Raza Aftab CURRICULUM VITAE E-mail: [email protected] 70A, Raleigh St, Carlisle Perth, WA, 6101 Cell Phone: +61469178703 Employment Objective An active and intellectually challenging work environment that embraces innovation and fosters professional growth. Personal Information Date of Birth: 15th October, 1981 Marital Status: Married Visa Status: Permanent Resident WA Driving License: Class HR (Non-Synchromesh) White (Construction) Card Professional Profile Highly qualified and competent Electrical Engineer with a good understanding of AIS & GIS Substation Layouts, Substation Control & Protection Schematics and Substation Electrical Equipments. Comprehensive knowledge and experience in Quality Control, Testing & Preventive Maintenance of Power & Distribution Transformers. Possesses exceptional team building and leadership skills, as well as interpersonal relations, negotiation, written and verbal communication abilities. Employment Experience Electrical Engineer INSELEC – Perth, Western Australia (Jun 2015 – till date) Duties & Responsibilities: Complying with Occupational Health & Safety policies and procedures. Creating Electrical Assets on SIMPRO Connect and develop action plans for their inspection, verification and testing. Provide technical assistance in live testing and verification of Electrical Assets. Reading and interpreting electrical drawings or specifications to determine wiring layouts for verification and testing. General labour/manual handling works. Electrical Technical Advisor Laplace Electric Pty Ltd. Perth, Western Australia (Jan 2015 – Jun 2015) Duties & Responsibilities: Evaluation of Scope of work for the Projects based in WA. Develop action plans on the testing services projects. Provide technical consultation and input regarding the Testing Services of the Transformers, Generators, Motors and Circuit Breakers. Liaise with In-House Contractors evaluating, developing and implementing of Maintenance

CV Raza Aftab

  • Upload
    raza239

  • View
    119

  • Download
    1

Embed Size (px)

Citation preview

Page 1: CV Raza Aftab

Raza AftabCURRICULUM VITAE E-mail: [email protected]

70A, Raleigh St, CarlislePerth, WA, 6101 Cell Phone: +61469178703

EmploymentObjective

An active and intellectually challenging work environment that embraces innovation and fostersprofessional growth.

PersonalInformation

Date of Birth: 15th October, 1981Marital Status: MarriedVisa Status: Permanent ResidentWA Driving License: Class HR (Non-Synchromesh)White (Construction) Card

ProfessionalProfile

Highly qualified and competent Electrical Engineer with a good understanding of AIS & GISSubstation Layouts, Substation Control & Protection Schematics and Substation ElectricalEquipments.

Comprehensive knowledge and experience in Quality Control, Testing & Preventive Maintenance ofPower & Distribution Transformers. Possesses exceptional team building and leadership skills, as wellas interpersonal relations, negotiation, written and verbal communication abilities.

EmploymentExperience

Electrical EngineerINSELEC – Perth, Western Australia (Jun 2015 – till date)

Duties & Responsibilities:

• Complying with Occupational Health & Safety policies and procedures.

• Creating Electrical Assets on SIMPRO Connect and develop action plans for their inspection,verification and testing.

• Provide technical assistance in live testing and verification of Electrical Assets.

• Reading and interpreting electrical drawings or specifications to determine wiring layouts forverification and testing.

• General labour/manual handling works.

Electrical Technical AdvisorLaplace Electric Pty Ltd. – Perth, Western Australia (Jan 2015 – Jun 2015)

Duties & Responsibilities:

• Evaluation of Scope of work for the Projects based in WA.

• Develop action plans on the testing services projects.

• Provide technical consultation and input regarding the Testing Services of the Transformers,Generators, Motors and Circuit Breakers.

• Liaise with In-House Contractors evaluating, developing and implementing of Maintenance

Page 2: CV Raza Aftab

or repair jobs.

• Review the Maintenance and repair jobs in an attempt to reduce preventing recurrence,providing follow-up with the client.

• Provide annual recommendations and actions to prevent recurrence.

Assistant Manager (Inspection, Quality Control, Testing & Engineering Servicesof HV Transformers)Pak Elektron Limited – Asia (Jan 2009 – Oct 2013)

Duties & Responsibilities:

• Sound knowledge of IEC 60076.

• Onsite Installation, Inspections, Maintenance of Power Transformers.

• Failure and Condition Assessment Testing of Power Transformers.

• Specialized testing of Power Transformers.

• Analysis and assessment of Test results.

