4
- - DESIGNER/DRAFTER: CHECKED BY: PROJECT TITLE: TOWN: DRAWING TITLE: PROJECT NO. DRAWING NO. SHEET NO. Filename: SHEET NO. REVISION DESCRIPTION DATE REV. DEPARTMENT OF TRANSPORTATION STATE OF CONNECTICUT SCALE 1"=60' 60 120 0 SCALE IN FEET OF WORK WHICH WILL BE REQUIRED. THE CONDITIONS OF ACTUAL QUANTITIES IN NO WAY WARRANTED TO INDICATE INVESTIGATIONS BY THE STATE AND IS SHEETS IS BASED ON LIMITED QUANTITIES OF WORK, SHOWN ON THESE THE INFORMATION, INCLUDING ESTIMATED SCALE AS NOTED 11/22/2017 BLOCK: SIGNATURE/ APPROVED BY: OFFICE OF ENGINEERING ...\PDU_MSH_PP_012_003_PLN-01.dgn Plotted Date: C O N N E C T I C U T D E P A R T M E N T O F T R A N S P O R T A T I O N PRELIMINARY CONCEPT REALIGNMENT OF ROUTE 6 TOWN OF BOLTON CONCEPTUAL DRAWING EXISTING CONDITIONS 83 COORDI NATE GRI D AD CONNECT I CUT ROUTE 44 EASTBOUND HO P R I V E R S T A TE P A R K T R A I L HO P RI VE R S T ATE PARK T RAI L NO T CH ROAD E XTE N S I ON NO T CH R OAD R OU TE 6 E A S T B OUND R OU TE 6 / 44 E A S T B OUND BRIDGE NO. 00484 BRIDGE NO. 04137 R=528', ACCEPTABLE FOR 40 MPH EXISTING ROUTE 6 CURVE NOTCH ROAD SIGHT LINES FOR OBSTRUCTING ROCK OUTCROPPING WARNING SIGN INTERSECTION FLASHING "T" PP_012_003 PLN-01 AND NOTCH ROAD, CONST. OF SHARED USE PATH QUARRY APARTMENTS EXISTING CONDITIONS TOWN OF BOLTON THE HOP RIVE TRAIL TO QUARRY ROAD SHARED USE PATH CONNECTING AND THE CONSTRUCTION OF A REALIGNMENT OF ROUTE 6 AND NOTCH ROAD PROPOSED PROJECT 12-003 (PP_012_003)

D PROPOSED PROJECT 12-003 (PP 012 003 ...30EEBA3C...EXISTING STRUCTURE RELOCATION OF NOTCH ROAD REALIGNMENT OF ROUTE 6 AND PROPOSED PROJECT 12-003 (PP_012_003) # 1 1 8 S N E T 1 0

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: D PROPOSED PROJECT 12-003 (PP 012 003 ...30EEBA3C...EXISTING STRUCTURE RELOCATION OF NOTCH ROAD REALIGNMENT OF ROUTE 6 AND PROPOSED PROJECT 12-003 (PP_012_003) # 1 1 8 S N E T 1 0

-

-

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

SCALE 1"=60'

60 1200

SCALE IN FEETOF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

11/22/2017

BLOCK:

SIGNATURE/

APPROVED BY:

OFFICE OF ENGINEERING

...\PDU_MSH_PP_012_003_PLN-01.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

PRELIMINARY CONCEPT

REALIGNMENT OF ROUTE 6TOWN OF BOLTON

CONCEPTUAL DRAWINGEXISTING CONDITIONS

83

CO

OR

DIN

AT

E

GRID

AD

CO

NN

EC

TIC

UT

ROUTE 44 EASTBOUND

HOP RIVER STATE PARK TRAIL

HOP RIV

ER STATE P

AR

K TR

AIL

NOTC

H

RO

AD EXTENSIO

NN

OT

CH

RO

AD

ROUTE 6 EASTBOUND

ROUTE 6/

44 E

ASTBOUND

BRIDGE NO. 00484

BRIDGE NO. 04137

R=528', ACCEPTABLE FOR 40 MPH

EXISTING ROUTE 6 CURVE

NOTCH ROAD

SIGHT LINES FOR

OBSTRUCTING

ROCK OUTCROPPING

WARNING SIGN

INTERSECTION

FLASHING "T"

