CURRENT SITUATION AND

UPGRADING PLAN FOR MYANMAR POWER SYSTEM

MR MAUNG MAUNG ( Chief Engineer)Myanma Electric Power Enterprise

Ministry of Electric Power

Page 2: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

Contents Geography of Myanmar

Existing Power Industry of Myanmar

Upgrading options for the Grid (Short Term Reinforcement Plan of

Transmission Lines & Substations)

Conclusion

2

Page 3: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

Geography of Myanmar

3

Page 4: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

Kachin

Sagaing

Shan

Mandalay

Magway

Chin

Rakhaing

Bago Kayar

YangonAyeyarwaddyKayin

Mon

Tanintharyi

Area of Country 261, 229.73 sq-mile(677,000 km2)

Population around 59.78 million(as of 2011)

The country consists ofStates

(1) Kachin

(2) Kayah

(3) Kayin

(4) Chin

(5) Mon

(6) Rakhaing

(7) Shan

Regions

(1) Sagaing

(2)

Tanintharyi

(3) Bago

(4) Magway

(5) Mandalay

(6) Yangon

(7)

Ayeyarwaddy

Brief Introduction to The Republic of Union of Myanmar4

Page 5: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

5

China – 2185km

Lao – 238km

Thailand- 1799km

India- 1462 km

Bangladesh-72km

Total Perimeter with International Borders 5756 km

GEOGRAPHY OF MYANMAR(Location)

Coast-2308km

Page 6: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

Geography of Myanmar(Topography)

6

Shan Plateaus

Kachin Mountains

YakhineMauntains

AyeyarwaddyDelta

Page 7: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

India China

Thailand

Bangladesh

Bay of Bengal

7Geography of Myanmar(Major Rivers)

Ayeyarwaddy2,063 km

Chindwin1,151 km

Thanlwin1,660 km

Sittaung310 km

Page 8: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

Population Distribution of Myanmar 8

POPULATION ESTIMATES OF MYANMAR

(AS OF OCTOBER 1 - 2010)

Population (Million)    

Annual Growth

Rate

S.N. Year Total Male Female (Percentage)

1 1990 - 1991 40.78 20.21 20.57 1.88

2 1995 - 1996 44.74 22.22 22.52 1.87

3 2000 - 2001 50.13 24.91 25.22 2.02

4 2003 - 2004 53.22 26.47 26.75 2.02

5 2004 - 2005 54.30 27.00 27.30 2.02

6 2005 - 2006 55.40 27.54 27.86 2.02

7 2006 - 2007 56.52 28.10 28.42 2.02

8 2007 - 2008 57.50 28.58 28.92 1.75

9 2008 - 2009 58.38 29.03 29.35 1.52

10 2009 - 2010 59.13 29.40 29.73 1.29

Page 9: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

9

Mandalay

Yangon

Naypyitaw

Main facts abstract from Geography of Myanmar

1} According to the land form and climate of Myanmar, there are rich hydro power resources in Northern and Eastern Regions of Myanmar. There are more than 15 Hydro Power Resources which were the capacity >1000MW in that regions.

2) Myanmar have the border with the China, India and Thailand. Therefore the power trade to these country can be achieved. 3) Yangon is the most populated region and it has about 7 millions peoples. Yangon has the main sea port and Industry Zones. Therefore, Yangon is the biggest load center of Myanmar. Mandalay, Naypyitaw and Ayeyarwaddy regions are also have the high population density and the power demand is increasing rapidly.

Page 10: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

10

Current Power Industry of

Myanmar

Page 11: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

• The electricity demand in Myanmar has doubled in last decade. The development of the electric power sector has become one of the top priorities of the Government of the Republic of Union of Myanmar.

11

Page 12: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

Background History• The voltage levels of the Myanmar electrical power system are

– 230 kV– 132 kV– 66 kV– 33 kV – 11 kV.

• The national grid has no direct connections to other grids of neighboring countries.• The network comprises

- 42 overhead lines at 230 kV with a total length of 3015 km- 35 overhead lines at 132 kV with a total length of 2058 km- 16 overhead lines at 66 kV with a total length of 587 km - 11 overhead lines at 33 kV having a total length of 27 km.

• The 230 kV and 132 kV overhead lines are interconnecting approximately 50 substations.

• The above details are valid for the transmission system only and do not include the distribution network.

12

Page 13: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

Hydropower Output (MW)

1 Baluchaung -1 28

2 Baluchaung -2 168

3 Yeywa 790

4 Kinda 56

5 Sedawgyi 25

6 Zawgyi -1 18

7 Zawgyi -2 12

8 Thapanzeik 30

9 Mone 75

10 Paunglaung 280

11 Kabaung 30

12 Yenwe 25

13 Zaungtu 20

14 Shweli -1 600(300)

15 Keng taung 54

16 Shwegyin 75

17 Kun 60

18 Kyeeon Kyeewa 74

19 Dapein-1 240(60)

Subtotal 2660(2180)

Gas-fired Output (MW)

1 Kyungchaung 54.3

2 Mann 36.9

3 Shwedaung 55.35

4 Mawlamyaing 12

5 Myanaung 34.7

6 Hlawga 154.2

7 Ywama 70.3

8 Ahlone 154.2

9 Thaketa 92

10 Thaton 50.95

Subtotal 714.9

Coal-fired Output (MW)

1 Tigyit 120

Existing Power Station ( Hydro, Gas-fired and Coal-fired Thermal )

Existing Power System Total   = 3,490.9(2950.9)MW

Power Stations in Myanmar (as of Dec’ 2012 )

Note: Output in parentheses is power supply to Myanmar from JV Projects.

13

Page 14: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

India China

ラオス

Thailand

ベトナム

Bangladesh

Bay of Bengal

Thanlwing River

Myanmar

シャム湾

7

8

9

1811

15

13

14

17

12

14

2

3

65

10

16

19

Existing Power Station Output  (MW) COD

Hydro

1 Baluchaung -2 168 1960/19742 Kinda 56 19853 Sedawgyi 25 19894 Baluchaung – 1 28 19925 Zawgyi -1 18 19956 Zawgyi -2 12 19987 Zaungtu 20 20008 Thapanzeik 30 20029 Mone 75 2004

10 Paunglaung 280 200511 Yenwe 25 200712 Kabaung 30 200813 Kengtawng 54 200914 Shweli -1 600 (300) 200915 Yeywa 790 201016 Dapein-1 240 (60) 201117 Shwegyin 75 201118 Kun 60 201219 Kyeeon Kyeewa 74 2012

Gas-fired

A Kyungchaung 54.3 1974B Mann 36.9 1980C Shwedaung 55.35 1984D Mawlamyaing 12 1980E Myanaung 34.7 1975/1984F Hlawga 154.2 1996/1999G Ywama 70.3 1980/2004H Ahlone 154.2 1995/1999I Thaketa 92 1990/1997J Thaton 50.95 1985/2001

Coal-fired α Tigyit 120 2004

A

B

C

D

E

F G H I

J

α

Mandalay

Nay Pyi Taw

YangonAyeyawaddy River

Sittaung River

Note: Output in parentheses is power supply to Myanmar from JV Projects.

Location of Existing Power Stations ( as of Dec’ 2012 ) 14

Page 15: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

Dry season : May 18, 2012 1,298 MW (10:00)

Rainy season: October 18, 2012 1796 MW (20:00) (Maximum power supply as of December 31, 2012 )

Power Supply Status of Myanmar in 2012 ( Dry and Rainy Season )

15

Page 16: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

Power Plants Under Construction and Planning(up to 2016)

Gas-fired Output (MW) COD

1 Hlawga(Gas Engine) 52 2013

Hlawga (3 Units)

543

123 2014

246 2015

174 2016

2 Thaketa(Gas Engines) 53.6 2013

Thaketa (3Units)

500

166 2014

166 2015

168 2016

3 Ahlone 100 2014

4 Ywa Ma 292 2013

Subtotal 1540.6

Hydropower Output (MW) COD

1 Upper Paunglaung 140 2014

2 Nancho 40 2014

3 Phyu 40 2014

9 Chipwenge 99 2012

10 Baluchaung-3 52 2013

11 Thaukyegat 120 2013

12 Upper Baluchaung 29 2015

Subtotal 520

Total Install Capacity = 2060.6 MW

16

Page 17: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

India China

ラオス

Thailand

ベトナム

Bangladesh

Bay of Bengal

Thanlwing River

Myanmar

シャム湾

7

8

9

1811

15

13

14

17

12

14

2

3

65

10

16

19

A

B

C

D

E

F G H I

J

Mandalay

Nay Pyi Taw

YangonAyeyawaddy River

Sittaung River

Location of Power Stations under Construction and Planning ( as of December’ 2012 )

ラオス ベトナムシャム湾

Hydropower (existing)

Gas-fired (existing)

Coal-fired (existing)

α

bad

h

gp

ce

i

f

j

k

mn

o

l

Ⅰ Ⅱ Ⅲ (Yangon Region )

Power Station

Power Station under construction and planning Output (MW) COD

a Upper Paunglaung 140 2014b Nancho 40 2014c Phyu 40 2014d Middle Paunglaung 100 2018e Tha-htay 111 2018f Upper Keng Tawng 51 2018

Hydro-power g Upper Yeywa 280 2019

h Shweli -3 1050 2020i Ann 10 -

j Bawgata 168 -

k Upper Bu 150 -l Chipwinge 99 2012

m Baluchaung-3 52 2013n Thaukyegat 120 2013o Upper Baluchaung 29 2015p Manipur 380 -