• Risk based Maintenance and Condition Assessment of Power Transformers.

• Retrofit of auxiliary equipment including On-Load Tap Changers of Power Transformers.

• Internal and external advice with regards to Power Transformer faults and problems.

• Compiling of Testing/Fault/Analysis reports.

• Compiling of method Statements and safety documents.

• Quotations/tendering and costing for the Servicing projects of Power Transformers.

• Site Inspections for Quotations and Tenders for Servicing of Power Transformers.

• Set up site activity programs.

• Supervision of all site activities and staff.• Design, develop and implement best quality practices and processes at various

manufacturing stages of HV Transformers.

• Maintain, monitor and ensure highest quality in services or products.

• Develop and initiate quality standards for Receiving material inspection, in-processinspection and testing of HV Transformers.

• Design and develop forms and instructions for evaluating, assessing, reporting anddocumenting on quality standards in products or services.

• Develop strategies to evaluate precision and accuracy of analytical equipment, measuring &testing equipment.

• Troubleshoot and resolve problems relating to quality control aspects.

• Lead, direct and assist technical, professional staff and measuring and testing a product ora service.

Page 3: CV Raza Aftab

• Tabulate and document data relating to products, processes, materials, its qualities andreliabilities.

• Research, study, compile and prepare material on quality control activities, processes andprocedures.

• Train staff, technicians and professionals on the aspects of quality control and testingactivities.

• Handle warranty claims, working hand-in-hand with the customer on HV Transformers.

• To provide field service engineering and technical assistance to customers in areas ofinstallation, startup, maintenance, repair, training and modification on HV & Distributiontransformers, Generators, Shunt Reactors, Circuit Breakers, Metal-Clad Switchgear, Powercables, Substation Equipment, Control & Protection System.

• Capable of self-managing assigned projects for electrical equipment, including workingknowledge of electrical test and diagnostic equipment.

• Performs conventional, engineering assignments that may involve equipment or productdesign, testing of materials, preparation of specifications, process studies, or researchinvestigations.

• Execution of power services related to installation testing and commissioning of HV &Distribution Transformers.

• Preparing the time line schedule for the Servicing job / scope of work.

• Plan the activities in proper manner with safety and quality.

• Assures and seeks to improve customer satisfaction and feedback through consistentcustomer interaction, e.g. Communication, (phone, e-mail, etc.).

• Works proactively to set customer expectation to assure a smooth completion of work withquality.

Major Projects:

• Development of quality assurance procedure and documents and implementation of thepractices for the ISO certification of the Power Transformers.

• Preparation of strategies and calculations for the short circuit testing of PowerTransformers.

• Feasibility studies for the development of a test field with capabilities to test a 250 MVA,220/132 kV Power Transformer.

• Development of Engineering Services Brochures in Smart draw.

• Enhancement of Distribution Transformers capacity by installation of cooling fans their autocut in, off, alarm and trip circuits.

• Repairing of Single phase On-load tap changer diverter switches of a 10/13 MVA PowerTransformer.

• Modifying the settings of the Earth fault relay to avoid the unnecessary tripping of the maincircuit breaker upon energizing the 3 x 2000 kVA distribution transformers.

• Repairing of Off load tap changer diverter switches of 2 x 100 MVA Power Transformers at1700 MW Power Plant.

Page 4: CV Raza Aftab

• Replacement of butterfly valves of a 105 MVA Power Transformer.

• Analysis of dissolved gases in 100/133 MVA, 230/11.5 kV Power Transformer by TDCG,Rogers ratio and IEC methods.

• De-slugging of distribution transformers by oil sprinkling/compression method.

Senior Project EngineerSiemens Engineering Limited - United Arab Emirates (April 2008 - Dec 2008)

Duties & Responsibilities:

• Post Bid Clarifications & Order Negotiations with Clients.

• Planning and Monitoring of Project activities pertaining to Electrical.

• Co-ordination of various activities with Design/Engineering department for both Primary andSecondary Engineering.

• Review and submission of documents for approval & follow up with approval procedures forsub suppliers/subcontractors.

• Preparation of Project status by progress reports in order to meet critical targets duringvarious stages of a Project.

• Preparation and follow-up of project schedule.

• Co-ordination of Factory Acceptance Tests, foreign as well as local factory testing.

• Preparation of Quality and Safety Plans for various projects.

