Upload
rareee
View
24
Download
2
Embed Size (px)
DESCRIPTION
CV for Civil Engineer
Citation preview
RESUME
M.RASIKRAJA Mobile:
No. 92/C, Christavar street, +91-9789021307 (INDIA)
Gudalur-Theni DT +91-9531860467
Tamilnadu-625518 E-mail: [email protected]
India [email protected]
A prospective career in the field of Civil Engineering amidst challenging environments that
would utilize and hone my professional and interpersonal skills and in the process augment
values to the concern.
/
With 8 years of experience in the field of infrastructures, I.T Parks ,residential, commercial
buildings.
B.E - Government college of Engineering, Salem-11,April 2004 with 71.72%
H.S.E - N.S.k.Ponniah Gowder Higher secondary school,Gudalur,April 1999 with 89.08%.
SSLC – N.S.K.Ponniah Gowder Higher Secondary school,Gudalur with 78.9%
Worked as an Assistant Engineer in M/s EAST COAST CONSTRUCTION &
INDUSTRIES Ltd., Chennai from August 2004 – Sep 2007
Worked as an Site Engineer in ALDAR LAING O ROURKE-ABUDHABI-UAE from
sep2007-Aug2009
Worked as a Project Engineer in EMIRATES CODE COMPANY-ABUDHABI
from Oct 2009 to Jan2011 (ADNOC PROJECT)
Working as a Civil Engineer in GPM LOOMBA SA-JV ,New Delhi from April
2011 to till date.
Packages : Microsoft Office, Autocad 2004, .Ms project.
Construction of Married Accomodation Project for Army/Airforce/Navy in
hilly terrain area including allied services at Portblair.
Software Skills
Professional Objective
Educational Qualifications
Experience Summary
Professional Experience
List of Projects
Construction of new schools complex for ADNOC at Ruwais -Abudhabi-UAE.
Infrastructure works at Al-Raha Beach -Abudhabi-UAE.
ETA Gardens Residential Apartments,Magadi road ,Bangalore
Vellore medical college,Vellore,Tamilnadu
Road Over bridge-Vaniyambadi,Tamilnadu
Patni computer systems (phase I & II), Sipcot IT park, Chennai.
Company: GPM LOOMBA SA-JV ,New Delhi. April 2011 to till date.
PROJECT #1:
Project : Constructions of Married Accommodation Project in hilly
terrain including allied services for Army/Airforce/Navy
(MAP Project) .
Client : Ministry Of Defence-Government Of India.
Project Location : BrichGunj Military station-Port Blair,South Andhamans.
Project Value : Rs 367.37 Crores within 28 months
Project Description :
It is the biggest site for MAP –PhaseII project.area having approx.65 Acres.The site Location is
heavily undulated and spread over on two ridges and one valley with big nala following in between.
It has very steep slopes and in level difference within the site is almost 90 meters.The layout in
the site is designed to accommodate 103 blocks in total consisting of 24 DUs of MAJORS ,93
Dus of JCOs and 775 Dus of ORs.
Blocks were planned with different configuration to suit the lay of the ground as per survey and
the Retaining walls of height between 3 to 10 meters.
Infrastructure work including, Roads, Drainage, Retaining walls& stone pitching,Rain water
Harvesting works,arboriculture works ans compound wall.
Including other services like Internal water supply works,Internal Electrical works and Area
drainage works..
The Length of Road has app.6Km with a slope of 1:8 to 1:12 .
Resposibilities :
Project scheduling and monitoring as per CPM Chart and report to project manager.
Utilise the man and materials.
Preparing weekly, monthly programmes.
Dealing with client,consultants and contractors.
Closeout the all QA/QC ,Safety issues.
Company: EMIRATES CODE COMPANY -ABUDHABI, from Oct 2009–JAN 2011
PROJECT #1:
Project : Constructions of new schools project for ADNOC .
Client : M/s ABUDHABI NATIONAL OIL CORPORATION.
