22
Barbara Früh COSMO General Meeting, Wrolaw, Poland September 10, 2015 1 Current activities in the CLM - Community Barbara Früh Deutscher Wetterdienst COSMO General Meeting September 10, 2015 Wroclaw, Poland

Current activities in the CLM-Community€¦ · Burkhardt Rockel, HZG Cooperation between COSMO Consortium and CLM Community is highly desirable … some collaborations already exist

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Current activities in the CLM-Community€¦ · Burkhardt Rockel, HZG Cooperation between COSMO Consortium and CLM Community is highly desirable … some collaborations already exist

Barbara Früh COSMO General Meeting, Wrolaw, Poland September 10, 2015 1

Current activities in the

CLM-CommunityBarbara Früh

Deutscher Wetterdienst

COSMO General Meeting

September 10, 2015

Wroclaw, Poland

Page 2: Current activities in the CLM-Community€¦ · Burkhardt Rockel, HZG Cooperation between COSMO Consortium and CLM Community is highly desirable … some collaborations already exist

Barbara Früh COSMO General Meeting, Wrolaw, Poland September 10, 2015 2

Hans-Jürgen Panitz KIT/IMK-TRO

Overview

COPAT - Coordinated Parameter Testing - Project

Anders et al.

Status of the CLM test suite –

Rockel, Keuler, Lüthi, Will, Anders

Review article on “Convection Resolving Climate Simulation”

Prein et al.

CLM-Community issues

Page 3: Current activities in the CLM-Community€¦ · Burkhardt Rockel, HZG Cooperation between COSMO Consortium and CLM Community is highly desirable … some collaborations already exist

Barbara Früh COSMO General Meeting, Wrolaw, Poland September 10, 2015 3

COPAT - Coordinated Parameter Testing - Project

Participants

Susanne Brienen (DWD), Andrew Ferrone (LIST),

Beate Geyer (HZG), Klaus Keuler (BTU),

Daniel Lüthi (ETHZ), Anne Roches (ETHZ),

Hans-Jürgen Panitz (KIT), Meriano Mertens (DLR),

Jan-Peter Schulz (DWD), Hendrik Wouters (KUL),

Ivonne Anders (ZAMG)

Aim: Coordinated parameter testing to give a recommendation on the

parameters to the users and have an evaluated community version in the end

based on COSMO5.0 including an evaluation report

Page 4: Current activities in the CLM-Community€¦ · Burkhardt Rockel, HZG Cooperation between COSMO Consortium and CLM Community is highly desirable … some collaborations already exist

Barbara Früh COSMO General Meeting, Wrolaw, Poland September 10, 2015 4

COPAT - Coordinated Parameter Testing - Project

Model version:

COSMO5.0_clm1;

COSMO5.0_clm3a

together with int2lm2.0

Spatial resolution:

0.44° for all testruns,

0.165° for final evaluation run

Domain and Setup:

Forcing:

ERAinterim 1979-2000)

(preprocessed data available via DKRZ)

Setup for reference run

available via wiki and/or at DKRZ

Page 5: Current activities in the CLM-Community€¦ · Burkhardt Rockel, HZG Cooperation between COSMO Consortium and CLM Community is highly desirable … some collaborations already exist

Barbara Früh COSMO General Meeting, Wrolaw, Poland September 10, 2015 5

Ivonne Anders, ZAMG

COPAT - Coordinated Parameter Testing Phase 1

reference

simulation

(on own

machine if

not at DKRZ)

sensitivity run

for one

namelist

parameter

out of a list

+

Evaluate using ETOOL

PDF output

Upload the

PDF output to the

wiki+

sensitivity

runs

with

combined

most

promising

parameters

from Phase 1

Phase 2 Phase 3

Tuning

simulations

based on the

best

combined

run

from Phase 2

Final

simulation

with

recommended

parameter

setting

0.165°

Evaluation

and final

report

Page 6: Current activities in the CLM-Community€¦ · Burkhardt Rockel, HZG Cooperation between COSMO Consortium and CLM Community is highly desirable … some collaborations already exist

Barbara Früh COSMO General Meeting, Wrolaw, Poland September 10, 2015 6

Ivonne Anders, ZAMG

COPAT - Coordinated Parameter Testing - Project

All information in a redC – wiki

Phase 1

Phase 2

Phase 3Ivonne Anders, ZAMG

Page 7: Current activities in the CLM-Community€¦ · Burkhardt Rockel, HZG Cooperation between COSMO Consortium and CLM Community is highly desirable … some collaborations already exist