• Control, monitoring and follow up to the Project by softwares such as:

• Windows XP Professional Edition• Microsoft Project• Microsoft Excel• Microsoft Word• Microsoft Power Point• Microsoft Visio• AutoCAD

Major Project:

Design, Supply, Installation, Testing & Commissioning of 2 x 132/11 kV GISs.

Substation EngineerNational Engineering Services Limited – Asia (Jan 2006 - Apr 2008)

Duties & Responsibilities:

• Preparation of complete bidding Documents, Cost estimation, BOQ, Bid Evaluation Report.

• Review of detailed Engineering drawings, Substation Equipment, Schematics of Control andProtection, Relay settings and CT calculations.

• Supervision and Coordination of the Testing and Commissioning of Control and ProtectionSystem at site.

Page 5: CV Raza Aftab

Major Projects

• Design review for the Extension of 500kV Substation.

• Design review of 500/220 kV Substation.

• Design review of 500/220/132 kV Substation.

• Design review of Dadu-Khuzdar 220/132 kV Substation.

Sales & Marketing EngineerPak Elektron Limited - Asia (Dec 2004 - Dec 2005)

Duties & Responsibilities:

• Sales of Distribution Transformers from 10 kVA rating to 5 MVA, HT & LT Switchgear,Kiosk substations and Polyphase Electromechanical & Static Energy Meters.

• Preparation of Bill of Quantities/Costing of the ordered equipment.

• Coordination with design and production departments for the preparation of design drawingand fabrication of the ordered equipment.

• Coordination with the Client for the final inspection, testing and dispatching of theordered equipment.

Education • University of Engineering & Technology (Asia) Master, Electrical (Power) Engineering (PartTime), Aug 2005 - Jan 2011.

• University of Engineering & Technology (Asia) Bachelor, Electrical (Power) Engineering, Jan2001 - Dec 2004.

SkillsSummary Areas of Interest:

Quality Control & Testing:

• To play a lead role in directing and assisting technical professional and staff in measuringand testing product and service.

• To generate innovative plans and strategies for the purpose of developing quality andservices.

• To design and develop various forms of instructions for assessing, evaluating, assessing anddocumenting on quality standards in services and products.

Computer Skills:

• Excellent command on Microsoft Office. (Word, Excel, Power Point, Project & Visio)• Fair command on MATLAB, PRIMAVERA-6, ETAP-6 & AUTOCAD.

I

Page 6: CV Raza Aftab

Trainings Safe Manual Tasks conducted by SPOTLESS, Jun 2015

Topics:

• Manual Tasks• Musculoskeletal Disorders• Types of Load• Assessment of Risks• Identifying the Hazards• SAM procedures to reduce Risks and Hazards

Internal Quality Auditing to ISO 9001:2008 - Quality Management System -Requirements, Jul 2009.

Topics:

• Processed based quality management systems• ISO 9001:2008 overview• Auditing for continual improvement• Planning and preparing for the internal audit

Introduction to AUTOCAD conducted by NESPAK, Mar 2007.

Topics:

• Basic Introduction• Use of Toolbars• Use of basic commands• Practicing of basic drawings

Introduction to Effective Time Management conducted by NESPAK, Feb 2007.

Topics:

• Basic Introduction• Timely Management of various activities in a Project• To differentiate between urgent and important activities• Key points for the successful completion of the Project

Introduction to Project Management conducted by NESPAK, Jan 2007.

Topics:

• Project & Project Management• Project Manager• Project Execution Steps• Risk, Opportunities & their Analysis• Financial Analysis

Introduction to Siemens Differential Relays and Substation Automation Systemconducted by Siemens Pakistan Engineering Ltd., May 2006.

Page 7: CV Raza Aftab

Topics:

• Siemens Transformer Differential Protection 7UT6.• Siemens Line Differential Protection.• Siemens Substation Automation & Technology Trends.

References

Miss. Katharine OttawayINSELECMobile: +61459459739

Mr. Jack MullettElectrical SupervisorElectric ResultsMobile: +61425668526

Mr. Muddasir NazirElectrical Projects EngineerCoogee Chemicals Pty Ltd.Mobile: +61447521889

Mr. Muhammad UsmanLaplace Electric Pty. Ltd.Mobile: +61417265988

Mr. Faisal JawadGeneral Manager (Power Division)Pak Elektron LimitedMobile: +923008406528

Mr. Khurram AfzalVice President (Power Division)National Engineering Services Pvt. LtdMobile: +923044068041