PP_012_003

PLN-01AND NOTCH ROAD,CONST. OF SHARED USE PATH

QUARRY

APARTMENTS

EXISTING CONDITIONS

TOWN OF BOLTON

THE HOP RIVE TRAIL TO QUARRY ROAD

SHARED USE PATH CONNECTING

AND THE CONSTRUCTION OF A

REALIGNMENT OF ROUTE 6 AND NOTCH ROAD

PROPOSED PROJECT 12-003 (PP_012_003)

Page 2: D PROPOSED PROJECT 12-003 (PP 012 003 ...30EEBA3C...EXISTING STRUCTURE RELOCATION OF NOTCH ROAD REALIGNMENT OF ROUTE 6 AND PROPOSED PROJECT 12-003 (PP_012_003) # 1 1 8 S N E T 1 0

-

-

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

SCALE 1"=60'

60 1200

SCALE IN FEETOF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

11/22/2017

BLOCK:

SIGNATURE/

APPROVED BY:

OFFICE OF ENGINEERING

...\PDU_MSH_PP_012_003_PLN-02a.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

PRELIMINARY CONCEPT

REALIGNMENT OF ROUTE 6TOWN OF BOLTON

CONCEPTUAL DRAWINGALL PROPOSED WORK

NO

TC

H

RO

AD

ROUTE 6 EASTBOUND

ROUTE 44 EASTBOUND

NOTC

H

RO

AD EXTENSIO

N

ROUTE 6/

44 E

ASTBOUND

HOP RIV

ER STATE P

AR

K TR

AIL

HOP RIVER STATE PARK TRAIL

CUTBACK ROCK OUTCROPPING

BRIDGE NO. 00484

TO BE REMOVED

ROUTE 6 EASTBOUND

TO BE REMOVED

BRIDGE NO. 04137

PP_012_003

PLN-02

DECEMBER 2017

AND NOTCH ROAD,CONST. OF SHARED USE PATH

FILL

CUT

BITUMINIOUS CONCRETE DRIVE

BITUMINIOUS TO BE REMOVED

LEGEND

PROPOSED MILL AND FILL

BRIDGE TO BE REMOVED

FORMER RAILROAD RIGHT-OF-WAY

EXISTING STRUCTURE

RELOCATION OF NOTCH ROAD

REALIGNMENT OF ROUTE 6 AND

PROPOSED PROJECT 12-003 (PP_012_003)

Page 3: D PROPOSED PROJECT 12-003 (PP 012 003 ...30EEBA3C...EXISTING STRUCTURE RELOCATION OF NOTCH ROAD REALIGNMENT OF ROUTE 6 AND PROPOSED PROJECT 12-003 (PP_012_003) # 1 1 8 S N E T 1 0

#118

SNET

10+00

11+00

12+00

13+0014+00

15+00 16+00 17+0018+00

19+00

20+0021+00

22+0023+00

24+0025+00 26+00 27+00

28+00

29+00

PLN-03MLW

GAM TOWN OF BOLTON

PLAN SHEET

SHARED USE PATH

54" VERTICAL BARRIERRESTRIPE ROADWAY

2" MILL AND FILLFULL DEPTH RECONSTRUCTION

SHIFT ROADWAY INTO MEDIAN

RETAINING WALL

54" VERTICAL BARRIER

(POSSIBLE - DEPENDING ON SLOPE)