Gas-Fired

Ⅰ Hlawga 543

52 2013123 2014246 2015174 2016

Ⅱ Taketa 500

52 2013166 2014166 2015168 2016

Ⅲ Ahlone 100 2013IV Ywama 292 2013

IV

17

Page 18: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

18

Page 19: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

Month 2009 2010 2011 2012Janurary 509 520 771 856Februrary 471 485 722 840

March 528 568 819 910Apri 508 562 795 824May 516 538 824 792Jun 522 568 829 843July 607 723 888 945

August 672 767 892 950Setember 651 767 860 950October 672 774 892 981

November 601 773 869 974December 573 765 873 939

Total 6830 7810 10034 10804

Monthly Generation in GWh (2009 to 2012)

19

Page 20: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

Janu

rary

Febr

urar

y

Mar

ch

Apri

May Jun

July

Augu

st

Sete

mbe

r

Oct

ober

Nov

embe

r

Dece

mbe

r0

100000

200000

300000

400000

500000

600000

700000

800000

900000

100000050

8534

4711

78

5280

13

5079

92

5162

22

5223

42 6069

79

6720

52

6510

17

6720

92

6005

12

5729

30

5197

66

4845

35 5684

13

5620

32

5379

91

5683

02

7234

34

7672

88

7668

16

7738

44

7730

74

7652

82

7710

26

7219

56 8193

87

7950

69

8238

37

8289

40

8882

76

8918

95

8598

54

8917

51

8688

96

8726

66

8559

03

8403

68

9096

67

8238

97

7918

08

8431

68 9454

21

9495

83

9498

15

9812

08

9744

61

9387

09

Monthly Generation in GWh (2009 to 2012)

2009 2010 2011 2012

20

Page 21: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

Monthly Power Generation (2007.01 - 2012.08)

0

100

200

300

400

500

600

700

800

900

1,000

Jan-

07

Apr-

07

Jul-0

7

Oct-

07

Jan-

08

Apr-

08

Jul-0

8

Oct-

08

Jan-

09

Apr-

09

Jul-0

9

Oct-

09

Jan-

10

Apr-

10

Jul-1

0

Oct-

10

Jan-

11

Apr-

11

Jul-1

1

Oct-

11

Jan-

12

Apr-

12

Jul-1

2

Pow

er G

ener

atio

n (G

Wh/

mon

th)

MOEP1 MEPE

Others Total

Shwegyin (75 MW) COD: Oct. 2011

Kun (60MW)COD: Jul. 2012

Kyeeon Kyeewa   (74 MW) COD: Aug. 2012

Yeywa (790MW )COD: Dec. 2010

Monthly Power Generation ( by Power Producer ) ( 2007 to 2012)

Yenwe ( 25MW ) COD: Feb. 2007Kabaung (30MW )COD: Mar. 2008

Kengtawng ( 54MW )COD: Mar. 2009

Shweli -1 ( 600MW )COD: May. 2009

HPGE

21

Page 22: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

Monthly Net System Energy Demand ( by Supplier ) ( 2007 to 2012)

0

100

200

300

400

500

600

700

800

900

1,000

Jan-

07

Apr-

07

Jul-0

7

Oct-

07

Jan-

08

Apr-

08

Jul-0

8

Oct-

08

Jan-

09

Apr-

09

Jul-0

9

Oct-

09

Jan-

10

Apr-

10

Jul-1

0

Oct-

10

Jan-

11

Apr-

11

Jul-1

1

Oct-

11

Jan-

12

Apr-

12

Jul-1

2

Month

Ene

rgy

Con

sum

ptio

n (G

Wh/

mon

th) ESE YESB Total

Shwegyin (75 MW) COD: Oct. 2011

Kun (60MW)COD: Jul. 2012

Kyeeon Kyeewa   (74 MW) COD: Aug. 2012

Yeywa (790MW )COD: Dec. 2010Yenwe ( 25MW ) COD: Feb. 2007

Kabaung (30MW )COD: Mar. 2008

Kengtawng ( 54MW )COD: Mar. 2009

Shweli -1 ( 600MW )COD: May. 2009

22

Page 23: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

-

1,000

2,000

3,000

4,000

5,000

6,000

1990 1995 2000 2003 2004 2005 2006 2007 2008 2009

一般、家庭用 工業用 商業用 その他(外灯等)

-

1,000

2,000

3,000

4,000

5,000

6,000

1990 1995 2000 2003 2004 2005 2006 2007 2008 2009

Fisical year

Pow

er G

ener

atio

n (G

Mh)

-

500,000

1,000,000

1,500,000

2,000,000

2,500,000

1990 1995 2000 2003 2004 2005 2006 2007 2008 2009

Fisical year

0

1,000

2,000

3,000

4,000

5,000

Consumers Consumption per consumers (KWh/consumer)

Power Consumption ( by Use )(FY 2009 )Power Consumption ( by Use )

商業用,1,071GWh,

21%

その他(外灯等), 57GWh,

1% 一般、家庭用,

2,015GWh,41%

工業用,1,850GWh,

37%

Power Consumption per Consumer

Since 2006, the number of consumer has increased, however, power consumption per consumer has decreased.

→   Restriction of power consumption (ex. planned outage) is thought to be one of the reasons of the reduction above.

-

500,000

1,000,000

1,500,000

2,000,000

2,500,000

1990 1995 2000 2003 2004 2005 2006 2007 2008 2009

Num

ber o

f Con

sum

ers

(No.

)

0

1,000

2,000

3,000

4,000

5,000

-

500,000

1,000,000

1,500,000

2,000,000

2,500,000

1990 1995 2000 2003 2004 2005 2006 2007 2008 20090

1,000

2,000

3,000

4,000

5,000

Com

sum

ed E

nerg

y pe

r Con

sum

er(k

wh/

Con

sum

er)

-

500,000

1,000,000

1,500,000

2,000,000

2,500,000

1990 1995 2000 2003 2004 2005 2006 2007 2008 20090

1,000

2,000

3,000

4,000

5,000

Consumers Consumption per consumers (KWh/consumer)

Power Consumption (1990 to 2009 )Household Industrial Commercial Others (lighting)

Household

Industrial

Commercial Others (lighting),57 GWh, 1%

23

Page 24: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

5033600.63

74%

1578856.03

23%217406.3

3%

Energy Mix (MWh)( by Power Producer ) 2009

Hydro Station(MWh)

Gas-FiredStation (MWh)

Coal-FiredThermalStation (MWh)

717789972%

2476327.2725%

379327.914%

Energy Mix (MWh)( by Power Producer ) 2011

Hydro Station(MWh)

Gas-FiredStation (MWh)

Coal-FiredThermalStation (MWh)

7722779.9171%

2845575.1626%

266222.752%

Energy Mix (MWh)( by Power Producer ) 2012

Hydro Station(MWh)

Gas-FiredStation (MWh)

Coal-FiredThermalStation (MWh)

5656508.7672%

1802754.2923%

351514.995%

Energy Mix (MWh)( by Power Producer ) 2010

Hydro Station(MWh)

Gas-FiredStation (MWh)

Coal-FiredThermalStation (MWh)

24

Page 25: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

Maximum Demand

Installed Capacity

60

504

109

1151

508

24076

265125

63 50

471

892

35 63

3194MW

1913MW

Legend

Tota

l Ins

talle

d Ge

nera

tion

Capa

city

Tota

l Dem

and

(*)

Current Installed Generation Capacity and Maximum Demand

⇒Generation gap between supply and demand (approx 400MW) is supplied through 230kV bulk TL

Demand of Yangon Region occupies 50% of Myanmar’s demand.

Some large hydropower plants in northern area

Power flow

90

Unit[MW]

(*)Summation of maximum load of each 230 and 132kV substation

(Demand data in Kachin, Chin, Rakhaing, Kayah, Kayin and Tanintharyi is not obtained.)

25

Page 26: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

Electrification Ratio

No Description Quantity

1 Population 59.78 million

2 Numbers of Household 8.92 million

3 Electrified Household 2.575 million

4 Percentage 28.86 %

1 % increment in electrified household covers 89,200 households and is

expected to be consumed 18187 MWh/yr.

26

Page 27: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

Demand Forecast for Myanmar

2011-12

2012-13

2013-14

2014-15

2015-16

2016-17

2017-18

2018-19

2019-

2020

2020-21

2021-22

2022-23

2023-24

2024-25

2025-26

2026-27

2027-28

2028-29

2029-30

2030-31

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

20000

1806 2155 2426 2732 30783477

39294442

50245686

64167243

8167

9213

10400

11746

13274

15008

16978

19215

(YEAR)

(MW)

27

Page 28: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

Upgrading options for the Grid (Short Term Reinforcement Plan of

Transmission Lines & Substations)

Page 29: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

29

Page 30: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

Transmission Lines Under ConstructionEstimated target period of completion - 2013

No From To kV Length(km)

Region/State Objective

1 ThaHton Maw la Myaing 230 80.50 MonTo Supply Mon State & strengthen National Grid

2 Thar ke ta East – Dagon 230 16.09 Yangon To supply Yangon Grid

3 Balu chaung-2 Shwe myo 230 193.12 Kayar To strengthen National Grid

4 Upper Yeywa Shwe sar yan 230 128.75 Mandalay To connect upper Yeywa HPP

5 Balu chaung-3 Balu chaung-2 132 5.79 Kayar To connect Balu chaung-3 HPP

6 Wah-Shaung Winemaw 132 17.3 Kachin To connect Chi-bwe-nge HPP

30

Page 31: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

TAPEIN(240 MW)

SHWELI(600 MW)

TAGAUNG

MANSAN

SHWESARYAN

NYAUNGBINGYI

OHNTAW

ဘလငး

BHAMO

NABAR

SHWEKU

KYAUKPAHTO

THAPHANSEIK(30 MW)

