10/22/2019 MPR Report :: Sep_2019 1/49 Bihar Rajya Pul Nirman Nigam Ltd, Patna Progress Report of Ongoing Schemes for Projects Date:Sep_2019 Division: --:Select:--, Printed on: 22/10/2019 Approved by SPE Achievement for the month / till month Physical Financial 1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 520.00 M 0.00/ 100.00 5.00/ 75.00 0.00/ 0.00 5.00/ 15.00 0.00/ 485.53 2 300.00 M 0.00/ 100.00 0.00/ 100.00 0.00/ 100.00 0.00/ 25.00 0.00/ 402.32 3 240.00 M 5.00/ 20.00 0.00/ 0.00 0.00/ 0.00 0.00/ 0.00 0.00/ 240.13 Sl.No Division Name Of Work Head / Sub Head Distirct Administrative Approval Type/Length Of Bridge(M) Agreement Amount Length of Approach (in M) Date of Commen cement Date Of Scheduled completion Revised Date of completion Likely date of completion Remarks Foundation (in %) Sub-Structure (in %) Super-Structure (in %) Approach (in %) Cumulative 3 19 Gaya Construction of H.L.R.C.C. 7 x 16.50 m Bridge including approach road, Protection work and Miscellaneous work over Punpun River between Shahganj & Gohra in Kurtha Block of Arwal District Under NABARD Scheme. Nabard RWD Arwal 918.500000 / 3099 / 14 Aug 2018 RCC/119.85 763.41 07 Mar 2019 06 Sep 2020 06 Sep 2020 Pier shaft & Earth filling work is in progress. Gaya Construction of H.L.R.C.C. 5x18.75m Bridge including approach road and protection work over Punpun River between Bhagwatipur - Kusre village in Arwal District under NABARD Scheme. (R.A.S. Enterprises, 9199245601) Nabard RCD Arwal 569.290000 / 7135(s) / 05 Sep 2013 RCC/97.00 492.67 10 Dec 2013 10 Jun 2015 Requisition is submitted D.M., Arwal vide letter no.-1390 dt. 26-11-2018. Verification of LPC completed. Gaya Construction of H.L.R.C.C. 19 x 18.00 m Bridge inplace of damaged bridge Over Falgu River at Ratan Bigha Village including approach road, Protection work, Diversion Work and Miscellaneous work in 16th K.M. of Ghoshi-Islampur-Giriyak Road in Jehanabad District. Plan Jehanabad 2331.040000 / 5601 (S) / 21 Jul 2018 RCC/353.40 2007.07 21 Feb 2019 20 Feb 2021 20 Feb 2021 Dismentaling work Completed. Piling work in progress. 31/132 No's pile completed.

ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

1/49

Bihar Rajya Pul Nirman Nigam Ltd, PatnaProgress Report of Ongoing Schemes for Projects Date:Sep_2019

Division: --:Select:--, Printed on: 22/10/2019 Approved by SPEAchievement for the month / till month

Physical Financial

1 2 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

1 520.00 M 0.00/100.00

5.00/75.00

0.00/0.00

5.00/15.00

0.00/485.53

2 300.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/25.00

0.00/402.32

3 240.00 M 5.00/20.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/240.13

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

3 19

Gay

a

Construction of H.L.R.C.C. 7 x 16.50 mBridge including approach road,

Protection work and Miscellaneouswork over Punpun River between

Shahganj & Gohra in Kurtha Block ofArwal District Under NABARD

Scheme.

Nab

ard

RWD

Arw

al

918.

5000

00 /

3099

/ 14

Aug

201

8

RC

C/1

19.8

5

763.

41

07 M

ar 2

019

06 S

ep 2

020

06 S

ep 2

020

Pier shaft & Earth filling work is in progress.

Gay

a

Construction of H.L.R.C.C. 5x18.75mBridge including approach road andprotection work over Punpun River

between Bhagwatipur - Kusre village inArwal District under NABARD

Scheme. (R.A.S. Enterprises,9199245601)

Nab

ard

RC

D

Arw

al

569.

2900

00 /

7135

(s) /

05

Sep

2013

RC

C/9

7.00

492.

67

10 D

ec 2

013

10 Ju

n 20

15 Requisition is submitted D.M., Arwal vide letter no.-1390 dt.26-11-2018. Verification of LPC completed.

Gay

a

Construction of H.L.R.C.C. 19 x 18.00m Bridge inplace of damaged bridge

Over Falgu River at Ratan BighaVillage including approach road,

Protection work, Diversion Work andMiscellaneous work in 16th K.M. of

Ghoshi-Islampur-Giriyak Road inJehanabad District.

Plan

Jeha

naba

d

2331

.040

000

/ 560

1 (S

) / 2

1 Ju

l 201

8

RC

C/3

53.4

0

2007

.07

21 F

eb 2

019

20 F

eb 2

021

20 F

eb 2

021

Dismentaling work Completed. Piling work in progress.31/132 No's pile completed.

Page 2: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

2/49

Achievement for the month / till month

Physical Financial

4 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/26.85

5 1300.00M

0.00/100.00

0.00/100.00

0.00/0.00

3.00/48.00

0.00/692.16

6 110.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/50.00

0.00/34.77

7 200.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

58.72/60.56

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Gay

a

Construction of Retaining wall &addional lane approach road for newelyConstructed H.L. R.C.C. Bridge over

Falgu River at Barari village inMashauri-Okri-Telhara-Ekangarsarai

road in Jehanabad District Under NONPLAN (2 x 120.00 M).

Non

-Pla

n

Jeha

naba

d

249.

8400

00 /

217(

s) /

04 Ja

n 20

12

RC

C/1

20.0

0

L/A Issue. 2 No's L.P.C. for payment pending before DLAO.Payment Pending at DLAO Level.

