11
Resume of Edwin G. Calonge Page 1 of 11 EDWIN G. CALONGE Mechanical Engineer (MEP Quantity Surveyor) Doha, Qatar Cell # +974- 33130-769 [email protected] Objective: To work as MEP Quantity Surveyor (post contract) or MEP Estimator Engineer (pre contract) or any related position in a prestigious engineering firm. To share my knowledge and work experiences for the growth of the company. Educational Background: College Degree : Saint Louis University (SLU) Baguio City, Philippines : Bachelor of Science in Mechanical Engineering (BSME) Eligibility: Mechanical Engineering Board Passer as Registered Mechanical Engineer Career History: Four (5) years & 3 mos. up to present as a MEP Quantity Surveyor (Qatar). (Post Contract) Five (5) years and 4 mos. as a MEP Quantity Surveyor (Dubai, UAE). (Post Contract) Four (4) years as a Mechanical Quantity Surveyor in Philippines. (Post Contract) Two (2) years as a Cost Engineer / Estimator in Philippines (Pre-contract). One (1) year as a Piping Engineer & QC in Saudi Arabia. One (1) year 7 mos. as a Mechanical Designer in Manufacturing firm (Philippines). Eleven years total Gulf experienced. Total work experienced 19 years. General Qualifications: Ability to understand and read Mechanical, Electrical, Plumbing, Drainage & Fire Protection drawings Ability to price variations / additional works and pricing of build up / star rates. Ability to estimate and quantify / material take-off from drawings.

CV of Edwin Calonge - May-16

Embed Size (px)

Citation preview

Page 1: CV of Edwin Calonge - May-16

Resume of Edwin G. Calonge Page 1 of 7

EDWIN G. CALONGE Mechanical Engineer (MEP Quantity Surveyor)Doha, QatarCell # +974- [email protected]

Objective: To work as MEP Quantity Surveyor (post contract) or MEP Estimator Engineer (pre contract) or any related position in a prestigious engineering firm. To share my knowledge and work experiences for the growth of the company.

Educational Background: College Degree : Saint Louis University (SLU) Baguio City, Philippines

: Bachelor of Science in Mechanical Engineering (BSME)

Eligibility:Mechanical Engineering Board Passer as Registered Mechanical Engineer

Career History:Four (5) years & 3 mos. up to present as a MEP Quantity Surveyor (Qatar). (Post Contract)Five (5) years and 4 mos. as a MEP Quantity Surveyor (Dubai, UAE). (Post Contract)Four (4) years as a Mechanical Quantity Surveyor in Philippines. (Post Contract)Two (2) years as a Cost Engineer / Estimator in Philippines (Pre-contract).One (1) year as a Piping Engineer & QC in Saudi Arabia.One (1) year 7 mos. as a Mechanical Designer in Manufacturing firm (Philippines).Eleven years total Gulf experienced. Total work experienced 19 years.

General Qualifications: Ability to understand and read Mechanical, Electrical, Plumbing, Drainage & Fire

Protection drawings Ability to price variations / additional works and pricing of build up / star rates. Ability to estimate and quantify / material take-off from drawings. Ability to understand BOQ and labour norms. Ability to manage subcontractor’s accounts. Knowledge in Computer Microsoft Excel & Word. Ability in Cost Estimate and Create BOQ. Preparing monthly payment application (progress billing).

Professional Employment:

1. April 2012 up to present : Lead Quantity Surveyor-MEP (4 yrs & up) Bouyges Batiment International - BBI Main Contractor Construction Company Doha, Qatar

Duties: Lead measuring QS for variation claims ( with 11 QS subordinates). Checking variation assessment done by my sub-ordinates before submission to

client. Evaluate and prepare cost for variations (Engineer’s Instruction) to be submitted

to client. Assessment of Request for Information (RFI) for possible cost effect. Reconciliation of submitted variation to client / consultant.

