Customer Inputs 600mw

Embed Size (px)

Citation preview

  • 8/13/2019 Customer Inputs 600mw

    1/17

    S.NODescription of Foundations (Customer

    Scope)Schedule Date Actual / Expected

    1 Boiler Main & Auxiliary

    2 Column Foundation

    3 PA Fan 30.06.2011 30.04.2013

    4 ID fan 30.06.2011 15.07.2012

    5 FD Fan 30.06.2011 30.04.2013

    6Duct Support Foundation Boiler (Outlet) &

    ESP (Inlet)30.04.2011 30.01.13

    7Duct Support Foundation ESP (Outlet) &

    ID Fan (Inlet)31.03.2011 30.02.2012

    8Duct Support Foundation ID Fan (Outlet)

    & Chimney30.04.2011 15.12.2011

    9 Condenser Foundation/ TG Deck 31.12.2010 28.08.2012(3rdPedestal handed over)

    10TG Hall With covering & EOT crane in

    Remote control mode30.01.2011

    11 Oil Canal 30.05.2012 30.04.2013

    12 Control Fluid Room with Foundations 30.03.2012 30.04.2013

    13 Main Oil Room wall 15.03.2012 10.04.2013

    14 ESP 30.04.2010 22.01.2011

    15 De-aerator Floor 30.06.2011 25.11.2012

    16 CEP 24.06.2011 30.07.2012

    17 MD-BFP 30.07.2011 23.10.2012

    18 TD-BFP 30.07.2011 30.04.2013

    19 Mills foundations 31.08.2011 15.05.2013

    20

    21 DC Power 02.11.2011 30.12.2012

    22 Control Room with A/C 31.10.2011 30.03.2013

    23 ESP Control Room 30.09.2011 30.10.2012

    24Instrument air, Compressed air & Service

    Air31.03.2012 30.03.2013

    25Start Up Power (ST & STN Board

    Charging)31.01.2012 30.01.2013

    26 NDCT- Cooling Tower 31.03.2012 30.05.2013

    27 Chimney for Duct Connection 28.12.2011 30.05.2013

    28 DM Plant 15.10.2011 30.06.2012

    29 Switch Yard 30.07.2012 30.08.2012

    System Readiness

    30.03.2010 28.10.2010

  • 8/13/2019 Customer Inputs 600mw

    2/17

    30 CW & ACW System 28.02.2012

    31 Fire Protection system 02.02.2012

    32 Coal handling System 31.07.2012

    33 Ash Handling System 31.07.2012

    34 Readiness for Power Evacuation 31.07.2012 20.02.2013

    35 AC & Ventilation system 31.07.2012

  • 8/13/2019 Customer Inputs 600mw

    3/17

    Remarks

    Only RHS handed over on28.12.2012

    Only RHS handed over on

    28.12.2012

    RHS handed over

    15.12.201

    Deck handed Over on28.02.2012

    (TES -25.05.12 )

    Side covering is Still

    pending. Floors (0.0, 8.5 &

    17 M pending)

    1 Nos was handed over on

    25.02.2013

    LHS last 2 Nos handed

    over on 23.03.2013

    Ready

    Ready

    Ready

    Ready

    Ready

    157/172 completed, work

    stopped since Oct12

    because of fatal accident

    BLU was done with temp

    chimney

    Ready

    Ready

  • 8/13/2019 Customer Inputs 600mw

    4/17

    Ready

    Pending

  • 8/13/2019 Customer Inputs 600mw

    5/17

    Sl. No. DescriptionScheduled

    Date

    Commitment in

    last CRM

    (25.04.13)

    Remarks

    Commitment as

    on 18.06.13

    (CRM)