Gay

a

Construction of H.L.R.C.C. 7 x 18.75 mBridge over river Punpun with approach

road, Protection work andMiscellaneous work in between

Khudwa - Kalen village in AurangabadDistrict Under MMADY Scheme. (JAIMATA DI ROAD CONSTRUCTION

PVT. LTD., PATNA)

MM

AD

Y

Aur

anga

bad

1318

.000

000

/ 111

0 / 3

0 A

pr 2

018

RC

C/1

35.5

6

1110

.00

25 D

ec 2

018

24 Ju

n 20

20

24 Ju

n 20

20 Foundation & Sub Structure finished. Super Structure workwill be done after rain. Approach 1600 m upto GSB

complete. Drain work is in progress.

Gay

a

Construction of Multi Cell Box Culvertof 3 x 7.020 m Over Bagahi Canal nearProposed Power Sub - Station of PowerGrid Corporation of India in Sherghati

Block of Gaya District. (SatyendraKumar Yadav, Gaya)

Oth

ers

Gay

a

100.

9500

00 /

M.O

.U. /

03

Dec

201

8

RC

C/2

3.26

94.4

8

21 F

eb 2

019

20 Ju

l 201

9

31 O

ct 2

019

Foundation, Sub Structure, Super Structure & Railing work iscompleted. Approach Road is in progress.

Gay

a

Construction of H.L.R.C.C. Bridgeincluding approach road, Protectionwork and Miscellaneous work over

Dhadhar River of Gaya-Fatehpur-GopiMore-Murli Road (Gaya-Rajauli Road

SH-70) in Gaya District Under PlanScheme. (Baban Kumar Singh, Gaya)

Plan

Gay

a

700.

0000

00 /

960

(S) /

01

Feb

2018

RC

C/1

25.0

0

07 M

ar 2

019

06 S

ep 2

020

06 S

ep 2

020

Diversion & Dismentling of existing bridge work iscompleted. Pile work is in progress.

Page 3: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

3/49

Achievement for the month / till month

Physical Financial

8 300.00 M 5.00/95.00

10.00/50.00

0.00/0.00

0.00/0.00

158.39/436.42

9 200.00 M 0.00/100.00

0.00/100.00

5.00/50.00

0.00/20.00

0.00/69.41

10 200.00 M 0.00/100.00

0.00/100.00

0.00/95.00

0.00/50.00

0.00/116.69

11 200.00 M 0.00/100.00

0.00/100.00

0.00/80.00

0.00/10.00

0.00/149.60

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Gay

a

Construction of H.L.R.C.C. 9x21.00mBridge including approach road andprotection work over Morhar RiverBetween Chitabkala and Gendabagvillage in Sherghati Block in Gaya

District.Pl

an

Gay

a

1610

.870

000

/ 353

(s) /

01

Feb

2018

RC

C/1

94.4

0

928.

98

10 M

ay 2

018

09 F

eb 2

020

09 F

eb 2

020 Pile work is completed. Out of 10, 9 nos of pile cap

completed. 5 nos shaft complete. Hammer head A1, P1, P4 &A2 completed & P5 hammer head reinforcement laying work

is in progress.

Gay

a

Construction of H.L.R.C.C. 3x21.00mBridge including approach road and

protection work in Bhalua to PaharpurRoad (K.M. 0 to K.M. 26.325) in

Chainage 600 M in Gaya District underPLAN Scheme. (Ramiya Construction

Pvt. Ltd., Gaya)

Plan

Gay

a

556.

2800

00 /

1146

6(s)

/ 28

Nov

201

1

RC

C/6

4.84

315.

23

10 M

ay 2

018

09 N

ov 2

019

09 N

ov 2

019 Work is in Progress. Span no.-1 deck slab is completed.

Girder work in span 3 is completed & deck slab work is inProgress.

Gay

a

Construction of H.L.R.C.C. 3x14.00mBridge including approach road andprotection work in Dhangai Bazar to

B.B. Pesra-Sobh to G.T. Road (K.M. 0to K.M. 14.10) in Chainage 13970 M in

Gaya District under PLAN Scheme.(M/s. JAY SHANKAR RAY,

Muzaffarpur)

Plan

Gay

a

429.

7300

00 /

1153

9(s)

/ 01

Dec

201

4

RC

C/5

5.84

227.

03

26 D

ec 2

016

25 M

ar 2

018

30 A

pr 2

019

31 O

ct 2

019 Work is in Progress. Recommended to debar. span no.-1, 2 &

3 of deck Slab is completed. Railing, wearing coat &Approach Road is in Progress.

Gay

a

Construction of H.L.R.C.C. 3x14.00mBridge including approach road andprotection work in Dhangai Bazar to

B.B. Pesra-Sobh to G.T. Road (K.M. 0to K.M. 14.10) in Chainage 4545 M in

Gaya District under PLAN Scheme.(Shree Tirupati Balaji Enterprises,

9470664329)

Plan

Gay

a

450.

6200

00 /

1153

9(s)

/ 01

Dec

201

4

RC

C/4

3.84

280.

78

18 F

eb 2

016

17 M

ay 2

017

31 M

ar 2

019

31 O

ct 2

019 Work is in Progress. Span No.-1, 2 & 3 deck slab work

completed. Railing & Wearing Coat work is in Progress.Earth work in approach road in progress. Contractor has been

debarred.

Page 4: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

4/49

Achievement for the month / till month

Physical Financial

12 160.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/80.00

0.00/972.18

13 100.00 M 0.00/80.00

0.00/25.00

0.00/0.00

0.00/0.00

0.00/520.10

14 380.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

15 475.00 M 0.00/100.00

0.00/100.00

15.00/85.00

0.00/5.00

0.00/564.80

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Gay

a

Construction of H.L.R.C.C. 17x21.75mBridge including approach road andprotection work over river Muhane

between Silaunjua-Bataspur village inBodhGaya Block of Gaya District underNABARD Scheme. (Ajay Engicon Pvt.

Ltd., Aurangabad (Bihar).

Nab

ard

RWD

Gay

a

983.