NGAPYADAING

MUSE

NAMKHAN

THEINNI

LASHIO

HSIBAW

NANSANYADANARPON

PYINOOLWIN

SEDAWGYI(25 MW)

LETPANHLA

MYAUKPYIN

INDUSTRIAL ZONE

MOHNYIN

AUNGPINLE

MOGOK

PAKHANGE

ပခကက

MONYWAKYAW

(Ka.Pa.Sa)

CHAUNGKU

CHIBWENGE(99 MW/2012)

MOGAUNG

HPAKANWAINGMAW(MYITKYINA)

MYITKYINA(1,2,3)

WASHAUNG

DAWPONYAN

MYITTHA40 MW

GANGAW

ဟားခါးဖလမး

သငးငငကလေလး

KALEWA

Sr. Project Name2012-2013 Project Plan

1. Winemaw-Myintkyina 66kV Transmission Line (1)(2)(3) (30)mile

2. Mogaung- Myitkyina 66kV Transmission Line (42)miles2013-2014 Project Plan

1. 66/11kV, 10MVA Myintkyina (1) (2)(3)Substation

2. Bhamo-Nabar-Ngapyawdaing-Ohntaw 230kV Transmission Line (285) miles & Substations

3. Bhamo-Myothit-Dawponyan 66kV Transmission Line (34)miles & Substations

2014-2015 Project Plan

1. Mogaung-Hpakan 66kV Transmission Line (55)miles & Substations

KACHIN STATE 31

Page 32: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

NAMSAN

KENGTAUNG54 MW

KALAWTHAZI

THAPYAYWA(MEIKHTILA)

SHWEMYO

PINLAUNG

BALUCHAUNG(1)(28 MW)PYINMANA

NAYPYITAW

TAUNGDWINGYI

MAGWAY

မနး

THEPHYU

TAUNGOO

PHYU(40 MW/2013)0

KUN(60 MW)

SHWEKYIN(75 MW)

THARYARGONE

KAMARNAT

MYAUNG TAGAR

SHEWDAUNG(3 x 18.45 MW)

လေခ�ာက

တလေ�ာင

TIKYIT

AUNGPANG

PINPET

MOENAL

LINKHAE

ဟသ�ာတ

MYANAUNG(1X 16.25 MW)(1X 18.45 MW)

ပြပ�

ကြကခငး

NAYPYITAW(2)

YEPAUNGSON

YINMARBIN

LOILEM

PAUK KAUNG

KHAPAUNG(30 MW)

YENWE(25 MW)

ZAUNGTU(20 MW)

SONSAE

KALAMAဆငလေပါငဝလေ�ာငလ

လေက�ာစာ KYAUKSWEKYO

လေ�ာငလေပြခလေ"ာက

ဆငတ

KAYAR STATE

AUNGTHAPYE

Sr. Project Name2012-2013 Project Plan

1. Baluchaung(3)- Baluchaung(2)132kV Transmission Line (4) miles & Substations

2. Baluchaung(2)-ShweMyo 230kV Line (120)miles & Substation

2014-2015 Project Plan

1. Loikaw-ShreTaw 66 kV Transmission Line (45)Miles & Substations

2. Loikaw- Bawlakhe 66 kV Transmission Line (60)Miles & Substations

3. Bawlakhe - PharSong 66 kV Transmission Line (40)Miles & Substations

4. Baluchaung(2)- Loikaw 132kV Transmission Line (12) miles & Substation

BALUCHAUNG(3)( 52 MW/2013)

BALUCHAUNG(2)(168 MW)

LOIKAW

SHARTAW

PHARSONG

3

Page 33: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

သာယာကနး

ကမာနတ

THATON(2 x 16.25 MW)(1 x 18.45 MW)

MAWLAMYINE(12 MW)

သနလျင

သာလေကတPAAN

MYAINGGALAY

�လေ%& 'ဒဂ

MYAWADDY

KAWKAREIK

YE

DAWEI

CHAUNGSONE

KAYIN STATE

PHAYARGONE

INDUSTRIAL ZONE

Sr. Project Name2012-2013 Project Plan

1. PaAn-Industrial Zone 66 kV Transmission Line (17) miles & Substation

2013-2014 Project Plan

1. PaAn-Phayangone(Zartapyin) 66/11kV, 5MVA Substation2014-2015 Project Plan

1. Mawlamyine-Kawkareik-Myawaddy 230kV Transmission Line (80) miles & Substations

2. PaAn - Hlaningbwe 66kV Transmission Line (27)miles & Substations

HLANINGBWE

33

Page 34: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

TAGAUNG

လေ*+စာ*

BELIN **ာ

THAPYAYWA(MEIKHTILA)

MYINGYAN(INDUSTRY)

MANN(MINBU)2 X 18.45 MW

CHAUK

TANYAUNG

MONE75 MW

SAYTOTETAYAR

KYUNGCHAUNG(3 x 18.1 MW)

တက�စ

ဗနးလေမာSHWEKU

လေ�ာငပနး

*တနာပ

ပြပငဦးလင

KYEEON KYEEWA70 MW

မးကတ

MYINGYAN

PAKHANGE

PAKKHOKKUPAUK

Project(L)

Project(P)

Project(N)

NGAPHE

လေဒါဖနးယန

HAKHA

FALAM

THINEGIN

KALE

SAW(KA.PA.SA)

CHIN STATE

KYAUKTAW

PONNAGYUN

SITTWE

MINBYA

MRAUK-U

ANN

MINDAT

NABAR

KYAUKPAHTO

KYAW

CHAUNGKUMYITTHA40 MW

GANGAW NYAUNGBINGYI

THAPHANSEIK(30 MW)

MONYWA

KALEWA

THAZI

NAYPYITAW(2)

YINMARBIN

SONSAE

MAGWAY

YEPAUNGSON

SHWEMYO

PINLAUNG

MYAUKPYIN

INDUSTRIAL ZONE

OHNTAW

AUNGPINLE

SEDAWGYI(25 MW)

NGAPYADAING LETPANHLA

Sr. Project Name2012-2013 Project Plan

1. Kyaw-Gangaw-Haka 66kV Transmission Line (89) miles & Substation 2013-2014 Project Plan

1. Hakha-Falam-Thinegin 66kV Transmission Line (50) miles& Substation

2. Pauk-Mindat 66kV Transmission Line (35) miles & Substation

34

Page 35: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

လေတာငင

လေ*+က�ငသာယာကနး

ကမာနတ

သနလျင

သာလေကတ

သတာ

�လေ%& 'ဒဂ

ဘလးလေခ�ာငး(၃)(၅၂မဂဂါဝပ)

MON STATE

THATON(2 x 16.25 MW)(1 x 18.45 MW)

MAWLAMYINE(12 MW)

PHAAN

MYAINGGALAY MYAWADDY

KAWKAREIK

YE

CHAUNGSONE

PHAYARGONE

INDUSTRIAL ZONE

HLANINGBWE

Sr. Project Name2012-2013 Project Plan

1. Thaton-Mawlamying 230kV Transmission Line (50) miles & Substation2013-2014 Project Plan

1. 66/11kV, 20MVA & 66/33kV, 20MVA Mawlamyine Substation

2014-2015 Project Plan

1. Mawlamyine-Chaungsone 66kV Transmission Line (18) miles & Substations

2. Mawlamyine- Thanbyuzayat 66kV Transmission Line (35) miles & Substations

SHWEKYIN(75 MW)

THANBYUZAYAT

35

Page 36: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

သာစ�သလေပြပဝ

(မတထ လာ)

လေနပြပ�လေတာ

TAUNGTWINGYI

MAGWAYMANN

လေလ&ာကား

ATHOKE

လေပြမာငးတကာ

OAKSHITPIN

CHAUK

TANYAUNG

MONE (75 MW)

SAYTOTETAYAR

ကျနးလေခ�ာငး

THABAUNG

YEKYI

HINTHADA

MYANAUNG

KYEEON KYEEWA70 MW

PYAE

KYANKIN

MANTHONE

လေနပြပ�လေတာ(၂)

Project(L)Project(P)

Project(N)

လေပါကလေခါငး

ခလေပါငး(၃၀မဂဂါဝပ)

*နယ(၂၅မဂဂါဝပ)လေ9ာငးတ

(၂၅မဂဂါဝပ)

ဘ*ငလေနာင

*ာမ

စနဆ�

ကလားမSINPAUNGWE

AUNGLANProject(C)

KYAWSYA လေက�ာကစယက� း

လေ�ာငလေပြခလေ"ာက

SANTE

NGEPHAE

SAWRAKHINE STATEKYAUKTAW

PONNAGYUN

SITTWE

MINBYA

MYAUK-U

ANN

BUTHIDAUNG

KYAUKPHYU

THANTWE

MAEI

KYEINTALI

GWA

TAUNGUP

RAMREE

THAHTAY111 MW

Sr. Project Name2012-2013 Project Plan

1. Ann-Ponnagyun 230 kV Transmission Line (120) miles & Substations

2. Oakshitpin-Taungup-Maei-Ann 230 kV Line (139) miles & Substations

3. Mann-Ann 230 kV Transmission Line (80) miles & Substations2013-2014 Project Plan

1. Maei-Kyaukphyu 230 kV Transmission Line (65) miles

2. Kyaukphyu 230 kV Substation-Kyaukphyu 66 kV Line (5) miles & Substations

3. Ponnagyun-Sittwe 66 kV Line (22) miles & Substations

4. Ponnagyun-MyukOo 66 kV Line (35) miles & Substations

5. Ponnagyun-Kyauktaw 66 kV Transmission Line (40) miles & Substations

6. Kyaukphyu-Ramree 6 6 kV Transmission Line (41) miles & Substations

7. Taungup-Thandwe 66 kV Transmission Line (30) miles & Substations2014-2015 Project Plan

1. Kyauktaw-Buthidaung 66 kV Transmission Line (35) miles & Substations

2. Maruk U-Minbya 66 kV Transmission Line (20) miles & Substations

3. Thandwe-Kyeintali-Gwa 66 kV Line (84) miles & Substations

4. Athoke-Gwa 66 kV Transmission Line (62) miles & Substations

36

Page 37: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

TAPEIN

SHWELI-1

TAGAUNG TAUNG

MANSAN

SHWESARYAN�နးလေတာ

BELIN YEYWA

NANSAN

KENGTAUNGKALA

W

သလေပြပဝ(မတထ လာ)