Barbara Früh COSMO General Meeting, Wrolaw, Poland September 10, 2015 7

Ivonne Anders, ZAMG

COPAT - Coordinated Parameter Testing - ProjectList of parameters to test

Page 8: Current activities in the CLM-Community€¦ · Burkhardt Rockel, HZG Cooperation between COSMO Consortium and CLM Community is highly desirable … some collaborations already exist

Barbara Früh COSMO General Meeting, Wrolaw, Poland September 10, 2015 8

technical test suite

based on the COSMO technical test suite by Meteo Suisse

climatological test suite

based on the starter package subchain scripts

The test suite consists of two parts

COSMO Standards for Source Code DevelopmentAppendix D: Steps of Code Development for CLM-Community Model Versions

The test suite is currently implemented on the HLRE3 „Mistral“ at DKRZ

Burkhardt Rockel, HZG

Status of the COSMO-CLM Test Suite

Page 9: Current activities in the CLM-Community€¦ · Burkhardt Rockel, HZG Cooperation between COSMO Consortium and CLM Community is highly desirable … some collaborations already exist

Barbara Früh COSMO General Meeting, Wrolaw, Poland September 10, 2015 9

name test_1

checkers The run success checker Does the model run at all?

The tolerance checkerAre the differences to the reference

version tolerable?

The identical checkerAre the results even identical to the

reference version?

The netCDF output checker Does netCDF output work?

The SAMOA checkerDo the output quantities are within

realistic limits?

names test_1r1, test_1r2

checkers The run success checker Does the restart work at all?

The restart checkerDo continuous and restarted runs

give identical results?

Restart

General

Presently implemented checks

Status Technical TS - Presently implemented checks

Burkhardt Rockel, HZG

Page 10: Current activities in the CLM-Community€¦ · Burkhardt Rockel, HZG Cooperation between COSMO Consortium and CLM Community is highly desirable … some collaborations already exist

Barbara Früh COSMO General Meeting, Wrolaw, Poland September 10, 2015 10

Continuous simulation: (takes less than 2 days at DKRZ)

Period: 10-1979 - 12-1984 (5 years + 3 months spin-up)

Domain: Europe (EURO-CORDEX domain)

Grid: 0.44 degrees

Quantities:T_2M, TOT_PREC, and more

Evaluation: (runs automatically, at the end of the simulation)

ETOOLS

o EOBS and CRU

o Graphics with ETOOL-VIS

Burkhardt Rockel, HZG

Status of the COSMO-CLM climatological Test Suite

Page 11: Current activities in the CLM-Community€¦ · Burkhardt Rockel, HZG Cooperation between COSMO Consortium and CLM Community is highly desirable … some collaborations already exist

Barbara Früh COSMO General Meeting, Wrolaw, Poland September 10, 2015 11

Climatological Test Suite:

Compare results to COSMO-CLM version which was taken as

basis for the new developed version (released version)

Implementation of additional tests

Distribute the package through RedC

Burkhardt Rockel, HZG

Status of the COSMO-CLM Test Suite

Outlook

Page 12: Current activities in the CLM-Community€¦ · Burkhardt Rockel, HZG Cooperation between COSMO Consortium and CLM Community is highly desirable … some collaborations already exist

Barbara Früh COSMO General Meeting, Wrolaw, Poland September 10, 2015 12

Andrew Ferrone, LIST

Review article on “Convection Resolving Climate Simulation”

A. F. Prein, W. Langhans, G. Fosser, A. Ferrone, N. Ban, K.

Goergen, M. Keller, M. Tölle, O. Gutjahr, F. Feser, E. Brisson, S.

Kollet, J. Schmidli, N. P. M. van Lipzig, and R. L. Leung:

A review on regional convection-permitting climate modeling:

Demonstrations, prospects, and challenges.

Rev. Geophys., 53, 323–361, doi:10.1002/2014RG000475,

2015).

Page 13: Current activities in the CLM-Community€¦ · Burkhardt Rockel, HZG Cooperation between COSMO Consortium and CLM Community is highly desirable … some collaborations already exist

Barbara Früh COSMO General Meeting, Wrolaw, Poland September 10, 2015 13

Andrew Ferrone, LIST

All CPMs improve shape

(onset and peak) of

precipitation diurnal cycle

compared to large scale

simulations but

not necessary the

amplitudes

[Fosser et al. 2014]

[Ban et al. 2014]

[Langhans et al. 2013]

[Prein el al. 2013]

[Kendon et al. 2012]

[Ban et al. 2014]

