15
CUBIC Constructional Contracting Water Systems & Waste Management Zaniary 104, 55 street, Villa 39 Erbil, Kurdistan - Iraq Republic GSM Iraq: +964 (750) 4499488 GSM Iraq: +964 (750) 0158568 E-mail: [email protected] Website: www.cubiceng.com CUBIC LTD Supply Chain (Procurement and Logistics) and Subcontracts Management Water Treatment and Waste Management (Hazardous and Non-Hazardous) Design, Manufacture, Installation, Operation and Maintenance of Water Supply Systems Constructional Contracting and Drilling Service, Leasing of Vehicle and Machinery CUBIC Ltd. is an Oil & Gas Service ISO certified company established since 25th November, 2007 under the laws of the Republic of Iraq, Kurdistan Region, having its registered office in Zaniary 104, 55 Street, Villa Number 39, Erbil, Kurdistan Region of IRAQ. Ministry of Industry & Trade license registration number: (4381). Ministry of Natural Resources license registration number: (100138). ISNetworld member contractor. Key clients: Chevron Iraq, Total, Marathon Oil KDV, Hunt Oil Middle East, TAQA Global, Talisman Energy, Oil Search, Murphy Oil, Oryx Petroleum, MOL Group, REPSOL, ShaMaran Petroleum, Kalegran Ltd., HESS, Sterling Energy, KNOC and others. Address: Zaniary 104, 55 Street, Villa 39 - Erbil – KRI – Republic of Iraq GSM Iraq: +964 (750) 4499488, GSM Iraq: +964 (750) 0158568 E-mail: [email protected] , Website: www.cubiceng.com

CUBIC · Waste Management HSE Cubic’s HSE policy provides a clear indication of the objectives and plans for occupational health and safety and all personnel are trained and competent

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CUBIC · Waste Management HSE Cubic’s HSE policy provides a clear indication of the objectives and plans for occupational health and safety and all personnel are trained and competent

CUBIC

Constructional Contracting Water Systems & Waste Management

Zaniary 104, 55 street, Villa 39 Erbil, Kurdistan - Iraq Republic GSM Iraq: +964 (750) 4499488 GSM Iraq: +964 (750) 0158568 E-mail: [email protected] Website: www.cubiceng.com

CUBIC LTD Supply Chain (Procurement and Logistics) and Subcontracts Management Water Treatment and Waste Management (Hazardous and Non-Hazardous) Design, Manufacture, Installation, Operation and Maintenance of Water Supply Systems Constructional Contracting and Drilling Service, Leasing of Vehicle and Machinery

CUBIC Ltd. is an Oil & Gas Service ISO certified company established since 25th November, 2007 under the laws of the Republic of Iraq, Kurdistan Region, having its registered office in Zaniary 104, 55 Street, Villa Number 39, Erbil, Kurdistan Region of IRAQ. Ministry of Industry & Trade license registration number: (4381). Ministry of Natural Resources license registration number: (100138). ISNetworld member contractor.

Key clients: Chevron Iraq, Total, Marathon Oil KDV, Hunt Oil Middle East, TAQA Global, Talisman Energy, Oil Search, Murphy Oil, Oryx Petroleum, MOL Group, REPSOL, ShaMaran Petroleum, Kalegran Ltd., HESS, Sterling Energy, KNOC and others.

Address: Zaniary 104, 55 Street, Villa 39 - Erbil – KRI – Republic of Iraq

GSM Iraq: +964 (750) 4499488, GSM Iraq: +964 (750) 0158568

E-mail: [email protected] , Website: www.cubiceng.com

Page 2: CUBIC · Waste Management HSE Cubic’s HSE policy provides a clear indication of the objectives and plans for occupational health and safety and all personnel are trained and competent

CUBIC

Constructional Contracting Water Systems & Waste Management

Zaniary 104, 55 street, Villa 39 Erbil, Kurdistan - Iraq Republic GSM Iraq: +964 (750) 4499488 GSM Iraq: +964 (750) 0158568 E-mail: [email protected] Website: www.cubiceng.com

CUBIC LTD

About CUBIC

CUBIC group of companies is a collection of Cubic Company for constructional contracting Limited as a parent company and Cubic Enviro Company Limited for environmental services as a subsidiary company that functions as a single economic entity through a common source of control to service oil and gas sector in Iraq and Kurdistan Region. CUBIC has been founded by Aryan Effendi in 2007 under the laws of IRAQ - Kurdistan Region after a long term experience in environment, engineering and construction fields.

