temperature (HT) for enclosed roof framing, framing in attic
spaces, and where indicated.
4. Use Interior Type A, unless otherwise indicated.
B. Identify fire-retardant-treated wood with appropriate classification marking of testing and
inspecting agency acceptable to authorities having jurisdiction.
DACC Main Campus Roof Replacement – Various Buildings
MISCELLANEOUS ROUGH CARPENTRY 061053 - 4
C. Application: Treat all miscellaneous carpentry, and items indicated on Drawings, and the
following:
1. Concealed blocking.
2. Roof construction.
2.4 MISCELLANEOUS LUMBER
A. General: Provide miscellaneous lumber indicated and lumber for support or attachment of other
construction, including the following:
1. Blocking.
2. Nailers.
3. Rooftop equipment bases and support curbs.
4. Cants.
5. Furring.
6. Grounds.
7. Utility shelving.
B. For blocking not used for attachment of other construction Utility, Stud, or No. 3 grade lumber
of any species may be used provided that it is cut and selected to eliminate defects that will
interfere with its attachment and purpose.
C. For blocking and nailers used for attachment of other construction, select and cut lumber to
eliminate knots and other defects that will interfere with attachment of other work.
2.5 FASTENERS
A. General: Provide fasteners of size and type indicated that comply with requirements specified
in this Article for material and manufacture.
1. Where carpentry is exposed to weather, in ground contact, pressure-preservative treated,
or in area of high relative humidity, provide fasteners with hot-dip zinc coating
complying with ASTM A 153/A 153M.
B. Nails, Brads, and Staples: ASTM F 1667.
C. Power-Driven Fasteners: NES NER-272.
D. Wood Screws: ASME B18.6.1.
E. Screws for Fastening to Cold-Formed Metal Framing: ASTM C 954, except with wafer heads
and reamer wings, length as recommended by screw manufacturer for material being fastened.
F. Lag Bolts: ASME B18.2.1.
G. Bolts: Steel bolts complying with ASTM A 307, Grade A; with ASTM A 563 hex nuts and,
where indicated, flat washers.
DACC Main Campus Roof Replacement – Various Buildings
MISCELLANEOUS ROUGH CARPENTRY 061053 - 5
H. Expansion Anchors: Anchor bolt and sleeve assembly of material indicated below with
capability to sustain, without failure, a load equal to 6 times the load imposed when installed in
unit masonry assemblies and equal to 4 times the load imposed when installed in concrete as
determined by testing per ASTM E 488 conducted by a qualified independent testing and
inspecting agency.
1. Material: Carbon-steel components, zinc plated to comply with ASTM B 633,
Class Fe/Zn 5.
2. Material: Stainless steel with bolts and nuts complying with ASTM F 593 and
ASTM F 594, Alloy Group 1 or 2
PART 3 - EXECUTION
3.1 INSTALLATION, GENERAL
A. Set carpentry to required levels and lines, with members plumb, true to line, cut, and fitted. Fit
carpentry to other construction; scribe and cope as needed for accurate fit. Locate , nailers,
blocking, , and similar supports to comply with requirements for attaching other construction.
B. Framing Standard: Comply with AF&PA's "Details for Conventional Wood Frame
Construction," unless otherwise indicated.
C. Metal Framing Anchors: Install metal framing to comply with manufacturer's written
instructions.
D. Do not splice structural members between supports, unless otherwise indicated.
E. Provide blocking and framing as indicated and as required to support facing materials, fixtures,
specialty items, and trim.
1. Provide metal clips for fastening gypsum board or lath at corners and intersections where
framing or blocking does not provide a surface for fastening edges of panels. Space clips
not more than 16 inches o.c.
F. Sort and select lumber so that natural characteristics will not interfere with installation or with
fastening other materials to lumber. Do not use materials with defects that interfere with
function of member or pieces that are too small to use with minimum number of joints or
optimum joint arrangement.
G. Comply with AWPA M4 for applying field treatment to cut surfaces of preservative-treated
lumber.
1. Use inorganic boron for items that are continuously protected from liquid water.
2. Use copper naphthenate for items not continuously protected from liquid water.
H. Securely attach carpentry work to substrate by anchoring and fastening as indicated, complying
with the following:
1. NES NER-272 for power-driven fasteners.
DACC Main Campus Roof Replacement – Various Buildings
MISCELLANEOUS ROUGH CARPENTRY 061053 - 6
2. Table 2304.9.1, "Fastening Schedule," in ICC's International Building Code.
3. Table 23-II-B-1, "Nailing Schedule," and Table 23-II-B-2, "Wood Structural Panel Roof
Sheathing Nailing Schedule," in ICBO's Uniform Building Code.
4. Table 2305.2, "Fastening Schedule," in BOCA's BOCA National Building Code.
5. Table 2306.1, "Fastening Schedule," in SBCCI's Standard Building Code.
6. Table R602.3(1), "Fastener Schedule for Structural Members," and Table R602.3(2),
"Alternate Attachments," in ICC's International Residential Code for One- and Two-
Family Dwellings.
7. Table 602.3(1), "Fastener Schedule for Structural Members," and Table 602.3(2),
"Alternate Attachments," in ICC's International One- and Two-Family Dwelling Code.
I. Use common wire nails, unless otherwise indicated. Select fasteners of size that will not fully
penetrate members where opposite side will be exposed to view or will receive finish materials.
Make tight connections between members. Install fasteners without splitting wood; do not
countersink nail heads, unless otherwise indicated.
3.2 WOOD BLOCKING, AND NAILER INSTALLATION
A. Install where indicated and where required for attaching other work. Form to shapes indicated
and cut as required for true line and level of attached work. Coordinate locations with other
work involved.
B. Attach items to substrates to support applied loading. Recess bolts and nuts flush with surfaces,
unless otherwise indicated.
C. Provide permanent grounds of dressed, pressure-preservative-treated, key-beveled lumber not
less than 1-1/2 inches wide and of thickness required to bring face of ground to exact thickness
of finish material. Remove temporary grounds when no longer required.
3.3 PROTECTION
A. Protect wood that has been treated with inorganic boron (SBX) from weather. If, despite
protection, inorganic boron-treated wood becomes wet, apply EPA-registered borate treatment.
Apply borate solution by spraying to comply with EPA-registered label.
B. Protect rough carpentry from weather. If, despite protection, rough carpentry becomes wet,
apply EPA-registered borate treatment. Apply borate solution by spraying to comply with EPA-
registered label.
END OF SECTION 061053
DACC Main Campus Roof Replacement – Various Buildings
PREPARATION FOR RE-ROOFING 070150 - 1
SECTION 070150
PREPARATION FOR RE-ROOFING
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. This Section includes the following:
1. Roof system and Base Flashing tear-off.
2. Temporary roofing membrane.
3. Roof re-cover preparation.
4. Removal of base flashings.
5. Protection of existing roofing system that is not re-roofed.
B. Related Sections include the following:
1. Division 01 Section "Summary" for restrictions on use of the premises due to Owner or
tenant occupancy.
2. Division 01 Section "Temporary Facilities and Controls" for temporary construction and
environmental-protection measures for reroofing preparation.
3. Division 06 Section “Miscellaneous Rough Carpentry" for wood nailers, cants, curbs, and
blocking.
4. Division 07 Section "Sheet Metal Flashing and Trim" for roof penetration flashings,
flashings, and counterflashings.
C. Unit Prices: Refer to Division 01 Section "Unit Prices" for description of Work in this Section
affected by unit prices.
1.3 MATERIALS OWNERSHIP
A. Except for items or materials indicated to be reused, reinstalled, or otherwise indicated to
remain Owner's property, demolished materials shall become Contractor's property and shall be
removed from Project site.
1.4 DEFINITIONS
A. Roofing Terminology: Refer to ASTM D 1079 and glossary in NRCA's "The NRCA Roofing
and Waterproofing Manual" for definition of terms related to roofing work in this Section.
B. Existing Membrane Roofing System: Single ply roofing membrane, surfacing, and components
and accessories between deck and roofing membrane.
DACC Main Campus Roof Replacement – Various Buildings
PREPARATION FOR RE-ROOFING 070150 - 2
C. Substrate Board: Rigid board or panel products placed over the roof deck that serve as thermal
barriers, provide a smooth substrate, or serve as a component of a fire-resistance-rated roofing
system.
D. Roof Re-Cover Preparation: Existing roofing membrane that is to remain and be prepared for
reuse.
E. Roof Tear-Off: Removal of existing membrane roofing system from deck.
F. Partial Roof Tear-Off: Removal of a portion of existing membrane roofing system from deck or
removal of selected components and accessories from existing membrane roofing system.
G. Remove: Detach items from existing construction and legally dispose of them off-site unless
indicated to be removed and reinstalled.
H. Existing to Remain: Existing items of construction that are not indicated to be removed.
1.5 SUBMITTALS
A. Product Data: For each type of product indicated.
B. Temporary Roofing: Include Product Data and description of temporary roofing system. If
temporary roof will remain in place, submit surface preparation requirements needed to receive
permanent roof, and submit a letter from roofing membrane manufacturer stating acceptance of
the temporary membrane, and that its inclusion will not adversely affect the roofing system's
resistance to fire and wind or its FMG rating.
C. Fastener pull-out test report. Contractor to provide a pull test on the existing light weight
concrete deck. Tests shall be in alignment with ANSI SPRI FX-1. The results of the pull test
will determine if the existing Lightweight concrete deck can provide the pull-out values to meet
FM 1-90.
D. Photographs or Videotape: Show existing conditions of adjoining construction and site
improvements, including exterior and interior finish surfaces, that might be misconstrued as
having been damaged by reroofing operations. Submit before Work begins.
E. Landfill Records: Indicate receipt and acceptance of hazardous wastes, such as asbestos-
containing material, by a landfill facility licensed to accept hazardous wastes.
F. Qualification Data: For Installer approved by warrantor of proposed roofing system.
1.6 QUALITY ASSURANCE
A. Installer Qualifications: Installer of new membrane roofing system.
B. Regulatory Requirements: Comply with governing EPA notification regulations before
beginning membrane roofing removal. Comply with hauling and disposal regulations of
authorities having jurisdiction.
DACC Main Campus Roof Replacement – Various Buildings
PREPARATION FOR RE-ROOFING 070150 - 3
C. Reroofing Conference: Conduct conference at Project site to comply with requirements in
Division 01 Section "Project Management and Coordination." Review methods and procedures
related to roofing system including, but not limited to, the following:
1. Meet with Owner; Architect; Owner's insurer if applicable; testing and inspecting agency
representative; roofing system manufacturer's representative; deck Installer; roofing
Installer including project manager, superintendent, and foreman; and installers whose
work interfaces with or affects reroofing including installers of roof accessories and roof-
mounted equipment.
2. Review methods and procedures related to reroofing preparation, including membrane
roofing system manufacturer's written instructions.
3. Review temporary protection requirements for existing roofing system that is to remain,
during and after installation.
4. Review roof drainage during each stage of reroofing and review roof drain plugging and
plug removal procedures.
5. Review and finalize construction schedule, and verify availability of materials, Installer's
personnel, equipment, and facilities needed to make progress and avoid delays.
6. Review existing deck removal procedures and Owner notifications.
7. Review procedures to determine condition and acceptance of existing deck for reuse.
8. Review structural loading limitations of deck during reroofing.
9. Review base flashings, special roofing details, drainage, penetrations, equipment curbs,
and condition of other construction that will affect reroofing.
10. Review HVAC shutdown and sealing of air intakes.
11. Review shutdown of fire-suppression, -protection, and -alarm and -detection systems.
12. Review procedures for asbestos removal or unexpected discovery of asbestos-containing
materials.
13. Review governing regulations and requirements for insurance and certificates if
applicable.
14. Review existing conditions that may require notification of Architect before proceeding.
1.7 PROJECT CONDITIONS
A. Owner will occupy portions of building immediately below reroofing area. Conduct reroofing
so Owner's operations will not be disrupted. Provide Owner with not less than 72 hours' notice
of activities that may affect Owner's operations.
1. Coordinate work activities daily with Owner so Owner can place protective dust or water
leakage covers over sensitive equipment or furnishings, shut down HVAC and fire-alarm
or -detection equipment if needed, and evacuate occupants from below the work area if
desired.
2. Before working over structurally impaired areas of deck, notify Owner to evacuate
occupants from below the affected area. Verify that occupants below the work area have
been evacuated prior to proceeding with work over the impaired deck area.
B. Protect building to be re-roofed, adjacent buildings, walkways, site improvements, exterior
plantings, and landscaping from damage or soiling from reroofing operations.
C. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities.
D. Owner assumes no responsibility for condition of areas to be reroofed.
DACC Main Campus Roof Replacement – Various Buildings
PREPARATION FOR RE-ROOFING 070150 - 4
1. Conditions existing at time of inspection for bidding will be maintained by Owner as far
as practical.
E. Limit construction loads on roof to rooftop equipment wheel loads.
F. The results of an analysis of test cores from existing membrane roofing system are available for
Contractor's reference.
G. Construction Drawings for existing roofing system are provided for Contractor's reference.
Contractor is responsible for conclusions derived from existing documents.
H. Weather Limitations: Proceed with reroofing preparation only when existing and forecasted
weather conditions permit Work to proceed without water entering into existing roofing system
or building.
I. Hazardous Materials: It is not expected that hazardous materials such as asbestos-containing
materials will be encountered in the Work.
1. Hazardous materials will be removed by Owner before start of the Work. Existing roof
will be left no less watertight than before removal.
2. If materials suspected of containing hazardous materials are encountered, do not disturb;
immediately notify Architect and Owner. Hazardous materials will be removed by
Owner under a separate contract.
PART 2 - PRODUCTS
2.1 TEMPORARY ROOFING MATERIALS
A. Selection of materials and design of temporary roofing is responsibility of Contractor.
B. Sheathing Paper: Red-rosin type, minimum 3 lb/100 sq. ft..
C. Base Sheet: ASTM D 4601, Type II, nonperforated, asphalt-impregnated and -coated, glass-
fiber sheet.
D. Glass-Fiber Felts: ASTM D 2178, Type IV, asphalt-impregnated, glass-fiber felt.
E. Asphalt Primer: ASTM D 41.
F. Roofing Asphalt: ASTM D 312, Type III or IV.
2.2 RECOVER BOARDS
A. Recover Board: ASTM C 208, Type II, Grade 1 or 2, cellulosic-fiber insulation board; 1/2 inch
thick.
B. Recover Board: ASTM C 728, perlite board; 1 inch thick.
DACC Main Campus Roof Replacement – Various Buildings
PREPARATION FOR RE-ROOFING 070150 - 5
C. Fasteners: Factory-coated steel fasteners, No. 12 or 14, and metal or plastic plates listed in
FMG's "Approval Guide," designed for fastening recover boards to appropriate deck material.
2.3 AUXILIARY REROOFING MATERIALS
A. General: Auxiliary reroofing preparation materials recommended by roofing system
manufacturer for intended use and compatible with components of new membrane roofing
system.
B. Base Sheet Fasteners: Capped head, factory-coated steel fasteners, listed in FMG's "Approval
Guide."
C. Metal Flashing Sheet: Metal flashing sheet is specified in Division 07 Section "Sheet Metal
Flashing and Trim."
PART 3 - EXECUTION
3.1 PREPARATION
A. Coordinate with Owner to shut down air intake equipment in the vicinity of the Work. Cover
air intake louvers before proceeding with reroofing work that could affect indoor air quality or
activate smoke detectors in the ductwork.
B. During removal operations, have sufficient and suitable materials on-site to facilitate rapid
installation of temporary protection in the event of unexpected rain.
C. Maintain roof drains in functioning condition to ensure roof drainage at end of each workday.
Prevent debris from entering or blocking roof drains and conductors. Use roof-drain plugs
specifically designed for this purpose. Remove roof-drain plugs at end of each workday, when
no work is taking place, or when rain is forecast.
1. If roof drains will be temporarily blocked or unserviceable due to roofing system removal
or partial installation of new membrane roofing system, provide alternative drainage
method to remove water and eliminate ponding. Do not permit water to enter into or
under existing membrane roofing system components that are to remain.
D. Verify that rooftop utilities and service piping have been shut off before commencing Work.
E. Fastener pull-out test report. Contractor to provide a pull test on the existing light weight
concrete deck. Tests shall be in alignment with ANSI SPRI FX-1. The results of the pull test
will determine if the existing Lightweight concrete deck can provide the pull-out values to meet
FM 1-90.
3.2 ROOF SYSTEM AND BASE FLASHING TEAR-OFF
A. General: Notify Owner each day of extent of roof tear-off proposed.
DACC Main Campus Roof Replacement – Various Buildings
PREPARATION FOR RE-ROOFING 070150 - 6
B. Remove existing roof system down to steel deck. Return ballast to Owner by taking ballast to
Owner’s preferred location.
3.3 TEMPORARY ROOFING MEMBRANE
A. Install approved temporary roofing membrane over area to be reroofed.
B. Install temporary roofing membrane over area to be reroofed.
C. Remove temporary roofing membrane before installing new roofing membrane.
3.4 EXISTING BASE FLASHINGS
A. Remove existing base flashings around parapets, curbs, walls, and penetrations.
1. Clean substrates of contaminants such as asphalt, sheet materials, dirt, and debris.
B. Do not damage metal counterflashings that are to remain. Replace metal counterflashings
damaged during removal with counterflashings of same metal, weight or thickness, and finish.