SHWEMYO

PAUNG LAUNG

ဘလးလေခ�ာငး(၁)(၂၈မဂဂါဝပ)

လေနပြပ�လေတာ

လေတာငတငးကြကး

TIKYIT

BAMAW

NABAR

SHWEKU

င&ကလေပ�ာဒငး

MUSE

NANKHAN

LASHIO

HSIBAW

NANSAN

WANSIN

KHOLANPINDAYA

AUNGTHAPYE

PINPAT

MOENAL

LINKHAE

YADANARBON

PYINOOLWIN

SEDAWGYI60 MW

LATPANHLA

MYAUKPYIN

INDUSTRIAL ZONE

MONG-NAUNG

လေနပြပ�လေတာ(၂)

YEPAUNGSON

YINMARBIN

LOILEN

ZAWGYI (2)12 MW

ZAWGYI (1)18 MW

AUNGPINLE

MOGOK

ပြမငးပြခ

မ*ာ(လေ�ာငခ�မးသာ)

DAWPHONEYAN SHAN STATE

TAUNGYI

UPPER BALUCHAUNG

105 MILE

MONGHSU

THEINNI

TARMONYE

MINEYAL

TANTYAN

KONHEIN

KYETHI

KUTKAI

LAUKKAING

HIS-HSENG

Sr. Project Name2012-2013 Project Plan

1 Kalaw-Pindaya 66 kV Transmission Line (22) miles & Substations

2 Kholan-Konhein 66 kV Line (33) miles & Substations

3 Lashio-Mineyal-Tantyan 66 kV Line (87) miles & Substations

4 Theinni-Tarmonye-Laukkaing 66 kV Line (75) miles & Substations

5 Aungthapye-Naungka 66kV Line (17) miles & Substations2013-2014 Project Plan

1 132/66 kV, 100 MVA Taungyi Substation

2 66/11 kV, 5 MVA Laihka Substation

3 Mong Naung-Mongshu 66 kV Line (33) miles & Substations

4 Upper Baluchaung-Kalaw 66 kV Transmission Line (20) miles2014-2015 Project Plan

1 Mansan-Theinni 230 kV Line (60) miles & Substations

2 Theinni-Kutkai-105 mile(Muse) 66kV Transmission Line (60) miles & Substations

3 Taungyi-Hsihseng 66kV Line (44) miles & Substations

4 Mong Naung-Kyethi 66 kV Line (30) miles & Substations

MONGKUNG

LAIHKA

PYINMANA

37

Page 38: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

တာပန

လေ*+လ(၁)

မနစ

လေ*+စာ*

NYAUNGBINGYIOHNTAW

BELIN

နမစ

က� ငးလေတာငးTHAZI

THAPYIWA

MYINGYAN(STEEL MILL)

လေ*+မြမ

CHAUK

TANYAUNG

MONE (75 MW)

SAETOTETAYAR

KYUNGCHAUNG

NABAR

KYAUKPAHTO

THAPHANSEIK30 MW

NGEPYAWDAING

မဆယ

နမခမး

သနန

လားရCး

သလေပါ

နမစန

ဝမဆငး

ခလန

လခ�ား

လေ�ာငသလေပြပ

ပငးပကမးန

ပြပငဦးလင

SEDAWGYI25 MW

LATPANHLA

MYAUKPYIN

INDUSTRIAL

MOHNYIN

MOGAUNG

မငးလေနာင

YEPAUNGSON

YINMARBIN

လငလင

လေ9ာဂ�(၂)(၁၂မဂဂါဝပ)

လေ9ာဂ�(၁)(၁၈မဂဂါဝပ)

AUNGPINLE

မးကတ

MYINGYAN

PAKHANGE

PAKHOKKU

MONYWA(AUNGCHANTHAR)

KYAW

PAUK

CHAUNGKU

Project(L)

Project(P)

Project(N)SAW

လေက�ာကလေတာ

၆၀

တာမး�

လေလာကကင

၂၃

၅၂

မငး*ယ

တန ယနး၄၈ ၃၉

ကနဟနး၃၃

၁၀၅ မင၁၀

၅၀

၃၀လေက�းသး မငးရCး

၃၃

လေတာငကြကး

၄၄၂၀

SAGAING DIVISION

MOGOK

Sr.

Project Name

2013-2014 Project Plan

1 132/33 kV, 2 x 50 MVA Monywa Substation

2 Gangaw-Kale 230 kV Transmission Line (80) miles & Substation

3 132/66kV, 100MVA Extension at Kyaukpahto Substation2014-2015 Project Plan

1 Thinegin-Kale-Kalewa 66 kV Transmission Line (30) miles

KALAYWA

38

THINEGINKALE

GANGAW

Page 39: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

SHWESATYAN

NYAUNGBINGYI

OHNTAW

BELIN YEYWA

နမစ

က� ငးလေတာငးKALAW

THAZI

THAPYAWA

MYINGYAN(STEEL MILL)

SHWEMYO

PAUNGLAUNG

BALUCHAUNG(1)28 MW

BALUCHAUNG(2)160 MW

PYINMANA

NAYPYITAW

TAUNGTWINGYI

MAGWAY

MANN

THEPHYU

TAUNGOO

ပြဖး

CHAUK

တလေ�ာင

ကျနးလေခ�ာငး

TIKYIT

HSIBAW

ဝမဆငး

ခလနLAIHKA

AUNGPANAUNGTHAPYAE

PINPET

LINKHAE

PYINOOLWINMYAUKPYIN

PYAE

INDUSTRIAL ZONE

မငးလေနာင

NAYPYITAW(2)

YEPONSONE

YINMARBIN

LOILEN

ZAWGYI(1) 12 MW

ZAWGYI(2)18 MW

လေ�ာငပငလယ

MYINGYAN

PAKHANGYI

PAKOKEKU

MONYWAလေက�ာ(ကပစ)

လေပါက

လေခ�ာငးကး

Project(N)

KAPAUNG30 MW

SONSE

KALAMA

SINPAUNGWE

AUNGLAN

Project(C)

KYAWSWAKYAUKSWEKYO

SINTE

BALUCHAUNG(3)52 MW

UPPER YEYWA

INGONE

KINDA

TAUNG_T KWN

NGAZON

TAGuNTAING

MYOGYI

Sr. Project Name2012-2013 Project Plan

1. Upper Yeywa- Shwesaryan 230kV Line (80) miles

2. 230/33 kV,100MVA Naypyitaw(2) Substation

3. Meikhtila-Taungoo 500 kV Transmission Line (146) miles

4. Myogyi-Taungtawkwn 33kV Transmission Line (10) miles

2013-2014 Project Plan

1. 132/33 kV, 100 MVA Taguntaing Substation

2. 132/33 kV, 100 MVA Industrial Zone Substation

3. 132/66 kV, 60 MVA Letpanhla Substation

4. 66/33 kV, 30 MVA Mogok Substation

2014-2015 Project Plan

1. 132/33 kV, 2 x 50 MVA Thazi Substation

2. Chauk-Nyaungoo 66 kV Line (28) miles & Substation

3. MyinChan-NgaZon 66kV Line (10)Miles & Substations

4. ThapyaWa 500/230kV Substation

5. AungPinlae 132/33kV, (20)MVA Substation

2015-2016 Project Plan

1 230 /33kV, 100 MVA Thapyaywa(Meikhtila) Substation

MANDALAY DIVITION 39

Page 40: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

လေ*+စာ*

NYAUNGBINGYI

OHNTAW

ဘလငး **ာ

နမစ

က� ငးလေတာငးကလေလာ

THAZI

THAPYAYWA(MEIKHTILA)

MYINGYAN

(NGAZON)

SHWEMYO

လေပါငးလေလာငးဘလးလေခ�ာငး(၁)(၂၈မဂဂါဝပ)

ဘလးလေခ�ာငး(၂)(၁၆၀မဂဂါဝပ)

PYINMANA

NAYPYITAW

TAUNGDWINGYI

MAGWAY

MANN(MINBU)

2 X 18.45 MW

THEPHYU

TaungooPHYU(40

MW/2013)KUN(60

MW)

SHEWDAUNGOAKSHITPIN

CHAUK

TANYAUNG

MONE75 MW

SAYTOTETAYAR

KYUNGCHAUNG

တက�စ

သလေပါ

ဝမဆငး

ခလနလခ�ား

လေ�ာငပနးလေ�ာငသလေပြပ

ပငးပက

မးန

လငးလေခး

ပြပငဦးလငMYAUKPYIN

KYEEON KYEEWA70 MW

PYAY

INDUSTRIAL ZONE

မငးလေနာင

NAYPYITAW(2)

YEPAUNGSON

YINMARBIN

လငလင

လေ9ာဂ�(၂)(၁၂မဂဂါဝပ)

လေ9ာဂ�(၁)(၁၈မဂဂါဝပ)MYINGYAN

PAKHAGYI

PAKKHOKKU

KYAW(KA.PA.SA)

PAUK

CHAUNGKU

PROJECT-L

PROJECT-P

PROJECT-N

PAUK KAUNG

KHAPAUNG(30 MW)

SONSAE

KALAMA

SINPAUNGWE

AUNGLAN

PROJECT-C

KYAWSWA

KYAUKSWEKYO

လေ�ာငလေပြခလေ"ာက

SINDE

NGAPHE

ဘလးလေခ�ာငး(၃)(၅၂မဂဂါဝပ)

MINDAT

MYITTHA40 MW

GANGAW

SAW(KA.PA.SA

)

လေက�ာကလေတာ

�"က**ာ၈၀

INGONE

KINDA56 MW

KANMA

MAGWAY DIVISIONSr Project s Name

2012-2013 Project Plan

1 230 /66 kV, 100 MVA Taungdwingyi Substation.2013-2014 Project Plan

1 Mann-Taungdwingyi 230 kV Line (85) miles & Substations.

2 Tanyaung-Saw 66 kV Transmission Line (45) miles & Substations.

3 230/66 kV, 100 MVA Chaungku & 66/35 kV, 60 MVA Pauk Subsations.