9500

00 /

1127

.86

/ 05

Mar

201

2

RC

C/3

80.0

0

983.

95

15 M

ar 2

013

14 S

ep 2

014

31 M

ar 2

019

31 O

ct 2

019 Bridge work completed. One side approach Road work

stopped due to L/A Problem. L.A. process completed.Possession Certificate given by DLAO, Gaya vide letter

no.-689 dt. 28-09-2019.

Exte

rnal

Pro

ject

Div

isio

n Construction of H.L, R.C.CBridge(3X25) with its approach road in

along Kakurwa Dhar in 24th Km ofChandradei-Bangama-paktola-Matiary-Mongra road in the district of Araria.

{Nirman Engicons Pvt. Ltd., At + P.O.-Mohanpur, District-Begusarai

(Bihar)-851131}(PKG41)

WB

P Ph

ase-

2

Ara

ria

757.

7600

00 /

404

/ 28

May

201

4

75.0

0

27 F

eb 2

016

26 A

ug 2

017

30 Ju

n 20

19

1. A2 & P2 well cap completed. 2. A1,P1 stenning inprogress. 3. Contractor is debarred. 4. By June,2020 it will be

completed. 5. LD is imposed. 6. Due to flood work isstopped.

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L, R.C.CBridge(4X21) in 13th Km of Nasir

Chowk Belwa Mazgama-Mongara roadin the district of Araria.(Braj KishoreRoy, Village-Kamrgama, Post-TiraJatmalpur, P.S-Kalyanpur, District-

Samastipur-847301)(PKG-20)

WB

P Ph

ase-

2

Ara

ria

775.

0000

00 /

552

/ 26

Oct

201

8

84.0

0

02 M

ar 2

016

01 Ju

n 20

17

1. Design Changed from pile to well and No. of span alsoincreased from 3 to 4. 2. Estimate for revise AA is approvedfrom BAPEPS Letter No.-552/2018 Dated-26.10.2018 and

approval of varriation awaited. 3. Contractor is not interestedto start work due to old rate and has requested to cancel the

agreement.

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L, R.C.CBridge(2X25) with its approach road in25th K.M. of Falka-Sripur-Bhawanipur-Karman Chowk road (at Balia Ghat) inthe District of Purnea.{Basant VanijyaLimited, Lakhibagh, Manpur, Gaya-

825003 (Bihar)}(PKG-19B)

WB

P Ph

ase-

2

Purn

ia

608.

4500

00 /

404

/ 28

May

201

4

50.0

0

27 F

eb 2

016

26 F

eb 2

018

31 M

ay 2

019 1. 2/2 Deck Slab Casted. 2. Crash Barrier Completed. 3. By

December,2019 it will be completed. 4. So cause issued tocontractor and LD is imposed.

Page 5: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

5/49

Achievement for the month / till month

Physical Financial

16 1700.00M

0.00/100.00

0.00/100.00

0.00/100.00

0.00/85.00

0.00/904.37

17 2000.00M

0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

64.69/336.39

18 0.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/144.38

19 320.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/68.49

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Exte

rnal

Pro

ject

Div

isio

n Construction of H.L, R.C.CBridge(3X33) in 11th K.M. of

Baluwahat koshi bandh via Aghori-Sakra-Paharpur-Baghwa road in Placeof SP Bridge in the district of Saharsa.

(Devraha Construction Pvt. Ltd.,Goutam Nagar, Ward No.-12, Saharsa-

852201) (PKG- 18)

WB

P Ph

ase-

2

Saha

rsa

1632

.710

000

/ 404

/ 28

May

201

4

99.0

0

29 S

ep 2

016

29 S

ep 2

018

31 M

ar 2

019 1. Bridge Completed. 2. WMM work under progress. 3. LD

is imposed. 4. By November,2019 it will be completed 5. Socause issued to contractor and LD is imposed.

Muz

affa

rpur Construction of Pontoon Bridge in river

Ganga between Chakosanghat toJamindari Ghat (including opening &Resetting for 5 Years) of Bidupur in

district Vaishali.

Plan

Vais

hali

3013

.650

000

/ 233

8(S)

/ 31

Mar

201

6

Pont

oon

Brid

ge/5

97.0

0

7660

8900

.00

06 F

eb 2

018

05 F

eb 2

023

Work Completed. 5 Year Maintance Period Year 2023

Bha

galp

ur

Re-setting, Repairing, Dissmentalling,maintainence work during flood

available 28 ests module of Pontoonbridge on Koshi river at Vijay Ghat

between Naugachhia & Dholbajja bazarin Bhagalpur District Pontoon Bridgeon Koshi river at Vijay Ghat betweenNougachia & Dholbajja bazar Year

2017-21-22 M/s Shailesh Kumar, GopalGoshala, Nogachia, Bhagalpur. Mob

No. 9431871130

Plan

Bha

galp

ur

394.

7500

00 /

1179

4(s)

/ 19

Dec

201

7

28.0

0

3753

8000

.00

18 F

eb 2

018

17 F

eb 2

023

31 M

ar 2

019

Due to rainy season pipa bridge has been dismantled and keptsafely by concern Contractor.

Patn

a-1 Construction of Cable Suspension

Bridge (Laxman Jhula) across PunpunRiver at Punpun ghat at the east side of

Railway bridge in district Patna

Plan

Patn

a

4677

.290

000

/ 116

6(S)

/ 31

Jan

2019

Oth

ers/

0.00

31 A

ug 2

019

02 M

ar 2

021

02 M

ar 2

021

Mobilization work is under progress.

Page 6: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

6/49

Achievement for the month / till month

Physical Financial

20 0.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/25.12

21 0.00 M 43.00/95.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/25.12

22 0.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/0.00

154.37/941.30

23 0.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/0.00

0.00/25.56

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Patn

a-1 (b) Construction of Jan Nayak Karpuri

Chhatrawas Chahar Diwari (Hostel) indistrict Patna.

