CU POWERHOUSE OPTIMIZATION

PAUL C. CALDARA, P.E.

Engineer, Energy Section Colorado Department of Regulatory Agencies Public Utilities Commission 1560 Broadway, Suite 250 Denver, CO 80202

Page 2: CU POWERHOUSE OPTIMIZATION - Utility Exchange · 2017. 10. 10. · powerhouse switchgear panel 24 . synchroscope 25 . turbine controls 26 . absorption chiller 27 . absorption chiller

PRESENTER’S BACKGROUND

• PROFESSIONAL ENGINEER ON STAFF, COLORADO PUC, 2008 TO PRESENT

• MANAGER, UTILITY SERVICES, UNIVERSITY OF COLORADO AT BOULDER, 2000 – 2008

• ENGINEER, MARKETING, XCEL ENERGY, 1990 – 2000

2

Page 3: CU POWERHOUSE OPTIMIZATION - Utility Exchange · 2017. 10. 10. · powerhouse switchgear panel 24 . synchroscope 25 . turbine controls 26 . absorption chiller 27 . absorption chiller

BY THE WAY….

• ONLY THE COMMISSION SPEAKS FOR THE COMMISSION. STAFF CAN PROVIDE STAFF’S OPINION.

• THE DRAWINGS AND INFORMATION IN THE PRESENTATION ARE FOR ILLUSTRATIVE PURPOSES AND MAY NOT BE PRECISELY ACCURATE.

3

Page 4: CU POWERHOUSE OPTIMIZATION - Utility Exchange · 2017. 10. 10. · powerhouse switchgear panel 24 . synchroscope 25 . turbine controls 26 . absorption chiller 27 . absorption chiller

WHAT YOU NEED TO KNOW:

•PRIORITIES:

1) SAFETY

2) RELIABILITY

3) ECONOMICS

4

Page 5: CU POWERHOUSE OPTIMIZATION - Utility Exchange · 2017. 10. 10. · powerhouse switchgear panel 24 . synchroscope 25 . turbine controls 26 . absorption chiller 27 . absorption chiller

CAMPUS LOAD

• ELECTRICITY: 20mW, 120,000,000 kWh annually.

• STEAM: 150,000 lbs/hr winter steam load.

• CHILLED WATER: 3,300 tons, peaks in summer.

5

Page 6: CU POWERHOUSE OPTIMIZATION - Utility Exchange · 2017. 10. 10. · powerhouse switchgear panel 24 . synchroscope 25 . turbine controls 26 . absorption chiller 27 . absorption chiller

PURPA

• PUBLIC UTILITIES REGULATORY POLICY ACT,1978.

• ENCOURAGED THE DEVELOPMENT OF COGENERATION FACILITIES, AND PROVIDES THAT UTILITIES WOULD BE REQUIRED TO PURCHASE ELECTRICITY FROM, AND PROVIDE BACK-UP POWER TO CO-GENERATORS AT NON-DISCRIMINATORY RATES.

• CO-GENERATORS ARE EXEMPT FROM REGULATION AS PUBLIC UTILITIES.

• ELECTRIC UTILITIES ARE REQUIRED TO INTERCONNECT AND OPERATE IN PARALLEL WITH COGENERATION FACILITIES.

6

Page 7: CU POWERHOUSE OPTIMIZATION - Utility Exchange · 2017. 10. 10. · powerhouse switchgear panel 24 . synchroscope 25 . turbine controls 26 . absorption chiller 27 . absorption chiller

CO-GENERATION

7

CAMPUS LOAD: ELECTRICITY, STEAM, CHILLED WATER

Page 8: CU POWERHOUSE OPTIMIZATION - Utility Exchange · 2017. 10. 10. · powerhouse switchgear panel 24 . synchroscope 25 . turbine controls 26 . absorption chiller 27 . absorption chiller

CO-GENERATION

8

Page 9: CU POWERHOUSE OPTIMIZATION - Utility Exchange · 2017. 10. 10. · powerhouse switchgear panel 24 . synchroscope 25 . turbine controls 26 . absorption chiller 27 . absorption chiller

CO-GENERATION

9

Page 10: CU POWERHOUSE OPTIMIZATION - Utility Exchange · 2017. 10. 10. · powerhouse switchgear panel 24 . synchroscope 25 . turbine controls 26 . absorption chiller 27 . absorption chiller

CO-GENERATION

10

Page 11: CU POWERHOUSE OPTIMIZATION - Utility Exchange · 2017. 10. 10. · powerhouse switchgear panel 24 . synchroscope 25 . turbine controls 26 . absorption chiller 27 . absorption chiller

