Cycle Isolation Monitoring

True North ConsultingRichard Duggan

SaskPowerAlyssa McLaughlin

EPRI Heat Rate Improvement ConferenceJanuary 25-27

St. Petersburg, Florida

Page 2: Cycle Isolation Monitoring - Home - True North Isolation Monitoring True North Consulting Richard Duggan SaskPower Alyssa McLaughlin EPRI Heat Rate Improvement Conference January 25-27

Agenda

Introduction Value of leaking valves Process for developing a Cycle Isolation Program Case study – SaskPower

Page 3: Cycle Isolation Monitoring - Home - True North Isolation Monitoring True North Consulting Richard Duggan SaskPower Alyssa McLaughlin EPRI Heat Rate Improvement Conference January 25-27

Introduction

Generating plants often suffer from power losses due to leakages through valves that are faulty and/or do not seat correctly.

Often these losses are significant and have been difficult to quantify.

Page 4: Cycle Isolation Monitoring - Home - True North Isolation Monitoring True North Consulting Richard Duggan SaskPower Alyssa McLaughlin EPRI Heat Rate Improvement Conference January 25-27

Cycle Isolation MonitoringCycle Isolation Monitoring

Monitor high energy valve leakageMonitor high energy valve leakage High energy valve leakage leads to:High energy valve leakage leads to:

Lost megawattsLost megawatts Reduced plant efficiencyReduced plant efficiency Potential valve damagePotential valve damage Increased heat rate!Increased heat rate!

Page 5: Cycle Isolation Monitoring - Home - True North Isolation Monitoring True North Consulting Richard Duggan SaskPower Alyssa McLaughlin EPRI Heat Rate Improvement Conference January 25-27

1% Leakage Effect on Heat Rate

0.62%Hot Reheat

0.80%Main Steam

Heat Rate ImpactLocation of Leakage in Cycle

Page 6: Cycle Isolation Monitoring - Home - True North Isolation Monitoring True North Consulting Richard Duggan SaskPower Alyssa McLaughlin EPRI Heat Rate Improvement Conference January 25-27

Types of Leakage

Leakage due to tank level control problems Leakage due to AOV valve setting issues Leakage due to MOV thermal expansion Relief valve drifting Steam cutting of valves Improper valve alignment Leakage resulting from maintenance on the system Leakage due to foreign material in the valve Leakage from startup valves being left open

Page 7: Cycle Isolation Monitoring - Home - True North Isolation Monitoring True North Consulting Richard Duggan SaskPower Alyssa McLaughlin EPRI Heat Rate Improvement Conference January 25-27

Cycle Isolation Monitoring

True North’s TP-Plus Cycle Isolation Monitoring software provides advanced cycle leakage detections.

This is a valuable tool for any thermal performance program to help quantify both heat rate loss and flow loss from valve problems.

Uses five different methods to predict valve leakages providing the user with confidence in the results.

This information is then used to prioritize maintenance and repair of valves.

Page 8: Cycle Isolation Monitoring - Home - True North Isolation Monitoring True North Consulting Richard Duggan SaskPower Alyssa McLaughlin EPRI Heat Rate Improvement Conference January 25-27

Process for Implementing Cycle Isolation Program

Y

N

Page 9: Cycle Isolation Monitoring - Home - True North Isolation Monitoring True North Consulting Richard Duggan SaskPower Alyssa McLaughlin EPRI Heat Rate Improvement Conference January 25-27

Identify Valves to Monitor

Review Plant Information Thermal Kits PEPSE Models P&ID’s Isometrics

Normally closed valves that if open, dump high energy fluid to a sink (condenser, blowdown tank, etc.)

Page 10: Cycle Isolation Monitoring - Home - True North Isolation Monitoring True North Consulting Richard Duggan SaskPower Alyssa McLaughlin EPRI Heat Rate Improvement Conference January 25-27

What Valves Should Be Monitored?

Feedwater heater dump valves Main steam line drain valves Gland seal unloader valve Turbine bypass valves Feedwater heater vent valves Gland steam isolation valves

Extraction steam line drain valves

Heater bypass valves Feed pump recirc valves Before and after seat drain

valves Steam drain line orifices (and

orifice bypass valves)

Page 11: Cycle Isolation Monitoring - Home - True North Isolation Monitoring True North Consulting Richard Duggan SaskPower Alyssa McLaughlin EPRI Heat Rate Improvement Conference January 25-27

Walkdown the Unit

Verify Location of Valves Determine measurement locations

Approximately 10 diameters downstream of valve Measure pipe temperature, not insulation temperature

Measure distance to sink Verify piping configurations

Look for sources of error Environmental conditions Other heat sources

Establish the walkdown order Document, document, document Record initial temperature measurements

Page 12: Cycle Isolation Monitoring - Home - True North Isolation Monitoring True North Consulting Richard Duggan SaskPower Alyssa McLaughlin EPRI Heat Rate Improvement Conference January 25-27

Condenser

Pipe surface temperature

Measurement Locations

Measure temperature approximately 10 diameters downstream of the valve. Be careful of conduction across the valve and piping.