Wel

fare

Dep

artm

ent

Patn

a

375.

8700

00 /

38(S

) / 1

3 A

pr 2

018

Oth

ers/

0.00

25 M

ar 2

019

25 D

ec 2

020

25 D

ec 2

020

Boundary Wall Completed.

Patn

a-1

(a) Construction of Jan Nayak KarpuriChhatrawas (Hostel) in district Patna.

Wel

fare

Dep

artm

ent

Patn

a

375.

8700

00 /

38(S

) / 1

3 A

pr 2

018

Oth

ers/

0.00

25 D

ec 2

020

122/122 Pile work completed. 24/27 Pile Cap work is underprogress.

Patn

a-1

Construction of Incubation Centre I.I.T.Patna (Bihta) O

ther

s

Patn

a

1640

.700

000

/ / 1

7 N

ov 2

016

Oth

ers/

0.00

06 O

ct 2

018

05 A

pr 2

020

05 A

pr 2

020

Finishing & Utility work in progress.

Patn

a-1

Construction of Accomodation withtoilet facility for Pataients and theirattendents in the campus of Indira

Ghandhi Institute of Medical Sciences(IGIMS) Patna (Total Area 2712sqft)

Plan

Patn

a

92.0

0000

0 / 2

22/1

8 / 2

9 Se

p 20

18

Oth

ers/

0.00

15 F

eb 2

019

14 N

ov 2

019

14 N

ov 2

019

Work Completed

Page 7: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

7/49

Achievement for the month / till month

Physical Financial

24 200.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/1.33

25 100.00 M 0.00/60.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/38.55

26 290.00 M 0.00/25.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/185.17

27 0.00 M 32.00/40.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/8.59

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Patn

a-1

Construction of H.L. R.C.C. Bridge(6x18.00m) over river Punpun betweenNashopur (Naubatpur Block) PoaawanGhat (Masaudhi Block) in Kahaguri-Khaurat Road in the district of Patna.

Plan

Patn

a

1369

.000

000

/ 229

6(S)

/ 05

Mar

201

9

RC

C/1

08.0

0

14 A

ug 2

019

13 A

ug 2

021

13 A

ug 2

021

Mobilization work is under progress.

Patn

a-1

Construction of H.L. R.C.C. Bridge(6x18.00m) in place of damaged bridge

in 12th Km of Pali-Ullar-MasaudhiRoad under Pali Block in the district of

Patna.

Plan

Patn

a

1346

.310

000

/ 746

1(S)

/ 26

Sep

201

8

RC

C/0

.00

06 M

ar 2

019

05 M

ar 2

021

05 M

ar 2

021

54/54 Pile Completed.

Patn

a-1

Construction of H.L. R.C,.C. bridgeMusnaper to Masaurhi-Noubatpur via

duct NH-83 Potahi & Patna GayaRailway line cross 20 km in between

Shahwajpur, Block-Punpu and ChakkanBigha, Block-Noubatpur Approach

road, Protection work with LA(6x18m)on the punpun river.

Plan

Patn

a

1427

.170

000

/ 446

4(s)

/ 14

Jun

2018

RC

C/1

11.6

0

05 M

ar 2

019

04 M

ar 2

021

04 M

ar 2

021

A1-12/12 P1-6/6 P2-6/6 P3-6/6 P4-6/6 P5-1/6 Total - 37/54Pile Completed.

Patn

a-1

Construction of left turning ramp 9Extra Arm) connecting Newly

constructed Mithapur-Chiraiyatand viaRailway Station Flyover (P30-P31)with Chiraiyatand Exhibition Road

Flyover in Patna.

Plan

Patn

a

818.

0000

00 /

8573

(S) /

15

Nov

201

8

RC

C/0

.00

09 M

ar 2

019

08 D

ec 2

019

08 D

ec 2

019

Page 8: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

8/49

Achievement for the month / till month

Physical Financial

28 585.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/340.69

29 100.00 M 0.00/100.00

0.00/100.00

0.00/97.00

0.00/25.00

0.00/651.21

30 400.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/162.77

31 2000.00M

0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/334.35

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Patn

a-1

Construction of Pontoon Bridge in riverGanga between Kachidargah to

Rustampur (Raghopur) (includingsetting, Resetting for 5 Years) of

Raghopur Block in district Vaishali.Pl

an

Patn

a

751.

5700

00 /

1180

4(s)

/ 19

Dec

201

7

Pont

oon

Brid

ge/0

.00

06 F

eb 2

018

15 Ju

n 20

22

15 Ju

n 20

22 Pontoon Sets dismantled from dated-09.07.2019 (MonsoonPeriod) and will be Re-installed after Monsoon.

Patn

a-1 Construction of H.L.R.C.C. Bridge

5x24.0 m in Punpun River in 11th Kmof Masaurhi-Naubatpur Pitmas Road in

Patna District.

Plan

Patn

a

1155

.000

000

/ 878

0(s)

/ 09

Oct

201

7

RC

C/1

20.0

0

25 A

pr 2

018

26 O

ct 2

019

26 O

ct 2

019 Foundation Completed. Sub-structure Completed. Girder &

Dec Slab of all five span is completed. Approach road workare in progress.

Patn

a-1

Construction of Pontoon Bridge in riverGanga between Gyaspur to KaladiyaraDiyara (including opening & Resettingfor 5 Years) of Bakhtiyarpur Block in

district Patna.

Non

-Pla

n

Patn

a

582.

