Government of India
Ministry of Water Resources River Development & Ganga Rejuvenation Central Water & Power Research Station
Khadakwasla, Pune – 411 024
Issue No.: 09 September 2017
____________________________________________________________________
CWPRS MONTHLY INFORMATION BULLETIN ________________________________________________________________________________
1. ESTIMATES
1.1 Submitted 03
1.2 Awarded 05
2. REPORTS SUBMITTED 06
3. RESEARCH PAPERS
3.1 Submitted 07
3.2 Published 08
4. PARTICIPATION IN SEMINARS/ SYMPOSIA/ CONFERENCES 08
5. LECTURES DELIVERED 09
6. PARTICIPATION IN MEETINGS
6.1 Technical Committees 09
6.2 Other Committees 09
7. TRAINING OF PERSONNELS 09
8. IMPORTANT VISITORS 10
9. NEW APPOINTMENTS / PROMOTIONS / RETIREMENTS 10
10. TRAINING PROGRAMMES ORGANIZED 11
11. OTHER INFORMATION 12
Phones : 24103378 Fax : 2438 1004 Email : [email protected] web: http://cwprs.gov.in
September 2017
2
Summary Information For 2009-2017
Years Jobs Awarded
_____________________
Nos. | Amount (Rs.)
Reports Submitted
Papers Published
Participation in Seminars/ Symposia/ Conferences
Lectures Delivered
Technical Committee Meetings
Training of Personnel
Training Programmes/ Conferences Organized
2009-10 118 14,46,68,747 94 57 39 36 30 59 04
2010-11 159 17,06,34,397 95 94 38 52 23 61 11
2011-12 139 18,56,13,568 116 63 26 45 42 88 08
2012-13 150 22,53,10,859 120 67 44 57 24 55 08
2013-14 152 18,24,51,087 112 63 37 68 21 54 11
2014-15 153 25,69,14,032 113 62 58 47 12 62 09
2015-16 85 13,95,89,971 106 65 51 74 17 120 10
2016-17 111 25,90,34,704 95 90 114 97 23 315 17
STUDIES AWARDED FOR CURRENT YEAR 2017-2018
Till Aug -17 57 14,14,16,325 35 18 06 05 17 538 07
During September -17
22 2,81,34,500 03 01 00 04 03 51 03
Total 7 9 16,95,50,825 38 19 06 09 20 589 10
Estimate submitted to Client but yet to be awarded
September 2017 22 6,22,86,760 - - - - - - -
CWPRS Information Bulletin September 2017
3
1. ESTIMATES
1.1 Submitted: (22 Nos. totaling to Rs, 6,22,86,760/-)
Sl. No.
Name of Work Sponsoring Agency Division Amount (Rs.)
1 Seismic Hazard Assessment of North and North East India
Project Director (Drip) & Director (DSR) Central water commission Dam Safety (Rehabilitation) Directorate 3rd floor, CWC New Library Building New Sewa Bhavan, R. K. Puram New Delhi-110066
ES 96,41,890
2 Mathematical model studies for transient analysis of surge shaft and tail race system of Arun - III H.E. Project Nepal
Additional General Manager, Satluj Jal Vidut Nigam Ltd. (JVNL), Design Uttarakhand Project and Arun-111 HEP Shakti Sadan, Sivn Corporate Office Complex, Shanan, Shimla, 171006, Himachal Pradesh (H.P) Phone-Fax:(0177) 2660131
SED 50,45,460
3 Mathematical model studies for estimation of siltation for the development of proposed Domestic Cruise Terminal at 15, Victoria Dock for M/s JNPT, Mumbai, Maharashtra.
Chief Engineer Mumbai Port Trust, Port House, 3rd floor Shoorji Vallabhdas Marg, Ballard Estate, Mumbai-400001
PH-III 12,87,170
4 Mathematical model studies for surge Analysis of Gungshi Barrage lift irrigation Scheme Murtijapur Taluka Dist.Akola, Maharashtra.