Consultant : M/s DORCHE GROUPPE-ABUDHABI.
M/s ENGINEERING CONSULTANTS GROUP -ABUDHABI
Project Location : ADNOC HOUSING COMPLEX - RUWAIS.
Project Value : 300MILLION DIRGAMS( 300 crores)
Project Description :
It has 3 schools(male,female&kindergarten schools) with G+1,Total build Area is 2,25,000sqm
with connecting landscaping.
Architect is German based architect.
Building is gladded with Structural glazing Semi unitized panels and in combination with
Project Details
composite panels.
Infrastructure work including, Roads, Drainage, Service yard and compound wall.
Including other services like Firefighting & Hydro-pneumatic system.
Kindergarten school was construct with fully precast panels.
Responsibilities :
Project scheduling and monitoring as per CPM Chart and report to project manager.
Utilize the man and materials
Preparing weekly, monthly programmes.
Dealing with client, consultants and contractors.
Closeout the all QA/QC ,Safety issues.
Company: ALDAR LAING O ROURKE –ABUDHABI ,Sep2007-Sep 2009
PROJECT #2:
Project : ALRAHA BEACH PROJECT
Client : M/s Aldar properties-Abu Dhabi.
Structural Consultant : M/s Consult mounsell Ltd-Abudhabi
Service Consultant : M/s Dornier consulting GmbH.
Project Location : Al-Raha Beach -Abudhabi
Project Value : $20billion
Project Description :
AL RAHA BEACH DEVELOPMENT: Construction of canal road bridges, Soil investigation get done by
geotechnical laboratory, providing them co-ordinate and site access, daily monitoring their activity,writtting daily records of their findings and daily report for their progress,
AL RAHA BEACH DEVELOPMENT: Construction of Canal Road Bridges, Piling get done by Sub contractor (Bauer, Dutch Foundation), checking the piling data sheet, establishment of site, material take off, requesting for temporary work items, dealing with consultant, giving program and three week look ahead concrete requirement to the planning department, Co-coordinating with Concrete supplier and giving correct drawing to the foremen, drawing profile for dewatering system. Checking daily progress sheet and monitoring it against the planning schedule, ordering for plant and equipment required for the coming activity, constructing of coffer dam by sheet piling method and the secant piles (male female piles).
AL RAHA BEACH DEVELOPMENT: Construction of Canal Road Bridges,liasoning with different trade of sub contractors, assisting in their activities, issuing work permits, writing method statements for different activities, Taking care of HSE of the works under my supervision(Domain)
Company: EAST COAST CONSTRUCTIONS AND INDUSTRIES LTD, from Aug 2004–Sep2007.
PROJECT #3:
Project : ETA Gardens - bangalore.
Client : M/s ETA STAR – India div.
Consultant : M/s Potencial Consultants P. Ltd
M/s JDS Architects P.Ltd
Project Location : Magadi Road-Bangalore.
Project Value : INR 120 Crores.
Project Description :
It has 8 towers with G+2,19floors Residential Apartments with Club house, Swimming pools,
open theatre, sports ground, children’s park, library, aerobics and meditation hall, bars and restaurant, car parks etc..,
Architect is German based architect.
It has connecting steel bridges at Every 6 Floors connecting with all Towers.
Armourcrete & STP water proofing system for raft slab & wall
Each floor has a 4 Flats ,Each Flat have 3 Bed rooms2 attached,1 commen Toilets,varendah and
Balcony with fully marble,Tiles Flooring.
Interior features with Modular furniture, Alu trac ceiling, Gypsum & AMF panel for False
ceiling, Joineries Fully Glazed Frameless Doors and Flooring Ceramic tile & Granite.
Building is gladded with Structural glazing Semi unitized panels and in combination with
composite panels.
Infrastructure work including, Roads, Drainage, Service yard and compound wall.
Including other services like Firefighting & Hydro-pneumatic system.
