Curriculum Vitae M.J.A.T. Mulder
Curriculum Vitae – status as of Date December 2016
Name : Mulder, Marcel Johannes Anthonius Theodorus
Address : Tadamastraat 18, 7201 ER ZUTPHEN, The Netherlands
Telephone : +31(0)6.14808212 or +31(0)575.843752
E mail : [email protected]
Date of Born : 12 January 1956 at Silvolde, Wisch
Not married (two sons of 35 and 32 year of age)
Education:
1991-1992 SWOT/ University of Twente- Commercial Technical
Management certificate
1982-1985 SWOT/ University of Twente- Business Administration
Bachelor of Business Administration
1975-1979 HTS - mechanical engineering/thermodynamics
engineering/energy, Arnhem,diploma Ingenieur/ Bachelor of
Science
1974-1975 Preliminary year HTS, Arnhem, level is equal to HAVO/VWO
1971-1974 MTS – mechanical engineering, Doetinchem, diploma
Summary of Work experience:
Well experienced pragmatic Project and Maintenance Manager
Over a period of more than 19 years active in the field of heavy industries and
energy generation.
Previous to this period 16 years experience in several management positions
in the manufacturing industry.
Project management experience on the side of the owner and at the side of
the contractor as well.
Very broad knowledge of Steam – and Gas turbines, theoretically and in
practice as well
2
Curriculum Vitae M.J.A.T. Mulder
A broad knowledge of Standards and Codes of Pressure Equipment, i.e.
ASME and PED and Russian Federation Customs Union regulations.
Broad experience with heat exchangers of all types.
Done often in the past and still willing to travel all over the World.
Broad experience on HSE related topics, in the planning phase and in the
execution phase as well. A lot of experience in safety control during the
Construction phase of projects.
Very broad experience in the heavy and petro chemical industry with Turn
Arounds, Shut Downs and Revamps, i.e. in the phases of Engineering,
Planning, Procurement and Construction.
Always eager to look for opportunities to improve processes.
Good qualities in communication and organising work and a strong focus on
getting the job done within the scheduled time frame.
Several Courses and Training:
VMF Stork Production Management
VOA 2 Industrial Engineering
TNO Metal Institute Apeldoorn, Metal Machining Technology
GITP Training Functional Performance and Efficiency Interviews
GITP Training Situational Leadership and Coaching
AVR / De Baak Finances for Non-Financials
Krauthammer Training Effective Presentations
NVDO Training in the FMECA technics
VCA 1 and VCA 2 certificate VCA VOL
NEM Energy Services, Training Steamboilers
BHV ( First Aid ) and AED
Construction Site Safety, CITB Construction Industry Training Board,Norfolk
UK
PM@Siemens , certified
LR, Confined Spaces
LR, Working on Height
3
Curriculum Vitae M.J.A.T. Mulder
LR, Safety for Pressure Systems, i.e. piping and heat exchangers
LR, Safe Car Driving Training
LR, training NDO/NDE/NDT
LR, training ASME B31.3
LR, training EN 13480, PED 97 en RToD
LR, training Integration & Safeguarding of proces systems
Knowledge of Russian Ghost and PB regulations and TR CU Certification
Languages:
Good skills in English, both verbally and in writing.
Very good language skills in German, near Native ( my mother was German).
During my time with ThyssenKrupp daily communication with German native
speakers, so a lot of exercise.
Project language at Lloyd’s Register is mainly English and partly German.
Communication in projects at NEM is mandatory in English.
Skills:
Primavera 3.0
MS – Project, Word, Excel and Powerpoint
API- pro, is a previous AVR maintenance management tool
MP5, is the current AVR maintenance management tool
Oracle Procurement Module, at AVR
Infor manufacturing control system, at Stork Almere
TPM
RCM
FMECA
Six Sigma
Prince 2
PMO & PMF Lloyd’s Register, used as a project management frame work
4
Curriculum Vitae M.J.A.T. Mulder
Well informed with regards to PED code and RToD and ASME as well
SAS and JDE, at Lloyd’s Register
SAP and Trimergo T2, at NEM U&IB
Used to read P&ID’s and Isometrics
Workexperience :
Period: September 2015 – December 2016 , projectcontract
Company and location: Brabant Alucast site Oss
Position: Project Manager
Brief description:
Projectmanager for a big investment project for manufacturing of wheel
suspension parts for the BMW 5 and 7 series and the new Rolls Royce to be
introduced in 2017. This is for BAI the biggest project done ever for one
particular product.