Executive Engineer, Amaravati Project Construction Division No.1 Jalajampada, Parisar Jail Road, Amaravati District Maharashtra, Telephone No-07212664920 Pin-444602 Maharashtra.
SED 2,10,680
5 Mathematical model studies to Predict dispersion of different oil Spill Scenarios under different wind and wave Conditions for M/s Mormugao, Port Trust, Goa.
Shri D. D Ambe, Executive Engineer Administrative office Head Land Sada, Mormugao Port Trust, Goa-403804
PH-I 11,19,590
6 Running & Maintenance of Mumbai Port Model, at CWPRS, Pune (Sept-2017 to Aug-2018)
The Chief Engineer, Mumbai Port Bhavan Mumbai Port Trust, Shoorji Vallabhdas Marg, Mumbai-400001
PH-III 28,09,720
7 Micro earthquake study for Kirthai-II HEP, Kishtwar, J & K
Chief Engineering Geologist, Jammu & Kashmir, Power Development Corporation, Geological wing, CID Block, PDD Complex, Bemina Srinagar 190018 Camp office 480-F Nitco Lane, Talab Tillo, Jammu
ES 11,82,330
8 Monitoring of blast Vibrations during under water blasting for deepening and widening of Mumbai Harbour Channel & JN Port channel (Phase-II) at JNPT, Mumbai, Maharashtra.
The Project Director, M/s Boskalis International B. V Bandra Kurta Complex, Bandra East, Mumbai 400051 Maharashtra.
VT 19,84,100
9 Conducting Bathymetric Survey of River Dibang at Gauge and Discharge Site Arunachal Pradesh.
Ramesh Kumar, Chief Engineer (Civil) Dibang Multipurpose Project (NHPC Ltd) Mayu Sector, P. O Roing, District-Lower Dibang Valley Arunachal Pradesh.
HI 9,80,420
CWPRS Information Bulletin September 2017
4
10 Mathematical model studies for evolving find Protection Measures for the river Swan from Sautokhgarh to Shri Anandpur Sahib in Punjab area
Executive Engineer, Irrigation (Punjab) Chandigarh Water Management investigation Division, Ropar
RH 23,91,200
11 Mathematical model studies for the bank protection works on right bank of River Tapi at Baudhan Pipariya & Vareil
Executive Engineer, Drainage Division No.2 opp. Chopati, Nr. MTB College, Athwalines Surat-39501, Gujarat
RH 7,56,220
12 Hydraulic model studies for determination of discharge coefficient for Teesta barrage Project, West Bengal (2-D sectional model)
Deputy Secretary Govt of West Bengal Jalsampad Bhavan, 3rd floor, Western Block Bidhangar, Salt Lake City, Kolkata, 700091 West Bengal.
HAPT 60,50,270
13 Running and Maintenance of 3-D Comprehensive model of Teesta IV Dam Spillway Sikkim (for one year)
Shri Vishal Saini, Chief Engineer, NHPC office complex, sec-33 Faridabad-121003, Haryana
SED 30,31,760
14 Seismic Hazard Assessment of North and North East India.
Project Director, (DRIP) & Director, (DSR) Central Water Commission, Dam Safety (Rehabilitation) Directorate 3rd floor, CWC New Library Building Near Sewa Bhavan, K. K Puram, New Delhi-4110066
ES 1,15,16,740
15 Desk study for undertaking analysis of prototype data on beach profiles at Project Varsha
The DG Varsha HQ, Project Varsha 1HQ MoD (Navy) Room No.50 'A' Block Hutment, Dalhousie Road New Delhi-110011
PH-II 84,10,290
16 Mathematical model studies for evolving Flood Protection measures and anti erosion works along the tributaries (Sundanwala, Konthriya 1 & 11 and Mandi Khala)v of River Bata.