Hourly precipitation

Review article Added value of CPMs Precipitation diurnal cycle

Page 14: Current activities in the CLM-Community€¦ · Burkhardt Rockel, HZG Cooperation between COSMO Consortium and CLM Community is highly desirable … some collaborations already exist

Barbara Früh COSMO General Meeting, Wrolaw, Poland September 10, 2015 14

CLM-Community development

7 12 18 2027

38 42 44 4552

62 67

1828

46

64

89

133

159

184

201 207

241253

0

50

100

150

200

250

300

2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

Institutions

CLM-Members (total)

Page 15: Current activities in the CLM-Community€¦ · Burkhardt Rockel, HZG Cooperation between COSMO Consortium and CLM Community is highly desirable … some collaborations already exist

Barbara Früh COSMO General Meeting, Wrolaw, Poland September 10, 2015 15

CLM-Community development of publications

0

5

10

15

20

25

30

35

40

45

50

1 2 1

53

10

27

13 13

17

35

49

37

14

no

. o

f p

ub

lic

ati

on

s

annual publications

4-year average

Page 16: Current activities in the CLM-Community€¦ · Burkhardt Rockel, HZG Cooperation between COSMO Consortium and CLM Community is highly desirable … some collaborations already exist

Barbara Früh COSMO General Meeting, Wrolaw, Poland September 10, 2015 16

External parameters for COSMO (NWP) and COSMO-CLM (climate)

EXTPAR/PEP Source Code Administration (SCA) D. Lüthi

Closely cooperating Working groups

WG2/WG DYNNUM

WG3b/WG SOILVEG

Burkhardt Rockel, HZG

Cooperation between COSMO Consortium and CLM Community

is highly desirable

… some collaborations already exist

… but it could still be improved!

Page 17: Current activities in the CLM-Community€¦ · Burkhardt Rockel, HZG Cooperation between COSMO Consortium and CLM Community is highly desirable … some collaborations already exist

Barbara Früh COSMO General Meeting, Wrolaw, Poland September 10, 2015 17

CRP - Gabriel Lippmann

41, rue du Brill

4422 Belvaux

Luxembourg

http://www.crpgl.lu/index.php?id=27&L=2

CLM-Community Assembly 2015

September 29 – October 02, 2015

Page 18: Current activities in the CLM-Community€¦ · Burkhardt Rockel, HZG Cooperation between COSMO Consortium and CLM Community is highly desirable … some collaborations already exist

Barbara Früh COSMO General Meeting, Wrolaw, Poland September 10, 2015 18

Leuphania University

Lüneburg, Germany

CLM-Community Assembly 2016

September 20 – 23, 2016

Page 19: Current activities in the CLM-Community€¦ · Burkhardt Rockel, HZG Cooperation between COSMO Consortium and CLM Community is highly desirable … some collaborations already exist

Barbara Früh COSMO General Meeting, Wrolaw, Poland September 10, 2015 19

Barbara Früh

Thank you very much for your attention!!!

Page 20: Current activities in the CLM-Community€¦ · Burkhardt Rockel, HZG Cooperation between COSMO Consortium and CLM Community is highly desirable … some collaborations already exist

Barbara Früh COSMO General Meeting, Wrolaw, Poland September 10, 2015 20

Ivonne Anders, ZAMG

COPAT - Coordinated Parameter Testing

ETOOL (based on Shell, CDO and NCL)

to analyse simulation output

to compare to gridded observation data from EOBS &

reference run

to identify best setup

• subregions: from PRUDENCE for Europe (see Figure)

• measures: bias in annual cycle, correlation, Taylor

plots, Brier Skill Score

Page 21: Current activities in the CLM-Community€¦ · Burkhardt Rockel, HZG Cooperation between COSMO Consortium and CLM Community is highly desirable … some collaborations already exist

Barbara Früh COSMO General Meeting, Wrolaw, Poland September 10, 2015 21

Andrew Ferrone, LIST

Review article: Differences in Climate Change Signal & Feedback Processes Precipitation

12 km simulation 1.5 km simulation

[Kendon et al., 2014]

Increase in short-term future extreme precipitation in the 1.5 km model (flashfloods)

This is not seen in the 12 km model.

Page 22: Current activities in the CLM-Community€¦ · Burkhardt Rockel, HZG Cooperation between COSMO Consortium and CLM Community is highly desirable … some collaborations already exist

Barbara Früh COSMO General Meeting, Wrolaw, Poland September 10, 2015 22

To improve the communication

within the growing community:

CLM-Community Newsletter

- 5rthissue published in July

If you are interested in receiving,

please, send an email to:

[email protected]

CLM-Community Newsletter