Page 1
Riyadh, KSA Contact No. 0591442865
Email ID : [email protected]
PMP CERTIFIED PLANNING ENGINEER HASSAN CHEEMA
CAREER OBJECTIVE
Attaining a position of Senior Planning Engineer in a well reputed international organization to contribute my knowledge, skills and experience for the advancement of the company while studying and making myself grow with the company.
SUMMARY
I am a PMP Certified Planning Engineer and have done Bachelors of Engineering in Civil from one of the most prestigious and highly ranked university of Pakistan. I have extensive experience of mega projects both in Pakistan and Kingdom of Saudi Arabia including:
1.High rise Buildings (5 Star Hotels & Office Buildings) 2.Hospitals
4. Housing Colonies 3.Metro Transit 4.Motorway (Roads & Bridges) 5.Railway Workshops and other facilities (SRO)
My areas of Expertise are but not limited to:
Project Schedule Management.
Critical Path Method & Linear Scheduling
Base Line Master Schedule (Level 1 to Level 5)
Cost Loaded, Resource Loaded Base Line Program
Program Updates and Program Revisions & Recovery
Time Extension Supports
Daily, Weekly & Monthly Progress Reports
Project Status Reports
Progress S- Curves and Resource Histograms
Earned Value Calculations and their Visual Representations.
Portfolio Management.
Development of Project Control.
Development of Progress Performance Parameters.
Resource Management.
Risk Analysis and Corrective Early Measures.
Cash Flow.
Auditing and Analysis of Time & Budget of Project.
Page 2
EXPERIENCE
Post : Senior Planning & Controls Engineer
Organization : Badael Consultant (Riyadh, Saudi Arabia)
Duration : Currently Working
( From :- 14th December, 2017 to Up till Now)
Responsibilities :
Reviewing Project Base Line Work Schedules for different Projects.
Reviewing Updated progress of work schedule on primavera.
Perform regular analysis of all schedule trends and preparing reports as required.
In case of delay proposing remedial measures i.e. schedule crashing, fast tracking etc. to catch up delays.
Reviewing all operations and extension requests.
Implement the work schedule and monitor progress of the work for timely execution of the project through daily/weekly/monthly/ reports with respect to review of the overall project or phase.
Preparing planed vs actual EVM, S-Curves, Resource Histograms for client.
Ensure that project controls documents such as resources histogram, schedules, reporting systems, material controls systems, etc. are fully developed by the designated personnel.
Liaising with Client & Contractors.
______________________________________________________________________________________________________________
Post : Senior Planning Engineer
Projects :
ProCare Hospital
Al-Khobar KSA
Taziz Tower
Dammam KSA
New Wagon Workshop,
(Saudi Railways Organization ) Dammam KSA
Wheels Lath & Power Car Maintenance Section, (Saudi Railways Organization ) Dammam KSA
Organization : Project Build Co. LTD (Al Khobar, Saudi Arabia)
Duration : 2 Years
( From :- 21st January, 2015 to 13th December, 2017)
Page 3
Responsibilities :
Preparing Project Base Line Work Schedules for different Projects.
Updating progress of work schedule on primavera of assigned projects and planning accordingly.
Perform regular analysis of all schedule trends and preparing reports as required.
In case of delay, preparing recovery program and proposing remedial measures i.e. schedule crashing, fast tracking etc. to catch up delays.
Preparation of short termed departmental detailed schedules based on base line schedule.
Provide support to all operations and extension requests.
Implement the work schedule and monitor progress of the work for timely execution of the project through daily/weekly/monthly/ reports with respect to review of the overall project or phase.
Preparing EVM, S-Curves, Resource Histograms, Cash in, Cash out & monthly Invoice Reports.
Ensure that project controls documents such as resources histogram, schedules, reporting systems, material controls systems, etc. are fully developed by the designated personnel and reviewed by Construction Management and that Engineering and Procurement interfaces are properly addressed.
Liaising with Procurement department regarding in time material requisition.
Liaising with Client, Consultant, Sub-contractors, supervisors and general work force involved.
Occasional Problem Oriented Site Tasks.
____________________________________________________________________________________________________
Post : Planning Engineer (Planning & Management)
Project : Rawalpindi – Islamabad Metro Project
Done on fast track basis 8 months
Organization : ZAHIR KHAN & BROTHERS
ENGINEERS & CONSTRUCTORS
Duration : 8 Months ( From :- 6th May, 2014 to 31st Dec, 2014)
Responsibilities :
Preparing Project Base Line Work Schedule & any revision required using Primavera.
Page 4
Updating progress of work using primavera P6.
Perform regular analysis of all schedule trends and preparing reports as required.
In case of delay preparing recovery program and proposing remedial measures i.e. schedule crashing, fast tracking etc.
Provide support to all operations and extension requests.
Prepare daily, weekly, monthly reports.
Liaising with Procurement department regarding in time material requisition.
Liaising with Client, Consultant, Sub-contractors, supervisors and general work force involved.
Occasional Problem Oriented Site Tasks.
_____________________________________________________________________________________________________
Post : Office Engineer
(In charge Planning & Technical Department)
Project : Faisalabad - Multan Motorway ( M-4 )
( Section Multan to Khanewal )
Organization : EKO (Turkish Trading Corporation) & KRC (Khalid Rauf & Co.) (JV)
Duration : 7 Months ( From :- 5th October, 2013 to 30th April, 2014)
“Was Previously working on the same project as Site
Engineer.”