2014-2015 Project Plan

1 Gangaw-Chaungku 230 kV Line (60) miles & Substations.

2 Myittha-Gangaw 66 kV Transmission Line (25) miles

3 Thapyaywa-Chauk-Minbu 230 kV Line (145) miles & Substations.

4 Kyungchaung-Mann 230 kV Line (90) miles & Substations.

5 Taungdwingyi-Aunglan 132 kV Line (66) miles & Subsations.

6 Aunglan-Thayet 66 kV Line (10) miles & Substations.

7 Oakshitpin-Kanma 66 kV Line (30) miles & Substations.

2015-2016 Project Plans

1 132/66 kV, 60 MVA Pakkhokku(Budhakone) Substation

THAYET

40

Page 41: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

NAMSAN

PINPET

THAZI

THAPYAYWA(MEIKHTILA)

ပြမငးပြခ(သမဏ)

SHWEMYO

PAUNGLAUNG

BALUCHAUNG(1)(28 MW)

BALUCHAUNG(2)(168 MW)

PYINMANA

NAYPYITAW

TAUNGDWINGYI

MAGWAY

မနး

THEPHYU

TAUNGOOPHYU

KUN(60

MW)SHWEKYIN

THARYARGONE

KAMARNATMYAUNG TAGAR

SHEWDAUNG

လေခ�ာက

တလေ�ာင

TIKYIT

AUNGPANGAUNGTHAPYE

PINPET

EAST DAGON

လေ*ကြက�HINTHAD

A

MYANAUNG

PYAY

ကြကခငး

NAYPYITAW(2)

YEPAUNGSON

YINMARBIN

LOILEM

PAUK KAUNG

KHAPAUNG(30 MW)

YENWE(25

MW) ZAUNGTU(20 MW)

SONSAE

KALAMA

SINPAUNGWE

AUNGLAN

KYAWSWA KYAUKSWEKYO

လေ�ာငလေပြခလေ"ာက

ဆငတ

BALUCHAUNG(3)( 52 MW)

THAUK-YE-KHAT(120 MW /2013)

BAGO DIVISION

MINHLA

SITTAUNG

Sr Project Name2012-2013 Project Plan

1 Shwedaung-Myaungtagar 230kV Transmission Line (130) miles

2 230/33 kV, 100 MVA Kamarnat Substation3 230/33 kV, 100 MVA Minhla Substation4 230/33 kV, 100 MVA Sittaung Substation

2013-2014 Project Plan

1 Taungoo-Kamarnat 500 kV Transmission Line (117) miles

2 Karmanat-Myaungtagar 500 kV Transmission Line (50) miles

3 Thaukyekhat(2)-Taungoo 230 kV Transmission Line (13) miles

4 Taungdwingyi-Shwedaung 230kV Transmission Line (100) miles & Substations

2014-2015 Project Plan

1 Taungoo-Shwedaung 230 kV Line (110) miles & Substations

2 Baluchaung(2)-Taungoo 230kV Line (96) miles & Substations

3 500/230 kV, 500 MVA Kamarnat Substation

4 500/230 kV, 500 MVA Taungoo Substation

2015-2016 Project Plan

1 Minhla-Hinthada 230 kV Line (60) miles & Substations

41

Page 42: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

ပြဖး

ကနး

သာယာကနး

ကမာနတ

သာလေကတ

HLAWGA

AHLON

ATHOKE

HLAINGTHARYAR

MYAUNG TAGAR

SHEWDAUNGOAKSHITPIN

သတာစနပနးမြမင

�လေ%& 'ဒဂ

PATHEIN

MYAUNGMYA

LAPUTTA

KANGYIDAUNT

THARBAUNG

YEGYI

HINTHADA

MYANAUNGKYANKIN

MATHONE

*နယ(၂၅မဂဂါဝပ)

လေ9ာငးတ(၂၅မဂဂါဝပ)

BAYINTNAUNG

YWAMA

NYAUNGCHEDAUUK

KYAIKLAT

MINHLA

AYEYARWADDY DIVISION

NGWESAUNG

CHAUNGTHAR

KANNI

Sr Project Name2012-2013 Project Plan

1 Athoke-Pathein 230kV Line (40) miles & Substations.

2013-2014 Project Plan

1 Pathein-Chaungthar 66kV Line (35) miles & Substations.

2 Pathein-Ngwesaung 66kV Line (30) miles & Substations.

3 Pathein-Kanni 66kV Line (7) miles & Substations.

4 Hlaingtharyar-Kyaiklat 230kV Line (30) miles & Substations.

2014-2015 Project Plan

1 Hinthada-Athoke 230 kV Line (80) miles

2 Oakshitpin-Hinthada 230kV Line (95) miles & Substations.

3 Hlaingthayar-Kyaiklat 66kV Line (30) miles & Substations.

4 Kyaiklat-Pyapon 66 kV Line (15) miles & Substations.

5 Kyaiklat-Bokalay 66kV Line (35) miles & Substations.

6 Hinthada - Laymyatnar 66kV Line (15) miles & Substations.

7 Hinthada - Danubyu 66kV Line (35) miles & Substations.

8 66/11kV, 2 x 10 MVA Hinthada Substaion

PYAPONBOKALAY

LAYMYATNAR

DANUBYU

42

Page 43: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

PHYU

KUN(60 MW)

SHWEKYIN

THARYARGONE

KAMARNAT

သ"

လေမာလမြမင

THANLYIN

THAKETA

HLAWGA

AHLON

ATHOKE

HLAINGTHARYAR

MYAUNG TAGAR

SHEWDAUNG

OAKSHITPIN

ဘား�

မြမငကလေလး

THIDA

SEINPANMYAING

ပသမ

MYAUNGMYA

BAYINTNAUNG

KANGYIDAUNT

သာလေပါငး

YEGYI

HINTHADA

MYANAUNG

KYANKIN

MATHONE

YENWE

(25 MW)

ZAUNGT

U(25 MW)

ဘ*ငလေနာင

YWAMA

NYAUNGCHEDAUUK

ပြမဝတ

လေကာက*တ

ဘ*ားကန

လေခ�ာငးဆ

EAST DAGON

THILAWA

SHWELINPAN

Sr. Project Name2012-2013 Project Plan

1 Thaketa- East Dagon 230kV Line (10) miles & Substations.

2 230/33 kV, 100 MVA Myaungtagar Substation

3 230/33 kV, 2 x 100 MVA Hlawga Substation

4 230/33 kV, 100 MVA Hlaingtharyar Substation

2013-2014 Project Plan

1 Ywama-Hlaingtharyae 230kV Line (7)miles & Substations

2014-2015 Project Plan

1 Shwelinpan (In/Out )Line (6) miles & Substations.

2 230/66kV, 100MVA Ywama Substation

3 Myaungdagar-Hlaingtaryar 230kV Transmission Line (28) miles

4 Thaketa- Ahlone 230kV Line (11) miles & Substation

2015-2016 Project Plan

1 Hlawga-Ywrma 230kV line(10)miles & Substations

2 KamarNut-EastDagon 230kV Line,(40)miles & Substations

3 ThanLynn-Thilawa 230kV Line (15)miles & Substations

4 Hlawga-Thakata 230kV Line (5)miles & Substations

5 Ahlone-Dala 230kV Line (8)miles & Substations

6 Thida GIS 230/66/11kV, 2x200 MVA Substations

YANGON DIVISION

KYAIKASAN

43

Page 44: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

သာယာကနး

ကမာနတ

THATON

MAWLAMYINE

သနလျင

သာလေကတPHAAN

MYAINGGALAY

�လေ%& 'ဒဂ

MYAWADDY

KAWKAREIK

YE

DAWEI

CHAUNGSONE

Sr Project Name2013-2014 Project Plan

1 Mawlamyine-Ye-Dawei 230 kV Tranmsission Line (132) miles & Substations.

TANINTHARYI DIVISION

PHAYARGONE

INDUSTRIAL ZONE

44

Page 45: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

Sr.

