Curtis Crews, Reliability Services Texas Reliability Entity, Inc. Changes in Relay Misoperations Reporting

Curtis Crews, Reliability Services Texas Reliability Entity, Inc. Changes in Relay Misoperations Reporting

Embed Size (px)

Citation preview

Page 1: Curtis Crews, Reliability Services Texas Reliability Entity, Inc. Changes in Relay Misoperations Reporting

Curtis Crews, Reliability ServicesTexas Reliability Entity, Inc.

Changes in Relay Misoperations Reporting

Page 2: Curtis Crews, Reliability Services Texas Reliability Entity, Inc. Changes in Relay Misoperations Reporting

2

Highlights

● Changes● Why Change?● How to Change?

ERCOT ROS November 11, 2010

Page 3: Curtis Crews, Reliability Services Texas Reliability Entity, Inc. Changes in Relay Misoperations Reporting

3

Changes

ERCOT ROS November 11, 2010

Page 4: Curtis Crews, Reliability Services Texas Reliability Entity, Inc. Changes in Relay Misoperations Reporting

4

History of Proposed Changes

● Result of NERC Reliability Metrics Working Group (RMWG), ERO-Reliability Assessments and Performance Analysis Group (ERO-RAPA), discussions

● Coordinated with Reliability Assessment Subcommittee (RAS), System Protection and Control Subcommittee (SPCS), Transmission Availability Data System Working Group (TADSWG), Transmission Availability Data System Regional Entity Coordinators (TADS-REC)

ERCOT ROS November 11, 2010

Page 5: Curtis Crews, Reliability Services Texas Reliability Entity, Inc. Changes in Relay Misoperations Reporting

5

Adequate Levels of Reliability(ALRs defined by RMWG)

● ALR4-1 Automatic Transmission Outages (ATO) Caused by Protection System Misoperations

● ALR6-11 ATO initiated by Failed Protection System

● ALR6-12 ATO initiated by Human Error● ALR6-13 ATO initiated by Failed AC Substation

Equipment● ALR6-14 ATO initiated by Failed AC Circuit

Equipment

ERCOT ROS November 11, 2010

Page 6: Curtis Crews, Reliability Services Texas Reliability Entity, Inc. Changes in Relay Misoperations Reporting

6

ERO-RAPA Key Function

● Develop a plan and an enterprise approach to data collection, checking, validation and assessment for use throughout NERC and the eight Regional Entities.

ERCOT ROS November 11, 2010

Page 7: Curtis Crews, Reliability Services Texas Reliability Entity, Inc. Changes in Relay Misoperations Reporting

7

Transmission Availability Data System(TADS)

● System change required to capture misoperation data

● Expansion of data required (TADS reports >200kV)

● Communication issues with TADS responsible entity and Relay Misoperation responsible entity

● TADS personnel are not Relay personnel

ERCOT ROS November 11, 2010

Page 8: Curtis Crews, Reliability Services Texas Reliability Entity, Inc. Changes in Relay Misoperations Reporting

8

How to change?

● NERC Standard change● NERC Rules of Procedure Section 1600

Request● Change TADS● Regional procedures

● First 3 options determined to be a more extended timeframe

ERCOT ROS November 11, 2010

Page 9: Curtis Crews, Reliability Services Texas Reliability Entity, Inc. Changes in Relay Misoperations Reporting

9

0

50

100

150

200

250

2006 2007 2008 2009 2010

Total Misoperations vs. Year

020406080

100120140160180200

2006 2007 2008 2009 2010

Misoperations vs. Year345 kV 138 kV

0.00%

2.00%

4.00%

6.00%

8.00%

10.00%

12.00%

14.00%

2006 2007 2008 2009 2010

% Misoperation vs. Year345 kV 138 kV

Misoperations “Trend”

ERCOT ROS November 11, 2010

Page 10: Curtis Crews, Reliability Services Texas Reliability Entity, Inc. Changes in Relay Misoperations Reporting

10

26%

24%

10%

22%

17%

Relay Settings

Implementation (Wiring errors,etc.)

Relay Failure

Pilot

Other

Per TADS Definitions:50% of 2009 misoperations attributable to Human Error

Summary of 2009 Misoperations - Cause

ERCOT ROS November 11, 2010

Page 11: Curtis Crews, Reliability Services Texas Reliability Entity, Inc. Changes in Relay Misoperations Reporting

11

Summary of 2010 Misoperations - Cause

37%

22%

9%

23%

10%

Relay Settings

Implementation (Wiringerrors, etc.)

Relay Failure

Pilot

Other

Per TADS Definitions:59% of 2010 misoperations attributable to Human Error

ERCOT ROS November 11, 2010

Page 12: Curtis Crews, Reliability Services Texas Reliability Entity, Inc. Changes in Relay Misoperations Reporting

12

References

● NERC Reliability Metrics Working Grouphttp://www.nerc.com/filez/rmwg.html

● NERC ERO Reliability Assessments and Performance Analysis Grouphttp://www.nerc.com/filez/ero-rapa.html

● NERC System Protection and Control Subcommitteehttp://www.nerc.com/filez/spctf.html

● ERCOT System Protection Working Grouphttp://www.ercot.com/committees/board/tac/ros/spwg/

● ERCOT Operating Guideshttp://www.ercot.com/mktrules/guides/operating/

ERCOT ROS November 11, 2010