Executive Engineer, 1 & RH Division, Paonta, Sahil, Distt, Sirmour Himachal Pradesh.
RH 12,52,080
17 Mathematical model studies for evolving Flood Protection measure and antierosion work along Palhori Khala tributary of River Yamuna.
Executive Engineer, 1 & RH Division, Paonta Sahib, Distt, Sirmour, Himachal Pradesh.
RH 5,46,030
18 Mathematical model studies for surge Analysis of Tembhu lift irrigation Scheme Stage-V, Taluka:Karad, Dist. Satara, Maharashtra.
Executive Engineer Water Resources Department Tambhu Lift irrigation Project DN. No.1 Sangli, Maharashtra.
SEP 4,44,290
19 Revival of Twiki Tube Piezometers (TTPS) of Sukhi Dam, Government of Gujarat, Bodeli, Gujarat.
Executive Engineer, Sukhi Project, Division No.2, Bodeli, Dist - Chhotaudepur Gujarat.
Hyd-INST
3,69,040
20 Mathematical model studies for evolving Flood Protection measures and antierosion works along the tributaries tributaries Cnimbuwala Kodewala, Deuwala and Dhonwala Khala.
Executive Engineer 1 & RH Division, Paonta Sahib, Distt, Sirmour, Himachal Pradesh.
RH 8,77,380
21 Revival of Twin Tube Piezometers (TTPS) of Madhuban Dam, Government of Gujarat, Near Vapi, Gujarat.
Executive Engineer, Madhuban, Damaganga Project, Gujarat.
Hyd-INST
3,57,840
22 Mathematical and desk studies for river training and protection works in the vicinity of Narmada main canal and Banas river crossing Village, Gujarat.
Superintending Engineer, SSNL, Gandhinagar.
BE 20,22,260
CWPRS Information Bulletin September 2017
5
1.2 Awarded: (22 Nos. totaling to Rs. 2,65,69,570 /- + 15,64,930/-for calibration works 15 Nos.)
Sl. No.
Name of Work
Sponsoring Agency Division Amount (Rs.)
1. Evaluation of properties of Geotextile material of Geobags from Flood Control Division No.2, Jhanharpur, Bihar
The Executive Engineer, Flood Control Division-2, Jhanjharpur, Naryar (Lohana Road), Dist, Madhubani, Bihar 847407
GE 1,00,720
2. Evaluation of properties of geotextile material of geobags from Flood Control Divn. No.2 Khagariya, Bihar
The Executive Engineer, Flood Control Division No.2, Khagariya, Bihar - 851204
GE 1,53,690
3. Mathematical Model Studies for Development Fisheries Harbour at Madhwad, Gujarat
Additional Chief Engineer (PSM), WAPCOS Ltd., Project Office, Gandhinagar
MMCE 8,10,110
4. Desk & Wave Flume studies for the design of breakwaters for the development of fishery harbour of Madhwad, Gujarat
Additional Chief Engineer (PSM), WAPCOS Ltd., Project Office, Gandhinagar
CHS-II 9,76,070
5. Mathematical Model Studies for Development of Fisheries Harbour at Mangrol (Phase-III), Gujarat
Additional Chief Engineer (PSM), WAPCOS Ltd., Project Office, Gandhinagar
MMCE 8,10,110
6. Desk & Wave flume studies for the design of breakwaters for development of Fishery Harbour at Mangrol (Phase-III), Gujarat
Additional Chief Engineer (PSM), WAPCOS Ltd., Project Office, Gandhinagar
CHS-II 97,607
7. Mathematical model studies for wave tranquility for development of fishing harbour at Navabandar, Gujarat
Additional Chief Engineer (PSM), WAPCOS Ltd., Project Office, Gandhinagar
MMCE 8,00,510
8. Mathematical Model Studies for Tidal hydrodynamics and sedimentation for the development of Fisheries Harbour at Navabandar, Gujarat
Additional Chief Engineer (PSM), WAPCOS Ltd., Project Office, Gandhinagar
MMCE 6,77,460
9. Desk and wave flume studies for the design of breakwaters for the development of fishery harbour at Navabandar, Gujarat
Additional Chief Engineer (PSM), WAPCOS Ltd., Project Office, Gandhinagar
CHS-II 9,76,070
10. Micro earthquake study for Kirthai HEP, Kishtwar, J & K
Chief Engineer ,Geologist, Jammu & Kashmir Power Development Corporation, Geologist Wing CID Block, PDD Complex, Bemina Srinagar - 190 018, Comp Office 480-F, Nitco Lane, Talab Tillo