It had been registered as Oil & Gas Service Company with Ministry of Natural Resources (MNR) under No. 100138 to be added to vender supplier list of KRI based on the good reputation, quality and safety standards policy.

The unprecedented requirements by Oil & Gas in KRI was a big challenge to establish such a company that can offer very high quality services in a youthful region with limited sources, but Cubic could overcome this challenge by constantly improvement and using the newest technologies.

Vision & Mission

As a construction and services group operating with newest basics of safety, environment and health, we aim to implement our projects in the most economically efficient, socially responsible and environmentally acceptable way, for the benefit of our employees and clients.

We apply the same standards to our activities with Oil & Gas companies to satisfy both our commercial and ethical requirements. We strive to continuously improve our performance and to act in accordance with good oilfield practice and high standards of corporate citizenship.

Water Systems

Most often customers looking for more than the pump, the valve …etc., they are looking for the complete solution and that is why they are choosing CUBIC. Our design, construction, operation and maintenance teams are fully capable of designing, implementing, operating and maintaining complete turnkey solutions. Supplying pumps, generators, control panels, pipe networks, compact pumping units/stations are a part of CUBIC service.

Cubic gained a world class reputation by offering its services for well know international companies like; Repsol, Marathon Oil, Chevron, Hunt Oil, MOL Group, Sterling Energy, Murphy Oil, KNOC, Oryx Petroleum, TAQA, Talisman Energy and many others.

Cubic provide the required construction works to achieve the project like access roads, water pits, bridges, culverts, and intakes.

Cubic provides full package for water system construction projects like survey works, design The system, supplying materials like various types of HDPE pipes, multistage centrifugal pumps, power generators, control panels and other related equipment, construction works, commissioning works, operation works, maintenance and dismantle of water supply systems, drilling water wells, design and install evaporation systems, design and install special transfer lines for drilling waste water, water treatment.

Page 3: CUBIC · Waste Management HSE Cubic’s HSE policy provides a clear indication of the objectives and plans for occupational health and safety and all personnel are trained and competent

CUBIC

Constructional Contracting Water Systems & Waste Management

Zaniary 104, 55 street, Villa 39 Erbil, Kurdistan - Iraq Republic GSM Iraq: +964 (750) 4499488 GSM Iraq: +964 (750) 0158568 E-mail: [email protected] Website: www.cubiceng.com

WATER INTAKE WATER PUMP UNIT

Drilling water wells:

Cubic does all the survey and geology studies at the destination location, then start the drilling water wells based on the reliable information.

Water projects/contracts

Since 2007 the company got many contracts with Oil & Gas block operators in Kurdistan Region/Iraq. And implemented many important water projects like:

1. Design, construction, KC water supply facility for TTOPCO (24 Km pipeline with three booster stations). 2. Operation, maintenance and dismantle KC water supply facility for TTOPCO (24 Km pipeline with three

booster stations). 3. Design, construction, operation, maintenance and dismantle Simirt-1 water supply facility for Hunt Oil

Middle East (4 KM Direct pumping collecting water from three water wells). 4. Design, construction, operation, maintenance and dismantle Sangaw-1 water supply facility for Sterling

Energy (Two parallel 6 Km pipeline and two booster stations and four water wells).

