25
D AA R Michael P. Doble, P.E., [email protected], 414-935-4435, www.daarcorp.com PROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL RIGHTS RESERVED. ADVANCED METHODS FOR SURVEYING BURIED UTILTIES INTRODUCTION TO SPAR AND CASE STUDY THE INFORMATION CONTAINED HEREIN IS PROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL RIGHTS RESERVED. LEADERSHIP EXPERIENCE QUALITY D AA R KNOWLEDGE

D AA R Michael P. Doble, P.E., [email protected], 414-935-4435, PROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL

Embed Size (px)

Citation preview

Page 1: D AA R Michael P. Doble, P.E., mike.doble@daarcorp.com, 414-935-4435,  PROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL

D A ARMichael P. Doble, P.E., [email protected], 414-935-4435, www.daarcorp.comPROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL RIGHTS RESERVED.

ADVANCED METHODS FOR SURVEYING BURIED UTILTIES

INTRODUCTION TO SPAR AND CASE STUDYTHE INFORMATION CONTAINED HEREIN IS PROPRIETARY AND CONFIDENTIAL.

© 2013 DAAR ENGINEERING, INC. ALL RIGHTS RESERVED.

LEADERSHIP

EXPERIENCE

QUALITY

D A A R

KNOWLEDGE

Page 2: D AA R Michael P. Doble, P.E., mike.doble@daarcorp.com, 414-935-4435,  PROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL

D A ARMichael P. Doble, P.E., [email protected], 414-935-4435, www.daarcorp.comPROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL RIGHTS RESERVED.

Summary• Problem/Solution• The Spar 300 System• Why a 3d Survey?• 3d Survey Concepts• Sample Projects

– High Pressure Gas Main Relocate– DOT Highway Project– Cable Crossing in River

Page 3: D AA R Michael P. Doble, P.E., mike.doble@daarcorp.com, 414-935-4435,  PROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL

D A ARMichael P. Doble, P.E., [email protected], 414-935-4435, www.daarcorp.comPROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL RIGHTS RESERVED.

The Problem

• Poorly mapped and abundant existing underground facilities complicate design and excavation

• Current Workflow– One-call service: Facilities marked– Facilities are un-earthed for depth– Spot location depths documented

• Problems– 2d data inaccuracies due to distortion– Spot depths may or may not tell the whole story– Depths are documented; not elevations

• Results– Designs require utility relocation– Utility strikes are common and

dangerous – April 2nd, 2008

Page 4: D AA R Michael P. Doble, P.E., mike.doble@daarcorp.com, 414-935-4435,  PROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL

D A ARMichael P. Doble, P.E., [email protected], 414-935-4435, www.daarcorp.comPROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL RIGHTS RESERVED.

The Problem

Page 5: D AA R Michael P. Doble, P.E., mike.doble@daarcorp.com, 414-935-4435,  PROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL

D A ARMichael P. Doble, P.E., [email protected], 414-935-4435, www.daarcorp.comPROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL RIGHTS RESERVED.

The Solution

• Prepare a 3d survey!• The Spar System

– 3d Magnetic Sensor– Trimble Access:

• Utility Survey Software• FieldSensTM Technology

– Trimble RTK-GNSS receiver– Transmitter

Page 6: D AA R Michael P. Doble, P.E., mike.doble@daarcorp.com, 414-935-4435,  PROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL

D A ARMichael P. Doble, P.E., [email protected], 414-935-4435, www.daarcorp.comPROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL RIGHTS RESERVED.

Why is Surveying Better than Locating?• We are professional surveyors: we provide professional quality data

• Avoid strikes and improve safety with accurate surveying• Provide for improved design workflow: data up front• Measure and document locating subsystem RMS error • Reduce depth ambiguity by surveying elevations (x, y AND z)• Locate with survey grade precision: RTK-GNSS• Combine overall errors from geospatial and locate subsystems

– Reduce the total effort to locate, map, document

• This technology allows for surveying from offset positions– Map the line without constant need to stay on peak or CL– Move away from distortion– Termed as casual contact– Survey where traditional methods don’t allow

Page 7: D AA R Michael P. Doble, P.E., mike.doble@daarcorp.com, 414-935-4435,  PROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL

D A ARMichael P. Doble, P.E., [email protected], 414-935-4435, www.daarcorp.comPROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL RIGHTS RESERVED.

Underwater or Deep Utility Mapping

Wireless sensor networking, synchronization results in improved measurement geometry

Page 8: D AA R Michael P. Doble, P.E., mike.doble@daarcorp.com, 414-935-4435,  PROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL

D A ARMichael P. Doble, P.E., [email protected], 414-935-4435, www.daarcorp.comPROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL RIGHTS RESERVED.

0 1 2 3 4 5 6 70

0.005

0.01

0.015

0.02

0.025

0.03

meters

field

str

engt

h, m

A/m

PeakNull

Single-Spar Line Mode

Target cable“Bleedover” cable

Model

Page 9: D AA R Michael P. Doble, P.E., mike.doble@daarcorp.com, 414-935-4435,  PROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL

D A ARMichael P. Doble, P.E., [email protected], 414-935-4435, www.daarcorp.comPROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL RIGHTS RESERVED.

Spar Range Summary

•Single Spar Line– Single epoch measurement, <3 meter range

•Dual Spar Line– Single epoch measurement, <15 meter range

•Dual Spar Sonde Tracking– Single epoch measurement, <8-12 meter range

Page 10: D AA R Michael P. Doble, P.E., mike.doble@daarcorp.com, 414-935-4435,  PROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL

D A ARMichael P. Doble, P.E., [email protected], 414-935-4435, www.daarcorp.comPROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL RIGHTS RESERVED.