ES 35,61,730
11. Underwater Seismic reflection Survey for M/s Mazgaon Dock Shipbuilders Ltd. At Mumbai, Maharashtra.
AGM (SB-HS & ID), Mazagaon Dock Shipbuilders Ltd. Dockyard Road Mazogaon, Mumbai-400010 Maharashtra.
GP 9,34,340
12. Desk Studies for the design of Coastal Protection work at Dumas-Sultanabad, Taluka-Choryasi, Dist. Surat (Phuse-II)
Executive Engineer, Surat Canal Division, Narmada Water Resources, Water Supply & Kulpasur Department Near M. T. B. Collage Athwalines, Surat-395001.
CHS-II 7,04,610
13. Running Maintenance of New wave model of Mormugao Port, Goa during 2017-2018
The Chief Engineer ,Mormugao Port Trust, Administrative office, Headland Sada, Mormugao, Goa-403804
PH-I 13,68,080
14. Performance Testing of Sample Submessible Pumps for Irrigation Department Uttar Pradesh, Lucknow-
Superintending Engineer, Central Equipment & Flores procurement Cell, irrigation & water resources
HMC 3,62,070
CWPRS Information Bulletin September 2017
6
2017 department Uttar Pradesh Ganga Sinchai Bhawan Telebagh, Lucknow-226025
15 Desk studies for disposal of dredged Sediment for development of Marina in Goa for Mormugao Port Trust.
The Prema Kumar, Dy.Chief Engineer, Administrative office Head land Sada, Mormugao Port Trust, Goa-403804
PH-I 1,00,000
16 Root Cause analysis of premature damage of turbine runnes blades suggest remedial measures and efficiency evaluation of Dudthganga Hydro Power Station Dist. Kolhapur, Maharashtra.
Superintending Engineer Hydro Power Circle 6th floor Prakash Bhawan Plot No. 106, Senapati Bapat Marg, Pune- 411016
HMC 6,79,390
17 Desk & wave flume studies for the design of breakwater for the development of Fishery harbour at Vadarevu in Prakasam district Andhra Pradesh.
Sr. General Manager (P & H) WAPCOS LIMITED, 76-C Institutional Area, Sector-18 Gurgaon-122015 (Haryana), India.
CHS-II 6,07,140
18 Desk & wave flume studies for the design of breakwater for the development of Fishery harbour at Uppada in East Godavari district Andhra Pradesh
Sr. General Manager (P & H) WAPCOS LIMITED, 76-C Institutional Area, Sector-18 Gurgaon-122015 (Haryana), India.
CHS-II 6,07,140
19 Desk & wave flume studies for the design of breakwater for the Phase-II development of Nizampatnam Fishery harbour in Guntur district, Andhra Pradesh
Sr. General Manager (P & H), WAPCOS LIMITED 76-C, Institutional Area Sector-18, Gurgaon-122015 (Haryana), India.
CHS-II 6,07,140
20 Desk & wave flume studies for the design of breakwater for the Phase-II development of Machilipatnam Fishery harbour in Krishna district, Andhra Pradesh.
Sr. General Manager (P & H), WAPCOS LIMITED 76-C, Institutional Area Sector-18, Gurgaon-122015 (Haryana), India.
