6

Click here to load reader

C.V

Embed Size (px)

Citation preview

Page 1: C.V

KENNY TAYLOR21 WOODSIDE

COWDENBEATHFIFE

KY4 9JWD.O.B: 30/01/1977

TEL HOME: +441383 511445TEL MOBILE: +447837700156EMAIL: [email protected]

[email protected]

PERSONAL PROFILE

A responsible, reliable individual who is seeking a position which will allow me to utilise myPractical/Supervisory skills and knowledge to their full potential. I enjoy both the team and individual role. I display a flexible, diligent approach to my workload and am confident of my ability to adapt to a new environment.I have 18 years experience in fabrication , installation , testing , completions and commissioning of pipework systems within the oil and gas , power , petrochemical and pharmaceutical industries.

SUMMARY

Currently , I am supervising the day to day maintenance and repair of the mechanical work in Exxonmobil Plant at Mossmorran. Qualified in the Exxons PTW systems able to build , submit , raise and sign-off permits. I cascade safety information at morning toolbox talks , then organise the work group and assign tasks , jobs and projects . Solve daily routing problems whilst building trust and working relationship with team members . Enforce rules and compliance to procedures and specifications ensuring safe working practices are adapted at all times.

EMPLOYMENT EXPERIENCE

February 2011 – Present Project: Exxon Mobil, Fife Ethelyne Plant, Mossmorran, Fife. Company: Deborah Services Ltd. Position: Piping Chargehand/Piping Superviser. August 2010 – October 2010 Project: Biomass Energy Centre, Cameron Bridge Distillery, Windygates. Company: Wellman Robey/Heads Engineering. Position: Adv Pipefitter.

Page 2: C.V

August 2006 – May 2010 Projects: AZ3 Syngenta, Grangemouth; Unit Outages 1,2,3 & 4, Longannet Power Station; GSK Montrose; Ineos Hydrocracker TAR; BP Dalmeny TAR. Company: Doosan Babcock Energy Ltd. Position: Adv Pipefitter.

May 2006 – August 2006 Project: Long Lake Project, Fort McMurray, Alberta, Canada.( Oil Sands ). Company: Flint Energy Services Ltd. Position: Adv Pipefitter/Piping Superviser.

October 2005 – April 2006 Project: Resolution, BP Kinneil, Grangemouth. Company: Mitsui Babcock Energy Ltd. Position: Adv Pipefitter.

September 2005 – October 2005 Shutdown: Total Lyndsey Oils, Immingham. Company: Amec Group Ltd. Position: Adv Pipefitter.

June 2005 – September 2005 Outage: Unit 3, Longannet Power Station. Company: Mitsui Babcock Energy Ltd. Position: Adv Pipefitter.

October 2004 – June 2005 Project: Nexen Buzzard Field Development, Methil Rig Yard, Methil. Company: Burntisland Fabrications Ltd. Position: Adv Pipefitter.

January 2004 – October 2004 Projects: Hydrofiner TAR; Green Oil Project; F.C.C.U. Project, BP Grangemouth. Company: Mistui Babcock Energy Ltd. Position: Adv Pipefitter.

July 2003 – October 2003 Shutdowns: PEX/PP3 TAR, BP Grangemouth; SC2 & Butyl Polymers TAR, Exxon Mobil, Fawley. Company: Amec Group Ltd. Position: Adv Pipefitter.

May 2003 – June 2003 Shutdowns: G4 & BE3 TAR, BP Grangemouth. Company: Mistui Babcock Energy Ltd. Position: Adv Pipefitter.

April 2003 – May 2003 Shutdown: Shell Oil Refinery, Stenungsund, Gothenburg, Sweden.

Page 3: C.V

Company: Konstruction Svets Ltd. Position: Adv Pipefitter.

May 2002 – September 2002 Projects: Various locations fitting A/C & Refrigeration Pipework in Scotland. Company: Coolforce Refrigeration Ltd. Position: Adv Pipefitter.

August 2001 – February 2002 Projects: Refit HMS Liverpool/Invincible/Dumbarton Castle & Iron Duke Ships, Royal Rosyth Dockyard. Company: Acetech Ltd. Position: Adv Pipefitter.

January 2000 – August 2001 Projects: PEX/PP3 Project, BP Grangemouth; Avecia/Zeneca Maintenance, Grangemouth. Company: Amec Capital Projects Ltd. Position: Adv Pipefitter.

January 1997 – January 2000 Projects: NSDS Traineeship in Exxon, Mossmorran; BP Grangemouth; Avecia/Zeneca Grangemouth. Companies: Amec/ Kvaerner & Mitsui Babcock Ltd. Position: Trainee Pipefitter.

TRAINING

E.C.I.T.B. NVQ Engineering Construction – Level 2 (QFN20/1).E.C.I.T.B. NVQ Engineering Construction - Installing Plant & PipeworkSystems – Level 3 (QPF30/2).SVQ Level 3 in Management at SCQF Level 7.RED SEAL QUALIFICATION CERTIFICATE, CANADA – Pipefitter/Steamfitter Journeyman.MEWP IPAF Licence No. (OP/0441103).First Aid at Work Certificate – HSE No: (25/99).I.O.S.H. Managing Safely Certificate – No: 41814.

(further details can be provided)

ADDITIONAL INFORMATION

I also possess a Full UK Driving Licence and access to my own transport. I also possess CCNSG Safety Passport Cert No. (688374); ACE/CSCS Skills Card No. (106865) and a Full UK Passport.

REFERENCES

Rab Morgan – Piping Engineer: 01383 511730.

Page 4: C.V

Calum Gallacher – Site Superintendent: 01383 846497. Mob: 07935196180.