Page 4: CUBIC · Waste Management HSE Cubic’s HSE policy provides a clear indication of the objectives and plans for occupational health and safety and all personnel are trained and competent

CUBIC

Constructional Contracting Water Systems & Waste Management

Zaniary 104, 55 street, Villa 39 Erbil, Kurdistan - Iraq Republic GSM Iraq: +964 (750) 4499488 GSM Iraq: +964 (750) 0158568 E-mail: [email protected] Website: www.cubiceng.com

5. Design, construction, operation, maintenance and dismantle Sangaw-1 water supply facility for Sterling Energy (2 Km pipeline with one booster and one water well).

6. Design, construction, operation, maintenance and dismantle Bekhme-1 water supply facility for Kalegran /MOL (8 Km pipeline and one booster station).

7. Design, construction, operation, maintenance and dismantle Sangaw South water supply facility for KNOC as a sub-contractor for Zozik (8.6 Km with four booster stations).

8. Design and construction Linnava-1 water supply facility for Murphy Oil Corporation as a sub-contractor for Millat Company (2.5 KM with two booster stations and three wells).

9. Operation and maintenance of Linavva-1 water supply facility for Murphy Oil Corporation (2.5 KM with two booster stations and three wells).

10. Design, construction, operation and maintenance Aqre-1 water supply facility for Kalegran / MOL Group (2.5 KM double pipeline with one double booster station).

11. Design, construction, operation and maintenance Simirt-2 water supply facility. for Hunt Oil Middle East (3.6 km collecting three water wells).

12. Design, construction, operation and maintenance K2/K44 water supply facility for Talisman Energy (3 Km with one booster.

13. Chevron (Design for 5 Km with 1 booster station and drilling three proposed water wells). 14. Design of Rovi-2 water supply facility for Chevron (Design for 3 Km with 1 booster station and drilling three

proposed water wells). 15. Design, construction, operation and maintenance of Maqlub-1 water supply facility for Hunt Oil (12 Km

with 3 booster stations). 16. Design, construction, operation and maintenance of K3 water supply facility for Talisman Energy (10 Km

with 2 booster stations). 17. Design, construction, operation & maintenance of DD–3, 4, 5, 6, 7, 8, 9, 10, 11 water supply facilities for

Oryx Petroleum (Norbest) Includes drilling 10 water wells. 18. Design, construction, operation & maintenance of Zewe Water supply facility for Repsol (40 Km pipeline,

16 booster station and two water wells). 19. Design, construction, operation & maintenance of Atrush block water supply facility AT4 for TAQA - (16 Km

pipeline, 8 booster station and two water wells). 20. Operation & Maintenance of CK6 water supply facility for TAQA - (10 Km pipeline, 4 booster station). 21. Design, construction, operation & maintenance of Banan#1 Water supply facility for Oryx - (4 Km pipeline,

and two water wells). 22. Design, construction, operation & maintenance of Banan#2 Water supply facility for Oryx - (5 Km

pipeline,). 23. Design, construction, operation & maintenance of AAS#1 Water supply facility for Oryx - (7 Km pipeline, 2

booster stations, and one water well). 24. Design, construction, operation & maintenance of AAS#2 Water supply facility for Oryx - (7 Km pipeline, 2

booster stations, and one water well). 25. Design, construction, operation & maintenance of AAS#2 Water supply facility for Oryx - (7 Km pipeline, 2

booster stations, and one water well). 26. Design, construction, operation & maintenance of Zeg1 Water supply facility for Oryx - (4 Km pipeline, 2

booster stations, and two water wells). Design K9 water supply facility for Talisman Energy. 27. Design Chia Surk water supply facility for Long ford Energy Inc. (Forbes & Manhattan). 28. Design, construction, operation and maintenance Simirt-3 water supply facility for Hunt Oil Middle East

(3.5 Km collecting three water wells). 29. Design & construction Bakrman-1 for Kalegran/MOL Group water supply facility (two parallel pipelines

with complete pumping units). 30. Design & construction Gulak-1 for Kalegran/MOL Group water supply facility two parallel pipelines with

complete pumping units).