If using infrared ensure it will be in the line of site from a safe location, but getting the device as close as possible to the pipe. Make sure the pipe is not “shiny” and that the hole in the insulation is adequate.

Know the drawings; look for other paths that could be a source of heat into the location you are measuring.

Page 13: Cycle Isolation Monitoring - Home - True North Isolation Monitoring True North Consulting Richard Duggan SaskPower Alyssa McLaughlin EPRI Heat Rate Improvement Conference January 25-27

Update List of Valves

Collect data on valves discovered during walkdown Update valve information

Upstream conditions Valve type, size Pipe size, schedule Distance to condenser

Record initial temperatures

Page 14: Cycle Isolation Monitoring - Home - True North Isolation Monitoring True North Consulting Richard Duggan SaskPower Alyssa McLaughlin EPRI Heat Rate Improvement Conference January 25-27

Determine if Valve Is Leaking

Determine nominal temperatures for non-leaking valves Establish threshold for identifying leaking valve

What temperature is indicative of a leak? Avoid false positives

Calculate Leakage Infer pressure inside pipe from temperature Use piping configuration and sink conditions to calculate flow Calculate value of fluid (high energy, high value) Convert flow to generation or heat rate loss.

Page 15: Cycle Isolation Monitoring - Home - True North Isolation Monitoring True North Consulting Richard Duggan SaskPower Alyssa McLaughlin EPRI Heat Rate Improvement Conference January 25-27

Prioritize If more than 1 valve is leaking, determine which valve is

worth more Effect on lost generation Cost to repair

Communicate with maintenance and/or operators to repair/replace valves Isolate if possible

Large valves are expensive to repair so make sure the benefit is there

Also include additional checks that confirm the valve is leaking

One thing to remember One thing to remember -- the the size of the leak today will not be size of the leak today will not be

the size of the leak tomorrowthe size of the leak tomorrow

Page 16: Cycle Isolation Monitoring - Home - True North Isolation Monitoring True North Consulting Richard Duggan SaskPower Alyssa McLaughlin EPRI Heat Rate Improvement Conference January 25-27

Verify Repairs

Always measure temperatures before and after repairs to ensure valve is repaired properly

Continue monitoring and ensure leaking condition does not return

Identify problem locations Document, document, document

What repair was performed? When was it performed?

Page 17: Cycle Isolation Monitoring - Home - True North Isolation Monitoring True North Consulting Richard Duggan SaskPower Alyssa McLaughlin EPRI Heat Rate Improvement Conference January 25-27

Cycle Isolation Implementation

True North Cycle Isolation software:EPRI HR Conference 2009

Interest expressed Implemented on two of our 305 MW units

• BDPS #6: 305 MW CE, 1814psia/1000F Reheat unit tangential twin furnace - 1978

• SHPS #1: 305 MW B&W, 1812psia/1000F Reheat unit front & back wall fired - 1992

Page 18: Cycle Isolation Monitoring - Home - True North Isolation Monitoring True North Consulting Richard Duggan SaskPower Alyssa McLaughlin EPRI Heat Rate Improvement Conference January 25-27

Cycle Isolation Implementation

Identify valves – P&IDs to True North Locate valves – walkdown of unit Quality of fluids – PEPSE models to True North

Page 19: Cycle Isolation Monitoring - Home - True North Isolation Monitoring True North Consulting Richard Duggan SaskPower Alyssa McLaughlin EPRI Heat Rate Improvement Conference January 25-27

Cycle Isolation Implementation

Site Visit with True North Located all valves Determined proper

measurement locations

Page 20: Cycle Isolation Monitoring - Home - True North Isolation Monitoring True North Consulting Richard Duggan SaskPower Alyssa McLaughlin EPRI Heat Rate Improvement Conference January 25-27

Cycle Isolation Implementation

Site Visit with True North Located all valves Determined proper

measurement locations Drilled holes in insulation

Page 21: Cycle Isolation Monitoring - Home - True North Isolation Monitoring True North Consulting Richard Duggan SaskPower Alyssa McLaughlin EPRI Heat Rate Improvement Conference January 25-27

Cycle Isolation Implementation

Site Visit with True North Located all valves Determined proper

measurement locations Drilled holes in insulation Measured temperatures

downstream of valves

Page 22: Cycle Isolation Monitoring - Home - True North Isolation Monitoring True North Consulting Richard Duggan SaskPower Alyssa McLaughlin EPRI Heat Rate Improvement Conference January 25-27

Cycle Isolation Implementation Leaking valves found

during initial walkdown:

Page 23: Cycle Isolation Monitoring - Home - True North Isolation Monitoring True North Consulting Richard Duggan SaskPower Alyssa McLaughlin EPRI Heat Rate Improvement Conference January 25-27

