CU POWERHOUSE OPTIMIZATION
PAUL C. CALDARA, P.E.
Engineer, Energy Section Colorado Department of Regulatory Agencies Public Utilities Commission 1560 Broadway, Suite 250 Denver, CO 80202
PRESENTER’S BACKGROUND
• PROFESSIONAL ENGINEER ON STAFF, COLORADO PUC, 2008 TO PRESENT
• MANAGER, UTILITY SERVICES, UNIVERSITY OF COLORADO AT BOULDER, 2000 – 2008
• ENGINEER, MARKETING, XCEL ENERGY, 1990 – 2000
2
BY THE WAY….
• ONLY THE COMMISSION SPEAKS FOR THE COMMISSION. STAFF CAN PROVIDE STAFF’S OPINION.
• THE DRAWINGS AND INFORMATION IN THE PRESENTATION ARE FOR ILLUSTRATIVE PURPOSES AND MAY NOT BE PRECISELY ACCURATE.
3
WHAT YOU NEED TO KNOW:
•PRIORITIES:
1) SAFETY
2) RELIABILITY
3) ECONOMICS
4
CAMPUS LOAD
• ELECTRICITY: 20mW, 120,000,000 kWh annually.
• STEAM: 150,000 lbs/hr winter steam load.
• CHILLED WATER: 3,300 tons, peaks in summer.
5
PURPA
• PUBLIC UTILITIES REGULATORY POLICY ACT,1978.
• ENCOURAGED THE DEVELOPMENT OF COGENERATION FACILITIES, AND PROVIDES THAT UTILITIES WOULD BE REQUIRED TO PURCHASE ELECTRICITY FROM, AND PROVIDE BACK-UP POWER TO CO-GENERATORS AT NON-DISCRIMINATORY RATES.
• CO-GENERATORS ARE EXEMPT FROM REGULATION AS PUBLIC UTILITIES.
• ELECTRIC UTILITIES ARE REQUIRED TO INTERCONNECT AND OPERATE IN PARALLEL WITH COGENERATION FACILITIES.
6
CO-GENERATION
7
CAMPUS LOAD: ELECTRICITY, STEAM, CHILLED WATER
CO-GENERATION
8
CO-GENERATION
9
CO-GENERATION
10
CO-GENERATION
11
CO-GENERATION
12
CO-GENERATION
13
EQUIPMENT
• TWO BOILERS: 130,000 lbs/hr AND 100,000 lbs/hr
• TWO 16 mW GAS COMBUSTION TURBINES
• TWO 80,000 lbs/hr HEAT RECOVERY STEAM GENERATORS
• 1 mW STEAM TURBINE
• THREE ABSORPTION CHILLERS
• THREE UTILITY FEEDERS
• ELECTRIC SWITCHGEAR
14
CIRCA 1910
15
CIRCA 1920-1930
16
CIRCA 1960
17
PRESENT DAY
18
SWITCHGEAR VAULT
19
13 kV SWITCHGEAR
20
13 kV SWITCHGEAR
21
13 kV SWITCHGEAR
22
MONITORING “THE BOARDS”
23
POWERHOUSE SWITCHGEAR PANEL
24
SYNCHROSCOPE
25
TURBINE CONTROLS
26
ABSORPTION CHILLER
27
ABSORPTION CHILLER
28
COMBUSTION GAS TURBINE
29
OUTSIDE OF TURBINE
30
TURBINE EXHAUST STACKS
31
COMBUSTION GAS TURBINE
32
GENERATOR END OF TURBINE
33
STEAM BOILER
34
STEAM BOILER, NATURAL GAS FLAME
35
STEAM BOILER, LOOKING UP
36
HRSG, LOOKING UP
37
PUMPS EVERYWHERE
38
• CO-GENERATION CAN INCREASE EFFICIENCY
BUT CAN ADD COMPLEXITY.
• THE SIZING OF EQUIPMENT IS IMPORTANT
BECAUSE YOU LIVE WITH YOUR DECISIONS FOR
A LONG TIME.
• THE MORE OPTIONS YOU HAVE TO SERVE LOAD,
THE MORE COMPLEX TO FIND TRUE
OPTIMIZATION.
39
• ALWAYS THINK BROADLY WHEN THINKING OF ENERGY AND ENERGY EFFICIENCY.
• LOOK FOR UNINTENDED CONSEQUENCES.
• REMEMBER YOUR PRIORITIES OF SAFETY, RELIABILITY, AND THEN ECONOMICS/EFFICIENCY.
40
THANK YOU