No. AppdRevision Chk.V Date
DO NOT SCALE
* Refer to Revision 1 for Original Signature
Scale (A1)
Scale (A3)Reduced
Dwg Check
Dsg Verifier
Drawn
Original Design
Date
Approved For Project:
IF IN DOUBT ASK.
Title: Drawing No:
Docu
ment
No.
Rev.
Drawing Plotted: 17 May 2013 01:17 a.m.
TRAF
FIC
STAG
ING
DRAW
INGS
- UP
DATE
.DW
G
SH1 MACKAYS TO PEKA PEKA
RP 1012/0.00 TO 1023/5.00Document created for NZTA by M2PP Alliance, Level 2, 17-21 Whitmore St, WELLINGTON
Construction*
By Chk
EXPRESSWAY
FOR TOC
NOT FOR CONSTRUCTION
CV-CM-307 0RAUMATI RD CROSSING
DETOUR ROUTEBB 16-05-13
A TRAFFIC STAGING FOR TOC PHASE BB 16-05-130 TRAFFIC STAGING FOR CONSENTING NRN 15-03-12
No. AppdRevision Chk.V Date
DO NOT SCALE
* Refer to Revision 1 for Original Signature
Scale (A1)
Scale (A3)Reduced
Dwg Check
Dsg Verifier
Drawn
Original Design
Date
Approved For Project:
IF IN DOUBT ASK.
Title: Drawing No:
Docu
ment
No.
Rev.
Drawing Plotted: 17 May 2013 01:17 a.m.
TRAF
FIC
STAG
ING
DRAW
INGS
- UP
DATE
.DW
G
SH1 MACKAYS TO PEKA PEKA
RP 1012/0.00 TO 1023/5.00Document created for NZTA by M2PP Alliance, Level 2, 17-21 Whitmore St, WELLINGTON
Construction*
By Chk
EXPRESSWAY
FOR TOC
NOT FOR CONSTRUCTION
CV-CM-308 0WHAREMAUKU STREAM BRIDGESITE ACCESS FROM IHAKARA ST
BB 16-05-13A TRAFFIC STAGING FOR TOC PHASE BB 16-05-130 TRAFFIC STAGING FOR CONSENTING NRN 15-03-12
No. AppdRevision Chk.V Date
DO NOT SCALE
* Refer to Revision 1 for Original Signature
Scale (A1)
Scale (A3)Reduced
Dwg Check
Dsg Verifier
Drawn
Original Design
Date
Approved For Project:
IF IN DOUBT ASK.
Title: Drawing No:
Docu
ment
No.
Rev.
Drawing Plotted: 17 May 2013 01:18 a.m.
TRAF
FIC
STAG
ING
DRAW
INGS
- UP
DATE
.DW
G
SH1 MACKAYS TO PEKA PEKA
RP 1012/0.00 TO 1023/5.00Document created for NZTA by M2PP Alliance, Level 2, 17-21 Whitmore St, WELLINGTON
Construction*
By Chk
EXPRESSWAY
FOR TOC
NOT FOR CONSTRUCTION
CV-CM-309 0KAPITI RD INTERCHANGE
STAGE 1BB 16-05-13
A Westbound lanes shifted north into the flush median from Arawhata Road to Milne Drive toprovide space for pedestrians and cyclists and allowing for truck movements into and out of siteaccess points.
B South abutment works, center piers and bridge beams on the south side to be completed alongwith the southern half of the Kapiti Rd reconstruction to be carried out behind TL-2 barriers
Details:
- Pedestrians and cyclists will be provided for in TMP layouts with dedicated paths through the work area- All TM at this work site will be undertake to COPTTM Level 2 requirements.
A TRAFFIC STAGING FOR TOC PHASE BB 16-05-130 TRAFFIC STAGING FOR CONSENTING NRN 15-03-12