Page 2: CV of Edwin Calonge - May-16

Resume of Edwin G. Calonge Page 2 of 7

EDWIN G. CALONGE Mechanical Engineer (MEP Quantity Surveyor)Doha, QatarCell # +974- [email protected]

Preparing monthly payment application. Monitor work activities of my sub-ordinates. Reporting variation claim progress to MEP Contracts Manager

PROJECT INVOLVEMENT in Qatar:

a. QP DISTRICT PROJECT (BARWA FINANCIAL DISTRICT) Commercial & Hotel Buildings9 High Rise Towers, Hotel-27 storey, Energy Center (District Cooling Plant), Substation & 4-storey Carpark.West Bay, Doha, Qatar Joint Venture : BBI, Midmac & Al Jaber EngineeringCivil, Architectural, MEP & FP WorksContract Amount : QR 4.70 BillionConsultant : KEO, AECOMCurrent Variation Submitted : QR 500 Million (MEP works)

ATTENDED TRAINING and SEMINARS sponsored by BBI:a. Contract Management Seminar – 2 days session (Location: BBI Office, Qatar)b. Leadership & Management Training & Seminar – 2 days session, conducted by

Confucius Training Center ( Location: Carlton Hotel, Singapore)

2. February 2011 to April 2012 : Quantity Surveyor-MEP (1 yr & 2 months) Sterling and Wilson Middle East WLL MEP Construction Company Doha, Qatar

Duties: Undertake measurement, prepare and submit monthly valuations. Evaluate and prepare cost for variations to be submitted to client. Administer and evaluate sub-contractors / suppliers claims and payments.

PROJECT INVOLVEMENT in Qatar:

a. BARWA COMMERCIAL AVENUE (4 storey-9km commercial buildings)Doha, Qatar MEP & FP WorksContract Amount : QR 101,000,000.00Variation Submitted : QR 139,000,000.00Main Contractor : Shapoorji Pallonji Qatar

3. August 2005 to January 2011 : Quantity Surveyor-MEP (Infrastructure Div.) 5 years & 4 months

BK ( Balfour Kilpatrick) Gulf LLC-BKG DUTCO BALFOUR BEATY Group Civil & MEP Construction Company Jebel Ali, Dubai U.A.E.

Page 3: CV of Edwin Calonge - May-16

Resume of Edwin G. Calonge Page 3 of 7

EDWIN G. CALONGE Mechanical Engineer (MEP Quantity Surveyor)Doha, QatarCell # +974- [email protected]

Duties: Assist the Project Manager / Senior Quantity Surveyor in identifying

circumstances occurring in the project which entitle the Company to additional monies or time and to ensure that contractual notices are given.

Undertake measurement, prepare and submit monthly valuations. Evaluate and prepare cost for variations to be submitted to client. Administer and evaluate sub-contractors / suppliers claims and payments.

MAJOR PROJECT INVOLVEMENT in United Arab Emirates:

a. DISTRICT COOLING PLANT – 105,000 TR Load OutJumeirah Lake Towers Project (JLT) – Industrial Project Jumeirah Dubai, U.A.EMEP & FP Works (Infrastructure Project)Main Contractor : Stellar Group LLC

b. DISTRICT COOLING PLANT – 21,000 TR Load OutPalm Jumeriah Trunk Project (PJT) – Industrial Project Palm Jumeriah , Dubai, U.A.E.MEP & FP Works (Infrastructure Project)Main Contractor : Stellar Group LLC

c. HIGH RISE BUILDING – 4 Towers – 28 Storey Bldg. Downtown Jebel Ali – Limitless Project Jebel Ali, Dubai, U.A.E.MEP & FP Works (Vertical Projects)Main Contractor : Taisei Corporation LLC

d. BURJ AL ARAB HOTEL – GM RESTAURANT MEP Fit - Out Project (1 no. floor)

Burj Al Arab Hotel, Dubai, U.A.E.MEP & FP Works

e. BURJ DUBAI LAKE FOUNTAIN Dubai, U.A.E.

MEP & FP WorksMain Contractor: Turner Construction International

f. ANGASANA SPA & HOTEL RESORTEASTERN MANGROVE PORJECT (5 storey – 1.4 km buildings)

Abu Dhabi, United Arab Emirates MEP & FP WorksMain Contractor: Brookfield Multiplex International

Page 4: CV of Edwin Calonge - May-16

Resume of Edwin G. Calonge Page 4 of 7

EDWIN G. CALONGE Mechanical Engineer (MEP Quantity Surveyor)Doha, QatarCell # +974- [email protected]

4. June 2003 to May 20041 : Piping Engineer & QC ( 9 months) EEI-ARCC (Engineering Equipment – Al Rashid Const. Corp.) Civil & MEP, Piping Works Construction Company, Al Khobar, Kingdom of Saudi Arabia

: Piping Engineer (3 mos.) – Seconded to Main Contractor: CHIYODA PETROSTAR LTD. Jubail, Saudi Arabia

Duties: Responsible for the re-design of pipes & pipe support installation as per site

condition. Involvement in Material take-off of pipes, fittings & pipe supports. QC / Line checker for pipe system prior to hydrotesting. Involvement in preparing Test Package (hydrotest).