    1

    Boiler Main & Auxiliary

    Column Foundation30-Mar-10 Available Available Available

    2 Condenser Foundation31-Dec-10 Available (handed

    over on 28.02.12Available(handed over

    on 28.02.12

    Available

    3

    TG Hall With covering with

    EOT crane31-Jan-11

    Side cladding -

    10.05.13

    Side cladding

    is still pending30.06.13

    4 De-aerator Floor 30-Jun-11 Available Available Available

    5 PA Fan Foundation30-Jun-11

    B side- Available

    A side- 10.05.13

    A side- Not

    yet available07.08.13

    6

    Availability of TG

    Foundation31-Dec-10 Available Available Available

    7 Mill Foundations 31-Aug-11All 9 foundations

    from 20.05.13 to

    10.06.13

    Still pending

    F & G Available

    A by 19.06.13

    H by 24.06.13

    B by 30.07.13

    C, D & E by 15.08.13

    J by 30.08.13

    8 CEP Foundation 24-Jun-11 Available Available Available

    9 Mill bay Foundations 30-Jun-11 completed Completed Available

    10 ID fan Foundation 30-Jun-11 Available Available

    Foundation Readiness

    Avantha 1 x 600 MW - Balance Customer Inputs

  • 8/13/2019 Customer Inputs 600mw

    6/17

    Sl. No. DescriptionScheduled

    Date

    Commitment in

    last CRM

    (25.04.13)

    Remarks

    Commitment as

    on 18.06.13

    (CRM)

    11 FD Fan Foundation30-Jun-11

    B side- Available

    A side- 10.05.13

    A side- Not

    yet available07.08.13

    12

    Duct Support Foundation -

    Boiler (Outlet) & ESP

    (Inlet)30-Apr-11 01.05.13 Available Available

    13

    Duct Support Foundation -

    ESP (Outlet) & ID Fan

    (Inlet)31-Mar-11 01.05.13 Available Available

    14

    Duct Support Foundation -

    ID Fan (Outlet) & Chimney30-Apr-11 01.05.13 Available Available

    15 MDBFP Foundation 30-Jul-11 Available Available Available

    16 TDBFP Foundation30-Jul-11

    1 foundation

    handed over. 2nd

    by 26.04.13

    Available

    17

    Bunker Bay Transfer Point -

    A 2-Dec-11 NA NA NA

    18

    Bunker Bay Transfer Point -

    B2-Dec-11 NA NA NA

    19 Bunker Floor 2-Dec-11 A, B available A, B available

    20 ESP Foundation 30-Apr-10 Available Available Available

    21 Feeder Floor A,B available

    A,B available and C,

    D, E by 05.07.13

    and F, G, H, J by

    07.08.13

  • 8/13/2019 Customer Inputs 600mw

    7/17

  • 8/13/2019 Customer Inputs 600mw

    8/17

    Sl. No. DescriptionScheduled

    Date

    Commitment in

    last CRM

    (25.04.13)

    Remarks

    Commitment as

    on 18.06.13

    (CRM)

    14

    Readiness of Cooling

    Tower31-Mar-12 30.05.2013

    50% by 20.08.13

    100% by 20.09.13

    15 Readiness of Chimney 28-Dec-11 30.05.13 21.06.13

    16 O&M Staff 31-Dec-11 Placed Placed Available

    17 Availability of Coal atBunker 31-Jul-12 NA 30.08.13

    1

    Readiness of Compressed

    Air System31-Mar-12 Available Available

    2 Readiness of DM Plant 15-Oct-11 Ready Available

    3 Readiness of Switchyard30-Jul-12 Ready Available

    4

    Start-Up Power (ST & STN

    Board Charging)30-Jan-12 Available Available

    5

    Readiness of Circulating

    Water System

    28-Feb-121st by 20.06.13

    2nd by 15.07.13

    6

    Readiness of Cable and

    Pipe Rack for LU2-Feb-12 Pending Available

    7

    Readiness of Fire

    protection System2-Feb-12 pending Available

    8

    Readiness of

    Communication System28-Feb-12 pending

    PA System by Jul'13

    Walky Talkies

    Available

    System Readiness

  • 8/13/2019 Customer Inputs 600mw

    9/17

    Sl. No. DescriptionScheduled

    Date

    Commitment in

    last CRM

    (25.04.13)

    Remarks

    Commitment as

    on 18.06.13

    (CRM)