2300

00 /

1196

4(s)

/ 21

Dec

201

7

Pont

oon

Brid

ge/0

.00

06 F

eb 2

018

15 Ju

n 20

22

15 Ju

n 20

22 Pontoon Sets dismantled from dated-09.07.2019 (MonsoonPeriod) and will be Re-installed after Monsoon.

Patn

a-1 Construction of Pontoon Bridge in river

Ganga between Danapur to PanapurDiyara (including opening & Resetting

for 5 Years) in district Patna. Non

-Pla

n

Patn

a

1114

.990

000

/ 119

65(s

) / 2

1 D

ec 2

017

Pont

oon

Brid

ge/0

.00

06 F

eb 2

018

15 Ju

n 20

22

15 Ju

n 20

22 Pontoon Sets dismantled from dated-10.07.2019 (MonsoonPeriod) and will be Re-installed after Monsoon.

Page 9: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

9/49

Achievement for the month / till month

Physical Financial

32 60.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.56

33 120.00 M 0.00/85.00

0.00/75.00

0.00/65.00

0.00/40.00

0.00/147.44

34 610.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/90.00

100.00/2550.99

35 1050.00M

0.00/100.00

0.00/100.00

0.00/100.00

0.00/0.00

0.00/1676.70

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Patn

a-1

(b) Construction of Balance work ofone span out of three span H.L.R.C.C.

Bridge (1x16.50M) across Dhaba Riverin 4th Km. of Khusrupur-Nagarnausa

Road at Nirmali chak Middle Vidayalayin Patna Dist. Including Approach in

both side and Bituminous work thereof.

Nab

ard

Patn

a

418.

9800

00 /

1871

(s) /

03

Mar

201

4

RC

C/1

6.50

Due to unavailibility of land, the work is stopped. Landowners had denied to given on Perpetual Lease because

nature of land decided by Six Man Committee is(Agriculture) not accepted by land owners. Land acquisitionunder LA act 2003 has been requested to D.M. Patna videthis office letter no.402, dated-16.02.2019 S.I.A. is under

progress.

Patn

a-1

(a) Construction of H.L.R.C.C. Bridge,3x16.50M and approach road work in

4th Km. of Khusrupur-NagarnausaRoad at Nirmali chak Middle School of

Khusrupur Block, in the District ofPatna.

Nab

ard

Patn

a

418.

9800

00 /

1871

/ 03

Mar

201

4

RC

C/5

1.38

24 N

ov 2

014

23 N

ov 2

015

23 N

ov 2

015

Due to unavailibility of land, the work is stopped. Landowners had denied to given on Perpetual Lease because

nature of land decided by Six Man Committee is(Agriculture) not accepted by land owners. Land acquisitionunder LA act 2003 has been requested to D.M. Patna videthis office letter no.402, dated-16.02.2019 S.I.A. is under

progress.

Bha

galp

ur

Balance work (Approach Road) forConstriction of H. L. R.C.C. Bridge

12X24.75m in Khrik Chorhar road atchorhar ghat of old kosi river branch inkharik Block District Bhagalpur underNabard loan project (RIDF-XVII) M/s

Rajiv Kumar Singh, Kharik, Bhagalpur.Mob.no. 9934095945

Nab

ard

Bha

galp

ur

2460

.570

000

/ 250

2(s)

/ 25

Mar

201

3

RC

C/3

04.3

6

2353

9669

.00

12 Ju

n 20

19

11 O

ct 2

019

31 D

ec 2

019

(i) L.A. -7.39 Acre. (ii) Section 11 notified on letter No. 03(P) LA dt- 10.03.2018 (iii) Six Member Committee under theChairmanship of D.M has been constituted for rehabilitation

& Re-arrangment. Vid office Commnique No. 340 dated-18.08.2018 (iv)Total Raiyat- 29 No. (v) Mauza- 2

(Maheshpur- 4.98 Acre & Ishapur- 2.41 Acre. (vi) DLAOBhagalpur Demanded Rs. 73,36,594.00 vide his letter no. 530

dated 04.12.2018 and the same was deposited to DLAOBhagalpur vide letter no. 05(we) dated 05.01.2019 of this

office. (vii) DLAO Bhagalpur Demanded Rs.1,23,51,596.00vide his letter no. 202 dated. 26.04.2019 and Lt No. 332dated- 29.06.2019 (viii) Section-19 is in progress. (ix)

Declaration of Section- 19(1) for Land Acquisition has beenpublish by D.L.A.O, Bhagalpur in News Papers.

Bha

galp

ur

Balance work (Approach Road) forConstruction of H.L. RCC Bridge

14x18.75 m on gerua river near baisavillage in Sanhaula-Baisa-Hanwara

road in Sanhaula Block districtBhagalpur under Nabard loan project

(RIDF-XVIII) M/s Sri Ram Enterprises,Bhagalpur. Mob.no. 9431422278

Nab

ard

Bha

galp

ur

2296

.080

000

/ 250

1(s)

/ 25

Mar

201

3

RC

C/2

51.6

8

2500

0000

.00

12 Ju

n 20

19

11 O

ct 2

019

31 D

ec 2

019

Bhagalpur (i) Land Acquisition-4.33 Accre Bhagalpur, Bihar.(ii) Total no of Raiyat-35 (iii) No of Mauza- 1 (Baisa) (iv)

Section 11 notified on letter No. 107 dt-30.03.18 (v) DLAOBhagalpur Demanded Rs. 1,69,36,343 vide his letter no. 535

dated 05.12.2018 and the same was deposited to DLAOBhagalpur vide letter no. 06(we) dated 05.01.2019 of thisoffice. (vi) Section-19 is in progress. (vii) Declaration ofSection- 19(1) for Land Acquisition has been publish by

D.L.A.O, Bhagalpur in News Papers.

Page 10: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

10/49

Achievement for the month / till month

Physical Financial

36 250.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/40.00

0.00/394.89

37 330.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/50.00

0.00/369.77

38 410.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/25.00

0.00/1257.25

39 200.00 M 4.00/52.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/630.50

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Dar

bhan

ga

Construction of HL RCC bridge(4x14.50M) Ujjan PWD Road in

Ghanshyampur Kathbara-Lagma KkoraMcheta-Lalpatti Road of 11.10 KM in(4x14.50 m) the District of Darbhanga.

Royal Engineers.FD

R

Dar

bhan

ga

842.