Page 5: CUBIC · Waste Management HSE Cubic’s HSE policy provides a clear indication of the objectives and plans for occupational health and safety and all personnel are trained and competent

CUBIC

Constructional Contracting Water Systems & Waste Management

Zaniary 104, 55 street, Villa 39 Erbil, Kurdistan - Iraq Republic GSM Iraq: +964 (750) 4499488 GSM Iraq: +964 (750) 0158568 E-mail: [email protected] Website: www.cubiceng.com

31. Design, construction, operation and maintenance PLK10 water supply facility for Shamaran Petroleum (5 Km with one booster station).

32. Design & Construction DD–2 water supply facility for Oryx Petroleum (Norbest) - (5 Km pipeline, one booster station and three water wells).

33. Operation & Maintenance of DD–2 water supply facility for Oryx Petroleum (Norbest) - (5 Km pipeline, one booster station and three water wells).

34. Design, construction, operation and maintenance of Harir-1 water supply facility for Marathon Oil (23 Km with eight booster stations and drilling six water wells).

35. Design, construction, operation and maintenance of Taza-1 water supply facility for Oil Search (13 Km with two booster stations).

36. Design, construction, operation and maintenance of Simirt-2 evaporation system for Hunt Oil Middle East. 37. Design & construction, of Bakrman-1 evaporation system for Kalegran/MOL. 38. Design, construction, operation & maintenance of Simrit#3 Water supply facility for Hunt Oil - (6Km

pipeline). 39. Design, construction, operation & maintenance of Simrit#4 Water supply facility for Hunt Oil - (5Km

pipeline). 40. Design, construction, operation & maintenance of Mirawa#1 water supply facility for Marathon Oil - (10Km

pipeline, 6 booster stations, and two water wells). 41. Design, construction, operation & maintenance of Mirawa#2 Water supply facility for Marathon Oil -

(13Km pipeline, 10 booster stations, and two water wells). 42. Design, construction, operation & maintenance of Jisik#1 Water supply facility for Marathon Oil - (8Km

pipeline, 4 booster stations, and one water wells). 43. Design, construction, of BOP & ABC water supply facility for TAQA - (1 Km pipeline, 2 water wells, and one

booster pump package). Km pipeline, 10 booster stations, and four water wells). 44. Design Maqlub#1 Water supply facility for Hunt Oil - (16 Km pipeline, 6 booster stations, and three water

wells). 45. Design, construction, operation & maintenance of Simrit#1 Water supply facility for Hunt Oil - (3 Km

pipeline, three water wells). 46. Design, construction, operation & maintenance of Simrit#2 Water supply facility for Hunt Oil - (5Km

pipeline, three water wells). 47. Design, construction, operation and maintenance of Safin-1 water supply facility for Marathon Oil (24 Km

with 12 booster stations and drilling three water wells). 48. Design, construction, of BOP & ABC water supply facility for TAQA - (1 Km pipeline, 2 water wells, and one

booster pump package).

AND MANY MORE CONTRACTS, PURCHASE ORDERS & SERVISE ORDERS

Page 6: CUBIC · Waste Management HSE Cubic’s HSE policy provides a clear indication of the objectives and plans for occupational health and safety and all personnel are trained and competent

CUBIC

Constructional Contracting Water Systems & Waste Management

Zaniary 104, 55 street, Villa 39 Erbil, Kurdistan - Iraq Republic GSM Iraq: +964 (750) 4499488 GSM Iraq: +964 (750) 0158568 E-mail: [email protected] Website: www.cubiceng.com

Waste Management

Cubic Group is specialized in integrated waste management, especially providing efficient incinerators with complete operation and maintenance services. Collecting all types of waste using industrial color coded skips and skip loaders, transport waste to recycling destination, transport waste and cutting from the drilling area and supply black water treatment units.

