CTC work packages report Nuria Catalan Lasheras BE/RF 28.05.2013

CTC work packages report

Embed Size (px)

DESCRIPTION

CTC work packages report. Nuria Catalan Lasheras BE/ RF 28.05.2013. Outline. Timeline and text report Work package list and contacts Warm Magnets Wigglers … Next steps. Timeline. Visual presentation of a work package separated in different tasks BLUE: Paper study Requirements - PowerPoint PPT Presentation

Citation preview

Page 1: CTC work packages report

CTC work packages report

Nuria Catalan Lasheras BE/RF

28.05.2013

Page 2: CTC work packages report

Outline

• Timeline and text report• Work package list and contacts

• Warm Magnets• Wigglers• …

• Next steps

Page 3: CTC work packages report

Timeline

• Visual presentation of a work package separated in different tasks

• BLUE: Paper study• Requirements• Design, CDR, TDR• Analysis of measurements and Optimization

• GREEN: Production• Procurement of parts• Prototype procurement• Measurement bench construction• Assembly

• ORANGE: Tests and measurements• In the lab• In the beam

Page 4: CTC work packages report

Milestones and deliverables

• BLUE: Drawings, thesis, papers• GREEN: Hardware• ORANGE: Reports and final validation

2009 2010 2011 2012My favorit project

Design of piece Prototype manufacturing and assembly Laboratory tests Analysis and optimizationReport

DrawingsParts

procurement Prototype Report

2013 2014 2015 2016

Analysis and optimization Full scale model Lab tests Beam tests Analysis

Review Final product Final report

Page 5: CTC work packages report

Disclaimer• Work in progress. Lots of corrections still going on in

all work packages• Time granularity is three months and some milestones

are taken from the past. Are they still valid?• Some tasks missing. Still on going?• Nevertheless allows a quick visualization of the status

and comparison between tasks• By the end of June, this “photograph” shall be

accurate for all past activities• Presented in order of accuracy. You can stop me at

any time…

Page 6: CTC work packages report

List of CTC packages# Package Responsible Status of the Status

001 DR SC Wiggler P. Ferracin Draft sent for review

002 Survey and alignment H. Mainaud 1st review 50%

003 Quad Stability K. Artoos Contacted. No answer

004 TBTM G. Ridonne Contacted. No answer

005 Warm magnets M. Modena Finished

006 Beam instrumentation T. Lefevre 1st review 50%

011 Controls N. Draper Not contacted

012 RF systems S. Doebert Not contacted

013 Powering D. Aguglia Draft sent for review

014 Vacuum systems C. Garion Draft sent for review

015 Magn. stray measurements S. Russ. Not contacted

016 DR extraction system M. Barnes Draft sent for review

Page 7: CTC work packages report

Warm Magnets. M. ModenaCTC-005 Warm Magnet prototypes. M. Modena

2009 2010 2011 2012 2013 2014Task 1. First optimization of magnets design for: size, weight, power consumption, estimeted cost of series production

Normal conducting magnet design catalogueEDMS 1082761 EDMS 1092991

EDMS 1097652EDMS 1139561 EDMS 1250188

Conceptual design of the anti-solenoidEDMS 1214775

Task 2. Prototype and small magnets series procurement for CLIC TBMT programFirst generation MBQ prototypes (2 for Lab)

Order Delivery

Second generation MBQ prototypes (2 Lab, 1 CLEX)Order T1 Delivery_T1

Order_T4Delivery T4

7 FBQ mock-ups for Lab Order (5) Delivery (5) Order (2) Delivery (2)

DBQ prototypes (6 lab, 1 CLEX)Order Delivery (2) Delivery (4)

MBQ steerers

Order Delivery (2)Task 3. Hybrid permanent magnet high gradient design and short prototype

QD0 Prototype MM (1) MM (2)Order Delivery

Study for a SD0Report

Task 4. Drive beam quadrupole tuneable PM prototypeHigh-Gradient prototype MM

Daresbury collaboration

Order components

Proto delivered

EDMS 1266788

Daresbury Low-Gradient prototypeOrder

componentsDelivery Report

Magnetic measurements missing?

Page 8: CTC work packages report

Warm Magnets. M. ModenaCTC-005 Warm Magnet prototypes. M. Modena

2009 2010 2011 2012 2013 2014Task 1. First optimization of magnets design for: size, weight, power consumption, estimeted cost of series production

Normal conducting magnet design catalogueEDMS 1082761 EDMS 1092991

EDMS 1097652EDMS 1139561 EDMS 1250188

Conceptual design of the anti-solenoidEDMS 1214775

Task 2. Prototype and small magnets series procurement for CLIC TBMT programFirst generation MBQ prototypes (2 for Lab)

Order Delivery

Second generation MBQ prototypes (2 Lab, 1 CLEX)Order T1 Delivery_T1

Order_T4Delivery T4

7 FBQ mock-ups for Lab Order (5) Delivery (5) Order (2) Delivery (2)

DBQ prototypes (6 lab, 1 CLEX)Order Delivery (2) Delivery (4)

MBQ steerers

Order Delivery (2)Task 3. Hybrid permanent magnet high gradient design and short prototype

QD0 Prototype MM (1) MM (2)Order Delivery

Study for a SD0Report

Task 4. Drive beam quadrupole tuneable PM prototypeHigh-Gradient prototype MM

Daresbury collaboration

Order components

Proto delivered

EDMS 1266788

Daresbury Low-Gradient prototypeOrder

componentsDelivery Report

PCL magnets design?