Set up of the production line, consisting of six robotic cells, including high
pressure Aluminium die cast molds and trimming presses.
Automatic handling system for Rontgen testing and Heat treatment of the
parts.
Negotiating with suppliers and responsible for the construction of the
production line.
Period: November 2014- August 2015, projectcontract
Company and location: NEM Industrial and Utility Boilers at Hengelo Ov.
Position: Project Manager
Brief description:
Projectmanager for the project ZapSib2 in Tobolsk, Russia. This contains the
scope of Engineering, Procurement and Manufacturing for the delivery of one
Low Pressure Boiler and three High Pressure Boilers.
The project is postponed by buyer Linde LE Munich from 2016 into 2017, this
because of other priorities set by endcustomer Sibur, part of GazProm, due to
decreased oil and gas prices.
An other project, PagBilao, is also slowed down by the buyer, based on this
NEM is faced with an overcapacity in Projectmanagement.
5
Curriculum Vitae M.J.A.T. Mulder
Period: November 2013- November 2014
Company and location: Lloyd’s Register at Rotterdam ( and Geleen,
Hoeven and Haren-Gn)
Position: Senior Project Manager
Brief description:
o Projectmanager for the business stream Energy Inspections Service Line
o Projectmanagement for new constructions/expansion/modification of pressure
systems, mainly steam systems but also gas systems and turn arounds on
petro chemical plants.
o Projects are performed cf pressure system appraisal such as DIN/RToD/EN
13480 or ASME B31.3.
o Project deliverable is a Design Appraisal Document, VVI license to operate
and KVI audit previous to start up.
o Project track introduced according the Project Management Framework as
used within the business streams Marine and Compliance since this was new
for the business stream Energy.
o The projects are mainly concentrated in the Botlek area Rotterdam, more
specific related to the petro chemical industries.
o Projects performed are a.o:
Siemens Kakinada
Rubis Botlek
Esso Nederland RLIP
ExxonMobil ROP CREEP
ERCA Moerdijk
Nuon Cofely HAT
LyondellBasell Botlek C4 project
ADM CHP Plant Europoort
Inputs for Order Intake and Quotation: Result of Hazard Analysis, Approved
piping specifications, Line list with PED classification data, Isometrics with
6
Curriculum Vitae M.J.A.T. Mulder
MTO, Internal pressure calculations, List of hydrotest systems, Draft
Inspection and Test Plans for pre-fabrication, Approved welding PQR/WPS
and welders documentation and NDE procedures, Stress Isometrics and Pipe
support drawings
Deliverables: Certificates of Conformity after satisfactory completion of all
inspection work for CAT 2 and CAT 3 lines, Design Approval Document
WBDA inspections of the pressure systems and KVI at Site
o But also NAM in Groningen, expansion of gas compression systems
Period: April 2013- November 2013, projectcontract
Company and location: Stork Turbo Services at Almere
Position: Senior Project Manager
Brief description:
Projectmanager for Revamp projects Shell Pernis, gascompressors
connected to steamturbine.
Major overhaul project at AVR Rozenburg on Turbine/Generator set C from
Brown Boveri. Re-engineering of rotor and stator blades, manufacturing of
new blades and on site projectmanagement, fully retrofit of steam and oil
system equipment. Mechanical Completion end of August 2013 resulting in a
increased output of the T/G set.
Minor overhaul on the so called Beck turbine of Franco Tosi.
Issuing of quotations for Yara Sluiskil and Borealis Kallo.
Minor overhaul on T/G sets 1, 2 and 3 for AVR Duiven.
Responsible for HSE, QA/QC and Installation and Commissioning.
7
Curriculum Vitae M.J.A.T. Mulder
Period: January 2012- March 2013, projectcontract
Company and location: Siemens Oil & Gas TurboMachinery at Hengelo O.