Cubic Group treats the contaminated soil based on testing a sample of contaminating material to decide chemical treatment or incinerating the contaminated soil by special fitted incinerator to get soil free of contamination and represents the incinerator manufacturers in Iraq and Arabian Gulf for wide range of incinerators like Self-Contained & Mobile Incinerators, Animal Cremation, and all other types of Waste Incinerators.

Cubic cleans the cuttings pits by treating the hazardous materials then disposes/moves remain sludge in safe way.

Cubic Co. is keen to use the newest techniques that are environmentally friendly without any negative impact on it, so Cubic makes waste water treatment units as recommended by international standards, and installed many unites at Oil &Gas development locations throughout KRI.

Page 7: CUBIC · Waste Management HSE Cubic’s HSE policy provides a clear indication of the objectives and plans for occupational health and safety and all personnel are trained and competent

CUBIC

Constructional Contracting Water Systems & Waste Management

Zaniary 104, 55 street, Villa 39 Erbil, Kurdistan - Iraq Republic GSM Iraq: +964 (750) 4499488 GSM Iraq: +964 (750) 0158568 E-mail: [email protected] Website: www.cubiceng.com

Waste management projects/contracts

Cubic performed many waste management services and projects in Kurdistan:

1. Repsol-Zewe#1 project/Suly block.

Provide one skid mounted Incinerator brand new, Including all spares and equipment required for maintenance and operators.

Provide Vehicle (Skip Loader) to transport skips from drill site/rig camp/OPF camp to the incinerator.

Provide 10 Skips with closable lids.

Provide two tote tanks.

Provision of weighting scales, recycling stations, pamphlets, plastic bags.

2. Repsol-Binary Serwan#1 project/Suly block.

Provide one skid mounted Incinerator brand new, Including all spares and equipment required for maintenance and operators.

Provide Vehicle (Skip Loader) to transport skips from drill site/rig camp/OPF camp to the incinerator.

Provide 11 Skips with closable lids.

Provide four tote tanks.

Provision of weighting scales, recycling stations, pamphlets, plastic bags.

3. Oryx-DD#2, DD3, DD4, DD5, DD6, DD7, DD8, DD9, DD10, DD11, DD Production projects/Erbil block.

Provide one skid mounted Incinerator brand new, Including all spares and equipment required for maintenance and operators.

Provide Vehicle to remove waste from drill site/rig camp/OPF camp to the incinerator.

Provide 8 Skips with closable lids.

Provide black water treatment unit, capacity 50 m3/day

Provide vacuum truck.

4. Oryx-AAS#1, AAS#2 projects/Duhook block.

Provide one skid mounted Incinerator brand new, Including all spares and equipment required for maintenance and operators.

Provide Vehicle to remove waste from drill site/rig camp/OPF camp to the incinerator.

Page 8: CUBIC · Waste Management HSE Cubic’s HSE policy provides a clear indication of the objectives and plans for occupational health and safety and all personnel are trained and competent

CUBIC

Constructional Contracting Water Systems & Waste Management

Zaniary 104, 55 street, Villa 39 Erbil, Kurdistan - Iraq Republic GSM Iraq: +964 (750) 4499488 GSM Iraq: +964 (750) 0158568 E-mail: [email protected] Website: www.cubiceng.com

5. KNOC - Mass, project/Suly block.

Provide one skid mounted Incinerator brand new, Including all spares and equipment required for maintenance and operators.

Provide 3 Skips with closable lids.

6. Chevron - Sarta project/Erbil block.

Provide one skid mounted Incinerator brand new, Including all spares and equipment required for maintenance and operators.

Provide Vehicle (Skip Loader) to transport skips from drill site/rig camp/OPF camp to the incinerator.

Provide 30 Skips with closable lids.

7. Chevron-Rovi project/Duhok block.

Provide one skid mounted Incinerator brand new, Including all spares and equipment required for maintenance and operators.

Provide Vehicle (Skip Loader) to transport skips from drill site/rig camp/OPF camp to the incinerator.

