                                                                 AMIT UPADHYAY     B/403, New Sangam Chs. Juhu Versova Link Rd. Andheri (W), Mumbai 400053, Maharashtra, India                                      Mobile: +91 7506744366, Email: [email protected]                                                                                                   OBJECTIVE To Work as a Solar Photovoltaic (PV) leader in a solar organization, large alternate power technology, distribution or power Generation Company, for designing of solar plants to deliver a sustainable & cost effective energy solution. PROFESSIONAL EXPERIENCE: Since Aug 2010 More than 5 Years of relevant experience in developing & designing of MW scale SPVPP. SUMMARY: Developed skills to lead the team of engineers in designing, developing SPVPP from barren land up to the connection to grid. Hands on experience to prepare the complete BOQ (Bill of quantity) along with budgeting/costing sheet of MW scale projects. Detailed Exposure & Experience on PVSYST Simulation for designing of SPVPP. Coordination of design & engineering for 132KV & 220KV switchyard in between contractor, Owner engineer’s & site representative. Worked on standardization on system designs for MW scale solar plants for techno-commercial optimization, leading to potential costs saving up to 20% of the total project investment except module cost. Apart from SPVPP designing, exposure to handle the projects as site manager, project coordinator and also as a project manager. Mahindra Susten Sep 2014 to Present Deputy Manager: System Design Leading the MW Scale projects in terms of detailed designing, conceptual planning etc. One point contact for Client/Owners Engineer from engineering department for the particular allotted projects. Satisfying to Client/Owners Engineer technically to get the final approval. Prepare Technical GTP’s of equipment’s, same GTP’s used in preparing the RFP/PR as per project requirement. Detail designing of SPVPP includes: Detailed designing of AC+DC SLD, Earthing plan and calculations Sizing calculation of cables & optimization Manage “As Built” drawings & documentation of executed projects for submitting to clients for handover purpose. Support tender /BD team in terms of engineering whenever required. Designed Projects: Special project 1MW SPVPP at Gajner in Rajasthan with String inverter along with Single axis tracking MMS. 100MW SPVPP at Mahabunagar in Telanagana for M/s Renew Power Coordination of 39MW 132KV Switchyard at Karnataka for M/s Renew Power

CURICULUM VITAE

Embed Size (px)

Citation preview

Page 1: CURICULUM VITAE

                                                                  AMIT UPADHYAY     B/403, New Sangam Chs. Juhu Versova Link Rd. Andheri (W), Mumbai 400053, Maharashtra, India                                      Mobile: +91 7506744366, Email: [email protected] 

                                                                                                     

OBJECTIVE To Work as a Solar Photovoltaic (PV) leader in a solar organization, large alternate power technology, distribution or power Generation Company, for designing of solar plants to deliver a sustainable & cost effective energy solution. PROFESSIONAL EXPERIENCE: Since Aug 2010

More than 5 Years of relevant experience in developing & designing of MW scale SPVPP. SUMMARY:

Developed skills to lead the team of engineers in designing, developing SPVPP from barren land up to the connection to grid.

Hands on experience to prepare the complete BOQ (Bill of quantity) along with budgeting/costing sheet of MW scale projects.

Detailed Exposure & Experience on PVSYST Simulation for designing of SPVPP. Coordination of design & engineering for 132KV & 220KV switchyard in between contractor,

Owner engineer’s & site representative. Worked on standardization on system designs for MW scale solar plants for techno-commercial

optimization, leading to potential costs saving up to 20% of the total project investment except module cost.

Apart from SPVPP designing, exposure to handle the projects as site manager, project coordinator and also as a project manager.

Mahindra Susten Sep 2014 to Present Deputy Manager: System Design

Leading the MW Scale projects in terms of detailed designing, conceptual planning etc. One point contact for Client/Owners Engineer from engineering department for the particular

allotted projects. Satisfying to Client/Owners Engineer technically to get the final approval. Prepare Technical GTP’s of equipment’s, same GTP’s used in preparing the RFP/PR as per

project requirement. Detail designing of SPVPP includes:

Detailed designing of AC+DC SLD, Earthing plan and calculations Sizing calculation of cables & optimization

Manage “As Built” drawings & documentation of executed projects for submitting to clients for handover purpose.

Support tender /BD team in terms of engineering whenever required. Designed Projects:

Special project 1MW SPVPP at Gajner in Rajasthan with String inverter along with Single axis tracking MMS.

100MW SPVPP at Mahabunagar in Telanagana for M/s Renew Power Coordination of 39MW 132KV Switchyard at Karnataka for M/s Renew Power

Page 2: CURICULUM VITAE

                                                                  AMIT UPADHYAY     B/403, New Sangam Chs. Juhu Versova Link Rd. Andheri (W), Mumbai 400053, Maharashtra, India                                      Mobile: +91 7506744366, Email: [email protected] 

                                                                                                     

25MW SPVPP including 132KV Switchyard at Ippatpuri in Telangana for M/s. First Solar

10MW SPVPP at Marikal in Telangana for M/s. First Solar 10MW SPVPP at Mahbubnagar in Telangana for M/s. First Solar 3X1MW SPVPP at Virudhunagar in Tamilnadu for Auto Consortium

Waaree Energies Ltd. Feb 2011 to Sep 2014 Assistant Manager: Engineering

During detailed engineering, depending on the availability of land and as per final Survey plan prepared suitable size of standard MW scale solar blocks considering minimal ohmic losses due to this operation & maintenance of solar plant will be easy in future also.