0500

00 /

289(

s) /

10 Ja

n 20

18

58.0

0

6077

6701

.00

05 M

ay 2

018

04 N

ov 2

019

04 N

ov 2

019

Approach road work in progress.Traffic started.

Dar

bhan

ga costruction of HLRCC bridge at damlaghat in bisfi block (3x21.75 m) SriKrishna Kant Thakur,9430897941 M

MSN

Y

Mad

huba

ni

470.

4700

00 /

8291

(s) /

01

Sep

2014

RC

C/6

7.12

3747

6383

.00

01 O

ct 2

014

01 Ja

n 20

16 One side B.T. approach and other side Earthen approachcompleted. Traffic Started. I

Remarks for LA: Sec.-11 is in Progress.

Dar

bhan

ga

Construction of HLRCC bridge withLand acquisition ,approach road andprotection work near naiyam gram at

pachphutiya ghat in Bagmati river(7x24.75 m) Hari Construction &

Associate Pvt. Ltd., Begusarai

BD

F

Dar

bhan

ga

2319

.190

000

/ 181

6(s)

/ 28

Feb

201

4

RC

C/1

77.5

6

1295

9003

1.00

03 M

ar 2

014

02 M

ar 2

016

Remarks for LA: Darbhanga-Sec.-19 in progress.samastipur-Sec.-11 in progress.

Dar

bhan

ga

Construction of HL RCC bridge(4X18.75M) in 15 Km of Bathiya-

Narayanpur- Kakodha-Devena-Rajkharwar with approach road,

Diversion work and Miscellaneouswork in the District of Darbhanga.

FDR

Dar

bhan

ga

1067

.000

000

/ 292

(s) /

12

Jan

2018

RC

C/7

7.48

8029

7962

.00

11 A

pr 2

018

10 O

ct 2

019

30 Ju

n 20

20

Work In Progress

Page 11: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

11/49

Achievement for the month / till month

Physical Financial

40 250.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/40.00

0.00/591.89

41 250.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/40.00

0.00/426.62

42 200.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/2.62

43 400.00 M 0.00/40.31

0.00/20.00

0.00/0.00

0.00/0.00

0.00/156.26

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Dar

bhan

ga

Construction of HL RCC bridge(6x14.50M) at Shivnagar Ghat in

11.50KM of Ghanshyampur- RasiyariRoad with approach road, Diversionwork and Miscellaneous work in the

District of Darbhanga.FD

R

Dar

bhan

ga

1046

.130

000

/ 294

(s) /

12

Jan

2018

RC

C/9

0.70

7847

3694

.00

11 A

pr 2

018

10 O

ct 2

019

31 D

ec 2

019

Approach work in progress.Traffic Started

Dar

bhan

ga

Construction of HL RCCbridge(4x14.50M) Ujjan PWD Road inGhanshyampur Kathbara-Lagma KkoraMacheta-Lalpatti Road of 12.10 KM in

the District of Darbhanga.

FDR

Dar

bhan

ga

816.

7100

00 /

290(

s) /

10 Ja

n 20

18

RC

C/6

0.48

5939

5815

.00

10 O

ct 2

018

07 A

pr 2

020

31 D

ec 2

019

Approach Road work in progress.Traffic Started

Sara

n W

orks

Construction of 4x16.00 m H.L. R.C.CBridge over Saran Main Canal crossingBagauch-Kotnarahwan road Damaged

in 2017 Flood under Gopalganj District.Agency- M/s Tirupati Bala ji EarthWork Pvt. Ltd. mob.-9431011120

FDR

Gop

alga

nj

852.

1800

00 /

685(

S) /

19 Ja

n 20

18

RC

C/6

4.00

03 O

ct 2

018

02 A

pr 2

020

30 Ju

n 20

19 NOC. Received from Engineer in Chief, WRD Headquartervide Letter No. 319 Dt. 07.03.2019. Work not started due to

public complain regarding alignment.

Sara

n W

orks

Construction of 4x18.75m H.L. R.C.CBridge including Approach Road,

rotection Work & Miscellaneous workover Bashi river crossing 1st KM ofTamkuhi-chhitauni road Damaged in2017 Flood under Gopalganj Distric.

FDR

Gop

alga

nj

808.

7400

00 /

687(

s) /

19 Ja

n 20

18

RC

C/7

5.00

524.

42

03 O

ct 2

018

02 A

pr 2

020

Work in Progress Pile Completed-14/14 Pile cap - 2completed. Abument saft & cap 1 No. Completed. Pier shaft& Pier Cap 1 no. completed. Change of type of foundationform pile to well in 3 Points approved. 1 well curb sinking

complete.

Page 12: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

12/49

Achievement for the month / till month

Physical Financial

44 200.00 M 0.00/100.00

0.00/60.00

0.00/0.00

0.00/0.00

0.00/327.55

45 200.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/0.00

2.30/231.56

46 0.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/855.95

47 400.00 M 0.00/100.00

0.00/80.00

0.00/36.00

0.00/10.00

0.00/386.42

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Sara

n W

orks

Construction of 4x14.00 m HL R.C.CBridge over Saran Main Canal crossingGopalganj-Barhariya road Damaged in2017 Flood under Gopalganj District.

Agency- Sona Engicon Pvt. Ltd.Mob.-9431407389

FDR

Gop

alga

nj

790.

3000

00 /

686(

S) /

19 Ja

n 20

18

RC

C/5

6.00

535.

09

03 O

ct 2

018

02 A

pr 2

020

30 Ju

n 20

19

Pile Completed- 44/44 Pile cap completed- 5/5 NOC.Received from Engineer in Chief, WRD Headquarter vide

Letter No. 319 Dt. 07.03.2019. Substructure work is inprogress.

Sara

n W

orks

Construction of 2x16.00 m H.L. R.C.CBridge over Hathua Branch Canal

crossing Mirganj-Bhagipatti-Samaurroad Damaged in 2017 Flood underGopalganj District. Agency- M.K

Enterprises Mob.-9431212686

FDR

Gop

alga

nj

549.