PROJECT #4:
Project : Vellore medical College-Vellore11
Client : M/s TPWD-Tamilnadu.
Consultant : M/s PWD Design.
Project Location : Adukkamparai-Vellore
Project Value : INR 20 Crores.
Project Description :
It has 4 towers of G+3 building with Hexactonal plan.
It has 3 curved domes in top.
It was government hospital which is use medical college students.
Infrastructure work including, Roads, Drainage, Service yard and compound wall.
Including other services like Firefighting & Hydro-pneumatic system
PROJECT #5:
Project : Road over bridge-vaniyambadi
Client : M/s Southern Railways.
Consultant : M/s Southern railways.
Project Location : Jolarpet Junction-Vaniyampadi
Project Value : INR 18 Crores.
Project Description :
It has 3 Span ROB bridge, Each span have a 16 beams with22m at End span,32m in middle
span
All Beams are post tensioning precast Beams which has T1,T2 32nos of 15.2mmdia Tendons.
This bridge has completed within 6 months..
PROJECT #6:
Project : IT Park for PATNI Computer Systems Ltd. Phase–II
(working)
Client : M/s PATNI Computer Systems Ltd.,
Consultant : M/s STUP Consultants P. Ltd
Project Location : SIPCOT IT Park, IT Highway, Siruseri, Chennai.
Project Value : INR 80 Crores.
Project Description : Main building area 2.90 Lac Sft. RCC Framed structure withBasement, Stilt and ground+3 floors.
Well Point dewatering system.
Mass Excavation more than 55000 cum.
Armourcrete & STP water proofing system for raft slab & wall (10300 Sqm).
GGBS cement concrete mix used for Sulphate & Chloride resistant.
Interior features with Modular furniture, Alu trac ceiling, Gypsum & AMF panel for False
ceiling, Joineries Fully Glazed Frameless Doors and Flooring Ceramic tile & Granite.
Building is gladded with Structural glazing Semi unitized panels and in combination with
composite panels.
Infrastructure work including, Roads, Drainage, Service yard and compound wall.
Including other services like Firefighting & Hydro-pneumatic system.
PROJECT #7:
Project : IT Park for PATNI Computer Systems Ltd. Phase - I.
Client : M/s PATNI Computer Systems Ltd.,
Consultant : M/s STUP Consultants P. Ltd
Project Location : SIPCOT IT Park, IT Highway, Siruseri, Chennai.
Project Value : INR 50 Crores.
Project Description :
Main building area 1.35 Lac Sft. RCC Framed structure and siporex concrete floor with floor
trunking.
Interior features with Modular furniture, Alu trac ceiling, Gypsum & AMF panel for False
ceiling, Joineries Fully Glazed Frameless Doors and Flooring Ceramic tile & Granite.
Building is gladded with Structural glazing Semi unitized panels and in combination with composite panels.
Project planning & Management.
Design,Drawings co-ordination.
Monitoring and Tracking activities.
Progress reporting.
Sub Contractor billing.
Rising ITR,MVR,MAR & Co-ordinate with Client and
Consultant.
Finishing works ,precast panels.
Post-tensioning Works.
Pilling Works.
Quality Assurance and Quality control.
Father’s Name : k.mohammed ibrahim
Date of Birth : may14 , 1982.
Sex : Male.
Nationality : Indian.
Marital Status : Married
Passport details
passport number : G0964920.
Date of issue & expiry : 02/12/2006 & 01/12/2016.
Place of issue : Tiruchirapalli.
Languages Known
To Read & Write : English,Tamil
To Speak : English,Tamil& Hindi
Work Permit : UAE, India Temp. Address GPM LOOMBA-SA JV C-55 EAST OF KAILASH NEW DELHI -110065
I hereby declare that the particulars in the curriculum vitae are true and correct to
the best of my knowledge and belief.
Place:
Date: (M.Rasikraja)
Personal Details
Job Expertise