3.5 DISPOSAL
A. Collect and place demolished materials in containers. Promptly dispose of demolished materials
in a legal manner. Do not allow demolished materials to accumulate on-site.
1. Storage or sale of demolished items or materials on-site will not be permitted.
B. Transport demolished materials off Owner's property and legally dispose of them on a daily
basis.
END OF SECTION
DACC Main Campus Roof Replacement – Various Buildings
ROOF AND DECK INSULATION 072200 - 1
SECTION 072200
ROOF AND DECK INSULATION
PART 1 – GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including the Conditions of the Contract
and Division 01 Specification Sections apply to this section.
1.2 SUMMARY
A. Section includes roof insulation over the properly prepared deck substrate.
B. Related Sections:
1. Section 07 52 00 – Modified Bituminous Membrane Roofing.
2. Section 07 62 00 – SBS Sheet Metal Flashing and Trim.
1.3 REFERENCES
A. American Society for Testing and materials (ASTM)
B. Cast Iron Soil Pipe Institute, Washington, D.C. (CISPI)
C. Factory Mutual Research (FM):
1. Roof Assembly Classifications.
D. National Roofing Contractors Association (NRCA):
1. Roofing and Waterproofing Manual.
E. Underwriters Laboratories, Inc. (UL):
1. Fire Hazard Classifications.
F. Sheet Metal and Air Conditioning Contractors National Association (SMACNA)
G. Steel Deck Institute, St. Louis, Missouri (SDI)
H. Southern Pine Inspection Bureau, Pensacola, Florida (SPIB)
I. Insulation Board, Polyisocyanurate (FS HH-I-1972)
J. Insulation Board, Thermal (Fiberboard) (FS LLL-1-535B)
1.4 SUBMITTALS
A. Product Data: Provide manufacturer’s specification data sheets for each product in accord-
ance with Division 01 Section Submittal Procedures. 01 13 00.
B. Provide a sample of each insulation type.
C. Provide a set of full tapered insulation shop drawings illustrating layout on actual existing
conditions drawing.
DACC Main Campus Roof Replacement – Various Buildings
ROOF AND DECK INSULATION 072200 - 2
1.5 QUALITY ASSURANCE
A. Fire Classification, ASTM E-108.
B. Manufacturer’s Certificate: Certify that roof system furnished is approved by Factory Mutual,
or Underwriters Laboratories in accordance with ASTM E108, Class A for external fire and
meets local or nationally recognized building codes.
C. Manufacturer’s Certificate: Certify that the roof system is adhered properly to meet or exceed
the requirements of FM 1-90.
D. Pre-installation meeting: Refer to Division 07 roofing specifications for pre-installation meet-
ing requirements.
1.6 DELIVERY, STORAGE AND HANDLING
A. Deliver products to site with seals and labels intact, in manufacturer’s original containers, dry
and undamaged.
B. Store all insulation materials in a manner to protect them from the wind, sun and moisture
damage prior to and during installation. Any insulation that has been exposed to any mois-
ture shall be removed from the project site.
C. Keep materials enclosed in a watertight, ventilated enclosure (i.e. tarpaulins).
D. Store materials off the ground. Any warped, broken or wet insulation boards shall be re-
moved from the site.
PART 2 – PRODUCTS
1.1 PRODUCTS, GENERAL
A. Basis of Design: Materials, manufacturer’s product designations, and/or manufacturer’s
names specified herein shall be regarded as the minimum standard of quality required for
work of this Section. Comply with all manufacturer and contractor/fabricator quality and
performance criteria specified in Part 1.
B. Substitutions: Products proposed as equal to the products specified in this Section shall be
submitted in accordance with Bidding Requirements and Division 01 provisions.
1. Proposals shall be accompanied by a copy of the manufacturer’s standard specification
section. That specification section shall be signed and sealed by a professional engi-
neer licensed in the state in which the installation is to take place. Substitution re-
quests containing specifications without licensed engineer certification shall be reject-
ed for non-conformance.
2. Include a list of three (3) projects of similar type and extent, located within a one hundred
mile radius from the location of the project. In addition, the three projects must be at
least five (5) years old and be available for inspection by the Architect, Owner or
Owner’s Representative.
DACC Main Campus Roof Replacement – Various Buildings
ROOF AND DECK INSULATION 072200 - 3
3. Equivalency of performance criteria, warranty terms, submittal procedures, and contrac-
tual terms will constitute the basis of acceptance.
4. The Owner’s decision regarding substitutions will be considered final. Unauthorized
substitutions will be rejected.
1.2 INSULATION MATERIALS
A. Thermal Insulation Properties and Approved Insulation Boards.
1. Rigid Polyisocyanurate Roof Insulation; ASTM C1289:
a. Qualities: Rigid, closed cell polyisocyanurate foam core bonded to heavy duty
glass fiber mat facers.
b. Thickness: Minimum 3.0.
c. R-Value: Minimum 18.0.
d. Compliances: FM listed under Roofing Systems
Federal Specification HH-I-1972, Class 1.
2. Tapered Polyisocyanurate Roof Insulation; ASTM C1289:
a. Qualities: Factory Tapered, closed cell polyisocyanurate foam core bonded to
heavy duty glass fiber mat facers.
b. Thickness: Minimum ¼”
c. Tapered Slope: Doubled the slope of the roof
d. Compliances: FM listed under Roofing Systems Federal Specification HH-I-
1972, Class 1
3. High Density Fiberboard Roof insulation; ASTM C208
a. Qualities: Rigid, composed of interlocking fibers factory blended treated with as-
phalt on all six (6) sides.
b. Board Size: Four feet by four feet (4’ x 4’)
c. Thickness: Minimum 25/32”
d. Compliances: FM listed under Roofing Systems. Federal Specification LLL-I-
535-B.
1.3 RELATED MATERIALS
A. Fasteners: Corrosion resistant screw fastener as recommended by roof membrane manufac-
turer.
1. Factory Mutual Tested and Approved with three (3) inches coated disc for I-90 rating,
length required to penetrate metal deck one inch. To be used to mechanically fasten
the polyisocyanurate through a metal deck.
2. Standard round wire, zinc-coated steel or aluminum; min 12 gauge, smooth, barbed or de-
formed shank, with 1 inch round plastic caps. Length must be sufficient to penetrate
into solid wood at least 3/4 inch. To be used to mechanically fasten a Type II Base
Sheet through a plywood deck.
3. Locking Impact nailed designed to attach a vented base sheet to an existing light weight
concrete deck. Contractor to ensure that the existing light weight concrete deck can
meet the pull out values necessary to meet the local code for wind uplifts.
PART 3 – EXECUTION
3.1 INSPECTION OF SURFACES
A. Roofing contractor shall be responsible for preparing an adequate substrate to receive insula-
tion.
DACC Main Campus Roof Replacement – Various Buildings
ROOF AND DECK INSULATION 072200 - 4
1. Verify that work which penetrates roof deck has been completed.
2. Verify that wood nailers are properly and securely installed.
3. Examine surfaces for defects, rough spots, ridges, depressions, foreign material, moisture,
and unevenness.
4. Do not proceed until defects are corrected.
5. Do not apply insulation until substrate is sufficiently dry.
6. Broom clean substrate immediately prior to application.
7. Use additional insulation to fill depressions and low spots that would otherwise cause
ponding water.
8. Verify that temporary roof has been completed.
3.2 INSTALLATION
A. Attachment with Mechanical Fasteners
1. Approved insulation board shall be fully attached to the deck with an approved mechani-
cal fastening system. As a minimum, the amount of fasteners shall be in accordance
with manufacturer’s recommendation for FM I-90 system. Otherwise, a minimum of
one fastener per two square feet shall be installed.
2. Filler pieces of insulation require at least two fasteners per piece if size of insulation is
less than four square feet.
3. Spacing pattern of fasteners shall be as per manufacturer’s recommendations to meet the
FM requirements. Placement of any fastener from edge of insulation board shall be a
minimum of three inches, and a maximum of six (6) inches.
4. Minimum penetration into deck shall be as recommended by the fastener manufacturer.
There is a one (1) inch minimum for metal decks.
5. Fully adhere subsequent layers of rigid and tapered rigid insulation in areas of roof ex-
ceeding available fastener depth. Coordinate adhesive with roof system manufactur-
er’s recommendation/ requirement for this adhesive.
3.3 CLEANING
A. Remove debris and cartons from roof deck. Leave insulation clean and dry, ready to receive
roofing membrane.
3.4 CONSTRUCTION WASTE MANAGEMENT
A. Remove and properly dispose of waste products generated during installation. Comply with
requirements of authorities having jurisdiction.
END OF SECTION
DACC Main Campus Roof Replacement – Various Buildings
ROOF AND DECK INSULATION 072200 - 5
DACC Main Campus Roof Replacement – Various Buildings
POLYMER BASED EXTERIOR INSULATION AND FINISH SYSTEM (EIFS) 072419 - 1
SECTION 072419
POLYMER BASED EXTERIOR INSULATION FINISH SYSTEM (EIFS)
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and Division 1 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes water-drainage exterior insulation and finish system (EIFS) applied over
water-resistive coating over glass mat faced gypsum sheathing.
B. Related Sections:
1. Not Used
1.3 SYSTEM DESCRIPTION
A. Class PB EIFS: A non-load-bearing, exterior wall cladding system that consists of an insulation
board attached adhesively, mechanically, or both to the substrate; an integrally reinforced base
coat; and a textured protective finish coat.
B. Water-Drainage EIFS: EIFS with a means that allows water entering into an EIFS assembly to
drain to the exterior.
1.4 PERFORMANCE REQUIREMENTS
A. EIFS Performance: Comply with the following:
1. Bond Integrity: Free from bond failure within EIFS components or between system and
supporting wall construction, resulting from exposure to fire, wind loads, weather, or
other in-service conditions.
2. Weathertightness: Resistant to water penetration from exterior into water-drainage EIFS
and assemblies behind it or through them into interior of building that results in
deterioration of thermal-insulating effectiveness or other degradation of EIFS and
assemblies behind it, including substrates, supporting wall construction, and interior
finish, and including a means that allows water entering into an EIFS assembly to drain to
the exterior.
B. Class PB EIFS: Provide EIFS having physical properties and structural performance that
comply with the following:
DACC Main Campus Roof Replacement – Various Buildings
POLYMER BASED EXTERIOR INSULATION AND FINISH SYSTEM (EIFS) 072419 - 2
1. Abrasion Resistance: Sample consisting of 1-inch thick EIFS mounted on 1/2-inch thick
gypsum board; cured for a minimum of 28 days; and showing no cracking, checking, or
loss of film integrity after exposure to 528 quarts of sand when tested per ASTM D 968,
Method A.
2. Absorption-Freeze Resistance: No visible deleterious effects and negligible weight loss
after 60 cycles per EIMA 101.01.
3. Accelerated Weathering: Five samples per ICC-ES AC235 showing no cracking,
checking, crazing, erosion, rusting, blistering, peeling, delamination, or other
characteristics that might affect performance as a wall cladding after testing for 2000
hours when viewed under 5 times magnification per ASTM G 153 or ASTM G 15.
4. Freeze-Thaw: No surface changes, cracking, checking, crazing, erosion, rusting,
blistering, peeling, or delamination, or indications of delamination between components
when viewed under 5 times magnification after 60 cycles per EIMA 101.01.
5. Mildew Resistance of Finish Coat: Sample applied to 2-by-2-inch clean glass substrate,
cured for 28 days, and showing no growth when tested per ASTM D 3273 and evaluated
according to ASTM D 3274.
6. Salt-Spray Resistance: No deleterious affects when tested according to ICC-ES AC235.
7. Tensile Adhesion: No failure in the EIFS, adhesive, base coat, or finish coat when tested
per EIMA 101.03.
8. Water Penetration: Sample consisting of 1-inch thick EIFS mounted on 1/2-inch- thick
gypsum board, cured for 28 days, and showing no water penetration into the plane of the
base coat to expanded polystyrene board interface of the test specimen after 15 minutes at
6.24 lbf/sq. ft. of air pressure difference or 20 percent of positive design wind pressure,
whichever is greater, across the specimen during a test period when tested per
EIMA 101.02.
9. Water Resistance: Three samples, each consisting of 1-inch thick EIFS mounted on 1/2-
inch- thick gypsum board; cured for 28 days; and showing no cracking, checking,
crazing, erosion, rusting, blistering, peeling, or delamination after testing for 14 days per
ASTM D 2247.
10. Impact Resistance: Sample consisting of 1-inch thick EIFS when constructed,
conditioned, and tested per EIMA 101.86; and meeting or exceeding the following:
a. Standard Impact Resistance: 25 to 49 inch-lb.
b. High Impact Resistance: 90 to 150 inch-lb .
11. Drainage: According to ICC-ES AC24.
12. Structural Performance Testing: EIFS assembly and components shall comply with ICC-
ES AC235 when tested per ASTM E 330.
1.5 SUBMITTALS
A. Product Data: For each type and component of EIFS indicated.
B. Shop Drawings: For EIFS. Include plans, elevations, sections, details of components, details of
penetration and termination, flashing details, joint locations and configurations, fastening and
anchorage details including mechanical fasteners, and connections and attachments to other
work.
C. Samples for Initial Selection: For each type of finish-coat color and texture indicated.
DACC Main Campus Roof Replacement – Various Buildings
POLYMER BASED EXTERIOR INSULATION AND FINISH SYSTEM (EIFS) 072419 - 3
1. Include similar Samples of joint sealants and exposed accessories involving color
selection.
D. Samples for Verification: 24-inch square panels for each type of finish-coat color and texture
indicated, prepared using same tools and techniques intended for actual work including custom
trim, each profile, an aesthetic reveal, a typical control joint filled with sealant of color selected.
1. Include sealants and exposed accessory Samples to verify color selected.
E. Qualification Data: For Installer and testing agency.
F. Manufacturer Certificates: Signed by manufacturers certifying that EIFS and joint sealants
comply with requirements.
G. Material or Product Certificates: For cementitious materials and aggregates and for each
insulation and joint sealant, from manufacturer.
H. Product Test Reports: Based on evaluation of comprehensive tests performed by a qualified
testing agency, for each water-/weather-resistive barrier, insulation, reinforcing mesh, joint
sealant, and coating.
I. Compatibility and Adhesion Test Reports: For joint sealants from sealant manufacturer
indicating the following:
1. Materials forming joint substrates and joint-sealant backings have been tested for
compatibility and adhesion with joint sealants.
2. Interpretation of test results and written recommendations for primers and substrate
preparation needed for adhesion.
J. Field quality-control reports.
K. Evaluation Reports: For exterior cement-board sheathing fasteners water-resistive coating
adhesive membrane flashing and EIFS (including insulation), from International Code Council.
L. Maintenance Data: For EIFS to include in maintenance manuals.
1.6 QUALITY ASSURANCE
A. Installer Qualifications: An installer who is certified in writing by EIFS manufacturer as
qualified to install manufacturer's system using trained workers.
B. Source Limitations: Obtain EIFS from single source from single EIFS manufacturer and from
sources approved by EIFS manufacturer as compatible with system components.
C. Fire-Test-Response Characteristics: Provide EIFS and system components with the following
fire-test-response characteristics as determined by testing identical EIFS and system
components per test method indicated below by UL or another testing and inspecting agency
acceptable to authorities having jurisdiction. Identify products with appropriate markings of
applicable testing agency.
DACC Main Campus Roof Replacement – Various Buildings
POLYMER BASED EXTERIOR INSULATION AND FINISH SYSTEM (EIFS) 072419 - 4
1. Fire-Resistance Characteristics: Provide materials and construction tested for fire
resistance per ASTM E 119.
2. Radiant Heat Exposure: No ignition of EIFS when tested according to NFPA 268.
3. Potential Heat: Acceptable level when tested according to NFPA 259.
4. Surface-Burning Characteristics: Provide insulation board, adhesives, base coats, and
finish coats with flame-spread index of 25 or less and smoke-developed index of 450 or
less, per ASTM E 84.
D. Mockups: Build mockups to verify selections made under sample submittals and to
demonstrate aesthetic effects and set quality standards for materials and execution and set
quality standards for fabrication and installation.
1. Approved mockups may become part of the completed Work if undisturbed at time of
Substantial Completion.
1.7 DELIVERY, STORAGE, AND HANDLING
A. Deliver materials in original, unopened packages with manufacturers' labels intact and clearly
identifying products.
B. Store materials inside and under cover; keep them dry and protected from weather, direct
sunlight, surface contamination, aging, corrosion, damaging temperatures, construction traffic,
and other causes.
1. Stack insulation board flat and off the ground.
2. Protect plastic insulation against ignition at all times. Do not deliver plastic insulating
materials to Project site before installation time.
3. Complete installation and concealment of plastic materials as rapidly as possible in each
area of construction.
1.8 PROJECT CONDITIONS
A. Weather Limitations: Maintain ambient temperatures above 40 deg F for a minimum of 24
hours before, during, and after adhesives or coatings are applied. Do not apply EIFS adhesives
or coatings during rainfall. Proceed with installation only when existing and forecasted weather
conditions and ambient outdoor air, humidity, and substrate temperatures permit EIFS to be
applied, dried, and cured according to manufacturers' written instructions and warranty
requirements.
1.9 COORDINATION
A. Coordinate installation of EIFS with related Work specified in other Sections to ensure that wall
assemblies, including sheathing, weather-resistant sheathing paper, flashing, trim, joint sealants,
windows, and doors, are protected against damage from the effects of weather, age, corrosion,
moisture, and other causes. Do not allow water to penetrate behind flashing and drainage plane
that is behind water-drainage EIFS.