Cycle Isolation Implementation Determined final walkdown order & created Worksheet

Page 24: Cycle Isolation Monitoring - Home - True North Isolation Monitoring True North Consulting Richard Duggan SaskPower Alyssa McLaughlin EPRI Heat Rate Improvement Conference January 25-27

Cycle Isolation Implementation Entered valve information into TP-Plus

Page 25: Cycle Isolation Monitoring - Home - True North Isolation Monitoring True North Consulting Richard Duggan SaskPower Alyssa McLaughlin EPRI Heat Rate Improvement Conference January 25-27

Cycle Isolation Implementation

Entered walkdown results Planned maintenance on valves

Approx $200,000 on a typical unit

Page 26: Cycle Isolation Monitoring - Home - True North Isolation Monitoring True North Consulting Richard Duggan SaskPower Alyssa McLaughlin EPRI Heat Rate Improvement Conference January 25-27

Cycle Isolation Implementation Post-OH Walkdown:

Approx $100,000 on a typical unit

Page 27: Cycle Isolation Monitoring - Home - True North Isolation Monitoring True North Consulting Richard Duggan SaskPower Alyssa McLaughlin EPRI Heat Rate Improvement Conference January 25-27

Cycle Isolation Implementation

Next Steps

Page 28: Cycle Isolation Monitoring - Home - True North Isolation Monitoring True North Consulting Richard Duggan SaskPower Alyssa McLaughlin EPRI Heat Rate Improvement Conference January 25-27

Using the Software

Collect Valve Information Data for each valve is entered into input forms or can be

imported from spreadsheets which then produce results from advanced cycle isolation loss calculations which can be graphed and reported to monitor valve degradation over time.

Page 29: Cycle Isolation Monitoring - Home - True North Isolation Monitoring True North Consulting Richard Duggan SaskPower Alyssa McLaughlin EPRI Heat Rate Improvement Conference January 25-27

Plant Walkdowns

The plant records downstream measurements of temperatures using handheld equipment. Some users of TP-Plus install

thermocouples to record temperature measurements.

Each measurement is recorded using TP-Plus Walkdown Worksheet forms or can be uploaded from spreadsheets or handheld recording devices.

Page 30: Cycle Isolation Monitoring - Home - True North Isolation Monitoring True North Consulting Richard Duggan SaskPower Alyssa McLaughlin EPRI Heat Rate Improvement Conference January 25-27

Action Reports

Page 31: Cycle Isolation Monitoring - Home - True North Isolation Monitoring True North Consulting Richard Duggan SaskPower Alyssa McLaughlin EPRI Heat Rate Improvement Conference January 25-27

Action Recommended Reports

Page 32: Cycle Isolation Monitoring - Home - True North Isolation Monitoring True North Consulting Richard Duggan SaskPower Alyssa McLaughlin EPRI Heat Rate Improvement Conference January 25-27

Action Taken Reports

Page 33: Cycle Isolation Monitoring - Home - True North Isolation Monitoring True North Consulting Richard Duggan SaskPower Alyssa McLaughlin EPRI Heat Rate Improvement Conference January 25-27

Graphing Interface Menu

Page 34: Cycle Isolation Monitoring - Home - True North Isolation Monitoring True North Consulting Richard Duggan SaskPower Alyssa McLaughlin EPRI Heat Rate Improvement Conference January 25-27

Graphing

Page 35: Cycle Isolation Monitoring - Home - True North Isolation Monitoring True North Consulting Richard Duggan SaskPower Alyssa McLaughlin EPRI Heat Rate Improvement Conference January 25-27

Results

0

0.2

0.4

0.6

0.8

1

1.2

1.4

1.6

1.8

2

High Pressure Drain to condenser - BypassLine

MW

e Lo

ss

High Pressure Drain tocondenser - BypassLine

High Pressure Drain tocondenser

Main Stean Stop Valve-above Seat Drain

Main Stean Stop Valve-below Seat Drain

Valve

Original Temp(°F)

Final Temp (°F)

MWe Savings

Approximate Fuel Cost Savings

(Annualized)Main Stean Stop Valve-below Seat Drain 495 100 1.3 137,000.00$ Main Stean Stop Valve-above Seat Drain 429 161 0.4 42,000.00$ High Pressure Drain to condenser 199 92 0.1 10,500.00$ High Pressure Drain to condenser - Bypass Line 227 93 0.1 10,500.00$

Total 1.9 200,000.00$

Page 36: Cycle Isolation Monitoring - Home - True North Isolation Monitoring True North Consulting Richard Duggan SaskPower Alyssa McLaughlin EPRI Heat Rate Improvement Conference January 25-27

Conclusion

Prioritize valve leakages Program to structure leakage measurement Identification of leaking valves can happen very quickly Tracking of leaking valves can be very rewarding

Estimate flow losses to cycle Estimate lost generation and heat rate impact Rapid Return on Investement!