    EDUCATION

    1991 St Mary`s Christian Brothers1994 Junior Certificate - including 2 Honours1996 Leaving Certificate - including 4 Honours

    CAREER PROFILE

    January 2009 July 2009I have just returned home from the Caribbean working on the second fixing of a hospital.I was involved in wiring the lights, power, fire alarm and fan coil units.

    I also wired the kitchen and canteen

    September 2008 December 2008 Personal Kraft , Norway

    Here I was working on a commercial office block. My duties included power,Lights, data systems and fire alarm, throughout the building. I also completedinstillations of conduit, trunking and cable tray

    January 2001 - June 2006 , Dornan Engineering, Eastgate, Retail Park Little Island, Cork

    Worked on the following construction sites, Bristol Myers Squibb Pharmaceutical- Mulhuddart, Dublin 15,Alza Pharmaceutical, Co, Tipperaey,Lough Rea Power Station,Pfizer - Dun Laoighre , Dublin,West Offally Powerstation,Medite , Co Tipperary Performed the following electrical tasks,

    Conduit, trunking and cable tray Sigle phase and three phase wiring Fire alarm Emergency lighting

    Curriculum Vitae of Terry Norris Page 1

  • 8/14/2019 Curriculum Vitae of Terry Norris

    2/2

    Tempory power and lighting Glanding and terminating power and control cables

    June 2006- October 2006 MIDROC ELECTRICIAL, SWEDEN

    . Here I was offered five months work on an iron ore mine in Sweden. My duties included containment for Power cables, (conduit, trunking and cable tray). Glanding and terminating power and control cables.Fitting of electrical switch boards and Heat tracing for all outside

    pipes.

    December 2006 December 2007

    I spent over a year traveling and working in Australia in which I spent seven months working on a largeextension to a Philip Morris cigarette factory.

    Feb 2007 August 2007 Five Star Electrical, Melbourne, Australia

    During my time with Five Star I had to prepare and terminate control and power cables to form circuts,Testing of mains and sub mains cable

    . Instillation of ladder rack and conduit. I was also on the fire alarmcrew

    January 2008 July 2008 Sitie-Braid Canadian Natural Canada.

    Here I was working on an oil refinery. It was the last seven months of the job. I was involved in cable tray,conduit and trunking. Wiring lights and power and terminating to fuse boards. I was also involved in pullingin and terminating of fire alarm and control cables through out the building.

    I worked mostly on Pharmaceutical projects and Power Stations. I have also worked Commercial and Domestic jobs.

    Curriculum Vitae of Terry Norris Page 2