DACC Main Campus Roof Replacement – Various Buildings
POLYMER BASED EXTERIOR INSULATION AND FINISH SYSTEM (EIFS) 072419 - 5
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Basis of Design:
1. Sto Corp., StoTherm® Classic NExT (with StoGuard Moisture Protection System)
2. Dryvit.
2.2 MATERIALS
A. Compatibility: Provide water-resistive coating, adhesive, fasteners, board insulation,
reinforcing meshes, base- and finish-coat systems, sealants, and accessories that are compatible
with one another and with substrates and approved for use by EIFS manufacturer for Project.
B. Exterior Glass Mat gypsum sheathing: Not less than 5/8-inch thick, glass mat gypsum
sheathing complying with ASTM C 1177, for exterior applications.
1. Fasteners: Wafer-head or flat-head steel drill screws complying with ASTM C 954, with
an organic-polymer coating or other corrosion-protective coating having a salt-spray
resistance of more than 500 hours per ASTM B 117.
a. Size and Length: As recommended by sheathing manufacturer for type and
thickness of sheathing board to be attached.
C. Water-Resistive Coatings: EIFS manufacturer's standard formulation and accessories for use as
water/weather-resistive barriers, compatible with substrate, and complying with physical and
performance criteria of ICC-ES AC209.
1. Sheathing Joint Tape: Type recommended by EIFS manufacturer for sealing joints
between and penetrations through sheathing.
D. Primer/Sealer: EIFS manufacturer's standard substrate conditioner designed to seal substrates
from moisture penetration and to improve the bond between substrate of type indicated and
adhesive used for application of insulation.
E. Flexible-Membrane Flashing: Cold-applied, fully self-adhering, self-healing, rubberized-
asphalt and polyethylene-film composite sheet or tape and primer; EIFS manufacturer's standard
or product recommended in writing by EIFS manufacturer.
F. Insulation Adhesive: EIFS manufacturer's standard formulation designed for indicated use,
compatible with substrate, and complying with one of the following:
1. Factory-mixed noncementitious formulation designed for adhesive attachment of
insulation to substrates of type indicated, as recommended by EIFS manufacturer.
G. Molded, Rigid Cellular Polystyrene Board Insulation: Comply with ASTM C 578, Type I;
EIFS manufacturer's requirements; and EIMA's "EIMA Guideline Specification for Expanded
Polystyrene (EPS) Insulation Board" for most stringent requirements for material performance
and qualities of insulation, including dimensions and permissible variations, and the following:
DACC Main Campus Roof Replacement – Various Buildings
POLYMER BASED EXTERIOR INSULATION AND FINISH SYSTEM (EIFS) 072419 - 6
1. Aging: Before cutting and shipping, age insulation in block form by air drying for not
less than six weeks or by another method approved by EIMA that produces equivalent
results.
2. Flame-Spread and Smoke-Developed Indexes: 25 and 450 or less, respectively, per
ASTM E 84.
3. Dimensions: Provide insulation boards not more than 24 by 48 inches and in thickness
indicated but not more than 4 inches thick or less than thickness allowed by
ASTM C 1397.
4. Channeled Board Insulation: EIFS manufacturer's standard factory-fabricated profile
with linear, vertical drainage channels, slots, or waves on the back side of board.
5. Board Insulation Closure Blocks: EIFS manufacturer's standard density, size, and
configuration.
H. Reinforcing Mesh: Balanced, alkali-resistant, open-weave, glass-fiber mesh treated for
compatibility with other EIFS materials, made from continuous multiend strands with retained
mesh tensile strength of not less than 120 lbf/in. per ASTM E 2098; complying with
ASTM D 578 and the following:
1. Standard-Impact Reinforcing Mesh: Not less than 4.0 oz./sq. yd.
2. High-Impact Reinforcing Mesh: Not less than 15 oz./sq. yd.
3. Strip Reinforcing Mesh: Not less than 3.75 oz./sq. yd.
4. Detail Reinforcing Mesh: Not less than 4.0 oz./sq. yd.
5. Corner Reinforcing Mesh: Not less than 7.2 oz./sq. yd.
I. Base-Coat Materials: EIFS manufacturer's standard mixture complying with one of the
following requirements:
1. Factory-blended dry formulation of portland cement, dry polymer admixture, and inert
fillers to which only water is added at Project site.
J. Waterproof Adhesive/Base-Coat Materials: EIFS manufacturer's standard waterproof
formulation complying with one of the following:
1. Job-combined formulation of manufacturer's standard polymer-emulsion adhesive and
manufacturer's standard dry mix containing portland cement.
K. Primer: EIFS manufacturer's standard factory-mixed, elastomeric-polymer primer for preparing
base-coat surface for application of finish coat.
L. Finish-Coat Materials: EIFS manufacturer's standard acrylic-based coating complying with the
following:
1. Factory-mixed formulation of polymer-emulsion binder, colorfast mineral pigments,
sound stone particles, and fillers.
2. Sealer: Manufacturer's waterproof, clear acrylic-based sealer for protecting finish coat.
3. Colors: As selected by Architect from manufacturer's full range.
M. Water: Potable.
N. Mechanical Fasteners: EIFS manufacturer's standard corrosion-resistant fasteners consisting of
thermal cap, standard washer and shaft attachments, and fastener indicated below; selected for
properties of pullout, tensile, and shear strength required to resist design loads of application
DACC Main Campus Roof Replacement – Various Buildings
POLYMER BASED EXTERIOR INSULATION AND FINISH SYSTEM (EIFS) 072419 - 7
indicated; capable of pulling fastener head below surface of insulation board; and of the
following description:
1. For attachment to steel studs from 0.033 to 0.112 inch in thickness, provide steel drill
screws complying with ASTM C 954.
2. For attachment to light-gage steel framing members not less than 0.0179 inch in
thickness, provide steel drill screws complying with ASTM C 1002.
3. For attachment to masonry and concrete substrates, provide sheathing dowel in form of a
plastic wing-tipped fastener with thermal cap, sized to fit insulation thickness indicated
and to penetrate substrate to depth required to secure anchorage.
4. For attachment, provide manufacturer's standard fasteners suitable for substrate.
O. Trim Accessories: Type as designated or required to suit conditions indicated and to comply
with EIFS manufacturer's written instructions; manufactured from UV-stabilized PVC; and
complying with ASTM D 1784, manufacturer's standard Cell Class for use intended, and
ASTM C 1063.
1. Casing Bead: Prefabricated, one-piece type for attachment behind insulation, of depth
required to suit thickness of coating and insulation, with face leg perforated for bonding
to coating and back leg.
2. Drip Screed/Track: Prefabricated, one-piece type for attachment behind insulation with
face leg extended to form a drip, of depth required to suit thickness of coating and
insulation, with face leg perforated for bonding to coating and back leg.
3. Weep Screed/Track: Prefabricated, one-piece type for attachment behind insulation with
perforated face leg extended to form a drip and weep holes in track bottom, of depth
required to suit thickness of coating and insulation, with face leg perforated for bonding
to coating and back leg; designed to drain incidental moisture that gets into wall
construction to the exterior at terminations of EIFS with drainage.
4. Expansion Joint: Prefabricated, one-piece V profile; designed to relieve stress of
movement.
5. Window Sill Flashing: Prefabricated type for both flashing and sloping sill over framing
beneath windows; with end and back dams; designed to direct water to exterior.
6. Parapet Cap Flashing: Type for both flashing and covering parapet top with design
complying with ASTM C 1397.
2.3 ELASTOMERIC SEALANTS
A. Elastomeric Sealant Products: Provide EIFS manufacturer's listed and recommended
chemically curing, elastomeric sealant that is compatible with joint fillers, joint substrates, and
other related materials, and complies with requirements for products and testing indicated in
ASTM C 1481 and with requirements in Division 07 Section "Joint Sealants" for products
corresponding to description indicated below:
1. Single-component, nonsag, neutral-curing silicone sealant.
2. Dow Corning 790.
3. Sealant with a VOC content of 250 g/L or less when calculated according to 40 CFR 59,
Subpart D (EPA Method 24).
B. Sealant Color: As selected by Architect from manufacturer's full range.
DACC Main Campus Roof Replacement – Various Buildings
POLYMER BASED EXTERIOR INSULATION AND FINISH SYSTEM (EIFS) 072419 - 8
2.4 MIXING
A. General: Comply with EIFS manufacturer's requirements for combining and mixing materials.
Do not introduce admixtures, water, or other materials except as recommended by EIFS
manufacturer. Mix materials in clean containers. Use materials within time period specified by
EIFS manufacturer or discard.
2.5 FOAM MOLDINGS AND ACCENT BANDS
A. NOT USED
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates, areas, and conditions, with Installer present, for compliance with
requirements for installation tolerances and other conditions affecting performance of EIFS.
B. Examine roof edges, wall framing, flashings, openings, substrates, and junctures at other
construction for suitable conditions where EIFS will be installed.
C. Proceed with installation only after unsatisfactory conditions have been corrected.
1. Begin coating application only after surfaces are dry.
2. Application of coating indicates acceptance of surfaces and conditions.
3.2 PREPARATION
A. Protect contiguous work from moisture deterioration and soiling caused by application of EIFS.
Provide temporary covering and other protection needed to prevent spattering of exterior finish
coats on other work.
B. Protect EIFS, substrates, and wall construction behind them from inclement weather during
installation. Prevent penetration of moisture behind drainage plane of EIFS and deterioration of
substrates.
C. Prepare and clean substrates to comply with EIFS manufacturer's written instructions to obtain
optimum bond between substrate and adhesive for insulation.
3.3 EXTERIOR GLASS MAT FACED GYPSUM SHEATHING INSTALLATION
A. Exterior Glass Mat Faced Sheathing: Install on metal framing to comply with manufacturer's
written instructions and evaluation report acceptable to authorities having jurisdiction.
DACC Main Campus Roof Replacement – Various Buildings
POLYMER BASED EXTERIOR INSULATION AND FINISH SYSTEM (EIFS) 072419 - 9
3.4 EIFS INSTALLATION, GENERAL
A. Comply with EIFS manufacturer's written instructions for installation of EIFS as applicable to
each type of substrate indicated.
3.5 SUBSTRATE PROTECTION APPLICATION
A. Primer/Sealer: Apply over gypsum sheathing substrates to protect substrates from degradation
and where required by EIFS manufacturer for improving adhesion of insulation to substrate.
B. Water-Resistive Coatings: Apply over substrates to protect substrates from degradation and to
provide water-/weather-resistive barrier.
1. Tape and seal joints, exposed edges, terminations, and inside and outside corners of
sheathing unless otherwise indicated by EIFS manufacturer's written instructions.
C. Flexible-Membrane Flashing: Install over weather-resistive barrier, applied and lapped to shed
water; seal at openings, penetrations, terminations, and where indicated by EIFS manufacturer's
written instructions to protect wall assembly from degradation. Prime substrates, if required,
and install flashing to comply with EIFS manufacturer's written instructions and details.
3.6 INSULATION INSTALLATION
A. Board Insulation: Adhesively attach insulation to substrate in compliance with ASTM C 1397,
EIFS manufacturer's written instructions, and the following:
1. Apply adhesive to ridges on back of insulation by notched-trowel method in a manner
that results in full adhesive contact over the entire surface of ridges, leaving channels free
of adhesive once insulation is adhered to substrate.
2. Press and slide insulation into place. Apply pressure over the entire surface of insulation
to accomplish uniform contact, high initial grab, and overall level surface.
3. Allow adhered insulation to remain undisturbed for period recommended by EIFS
manufacturer, but not less than 24 hours, before beginning rasping and sanding
insulation, or applying base coat and reinforcing mesh.
4. Begin first course of insulation from a level base line and work upward.
5. Stagger vertical joints of insulation boards in successive courses to produce running bond
pattern. Locate joints so no piece of insulation is less than 12 inches wide or 6 inches
high. Offset joints not less than 6 inches from corners of window and door openings and
not less than 4 inches from aesthetic reveals.
a. Adhesive Attachment: Offset joints of insulation not less than 6 inches from
horizontal and 4 inches from vertical joints in sheathing.
6. Interlock ends at internal and external corners.
7. Abut insulation tightly at joints within and between each course to produce flush,
continuously even surfaces without gaps or raised edges between boards. If gaps greater
than 1/16 inch occur, fill with insulation cut to fit gaps exactly; insert insulation without
using adhesive or other material.
8. Cut insulation to fit openings, corners, and projections precisely and to produce edges
and shapes complying with details indicated.
DACC Main Campus Roof Replacement – Various Buildings
POLYMER BASED EXTERIOR INSULATION AND FINISH SYSTEM (EIFS) 072419 - 10
9. Rasp or sand flush entire surface of insulation to remove irregularities projecting more
than 1/32 inch 1/16 inch from surface of insulation and to remove yellowed areas due to
sun exposure; do not create depressions deeper than 1/16 inch
10. Cut aesthetic reveals in outside face of insulation with high-speed router and bit
configured to produce grooves, rabbets, and other features that comply with profiles and
locations indicated. Do not reduce insulation thickness at aesthetic reveals to less than
3/4 inch
11. Interrupt insulation for expansion joints where indicated.
12. Install insulation closure blocks using ribbon-and-dab method to create air zones where
indicated.
13. Form joints for sealant application with back-to-back casing beads for joints within EIFS
and with perimeter casing beads at dissimilar adjoining surfaces. Make gaps between
casing beads and between perimeter casing beads and adjoining surfaces of width
indicated.
14. After installing insulation and before applying field-applied reinforcing mesh, fully wrap
board edges. Cover edges of board and extend encapsulating mesh not less than 2-1/2
inches over front and back face unless otherwise indicated on Drawings.
15. Treat exposed edges of insulation as follows:
a. Except for edges forming substrates of sealant joints, encapsulate with base coat,
reinforcing mesh, and finish coat.
b. Encapsulate edges forming substrates of sealant joints within EIFS or between
EIFS and other work with base coat and reinforcing mesh.
c. At edges trimmed by accessories, extend base coat, reinforcing mesh, and finish
coat over face leg of accessories.
16. Coordinate installation of flashing and insulation to produce wall assembly that does not
allow water to penetrate behind flashing and water-/weather-resistive barrier.
B. Expansion Joints: Install at locations indicated, where required by EIFS manufacturer, and as
follows:
1. At expansion joints in substrates behind EIFS.
2. Where EIFS adjoin dissimilar substrates, materials, and construction, including other
EIFS.
3. At floor lines in multilevel wood-framed construction.
4. Where wall height or building shape changes.
5. Where EIFS manufacturer requires joints in long continuous elevations.
3.7 BASE-COAT INSTALLATION
A. Base Coat: Apply to exposed surfaces of insulation in minimum thickness recommended in
writing by EIFS manufacturer, but not less than 1/16-inch dry-coat thickness.
B. Reinforcing Mesh: Embed type indicated below in wet base coat to produce wrinkle-free
installation with mesh continuous at corners and overlapped not less than 2-1/2 inches or
otherwise treated at joints to comply with ASTM C 1397 and EIFS manufacturer's written
instructions. Do not lap reinforcing mesh within 8 inches of corners. Completely embed mesh,
applying additional base-coat material if necessary, so reinforcing-mesh color and pattern are
not visible.
DACC Main Campus Roof Replacement – Various Buildings
POLYMER BASED EXTERIOR INSULATION AND FINISH SYSTEM (EIFS) 072419 - 11
1. Standard-impact reinforcing mesh location as depicted in drawings.
2. High-impact reinforcing mesh location as depicted in drawings.
C. Additional Reinforcing Mesh: Apply strip reinforcing mesh around openings extending 4
inches beyond perimeter. Apply additional 9-by-12-inch strip reinforcing mesh diagonally at
corners of openings (re-entrant corners). Apply 8-inch wide strip reinforcing mesh at both
inside and outside corners unless base layer of mesh is lapped not less than 4 inches on each
side of corners.
1. At aesthetic reveals, apply strip reinforcing mesh not less than 8 inches wide.
2. Embed strip reinforcing mesh in base coat before applying first layer of reinforcing mesh.
3.8 FINISH-COAT INSTALLATION
A. Primer: Apply over dry base coat according to EIFS manufacturer's written instructions.
B. Finish Coat: Apply over dry primed base coat, maintaining a wet edge at all times for uniform
appearance, in thickness required by EIFS manufacturer to produce a uniform finish of color
and texture matching approved sample and free of cold joints, shadow lines, and texture
variations.
1. Texture: As selected by Architect from manufacturer's full range.
2. Embed aggregate in finish coat according to EIFS manufacturer's written instructions to
produce a uniform applied-aggregate finish of color and texture matching approved
sample.
C. Sealer Coat: Apply over dry finish coat, in number of coats and thickness required by EIFS
manufacturer.
3.9 INSTALLATION OF JOINT SEALANTS
A. Prepare joints and apply sealants, of type and at locations indicated, to comply with applicable
requirements in Division 07 Section "Joint Sealants" and in ASTM C 1481.
1. Apply joint sealants after base coat has cured but before applying finish coat.
2. Clean surfaces to receive sealants to comply with indicated requirements and EIFS
manufacturer's written instructions.
3. Apply primer recommended in writing by sealant manufacturer for surfaces to be sealed.
4. Install sealant backing to control depth and configuration of sealant joint and to prevent
sealant from adhering to back of joint.
5. Apply masking tape to protect areas adjacent to sealant joints. Remove tape immediately
after tooling joints, without disturbing joint seal.