CO-GENERATION

11

Page 12: CU POWERHOUSE OPTIMIZATION - Utility Exchange · 2017. 10. 10. · powerhouse switchgear panel 24 . synchroscope 25 . turbine controls 26 . absorption chiller 27 . absorption chiller

CO-GENERATION

12

Page 13: CU POWERHOUSE OPTIMIZATION - Utility Exchange · 2017. 10. 10. · powerhouse switchgear panel 24 . synchroscope 25 . turbine controls 26 . absorption chiller 27 . absorption chiller

CO-GENERATION

13

Page 14: CU POWERHOUSE OPTIMIZATION - Utility Exchange · 2017. 10. 10. · powerhouse switchgear panel 24 . synchroscope 25 . turbine controls 26 . absorption chiller 27 . absorption chiller

EQUIPMENT

• TWO BOILERS: 130,000 lbs/hr AND 100,000 lbs/hr

• TWO 16 mW GAS COMBUSTION TURBINES

• TWO 80,000 lbs/hr HEAT RECOVERY STEAM GENERATORS

• 1 mW STEAM TURBINE

• THREE ABSORPTION CHILLERS

• THREE UTILITY FEEDERS

• ELECTRIC SWITCHGEAR

14

Page 15: CU POWERHOUSE OPTIMIZATION - Utility Exchange · 2017. 10. 10. · powerhouse switchgear panel 24 . synchroscope 25 . turbine controls 26 . absorption chiller 27 . absorption chiller

CIRCA 1910

15

Page 16: CU POWERHOUSE OPTIMIZATION - Utility Exchange · 2017. 10. 10. · powerhouse switchgear panel 24 . synchroscope 25 . turbine controls 26 . absorption chiller 27 . absorption chiller

CIRCA 1920-1930

16

Page 17: CU POWERHOUSE OPTIMIZATION - Utility Exchange · 2017. 10. 10. · powerhouse switchgear panel 24 . synchroscope 25 . turbine controls 26 . absorption chiller 27 . absorption chiller

CIRCA 1960

17

Page 18: CU POWERHOUSE OPTIMIZATION - Utility Exchange · 2017. 10. 10. · powerhouse switchgear panel 24 . synchroscope 25 . turbine controls 26 . absorption chiller 27 . absorption chiller

PRESENT DAY

18

Page 19: CU POWERHOUSE OPTIMIZATION - Utility Exchange · 2017. 10. 10. · powerhouse switchgear panel 24 . synchroscope 25 . turbine controls 26 . absorption chiller 27 . absorption chiller

SWITCHGEAR VAULT

19

Page 20: CU POWERHOUSE OPTIMIZATION - Utility Exchange · 2017. 10. 10. · powerhouse switchgear panel 24 . synchroscope 25 . turbine controls 26 . absorption chiller 27 . absorption chiller

13 kV SWITCHGEAR

20

Page 21: CU POWERHOUSE OPTIMIZATION - Utility Exchange · 2017. 10. 10. · powerhouse switchgear panel 24 . synchroscope 25 . turbine controls 26 . absorption chiller 27 . absorption chiller

13 kV SWITCHGEAR

21

Page 22: CU POWERHOUSE OPTIMIZATION - Utility Exchange · 2017. 10. 10. · powerhouse switchgear panel 24 . synchroscope 25 . turbine controls 26 . absorption chiller 27 . absorption chiller

13 kV SWITCHGEAR

22

Page 23: CU POWERHOUSE OPTIMIZATION - Utility Exchange · 2017. 10. 10. · powerhouse switchgear panel 24 . synchroscope 25 . turbine controls 26 . absorption chiller 27 . absorption chiller

MONITORING “THE BOARDS”

23

Page 24: CU POWERHOUSE OPTIMIZATION - Utility Exchange · 2017. 10. 10. · powerhouse switchgear panel 24 . synchroscope 25 . turbine controls 26 . absorption chiller 27 . absorption chiller

POWERHOUSE SWITCHGEAR PANEL

24

Page 25: CU POWERHOUSE OPTIMIZATION - Utility Exchange · 2017. 10. 10. · powerhouse switchgear panel 24 . synchroscope 25 . turbine controls 26 . absorption chiller 27 . absorption chiller

SYNCHROSCOPE

25

Page 26: CU POWERHOUSE OPTIMIZATION - Utility Exchange · 2017. 10. 10. · powerhouse switchgear panel 24 . synchroscope 25 . turbine controls 26 . absorption chiller 27 . absorption chiller

TURBINE CONTROLS

26

Page 27: CU POWERHOUSE OPTIMIZATION - Utility Exchange · 2017. 10. 10. · powerhouse switchgear panel 24 . synchroscope 25 . turbine controls 26 . absorption chiller 27 . absorption chiller