CHS-II 6,07,140
21 Hydraulic model studies for Additional Spillway of Hirakud dam, Odisha, 1:40 Scale, 2-D sectional model.
Shri. Haramohan Pradhan Chief Engineer & Basin Manager Hirakud Dam Circle, Burla-768017 Odisha.
SED 70,89,000
22 Dam Break studies for Khadakwasla Irrigation system consisting of 4 Reservoirs-Temghar, Panshet, Varasgaon and Khadakwasla, Maharashtra.
Superintending Engineer Pune Irrigation Circle, Sinchan Bhavan Barne Road Mangalwar Peth, Pune-411011, Maharashtra.
SWH 30,60,980
2. REPORTS SUBMITTED: (03 Nos.)
S. No. Title Report No Month/Year
1. Temperature Control studies on mass concrete mix M15 A80 for Spillway Blocks of Polavaram Dam, West Godavari, Andhra Pradesh
5519 09/2017
2. Underwater Seismic Reflection Survey for M/s Mazagaon Dock Shipbuilders ltd. Mumbai Maharashtra.
5520 08/2017
3. Geotechnical stability studies and Settlement analysis for proposed Breakwater at 2nd stage Development of Karwar Port, Karnataka.
5521 09/2017
CWPRS Information Bulletin September 2017
7
3. RESEARCH PAPERS
3.1 Submitted – (28 Nos.)
1. Paper Titled " Prediction of siltation for mega terminal in macro tidal region by hybrid modeling ” by A.A. Purohit, M.M. Vaidya, A. Basu, K.A. Chavan , for possible publication in 22nd International Conference on Hydraulics, Water Resources & Coastal Engineering - HYDRO 2017.
2. Paper Titled “Evolving gate operation schedule for spillway through hydraulic model studies" by B.S. Sunderlal, Dr. M.R. Bhajantri, Dr. (Mrs) V.V. Bhosekar, R.. Bhate, Amol H. Gaikwad, for possible publication in 22nd International Conference on Hydraulics, Water Resources & Coastal Engineering - HYDRO 2017.
3. Paper Titled” Well logging - a state of art technology in resolving problems in hydraulic structures" by Dr. Rolland Andrade, Govind Panwalkar, N.V. Deshpande for possible publication in 22nd International Conference on Hydraulics, Water Resources & Coastal Engineering – HYDRO 2017.
4. Paper Titled “Assessment of applicability of particular probability distribution for extreme value analysis of rainfall under missing data scenario” by N. Vivekanandan, Dr. C. Ramesh, R.S. Jagtap for possible publication in 22nd International Conference on Hydraulics, Water Resources & Coastal Engineering – HYDRO 2017.
5. Paper Titled” Performance of modified spillway for heightened gravity dam” by V.S. Rama Rao, Dr. M.R. Bhajantri, Amit Kulhare, Mrs. P.P. Gadge for possible publication in 22nd International Conference on Hydraulics, Water Resources & Coastal Engineering – HYDRO 2017.
6. Paper Titled "Numerical model studies to assess wave transmission through permeable structure" by Amit Kumar Jha, K.H. Barve, L.R. Ranganath for possible publication in 22nd International Conference on Hydraulics, Water Resources & Coastal Engineering – HYDRO 2017.
7. Paper Titled " Study of impact on hydrodynamics and siltation due to shifting of offshore breakwater” by L.R. Ranganath, B. Krishna, Dr. A.K. Singh, G.A. Rajkumar, Karthikeyan M for possible publication in 22nd International Conference on Hydraulics, Water Resources & Coastal Engineering- HYDRO 2017.
8. Paper Titled "Mathematical Model Studies to optimize the layout of fisheries harbour at Manjeshwar, Kerala" by K.H. Barve, M.D. Sawant, Dr. Prabhat Chandra, T. Nagendra for possible publication in 22nd International Conference on Hydraulics, Water Resources & Coastal Engineering - HYDRO – 2017.