6. Recess sealant sufficiently from surface of EIFS so an additional sealant application,
including cylindrical sealant backing, can be installed without protruding beyond EIFS
surface.
DACC Main Campus Roof Replacement – Various Buildings
POLYMER BASED EXTERIOR INSULATION AND FINISH SYSTEM (EIFS) 072419 - 12
3.10 CLEANING AND PROTECTION
A. Remove temporary covering and protection of other work. Promptly remove coating materials
from window and door frames and other surfaces outside areas indicated to receive EIFS
coatings.
END OF SECTION 072419
DACC Main Campus Roof Replacement – Various Buildings
THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 075423 - 1
SECTION 075423
FULLY ADHERED THERMOPLASTIC POLYOLEFIN (TPO) ROOFING
PART 1 - GENERAL
1.1 GENERAL NOTES
A. Preceding job start up, contractor shall decide to his satisfaction that all specifications contained
herein are workable and achievable. Any questions shall be submitted during bid period.
B. Contractor will perform all work by competent, trained, and properly equipped personnel in
strict accordance with good roofing practices, applicable industry standards and roofing
manufacturer's recommendations.
C. Contractor will observe all published safety prevention policies and practices relating to
application of roofing system and related work. All federal, state, and local codes shall be
followed.
D. Contractor will follow application, safety, etc. information as published in the most current
edition of the Firestone ULTRAPLY TPO Roofing System Technical Specification.
E. Contractor will dispose of all materials properly. Any material removal shall comply with state
and local codes and requirements and shall be disposed of in a legal manner.
1.2 SUMMARY
Section Includes:
A. The removal of the existing roof system down to the deck. All asbestos removal shall comply
with state and local codes and requirements and shall be disposed of in a legal manner. Prepare
deck/ substrate for new roof system.
B. The installation of a new Adhered ULTRAPLY TPO roofing system with a 20 year NDL. In
addition, contractor shall include all related items of work as noted herein or indicated on the
drawings or otherwise required to complete the specified elements of work and provide the
necessary warranties for this work.
C. Roof insulation.
D. Wood Nailer Installation.
E. Field Membrane and Flashing Membrane Installation.
1.3 RELATED SECTIONS
A. Selective Demolition
B. Rough Carpentry
C. Roof Insulation
D. Sheet Metal Flashing and Trim
E. Roofing Specialties and Accessories.
F. Skylights
G. Joint Sealers
DACC Main Campus Roof Replacement – Various Buildings
THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 075423 - 2
1.4 DEFINITIONS
A. Roofing Terminology: Definitions in ASTM D 1079 and glossary in NRCA's "The NRCA
Roofing and Waterproofing Manual" apply to work of this Section.
1.5 PREINSTALLATION MEETINGS
A. Before start of roofing work, convene and manage a conference to discuss the proper installation
of materials. Attendees shall include all parties directly affecting work of this Section.
1.6 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Shop Drawings: For roofing system. Include plans, elevations, sections, details, tapered insulation
system and attachments to other work. Provide a set of full tapered insulation shop drawings
illustrating layout on actual existing conditions drawing as to make the submittal project specific.
C. Samples for Verification: For the following products:
1. Sheet roofing, of color required.
2. Roof paver, full sized, in each color and texture required.
3. Dens Deck, 5/8” sample.
1.7 INFORMATIONAL SUBMITTALS
A. Research/Evaluation Reports: For components of roofing system, from ICC-ES.
B. Sample Warranties: For manufacturer's special warranties.
1.8 CLOSEOUT SUBMITTALS
A. Maintenance Data: For roofing system to include in maintenance manuals.
1.9 QUALITY ASSURANCE/ OBSERVATION
A. Installer Qualifications: A qualified firm that is approved, authorized, or licensed by roofing
system manufacturer to install manufacturer's product and that is eligible to receive manufacturer's
special warranty.
1. Experience: Minimum 10 documented installations of fully adhered and/or mechanically
attached scrim reinforced TPO roofs.
DACC Main Campus Roof Replacement – Various Buildings
THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 075423 - 3
2. Maintain crew of workmen skilled and experienced in TPO roof installations with documented
training credentials from the manufacturer.
3. Staffing: Properly staff the project at all times with sufficient workmen to execute the project.
Additionally, provide a project superintendent on-site full-time for the duration of the contract.
B. Inspection by Manufacturer for each building: Provide a pre-installation, after demolition, two
during installation and one final inspection of the roofing system by a Technical
Representative employed by roofing system manufacturer.
C. Contractor to employ a third party testing agency to conduct a fastener field pull test on each roof
area’s roof deck utilizing the anticipated project fastener. Results to be reviewed and approved by
the roof system manufacturer for compliance with their warranty requirements. A written test
report shall be submitted for information purposes.
1.10 WARRANTY
A. Provide 20 year Firestone Red Shield Roofing System NDL Warranty (Red Shield NDL
Warranty). Warranty shall include membrane, roof insulation, (and membrane accessories or
membrane accessories, and metal edging and coping.)
1. Red Shield Warranty:
a. Limit of liability: No Dollar Limitation
b. Scope of coverage:
Repair any leak in the Firestone TPO Roofing System caused by the ordinary wear and
tear of the elements, manufacturing defect in Firestone brand materials, and the work-
manship used to install these materials.
2. Insulation Warranty:
a. Limit of liability: No Dollar Limitation
b. Scope of coverage:
Provide replacement ISO 95+ insulation which warps, bows, or destabilizes to the point
of causing a roof leak as a result of any manufacturing defect.
B. Provide a separate Firestone ISO 95+ Insulation Warranty (Insulation Warranty). Warranty term
shall coincide with Red Shield NDL Warranty.
C. Installers Warranty: Roof system installer shall guarantee the entire roofing system inclusive of
metal accessories for a period of two (2) years from date of substantial completion.
1.11 SYSTEM DESCRIPTION
DACC Main Campus Roof Replacement – Various Buildings
THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 075423 - 4
A. Reinforced THERMOPLASTIC OLEFIN sheet roofing, that is adhered to its substrate with
UltraPly TPO bonding adhesive.
1.12 QUALIFICATIONS
A. Manufacturer:
1. Company providing a no dollar limit, single source roof system warranty covering all mem-
branes, flashings, metal roofing accessories and metal parapet caps that is backed by corpo-
rate assests in excess of one billion dollars.
2. System supplier must have ISO 9002 certification
3. Manufacturer must be able to provide the project with the membrane and Isocyanurate insula-
tion that is produced in their facilities.
B. Applicator:
1. Shall be a Firestone Red Shield Licensed Contractor.
2. Shall have a fully staffed office within 175 miles of the job site.
3. Shall have at least five years experience in installing heat welded system.
1.13 REGULATORY REQUIREMENTS
A. Conform to applicable local building code requirements.
B. Underwriters Laboratories, Inc. (UL): Class A Fire Hazard Classification.
C. Factory Mutual Corporation (FM): Roof Assembly Classification, FM Construction Bulletin 1-
28, meeting minimum requirements of FM 1-90
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Manufacturers: Subject to compliance with requirements, may be incorporated into the Work
include, but are not limited to, the following (other manufacturers may be considered as prior
approvals during the bid period):
1. Firestone Building Products (basis of design product).
2. GAF Materials Corporation.
3. Johns Mansville Roofing Systems.
2.2 PERFORMANCE REQUIREMENTS
A. Accelerated Weathering: Roofing system shall withstand 2000 hours of exposure when tested
according to ASTM G 152, ASTM G 154, or ASTM G 155.
B. Impact Resistance: Roofing system shall resist impact damage when tested according to
ASTM D 3746 and ASTM D 4272.
C. Roofing System Design: Tested by a qualified testing agency to resist the following uplift
pressures as calculated per FM 1-90.
DACC Main Campus Roof Replacement – Various Buildings
THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 075423 - 5
D. Exterior Fire-Test Exposure: ASTM E 108 Class A; for application and roof slopes indicated;
testing by a qualified testing agency. Identify products with appropriate markings of applicable
testing agency.
E. Fire-Resistance Ratings: Comply with fire-resistance-rated assembly designs indicated. Identify
products with appropriate markings of applicable testing agency.
2.3 TPO ROOFING
A. Fabric-Reinforced Ultra-Ply TPO Sheet 60 mills thick: ASTM D 6878, scrim-reinforced, uniform,
flexible TPO sheet.
1. Thickness: 60 mils, nominal.
2. Exposed Face Color: White.
2.4 AUXILIARY ROOFING MATERIALS
A. General: Auxiliary materials recommended by roofing system manufacturer for intended use and
compatible with roofing.
1. Liquid-type auxiliary materials shall comply with VOC limits of authorities having
jurisdiction.
2. Adhesives and sealants that are not on the exterior side of weather barrier shall comply
with the following limits for VOC content:
a. Plastic Foam Adhesives: 50 g/L.
b. Gypsum Board and Panel Adhesives: 50 g/L.
c. Multipurpose Construction Adhesives: 70 g/L.
d. Fiberglass Adhesives: 80 g/L.
e. Single-Ply Roof Membrane Adhesives: 250 g/L.
f. Single-Ply Roof Membrane Sealants: 450 g/L.
g. Nonmembrane Roof Sealants: 300 g/L.
h. Sealant Primers for Nonporous Substrates: 250 g/L.
i. Sealant Primers for Porous Substrates: 775 g/L.
j. Other Adhesives and Sealants: 250 g/L.
3. Adhesives and sealants that are not on the exterior side of weather barrier shall comply
with the testing and product requirements of the California Department of Public Health's
(formerly, the California Department of Health Services') "Standard Method for the
Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources
Using Environmental Chambers."
B. Sheet Flashing: Manufacturer's standard unreinforced TPO sheet flashing, 60 mils thick,
minimum, of same color as TPO sheet.
C. Slip Sheet: If required by Manufacturer for this application, it shall be of thickness required for
application.
DACC Main Campus Roof Replacement – Various Buildings
THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 075423 - 6
D. Miscellaneous Accessories: Provide metal termination bars, metal battens, pourable sealers,
preformed cone and vent sheet flashings, preformed inside and outside corner sheet flashings, T-
joint covers, lap sealants, termination reglets, and other accessories.
E. Roof Flashing
1. Description: .060 ULTRAPLY TPO membrane
F. ULTRAPLY TPO Flashing project data
1. Description: Non-reinforced, TPO, single-ply flashing composed of Thermoplastic Polyolefin
polymer, and Ethylene Propylene Rubber.
a. Nominal Thickness: .060 inch
G. Bonding Adhesive:
1. Description: SBR-based, formulated for compatibility with the ULTRAPLY TPO membrane
& a wide variety of substrate materials, including masonry, wood, and insulation facings.
2. Product/Producer:
a. ULTRAPLY TPO Bonding Adhesive by Firestone and primer as required by manufac-
turer for proper adhesion to substrate found in field.
H. Pourable Sealer:
1. Description: 2-Part urethane , 2-color for reliable mixing.
I. Seam Plates:
1. Description: Steel with barbs and a Galvalume coating.
2. Reference Standard: Corrosion-resistant to meet FM-4470 criteria.
J. Termination Bar:
1. Description: 1.3" X 0.10" thick aluminum bar with integral caulk ledge.
2. Product/Producer:
a. Firestone Termination Bar by Firestone
K. Membrane Fasteners
1. Description: Standard duty threaded fastener with fluorocarbon polymer coating and drill
point tip capable of penetrating 20 gauge steel. Length shall be sufficient to penetrate deck a
minimum of 1/2" for steel and 1" for wood and concrete. Structural concrete decks must be
pre-drilled with a 3/16" carbide drill bit to a depth 1/2" deeper than the fastener engagement.
2. Reference Standard: SAE 1022, Heat Treated
3. Product/Producer:
a. All Purpose (AP) fasteners by Firestone.
L. UltraPly TPO Cut Edge Sealant
1. Polymeric sealant for use where exposed reinforcement is encountered.
2. Product/Producer;
a. Firestone UltarPly TPO Cut Edge Sealant by Firestone
M. Firestone UltraPly TPO General Purpose Sealant
1. Polymeric one part general purpose sealant
2. Product/Producer,
a. Firestone UltraPly TPO General Purpose Sealant by Firestone
N. Firestone UltraPly TPO Coated Metal
1. Galvanized Steel with Manufacturers bonded TPO Coating.
2. Product/Producer,
a. Firestone UltraPly TPO Coated Metal by Firestone
O. Firestone UltraPly TPO Molded Flashing Accessories
1. Unreinforced UltraPly TPO membrane Pre-Molded for a variety of flashing details (i.e. Pipe
Boots, Inside-Outside corners, etc.)
2. Product/Producer,
a. Firestone UltraPly TPO Pre-molded Flashing Accessories by Firestone
DACC Main Campus Roof Replacement – Various Buildings
THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 075423 - 7
2.5 SHEET METAL
A. Metal Coping Cap, Splice Plates and Edge Metal: 24 gauge Kynar Finished Sheet Metal, Firestone
Edgegard.
B. Cleat: 22 gauge Galvanized Sheet Metal.
C. Fasteners: #10 Fasteners with neoprene washers, to be spaced every 8” o.c.
2.6 ROOF INSULATION
A. Expanded-Polystyrene Board Insulation ( Base Layer): 1.75" thickness (2 layers) R-20, 48 inch X
96 inch, ASTM C 578, Type IV, 1.6-lb/cu. ft., minimum density, square edged.
B. Tapered Insulation (Intermediate Layer): Provide factory-tapered insulation boards fabricated to
slope noted on plans, 48 inch X 48 inch unless otherwise indicated.
C. Provide preformed saddles, crickets, tapered edge strips, and other insulation shapes where
indicated for sloping to drain. Fabricate to slopes indicated.
D. High Density Polyisocyanurate Cover Board (Top Layer): Non-combustible, water resistant high
density, closed cell polyisocyanurate core with coated glass mat facers, complying with ASTM D
1623, and with the following additional characteristics:
1. Size: 48 inches (1220 mm) by 96 inches (2440 mm), nominal.
a. Exception: Board to be attached using adhesive or asphalt may be no larger than 48
inches (1220 mm) by 48 inches (1220 mm), nominal.
2. Thickness: 0.5 inch (12.7mm).
3. R-Value: 2.5 R based on ASTM tests C158 and C177.
4. Surface Water Absorption: <3%, maximum, when tested in accordance with ASTM C 209.
5. Compressive Strength: 120psi, when tested in accordance with ASTM 1621.
6. Density: 5pcf, when tested in accordance with ASTM 1622.
7. Factory Mutual approved for use with FM 1-60 and 1-90 rated roofing assemblies.
8. Mold Growth Resistance: Passed, when tested in accordance with ASTM D 3273.
Acceptable Product: ISOGARD HD Cover Board by Firestone.
E. INSULATION FASTENERS AND INSULATION ADHESIVES
1. Description: Heavy duty threaded fastener with 3-coat waterborne fluorocarbon polymer
coating and drill point tip capable of penetrating 20 gauge steel. Fastener shall meet mini-
mum thread size of .260” and a 13 threads per inch. Length shall be sufficient to penetrate
deck a minimum of ¾” for steel and 1” for wood and concrete. Structural concrete decks
must be pre-drilled with a 7/32” carbide drill bit to a depth ½” deeper than the fastener en-
gagement.
2. Reference Standard: SAE 1022, Heat Treated
3. Product/Producer:
Heavy Duty (HD) fasteners by Firestone.
4. Adhesive for insulation attachment at areas of roof exceeding available fastener depth. Adhe-
sive is two-component low rise polyurethane engineered to adhere multiple layers of insula-
DACC Main Campus Roof Replacement – Various Buildings
THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 075423 - 8
tion. Type as required by roof membrane manufacturer for roofing system and warranty to be
provided; use only adhesives furnished by roof membrane manufacturer to comply with spec-
ified wind uplift requirements.
2.7 NAILERS FOR FLANGES AND ROOF ACCESSORIES
A. Description: Structural Grade No. 2 or better Southern Pine, Douglas Fir, or Exterior Grade plywood.
All wood shall be pressure treated for rot resistance.
1. Nailer width: Minimum 3 ½ in. (nominal) wide or as wide as the nailing flange of each roof
accessory.
2. Nailer thickness: Thickness of roof insulation.
B. Reference Standards:
1. Southern Pines: PS 20; SPIB Grading Rules.
2. Western Woods: PS 20; WWPA Grading Rules.
3. Plywood: PS 1; APA Grade Stamps.
4. Pressure preservative treatment: AWPB LP2. 2.8 ROOF WALKWAY PADS, PIPE BOOTS, MOLDED CORNERS
A. Roof Walkway Pads:
1. Description: Reinforced ULTRAPLY TPO Walkway Pads, .130" X 30" X 50' with Patterned traf-
fic bearing surface.
B. ULTRAPLY TPO molded inside corners
C. ULTRAPLY TPO molded outside corners
D. ULTRAPLY TPO molded pipe boots
PART 3 - EXECUTION
3.1 ROOFING INSTALLATION, GENERAL
A. Install roofing system according to roofing system manufacturer's written instructions.
B. Complete terminations and base flashings and provide temporary seals to prevent water from
entering completed sections of roofing system at the end of the workday or when rain is forecast.
Remove and discard temporary seals before beginning work on adjoining roofing.
C. Install roofing and auxiliary materials to tie in to existing roofing to maintain weathertightness of
transition.
D. Examine roof deck to determine that it is sufficiently rigid to support roofers and their mechanical
equipment and that deflection will not strain or rupture roof components or deform deck.