Page 9: CTC work packages report

DR SC Wigglers. P. FerracinCTC-001. Damping rings Superconductive wiggler. F. Ferracin

2012 2013 2014Task 1.Nb-Ti Superconducting wigglerKIT Short model Full magnet Bath test Cold tests Beam tests

Contract with KIT

Review of CDR 10-pole prototype

TDR Approval Delivery to KIT

Cryostat fabrication

CTC-001. Damping rings Superconductive wiggler. F. Ferracin2013 2014 2015

Task 2. Nb3Sn Superconducting wigglerSecond magnet with improved insulation Cold Tests Analysis

Final Drawings Short Prototype

Final report

First NbSn magnets? Results? Is there a report?

Page 10: CTC work packages report

Beam transport equipment. M. BarnesCTC-016. DR extraction systems. M. Barnes

2011 2012 2013 2014 2015DR extraction kickers

Inductive Adder and controls Power tests 20 layers full prototype 2nd prototype Beam tests @ ATF? CLIC-Note-884 CERN-ATS-2011-

CLIC–Note–938 Parts procurement

5-layers prototype

2nd 5-layers prototype

long 20-layers prototype

2nd long prototype

IFIC Ciemat Stripline kickers Tests in CIEMAT Beam tests in Alba? Beam tests @ ATF?

CTC-016. DR extraction systems. M. Barnes2011 2012 2013 2014 2015

DR extraction kickersInductive Adder and controls Power tests 20 layers full prototype 2nd prototype Beam tests @ ATF? CLIC-Note-884 CERN-ATS-2011-

CLIC–Note–938 Parts procurement

5-layers prototype

2nd 5-layers prototype

long 20-layers prototype

2nd long prototype

IFIC Ciemat Stripline kickers Tests in CIEMAT Beam tests in Alba? Beam tests @ ATF?

Deliverables and milestones for the strip line kicker are missingActual start of the study?

Beam tests where and when?

Other tasks described in 2009?

Page 11: CTC work packages report

Powering. D. Aguglia

CTC-013 Powering. D. Aguglia2012 2013 2014 2015 2016

Modulators for DB generationETHZ Full modulator 1 Small split-core model Full scale modulator

Letter of Intent

Contract Review? Mod assembled

Mod 1 delivered

LAVAL PFS High Voltage concept Monolithic transformer & active bouncer CERN PFNContract

Nothingham Charger & grid concept Small model charger Full charger constructionK contract Decision on

ChargerMod 1

delivered

• Publications mentioned?• What about the other tasks in the work

package?• CERN activities

Page 12: CTC work packages report

Survey & alignment. H. Mainaud-DurandCTC-002 Survey and Alignment. H Mainaud Durand

2009 2010 2011 2012 2013 2014 2015Task 1. Development of sensor and actuators

cWPS development of absolute measurements Radiation tests CLEX validationNote? Note?

oWPS

NIKHEFF RasChain development

Lambda sensor

Linear actuators

Cam Movers Radiation tests CLEX validationNote?

Task 2.Tunnel metrologyShort range validation in TT1

Long range in TZ32

Task 3. PrealignmentPrealignment Validation in Type0 Validation in Type0

EDMS 1261487

Instrumentation development Photogrametrie Microtriangulation

Active prealignmentValidation

CERN-ATS-2012-Task 4.Active prealignment & monitoring in the MDI

QDO monitoring

Construction of measuring benches should be considered as hardware

Page 13: CTC work packages report

Survey & alignment. H. Mainaud-DurandCTC-002 Survey and Alignment. H Mainaud Durand

2009 2010 2011 2012 2013 2014 2015Task 1. Development of sensor and actuators

cWPS development of absolute measurements Radiation tests CLEX validationNote? Note?

oWPS

NIKHEFF RasChain development

Lambda sensor

Linear actuators

Cam Movers Radiation tests CLEX validationNote?

Task 2.Tunnel metrologyShort range validation in TT1

Long range in TZ32

Task 3. PrealignmentPrealignment Validation in Type0 Validation in Type0

EDMS 1261487

Instrumentation development Photogrametrie Microtriangulation

Active prealignmentValidation

CERN-ATS-2012-Task 4.Active prealignment & monitoring in the MDI

QDO monitoring

Missing all milestones

Page 14: CTC work packages report

Instrumentation. T. LefevreCTC-006 Instrumentation. T. Lefevre

2011 2012 2013 2014BPM development

RHUL 14 Ghz Resonant cavity Tests in CTF Second prototype Beam testsIPAC12 CERN-

ATS-2012-` Report from

tests in CTF3Final report

from RHULDB decelerator stripline BPM

Combiner loop BPM

Emittance measurementsRHUL Laser wire scanner design LWS construction Tests in Petra and ATF

RHUL UV DR monitors in CESRTA Vacum and decetor system X-range Tests in CSRTA Tests UV range?

DB decelerator imaging

Longitudinal measurementsDundee Longitudinal profile measurements using EO techniques Lab set-up Tests in CTF3

CDR Material characterizat

XFROG developmen

Experimental report

CDR bunch length monitor

BLM developmentBLM for Damping rings

Cost effective BLM Test of Cherenkov fibers in CTF3

Lots of info still missing! Should be at least 4 work packages…Reporting is always easier to find from collaborations…

Page 15: CTC work packages report

What do we have now

An homogeneous way to describe the work packages• Tasks, durations, delays• Main results and decisions to be taken• Collaborations for each task• To come: Interrelations between packages.• Links, pictures? To put the CTC work into value?• What is not in the timeline. Will be in the text

• Technological challenge• Start of the art• Resources and budgets

Page 16: CTC work packages report

Conclusions

• Every work package will have 1-4 pages of text introduction explaining the challenges start of the art and a short status.

• Is this ok?• Still to contact controls, RF sources,

magnetic measurements• What to do with other work packages (OP,

civil services, dumps and targets)?