9. Paper Titled “Impact of tides on a typical port situated at upstream of tidal channel" by Anil Bagwan, Jiweshwar Sinha for possible publication in 22nd International Conference on Hydraulics, Water Resources & Coastal Engineering - HYDRO – 2017.
10. Paper Titled " Numerical simulation of flow over spillway with sloping apron stilling basin type energy dissipator" by K.T. More, Dr. M.R. Bhajantri, Dr. (Mrs) V.V. Bhosekar for possible publication in 22nd International Conference on Hydraulics, Water Resources & Coastal Engineering - HYDRO – 2017.
11. Paper Titled “ Impact of different river discharge condition on sedimentation in the navigation channel and river mouth - a case study " by V.B. Sharma, Dr. J.D. Agrawal for possible publication in 22nd International Conference on Hydraulics, Water Resources & Coastal Engineering - HYDRO – 2017.
12. Paper Titled "Evaluation of performance of the methods used in estimation of evaporation" by N. Vivekanadan for possible publication in 5th India Water Week 2017.
13. Paper Titled "Morphological studies to optimize siltation in fishing harbor in south-west coast of India" by Dr. A. K. Singh, B. Krishna, M. Karthikeyan, L. R. Ranganath for possible publication in 22nd International Conference on Hydraulics, Water Resources & Coastal Engineering-HYDRO 2017.
14. Paper Titled” Physical and numerical simulation of scour downstream of ski-jump bucket spillway-a case study" by Amit Kulare, Dr. M. R. Bhajantri, Dr. (Mrs.) V. V. Bhosekar for possible publication in 22nd International Conference on Hydraulics, Water Resources & Coastal Engineering-HYDRO 2017.
15. Paper Titled” Hydraulic model studies for channelization of river Kosi by using Type shape spur "by Dr. S. A. Burele, Prof. Nayan Sharma, Pro. Z. Ahmad, Pro. I. D. Gupta for possible publication in 22nd International Conference on Hydraulics, Water Resources & Coastal Engineering-HYDRO 2017.
CWPRS Information Bulletin September 2017
8
16. Paper Titled “ Formulation of relation between rainfall intensity, duration and frequency for a city in India” by K. B. Bobade, S. G. Manjunatha for possible publication in 22nd International Conference on Hydraulics, Water Resources & Coastal Engineering-HYDRO 2017.
17. Paper Titled "Design of multipurpose tidal basin model for estuarine port development studies” by P. A. Kashyape, H. B. Jagadeesh, T. Nagendra for possible publication in 22nd International Conference on Hydraulics, Water Resources & Coastal Engineering-HYDRO 2017.
18. Paper Titled “Hydrodynamic modeling for development of a port in an estuary" by A. K. Singh, L. R. Ranganath, M. Karthikeyan for possible publication in 4th International Conference in Ocean Engineering (ICOE2018).
19. Paper Titled” Desk studies and modeling sedimentation pattern in gulf of Khambhat" by L. R. Ranganath, Dr. A. V. Sriram, M. Karthikeyan for possible publication in 4th International Conference in Ocean Engineering (ICOE2018).
20. Paper Titled "Application of FEM in evolving optimal layout of semi-enclosed basin to minimize siltation in complex micro tidal region for case of mega ship building" by A. A. Purohit, M. M. Vaidya for possible publication in 4th International Conference in Ocean Engineering (ICOE2018).
21. Paper Titled "Numerical modeling of wave propagation for fishery harbor on west coast of India” by Mrs. Vaibhavi Roy, Amol Borkar for possible publication in 22nd International Conference on Hydraulics, Water Resources & Coastal Engineering-HYDRO 2017.
22. Paper Titled” Mathematical model studies for the analysis of inclined surge tunnels” by Mrs. Sushma Vyas, Y. N. Srivastava, Dr. (Mrs.) V. V. Bhosekar for possible publication in 22nd International Conference on Hydraulics, Water Resources & Coastal Engineering-HYDRO 2017.