E. Verify that surfaces and site conditions are ready to receive work. Correct defects in the substrate
before commencing with roofing work.
F. Examine roof substrate to verify that it is properly sloped to drains.
DACC Main Campus Roof Replacement – Various Buildings
THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 075423 - 9
G. Start work with sealants and adhesives at 60° - 80° F.
H. Fumes from adhesive solvents may be drawn into the building during installation through rooftop
intakes. Appropriate measures must be taken to assure that fumes from adhesive solvents are not drawn
into the building through air intakes.
I. Remove existing roof system components as specified
J. The surface must be clean, dry, smooth, free of sharp edges, fins, loose or foreign materials, oil,
grease and other materials which may damage the membrane. All roughened surfaces which could cause
damage shall be properly repaired before proceeding.
K. All surface voids of the immediate substrate greater than 1/4" wide must be properly filled with an
acceptable insulation or suitable fill material.
3.2 INSULATION INSTALLATION
A. Coordinate installing roofing system components so insulation is not exposed to precipitation or
left exposed at the end of the workday.
B. Install new base layer and tapered insulation over existing metal deck to conform to slopes
indicated using manufacturer available metal fasteners of recommended length complying with the
manufacturer’s requirements and the appropriate wind uplift fastening patterns directed by the
manufacturer. Fully adhere all other insulation layers and cover baord with insulation adhesive as
per manufacturer’s recommendations.
C. Fully adhere cover board over tapered insulation with long joints in continuous straight lines with
end joints staggered between rows. Offset joints of insulation below a minimum of 6 inches in
each direction, butt cover boards together.
E. Install only as much insulation as can be covered with the completed roofing system before the
end of the day's work or before the onset of inclement weather.
F. Seal deck joints, where needed, to prevent water and moisture infiltration.
G. Lay roof insulation in courses parallel to roof edges.
H. Neatly fit insulation to all penetrations, projections, and nailers. Insulation shall be fit tightly,
with gaps not greater than ¼”. All gaps greater that ¼” shall be filled with acceptable insulation.
Under no circumstances shall the roofing membrane be left unsupported over a space greater than
DACC Main Campus Roof Replacement – Various Buildings
THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 075423 - 10
¼”. Tapered insulation shall be installed around roof drains and scuppers so as to provide proper
slope for drainage. Miter roof insulation edges at ridge, valley and other similar non-planar
conditions.
I. When installing multiple layers of insulation, all joints between layers shall be staggered at least 6
in.
J. Installation of intermediate insulation layer by Using the Firestone Heavy Duty fasteners and
Firestone insulation plate engage fastener through insulation into Steel Deck at the depth
specified by the Firestone Technical Manual. Pattern and rate as determined by Factory Mutual
Document 1-28. Fully adhere all other insulation layers.
3.3 MEMBRANE INSTALLATION
A. Place membrane panel, over the substrate in its final position.
B. After making sure the sheet is placed in its final position allowing for a 3” lap, fold it back even-
ly onto itself so as to expose the underside.
a. Where UltraPly TPO Membrane has been cut to expose reinforcing membrane, Fire-
stone's UltraPly TPO Cut Edge Sealant or UltarPly TPO General Purpose Sealant must
be used to encapsulate exposed edge. C. Sweep the mating surface of the membrane with a stiff broom to remove any dirt that may have
accumulated.
D. Apply UltraPly TPO bonding adhesive at about the same time to both the exposed underside of
the sheet and the substrate to which it will be adhered so as to allow approximately the same dry-
ing time.
E. Do not apply bonding adhesive over an area that is to be later heat welded to another sheet or
flashing.
F. Allow bonding adhesive to flash off until tacky. Touch the bonding adhesive surface with a
clean, dry finger to be certain that the adhesive film is dry to the touch and there is no wet adhe-
sive beneath the top adhesive film. If either motion exposes wet or stringy adhesive when the fin-
ger is lifted, then it is not ready for mating. Flash off time will vary depending on ambient air
conditions.
G. Starting at the fold, roll the previously coated portion of the sheet into the coated substrate slowly
and evenly so as to minimize wrinkles.
H. To ensure proper contact, compress the bonded half of the sheet to the substrate with a stiff push
broom.
I. Fold the unadhered half of the membrane sheet back onto itself, and repeat the procedure to com-
plete the bonding of the sheet.
3.4 MEMBRANE LAP SPLICING
A. Lap splice areas that have been contaminated must be wiped down with a dry or damp (water on-
ly) clean cloth prior to heat welding and allow to completely dry.
B. All field and flashing splices on the horizontal surface shall be completed using an automatic heat
welder which has been designed for hot air welding of thermoplastic membranes.
C. Hand held welders are only to be used on vertical welds or where an automatic welder is not prac-
tical or cannot be used.
DACC Main Campus Roof Replacement – Various Buildings
THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 075423 - 11
D. Seams made with the automatic welder shall be a minimum of 1-1/2" wide. Seams made with
hand welders shall be a minimum of 2" wide. Use 2" wide silicone or silicone coated steel hand
rollers to assure proper mating of surfaces as hand heat welding proceeds.
E. Probe all completed welds using a slotted screwdriver or cotter pin puller type tool to verify seam
integrity. Do not probe welds until they have had time to cool to ambient conditions. Any welds
found to be insufficiently welded need to be repaired on a daily basis.
3.5 MEMBRANE SECUREMENT
A. Secure membrane at all locations where the membrane terminates or goes through an angle
change greater than 1" in 12" except for round pipe
B. penetrations less than 18" in diameter and square penetrations less than 4" square.
3.6 BASE FLASHING INSTALLATION AND FLASHING OF PENETRATIONS
A. Install sheet flashings and preformed flashing accessories, and adhere to substrates according to
roofing system manufacturer's written instructions.
B. Apply bonding adhesive to substrate and underside of sheet flashing at required rate, and allow to
partially dry. Do not apply to seam area of flashing.
C. Flash penetrations and field-formed inside and outside corners with cured or uncured sheet
flashing.
D. Clean seam areas, overlap, and firmly roll sheet flashings into the adhesive. Hot-air weld side and
end laps to ensure a watertight seam installation.
E. Terminate and seal top of sheet flashings and mechanically anchor to substrate through termination
bars.
F. General:
1. If project is a Retrofit or Tear-Off remove all existing flashings (i.e. lead, asphalt, mastic,
etc.).
2. Flash all penetrations passing through the membrane.
3. The flashing seal must be made directly to the penetration.
G. Pipes, Round Supports, etc.
1. Flash with Firestone Pre-Molded UltraPly Pipe Flashings where practical.
2. Flash using UltraPly membrane when Pre-Molded Flashing is not practical.
H. Structural Steel Tubing
1. Use a field fabricated pipe flashing detail provided that the minimum corner radius is greater
than 1/4" and the longest side of the tube does not exceed 12". When the tube exceeds 12"
use a standard curb detail.
I. Roof Drains
1. Remove all existing flashings, drain leads, roofing materials and cement from the existing
drain in preparation for membrane and Water Block Seal.
2. Provide a clean even finish on the mating surfaces between the clamping ring and the drain
bowl.
3. Taper insulation around the drain to provide a smooth transition from the roof surface to the
drain. Use pre-manufactured tapered insulation with facer or suitable bonding surface to
achieve slope. Slope shall not exceed Firestone recommendations.
DACC Main Campus Roof Replacement – Various Buildings
THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 075423 - 12
4. Position the UltraPly TPO membrane, then cut a hole for the roof drain to allow 1/2" -3/4" of
membrane extending inside the clamping ring past the drain bolts.
5. Make round holes in the UltraPly TPO membrane to align with clamping bolts. Do not cut
the membrane back to the bolt holes.
6. Place Water Block Seal on top of drain bowl where the clamping ring seats below the mem-
brane
7. Install the roof drain clamping ring and clamping bolts. Tighten the clamping bolts to
achieve constant compression.
J. Pipe Clusters and Unusual Shaped Penetrations
1. Fabricate penetration pockets to allow a minimum clearance of 1" between the penetration
and all sides.
2. Secure penetration pockets per Firestone Details
3. Fill penetration pockets with Pourable Sealer, so as to shed water. Pourable Sealer shall be a
minimum of 2" deep.
K. Hot Pipes
1. Protect the UltraPly TPO components from direct contact with steam or heat sources when
the in-service temperature is in excess of 140º F. In all such cases flash to an intermediate in-
sulated "cool" sleeve per Firestone details.
L. Flexible Penetrations
1. Provide a weathertight gooseneck set in Water Block Seal and secured to the deck.
2. Flash in accordance with Firestone Details
M. Scuppers
1. Remove existing scupper and provide a new welded watertight scupper or clean the existing
scupper for reuse.
2. Set welded watertight scupper in Water Block Seal and secure to the structure.
3. Flash in accordance with Firestone Details.
N. Expansion Joints
1. Install as shown on roof drawings in accordance with Firestone details.
3.7 FLASHING- WALLS, PARAPETS, MECHANICAL EQUIPMENT CURBS,
SKYLIGHTS, ETC.
A. General:
Using the longest pieces practical, flash all walls, parapets, curbs, etc., a minimum of 8” high per
Firestone Details.
B. Evaluate Substrate:
Evaluate the substrate and overlay per Firestone specifications as necessary.
C. If project is a Retrofit or Tear-Off remove all flashings.
D. Remove excessive asphalt to provide a smooth, sound surface for new flashings.
E. Apply UltraPly TPO Bonding Adhesive at about the same time to both the membrane flashing
and the surface to which it is being bonded so as to allow approximately the same drying time.
Apply TPO Bonding Adhesive by rolling the adhesive on to the mating surfaces evenly, avoiding
globs or puddles.
F. Allow TPO Bonding Adhesive to flash off until tacky. Touch the TPO Bonding Adhesive surface
with a clean, dry finger to be certain that the adhesive does not stick or string. As you are touch-
ing the adhesive, pushing straight down to check for stringing, also push forward on the adhesive
at an angle to ensure that the adhesive is ready throughout its thickness. If either motion exposes
wet or stringy adhesive when the finger is lifted, then it is not ready for mating. Flash off time
will vary depending on ambient air conditions.
G. Roll the flashing into the adhesive evenly and carefully so as to minimize wrinkles.
H. To ensure proper contact, compress the flashing to the substrate with a stiff push broom.
DACC Main Campus Roof Replacement – Various Buildings
THERMOPLASTIC POLYOLEFIN (TPO) ROOFING 075423 - 13
I. Complete the splice between membrane flashing and the main roof sheet by hot air welding.
Provide lap splices in accordance with Firestone details.
J. Provide termination directly to the vertical substrate as shown in Firestone Details.
K. Install TPO-Joint covers at field and flashing splice intersections as required by Firestone.
L. Install intermediate flashing attachment as required by Firestone Specifications and Details
3.8 TEMPORARY CLOSURE
Temporary closures which ensure that moisture does not damage any completed section of the new
roofing system are the responsibility of the roofing contractor. Completion of flashings, termina-
tions, and temporary closures shall be completed as required to provide a watertight condition.
3.9 PROTECTING AND CLEANING
A. Protect roofing system from damage and wear during remainder of construction period. When
remaining construction does not affect or endanger roofing, inspect roofing for deterioration and
damage, describing its nature and extent in a written report, with copies to Architect and Owner.
B. Correct deficiencies in or remove roofing system that does not comply with requirements, repair
substrates, and repair or reinstall roofing system to a condition free of damage and deterioration at
time of Substantial Completion and according to warranty requirements.
C. Clean overspray and spillage from adjacent construction using cleaning agents and procedures
recommended by manufacturer of affected construction.
3.10 MATERIAL STORAGE AND HANDLING
A. Keep all adhesives, sealants, primers and cleaning materials away from all sources of ignition.
B. Consult container labels and Material Safety Data Sheets (MSDS) for specific safety instructions.
C. Deliver materials to job site in their original containers as labeled by the manufacturer.
3.11 WOOD NAILER LOCATION AND INSTALLATION
A. Total wood nailer height shall match the total thickness of insulation being used and shall be in-
stalled with a 1/8" gap between each length and at each change of direction.
B. Wood nailers shall be firmly fastened to the deck. Mechanically fasten wood nailers to resist a
force of 200 lbs. per lineal foot.
3.12 SHEET METAL WORK
A. Install sheet metal as shown on roof drawings.
B. Follow current industry guidelines for installation or Firestone requirements, whichever is more
stringent.
3.13 ROOF WALKWAY PADS
A. Install and adhere pads to membrane by creating a continuous walk path from the roof access
hatch to all parapet crossover ladders, roof-mounted mechanical equipment, all roof-mounted
fans and forced air vents requiring maintenance. Submit a layout shop drawing for this work for
owner review and approval.
END OF SECTION 075423
DACC Main Campus Roof Replacement – Various Buildings
SHEET METAL FLASHING AND TRIM 076200 - 1
SECTION 076200
SHEET METAL FLASHING AND TRIM
PART 1 – GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including the Conditions of the
Contract and Division 01 Specification Sections apply to this section.
1.2 SUMMARY
A. Provide all labor, equipment, and materials to fabricate and install the following.
1. Metal Coping Cap.
2. Counterflashing.
3. Scuppers and Escutheon Plates.
4. Pitch Pans and Metal Bonnets.
B. Related Sections:
1. Division 07 Section Common Work Results for Thermal and Moisture
Protection.
C. Related Work Specified Elsewhere:
1. Division 06 Section Rough Carpentry
2. Division 07 Section SBS Modified Bituminous Membrane Roofing
D. American Society for Testing and Materials (ASTM)
1. American National Standards Institute and Single Ply Roofing Institute (ANSI/SPRI)
1. ANSI/SPRI ES-1 Testing and Certification Listing of Shop Fabricated Edge
Metal.
2. Factory Mutual Research Corporation (FMRC)
3. Underwriters Laboratories (UL)
4. Sheet Metal and Air Conditioning Contractors National Association (SMACNA)
1. 1993 Edition Architectural Sheet Metal Manual
5. National Roofing Contractors Association (NRCA)
1. Roofing and Waterproofing Manual
6. American Society of Civil Engineers (ASCE)
1. ASCE 7-05 Minimum Design Loads for Buildings and Other Structures.
1.4 SUBMITTALS FOR REVIEW
A. Product Data:
1. Provide manufacturer’s specification data sheets for each product.
2. Metal material characteristics and installation recommendations.
3. Submit color chart prior to material ordering and/or fabrication so that equivalent
DACC Main Campus Roof Replacement – Various Buildings
SHEET METAL FLASHING AND TRIM 076200 - 2
colors to t hose specified can be approved.
B. Shop Drawings
1. For manufactured and ANSI/SPRI approved shop fabricated gravel stops, fascia,
scuppers, and all other sheet metal fabrications.
2. Indicate material profile, jointing pattern, jointing details, fastening methods,
flashing, terminations, and installation details.
3. Indicate type, gauge and finish of metal.
C. Specimen Warranty: Provide an unexecuted copy of the warranty specified for this
Project, identifying the terms and conditions required of the Manufacturer and the
Owner.
1.5 SUBMITTALS FOR INFORMATION
A. Design Loads: Any material submitted as equal to the specified material must be
accompanied by a report signed and sealed by a professional engineer licensed in the
state in which the installation is to take place. This report shall show that the
submitted equal meets the wind uplift and perimeter attachment requirements
according to ASCE 7-05 and ANSI/SPRI ES-1. Substitution requests submitted
without licensed engineer approval will be rejected for non-conformance.
B. Factory Mutual Research Corporation’s (FMRC) wind uplift resistance
classification: The roof perimeter flashing shall conform to the requirements as
defined by the FMRC Loss Prevention Data Sheet 1-49.
C. A letter from an officer of the manufacturing company certifying that the materials
furnished for this project are the same as represented in tests and supporting data.
D. Mill production reports certifying that the steel thickness are within allowable
tolerances of the nominal or minimum thickness or gauge specified.
E. Certification of work progress inspection. Refer to Quality Assurance Article
below.
F. Certifications:
1. Submit roof manufacturer’s certification that metal fasteners furnished are
acceptable to roof manufacturer.
2. Submit roof manufacturer’s certification that metal furnished is acceptable to
roofing manufacturer as a component of roofing system and is eligible for
roof manufacturer’s system warranty.
1.6 CONTRACT CLOSEOUT SUBMITTALS
A. General: Comply with Requirements of Section 01 78 00 – Closeout Submittals.
B. Special Project Warranty: Provide specified warranty for the Project, executed by
the authorized agent of the Manufacturer.
C. Roofing Maintenance Instructions. Provide a manual of manufacturer’s
recommendations for maintenance of installed roofing systems.
DACC Main Campus Roof Replacement – Various Buildings
SHEET METAL FLASHING AND TRIM 076200 - 3
1.7 QUALITY ASSURANCE
A. Engage an experienced roofing contractor specializing in sheet metal flashing work
with a minimum of five (5) years experience.
B. Maintain a full-time supervisor/foreman who is on the job-site at all times during
installation. Foreman must have a minimum of five (5) years experience with the
installation of similar system to that specified.
C. Source Limitation: Obtain components from a single manufacturer. Secondary
products which cannot be supplied by the specified manufacturer shall be approved
in writing by the primary manufacturer prior to bidding.
D. Upon request fabricator/installer shall submit work experience and evidence of
financial responsibility. The Owner’s representative reserves the right to inspect
fabrication facilities in determining qualifications.