Project NameEstimated Project Cost

RemarksMaterial Cost

Mil: Kyats(Mil:USD)

Construction CostMil:

Kyats(Mil:USD)Kachin State

1. Waingmaw-Myitkyina(1)(2)(3) 66 kV Transmisson Line (30) mile

4,261(4.734) 664.5(.738) Completed

2. Myitkyina-Mogaung66 kV Transmisson Line (42) mile

1,754(1.949) 930.5(1.034) Completed

3. Myitkyina(1),Myitkyina(2) & Myitkyina(3) 66 kV Substation

16,160(17.956) 1,314(1.460) Completed

4. Bhamo-Nabar, Ngapawdine-Ohntaw 230 kV Transmisson Lines (285) mile & Substations

89,786(99.762) 42,602(47.336) 2013-2014 Financial year

5. Bhamo-Myotit-Dawponyan 66 kV Transmisson Line (34) mile & Substations

2,800(3.111) 2,657(2.952) 2013-2014 Financial year

6. Waingmaw-Mogaung 132 kV Transmisson Line (60) mile & Substations

11,880(13.200) 2,642(2.936) 2014-2015 Financial year

7. Mogaung- Hpakant 66 kV Transmisson Line (55) mile & Substations

4,225(4.694) 2,350(2.611) 2014-2015 Financial year

Sub Total 130,866(145.407)

53,160(59.067)

Current Status of Implementation of Projects (Transmission Lines & Substations),On-going and will be Completed During Financial Years of (2012-2013) To (2015-2016)

45

Exchange Rate : 1 USD = 900 Ks.

Page 46: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

Sr.

Project NameEstimated Project Cost

NoteMaterial Cost

Mil: Kyats(Mil:USD)

Construction CostMil:

Kyats(Mil:USD)

Kayar State (Contd;)

1. Baluchaung(2)-Shwemyo 230 kV Transmisson Line (120) mile & Substations

19,500(21.667) 7,699(8.554)2012-2013

Financial year

2. Baluchaung(2)-Baluchaung(3) 132 kV Transmisson Line (4) mile & Substation Extension

2012-2013 Financial year

3. Baluchaung(2)-Loikaw 132 kV Transmisson Line (12) mile & Substations

14,709(16.343) 3,222(3.580) 2014-2015 Financial year

4. Loikaw-Shadaw 66 kV Transmisson Line (45) mile & Substations

2,375(2.639) 1,979(2.199) 2014-2015 Financial year

5. Loikaw-Bawlakhe 66 kV Transmisson Line (60) mile & Substations

4,200(4.667) 2,491(2.768) 2014-2015 Financial year

6. Bawlakhe-Hpasawng 66 kV Transmisson Line (40) mile & Substations

5,400(6.000) 1,807(2.008) 2014-2015 Financial year

Total for Kachin State 46,184(51.316) 17,198(19.109)

Status of Implementation of Projects (Transmission Lines & Substations),On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)

46

Page 47: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

Sr.

Project NameEstimated Project Cost

NoteMaterial Cost

Mil: Kyats(Mil:USD)

Construction CostMil:

Kyats(Mil:USD)

Kayin State

1. Hpa-an-Industrial Zone 66 kV Transmisson Line (17) mile & Substations

- 1,020(1.133) On-Going

2. Hpa-an-Phayarkone(Zartabyin) 66 /11kV, 5 MVA Substation

2,250(2.500) 879(0.977) 2013-2014 Financial year

3. Mawlamyine-Kawkareit-Myawadi 230 kV Transmission Line (80) mile & Substations

27,900(31.000) 8,675(9.639) 2014-2015 Financial year

4. Hpa-an-Hlinebwe 66 kV Transmisson Line (27) mile & Substations

2,860(3.178) 1,392(1.547) 2014-2015 Financial year

Total for Kayar State 33,010(36.678) 11,966(13.296)

Status of Implementation of Projects (Transmission Lines & Substations),On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)

47

Page 48: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

Status of Implementation of Projects (Transmission Lines & Substations),On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)

Sr.

Project NameEstimated Project Cost

NoteMaterial Cost

Mil: Kyats(Mil:USD)

Construction CostMil:

Kyats(Mil:USD)

Chin State1. Kyaw-Gangaw-Harkhar 66 kV

Transmisson Line (89) mile & Substations

11,531(12.812) 2,010(2.233) On-Going

2. Harkhar-Phalam-Taingin 66 kV Transmisson Line (50) mile & Substations

5,600(6.222) 3,820(4.244) 2013-2014 Financial year

3. Pauk-Minthet 66 kV Transmisson Line (35) mile & Substations

2,880(3.200) 2,295(2.550) 2013-2014 Financial year

Total for Chin State 22,011(22.234) 8,125(9.028)

Mon State

1. Thaton-Mawlamyine 230 kV Transmisson Line (50) mile & Substations

11,106(12.340) 6,990(7.767) On-Going

2. Mawlamyine-Chaungzon 66 kV Transmisson Line (18) mile & Substations

3,618(4.020) 5,084(5.649) 2013-2014 Financial year

3. Mawlamyine-Thanbuzayat 66 kV Transmisson Line (35) mile & Substations

3,600(4.000) 1,665(1.850) 2013-2014 Financial year

4. 66/11 kV, 20 MVA & 66/33 kV, 20 MVA Mawlamyine Substation

4,050(4.500) 438(0.487) 2014-2015 Financial year

5. Thaton-Bilin 66 kV Transmission Line (38) mile & Substations

3,368(3.742) 1,768(1.964) 2015-2016 Financial year

Total for Mon State 25,742(28.602) 15,945(17.717)

48

Page 49: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

Status of Implementation of Projects (Transmission Lines & Substations),On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)

Sr.

Project NameEstimated Project Cost

NoteMaterial Cost

Mil:Kyats(Mil:USD)

Construction CostMil:

Kyats(Mil:USD)

Rakhine State

1. Mann-Ann-Ponnagyun 230 kV Transmission Line (200) mile & Substations 68,741(76.379) 21,699(24.110)

On-Going

2. Oakshitbyin-Toungup-Ma-ei 230 kV Transmission Line (139) mile & Substations

On-Going

3. Ma-ei-Kyaukphyu 230 kV Transmisson Line (65) mile

14,040(15.600) 2,224(2.471) 2013-2014 Financial year

4. Kyaukphyu 230 kV Substation-Kyaukphyu 66 kV Transmission Line (5) mile & Substations

2,025(2.250) 569(0.632) 2013-2014 Financial year

5. Mrauk-u-Ponnagyun-Sittwe 66 kV Transmission Line (57) mile & Substations

6,660(7.400) 2,856(3.173) 2013-2014 Financial year

6. Ponnagyun-Kyauktaw 66 kV Transmission Line (40) mile & Substations

2,520(2.800) 1,807(2.008) 2013-2014 Financial year

7. Kyaukphyu-Ramree 66 kV Transmission Line (41) mile & Substations

3,645(4.050) 1,870(2.078) 2013-2014 Financial year

Sub Total

49

Page 50: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

Sr. Project NameEstimated Project Cost

NoteMaterial Cost

Mil: Kyats(Mil:USD)

Construction CostMil:

Kyats(Mil:USD)

Yakhine State (cont;)

8. Toungup-Thandwe 66 kV Transmission Line (30) mile & Substations

4,000(4.444) 1,465(1.628) 2013-2014 Financial year

9. Kyauktaw-Buthitaung 66 kV Transmission Line (35) mile & Substations

3,183(3.537) 1,665(1.850) 2014-2015 Financial year

10 Mrauk-u-Minbya 66 kV Transmission Line (20) mile & Substations

2,250(2.500) 1,152(1.280) 2014-2015 Financial year

11. Thandwe-Kyeintali 66 kV Transmission Line (84) mile & Substations

6,480(7.200) 3,342(3.713) 2014-2015 Financial year

12. Athoke- Gwa 66 kV Transmission Line (62) mile & Substations

4,320(4.800) 2,589(2.877) 2014-2015 Financial year

Total for Yakhine State 117,864(130.960)

41,238 ( 45.820)

Status of Implementation of Projects (Transmission Lines & Substations),On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)

50

Page 51: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

Status of Implementation of Projects (Transmission Lines & Substations),On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)

Sr. Project NameEstimated Project Cost

NoteMaterial Cost

Mil:Kyats(Mil:USD)

Construction Cost

Mil:Kyats(Mil:USD)

Shan State1. Kalaw-Pindaya 66 kV Transmission Line

(22) mile & Substations1,889(2.099) 800(0.889) Completion

2. Aungthapyay-Naungkar 66 kV Transmission Line (17) mile & Substations

1,389(1.543) 1,050(1.167) Completion

3. Khainglon-Konhein 66 kV Transmission Line (33) mile & Substations

3,272(3.636) 2,499(2.777) On-Going

4. Lashio-Mineyal- Tantyan 66 kV Transmission Line (87) mile & Substations

3,931(4.368) 3,882(4.313) On-Going

5. Teinni-Tarmoenye-Launktai 66 kV Transmission Line (75) mile & Substations

7,171(7.968) 3,471(3.857) On-Going

6. Taunggyi 132/66 kV, 100 MVA Substation

5,400(6.000) 450(0.500) 2013-2014 Financial year

7. Lecha 66/11 kV, 5 MVA Substation 2,000(2.222) 438(0.487) 2013-2014 Financial year

8. Minenaung- Mineshoe 66 kV Transmission Line (33) mile & Substations

3,200(3.556) 2,297(2.552) 2013-2014 Financial year

Sub Total

51

Page 52: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

Status of Implementation of Projects (Transmission Lines & Substations),On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)

Sr. Project NameEstimated Project Cost

NoteMaterial Cost

Mil: Kyats(Mil:USD)

Construction CostMil:

Kyats(Mil:USD)