Position: Project Manager
Brief description:
Project manager for new Construction site Rhourde Nouss and Gassi Touilliin
Algeria
Teamlead of Project Service Managers Group for harmonising and
synchronisation of work procedures for Installation and Commissioning
activities with a clear focus on efficiency improvement
The centrifugal compressors in these projects are driven by gasturbines
(Siemens Lincoln)
Responsible for HSE, Installation and Commisssioning Budget and Time
schedule
Progress reporting to TRB division management
Period: May 2011- December 2011
Company and location: Visser&Smit Marine Contracting at Sliedrecht
Position: Site Manager
Brief description:
Responsible in the end for projectlocation on shore for the off shore activities
for the projects London Array in Ramsgate and for Walney2/Ormonde in
Heysham in the United Kingdom
Windfarm Construction at sea, approximate 20 mile out of the coastline
Main tasks, Procurement of equipment and managing of logistical flow, for
materials and coordinating of shift changes as well for the people working off
shore
Responsible for HSE, Construction site budget and scheduling
Coordination and intensive communication with the harbor authorities and the
Marine coördinator of the EPC company, i.e. Dong and Vattenfall
Progress reporting to project leader located in the main office at Sliedrecht
8
Curriculum Vitae M.J.A.T. Mulder
Work is carried out in a four weeks on schedule ( seven days a week at a
minimum of ten hours a day) and two weeks off sequence
Period: February 2010- May 2011
Company and location: Visser&Smit Hanab at Papendrecht
Position: Construction Manager
Brief description:
End responsible on projectlocation Bavin at Veendam during new
Construction of a Waste incinerator plant with steam delivery to the company
Calmag and electricity excitation of 2,8 MWe with a Siemens steamturbine
EPCM project, during engineering phase the input delivered for the
maintenance aspects
Generating of the specifications for the Procurement department
Responsible for HSE, Construction budget and project execution scheduling
Mechanical completion in April 2011, hand over to Commissioning manager
Commercial operation after July 2011.
Period: Juni 2009- Februari 2010, projectcontract
Company and location: NEM Standard Fasel Energy Services at Hengelo
Position: Project Manager
Brief description:
Responsible for the projects at Edea Geleen on the Chemelot premises, Shell
HV-5 at Pernis and the Alstohm project at the Eemshaven.
Commissioning support on the HRSG Rijnmond2 Maasstroom Energy project
Responsible for engineering planning and execution scheduling and progress
as well
9
Curriculum Vitae M.J.A.T. Mulder
Period: December 2006- May 2009
Company and location: ThyssenKrupp Anlagenservice at Oberhausen,
Germany
Position: Projektmanager “und Stuetzpunktleiter“ IJmuiden.
Brief description:
Construction manager during shut downs and revamps of the Sinter plant,
TKAS acts as main contractor with upto 240 workers.
As a main contractor in charge of managing of sub contractors
Managing of the service hub of TKAS on the Corus premises.
Supervision of the service hub, work preparation for periodic shut downs for
PEFA, Hot mill 2, Direct Sheet Plant and Blast Furnace 7. Daily maintenance
for Coking Plant 1.
Reporting to Managing Director in Oberhausen Germany.
Oxygensteel plant 2, new Construction and revamp of Converter 21.
Aquisition at Waste Incinerator companies in the Netherlands for introducing
TKAS as a service partner.
Period: February 2006- December 2006 via Yacht
Company and location: Corus Strip Products IJmuiden
Position: Construction Site Manager
Brief description:
Responsible for PEFA/ Pellet Plant turn around, with a major scope, life cycle
is 15 years.
Life time extension modifications prepared and also executed
Capacity increased from 4,5 to 5 million ton pellets year production.
In charge of daily turn around progress meetings with all contractor parties.
During engineering phase writing of HSE project plan and arrange of
restricted area lay out.
Coordination of workpackages in turn around.
Coordination and fine tuning with sub contractors.
Developing of detailed planning, for Engineering, Procurement and
Construction.
10
Curriculum Vitae M.J.A.T. Mulder
Finalising and negotiations of less and additional work items.
Author of Project Evaluation report.
Period: August 1996- February 2006
Company and location: NV AVR- Avira at Duiven
Position: Maintenance Manager
Brief description:
Technical responsible for Waste Incinerator Plant, Thermal Conversion
Installation, Composting Installations and buildings.