ABSORPTION CHILLER

27

Page 28: CU POWERHOUSE OPTIMIZATION - Utility Exchange · 2017. 10. 10. · powerhouse switchgear panel 24 . synchroscope 25 . turbine controls 26 . absorption chiller 27 . absorption chiller

ABSORPTION CHILLER

28

Page 29: CU POWERHOUSE OPTIMIZATION - Utility Exchange · 2017. 10. 10. · powerhouse switchgear panel 24 . synchroscope 25 . turbine controls 26 . absorption chiller 27 . absorption chiller

COMBUSTION GAS TURBINE

29

Page 30: CU POWERHOUSE OPTIMIZATION - Utility Exchange · 2017. 10. 10. · powerhouse switchgear panel 24 . synchroscope 25 . turbine controls 26 . absorption chiller 27 . absorption chiller

OUTSIDE OF TURBINE

30

Page 31: CU POWERHOUSE OPTIMIZATION - Utility Exchange · 2017. 10. 10. · powerhouse switchgear panel 24 . synchroscope 25 . turbine controls 26 . absorption chiller 27 . absorption chiller

TURBINE EXHAUST STACKS

31

Page 32: CU POWERHOUSE OPTIMIZATION - Utility Exchange · 2017. 10. 10. · powerhouse switchgear panel 24 . synchroscope 25 . turbine controls 26 . absorption chiller 27 . absorption chiller

COMBUSTION GAS TURBINE

32

Page 33: CU POWERHOUSE OPTIMIZATION - Utility Exchange · 2017. 10. 10. · powerhouse switchgear panel 24 . synchroscope 25 . turbine controls 26 . absorption chiller 27 . absorption chiller

GENERATOR END OF TURBINE

33

Page 34: CU POWERHOUSE OPTIMIZATION - Utility Exchange · 2017. 10. 10. · powerhouse switchgear panel 24 . synchroscope 25 . turbine controls 26 . absorption chiller 27 . absorption chiller

STEAM BOILER

34

Page 35: CU POWERHOUSE OPTIMIZATION - Utility Exchange · 2017. 10. 10. · powerhouse switchgear panel 24 . synchroscope 25 . turbine controls 26 . absorption chiller 27 . absorption chiller

STEAM BOILER, NATURAL GAS FLAME

35

Page 36: CU POWERHOUSE OPTIMIZATION - Utility Exchange · 2017. 10. 10. · powerhouse switchgear panel 24 . synchroscope 25 . turbine controls 26 . absorption chiller 27 . absorption chiller

STEAM BOILER, LOOKING UP

36

Page 37: CU POWERHOUSE OPTIMIZATION - Utility Exchange · 2017. 10. 10. · powerhouse switchgear panel 24 . synchroscope 25 . turbine controls 26 . absorption chiller 27 . absorption chiller

HRSG, LOOKING UP

37

Page 38: CU POWERHOUSE OPTIMIZATION - Utility Exchange · 2017. 10. 10. · powerhouse switchgear panel 24 . synchroscope 25 . turbine controls 26 . absorption chiller 27 . absorption chiller

PUMPS EVERYWHERE

38

Page 39: CU POWERHOUSE OPTIMIZATION - Utility Exchange · 2017. 10. 10. · powerhouse switchgear panel 24 . synchroscope 25 . turbine controls 26 . absorption chiller 27 . absorption chiller

• CO-GENERATION CAN INCREASE EFFICIENCY

BUT CAN ADD COMPLEXITY.

• THE SIZING OF EQUIPMENT IS IMPORTANT

BECAUSE YOU LIVE WITH YOUR DECISIONS FOR

A LONG TIME.

• THE MORE OPTIONS YOU HAVE TO SERVE LOAD,

THE MORE COMPLEX TO FIND TRUE

OPTIMIZATION.

39

Page 40: CU POWERHOUSE OPTIMIZATION - Utility Exchange · 2017. 10. 10. · powerhouse switchgear panel 24 . synchroscope 25 . turbine controls 26 . absorption chiller 27 . absorption chiller

• ALWAYS THINK BROADLY WHEN THINKING OF ENERGY AND ENERGY EFFICIENCY.

• LOOK FOR UNINTENDED CONSEQUENCES.

• REMEMBER YOUR PRIORITIES OF SAFETY, RELIABILITY, AND THEN ECONOMICS/EFFICIENCY.

40

Page 41: CU POWERHOUSE OPTIMIZATION - Utility Exchange · 2017. 10. 10. · powerhouse switchgear panel 24 . synchroscope 25 . turbine controls 26 . absorption chiller 27 . absorption chiller

THANK YOU