1.8 DELIVERY, STORAGE, AND HANDLING
A. Deliver materials in manufacturer’s original, unopened containers or packages with
labels intact and legible.
B. Stack pre-formed and pre-finished material to prevent twisting, bending, or abrasion,
and to provide ventilation. Slope metal sheets to ensure drainage.
C. Prevent contact with materials which may cause discoloration or staining.
1.9 PROJECT CONDITIONS
A. Determine that work of other trades will not hamper or conflict with necessary
fabrication and storage requirements for pre-formed metal edge system.
1.10 DESIGN AND PERFORMANCE CRITERIA
A. Thermal expansion and contraction:
1. Completed metal edge flashing system shall be capable of withstanding
expansion and contraction of components caused by changes in temperature
without buckling, producing excess on structure, anchors or fasteners, or
reducing performance ability.
1.11 WARRANTIES
A. Owner shall receive one (1) warranty from manufacturer of roofing materials
covering all of the following criteria. Multiple warranties are not acceptable.
1. Pre-finished metal material shall require a written thirty (30) - year non-prorated
warranty covering fade, chalking and film integrity. The material shall not
show a color change greater than 5 NBS color units per ASTM D2244 or
chalking excess of 8 units per ASTM D659. If either occurs material shall be
replaced per warranty, at no cost to the Owner.
2. Changes: Changes or alterations in the edge metal system without prior written
consent from the manufacturer shall render the system unacceptable for a
warranty.
DACC Main Campus Roof Replacement – Various Buildings
SHEET METAL FLASHING AND TRIM 076200 - 4
3. The Contractor shall provide the Owner with a notarized written warranty
assuring that all sheet metal work including caulking and fasteners to be
watertight and secure for a period of two years from the date of final
acceptance of the building. Warranty shall include all materials and
workmanship required to repair any leaks that develop, and make good any
damage to other work or equipment caused by such leaks or the repairs
thereof.
4. Installing roofing contractor shall be responsible for the installation of the edge
metal system in general accordance with the membrane manufacturer’s
recommendations.
5. Installing contractor shall certify that the edge metal system has been installed
per the manufacturer’s printed details and specifications.
6. One manufacturer shall provide a single warranty for all accessory metal for
flashings, metal copings and any transitions between two different material
types.
PART 2 – PRODUCTS
2.1 PRODUCTS, GENERAL
A. Basis of Design: Materials, manufacturer’s product designations, and/or
manufacturer’s names specified herein shall be regarded as the minimum standard of
quality required for work of this Section. Comply with all manufacturer and
contractor/fabricator quality and performance criteria specified in Part 1.
B. Substitutions: Products proposed as equal to the products specified in this Section
shall be submitted in accordance with Bidding Requirements and Division 01
provisions.
1. Proposals shall be accompanied by a copy of the manufacturer’s standard
specification section. That specification section shall be signed and sealed by
a professional engineer licensed in the state in which the installation is to take
place. Substitution requests containing specifications without licensed
engineer certification shall be rejected for non-conformance.
2. Include a list of three (3) projects of similar type and extent, located within a one
hundred mile radius from the location of the project. In addition, the three
projects must be at least five (5) years old and be available for inspection by
the Architect, Owner or Owner’s Representative.
3. Equivalency of performance criteria, warranty terms, submittal procedures, and
contractual terms will constitute the basis of acceptance.
4. The Owner’s decision regarding substitutions will be considered final.
Unauthorized substitutions will be rejected.
2.2 MATERIALS
A. Escutheon Plates: 24 ga. Kynar Finish Metal.
B. Metal Coping Cap: ANSI SPRI ES-1 Certified. Minimum: 24 ga. Kynar Finish
steel.
DACC Main Campus Roof Replacement – Various Buildings
SHEET METAL FLASHING AND TRIM 076200 - 5
C. Pitch Pans and Bonnets: 24 ga. Galvanized sheet metal.
D. Counter Flashing and Through Wall and Overflow Scuppers: 24 ga. Kynar Finish
Sheet Metal.
E. Lead pipe flashing: ASTM B69-98a.
1. Thickness: 0.04”
2. Pipe flashing: interior coated, exterior preprimed.
F. Lead solder: SN 100C, Aim Solder.
G. Flux for lead: #17 or #70.
H. Underlayment for all metal coping to be Grace Ultra-Ice and Water Shield and as
noted on drawings.
PART 3 – EXECUTION
3.1 EXECUTION, GENERAL
A. Isolate metal products from dissimilar metals, masonry or concrete with bituminous
paint, tape, or slip sheet. Use gasketed fasteners where required to prevent corrosive
reactions.
3.2 GENERAL
A. Secure fascia to wood nailers at bottom edge with a continuous cleat.
B. Fastening of metal to walls and wood blocking shall comply with building code
standards.
C. All accessories or other items essential to the completeness of sheet metal
installation, whether specifically indicated or not, shall be provided and of the same
material as item to which applied.
D. Allow sufficient clearances for expansion and contraction of linear metal
components. Secure metal using fasteners as required by the system. Exposed face
fastening will be rejected.
3.3 INSPECTION
A. Verify that curbs are solidly set and nailing strips located.
B. Perform field measurements prior to fabrication.
C. Coordinate work with work of other trades.
D. Verify that substrate is dry, clean and free of foreign matter.
E. Commencement of installation shall be considered acceptance of existing
conditions.
3.4 MANUFACTURED SHEET METAL SYSTEMS
A. Furnish and install manufactured fascia and coping cap systems in strict accordance
with manufacturer’s printed instructions.
DACC Main Campus Roof Replacement – Various Buildings
SHEET METAL FLASHING AND TRIM 076200 - 6
B. Provide factory-fabricated accessories including, but not limited to, fascia extenders,
miters, scuppers, joint covers, etc. Refer to Source limitation provision in Part 1.
3.5 SHOP-FABRICATED SHEET METAL
A. Metal work shall be shop fabricated to configurations and forms in accordance with
recognized sheet metal practices.
B. Hem exposed edges.
C. Angle bottom edges of exposed vertical surfaces to form drip.
D. Lap corners with adjoining pieces fastened and set in sealant.
E. Form joints for gravel stop fascia system, coping cap with a 3/8” opening between
sections. Back the opening with an internal drainage plate formed to the profile of
fascia piece.
F. Install sheet metal to comply with referenced ANSI/SPRI, SMACNA and NRCA
standards.
3.6 CLEANING
A. Clean installed work in accordance with the manufacturer’s instructions.
B. Replace damaged work than cannot be restored by normal cleaning methods.
3.7 CONSTRUCTION WASTE MANAGEMENT
A. Remove and properly dispose of waste products generated. Comply with
requirements of authorities having jurisdiction.
3.8 FINAL INSPECTION
A. At completion of installation and associated work, meet with Contractor, Architect,
installer, installer of associated work, Owner, roofing system manufacturer’s
representative, and other representatives directly concerned with performance of
roofing system.
B. Inspect work and flashing of roof penetrations, walls, curbs and other equipment.
List all items requiring correction or completion and furnish a copy of list to each
party in attendance.
C. Repair or replace deteriorated or defective work found at time above inspection as
required to a produce an installation which is free of damage and deterioration at
time of Substantial Completion and according to warranty requirements.
D. Notify the Contractor and Architect upon completion of corrections.
E. Following the final inspection, provide written notice of acceptance of the
installation from the roofing system manufacturer.
F. Immediately correct roof leakage during construction. If the Contractor does not
respond within twenty-four (24) hours, the Owner will exercise rights to correct the
Work under the terms of the Conditions of the Contract.
END OF SECTION
DACC Main Campus Roof Replacement – Various Buildings
MANUFACTURED ROOF SPECIALTIES 077100 - 1
SECTION 077100
MANUFACTURED ROOF SPECIALTIES
PART 1 - GENERAL
1.1 SECTION INCLUDES
A. Roof mounted pipe supports.
1.2 RELATED SECTIONS
A. Section 076200 – Sheet Metal Flashing and Trim
1.3 REFERENCES
A. SMACNA (ASMM) – Architectural Sheet Metal Manual; Sheet Metal and Air Conditioning
Contractors’ National Association; 1993, Fifth Edition.
1.4 SUBMITTALS
A. Product Data: Provide data on shape of components, materials and finishes, anchor types and
locations.
B. Manufacturer’s Installation Instructions: Indicate special procedures and perimeter conditions
requiring special attention.
1.5 QUALITY ASSURANCE
1. Perform work in accordance with SMACNA Architectural Sheet Metal Manual details.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Roof mounted pipe supports
1. Copper B-Line
2. Mapa Products
DACC Main Campus Roof Replacement – Various Buildings
MANUFACTURED ROOF SPECIALTIES 077100 - 2
PART 3 - EXECUTION
3.1 EXAMINATION
1. Verify that deck, curbs, roof membrane, base flashing, and other items affecting work of
this Section are in place and positioned correctly.
3.2 INSTALLATION
A. Install components in accordance with manufacturer’s instructions.
B. Coordinate installation of components of this section with installation of roofing membrane and
base flashings.
C. Coordinate installation of sealants and roofing cement with work of this section to ensure water
tightness.
D. Set splash block under down spout.
END OF SECTION 077100
DACC Main Campus Roof Replacement – Various Buildings
ROOF HATCH SAFETY RAIL SYSTEM 077260 - 1
SECTION 07 72 60
ROOF HATCH SAFETY RAIL SYSTEM
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Factory fabricated roof hatch fall protection safety rail and ladder extension system installed on
[existing] roof hatches.
1.02 RELATED REQUIREMENTS
A. Selective Demolition
B. Rough Carpentry.
1.03 REFERENCE STANDARDS
A. ASTM A 500/A 500M - Standard Specification for Hot-Formed Welded and Seamless Carbon
Steel Structural Tubing in Rounds and Shapes; 2007.
B. California Occupational Safety & Health Administration (CAL OSHA): 3209 - Standard
Guardrails.
C. California Occupational Safety & Health Administration (CAL OSHA): 3212 - Floor Openings,
Floor Holes and Roofs.
D. Occupational Safety & Health Administration (OSHA): 29 CFR 1910.29 - Guarding Floor and
Wall Openings and Holes.
E. Occupational Safety & Health Administration (OSHA): 29 CFR 1910.23 - Fixed Ladders.
1.04 ADMINISTRATIVE REQUIREMENTS
A. Coordination: Coordinate installation of roof hatch safety rail and ladder extension system with
raising and re-installation of roof hatch and roof flashing.
B. Sequencing: Ensure that roof hatches and related flashings are complete prior to proceeding
with installation of safety rail and ladder extension system.
1.05 SUBMITTALS
A. See submittal procedures in Division 1.
B. Product Data: Provide manufacturer's product data for complete safety rail system, including
finishes.
C. Shop Drawings: Indicate profiles, accessories, location, quantities and dimensions.
D. Certificate: Certify that products of this section meet or exceed specified requirements.
E. Manufacturer's Instructions: Indicate complete instructions for proper installation of safety rail
system.
F. Warranty: Submit manufacturer warranty and ensure that forms have been completed in
DACC Main Campus Roof Replacement – Various Buildings
ROOF HATCH SAFETY RAIL SYSTEM 077260 - 2
Owner's name and registered with manufacturer.
1.06 QUALITY ASSURANCE
A. Manufacturer Qualifications: Company specializing in manufacturing products specified in this
section, with not less than 2 years of documented experience.
B. [Installer Qualifications: Manufacturer's certified installer.]
1.07 DELIVERY, STORAGE, AND HANDLING
A. Deliver products to project site in manufacturer's original packaging.
B. Store products under cover, dry and elevated above grade.
1.08 FIELD CONDITIONS
A. Existing Conditions: Verify that existing roof hatches are suitable to receive proper installation
of safety rail and ladder extension system. Notify Architect of conditions that would prevent
proper installation.
1.09 WARRANTY
A. See Closeout Submittals, for additional warranty requirements.
B. Materials shall be free of defects in material and workmanship for a period of twenty(20) years
from the date of purchase. Powder coat finish has 3 year limited warranty. Within this period,
manufacturer shall replace defective components at no charge to Owner.
PART 2 PRODUCTS
2.01 MANUFACTURER
A. SafePro L.P., 1355 N. Walton Walker, Dallas, TX 75211; Phone: 1-877-723-3570; Fax: 214-
330-5435; Website: www.safeprosafety.com or equal.
B. Substitutions: See Section 01 60 00 - Product Requirements.
2.02 ROOF HATCH FALL PROTECTION SAFETY RAIL AND LADDER EXTENSION
SYSTEM
A. Basis of Design: Roof Hatch Fall Protection Safety Rail Model No. [SP-3036][SP-3636] and as
appropriate for field verified hatch sizes.
B. Description: Steel tube railing system mounted on roof hatch providing an ergonomically
correct power grip in a safe upright egress and ingress through roof hatches in addition to
protection from accidental falls through roof opening while roof hatch is open. Includes top and
mid-rail and wrap around self-closing gravity gate mounted with heavy duty hinges acting as a
ladder extension.
1. Steel Tubing: 1-1/2 inch hot rolled electric welded steel tubing, ASTM A500, Grade B,
hot formed.
2. Size: Formed to fit roof hatch size of 30 x 36 [36 x 36] and as appropriate for field verified
hatch sizes.
3. Height: 42 inch above roof surface when mounted on standard roof hatch cap flashing.
4. Mounting System: Integrated stanchions of rail system through bolted to extended cap
flashing of roof hatch using 3/8 inch bolts.
5. Gate System: Gravity self-closing, non-collapsible full wrap around steel tubing grab hold,
welded construction. Heavy duty hinges with 5/8 inch hinge pin with built in pinch-less
DACC Main Campus Roof Replacement – Various Buildings
ROOF HATCH SAFETY RAIL SYSTEM 077260 - 3
gate stop and pull up full open positioning.
6. Fasteners: Stainless steel 316 Grade Hex head bolts, 3/8 inch x 2 inch, Nylon locking Hex
nut and flat washers.
7. Labels: Furnish with manufacturer's standard labels containing SafePro Patent Number,
and SafePro Logo.
C. Performance:
1. Meets and exceeds OSHA Standard CFR 29 1910.23 and CFR 29 1910.29.
2. Meet and exceeds Cal-OSHA §3212. Floor Openings, Floor Holes and Roofs and §3209.
Standard Guardrails.
D. Fabrication: Factory formed and fully welded construction, free of sharp edges and snag points.
E. Finish: Factory finished with powder coating.
1. Powder Coat Finish: Manufacturer's standard super durable powder coating; color: Safety
Yellow.
PART 3 EXECUTION
3.01 EXAMINATION
A. Verification of Conditions: Verify that roof hatch is suitable to receive proper installation of
safety rail and ladder extension system. Report unsatisfactory conditions to Architect [Owner].
3.02 INSTALLATION
A. Install safety rail and ladder extension system in accordance with manufacturer's instructions
using bolts furnished by railing manufacturer.
B. [Install safety rail and ladder extension system in accordance with manufacturer's instructions
utilizing manufacturer's Certified Installers.]
C. Install safety rail and ladder extension system by through-bolting to integral curb flashing of
roof hatch, avoiding penetration of roof base flashing.
3.03 ADJUSTING
A. Adjust gate for smooth operation, free of binding.
END OF SECTION
DACC Main Campus Roof Replacement – Various Buildings
JOINT SEALANTS AND CAULKING 07920 - 1
SECTION 079200
JOINT SEALANTS
PART 1 – GENERAL
1.1 DESCRIPTION
A. Work includes:
1. Throughout the Work, seal and caulk joints where shown on the Drawings and/or as re-
quired by the Project Manager to provide and maintain watertight and airtight continuous
seals.
2. This section includes, but is not limited to, providing joint sealants to be in the
following areas:
a) Parapet cap copings and counterflashings at roofing conditions
b) All other joints as directed by the Project Manager
1.2 QUALITY ASSURANCE
A. Use adequate numbers of skilled workmen who have successfully completed a minimum of
three projects in the last five years of similar type and scope as the project herein. The work-
men shall be thoroughly trained and experienced in joint sealant applications and completely
familiar with the specified requirements and methods needed for the proper performance of
the work of this section.
B. Joint sealer products shall be obtained from a single manufacturer for each product re-
quired.
C. Job Site Testing
1. All joint sealants shall be field tested for proper adhesion to the joint substrates prior to
installation. Do not proceed with the work until job site tests have been approved by the
Project Manager.
2. Locate and provide test joints for each type of joint sealant, and substrate as directed by
the Project Manager.
3. Acceptable test joints will be used as the standard for all joint sealant work on the
project.
4. Sealants which fail to adhere to the substrates shall be removed and replaced at no extra
cost to the Owner.
1.3 SUBMITTALS
A. Product Data: Within 15 calendar days after the Contractor has received the Owner's
Notice to Proceed, submit:
1. Materials list of items proposed to be provided under this Section; and in compliance
with Section 01330 Submittals and Substitutions.
2. Manufacturer's specifications and other data needed to prove compliance with the
specified requirements;
3. Manufacturer's recommended installation procedures which, when approved by the Pro-
ject Manager, will become the basis for accepting or rejecting actual installation proce-
dures used on the Work.
DACC Main Campus Roof Replacement – Various Buildings
JOINT SEALANTS AND CAULKING 07920 - 2
B. Samples: Accompanying the submittal described above, submit samples of each sealant, each
backing material, each primer, and each bond breaker proposed to be used. Include color sam-
ples of full standard product color range.
1.4 PRODUCT HANDLING
A. Do not retain at the job site material which has exceeded the shelf life recommended by its
manufacturer.
