Neven Leonard, Nenad Smontara
CO2 ROZ Conference, Midland, Texas,
08.12.2016.
CURRENT STATUS OF EOR CO2
FLOODING PROJECT IN CROATIA,
CONTENT
• 1. INTRODUCTION,
• 2. REASONS FOR STARTING EOR PROJECT,
• 3. EOR PROJECT REALIZATION,
• 4. EOR MONITORING & RESERVOIR SIMULATION
• 5. CONCLUSION
EOR PROJECT PREPARATION
1978 – 1991, ”SCREENING” PHASE FOR 14
LARGEST OIL FIELDS IN CROATIA
EXAMING CO2 PVT CONDITIONS – ORIGINAL OIL
NUMERICAL SIMULATION OF TERTIARY
PHASE OF OIL PRODUCTION
CO2 PILOT PROJECT ON IVANIĆ 2001. – 2006.
EOR – CO2 SOURCE
Ivanić
&
Žutica
GTP
Molve
EOR – CO2 INJECTION QUANTITIES
Ivanić
Žutica North
• INJECTORS:
22 WAG, 8 DISPOSAL
PRODUCERS: 76
Žutica South
INJECTORS:
17 WAG, 5 DISPOSAL
PRODUCERS: 85
1st
PH
AS
E
GTP Molve
Facilities: CO2 Compressor stationFacilities: CS CO2, Liquefaction
and pumping station
CS Žutica
GTP Ethane
Facilities: Membrane separation
unit
2n
d P
HA
SE
30 000 000 m3
1.1 * 109 cuft
injected
Scope of 2016/2017
CO
MP.
EOR PROJECT - TECHNICAL CONTENT AND SIMPLIFIED SCHEME
COMP. ST.
ŽUTICA
IVANIĆ
ŽUTICA
PUMP
200 barLIQUEFACTION
CO2
88 km100 bar
ETHANE
PLANT
MEMBRANE
SEPARATOR
CO2DEH.
DEH.COMP.
30 bar
LO-CAT
Refinery
600 000 m3/d
COMP.
GTP MOLVE – CO2 SOURCE
20”
• Installed electric energy 5.5 MW • 3 x 1.8 MW Compression 0-30 bar (0-435 PSI),
21 * 106 cuft/day CO2
• CO2 Dehydration unit • TS 35/3.3/0.4 kV, DCS
GTP ETHANE
Cooling
tower
CO2
pumpCompressor
for CO2
Molve
Ivanić & Žutica
oilfields
CS CO2 Ethane
TS building
heat exchanger & cooling towers
• Rated power 2.1 MW • 2 x 0.71 MW Compression 30-90 bar
(435-1305 PSI), 21 * 106 cuft/day CO2
• CO2 cooling – cooling tower• CO2 pumps 90 to 200 bar (1305-2900 PSI),
2x200 kW• TS 35/10/0.69/0.4 kV, DCS
CONSTRUCTION OF PIPELINE NETWORK
Installed pipelines network:
• CO2 colector pipeline 8” – 9340 m• Oil field Ivanić pipelines 11500 m : 8” – 550 m,
6” – 5782 m,4” – 1772 m,2” – 3500 m,
CO2 section nodes – 4.
• Oil field Žutica pipelines 20200 m : 8” – 3700 m,6” – 7550 m,4” – 2400 m,2” – 6550 m,
CO2 section nodes – 6.
41040 m pipelines, 10 CO2 nodes
EOR SUB-SURFACE ACTIVITIES 2012
• Pilot re-lining on the well Žu-111Successfully finished in April 2012 !
• mandatory (based on Mining project ) re-lining with NEW CASING,• prepared and designed by INA internal resources - Drilling & Well Services Management,
RE-LININGBEFORE AFTER
EOR SUB-SURFACE ACTIVITIES 2013
• 49 wells (37 WAG + 12 disposal) re-lining with NEW CASING: 4” or 31/2”
4” casing
successfully
installed
EF IVANIĆ FIRST RESULTS OF CO2 INJECTION
12
Exploitation field Ivanić:- 43 production wells;- 2 measurement wells;- 14 WAG injecton wells (2 without permit);- 5 water injection wells;- 2 substitute WAG wells CO2.