0700

00 /

895(

S) /

30 Ja

n 20

18

RC

C/3

2.00

306.

65

03 O

ct 2

018

02 Ja

n 20

20

30 Ju

n 20

19 NOC issued. Work in progress. Pile completed- 22/22 Pilecap completed- 03/03. Sub Structure completed. Deck slab of

both spans completed.

Sara

n W

orks

Construction & Resetting of newPontoon Bridge and Maintenace of

Pontoon Bridge form Year 2016-17 to2020-21 and Dismentling of Pontoon

Bridge form the Alignment and storingthe Pontoon sets at safe place on theside of river embankment at Pahleza

Ghat inbetween Gaddipatti to Ramsapurduring rainy season. Agency- Shrishti

Developers Pvt. Ltd. Mob.-9431014606

Plan

Sara

n

1076

.720

000

/ 29

(s) /

06

Jan

2016

293.

00

1061

.37

22 A

pr 2

016

Pontoon Bridge open on dt. 11.07.2019

Sara

n W

orks Construction of 5X18.75m H.L. R.C.C

Bridge over Dabra river in betweenAhimanpatti Kanakpur to ShitalpurStation in Dighwara block in Saran

District Nab

ard

RWD

Sara

n

765.

1500

00 /

1360

/ 26

Apr

201

8

RC

C/7

3.75

553.

73

29 O

ct 2

018

28 A

pr 2

020 Work in Progress Pile Completed-42/42 Pile Cap Completed-

06/06 Substructure & Super Structure work in Progress.Girder & deck slab of 2 span completed.

Page 13: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

13/49

Achievement for the month / till month

Physical Financial

48 200.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/65.00

0.00/808.87

49 1122.00M

0.00/100.00

0.00/90.00

5.00/40.00

0.00/0.00

0.00/552.75

50 250.00 M 0.00/15.00

0.00/0.00

0.00/0.00

0.00/5.00

0.00/323.37

51 200.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Saha

rsa

"Constraction of HL RCC (6x18.00M)Bridge on tilyuga River in 1st KM of

Lalminia-simraha road under Plan HeadMarouna block in supaul distt. Raj

Construction 9430883767"Pl

an

Supa

ul

1359

.630

000

/ 300

7(S)

/ 31

Mar

201

5

RC

C/1

11.6

0

821.

36

30 D

ec 2

015

30 D

ec 2

017

Agg - 821.36 Lac Bridge Work is Complete. Approach Workin Progress Perpetual Lease is in Progress

Saha

rsa

"Construction of High Level RCCBridge (6x18.75) Marauna block of

Ganaura PWD Road to Maharaji Tola inthe district of Supaul (NABARD)

Manoj Kumar - 9470049418" Nab

ard

RWD

Supa

ul

1178

.160

000

/ 745

2 / 1

4 Ju

l 201

7

RC

C/1

30.5

0

798.

53

30 Ja

n 20

18

30 D

ec 2

020

Agg - 798.534 Lac All Well complete. Two no. Deck SlabCompleted

Saha

rsa

Construction of High Level RCC(4x18.75) Bridge at Dakra Dhar of

Mahishi Block on the Ena to KanadiyaRoad (NABARD) Shankar Sharma

9934756142 Nab

ard

RWD

Saha

rsa

1810

.680

000

/ 129

3 / 1

6 A

pr 2

018

RC

C/6

34.0

0

1418

.23 Agg - 1418.23 Lac Well Curb A1- 6 lift , P1- 9 Lift, P2 - 9

Lift, P3 - 8 Lift, P4 - 5lift and P5 - 5 lift Complete.

Saha

rsa

"Construction of High Level RCCBridge (4x24.75M) at 19th KM of

Nirmali-Marauna-Madhepur Road inthe district of Suapul including

Approach road, Protection Work, inflood effected damage year 2017.

Shashi Ranjan 7488173962"

FDR

Supa

ul

604.

0000

00 /

47(S

) / 0

2 Ja

n 20

18

RC

C/1

01.4

8

573.

64

31 M

ay 2

018

30 A

ug 2

020

30 Ju

n 20

19 Agg - 573.64 Lac For cancellation of project , written byM.D Letter No - 908 (We) Date - 29-03-2019

Page 14: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

14/49

Achievement for the month / till month

Physical Financial

52 200.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/90.00

0.00/219.04

53 200.00 M 0.00/100.00

0.00/100.00

0.00/90.00

0.00/35.00

0.00/159.05

54 200.00 M 0.00/100.00

0.00/100.00

5.00/85.00

0.00/10.00

0.00/178.30

55 200.00 M 0.00/100.00

0.00/100.00

5.00/95.00

0.00/35.00

0.00/339.53

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Saha

rsa

"Construction of High Level RCCBridge (3x16.50M) at 5th KM of Balthi

Musharniyan Road in the district ofSaharsa including Approach road,Protection Work, in flood effected

damage year 2017 Arju Construction -9304026134"

FDR

Saha

rsa

309.

7000

00 /

510(

S) /

16 Ja

n 20

18

RC

C/4

9.50

280.

12

03 A

ug 2

018

02 N

ov 2

019

30 Ju

n 20

19 Agg - 280.12 Lac Bridge work in complete. BM & SDBCwork is in progress

Saha

rsa

"Construction of High Level RCCBridge (2x16.50M) at 1st KM of

Fatehpur-Kashnagar Road in the districtof Saharsa including Approach road,

Protection Work in flood effecteddamage year 2017 Balram Singh-

9431082277"

FDR

Saha

rsa

317.

0000

00 /

482(

S) /

15 Ja

n 20

18

RC

C/3

3.50

241.