Representative Projects

• High Pressure Gas Main Relocate– Objective: Save cost on hydroexcavation– Objective: Verify a difficult locate

• DOT Highway Project:– Objective: Save time and avoid utility strikes

• Cable Crossing in River– Objective: Document cable location for dredging

Page 11: D AA R Michael P. Doble, P.E., mike.doble@daarcorp.com, 414-935-4435,  PROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL

D A ARMichael P. Doble, P.E., [email protected], 414-935-4435, www.daarcorp.comPROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL RIGHTS RESERVED.

High Pressure Gas Relocate

Page 12: D AA R Michael P. Doble, P.E., mike.doble@daarcorp.com, 414-935-4435,  PROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL

D A ARMichael P. Doble, P.E., [email protected], 414-935-4435, www.daarcorp.comPROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL RIGHTS RESERVED.

Hydroexcavation to Verify

Page 13: D AA R Michael P. Doble, P.E., mike.doble@daarcorp.com, 414-935-4435,  PROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL

D A ARMichael P. Doble, P.E., [email protected], 414-935-4435, www.daarcorp.comPROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL RIGHTS RESERVED.

Depth Verification

Page 14: D AA R Michael P. Doble, P.E., mike.doble@daarcorp.com, 414-935-4435,  PROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL

D A ARMichael P. Doble, P.E., [email protected], 414-935-4435, www.daarcorp.comPROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL RIGHTS RESERVED.

Wisconsin Hwy 33 Saukville

Page 15: D AA R Michael P. Doble, P.E., mike.doble@daarcorp.com, 414-935-4435,  PROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL

D A ARMichael P. Doble, P.E., [email protected], 414-935-4435, www.daarcorp.comPROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL RIGHTS RESERVED.

Cable Crossing in River

Page 16: D AA R Michael P. Doble, P.E., mike.doble@daarcorp.com, 414-935-4435,  PROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL

D A ARMichael P. Doble, P.E., [email protected], 414-935-4435, www.daarcorp.comPROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL RIGHTS RESERVED.

Dual-Spar Water Locate Set-up

Page 17: D AA R Michael P. Doble, P.E., mike.doble@daarcorp.com, 414-935-4435,  PROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL

D A ARMichael P. Doble, P.E., [email protected], 414-935-4435, www.daarcorp.comPROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL RIGHTS RESERVED.

Project Results

• High Pressure Gas Main: Gas utility crews saved three days of excavation time in verification of pipe location and elevation

• Highway Project: Grading crews were able to grade over the line without any inadvertent strikes

• River Crossing: Dredging crew was able to dredge with confidence allowing the work to be completed in this section two days ahead of schedule

Page 18: D AA R Michael P. Doble, P.E., mike.doble@daarcorp.com, 414-935-4435,  PROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL

D A ARMichael P. Doble, P.E., [email protected], 414-935-4435, www.daarcorp.comPROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL RIGHTS RESERVED.

DAAR Experience in Summary

• Spar performed as specified• Gas main and tap elevations consistently measured from

surface to 12 feet below ground with accuracy of +/- 3 to 5 inches

• Highway 33 project compared previously measured gas main GPS elevation points to Spar data and noted +/- 1.5 inch elevation differences – very good!

• DEEP depths provide a challenge• Liability concerns alleviated by documented accuracy

Page 19: D AA R Michael P. Doble, P.E., mike.doble@daarcorp.com, 414-935-4435,  PROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL

D A ARMichael P. Doble, P.E., [email protected], 414-935-4435, www.daarcorp.comPROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL RIGHTS RESERVED.

QUESTIONS

INTRODUCTION TO SPAR AND CASE STUDYTHE INFORMATION CONTAINED HEREIN IS PROPRIETARY AND CONFIDENTIAL.

© 2012 DAAR ENGINEERING, INC. ALL RIGHTS RESERVED.D A A R

ADVANCED METHODS FOR SURVEYING BURIED UTILTIES

Page 20: D AA R Michael P. Doble, P.E., mike.doble@daarcorp.com, 414-935-4435,  PROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL

D A ARMichael P. Doble, P.E., [email protected], 414-935-4435, www.daarcorp.comPROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL RIGHTS RESERVED.

System Architecture

Page 21: D AA R Michael P. Doble, P.E., mike.doble@daarcorp.com, 414-935-4435,  PROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL

D A ARMichael P. Doble, P.E., [email protected], 414-935-4435, www.daarcorp.comPROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL RIGHTS RESERVED.

Note Records in Trimble Access

Page 22: D AA R Michael P. Doble, P.E., mike.doble@daarcorp.com, 414-935-4435,  PROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL

D A ARMichael P. Doble, P.E., [email protected], 414-935-4435, www.daarcorp.comPROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL RIGHTS RESERVED.

Export of Data

Page 23: D AA R Michael P. Doble, P.E., mike.doble@daarcorp.com, 414-935-4435,  PROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL

D A ARMichael P. Doble, P.E., [email protected], 414-935-4435, www.daarcorp.comPROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL RIGHTS RESERVED.

CSV File: Translated

Page 24: D AA R Michael P. Doble, P.E., mike.doble@daarcorp.com, 414-935-4435,  PROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL

D A ARMichael P. Doble, P.E., [email protected], 414-935-4435, www.daarcorp.comPROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL RIGHTS RESERVED.

EMF Equipment

Page 25: D AA R Michael P. Doble, P.E., mike.doble@daarcorp.com, 414-935-4435,  PROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL

D A ARMichael P. Doble, P.E., [email protected], 414-935-4435, www.daarcorp.comPROPRIETARY AND CONFIDENTIAL. © 2013 DAAR ENGINEERING, INC. ALL RIGHTS RESERVED.

EMF Connections