CO282
852
63
54
31
18
28
5984
46
5
7
EF Ivanić first results of CO2 injection
13
Exploitation field Ivanić:- 43 production wells;- 2 measurement wells;- 14 WAG injecton wells (2 without permit);- 5 water injection wells;- 2 substitute WAG wells CO2.
CO282
852
63
54
31
18
28
5984
46
5
7
10
Ql Qo Qw Qg Cycle
bbl/d bbl/d bbl/d cuft/d h
1.'14. 0 0 0 0
3.'15. 120 3 117 3320
4.'15. 60 3 57 1660 6 x 2h
01.'16. 264 12.6 251.4 6074 24 h
04.'16. 330 15.6 314.4 10488 24 h
07.'16. 492 34.8 457.2 96444 24 h
08.'16. 288 20.4 267.6 56433 24 h
09.'16. 198 13.8 184.2 38811 24 h
11.'16. 636 75 561 807964 24 h
12.'16. 624 87.6 536.4 704139 24 h
Iva-7 Method
artificial
lift
natural
flow
Ql Qo Qw Qg Cycle
bbl/d bbl/d bbl/d cuft/d h
1.'14. 6 5.94 0.06 1695 2 x 2h
7.'15 102 3 99 4414 24h
04.'16. 108 3 105 10347 24 h
07.'16. 318 15 303 181906 24 h
08.'16. 282 53.4 228.6 556206 24 h
09.'16. 120 19.8 100.2 488190 24 h
10.'16. 120 19.8 100.2 488190 24 h
11.'16. 78 24.6 53.4 762550 24 h
Iva-10 Method
artificial
lift
natural
flow
EOR IVANIĆ - MONITORING
Prior to the start of CO2 injection, initial conditions of the 43 production wells were
determined.
Continuous measurements of fluid quantities on all production wells with 3-phaze
metering separators to detect any increase in oil production (hundreds of
measurements)
Detection of CO2 concentration in associated gas on production wells resulted in
the ability to make timely decisions for interventions in production wells
Continuous fluid level measurement on all production wells
Well logging measurements (production logs) in injection and production wells for
monitoring CO2 injection profiles of the targeted reservoirs
PRODUCTION LOG MEASUREMENT
Collected data used for calibration of existing numerical model for Ivanić oilfield,
and better comprehension of the oil displacement process
The numerical model was crucial in understanding and managing unexpected
quantities of produced fluid from the production
Current Ivanić E300 model is being continuously updated to increase it’s
predictive accuracy
Major obstacle in the quality is field production using SRP’s;
When wells start to flow naturally, predictive power of the model is expected to
improve
The model has been able to predict the quick CO2 breakthrough in Iva-13
producer
An ongoing campaign to improve vertical and horizontal sweep efficiency
(production/injection profile harmonization, detailed production measurements)
MONITORING DATA VITAL FOR RESERVOIR SIMULATION AND
RELIABLE PREDICTIONS
GAMMA RESERVOIR CO2 SATURATION: OCTOBER 2014 – NOVEMBER 2016
275.00.000 m3 CO2 injected - 9% HCPV
MONITORING DATA VITAL FOR RESERVOIR SIMULATION
• Besides, updating the model with production data.
Sensitivities are being run in order to estimate
expected EOR increment;
• Expected impact is being manually shifted by using
cum CO2 injected (as %HCPV) vs. expected
increment;
• By doing so, better fit to actual pilot is being achieved
while keeping expected recovery constant.
2016 = 18 000 m3
OIL FIELD IVANIĆ – FIRST RESULTS
CONCLUSION
• Incremental oil production: 3,9 * 106 m3 / 3,4 *106 t(22.6 * 106 bbl)
• Incremental gas production: 599 * 106 m3 (21.2 * 109 cuft)
•Prolonged oil and gas production of Ivanić and Žutica mature fields (for the next 25 years)
•During the project, the total of: 3,55 *109 m3 / 6,94 *106 t (125 * 109 cuft) CO2 will be injected
•Expected re-production of: 0,8 mlrd. m3 / 1,50 mil. t (28 * 109 cuft) CO2
• CO2 retention in the reservoir: 2,78 billion m3 / 5,44 million t(97 * 109 cuft)
THANK YOU FOR YOUR ATENTION !!!
SRETNO !!!