Cut over plan SID upgrade BI ABAP Date: Performed by: Source release: Target release: No. Activity Preparation of upgrade 1 Upgrade documentation available 2 Upgrade directory available with sufficient space (3,5GB+) 3 Check value of rdisp/mshost & rdisp/wp_no_vb 4 Source release of software meets requirements for upgrade 5 6 Convert the data classes of InfoCubes 7 Check inconsistent InfoObjects 8 Convert inconsistent characteristic values with a conversion routine 9 You migrate InfoPackage groups to process chains. 10 Fill the download directory 11 Generate the SAP Solution Manager key 12 Run reports RUTTTYPACT and UMG_POOL_TABLE 13 Create and run a report for Open Hub 14 Set operation mode for upgrade in RZ04 15 Download the JCE Jurisdiction Policy Files 16 Make the preparations at the database level 17 Update database statistics-see note 819655 for commands 18 19 Check the resource quotas of the database user 20 Apply note 558197 21 Check delta queue in TX RSA7 Extraction & Configuration roadmap steps 22 Start upgrade program & upgrade GUI on CI host 23 Enter keyword for Upgrade (keyword=22803354) 24 Enter mount directories with upgrade medias 25 Enter password for DDIC user 26 Check note 1462709 28 Choose preconfiguration mode 29 Enter password for user system 30 Check and update version of R3trans,tp and SAP kernel Plan modification adjustment-get SCCR key and check Z* package existence Check ora parameter 'shared_pool_size' (at least 400MB), 'optimizer_features_enable', 'compatible' see note

CutOver Plan Upgrade TEMPLATE

Embed Size (px)

Citation preview

Page 1: CutOver Plan Upgrade TEMPLATE

Cut over plan SID upgrade BI ABAP Date:Performed by:Source release:Target release:

No. Activity Guide referencePage number

Preparation of upgrade1 Upgrade documentation available2 Upgrade directory available with sufficient space (3,5GB+) 493 Check value of rdisp/mshost & rdisp/wp_no_vb 484 Source release of software meets requirements for upgrade 50

5 62

6 Convert the data classes of InfoCubes 637 Check inconsistent InfoObjects 638 Convert inconsistent characteristic values with a conversion routine 64

9 You migrate InfoPackage groups to process chains. 6510 Fill the download directory 6511 Generate the SAP Solution Manager key 6712 Run reports RUTTTYPACT and UMG_POOL_TABLE 6813 Create and run a report for Open Hub 6814 Set operation mode for upgrade in RZ04 6915 Download the JCE Jurisdiction Policy Files 7016 Make the preparations at the database level 7017 Update database statistics-see note 819655 for commands 70

18 7019 Check the resource quotas of the database user 7020 Apply note 55819721 Check delta queue in TX RSA7

Extraction & Configuration roadmap steps22 Start upgrade program & upgrade GUI on CI host 7423 Enter keyword for Upgrade (keyword=22803354)24 Enter mount directories with upgrade medias25 Enter password for DDIC user26 Check note 146270928 Choose preconfiguration mode 3729 Enter password for user system30 Check and update version of R3trans,tp and SAP kernel

Plan modification adjustment-get SCCR key and check Z* package existence

Check ora parameter 'shared_pool_size' (at least 400MB),'optimizer_features_enable', 'compatible' see note

Page 2: CutOver Plan Upgrade TEMPLATE

31 Enter SOLMAN key 32 Specify location of SW you want to include - SPDD transport,ADDons,SPS,LANG33 Make entries for shadow instance installation

Checks and Preparation roadmap steps34 Start with Java upgrade - only after Configuration step is finished - see JAVA tab 5535 Decide about report RASUVAR<x> to save variants36 Run report RSDMD_CHECKPRG_ALL with repair option37 Run report SAP_UPDATE_DBDIFF and check ABAP DDIC consistency in db0238 Run TX: /n/ASU/UPGRADE and perform listed steps39 Check results of system checks-CHECKS.LOG 89

Preprocessing roadmap step40 Check central and DB & product specific upgrade notes for updates41 Confirm unconfirmed support packages42 Enter ADDons keywords43 Release locked objects and confirm repairs44 Clean up outstanding updates 9345 Save kernel46 Process uncompleted conversion requests and restart logs (TX SE14) 22/TroubleG

47 9448 Change system change option to modifiable in SE0649 Adjust modified SAP objects- SPDD50 Isolate Central Instance 49/TroubleG51 Stop and delete saposcol 49/TroubleG52 Disable cron jobs 49/TroubleG53 Disable SAP BTC jobs with report BTCTRNS1 (except job RDDIMPDP) 49/TroubleG54 Inform UC4 team about jobs suspends55 Make sure no Operation mode change occures during upgrade 49/TroubleG56 BACKUP database NOW57 Backup /usr/sap/SID - especially SDM directory!58 Backup upgrade directory + home dir of adm user59 Change archive log mode of DB when prompted by upgrade program60 Check permissions on umode.lst in /usr/sap/trans/bin

Downtime roadmap step61 Downtime starts62 Enable log archive mode63 Downtime ends64 Check unix filesystem strcuture - links exe,global etc

Postprocessing roadmap step65 Create backint link in kernel directory66 Apply sadba role 11967 Check SGEN and run it if it's not already running68 Enable cron jobs

Remove conflicts between customer tables and new viewsby deleting the customer tables

Page 3: CutOver Plan Upgrade TEMPLATE

69 Run TX /n/ASU/UPGRADE and perform listes follow up steps70 Install sapcrypto lib and check https service in SMICM71 Check note 741864 -FINBASIS memorry settings72 Check errors listed in LONGPOST.LOG73 Execute program COM_PRODUCT_UPGRADE if prompted in LONGPOST.LOG 12774 Modification adjustment-SPAU75 Enabled SAP BTC jobs with report BTCTRNS276 Activate the Internet Communication Manager 11177 Perform the follow-up activities for user root 11978 Perform the follow-up activities for the SAP Kernel 12179 Activate the ICM service 12280 Perform actions for the Cost-Based Optimizer 128

81135

82 Delete old tablespaces 136

83135

84 Check upgrade guide for other follow up activities if needed85 De-apply note 55819786 Apply note 790727- ITS pulishing services

87

Publish WebGui,IAC and SYSTEM services (see complete comment)

88

Activate ICF services mentioned in note 517484

89

90

Acivate services sap/public/bc91 Activate service sap/bc/bsp/sap -all sub services

92136

Distribute the configuration to all systems in the transport domain

Copy glossary and terminology data from container tables to database tables

Activate all services under /sap/bc/gui/sap/its

Save files for follow-up upgrades and you make a backup of the subdirectory that contains the shadow instance profiles, if necessary

Page 4: CutOver Plan Upgrade TEMPLATE

You convert the chart settings [page 111].You convert the Web Objects from SAP BW 3.x [page 113].You switch over to the new standard template for ad-hoc analysis [page 115].You activate hierarchy versions [page 118].You install the Java components [page 122] if necessary.

You check application Release Notes [page 124] for specific follow-up activities.You adjust the Customizing settings [page 124].You adjust your own developments [page 125], if necessary.You configure the SAP Internet Transaction Server [page 54] and migrate applications, if necessary.You perform follow-up activities in the authorizations area [page 131]:You perform follow-up activities for Application Link Enabling (ALE) [page 133].SAP Retail: You convert the terminology [page 134].

You reimport additional programs [page 123] such as RFC-SDK or CPIC-SDK from the SAP NetWeaver Presentation DVD, if necessary.

Page 5: CutOver Plan Upgrade TEMPLATE
Page 6: CutOver Plan Upgrade TEMPLATE
Page 7: CutOver Plan Upgrade TEMPLATE
Page 8: CutOver Plan Upgrade TEMPLATE

Status Responsibility… Brasbunker

Concluído Value TeamAtrasado A Definir

Em AndamentoNão AplicávelPrerequisites Status Start (CET) End (CET)

SAP notes Date Time Date Time

…………

…458363 …

Not needed………

1032635 Not needed……

558197 …819655 …

819655 & 830576 ……

558197 …1293745 & 506694 …

…1293745 …

……

1462079 Not needed………

Page 9: CutOver Plan Upgrade TEMPLATE

………

See Java upg guide ………………

…………………

…………………

……

………

Page 10: CutOver Plan Upgrade TEMPLATE

Atrasado

558197790727 …

934824

517484

……………………

Page 11: CutOver Plan Upgrade TEMPLATE

………………………

…………………………………………………………………………………………

Page 12: CutOver Plan Upgrade TEMPLATE

…………………………………………………………………………………………………………

Page 13: CutOver Plan Upgrade TEMPLATE
Page 14: CutOver Plan Upgrade TEMPLATE
Page 15: CutOver Plan Upgrade TEMPLATE