    9

    Readiness of Air

    Conditioning System28-Feb-12 pending Available

    10

    Readiness of ventilation

    System28-Feb-12 pending Available

    11

    Readiness of Auxiliary

    Cooling Water 28-Feb-12 pendingBy BHEL 18.06.13

    By WPIL 21.06.13

    12

    Readiness of Fuel Oil

    System28-Feb-12 Available

    13 Readiness of ASH Dyke 31-Jul-12 30.09.13

    14

    Readiness of Coal

    Handling System31-Jul-12 Jul'13 Pending 30.08.13

    15

    Readiness of Ash

    Handling System31-Jul-12

    15.05.13 bottom

    sealPending

    25.08.13 till

    intermediate silo

    16

    Readiness for Power

    Evacuation31-Jul-12 Available Available

  • 8/13/2019 Customer Inputs 600mw

    10/17

    2 Boiler Main & Auxiliar3 Column Foundation

    ID fan 30.06.2

    Duct Support Foundation Boiler (Outlet) & ESP (Inlet) 30.04.2

    Duct Support Foundation ESP (Outlet) & ID Fan (Inlet) 31.03.2

    Duct Support Foundation

    ID Fan (Outlet) & Chimney30.04.2

    Condenser Foundation/ TG Deck 31.12.2

    PA Fan 30.06.2

    FD Fan 30.06.2

    Description of Foundations (Customer Scope) Date

    30.03.2

  • 8/13/2019 Customer Inputs 600mw

    11/17

    TG Hall With covering &

    EOT crane in Remote

    control mode

    Oil Canal 30.05.2

    Control Fluid Room with Foundations 30.03.2

    Main Oil Room wall 15.03.2

    ESP 30.04.2

    De-aerator Floor 30.06.2

    CEP 24.06.2

    MD-BFP 30.07.2

    TD-BFP 30.07.2

    Mills foundations 31.08.2

    DC Power 02.11.2

    30.01.2

    System Readiness

  • 8/13/2019 Customer Inputs 600mw

    12/17

    Control Room with A/C 31.10.2

    ESP Control Room 30.09.2

    Instrument air, Compressed air & Service Air 31.03.2

    Start Up Power (ST & STN Board Charging) 31.01.2

    NDCT- Cooling Tower 31.03.2

    Chimney for Duct Connection 28.12.2

    DM Plant 15.10.2

    Switch Yard 30.07.2

    CW & ACW System 28.02.2

    Fire Protection system 02.02.2

    Coal handling System 31.07.2

  • 8/13/2019 Customer Inputs 600mw

    13/17

  • 8/13/2019 Customer Inputs 600mw

    14/17

  • 8/13/2019 Customer Inputs 600mw

    15/17

    Side

    coverin

    isStill

    pendin

    .

    Floors(0.0,

    8.5 &17 M

    pendin

    30.04.2

    013

    Pendin

    30.04.2

    013

    Pendin

    10.04.2

    013

    Pendin

    22.01.2

    011

    Handed

    over25.11.2

    012

    Handed

    over30.07.2

    012

    Handed

    over23.10.2

    012

    Handed

    over30.04.2

    013

    1 Nos

    washanded

    over on

    25.02.2

    013,

    2nd

    Founda

    tion

    still

    pendin

    g

    15.05.2

    013

    Still

    pendin

    30.12.2

    012

    Ready

  • 8/13/2019 Customer Inputs 600mw

    16/17

    30.03.2

    013

    Ready

    30.10.2

    012

    Ready

    30.03.2

    013

    Ready

    30.01.2013

    Ready

    30.05.2

    013

    157/17

    2

    comple

    ted,

    work

    stoppe

    d since

    Oct12

    because of

    fatal

    acciden

    t

    30.05.2

    013

    Still

    pendin

    g -BLU

    was

    done

    with

    temp

    chimne

    30.06.2

    012

    Ready

    30.08.2

    012

    Ready

    12 Still

    pendin

    12 Still

    pendin

    12 Still

    pendin

  • 8/13/2019 Customer Inputs 600mw

    17/17

    12 Still

    pendin

    20.02.2

    013

    Ready

    12 Pendin