Shan State ( Contd)9. Upper Baluchaung- Kalaw 66 kV

Transmission Line (20) mile & Substations

- 684(0.760) 2013-2014 Financial year

10. Mansan-Teinni 230 kV Transmission Line (60) mile & Substations

24,390(27.100) 6,163(6.848) 2014-2015 Financial year

11. Teinni- Kutkhaing-105 mile (Musal) 66 kV Transmission Line (60) mile & Substations

5,940(6.600) 2,550(2.833) 2014-2015 Financial year

12. Taunggyi- Sesai 66 kV Transmission Line (44) mile & Substations

3,150(3.500) 1,535(1.706) 2014-2015 Financial year

13. Minenaung- Gyithe 66 kV Transmission Line (30) mile & Substations

3,150(3.500) 1,494(1.660) 2014-2015 Financial year

14. Mansan- Lashio 66 kV Transmission Line (26) mile & Substations

3,622(4.024) 2,207(2.452) 2014-2015 Financial year

Total for Shan State 68,504(76.116) 29,520(32.800)

52

Page 53: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

Sr. Project NameEstimated Project Cost

NoteMaterial Cost

Mil: Kyats(Mil:USD)

Construction CostMil: Kyats (Mil:USD)

Sagaing Region

1. Nyaungbingyi- Latpandaung 230 kV Transmission Line (3.5) mile & Substations

- 2,270(2.522) 2013-2014 Financial year

2. Gangaw- Kalay 230 kV Transmission Line (80) mile & Substations

28,512(31.680) 7,249(8.054) 2013-2014 Financial year

3. Kyaukpahtoe 132/66 kV, 100MVA Substation Extension

6,300(7.000) 450(0.500) 2013-2014 Financial year

4. Monywa 132/33 kV, 2x50 MVA Substation Extension

8,380(9.311) 1,890(2.100) 2014-2015 Financial year

5. Taingin- Kalay-Kalaywa 66 kV Transmission Line (30) mile & Substations

4,5005.000) 1,902(2.113) 2014-2015 Financial year

Total for Sagaing Region 47,692(52.991) 13,761(15.290)

Tanintharyi Region

1. Mawlamyine- Ye-Dawei 230 kV Transmission Line (132) mile & Substations

50,373(55.970) 22,023(24.470) 2013-2014 Financial year

Total for Tanintharyi Region 50,373(55.970) 22,023(24.470)

Status of Implementation of Projects (Transmission Lines & Substations),On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)

53

Page 54: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

Status of Implementation of Projects (Transmission Lines & Substations),On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)

Sr. Project NameEstimated Project Cost

NoteMaterial Cost

Mil: Kyats(Mil:USD)

Construction CostMil:

Kyats(Mil:USD)

Bago Region1. Sittaung 230/33 kV, 100MVA

Substation 3,413(3.792) 1,910(2.122) Completion

2. Kamarnat 230/33 kV, 100MVA Substation Extension

3,758(4.176) 250(0.278) On-Going

3. Minhla 230/33 kV, 100MVA Substation

3,753(4.170) 1,910(2.122) On-Going

4. Shwetaung- Myaungtagar 230 kV Transmission Line (130) mile & Substations

11,628(12.920) 10,273(11.414) On-Going

5. Thautyekhat(2)- Taungoo 230 kV Transmission Line (13) mile & Substations

- 826(0.918) On-Going

6. Chaungkuu 230 /66 kV, 100 MVA Substation Extension

78,975(87.750) 17,316(19.240) 2013-2014 Financial year

7. Taungdwingyi- Shwetaung 230 kV Transmission Line (100) mile & Substations

18,100(20.111) 7,944(8.827) 2013-2014 Financial year

8. Kamarnat-Myauntagar 500 kV Transmission Line (50) mile

37,800(42.000) 7,400(8.222) 2014-2015 Financial year

9. Taungoo- Shwetaung 230 kV Transmission Line (100) mile

26,640(29.600) 8,720(9.689) 2014-2015 Financial year

54

Page 55: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

Status of Implementation of Projects (Transmission Lines & Substations),On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)

Sr. Project NameEstimated Project Cost

NoteMaterial Cost

Mil: Kyats(Mil:USD)

Construction CostMil:

Kyats(Mil:USD)

Bago Region10. Baluchaung(2)- Taungoo 230 kV

Transmission Line (96) mile 16,992(18.880) 5,864(6.516) 2014-2015

Financial year

11. Kamarnat 500/230 kV, 500 MVA 23,400(26.000) 1,000(1.111) 2014-2015 Financial year

12. Taungoo 500/230 kV, 500 MVA 23,400(26.000) 1,000(1.111) 2014-2015 Financial year

13. Minhla- Hinthada 230 kV Transmission Line (60) mile & Substations

12,510(13.900) 4,838(5.376) 2015-2016 Financial year

260,369(289.299)

69,251(76.946)

55

Page 56: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

Sr. Project NameEstimated Project Cost

NoteMaterial Cost

Mil: Kyats(Mil:USD)

Construction CostMil:

Kyats(Mil:USD)

Magway Region

1. Mann- Taungdwingyi 230 kV Transmission Line (85) mile & Substations

22,324(24.804) 13,028(14.476) 2013-2014 Financial year

2. Oakshitpin- Kanma 66 kV Transmission Line (30) mile & Substations

3,600(4.000) 1,494(1.660) 2013-2014 Financial year

3.Thapyaewa-Chauk-Minbu 230 kV Transmission Line (145) mile & Substations

33,852(37.613) 10,765(11.961) 2014-2015 Financial year

4. Kyunchaung-Mann 230 kV Transmission Line (90) mile & Substations

21,780(24.200) 7,367(8.186) 2014-2015 Financial year

5. Chaungkuu 230 /66 kV, 100 MVA Substation Extension

11,072(12.302) 400(0.444) 2014-2015 Financial year

6. Taungdwingyi- Aunglan 132 kV Transmission Line (66) mile & Substations

13,487(14.986) 2,792(3.102) 2014-2015 Financial year

7. Taungdwingyi 132/66 kV, 100 MVA Substation Extension

4,161(4.623) 350(0.389) 2014-2015 Financial year

Status of Implementation of Projects (Transmission Lines & Substations),On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)

56

Page 57: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

Sr. Project NameEstimated Project Cost

NoteMaterial Cost

Mil: Kyats(Mil:USD)

Construction CostMil:

Kyats(Mil:USD)

Magway Region

8. Gangaw-Chaungkuu 230 kV Transmission Line (60) mile, Myittar- Gangaw 66 kV Transmission Line (25) mile & Substations

22,500(25.000) 6,418(7.131) 2014-2015 Financial year

9. Aunglan- Thayet 66 kV Transmission Line (10) mile & Substations

2,307(2.563) 492(0.547) 2014-2015 Financial year

10. Tanyaung- Saw 66 kV Transmission Line (45) mile & Substations 8,640(9.600) 2,008(2.231)

2014-2015 Financial year

11. Pakokku(Buddha Kone) 132/66 kV, 60 MVA Substation Extension 5,535(6.150) 1,492(1.658) 2015-2016

Financial year

149,258(165.842) 46,606(51.784)

Status of Implementation of Projects (Transmission Lines & Substations),On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)

57

Page 58: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

Status of Implementation of Projects (Transmission Lines & Substations),On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)

Sr. Project Name

Estimated Project Cost

NoteMaterial Cost

Mil: Kyats(Mil:USD)

Construction CostMil:

Kyats(Mil:USD)

Mandalay Region1. Naypyitaw 230 /33 kV, 100 MVA

Substation 4,446(4.940) 1,910(2.122) On-Going

2. Meikhtila-Taungoo 500 kV Transmission Line (146) mile

100,529(111.699)

21,608(24.009) 2012-2013 Financial year

3. Upper Yeywar-Shwesaryan 230 kV Transmission Line (80) mile & Substation Extension

15,498(17.220) 4,857(5.397) 2012-2013 Financial year

4. Myogyi-Taungtawkwin 33 kV Transmission Line (10) mile & Substation Extension

1,594(1.771) 612(0.680) 2012-2013 Financial year

5. Tagontaing 132/33 kV, 100 MVA Substation Extension

6,300(7.000) 250(0.278) 2013-2014 Financial year

6. Latpanhla 132/66 kV, 60 MVA Substation Extension

8,978(9.976) 300(0.333)

2013-2014 Financial year

7. Moegote 66/33 kV, 30 MVA Substation Extension

2013-2014 Financial year

8. Thapyaewa(Meikhtila) 500/230 kV, 500 MVA Substation

23,400(26.000) 1,000(1.111) 2014-2015 Financial year

58

Page 59: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

Status of Implementation of Projects (Transmission Lines & Substations),On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)

Sr. Project Name

Estimated Project Cost

NoteMaterial Cost

Mil: Kyats(Mil:USD)

Construction CostMil:

Kyats(Mil:USD)

Mandalay Region9. Industrial Zone 132/33 kV, 100 MVA

Substation 10,773(11.970) 438(0.487) 2014-2015

Financial year10. Tharzi 132/33 kV, 2x50 MVA Substation

Extension6,300(7.000) 450(0.500) 2014-2015

Financial year11. Aungpinlal 132/33 kV, 2x50 MVA

Substation Extension 4,500(5.000) 258(0.287) 2014-2015 Financial year

12. Chauk- Nyaung Oo 66 kV Transmission Line (28) mile & Substations

2,722(3.024) 1,396(1.551) 2014-2015 Financial year

13. Myingyan- Ngazon 66 kV Transmission Line (10) mile & Substations 2,250(2.500) 780(0.867) 2014-2015

Financial year

14. Bellin 230/33 kV, 100 MVA Substation Extension 7,380(8.200) 350(0.389) 2015-2016

Financial year

15. Thapyaewa(Meikhtila) 230/33kV, 100 MVA Substation Extension 7,380(8.200) 350(0.389) 2015-2016

Financial yearTotal Mandalay Region

202,050(224.500) 34,559(38.399)