Provide 28 Skips with closable lids.

8. HuntOil-Maqloub project/Duhok block.

Provide one skid mounted Incinerator, Including all spares and equipment required for maintenance and operators.

Ash Skip with closable lids

9. TAQA-Atrush project/Duhok block.

Provide black water treatment unit, capacity 50 m3/day

10. Oryx-Banan#1, Banan#2 projects/Erbil block.

Provide one skid mounted Incinerator brand new, Including all spares and equipment required for maintenance and operators.

Provide Vehicle to remove waste from drill site/rig camp/OPF camp to the incinerator.

Provide 10 Skips with closable lids.

Provide black water treatment unit, capacity 50 m3/day

Provide vacuum truck

AND MANY MORE CONTRACTS, PURCHASE ORDERS & SERVISE ORDERS

Page 9: CUBIC · Waste Management HSE Cubic’s HSE policy provides a clear indication of the objectives and plans for occupational health and safety and all personnel are trained and competent

CUBIC

Constructional Contracting Water Systems & Waste Management

Zaniary 104, 55 street, Villa 39 Erbil, Kurdistan - Iraq Republic GSM Iraq: +964 (750) 4499488 GSM Iraq: +964 (750) 0158568 E-mail: [email protected] Website: www.cubiceng.com

Construction Projects:

Since 2007 the company got many contracts with Oil & Gas block operators in Kurdistan Region/Iraq. And implemented many important projects like:

1. Basrima preparation and pavement road for Marathon oil. 2. Site renovation, building the water pits, flare pits, and wastewater pits of Zeg for Oryx petroleum. 3. Constructing the water pits, flare pits, and wastewater pits of Banan1, Banan2, AAS1, and AAS2 for

Oryx petroleum. 4. Constructing the water pits, flare pits, and wastewater pits of DD for Oryx petroleum. 5. 12 Schools renovation of Bassirma district for Marathon Oil. 6. Library and conference hall renovation of Bassirma district for Marathon Oil. 7. Design and construction of Pumping Stations of Harir-1 water supply facility for Marathon Oil. 8. Design and construction of Pumping Stations of Taza-1 water supply facility for Oil Search. 9. Design and construction of Pumping Stations of Safin-1 water supply facility for Marathon Oil. 10. Design and construction of Pumping Stations of Sarta-2 water supply facility for Chevron. 11. Design and construction of Pumping Stations of K3 water supply facility for Talisman Energy. 12. Design and construction of Pumping Stations of DD–3, 4, 5, 6, 7, 8, 9, 10, 11 water supply facilities for

Oryx Petroleum (Norbest). 13. Design and construction of Pumping Stations of Zewe Water supply facility for Repsol. 14. Design and construction of Pumping Stations of Atrush

Construction Projects

Page 10: CUBIC · Waste Management HSE Cubic’s HSE policy provides a clear indication of the objectives and plans for occupational health and safety and all personnel are trained and competent

CUBIC

Constructional Contracting Water Systems & Waste Management

Zaniary 104, 55 street, Villa 39 Erbil, Kurdistan - Iraq Republic GSM Iraq: +964 (750) 4499488 GSM Iraq: +964 (750) 0158568 E-mail: [email protected] Website: www.cubiceng.com

Consultancy Services:

We provide under these services mainly specialized and experienced personnel to assist and help our customers in their operations of exploration and production, the following are our main field of expertise:

• Logistics Expert and Logistics Operations Personnel.

• Production Expert and Production Field Personnel.

• Drilling Expert and Drilling Field Personnel.

• Environmental Expert and Environmental site assessment.

Logistics & Procurement Services

• All procurement services in General

• Provide Vehicles & Equipment

• Provide Tower Lights & related tools

• Provide Power Generator& Transformers

• Provide Transportation Services

• Provide labor and rental equipment

Commitment to Quality

All our systems are bespoke and designed to suit the client’s exact requirements. We insist on using only the highest grade materials and parts at every stage of construction, allowing us to offer the highest quality products available. The quality and durability of all our equipment makes them ideal for the harshest and most demanding environments the world has to offer.