Responsible for availability of the incinerator Lines, in the period of 1996-2005
the overall availability is increased from 84% to 92% due to a methodical
approach and Root Cause Analysis of the Performance killers.
Indirectly managing of 24 own Maintenance personnel in the disciplines
mechanical, electrical and instrumentation.
Direct managing of teamleaders, work preparators, maintenance engineers
and CAD engineer.
Responsible for maintenance purchases, services, materials and temporary
personnel.
Projects in the field of strategic purchasing in cooperation with Shared
Service Center at Pernis.
Examples: high volume purchase of iron casting parts, item prices of
refractory components, supplier contracts for scaffolding and steampipe
isolation.
Point of contact for NoBo Lloyd’s Register for periodical inspections and shut
down and start up of installation areas.
Control of maintenance budget for external order processing.
Ordering orders with key suppliers.
New built investment budget approx. . € 8 M per year.
Maintenance budget ca.€ 6 M per year.
For maintenance purposes participating in new built constructions in
cooperation with the projects office at Rozenburg, input for interfaces of
modifications with existing operational installations.
11
Curriculum Vitae M.J.A.T. Mulder
Act as projectmanager for several modification and new built projects.
Familiar with IPMA and Prince2.
Used to work with external consultants, for specific maintenance optimization
topics. These are a.o. Tecona, Principal Consult, PDM and Kepner Tregoe.
Sharing of best practices with the maintenance managers of Rozenburg and
Brielselaan Rotterdam.
Implementing of maintenance management system MP5 (which has replaced
API pro), MP5 is linked to the Oracle production control system.
Familiar with the maintenance approach according TPM and RCM and the
Six Sigma theory.
Familiar with MS Projects and PRIMAVERA.
Acts as Construction Manager during turn arounds during planning phase and
execution as well.
Originally two shut downs per line took place, based on a preventive
maintenance approach this is reduced to one shut down a year.
This results in a availability Improvement from 84% to 92%.
Depending on scope, the duration of the shut down is between two to ten
weeks.
Turn around budget per shut down is between € 400 K up to € 3 M .
Labour force in a shut down is approx. up to 200 persons.
Member of the VVA ( Branche organisation of Waste Incinerators
companies).
Period: August 1993- August 1996
Company and location: Nebato-van der Wal at Montfoort
Position: Operations Manager
Brief description:
Production facilities moved from Montfoort to Bergeijk.
This was done after a re aligning of the production organisation in terms of
achievement of ISO 9001 certification, work preparation, production planning
and purchasing.
12
Curriculum Vitae M.J.A.T. Mulder
Production optimization and improvements in the logistics.
Responsible for Procurement and HRM.
Nebato is a important supplier for the Automotive Industry.
Period: December 1990- August 1993
Company and location: Winterwarm at Winterswijk
Position: Operations Manager
Brief description:
Optimizations introduced in the production process such as Routing lay out
and purchase process.
Quality system implemented and certification achieved according ISO 9001
by Gastech.
Supporting to the department of product development for fabrication methods.
Responsible for Procurement and HRM.
Responsible for the production planning.
Period: July 1987- December 1990
Company and location: Revab at Silvolde
Position: Operational Manager
Brief description:
Point of contact to grant providers and approval authority GAK/GMD.
Product development in co operation with TU Delft and University of Twente.
Product development together with Het Dorp at Arnhem and the foundation of
Bio pediatric.
Responsible for Procurement and HRM.
Period: September 1984- July 1987
Company and location: ASM-Fico at Herwen and Zevenaar
Position: Technical Sales Coordination
13
Curriculum Vitae M.J.A.T. Mulder
Brief description:
Sales communication with sales offices in USA, UK and Asia.
Welcome and accompanying of foreigner visitors.
Available gain of technical information as input for systems engineering.
Managing and quoting on exchange and spare parts.
The making of technical sales documentation and sales information.
Period: July 1979- September 1984
Company and location: Stork Pompen at Hengelo Ov.
Position: Assistant- too Plant Manager
Brief description:
Project management for introducing CNC machines in the parts fabrication,
a.o. boring and milling machine and lathes.
Preparing of investment applications.
Production technology optimization projects executed.
Production routing improved in the mechanical manufacturing shop.
Improvements implemented on the test and trial stand facilities.