Current Status of Trash Load Reductions and Other Trash Management/Monitoring Activities in San Mateo County Chris Sommers Managing Scientist EOA, Inc. June 15, 2017

Current Status of Trash Load Reductions and Other Trash ...ccag.ca.gov/.../uploads/2017/06/SMCWPPP-Trash-Load... · Municipal Regional (Stormwater) Permit (MRP) Provision C.10 Trash

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Current Status of Trash Load Reductions and Other Trash ...ccag.ca.gov/.../uploads/2017/06/SMCWPPP-Trash-Load... · Municipal Regional (Stormwater) Permit (MRP) Provision C.10 Trash

Current Status of Trash Load Reductions and Other Trash Management/Monitoring

Activities in San Mateo County

Chris Sommers Managing Scientist

EOA, Inc.

June 15, 2017

Page 2: Current Status of Trash Load Reductions and Other Trash ...ccag.ca.gov/.../uploads/2017/06/SMCWPPP-Trash-Load... · Municipal Regional (Stormwater) Permit (MRP) Provision C.10 Trash

Municipal Regional (Stormwater) Permit (MRP) Provision C.10

Trash Load Reduction Targets • 40% by July 2014 • 60% by July 2016 (performance guideline) • 70% by July 2017 (mandatory/enforceable) • 80% by July 2019 • 100% (no adverse impacts) by July 2022

Mandatory Full Capture Systems Receiving Water Monitoring Program Annual Creek/Shoreline Cleanups Maintain Long-Term Plan

Page 3: Current Status of Trash Load Reductions and Other Trash ...ccag.ca.gov/.../uploads/2017/06/SMCWPPP-Trash-Load... · Municipal Regional (Stormwater) Permit (MRP) Provision C.10 Trash

Trash Load Reduction

Trash Reductions (%) • Baseline (2009) vs. Current Trash Generation • Trash Generation Maps (Baseline) • Current Trash Reductions determined by:

1. Extent of Full Capture System Treatment 2. On-land Visual Assessment Results (Other Actions) 3. Demonstrable reductions via Source Controls 4. Additional Creek and Shoreline Cleanups

Trash Generation Category

Very High

High

Moderate

Low

**Dotted areas are non-jurisdictional (e.g., CalTrans)

Page 4: Current Status of Trash Load Reductions and Other Trash ...ccag.ca.gov/.../uploads/2017/06/SMCWPPP-Trash-Load... · Municipal Regional (Stormwater) Permit (MRP) Provision C.10 Trash

Extent of Trash Full Capture

San Mateo Countywide • All member agencies exceeded

the minimum treatment areas required by the MRP

• Over >3,100 acres of moderate, high, and very high trash generating areas treated to-date

• Began implementing enhanced maintenance and operation tracking and reporting

• >30% trash reduction due to full capture systems

Page 5: Current Status of Trash Load Reductions and Other Trash ...ccag.ca.gov/.../uploads/2017/06/SMCWPPP-Trash-Load... · Municipal Regional (Stormwater) Permit (MRP) Provision C.10 Trash

Trash Generation Category

Very High

High

Moderate

Low

Treated by Full Capture Device

Page 6: Current Status of Trash Load Reductions and Other Trash ...ccag.ca.gov/.../uploads/2017/06/SMCWPPP-Trash-Load... · Municipal Regional (Stormwater) Permit (MRP) Provision C.10 Trash

On-land Visual Assessments (Other Control Measures)

Assessment method used to account for trash reductions from actions other than full capture systems • Enhanced street sweeping • Reoccurring on-land cleanup events • Enhanced business inspection programs • Other actions

San Mateo Countywide • Over 1,100 assessments conducted in FYs 15-16 & 16-17

to-date (~200 planned for June/July) • >200 miles of streets/sidewalks assessed • ~20% trash reduction observed to-date

Page 7: Current Status of Trash Load Reductions and Other Trash ...ccag.ca.gov/.../uploads/2017/06/SMCWPPP-Trash-Load... · Municipal Regional (Stormwater) Permit (MRP) Provision C.10 Trash

Source Controls

Reusable bag ordinances Expanded polystyrene food

service ware ordinances 10% trash reduction for

most member agencies • Maximum allowed under MRP

Page 8: Current Status of Trash Load Reductions and Other Trash ...ccag.ca.gov/.../uploads/2017/06/SMCWPPP-Trash-Load... · Municipal Regional (Stormwater) Permit (MRP) Provision C.10 Trash

Additional Creek and Shoreline Cleanups

Offsets for cleanups conducted above and beyond those required by MRP 2.0 3:1 offset Maximum 10% reduction

allowed under MRP Reductions vary among member

agencies

Page 9: Current Status of Trash Load Reductions and Other Trash ...ccag.ca.gov/.../uploads/2017/06/SMCWPPP-Trash-Load... · Municipal Regional (Stormwater) Permit (MRP) Provision C.10 Trash

Projected SMCWPPP Member Agency Trash Reductions in FY 16-17

Member agency Annual Reports will be submitted to the Water Board on September 30th

Current Status (As of June 1, 2017)

• 11 of 21 member agencies > 70% reduction

• 9 of 21 member agencies currently installing full capture devices or implementing other actions this FY and will likely demonstrate > 70% reduction

• 1 of 21 member agencies plan to install full capture devices to achieve > 70%, but will likely need additional time

Page 10: Current Status of Trash Load Reductions and Other Trash ...ccag.ca.gov/.../uploads/2017/06/SMCWPPP-Trash-Load... · Municipal Regional (Stormwater) Permit (MRP) Provision C.10 Trash

Required Next Steps if < 70% Reduction

Those member agencies < 70% required to: • Report of non-compliance within 10 working days

following each scheduled date • Develop and submit a “compliance plan” with

FY 16-17 annual report — Actions that will be taken to achieve a 70% reduction — Associated schedule — Funding Mechanisms

Meet with Water Board staff in advance of Annual Report

WB Enforcement Actions – Case-by-case basis Consistent with Water Board May 22nd Letter

Page 11: Current Status of Trash Load Reductions and Other Trash ...ccag.ca.gov/.../uploads/2017/06/SMCWPPP-Trash-Load... · Municipal Regional (Stormwater) Permit (MRP) Provision C.10 Trash

Trash Receiving Water Monitoring Plan

Plan under development via BASMAA regional project

SMCWPPP required to begin implementation by October 1, 2017

MRP requires submittal of a plan to monitor local waterways by June 30, 2017

• Requires approval by Water Board Executive Officer, peer review and stakeholder input

Page 12: Current Status of Trash Load Reductions and Other Trash ...ccag.ca.gov/.../uploads/2017/06/SMCWPPP-Trash-Load... · Municipal Regional (Stormwater) Permit (MRP) Provision C.10 Trash

SMCWPPP Litter Work Group

Forum to coordinate on broader litter/trash issues in San Mateo County

FY 16-17 Tasks • Mapping of illegal dumping and container “overages” • Tool kit for Improved Waste Management at MFRs

FY 17-18 Tasks

Work group of Trash Subcommittee • Municipal staff (stormwater and solid

waste/recycling) • Waste hauler staff

Page 13: Current Status of Trash Load Reductions and Other Trash ...ccag.ca.gov/.../uploads/2017/06/SMCWPPP-Trash-Load... · Municipal Regional (Stormwater) Permit (MRP) Provision C.10 Trash