Responsibilities :
Updating schedule progress using primavera P6.
Prepare daily, weekly, monthly reports.
Drawing Of Linear Plan & Profile of Motorway on Autodesk Civil 3D.
Submission of Shop Drawings and Bar Bending Schedules of Bridges, Underpasses, Subways, Box culverts, Pipe culverts & other structures for approval from Consultant.
Co-Ordination with Site supervisors and Surveyors and providing them with necessary data for execution of work.
Co-Ordination with QS Department and providing them with necessary data.
Page 5
ADDITIONAL CHARGES
Supervision Of Stressing Of Girders
Dealings with Sub-Contractors
Occasional Problem Oriented Site Tasks.
_____________________________________________________________________________________________________
Post : Site Engineer
Project : Faisalabad - Multan Motorway ( M-4 )
( Section Multan to Khanewal )
Organization : EKO (Turkish Trading Corporation) & KRC (Khalid Rauf & Co.) (JV)
Duration : 1 Year and 2 Months ( From :- 25th August, 2012 to 4th October, 2013 )
Responsibilities:
1. Supervision of casting & stressing of Pre – Stressed Concrete Girders.
2. Supervision of Piling Activities & Foundations.
2. Supervision Of Construction Activities of Bridges, Underpasses,
Retaining Walls, Subways, Box Culverts & Pipe Culverts.
Post : Internee
Project : Faisalabad - Multan Motorway ( M-4 )
( Section Multan to Khanewal )
Organization : EKO (Turkish Trading Corporation) & KRC (Khalid Rauf & Co.) (JV)
Duration : 2 Months during degree ( From :- 25th June, 2012 to 25th Aug, 2012 )
Post : Internee
Organization : NOOR DURANI ASSOSIATES
Duration : 1 Month during degree ( From :- 1th July, 2011 to 30th July, 2011 )
EDUCATION
NATIONAL UNIVERSITY OF SCIENCES AND TECHNOLOGY (NUST) ISLAMABAD
SCHOOL OF CIVIL AND ENVIRONMENTAL ENGINEERING
Bachelors of Engineering in Civil
Academic Projects:
Preparing Project Work Schedule of a Multi Storey Building.
Topographical Survey and Mapping of NUST Islamabad H-12 Campus
Page 6
using Total Station and GPS.
Architectural Design of Multinational Head Office Building on Auto Cad.
Presentations On
Importance of Planning and Management Techniques & tools in Construction Industry.
Most Probable Causes of Cost & Time Over Run in a project.
Display of Different Engineering Materials in modern era construction.
Persuasive and Effective Communication Skills.
Advances in seismic designing.
Final Year Project:
Structural analysis of Extra Dozed Box Girder Bridge using SAP and CSI Bridge (Case Study Naluchi Bridge Muzafarabad, Pakistan)
LANGUAGE
English – speak fluently and read/write with high proficiency
Urdu – native language
ENGINEERING COUNCIL ACCREDITATION
PAKISTAN ENGINEERING COUNCIL SAUDI COUNCIL OF ENGINEERS
Reg. No. = Civil/35695 Reg. No. = 239395 Date of Registration = Jun, 16 2014 Date of Registration = 26/09/1423 H
Validity until = Dec, 31 2016 Validity until = 02/07/1439 H
COMPUTER SKILLS
Planning : Primavera Enterprise Project Management Software
P6 (v 15.2) & Microsoft Project.
Computed Aided Drawing : Auto CAD 2014
Highway Geometric Design : Autodesk Civil 3D 2014
Document/Text processing : Microsoft Word, Microsoft Excel, Microsoft Power Point
Operating Systems: Windows 10, Windows 8, Windows 7, Vista, XP, 2000, 98.
Page 7
Student Development Experiences
Manager Human Resource In NUST Science Society
School Representative of NUST Community Services Club
Executive member at NUST Bazm-e-Pakistan
Executive member at NUST Literary Circle
Founded a department club by name of NICE INDOOR SPORTS CLUB
Organized and Participated in many International Conferences
Been a part of the organization team Of International conference on Natural Disasters and Earth Quake hazards headed and attended by UNESCO members.(2010)
HONORS / AWARDS Got Nominated for Rector’s Gold Medal Competition at NUST Won many Debates and Declamation Contests throughout my educational career Won best TV commercial award at NUST INSIGHT 2011. Won 2nd Best Industrial Project Title at Job Fair, NUST Winner of Sytek Annual Science Quiz
COMMUNITY INVOLVEMENT
General Secretary NUST International Model United nations ’13, at NBS Hosted South Asian Youth Conference 2012, at Pak-China Friendship Centre. School Representative of NUST Community Services Club Executive member at NUST Bazm-e-Pakistan Executive member at NUST Literary Circle Founded a department club by name of NICE INDOOR SPORTS CLUB Been a part of the organization team Of International conference on Natural
Disasters and Earth Quake hazards headed and attended by UNESCO members.(2010)
Flood relief work in summer 2010.
Been a part or the fund raising campaign for Earth Quake victims (2005) and then later for Flood victims(2010)
Working as part of social welfare project “Educate Pakistan” at Azan e Sehar
Voluntarily participation in organizing different events at school and university.
REFERENCES Can be provided if asked for
Page 8