B. Store products on site in compliance with the manufacturer's recommendations and as nec-
essary to prevent damage or deterioration to the materials.
1.5 WARRANTY
A. All sealants and caulking shall be provided with a five year manufacturer's warranty.
PART 2 – PRODUCTS
2.1 SEALANTS AND CAULK
A. Except as specifically otherwise approved by the Project Manager, use only the types of seal-
ants described in this Section. Polysulfide sealants require manufacturer's corporate seal.
B. Vertical surfaces and non-traffic bearing horizontal surfaces:
1. One-part Urethane Sealant: Sealant for use at coping joints, reglet joints, etc., shall be a
one-component urethane non-sag, gun grade sealant designed for use in active exterior
joints, and shall meet or exceed Federal Specification No. 1 TT-S-00230C, Type II, Class
A, ASTM C 920. Where joint surfaces are contained or are contaminated with bitumi-
nous materials, provide manufacturer's modified-type sealant (modified with coal-tar or
asphalt as required), as manufactured by Sonneborn (RC-708), or approved equal.
2. Silyl-terminated Polyether Sealant: To seal the leading edge of the CTEM mem-
brane, to bond CTEM at terminations with metal, and for open CTEM seam repair,
sealant shall be a thermosetting, solvent free, non-slump, self-fixturing, multipurpose
structural sealant which shall meet the following physical and performance proper-
ties, M-1 as manufactured by Chem Link, Inc., or approved equal.
Properties
Specific Gravity 1.62 (13.5 lbs./gallon)
Viscosity 800,000 cps Brookfield RTV, TF spindle, 4 rpm 70
degrees F. Shear Strength (ASTM D-1002) 300 psi+ (7 day
ambient cure) Elongation @ break (ASTM D-412) 300% (7
day ambient cure) Hardness Shore A (ASTM C-661) 50 –
55 (14 day ambient cure) Tack free time (ASTM C-679)
35 minutes
Low temperature flex Minus 20 degrees F: PASS
Slump (sag) (ASTM C-639) Zero slump
Shrinkage (ASTM D-2453) No measurable shrinkage (14 cay
cure) Service temperature -40 degrees F to 200 degrees F
DACC Main Campus Roof Replacement – Various Buildings
JOINT SEALANTS AND CAULKING 07920 - 3
C. Colors
1. Colors for each sealant installation will be selected by the Project Manager from
standard colors normally available from the specified manufacturers.
2. Should such standard color not be available from the approved manufacturer except at
additional charge, provide such colors at no additional cost to the Owner.
2.2 PRIMERS
A. Use only those primers which are non-staining, have been tested for durability on the sur-
faces to be sealed, and are specifically recommended for this installation by the manufac-
turer of the sealant used.
2.3 BACKUP MATERIALS
A. Use only those backup materials which are specifically recommended for this installation by
the manufacturer of the sealant used, which are non-absorbent, and which are non- staining.
B. Acceptable types include:
1. Closed-cell resilient urethane or polyvinyl-chloride foam;
2. Closed-cell polyethylene foam;
C. Preformed support strips for ceramic tile control joint and expansion joint work: Use
polyisobutylene or polychloroprene rubber.
2.4 BOND-BREAKER TAPE
A. Polyethylene tape or other plastic tape as recommended by sealant manufacturer for prevent-
ing sealant from adhering to rigid, inflexible joint filler materials or joint surfaces at back of
joint where such adhesion would result in sealant failure. Provide self-adhesive tape where
applicable.
2.5 MASKING TAPE
A. For masking around joints, provide masking tape complying with Fed Spec UU-T-I06c.
2.6 JOINT PRIMER/SEALER
A. Provide type of joint primer/sealer recommended by sealant manufacturer for joint
surfaces to be primed or sealed.
PART 3 – EXECUTION
3.1 SURFACE CONDITIONS
A. Examine the areas and conditions under which work of this Section will be performed.
Correct conditions detrimental to timely and proper completion of the work. Do not pro-
ceed until unsatisfactory conditions are corrected.
DACC Main Campus Roof Replacement – Various Buildings
JOINT SEALANTS AND CAULKING 07920 - 4
3.2 PREPARATION
A. Concrete surfaces
Install only on surfaces which are dry, sound, and well brushed, wiping free from dust.
1. At open joints, remove dust by mechanically blown compressed air if so required.
2. Use solvent to remove oil and grease, wiping the surfaces with clean rags.
3. Where surfaces have been treated, remove the surface treatment by sandblasting or wire
brushing.
4. Remove laitance and mortar from joint cavities.
5. Where backstop is required, insert the approved backup material into the joint cavity to
the depth needed.
B. Steel surfaces
1. Steel surfaces in contact with sealant:
Sandblast as required to achieve acceptable surface for bond.
a) If sandblasting is not practical, or would damage adjacent finish, scrape the metal or
wire brush to remove mill scale.
b) Use solvent to remove oil and grease, wiping the surfaces with clean rags.
2. Remove protective coatings on steel by sandblasting or by using a solvent which
leaves no residue.
C. Aluminum surfaces
1. Aluminum surfaces in contact with sealant:
Remove temporary protective coatings, dirt, oil, and grease.
When masking tape is used for protective cover, remove the tape just prior to applying
the sealant.
2. Use only such solvents to remove protective coatings as are recommended for that pur-
pose by the manufacturer of the aluminum work, and which are non-staining.
3.3 INSTALLATION OF BACKUP MATERIAL
A. Use only the backup material recommended by the manufacturer of the sealant used, and ap-
proved by the Project Manager for the particular installation, compressing the backup material
25 to 50 percent to achieve a positive and secure fit.
B. When using backup of tube rod stock, avoid lengthwise stretching of the material. Do not
twist or braid hose or rod backup stock.
3.4 PRIMING
A. Use only the primer recommended by the manufacturer of the sealant, and approved by the
Project Manager for the particular installation, applying in strict accordance with the manu-
facturer's recommendations as approved by the Project Manager.
3.5 BOND-BREAKER INSTALLATION
A. Provide an approved bond-breaker where recommended by the manufacturer of the sealant for
preventing the sealant to adhering to rigid, inflexible joint filler materials or to joint surfaces at
back of joint where such adhesion would result in sealant failure. Adhere strictly to the instal-
lation recommendations as approved by the Project Manager.
JOINT SEALANTS 079200 - 5
3.6 INSTALLATION OF SEALANTS
A. Prior to start of installation in each joint, verify the joint type according to details
on the Drawings, or as otherwise directed by the Project Manager, and verify
that the required proportion of width of joint to depth of joint has been secured.
B. Comply with ASTM C1193 for application of joint sealants.
C. Equipment:
1. Apply sealant under pressure with power-actuated or hand gun, or by
other appropriate means.
2. Use guns with nozzle of proper size, and providing sufficient pressure to
completely fill the joints as designed.
D. Thoroughly and completely mask joints where the appearance of sealant on ad-
jacent surfaces would be objectionable.
E. Install the sealant in strict accordance with the manufacturer's recommendations
as approved by the Project Manager, thoroughly filling joints to the recom-
mended depth.
F. Tool joints to the profile shown on the Drawings, or as otherwise required if such
profiles are not shown on the Drawings.
G. Do not install sealant when air temperature is under 40 degrees F. Sealant tempera-
ture to be at least 50 degrees F; controlled warming permitted to ease installation.
H. Cleaning up:
1. Remove masking tape immediately after joints have been tooled.
2. Clean adjacent surfaces free from sealant as the installation progresses, us-
ing solvent or cleaning agent recommended by the manufacturer of the
sealant used.
END OF SECTION
079200
DACC Main Campus Roof Replacement – Various Buildings
UNIT SKYLIGHTS 086200 - 1
SECTION 086200 UNIT SKYLIGHTS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Self-flashing unit skylights.
B. Related Sections:
1. Division 06 Section " Miscellaneous Rough Carpentry" for wood framing and blocking at unit skylights.
2. Division 07 Section "Sheet Metal Flashing and Trim" for flashing at unit skylights. 3. Division 08 Section "Structured-Polycarbonate-Panel Assemblies" for metal-framed
skylights glazed with translucent insulating panels.
1.3 PERFORMANCE REQUIREMENTS
A. AAMA/WDMA Performance Designation: Provide unit skylights capable of complying with performance requirements indicated, based on testing manufacturer's unit skylights that are representative of those specified and that are of minimum test size indicated below:
1. Size required by AAMA/WDMA 101/I.S.2/NAFS for gateway performance for both gateway performance and optional performance grade.
2. Size: 6’-9” X 6’-9” Science Hall – Field Verify 4’X5’ Fire Station – Field Verify
B. Test Performance Criteria: Provide unit skylights capable of complying with performance requirements indicated, based on testing manufacturer's unit skylights that are representative of those specified.
1. Structural Performance: Provide unit skylights, including glazing and anchorage, capable of withstanding the effects of the following design loads:
a. Positive Pressure or Inward Load: <60psf>. b. Negative Pressure or Uplift Load: <60psf>.
DACC Main Campus Roof Replacement – Various Buildings
UNIT SKYLIGHTS 086200 - 2
2. Air Infiltration: Provide unit skylights with maximum air leakage through assembly of 0.3 cfm/sq. ft. (1.5 L/s per sq. m) when tested according to ASTM E 283 at a minimum static-air-pressure difference of 6.24 lbf/sq. ft. (300 Pa) .
3. Water Penetration: Provide unit skylights that do not evidence water penetration through assembly when tested according to ASTM E 331 at a zero static-air-pressure difference across unit.
C. Windborne-Debris-Impact-Resistance Performance: Provide unit skylights that pass missile-impact and cyclic-pressure tests when tested according to ASTM E 1886 and testing information in ASTM E 1996.
1. Small-Missile Impact: For unit skylights located more than 30 feet (9.1 m) above grade.
1.4 SUBMITTALS
A. Product Data: For each type of unit skylight indicated. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes for unit skylights.
B. Samples for Initial Selection: For unit skylights with factory-applied color finishes.
C. Product Test Reports: Based on evaluation of comprehensive tests performed within the last four years by a qualified testing agency for each type, performance class, performance grade, and size of unit skylight. Test results based on use of downsized test units will not be accepted.
D. Maintenance Data: For unit skylights to include in maintenance manuals.
E. Warranty: Sample of special warranty.
1.5 QUALITY ASSURANCE
A. Manufacturer Qualifications: A manufacturer capable of fabricating unit skylights that meet or exceed performance requirements indicated and of documenting this performance by inclusion in lists and by labels, test reports, and calculations.
B. Installer Qualifications: An installer acceptable to unit skylight manufacturer for installation of units required for this Project.
C. Source Limitations: Obtain unit skylights from single source from single manufacturer.
D. Surface-Burning Characteristics of Plastic Glazing: Provide plastic glazing sheets identical to those tested for fire-exposure behavior per test method indicated below by a testing and inspecting agency acceptable to authorities having jurisdiction. Identify materials with appropriate markings of applicable testing and inspecting agency.
1. Self-Ignition Temperature: 650 deg F (343 deg C) or more for plastic sheets in thickness indicated when tested per ASTM D 1929.
2. Smoke-Production Characteristics: Comply with either requirement below:
a. Smoke-Developed Index: 450 or less when tested per ASTM E 84 on plastic sheets in manner indicated for use.
DACC Main Campus Roof Replacement – Various Buildings
UNIT SKYLIGHTS 086200 - 3
b. Smoke Density: 75 or less when tested per ASTM D 2843 on plastic sheets in thickness indicated for use.
3. Burning Characteristics: Tested per ASTM D 635. a. Polycarbonate-Insulating-Panel Glazing: Class CC2, burning rate of 2-1/2 inches
(64 mm) per minute or less for nominal thickness of 0.060 inch (1.5 mm) or thickness indicated for use.
1.6 COORDINATION
A. Coordinate unit skylight flashing requirements with roofing system.
B. Provide anchors and inserts to be placed in adjacent construction in proper sequence so as not to delay the Work.
1.7 WARRANTY
A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace components of unit skylights that fail in materials or workmanship within specified warranty period.
1. Failures include, but are not limited to, the following:
a. Uncontrolled water leakage. b. Deterioration of metals, metal finishes, and other materials beyond normal
weathering. c. Breakage of polycarbonate glazing.
2. Warranty Period: Two years from date of Substantial Completion.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
1. American Skylites. 2. APC Dayliter; C/S Group. 3. Auburn Skylights; Major Industries, Inc. 4. Bristolite Skylights. 5. CPI International. 6. Dur-Red Products. 7. Exarc Skylights, Inc. 8. Fiore Skylights, Inc. 9. Fox Lite, Inc.; Skymaster Skylights. 10. GE Polymer Shapes; General Electric Company. 11. Glazed Structures Inc.
DACC Main Campus Roof Replacement – Various Buildings
UNIT SKYLIGHTS 086200 - 4
12. Hi Pro International, Inc. 13. Kalwall Corporation. 14. Lane-Aire Manufacturing Corp. 15. Naturalite Skylight Systems; Vistawall Group (The). 16. Plasteco, Inc. 17. Plastic Engineering Company of Tulsa, Inc. 18. Skyline Sky-Lites, LLC. 19. Solar Industries, Inc. 20. Sunglo Skylight Products. 21. VELUX America. 22. Wasco Products, Inc.
2.2 MATERIALS
A. Aluminum Components:
1. Sheets: ASTM B 209 (ASTM B 209M), alloy and temper to suit forming operations and finish requirements but with not less than the strength and durability of alclad Alloy 3005-H25.
2. Extruded Shapes: ASTM B 221 (ASTM B 221M), alloy and temper to suit structural and finish requirements but with not less than the strength and durability of Alloy 6063-T52. Match existing configuration.
B. Fasteners: Same metal as metal being fastened, nonmagnetic stainless steel, or other noncorrosive metal as recommended by manufacturer. Finish exposed fasteners to match material being fastened.
1. Where removal of exterior exposed fasteners might allow access to building, provide nonremovable fastener heads.
2.3 GLAZING
A. Polycarbonate Glazing: Thermoformable, extruded monolithic sheets, UV resistant, burglar-resistance rated per UL 972, and with average impact strength of 12 to 16 ft-lb/in. (640 to 854 J/m) of width when tested per ASTM D 256, Test Method A (Izod).
1. Double-Glazing Profile: Dome, 25 percent rise. Match existing profile.
a. Thicknesses: Not less than thicknesses required to exceed performance requirements.
b. Inner Glazing Color: White. c. Outer Glazing Color: Clear.
B. Glazing Gaskets: Manufacturer's standard .
DACC Main Campus Roof Replacement – Various Buildings
UNIT SKYLIGHTS 086200 - 5
2.4 INSTALLATION MATERIALS
A. Bituminous Coating: SSPC-Paint 12, solvent-type, bituminous mastic, nominally free of sulfur and containing no asbestos fibers, formulated for 15-mil (0.4-mm) dry film thickness per coating.
B. Joint Sealants: As specified in Division 07 Section "Joint Sealants."
C. Roofing Cement: ASTM D 4586, asbestos free, designed for trowel application or other adhesive compatible with roofing system.
2.5 UNIT SKYLIGHTS WITH INTEGRAL DOMED FALL PROTECTION
A. General: Provide factory-assembled unit skylights that include glazing, extruded-aluminum glazing retainers, gaskets, and inner frames and that are capable of withstanding performance requirements indicated.
B. Unit Shape and Size: As indicated – Match existing characteristics.
C. Condensation Control: Fabricate unit skylights with integral internal gutters and non-clogging weeps to collect and drain condensation to the exterior.
D. Thermal Break: Fabricate unit skylights with thermal barrier separating exterior and interior metal framing.
E. Provide domed, galvanized steel mesh fall protection system with skylight unit by skylight manufacturer or company recommended and approved by skylight manufacturer.
2.6 GENERAL FINISH REQUIREMENTS
A. Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for recommendations for applying and designating finishes.
B. Appearance of Finished Work: Noticeable variations in same piece are not acceptable. Variations in appearance of adjoining components are acceptable if they are within the range of approved Samples and are assembled or installed to minimize contrast.
2.7 ALUMINUM FINISHES
A. Clear Anodic Finish: AAMA 611, AA-M12C22A41, Class I, 0.018 mm or thicker.
DACC Main Campus Roof Replacement – Various Buildings
UNIT SKYLIGHTS 086200 - 6
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine openings, substrates, structural support, anchorage, and conditions, with Installer present, for compliance with requirements for installation tolerances and other conditions affecting performance of the Work.
B. Proceed with unit skylight installation only after unsatisfactory conditions have been corrected.
3.2 INSTALLATION
A. Coordinate installation of unit skylight with installation of substrates, vapor retarders, roof insulation, roofing membrane, and flashing as required to ensure that each element of the Work performs properly and that combined elements are waterproof and weathertight.
B. Comply with recommendations in AAMA 1607 and with manufacturer's written instructions for installing unit skylights.
C. Install unit skylights level, plumb, and true to line, without distortion.
D. Anchor unit skylights securely to supporting substrates.
E. Where metal surfaces of unit skylights will contact incompatible metal or corrosive substrates, including preservative-treated wood, apply bituminous coating on concealed metal surfaces, or provide other permanent separation recommended in writing by unit skylight manufacturer.
F. Set unit skylight flanges in thick bed of roofing cement to form a seal unless otherwise indicated.
G. Where cap flashing is indicated, install to produce waterproof overlap with roofing or roof flashing. Seal with thick bead of mastic sealant except where overlap is indicated to be left open for ventilation.