Cubic Group works throughout KRI in various environments and familiar with the international organizations and companies requirements, and this knowledge came after many projects achieved in various locations.

Page 11: CUBIC · Waste Management HSE Cubic’s HSE policy provides a clear indication of the objectives and plans for occupational health and safety and all personnel are trained and competent

CUBIC

Constructional Contracting Water Systems & Waste Management

Zaniary 104, 55 street, Villa 39 Erbil, Kurdistan - Iraq Republic GSM Iraq: +964 (750) 4499488 GSM Iraq: +964 (750) 0158568 E-mail: [email protected] Website: www.cubiceng.com

HSE

Cubic’s HSE policy provides a clear indication of the objectives and plans for occupational health and safety and all personnel are trained and competent for their assigned tasks considering the safety, health & environments principles, Cubic Group has a training and competency program in place prior to commencement of the work.

Cubic is an ISO certified company since June 2013;

• ISO 9001:2008

• ISO14001:2004

• OHSAS 18001:2007

Samples of different certificates

ISO 9001:2008 ISO14001:2004 ISO OHSAS 18001:2007 Certificates

Page 12: CUBIC · Waste Management HSE Cubic’s HSE policy provides a clear indication of the objectives and plans for occupational health and safety and all personnel are trained and competent

CUBIC

Constructional Contracting Water Systems & Waste Management

Zaniary 104, 55 street, Villa 39 Erbil, Kurdistan - Iraq Republic GSM Iraq: +964 (750) 4499488 GSM Iraq: +964 (750) 0158568 E-mail: [email protected] Website: www.cubiceng.com

From STERLING ENERGY From TAQA GLOBAL

TTOPCO Certificates

Page 13: CUBIC · Waste Management HSE Cubic’s HSE policy provides a clear indication of the objectives and plans for occupational health and safety and all personnel are trained and competent

CUBIC

Constructional Contracting Water Systems & Waste Management

Zaniary 104, 55 street, Villa 39 Erbil, Kurdistan - Iraq Republic GSM Iraq: +964 (750) 4499488 GSM Iraq: +964 (750) 0158568 E-mail: [email protected] Website: www.cubiceng.com

TAQA Certificate Hunt Oil Certificate

Page 14: CUBIC · Waste Management HSE Cubic’s HSE policy provides a clear indication of the objectives and plans for occupational health and safety and all personnel are trained and competent

CUBIC

Constructional Contracting Water Systems & Waste Management

Zaniary 104, 55 street, Villa 39 Erbil, Kurdistan - Iraq Republic GSM Iraq: +964 (750) 4499488 GSM Iraq: +964 (750) 0158568 E-mail: [email protected] Website: www.cubiceng.com

Cubic has developed a world class reputation for developing solutions for companies like:

Hunt Oil Middle East HKN Energy ShaMaran Chevron Total

Sterling Energy KNOC MOL MARATHON OIL Talisman Energy

DNO REPSOL HESS Oil Search

Oryx Petroleum TAQA GLOBAL Murphy Oil

Page 15: CUBIC · Waste Management HSE Cubic’s HSE policy provides a clear indication of the objectives and plans for occupational health and safety and all personnel are trained and competent

CUBIC

Constructional Contracting Water Systems & Waste Management

Zaniary 104, 55 street, Villa 39 Erbil, Kurdistan - Iraq Republic GSM Iraq: +964 (750) 4499488 GSM Iraq: +964 (750) 0158568 E-mail: [email protected] Website: www.cubiceng.com

Address: Zaniary 104, 55 Street, Villa 39 - Erbil – KRI – Republic of Iraq

GSM Iraq: +964 (750) 4499488, GSM Iraq: +964 (750) 0158568

E-mail: [email protected], Website: www.cubiceng.com