23. Paper Titled” Developments of Fishery harbor with long training walls along creek inlet mouth in east coast of India: a case study" by Mrs. Shivani Sahu, Anil Bagwan, Jiweshwar Sinha for possible publication in 22nd International Conference on Hydraulics, Water Resources & Coastal Engineering-HYDRO 2017.
24. Paper Titled” Performance assessment of upgraded spillway-case study” by Mrs. V. P. Gadhe, Dr. R. G. Patil, Dr. (Mrs.) V. V. Bhosekar for possible publication in 22nd International Conference on Hydraulics, Water Resources & Coastal Engineering-HYDRO 2017.
25. Paper Titled “ Mitigating cavitation on high head orifice spillways" by R. R. Bhate, Dr. M. R. Bhajantri, Dr. (Mrs.) V. V. Bhosekar for possible publication in 22nd International Conference on Hydraulics, Water Resources & Coastal Engineering-HYDRO 2017.
26. Paper Titled " Experimental investigations for Telengiri dam spillway, Irrigation Project, Odisha- case study" by Dr. (Mrs.) Prajakta P. Gadge, Dr. M. R. Bhajantri, Dr. (Mrs.) V. V. Bhosekar for possible publication in 22nd International Conference on Hydraulics, Water Resources & Coastal Engineering-HYDRO 2017.
27. Paper Titled "Modeling of scour downstream of Ski jump bucket” by Mrs. S. R. Patnaik, Dr. M. R. Bhajantri, Mrs. V. P. Gadhe, Dr. (Mrs.) V. V. Bhosekar for possible publication in 22nd International Conference on Hydraulics, Water Resources & Coastal Engineering-HYDRO 2017.
28. Paper Titled “Significance of Site Specific Stiffness parameters on settlement behaviour of Rubble Mound Breakwater constructed on soft marine clay" by Tanusree Samanta, J.S Edlabadkar, M.V. Chhatre, for possible publication in Indian Geotechnical conference 2017, GeoNest.
3.2 Published: (01 No.)
1. Paper Titled " Tracing dam seepage using nuclear logging and tracer techniques” by G.A. Panvalkar, A.D. Chunade published in ISH Journal of Hydraulic Engineering, September 2017.
4. PARTICIPATION IN SEMINARS/ SYMPOSIA/ CONFERENCES/ - NIL
CWPRS Information Bulletin September 2017
9
5. LECTURES DELIVERED – ( 4 Nos.)
Sl. No. Title Event, Place, Date Name of Officer
1. RMU of Hydro Power Plants Kolhapur, 01 September, 2017
Shri M.S.R. Naidu, Sci-B
2. i) Global positioning system & its application
ii) Sonar Bathymetry in water resources and processing of bathymetry
NWA, Pune 11 - 22 September, 2017.
Shri Selva Balan M, Sci-D
3. Management of Dredged Material
ITC Maratha, Mumbai 07 September, 2017.
Shri V.K. Shukla, Sci-B
4. Satellite & Sensor NWA, Pune 11 - 22 September, 2017.
Shri S.D. Ranade, Sci-D
6. PARTICIPATION IN MEETINGS: 6.1 Technical Committee Meetings: (03 Nos.)
Sl. No.
Name of Committee Place and Date Participant(s)
1. Attended meeting by Secretary, MoWR, RD & GR regarding revision of pension cases
New Delhi, 18 September, 2017
Dr. (Mrs) V.V. Bhosekar ,Director
2. Attended meeting with Project Authorities regarding hydraulic model studies
New Delhi 19September,2017
Dr. (Mrs) V.V. Bhosekar , Director
3 Attended meeting related to Hydrometry and ISO works
BIS, New Delhi 20 September,2017
Dr. (Mrs) V.V. Bhosekar , Director
6.2 Other Meetings:
Sl. No.