3.3 CLEANING
A. Clean exposed unit skylight surfaces according to manufacturer's written instructions. Touch up damaged metal coatings and finishes.
B. Remove excess sealants, glazing materials, dirt, and other substances.
C. Remove and replace glazing that has been broken, chipped, cracked, abraded, or damaged during construction period.
D. Protect unit skylight surfaces from contact with contaminating substances resulting from construction operations.
END OF SECTION
DACC Main Campus Roof Replacement – Various Buildings
PORTLAND CEMENT PLASTER 092200 - 1
SECTION 092200 PORTLAND CEMENT PLASTER
PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General and Supplementary Conditions
and Division 1 specification sections, apply to work of this section. 1.02 SECTION INCLUDES A. Metal lathing. B. Sheathing. C. Portland cement plaster, 3 coat system. 1.03 SUBMITTALS A. Submit under provisions of Section 01300. B. Shop Drawing: Submit layout of expansion and control joints. C. Product Data: Provide data on plaster materials, characteristics and limitations of products
specified. D. Samples: Submit two samples, 12 x 12 inch in size illustrating finish color and texture. 1.04 QUALITY ASSURANCE A. Perform Work in accordance with ASTM C926. 1.05 QUALIFICATIONS A. Applicator: Company specializing in performing the work of this section with minimum three
years documented experience. 1.06 MOCKUP A. Provide mockup of plaster system with accessories. B. Construct mockup, 8 feet long by 8 feet high, illustrating surface finish and color. C. Locate where directed by Architect. D. Mockup may remain as part of the Work upon approval.
DACC Main Campus Roof Replacement – Various Buildings
PORTLAND CEMENT PLASTER 092200 - 2
1.07 ENVIRONMENTAL REQUIREMENTS A. Do not apply plaster when substrate or ambient air temperature is less than 50 degrees F (10
degrees C) nor more than 80 degrees F (27 degrees C). PART 2 - PRODUCTS 2.01 PLASTER MATERIALS A. Cement: ASTM C150, Type I Portland. B. Lime: ASTM C206, Type S. C. Aggregate: In accordance with ASTM C897. D. Water: Clean, fresh, potable and free of mineral or organic matter which can affect plaster. E. Bonding Agent: ASTM C631; type recommended for bonding plaster to masonry surfaces. F. Finish: Manufacturer's elastomeric premixed finish coat, color to be selected from full range of
colors. G. Masonry Primer: Manufacturer’s masonry filler/ primer to prevent telegraphing of masonry
joints through system. 2.02 PLASTER FINISH MATERIALS A. Elastomeric Coating. B. Color: Final color selected by Architect from field samples, preliminary color is desert tan. 2.03 FURRING AND LATHING A. Metal Lath: ASTM C847; self furring mesh 2.5 lb/sq ft of weight to suit application. B. Exterior grade, 1/2 inch asphalt impregnated wood fiber board sheathing. C. Underlayment: Tyvek Stucco Wrap. D. Casing Bead: Formed zinc, minimum 26 gage thick; depth governed by plaster thickness;
maximum possible lengths; expanded metal flanges, with bullnosed edges. E. Corner Bead: Formed zinc, minimum 26 gage thick; depth governed by plaster thickness;
maximum possible lengths; expanded metal flanges, with radiused edge. F. Corner Mesh: Formed zinc, minimum 26 gage thick; expanded flanges shaped to permit
complete embedding in plaster; minimum 2 inches wide; galvanized finish. G. Control and Expansion Joint Accessories: Formed zinc, minimum 26 gage thick; accordion
profile, 2 inch expanded metal flanges each side; galvanized finish.
DACC Main Campus Roof Replacement – Various Buildings
PORTLAND CEMENT PLASTER 092200 - 3
H. Anchorage Methods: Nails, staples, or other approved metal supports, of type and size to suit
application, galvanized to rigidly secure lath and associated metal accessories in place. 2.04 CEMENT PLASTER MIXES A. Mix and proportion cement plaster in accordance with ASTM C926, Type C. B. Finish Coat: Premixed, elastomeric, integrally colored, pebble finish as manufactured by El Rey
Stucco, or equal. C. Mix only as much plaster as can be used prior to initial set. D. Protect mixtures from freezing, frost, contamination, and evaporation. E. Do not retemper mixes after initial set has occurred. PART 3 - EXECUTION 3.01 EXAMINATION A. Verify surfaces and site conditions under provisions of Section 01039. B. Masonry: Verify joints are cut flush and surface is ready to receive work of this Section. Verify
no bituminous or water repellent coatings exist on masonry surface. 3.02 PREPARATION A. Dampen masonry surfaces to reduce excessive suction. B. Clean concrete surfaces of foreign matter. Clean surfaces using acid solutions, solvents, or
detergents. Wash surfaces with clean water. C. Roughen smooth concrete surfaces and apply bonding agent. Apply in accordance with
manufacturer's instructions. 3.03 INSTALLATION - LATHING MATERIALS A. Apply one ply of felt underlayment over substrate; weather lap edges 4 inches (100 mm)
minimum. Fasten in place. B. Apply self furring reinforcement with self furring ribs perpendicular to supports. C. Lap ends minimum 1 inch. Secure end laps with tie wire where they occur between supports. D. Lap sides of diamond mesh lath minimum 1-1/2 inches.
DACC Main Campus Roof Replacement – Various Buildings
PORTLAND CEMENT PLASTER 092200 - 4
3.04 INSTALLATION - ACCESSORIES A. Continuously reinforce internal angles with corner mesh, return metal lath 3 inches from corner to
form the angle reinforcement; fasten at perimeter edges only. B. Place corner bead at external wall corners; fasten at outer edges of lath only. C. Place strip mesh diagonally at corners of lathed openings. Secure rigidly in place. D. Place 4 inch wide strips of metal lath centered over junctions of dissimilar backing materials.
Secure rigidly in place. E. Place casing beads at terminations of plaster finish. Butt and align ends. Secure rigidly in place. 3.05 CONTROL AND EXPANSION JOINTS A. In soffits locate exterior control and expansion joints every 12 feet maximum in each direction or
as indicated. B. Coordinate joint placement with other related work. 3.06 PLASTERING A. Apply plaster in accordance with ASTM C926. B. Apply scratch coat to a nominal thickness of 3/8 inch, brown coat to a nominal thickness of 3/8
inch, and a finish coat to a nominal thickness of 1/8 inch over metal lathed surfaces. C. Moist cure scratch and brown coats. Apply brown coat immediately following initial set of
scratch coat. D. After curing, dampen base coat prior to applying finish coat. E. Apply finish coat per manufacturer’s recommendation. 3.07 FINISH TEXTURE A. Evenly distributed sand finish. B. Do not leave trowel marks. C. Utilize elastomeric, integrally colored finish color coat with fine pebble texture. 3.08 TOLERANCES A. Maximum Variation from True Flatness: 1/8 inch in 10 feet. END OF SECTION
DACC Main Campus Roof Replacement – Various Buildings
PAINTING 099000 - 1
SECTION 099000
PAINTING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General and Supplementary Conditions and
Division 1 specification section, apply to work of this section. 1.02 SECTION INCLUDES A. Surface preparation and field application of paints and coatings. B. Paint exterior mechanical items as scheduled. 1.03 SURFACES TO BE PAINTED A. All exposed surfaces whether or not colors are designated in "schedules". B. All exposed structural steel and metal deck. C. Exposed bare and covered pipe and ducts and hangers. D. All interior concrete floors unless noted otherwise. E. Exposed steel and iron work. F. Tops and bottom of all wood doors. G. Primed metal surfaces of equipment installed under mechanical and electrical work including distribution
cabinets. H. Surfaces, cables, piping visible through grille work. I. All exterior concrete surfaces except concrete walks, ramps and curbs. Surfaces include stem, walls or
foundation walls. J. All exposed to view portions of control joints. 1.04 SURFACES NOT TO BE PAINTED A. Natural finish of material where specifically noted not to be painted. B. Pre-finished items including finished electrical equipment, including light fixtures and switch gear. C. Finished metal surfaces such as anodized aluminum, stainless steel, and chromium plate. D. Code required labels. 1.05 SUBMITTALS A. Submit under provisions of Section 01300.
DACC Main Campus Roof Replacement – Various Buildings
PAINTING 099000 - 2
B. Product Data: Provide data on all finishing products. C. Samples: Submit two sets of paint samples, 4 x 5 inch in size illustrating colors scheduled. Submit color
fan when requested by Architect. 1.06 SINGLE SOURCE RESPONSIBILITY A. Provide primers and other undercoat paint produced by same manufacturer as finish coats. 1.07 REGULATORY REQUIREMENTS A. Conform to applicable code for flame and smoke rating requirements for finishes. 1.08 FIELD SAMPLES A. Provide field sample of paint under provisions of Section 01400. B. Provide two field sample panels, 2 feet long by 8 inches depicting texture, and finish. Provide samples a
minimum of 1 week prior to scheduled start of painting work. C. Locate where directed by architect. D. Architect may change or adjust color based on review of field sample, final acceptance of all colors
will be from field samples. 1.09 DELIVERY, STORAGE, AND HANDLING A. Deliver, store, protect and handle products to site under provisions of Section 01600. B. Deliver products to site in sealed and labeled containers; inspect to verify acceptability. C. Container label to include manufacturer's name, type of paint, brand name, lot number, brand code,
coverage, surface preparation, drying time, cleanup requirements, color designation, and instructions for mixing and reducing.
D. Store paint materials at minimum ambient temperature of 45 degrees F and a maximum of 90 degrees F in
ventilated area, and as required by manufacture's instructions. 1.10 ENVIRONMENTAL REQUIREMENTS A. Do not apply materials when surface and ambient temperatures are outside the temperature ranges required
by the paint product manufacturer. B. Do not apply exterior coatings during rain or snow, or when relative humidity is outside the humidity
ranges required by the paint product manufacturer. B. Mimimum Application Temperatures for Latex Paints: 45 degrees F for interiors; 50 degrees F for exterior
unless required otherwise by manufacturer’s instructions. PART 2 - PRODUCTS 2.01 MANUFACTURERS
DACC Main Campus Roof Replacement – Various Buildings
PAINTING 099000 - 3
A. Manufacturers 1. Benjamin Moore and Co. (BM) 2. PPG Industries, Pittsburgh Paints (PPG) 3. Sherwin - Williams Co. (SW) 4. Hanley Paint Manufacturing Co. Inc. (Hanley) 5. Wellborn (Wellborn) 6. Valspar B. Manufacturers / Concrete Stain 1. Lithochrome Chemstain by L.M. Scofield Company 2. Stain-Crete by Increte Systems 3. Kemiko Stone Tone Stain by Kemiko Concrete Products 2.02 MATERIALS A. Coatings: Ready mixed, except field catalyzed coatings. Process pigments to a softpaste consistency,
capable of being readily and uniformly dispersed to a homogeneous coating; good flow and brushing properties; capable of drying or curing free of streaks or sags.
B. Accessory Materials: Linseed oil, shellac, turpentine, paint thinners and other materials not specifically
indicated but required to achieve the finishes specified, of commercial quality. C. Stain (concrete): Ready to use, penetrating, reactive stain that chemically combines with cured concrete. D. Granite, Faux Collection, Signature Color with Granite Crystals, paint system by Valspar. 2.03 FINISHES A. Refer to schedule at end of section for surface finish schedule. Refer to drawings for color selection. PART 3 - EXECUTION 3.01 EXAMINATION A. Verify site conditions under provisions of Section 01039. B. Verify that surfaces are ready to receive work as instructed by the product manufacturer. C. Examine surfaces scheduled to be finished prior to commencement of work. Report any condition that
may potentially affect proper application. Beginning of work means acceptance of existing conditions. D. Measure moisture content of surfaces using an electronic moisture meter. Do not apply finishes unless
moisture content of surfaces are below the following maximums: 1. Plaster and Gypsum Wallboard: 12 percent. 2. Concrete: 12 percent. 3. Concrete Floors: 8 percent. E. Concrete that is to be stained must be fully cured and should not be applied prior to 60 days within pour. 3.02 PREPARATION
DACC Main Campus Roof Replacement – Various Buildings
PAINTING 099000 - 4
A. Remove or mask electrical plates, hardware, light fixture trim, escutcheons, and fittings prior to preparing surfaces or finishing.
B. Correct defects and clean surfaces which affect work of this section. Remove existing coatings that exhibit
loose surface defects. C. Insulated Coverings: Remove dirt, grease and oil from canvas and cotton. D. Concrete Floors: Remove contamination, acid etch and rinse floors with clear water. Verify required acid-
alkali balance is achieved. Allow to dry. E. Gypsum Board Surfaces: Fill minor defects with filler compound. Spot prime defects after repair. F. Galvanized Surfaces: Remove surface contamination and oils and wash with solvent. Apply coat of
etching primer. G. Concrete and Unit Masonry Surfaces Scheduled to Receive Paint Finish: Remove dirt, loose mortar, scale,
salt or alkali powder, and other foreign matter. Remove oil and grease with a solution of tri-sodium phosphate; rinse well and allow to dry. Remove stains caused by weathering of corroding metals with a solution of sodium metasilicate after thoroughly wetting with water. Allow to dry.
H. Shop Primed Steel Surfaces: Sand and scrape to remove loose primer and rust. Feather edges to make
touchup patches inconspicuous. Clean surfaces with solvent. Prime bare steel surfaces. I. Interior Wood Items Scheduled to Receive Paint Finish: Wipe off dust and grit prior to priming. Seal
knots, pitch streaks, and sappy sections with sealer. Fill nail holes and cracks after primer has dried; sand between coats.
J. Interior wood items scheduled to receive transparent finish: Wipe off dust and grit prior to sealing, seal
knots, pitch streaks, and sappy sections with sealer. Fill nail holes and cracks after sealer has dried; sand lightly between coats.
K. Doors Scheduled for Painting: Seal top and bottom edges with primer. Apply 2 coats paint or stain to all
edges to match face. J. Concrete Surfaces Scheduled to Receive Stain Finish: Immediately prior to chemically staining, the
concrete must be thoroughly cleaned. The surface should be swept, then pressure washed or scrubbed using a rotary floor machine. Use of a suitable, high-quality commercial detergent will facilitate cleaning. The surface must be rinsed after cleaning until the rinse water is completely clean. Use of acid cleaners is prohibited.
M. Remove existing paint down to bare metal on all existing steel items scheduled for painting. Apply new
paint system as scheduled. 3.03 APPLICATION A. Apply products in accordance with manufacturer's instructions. B. Do not apply finishes to surfaces that are not dry. C. Apply each coat to uniform finish. D. Where clear finishes are required, tint fillers to match wood. Work fillers into the grain before set. Wipe
excess from surface.
DACC Main Campus Roof Replacement – Various Buildings
PAINTING 099000 - 5
E. Apply each coat of paint slightly darker than preceding coat unless otherwise approved. F. Sand wood and metal lightly between coats to achieve required finish. G. Vacuum clean surfaces free of loose particles. Use tack cloth just prior to applying next coat. H. Allow applied coat to dry before next coat is applied. I. Prime concealed surfaces of all woodwork with primer paint. J. Pavement marking shall have crisp edges. Provide additional coat if edges are not crisp and if substrate
shows through. 3.04 FINISHING MECHANICAL AND ELECTRICAL EQUIPMENT A. Refer to Mechanical and Electrical Sections for schedule of color coding and identification banding of
equipment, duct work, piping, and conduit. B. Paint shop primed equipment. C. Remove unfinished louvers, grilles, covers, and access panels on mechanical and electrical components
and paint separately. D. Prime and paint exposed items: insulated and non-insulated exposed pipes, conduit, boxes, insulated and
non-insulated exposed ducts, hangers, brackets, collars and supports, except where items are prefinished. E. Paint interior surfaces of air ducts that are visible through grilles and louvers with one coat of flat black
paint, to visible surfaces. Paint dampers exposed behind louvers and grilles. F. Paint exposed items occurring in finished areas. G. Paint both sides and edges of plywood backboards for electrical and telephone equipment before installing
equipment. H. Color code equipment, piping, conduit, and exposed duct work. Color band and identify with flow arrows
names and numbering. I. Reinstall electrical cover plates, hardware, light fixture trim, escutcheons, and fittings removed prior to
finishing. 3.05 CLEANING A. Clean work under provisions of 01700. B. Collect waste material which may constitute a fire hazard, place in closed metal containers and remove
daily from site. 3.06 SCHEDULE - EXTERIOR SURFACES A. Pavement Markings: 1. One coat paint, white, TT - P - 115, 2.5 mils total dry thickness. B. Concrete, Concrete Block:
DACC Main Campus Roof Replacement – Various Buildings
PAINTING 099000 - 6
1. One coat of block primer. 2. Two coats vinyl acrylic masonry paint, flat, thin 1st coat per manufacturer's
recommendations, TT - P - 19 C. C. Concrete Block: 1. Three coats of OKON W-2 water repellent sealer (modified acrylic emulsion). Transparent. D. Steel - Shop Primed and Existing Painted: 1. Touch-up with primer or reprime. 2. Two coats of alkyd enamel, semi-gloss. E. Steel - Galvanized: 1. One coat galvanize primer. 2. Two coats of alkyd enamel, semi-gloss. F. Steel - Galvanized Deck: 1. One coat galvanize primer. 2. 3 mil DFT thick minimum topcoat 3. Two coats of alkyd enamel, semi-gloss. END OF SECTION 099000