59

Page 60: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

Sr. Project Name

Estimated Project Cost

NoteMaterial Cost

Mil: Kyats(Mil:USD)

Construction CostMil:

Kyats(Mil:USD)

Ayeyarwaddy Region1. Athoke-Pathein 230 kV Transmission

Line (40) mile & Substations18,000(20.000) 4,360(4.844) 2012-2013

Financial year2. Hlaingtharyar-Kyeiklat 230 kV

Transmission Line (30) mile & Substations

13,547(15.052) 4,329(4.810) 2013-2014 Financial year

3. Pathein-Chaungthar 66 kV Transmission Line (35) mile & Substations

2,925(3.250) 1,665(1.850) 2013-2014 Financial year

4. Pathein-Ngwesaung 66 kV Transmission Line (30) mile & Substations

2,700(3.00) 1,495(1.661) 2013-2014 Financial year

5. Pathein-Pathein(Kyotadar) 66 kV Transmission Line (7) mile & Substations

3,857(4.286) 708(0.787) 2013-2014 Financial year

6. Hinthada-Athoke 230 kV Transmission Line (80) mile & Substation Extension

20,160(22.400) 6,391(7.101) 2014-2015 Financial year

7. Oakshitpin-Hinthada 230 kV Transmission Line (95) mile & Substations

23,310(25.900) 9,375(10.417) 2014-2015 Financial year

8. Hlaintharyar-Kyeiklat 66 kV Transmission Line (30) mile & Substation Extension

3,600(4.000) 1814(2.016) 2014-2015 Financial year

Status of Implementation of Projects (Transmission Lines & Substations),On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)

60

Page 61: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

Sr. Project Name

Estimated Project Cost

NoteMaterial Cost

Mil: Kyats(Mil:USD)

Construction CostMil:

Kyats(Mil:USD)

Ayeyarwaddy Region (Contd;)9. Kyeiklat –Phyarpone 66 kV

Transmission Line (15) mile & Substations

2,307(2.563) 951(1.057) 2014-2015 Financial year

10. Kyeiklat –Bokalay 66 kV Transmission Line (35) mile & Substations

3,229(3.588) 1,635(1.817) 2014-2015 Financial year

11. Hinthada 66/11 kV, 2x10 MVA Substation Extension

3,690(4.100) 4,38(0.487) 2014-2015 Financial year

12. Hinthada-Laymyatnar 66 kV Transmission Line (15) mile & Substation Extension

1,845(2.050) 951(1.057) 2014-2015 Financial year

13. Hinthada-Danuphyu 66 kV Transmission Line (35) mile & Substation Extension

2,768(3.076) 1,635(1.817) 2014-2015 Financial year

Total (Ayeyarwaddy Region ) 101,938(113.264) 35,747(39.719)

Status of Implementation of Projects (Transmission Lines & Substations),On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)

61

Page 62: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

စဉ Project Name

Estimated Project Cost

NoteMaterial Cost

Mil: Kyats(Mil:USD)

Construction CostMil:

Kyats(Mil:USD)

Yangon Region (Contd;)1. Myaungtagar 230/33 kV, 100 MVA

Substation Extension3,301(3.668) 250(0.278) On-Going

2. Hlawgar 230/33 kV, 2x100 MVA Substation Extension

7,050(7.833) 350(0.389) On-Going

3. Hlaintharyar 230/33 kV, 100 MVA Substation Extension

3,557(3.952) 250(0.278) On-Going

4. Thaketa-East Dagon 230 kV Transmission Line (10) mile & Substations

17,370(19.300) 2,778(3.087) 2012-2013 Financial year

5. Ywarma-Hlaimgtharyar 230 kV Double Circuit Transmission Line (7) mile & Substations

4,212(4.680) 5,719(6.354) 2013-2014 Financial year

6. Ywarma230/66 kV, 100 MVA Substation Extension

7,200(8.000) 450(0.500) 2014-2015 Financial year

7. Shwelinpanm In/Out 230 kV Transmission Line (6) mile & Substations

9,612(10.680) 2,376(2.640) 2014-2015 Financial year

8. Myaungtagar-Hlaingtharyar 230 kV Transmission Line (28) mile & Substations

9,696(10.773) 1,774(1.971) 2014-2015 Financial year

Sub Total

Status of Implementation of Projects (Transmission Lines & Substations),On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)

62

Page 63: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

Status of Implementation of Projects (Transmission Lines & Substations),On-going and will be Complete d During Financial Years of (2012-2013) To (2015-2016)

စဉ Project Name

Estimated Project Cost

NoteMaterial Cost

Mil: Kyats(Mil:USD)

Construction CostMil:

Kyats(Mil:USD)

Yangon Region (Contd;)9. Thaketa-Ahlone 230 kV Transmission Line

(11) mile & Substations2,700(3.000) 752(0.836) 2014-2015

Financial year10. North Oakkala-(Hlawgar-Thaketa) 230 kV

Double Circuit Transmission Line (5) mile & Substations

14,580(16.200) 2,789(3.099) 2015-2016 Financial year

11. Hlawgar-Ywarma 230 kV Double Circuit Transmission Line (10) mile & Substations

4,860(5.400) 956(1.062) 2015-2016 Financial year

12. Thida GIS 230/66/11 kV, 2x200 MVA Substations

25,200(28.000) 2,800(3.111) 2015-2016 Financial year

13. Kamarnat-East Dagon 230 kV Double Circuit Transmission Line (40) mile & Substations

11,340(12.600) 3,285(3.650) 2015-2016 Financial year

14. Thanlyin-Thilawa 230 kV Double Circuit Transmission Line (15) mile & Substations

9,990(11.100) 5,255(5.839) 2015-2016 Financial year

15. Ahlone-Dala 230 kV Transmission Line (8) mile & Substations

8,100(9.000) 2,481(2.757) 2015-2016 Financial year

Total for Yangon Region 138,768(154.187) 32,265(35.850)

63

FOR ALL STATE & REGION TOTAL 1,392,629(1,547.366) 431,364(479.293)

1,823,993 ( 2,026.659)

Page 64: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

ShweLi(3)1050MW

ThaPyaWa

MongTon7000MW

KarmarNut

MyaungTagar

500kV ShweLi(3)- ThaPyaWa (Proposal Stage) Double Circuit Line (250)miles

500kV MongTon-Taungoo (Proposal Stage) Double Circuit Line (230)miles

500kV ThaPyaWa – Taungoo (Contracted Stage) Double Circuit Line (153.3)miles

500kV Taungoo-KamarNat (Proposal Stage) Double Circuit Line (117 )miles

500 KV Power Transmission Plan In Myanmar

500kV KamarNat-MyaungTagar (Proposal Stage) Double Circuit Line (50)miles

Taungoo

64

Page 65: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

List of Project To be Implemented by Myanma Electric Power Enterprise, Ministry of Electric Power Under (5)

Years Plan (2012-2013) To (2015-2016)

Voltage(kV)

No of Line

Line Length(km)

500 3 521

230 37 4280

132 4 237

66 51 3047

33 1 17Total 96 8102

Transmission LinesVolta

ge(kV)

No of Substati

on

Installed Capacity

(MVA)500 3 1500

230 38 4486

132 17 1370

66 66 857.5

33 - -Total 124 8213.5

Substations

65

Page 66: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

Sr. Name of Lines Length of Lines(km)

1 Myaukpyin- Shwesaryan 26

2 Yaeywar-Thapaywa 112

3 Yaeywar-Belin 39

4 Belin-Thapaywa 88

5 Hlaingthayar - Ahlone 23

288Total

The Existing High Voltage Transmission Lines with OPGW Cable

66

Page 67: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

Sr. Name of Lines Length of Lines(km)

1 Thapaywa - Thazi 27

2 Thazi - Shwemyo 121

3 Shwemyo - Pyinmana 40

4 Pyinmana - Naypyitaw 26

5 Belin - Shwesaryan 32

6 Taungdwingyi - Magwe 76

7 Magwe - Chauk 117

8 Chauk - Kyunchaung 45

9 Kyunchaung - Naungpingyi 163

10 Naungpingyi - Ohmtaw 92

11 Naungpingyi - Chaungu 108

12 Ohntaw - Belin 64

911Toatal

High Voltage Transmission Lines which were planned to replaced the existing Galvanized Steel

Earth Wire with OPGW (Upper Ring)

67

Page 68: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

Sr. Name of Lines Length of Lines(km)

1 NCC - Naypyitaw(1) 41

2 Naypyitaw(1) - Taungdwingyi 75

3 Taungdwingyi - Shwetaung 143

4 Myaungtagar - Hlaingtharyar 36

5 Myaungtagar - Hlawga 31

6 Tharyargone - Hlawga 151

7 Pyinmana - Thephyu 36

8 Thephyu - Taungoo 65

9 Taungoo - Tharyargone 97

10 Tharyargone - Khamarnet 93

11 Khamarnet - Thanlyin 98

12 Thanlyin - Tharketa 12

878Toatal

High Voltage Transmission Lines which were planned to replaced the existing Galvanized Steel Earth

Wire with OPGW (Lower Ring)

68

Page 69: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

OPGW NETWORK OF MYANMAR POWER SYSTEM69

Page 70: CURRENT SITUATION AND UPGRADING PLAN FOR MYANMAR POWER SYSTEM

THANK YOU FOR YOUR KIND ATTENTION

U Aung Kyaw OoDeputy Chief EngineerPower Transmission Project Department (PTP)Myanmar Electric Power Enterprise (MEPE)Ministry of Electric Power(MOEP)