Project Involvement in Kingdom of Saudi Arabia:

a. Jubail United Petrochemical Company (JUPC) Polyvinyl & Polyethylene Plastic Plant Project Industrial City, Al Jubail, Saudi ArabiaMechanical & Piping WorksMain Contractor : Chiyoda Petrostar LTD.

5. February 2002 to May 2003 : Mech’l Quantity Surveyor (1 yr –3 mos.)MSM Contracting CorporationConstruction CompanyMakati City, Philippines

Project Involvement in Philippines:a. Philip Morris Green Field Project

Industrial Cigarette Plant - P & D WorksBatangas City, Philippines Main Contractor : Leighton Philippines

6. December 2000 to Feb. 2002 : Mech’l Quantity Surveyor (1yr. – 2 mos.)HTE Integrated Services Inc & Cont.Construction CompanyMandaluyong City, Philippines

Page 5: CV of Edwin Calonge - May-16

Resume of Edwin G. Calonge Page 5 of 7

EDWIN G. CALONGE Mechanical Engineer (MEP Quantity Surveyor)Doha, QatarCell # +974- [email protected]

Project Involvement:a. ABS-CBN ELG Center Project

High Rise Building – Mech’l & HVAC WorksQuezon City, Philippines

b. SM-Keppel Podium Phase I ProjectHigh Rise Building - MEP & FP WorksMandaluyong City, Philippines

c. Hatch Asia IT Incubator Project4 Storey Building – MEP WorksFort Bonifacio, Philippines

d. LKG Tower Project38F High Rise Building - MEP & FP WorksMakati City, Philippines

7. September 2000 to Dec. 2000 : Quantity Surveyor (MEP)-(3 months)Seconded:D. G. Jones and Partners Int’lConstruction Cost Consultant CompanyMakati City, Philippines

Project Involvement:a. Angolia Project

Industrial Plant – MEP WorksMaterial Take –off and Create BOQCountry of Africa, Angolia City

b. Insular Life Bank Building Project28F High Rise Building MEP & FP WorksAlabang Village, Metro Manila, Philippines

8. August 1999 to Sept. 2000 : Quantity Surveyor – (1 yr – 1 month)SAEI – EEI Construction Corp.French – Filipino Joint VentureConstruction CompanyMakati City, Philippines

Project Involvement:

a. Pacific Plaza Towers57F Twin Tower High Rise Building

Page 6: CV of Edwin Calonge - May-16

Resume of Edwin G. Calonge Page 6 of 7

EDWIN G. CALONGE Mechanical Engineer (MEP Quantity Surveyor)Doha, QatarCell # +974- [email protected]

Civil, MEP & FP WorksFort Bonifacio, Philippines

9. August 1997 to Aug. 1999 : Design & Cost Engineer / Estimator (2 years)EEI Corporation Construction Division, Engg. Dept.Construction CompanyQuezon City, Philippines

Project Involvement:a. Bataan, PBR Project

Refinery Plant - PhilippinesMechanical & Piping Works

b. Quezon Province Power Plant ProjectPower Plant - PhilippinesMechanical & Piping Works

c. Robinsons Place Twin Tower38F High Rise Building Fire Protection Works – Awarded ProjectManila, Philippines

10. December 1995 to July 1997 : Mechanical Designer – (1 yr. – 7mos.)ASTRON PhilippinesManufacturing Company Engineering Department

Personal Background:Philippine Address : #161 Felisa Street, Barangay Parada, Valenzuela City, PhilippinesNationality : FilipinoBirth date : August 14, 1971Civil Status : MarriedVisa Status : Residence / Employment Visa (Qatar)Driver’s License # : Dubai & Qatar License Available Wife’s Name : Jennifer L. Calonge (Philippine CP # +63 932 8681760)

Page 7: CV of Edwin Calonge - May-16

Resume of Edwin G. Calonge Page 7 of 7

EDWIN G. CALONGE Mechanical Engineer (MEP Quantity Surveyor)Doha, QatarCell # +974- [email protected]

Current Overview of the Project – QP District Qatar, Doha: