37
Customizing a SharePoint GIS to provide Construction Information at LAX 2016 ESRI Conference – San Diego, CA June 30, 2016 Don Chinery, Los Angeles World Airports

Customizing a SharePoint GIS to provide Construction … · 2016-07-25 · HTML 5 Language and SharePoint 2013 Information Displayed through Interactive Map Application on LAWA SharePoint

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Customizing a SharePoint GIS to provide Construction … · 2016-07-25 · HTML 5 Language and SharePoint 2013 Information Displayed through Interactive Map Application on LAWA SharePoint

Customizing a SharePoint GIS to provide Construction Information at LAX

2016 ESRI Conference – San Diego, CAJune 30, 2016

Don Chinery, Los Angeles World Airports

Page 2: Customizing a SharePoint GIS to provide Construction … · 2016-07-25 · HTML 5 Language and SharePoint 2013 Information Displayed through Interactive Map Application on LAWA SharePoint

Agenda

CALM Program Controls

Introduction

LAX Background

Program Controls/GIS

Data Collection/Analysis

Application

Deliverables

Costs

Benefits

Conclusion

Page 3: Customizing a SharePoint GIS to provide Construction … · 2016-07-25 · HTML 5 Language and SharePoint 2013 Information Displayed through Interactive Map Application on LAWA SharePoint

LAX Airport

CALM Program Controls

Gateway to LA: 75 million passengers per year (2015)

Page 4: Customizing a SharePoint GIS to provide Construction … · 2016-07-25 · HTML 5 Language and SharePoint 2013 Information Displayed through Interactive Map Application on LAWA SharePoint

LAX Passenger Count

CALM Program Controls

Washington - Dulles

NY/NJ -Newark

Orange County

Page 5: Customizing a SharePoint GIS to provide Construction … · 2016-07-25 · HTML 5 Language and SharePoint 2013 Information Displayed through Interactive Map Application on LAWA SharePoint

LAX Footprint

Orange County

DIA DFW

Page 6: Customizing a SharePoint GIS to provide Construction … · 2016-07-25 · HTML 5 Language and SharePoint 2013 Information Displayed through Interactive Map Application on LAWA SharePoint

$10 Billion of Construction Improvements

Capital, Airlines/Tenants, Maintenance Projects

3 major phases – 2010 through 2024

Nation’s largest modernization airport project

Largest public works project in Los Angeles’ history

Page 7: Customizing a SharePoint GIS to provide Construction … · 2016-07-25 · HTML 5 Language and SharePoint 2013 Information Displayed through Interactive Map Application on LAWA SharePoint

Bradley West (2013)

Page 8: Customizing a SharePoint GIS to provide Construction … · 2016-07-25 · HTML 5 Language and SharePoint 2013 Information Displayed through Interactive Map Application on LAWA SharePoint

New Face - Central Terminal Area (2014)

Page 9: Customizing a SharePoint GIS to provide Construction … · 2016-07-25 · HTML 5 Language and SharePoint 2013 Information Displayed through Interactive Map Application on LAWA SharePoint

Terminal Renovations (2016 – 2018)

Page 10: Customizing a SharePoint GIS to provide Construction … · 2016-07-25 · HTML 5 Language and SharePoint 2013 Information Displayed through Interactive Map Application on LAWA SharePoint

Midfield Satellite Concourse (2019)

Page 11: Customizing a SharePoint GIS to provide Construction … · 2016-07-25 · HTML 5 Language and SharePoint 2013 Information Displayed through Interactive Map Application on LAWA SharePoint

Landside Access Modernization Program (LAMP)

LAX is the busiest origin and destination airport in the world

Connectinglax.com

Page 12: Customizing a SharePoint GIS to provide Construction … · 2016-07-25 · HTML 5 Language and SharePoint 2013 Information Displayed through Interactive Map Application on LAWA SharePoint

Consolidated Rent-A-Car Center (CONRAC)

Page 13: Customizing a SharePoint GIS to provide Construction … · 2016-07-25 · HTML 5 Language and SharePoint 2013 Information Displayed through Interactive Map Application on LAWA SharePoint

Intermodal Transportation Facility (ITF)

Page 14: Customizing a SharePoint GIS to provide Construction … · 2016-07-25 · HTML 5 Language and SharePoint 2013 Information Displayed through Interactive Map Application on LAWA SharePoint

Automated People Mover System (APM)

Page 15: Customizing a SharePoint GIS to provide Construction … · 2016-07-25 · HTML 5 Language and SharePoint 2013 Information Displayed through Interactive Map Application on LAWA SharePoint

Coordination And Logistics Management

C.A.L.M.

Minimizing construction-related impacts to passengers and tenants while maintaining

a positive guest experience.

Page 16: Customizing a SharePoint GIS to provide Construction … · 2016-07-25 · HTML 5 Language and SharePoint 2013 Information Displayed through Interactive Map Application on LAWA SharePoint

CALM Deliverables

CALM Program Controls

Program Management Function

Program Controls Deliverables:

Master Schedule – all projects – published monthly

GIS Database – “Live” CALM Geodatabase

Schedule and Locational Information tracked from

Planning through Design & Construction

Page 17: Customizing a SharePoint GIS to provide Construction … · 2016-07-25 · HTML 5 Language and SharePoint 2013 Information Displayed through Interactive Map Application on LAWA SharePoint

Master Coordination Schedule

Page 18: Customizing a SharePoint GIS to provide Construction … · 2016-07-25 · HTML 5 Language and SharePoint 2013 Information Displayed through Interactive Map Application on LAWA SharePoint

ArcGIS Geodatabase

Identify Locations for

All Projects

Interactive Map Application

GIS

Page 19: Customizing a SharePoint GIS to provide Construction … · 2016-07-25 · HTML 5 Language and SharePoint 2013 Information Displayed through Interactive Map Application on LAWA SharePoint

Live Data

Efficient Packaging

Captures Active and Future Work Areas

Reports Scheduling

Reveals Time and Space Conflict

Stores Project Details

Provides Mapping for Logistical Coordination

GIS

Page 20: Customizing a SharePoint GIS to provide Construction … · 2016-07-25 · HTML 5 Language and SharePoint 2013 Information Displayed through Interactive Map Application on LAWA SharePoint

CALM GIS Application

CALM Program Controls Project Locations for All Available Projects in the Master Schedule Data Stored in ArcGIS Geodatabase HTML 5 Language and SharePoint 2013 Information Displayed through Interactive Map Application on

LAWA SharePoint Website – Access to Internal Airport Employees Only

Updated Daily Project Information Captured Includes

Phasing and Site Logistics Plans Construction Start and End Dates ADG Project Managers Project Status (Planning, In Design, In Construction, Complete) Contractor Information Square Footage

Planning Tool (Examples Include Element Maps, Roadway Coordination, Laydown Areas)

Page 21: Customizing a SharePoint GIS to provide Construction … · 2016-07-25 · HTML 5 Language and SharePoint 2013 Information Displayed through Interactive Map Application on LAWA SharePoint

Systems Integration (P6 to ArcGIS)

Page 22: Customizing a SharePoint GIS to provide Construction … · 2016-07-25 · HTML 5 Language and SharePoint 2013 Information Displayed through Interactive Map Application on LAWA SharePoint

CALMShare Website

Page 23: Customizing a SharePoint GIS to provide Construction … · 2016-07-25 · HTML 5 Language and SharePoint 2013 Information Displayed through Interactive Map Application on LAWA SharePoint

CALMShare Website

Page 24: Customizing a SharePoint GIS to provide Construction … · 2016-07-25 · HTML 5 Language and SharePoint 2013 Information Displayed through Interactive Map Application on LAWA SharePoint

CALMShare Website

Page 25: Customizing a SharePoint GIS to provide Construction … · 2016-07-25 · HTML 5 Language and SharePoint 2013 Information Displayed through Interactive Map Application on LAWA SharePoint

Identify Functionality

Page 26: Customizing a SharePoint GIS to provide Construction … · 2016-07-25 · HTML 5 Language and SharePoint 2013 Information Displayed through Interactive Map Application on LAWA SharePoint

CALM GIS Application

GIS ExamplesProject Name: T6 Electrical UpgradeConstruction Start Date: 12/9/2014Construction End Date: 3/2/2017Project Number: C-LAX-11687ADG Project Manager: R. HeiserStatus: In ConstructionTerminal: 6Level: ArrivalsSquare Footage: 9,213 sq. ftContractor: TurnerContractor Phone Number: 213.896.3401Inspector: Sonny CruzInspector Phone Number: 424-646-6014

Page 27: Customizing a SharePoint GIS to provide Construction … · 2016-07-25 · HTML 5 Language and SharePoint 2013 Information Displayed through Interactive Map Application on LAWA SharePoint

Select Work Areas

Page 28: Customizing a SharePoint GIS to provide Construction … · 2016-07-25 · HTML 5 Language and SharePoint 2013 Information Displayed through Interactive Map Application on LAWA SharePoint

Filtering Functionality

12

Page 29: Customizing a SharePoint GIS to provide Construction … · 2016-07-25 · HTML 5 Language and SharePoint 2013 Information Displayed through Interactive Map Application on LAWA SharePoint

Space/Time Conflicts

Overlap of CIP, Tenant and Concessions

Construction Projects

Page 30: Customizing a SharePoint GIS to provide Construction … · 2016-07-25 · HTML 5 Language and SharePoint 2013 Information Displayed through Interactive Map Application on LAWA SharePoint

Roadway Coordination Map

GIS Examples

Page 31: Customizing a SharePoint GIS to provide Construction … · 2016-07-25 · HTML 5 Language and SharePoint 2013 Information Displayed through Interactive Map Application on LAWA SharePoint

Construction Staging Laydown Map

GIS Examples

Page 32: Customizing a SharePoint GIS to provide Construction … · 2016-07-25 · HTML 5 Language and SharePoint 2013 Information Displayed through Interactive Map Application on LAWA SharePoint

Passenger Gate Closure Map

GIS Examples

Page 33: Customizing a SharePoint GIS to provide Construction … · 2016-07-25 · HTML 5 Language and SharePoint 2013 Information Displayed through Interactive Map Application on LAWA SharePoint

AOA Access Map

Post 236B

Post 23

Post 21

Post 236B

Future Post 5

Page 34: Customizing a SharePoint GIS to provide Construction … · 2016-07-25 · HTML 5 Language and SharePoint 2013 Information Displayed through Interactive Map Application on LAWA SharePoint

GIS Costs

CALM Program Controls

Initial Data Collection – 1 FTE – 6 months

Data Development – Schedule/GIS – 2 FTE – 6 months

GIS System Development – 2 FTE – 6 months

Hardware/Software Costs = < $100K

Maintenance of Schedule/GIS system (ongoing) – 3 FTE

Page 35: Customizing a SharePoint GIS to provide Construction … · 2016-07-25 · HTML 5 Language and SharePoint 2013 Information Displayed through Interactive Map Application on LAWA SharePoint

GIS Data Verification Process

CALM Program Controls

Confirm with Project Managers on a monthly basis –project status

Cross-reference with Program Controls on budget/cost reports

Conduct Quarterly Data Scrubs with:

Planning

Project Managers

CALM Team

Attend weekly project OAC and status meetings for latest information

Page 36: Customizing a SharePoint GIS to provide Construction … · 2016-07-25 · HTML 5 Language and SharePoint 2013 Information Displayed through Interactive Map Application on LAWA SharePoint

GIS Benefits

CALM Program Controls

Tool used for Terminal Coordination Meetings

Full Control of Interface Changes – Can Reflect Organizational Changes Quickly

Resolve Conflicts “On Paper” Rather than in the “Field”

Minimize Passenger Inconvenience

More Efficient Packaging of Work

More Information for Project Managers in Terminals –Know the “Big Picture” Rather than Individual Projects

Page 37: Customizing a SharePoint GIS to provide Construction … · 2016-07-25 · HTML 5 Language and SharePoint 2013 Information Displayed through Interactive Map Application on LAWA SharePoint

Questions

Donald Chinery, GISPGIS Project Manager

Los Angeles World [email protected]