RETAINING WALL

EXISTING DRIVE

CONNECTION TO

20+0021+00

22+0023+00

24+0025+00 26+00 27+00

28+00

29+00

MA

TC

H

MA

RK

SE

E S

HE

ET PL

N - 3

26+00

20+0021+00

22+0023+00

24+0025+00 27+00

28+00

29+00

54" VERTICAL BARRIERSHARED USE PATH

FULL DEPTH RECONSTRUCTION

SHIFT ROADWAY INTO MEDIAN

RESTRIPE ROADWAY

2" MILL AND FILL

54" VERTICAL BARRIER SPLIT RAIL FENCE

MA

TC

H

MA

RK - 1

MA

TC

H

MA

RK - 1

REALIGNMENT OF ROUTE 6PP_012_003

AND NOTCH ROAD,CONST. OF SHARED USE PATH

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

SCALE 1"=40'

40 800

SCALE IN FEETOF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

11/22/2017

BLOCK:

SIGNATURE/

APPROVED BY:

OFFICE OF ENGINEERING

...\PDU_MSH_PP_012_003_PLN-03.dgn

Border Version: 11/29/13

Plotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

PRELIMINARY CONCEPT

DECEMBER 2017

FENCE

SPLIT RAIL

TUNNEL

EXISTING RAIL

METAL BEAM RAILMETAL BEAM RAIL

METAL BEAM RAILMETAL BEAM RAIL

RECONSTRUCTION

FULL DEPTH

SHIFT ROADWAY

SHARED-USE PATH

14+00

10+00

11+00

12+00

13+00

15+00 16+00 17+0018+00

19+00

(HOP RIVER TRAIL TO QUARRY ROAD)

CONSTRUCTION OF A SHARED-USE PATH

PROPOSED PROJECT 12-003 (PP_012_003)

Page 4: D PROPOSED PROJECT 12-003 (PP 012 003 ...30EEBA3C...EXISTING STRUCTURE RELOCATION OF NOTCH ROAD REALIGNMENT OF ROUTE 6 AND PROPOSED PROJECT 12-003 (PP_012_003) # 1 1 8 S N E T 1 0

29+0030+00

31+00 32+00

33+00

34+00

35+00

36+00

30+0031+00 32+00

33+00

34+00

3+000

3+612

3

MLW

PLN-04

TOWN OF BOLTON

30+00

31+00 32+00

33+00

34+00

35+00

36+0036

+1236

+12

SHARED USE PATH

AND IMPROVE SIGHTLINE

SHORTEN CROSSING

NARROW LANES TO

RESTRIPE ROADWAY

2" MILL AND FILL

SLIP RAMP TO ACCEPT ON-ROAD BICYCLESSHARED USE PATH

SPLIT RAIL FENCE

FULL DEPTH RECONSTRUCTIONSHIFT ROADWAY

54" VERTICAL BARRIER

CROSS ROUTE 44 EASTBOUND

CROSS ROUTES 44 WESTBOUND

MA

TC

H

MA

RK

SE

E S

HE

ET P

LN - 2

MA

TC

H

MA

RK

SE

E S

HE

ET P

LN - 2

PLAN SHEET

SHARED USE PATH

54" VERTICAL BARRIER

FULL DEPTH RECONSTRUCTIONSHIFT ROADWAY

TO ACCOMIDATE SHARED USE PATHSHIFT ROADWAY

RESTRIPE ROADWAY

2" MILL AND FILL

TO INCREASE SHOULDER WIDTHSHIFT LANES

ALTERNATE 1

ALTERNATE 2

PP_012_003

PEDESTRIAN MODIFICATIONSACCOMIDATE SIGNAL AND RECONFIGURE ISLAND TO

GUIDERAIL

GUIDERAIL

SPLIT RAIL FENCE

ALT 1 AND ALT 2

REALIGNMENT OF ROUTE 6

CONST. OF SHARED USE PATH AND NOTCH ROAD,

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

SCALE 1"=40'

40 800

SCALE IN FEETOF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

11/22/2017

BLOCK:

SIGNATURE/

APPROVED BY:

OFFICE OF ENGINEERING

...\PDU_MSH_PP_012_003_PLN-03.dgnPlotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

PRELIMINARY CONCEPT