Name of Committee Place and Date Participant(s)
1. Attended wrap up meeting of NHP at MOWR, D & GR chaired by Hon. Secretary, MoWR, RD & GR
New Delhi, 04 September, 2017
Shri N.D. Atkekar, Sci-D
2. Attended meeting on “Dam Safety Guidelines”.
CWC, New Delhi 27 September,2017
Shri A.K. Ghosh, Sci-D
3. Attended meeting on “Dam Rehabilitation Committee “
SSNNL, Gujarat 27 – 28 September, 2017
Shri Selva Balan M., Sci-D
4. Attended BIS meeting.
New Delhi, 21 September, 2017
Dr. C. Krishnaiah, Sci-D
7. TRAINING OF PERSONNEL – (09 Trainings and 51 Personnel)
Sl. No.
Title Event, Place, Date Name of Officer
1. World Bank Procurement Procedure
NWA, Pune 25-27 September, 2017
Shri T.K. Swain, Sci-C Shri Subba Rao Ch, Sci-B Shri Rahul Kumar Patel, RA
CWPRS Information Bulletin September 2017
10
2. Rock Mechanics and geophysical investigation for water resources projects
CSMRS, New Delhi 21-22 September, 2017
Shri Vivek B. Bagade, ARO Shri Santhosh Kumar Ranga, ARO
3. Morphological study of rivers Ganga, Sharda and Rapti using remote sensing techniques.
New Delhi , 18-19 September, 2017
Mrs. Neena Isaac, Sci-D Shri Arun Kumar, Sci-B
4. Basics of Hydrology NIH, Roorkee 11 – 22 September, 2017
Shri Vinesh Katte, Sci-B
5. Data Acquisition preprocessing and modelling using HEC-RAS
Delft, Netherlands 18-29 September, 2017
Shri Srishailam C, Sci-B
6. Hydro Workshop Kolhapur, Maharashtra 08 September, 2017
Shri Hanumanthappa M.S., Sci-B
7 Smart Power Technologies CPRI, Bengaluru 14-15 September, 2017
Shri G.C. Sahoo ,Sci-B Shri Saurabh Singh, ARO
8. Hydrographic Survey Techniques for Sediment Assessment
CWPRS, Pune 12 – 14 September, 2017
9 officials participated
9 Management Development for Group A Officers
CWPRS, Pune 19 – 21 September 2017
30 officials participated
8. IMPORTANT VISITORS: Shri S.K. Verma, DGM from Bokaro Project Steel Plant visited CWPRS in connection with intake well studies.
9. NEW APPOINTMENTS, PROMOTIONS & RETIREMENTS
Sl. No.
Name of Person Designation Group Division Date
New Entrants
1 Shri. Balchim S. B. Craftsman C Mech.W/S 11/09/2017
2 Shri Thopte B.R. Craftsman C Telephone Sec 18/09/2017
Promotions
Retirement
1 Shri V.R. Kavi LA-I C PH-I 30/09/2017
Voluntary Retirement
Repatriation/Transfer
1 C.V.R.Murthy(Deputation) Sci-‘B’ A - 05/09/2017
Resignation
Nil
CWPRS Information Bulletin September 2017
11
Demises
Nil
10. TRAINING PROGRAMMES/ CONFERENCES ORGANIZED: (03 Nos.)
1. Training Course on “Geophysical investiagation for Civil Engineering Water and Power Project” at
CWPRS, Pune during 05 – 07 September, 2017.
2. Training Course on “ Hydrographic Surey Techniques for Sediment Assessment” at CWPRS, Pune
during 12 – 14 September, 2017.
CWPRS Information Bulletin September 2017
12
3. Training Course on “ Management Development Group A Officials” at CWPRS, Pune during 19 –
21 September, 2017
10. OTHER INFORMATION: Hindi Pakhawada has been celebrated at CWPRS, Pune during 06-14 September, 2017.