Responsibility Comments

TSITSITSITSI

Linde

LindeLindeLinde

TSITSITSITSITSITSITSITSITSI

TSITSITSITSI

TSITSITSITSITSI correction included in FIX packageTSITSITSI

Page 16: CutOver Plan Upgrade TEMPLATE

TSITSITSI

TSITSI

Linde in ASU stepsTSI in ASU steps

Linde together with TSI based on ASU stepLinde together with TSI based on error in CHECKS.LOG

TSITSITSI

LindeTSITSITSI

TSITSI

LindeTSITSITSITSITSITSITSITSITSITSITSI

TSITSITSITSI

TSITSITSITSI

Page 17: CutOver Plan Upgrade TEMPLATE

Linde together with TSI based on ASU stepTSITSI

Linde together with TSI based on errorsTSI

LindeTSITSITSITSITSITSI

TSITSI

TSITSITSITSI

TSI

TSI

TSI

TSITSI

TSI

Please access the transaction SE80 and execute the following steps forthe services WEBGUI, SYSTEM and IAC:1) In the dropdown box select "Internet Service"2) In the input field please type <service> and press ENTER

Page 18: CutOver Plan Upgrade TEMPLATE
Page 19: CutOver Plan Upgrade TEMPLATE
Page 20: CutOver Plan Upgrade TEMPLATE
Page 21: CutOver Plan Upgrade TEMPLATE
Page 22: CutOver Plan Upgrade TEMPLATE

Cut over plan SID upgrade BI ABAP Date: StatusPerformed by: …Source release: DoneTarget release: Error

In progressNot needed

No. Activity Guide reference PrerequisitesPage number SAP notes

Preparation of upgrade1 Check source release of SAP system - min. SP09 2 Check JDK and SDM version - min SP143 Download SP stacks4 Download upgrade DVDs5 Perform DB backup + /usr/sap/SID backup

6 8851677 Apply note 885167-increase PSAP<SID>DB size 8851678 Apply note 995116 - disable sapstartsrv9 Create upgrade directory- check free space - min 3.5GB

10 Start PREPARE and SDTGui 4811 PREPARE-Initialization and Extraction 5012 PREPARE-Configuration 5113 PREPARE-General Checks and Finalization 54

Upgrade Process14 Start upgrade 5515 Backup DB 5516 Backup /usr/sap/SID- especially SDM directory!17 Backup upgrade directory + home direcotry of adm user18 Check /usr/sap/SID/SYS/global, exe, profile are links to /sapmnt19 Apply note 914818 (check point 4 -aik) 91481820 Apply note 865424 86542421 Downtime starts22 Downtime ends23 Create backup of DB 56

Follow up activities24 Execute saproot.sh 5825 Change parameter open_cursor to original value 885167

Execute follow up steps for SLD 60

Apply note 885167-check DB parameters-increase open cursors

Page 23: CutOver Plan Upgrade TEMPLATE

Execute follow up steps for Adobe document services 61Execute follow up steps for Solution manager 62

Page 24: CutOver Plan Upgrade TEMPLATE

ResponsibilityLinde

TSI

Status Start (CET) End (CET) ResponsibilityDate Time Date Time

… TSI… TSI… TSI… TSI… TSI

… TSI… TSI… TSI… TSI… TSI… TSI… TSI… TSI

… TSI… TSI

TSITSI

… TSI… TSI… TSI… TSI… TSI… TSI

… TSI

Page 25: CutOver Plan Upgrade TEMPLATE
Page 26: CutOver Plan Upgrade TEMPLATE

Comments

Page 27: CutOver Plan Upgrade TEMPLATE
Page 28: CutOver Plan Upgrade TEMPLATE

Role Name MailSAP Basis Julius Zbuska [email protected]

Page 29: CutOver Plan Upgrade TEMPLATE

Tel Mobile Company+421 55 72 44 814 T-systems

Page 30: CutOver Plan Upgrade TEMPLATE

ABAP Upgrade guide BI 7.0 EHP1

SAPup Troubleshooting Guide (TroubleG)

https://websmp201.sap-ag.de/~sapidb/011000358700000505252009E

Adobe Acrobat Document

Page 31: CutOver Plan Upgrade TEMPLATE

JAVA Upgrade guide BI 7.0 EHP1

https://websmp201.sap-ag.de/~sapidb/011000358700000512822009E