Attend technical meetings as per projects requirement, some are as follow: Technical evaluation of vendors & equipment’s Finalization of vendors as well as contractors Understand the client requirement and provide the same in cost effective manner

Finalization of equipment’s in such a way without compromising in designing but in a cost effective manner: Module, SMB, Solar cables & Inverter etc. Transformer, RMU, HT Breaker panel & AC Cables etc. Lightning protection system, Security system & earthing materials etc.

Working experience on AutoCAD for designing the layout of MW scale SPVPP including Array Layout, String Codification, DC Earthing Plan, AC+DC Trench plan etc.

Yield analysis for multiple locations for Maharashtra, Gujarat & Rajasthan region to assist the team in land selection

Lead the designing team of solar telecom tower, designed the pilot project for M/s Reliance communication Ltd. System design in such a manner without replacing any exiting equipment’s basically

done a retrofit job Physical verification & Site finalization

Sr. Engineer - Projects Dec 2011 - March 2013 Engineer - Solar PV Aug 2011 - Nov 2011 Trainee Engineer- Solar Feb 2011 - July 2011 Designed Projects:

50MW SPVPP at Ichhawar in MP for M/s. Waaneep Solar Pvt. Ltd. 25MW SPVPP at Badla in Rajasthan for M/s. Roha Dyechem Pvt. Ltd.

Designed and commissioned projects:

6MW SPVPP at Santhpur in Karnataka for M/s. Sharda Construction. 1MW SPVPP at Susner in MP for M/s. HAET Energies. 1MW SPVPP at Susner in MP for M/s. Neel Properties Pvt. Ltd. 5MW SPVPP at Susner in MP for M/s. Bhadresh Trading Corporation Ltd. 5MW SPVPP at Susner in MP for M/s. Friends Salt & Allied Industries. 5MW SPVPP phase2 at Susner in MP for M/s. Friends Salt & Allied Industries.

Page 3: CURICULUM VITAE

                                                                  AMIT UPADHYAY     B/403, New Sangam Chs. Juhu Versova Link Rd. Andheri (W), Mumbai 400053, Maharashtra, India                                      Mobile: +91 7506744366, Email: [email protected] 

                                                                                                     

2MW SPVPP at Modasa in Gujarat for M/s. Claris Lifesciences Ltd. Due to design completion in time we are able to commissioned plant in a record period in just 35 days.

5MW SPVPP at Charanka in Gujarat for M/s Avatar Solar Pvt. Ltd. 5MW SPVPP at Kolayat in Rajasthan for M/s. Greentech Pvt. Ltd. 10MW SPVPP at UNA in Gujarat for M/s. Mono Steel India Ltd. 100KW solar roof top project at Rajkot in Gujarat for M/s. VVP Engineering College.

Designed, executed and commissioned project:

Successfully executed 3MW solar project at MODASA in Gujarat in just 57 days as a Project Coordinator, Designer as well as Site Manager for M/s. Abellon Clean Energy Pvt. Ltd.

Cathodic Protection Engineering Services Aug 2010 to Dec 2010 Site Engineer

Experienced on testing of oil pipeline from protection of corrosion, used techniques were CAT (Current Attenuation Technique) & DCVG (Direct Current Voltage Gradient)

Tested oil pipeline from Patna to Mughalsarai for IOCL (Indian Oil Corporation Ltd). APPRECIATION CERTIFICATES

Got Certificate of Appreciation for handling Tech Specs & PR for items aside from my normal work from M/s Mahindra Susten.

Got Certificate of Appreciation for Special Recognition on Annual day celebration from M/s Waaree Energies Ltd.

Certificate of Appreciation in special acknowledgement for remarkable contribution in solar PV projects, As Design & Engineering team member from M/s Waaree Energy Ltd.

Certificate of Appreciation for completion of first PPA based solar project with in time from M/s Waaree Energy Ltd. as well as from our client M/s Abellon clean Energy Pvt. Ltd.

SOFTWARE SKILLS

PVSYST, AUTOCAD, CGLUX, MS PROJECT, MATLAB ACADEMIC DETAILS

Passed B.Tech in Electrical and Electronics Engineering (2006-2010) from Anand Engineering College, Agra affiliated to UPTU, Lucknow with an Aggregate of 67.3%.

Passed Senior Secondary School Examination, 2006 of the UP board with 59.4 % from T.D Inter College, Jaunpur (UP).

Passed Secondary School Examination 2004 of the UP board with 63.8 % from Nehru Balodhyan Inter College, Jaunpur (UP).