26

03 A

ug 2

017

02 A

ug 2

019

30 Ju

n 20

19 Agg - 241.26 Lac Deck Slab Completed in both Span. Earthwork progress in approach road.

Saha

rsa

Construction of High Level RCCBridge (2x16.50M) at 3rd KM of Balthi

Musharniyan viya N.H.-107 to BundRoad in the district of Saharsa including

Approach road, Protection Work, inflood effected damage year 2017

Balram Singh-9431082277

FDR

Saha

rsa

386.

7100

00 /

483(

S) /

15 Ja

n 20

18

RC

C/3

3.50

288.

06

03 A

ug 2

018

02 A

ug 2

019

30 Ju

n 20

19 Agg - 288.06 Lac All Span Deck Slab Complete. Earth Workis in progress

Saha

rsa

Construction of High Level RCCBridge (3x24.75M) at 3.85th KM ofBalthi Musharniyan viya N.H.-107

Road in the district of Saharsa includingApproach road, Protection Work,Diversion Work. Shashi Ranjan

7488173962

FDR

Saha

rsa

826.

9900

00 /

1207

5(S)

/ 27

Dec

201

7

RC

C/7

6.09

486.

46

07 A

pr 2

018

19 O

ct 2

019

Agg - 486.46 Lac All Span Deck Slab is complete. Earthwork in progress of Approach road

Page 15: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

15/49

Achievement for the month / till month

Physical Financial

56 400.00 M 0.00/100.00

0.00/100.00

20.00/30.00

0.00/10.00

0.00/174.76

57 0.00 M 0.00/100.00

0.00/100.00

0.00/60.00

0.00/20.00

13.93/170.22

58 200.00 M 0.00/100.00

0.00/100.00

10.00/100.00

0.00/30.00

0.00/140.65

59 300.00 M 0.00/100.00

0.00/100.00

5.00/100.00

0.00/40.00

0.00/164.21

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Saha

rsa

Construction of High Level RCCBridge (3x21.75M) at 5.40th KM ofGwalpada to Bihariganj Road at the

place of Old Scrow Pile Bridgeincluding Approach Road, Protectionwork, in the district of Madhepura, in

flood effected damage year 2017. (PileFoundation) Shiv Krishna Builders

Pvt.ltd. Mob - 9431268201

FDR

Mad

hepu

ra

482.

5500

00 /

899(

s) /

30 Ja

n 20

18

RC

C/6

7.12

350.

40

06 S

ep 2

018

05 D

ec 2

019

30 Ju

n 20

19

Agg - 350.40 Lac Work is Progress

Saha

rsa

Construction of High Level RCCBridge (3x16.50M) at 6.60th KM ofGwalpada to Bihariganj Road at the

place of Old Scrow Pile Bridge in thedistrict of Madhepura, in flood effected

damage year 2017. Manoj Kumar -9470049418

FDR

Mad

hepu

ra

419.

4300

00 /

1196

7(s)

/ 21

Dec

201

7

RC

C/5

1.37

287.

95

07 A

pr 2

018

06 A

pr 2

019

30 Ju

n 20

19 Agg - 287.95 Lac 2nd Deck slab work is Completed. 2ndDeck Slab is in Progress

Saha

rsa

"Construction of High Level RCCBridge (3x16.50M) at 2.70th KM of

Lalminiyan-Simraha Road in thedistrict of Suapul including Approach

road, Protection Work, in flood effecteddamage year 2017. Haqu Construction

Mob - 9955334076 & 7667383440"

FDR

Supa

ul

395.

5600

00 /

508(

S) /

16 Ja

n 20

18

49.5

0

282.

53

06 S

ep 2

018

05 D

ec 2

019

30 Ju

n 20

19 Agg - 282.53 Lac All Deck slab Completed. Approach Roadis in Progress.

Saha

rsa

Construction of High Level RCCBridge (3x16.50M) at 10.00th KM of

Lalminiyan-Simraha Road in thedistrict of Suapul including Approach

road, Protection Work, in flood effecteddamage year 2017. Laxman Kumar -

9431383203

FDR

Supa

ul

425.

0000

00 /

509(

s) /

18 Ja

n 20

18

49.5

0

314.

44

28 S

ep 2

018

27 D

ec 2

019

30 Ju

n 20

19 Agg - 314.44Lac All Deck slab Completed. Approach Roadis in Progress.

Page 16: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

16/49

Achievement for the month / till month

Physical Financial

60 100.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/68.38

61 200.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

62 480.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/87.00

1.02/2339.83

63 780.00 M 0.00/100.00

5.00/45.00

0.00/0.00

0.00/0.00

0.00/334.06

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Nal

anda

Construction of HL RCC bridge4x10.00m in place of old bridge over

Panchane river at 126 th kmBiharshariff-Bakhtiyarpur road in

Nalanda district.C

RF

Nal

anda

320.

8000

00 /

5679

(s) /

25

Jun

2015

RC

C/4

0.00

256.

23

18 A

pr 2

018

17 A

pr 2

019

31 M

ar 2

020

After retender work order has been issued in favour of M/SHaque Construction on dated 18.04.2018. As per telephonicdirection by diagaster Mannagement department nalanda ondate-28.09.2019 and D.M nalanda has given instruction to

remove the newly constructed Diversion on urgent basis dueto heavy flood in panchane river to save human life and vide

this office Memo no -1228 dt-28.09.2019 informationintimated to M.D BRPNNL.

Nal

anda

Construction of H.L.R.C.C Bridge3x16.00m with diversion, Protection

work , dismantling work and ApproachRoad in the 20th km of Sheikhpura –

Arha Road.

Plan

Nal

anda

601.

7500

00 /

1192

(s) /

01

Feb

2019

HL/

49.8

3

0.00

work has awarded to Kumar Piyush Construction Pvt. Ltd.Work order Issued on dated 14.08.2019. Diversion work in

Progress.

Nal

anda

construction of HL RCC bridge9x24.75M on Harohar river in

Sadaibigha village at Barahiya block inLakhisarai district. NARAYAN DAS

CONSTRUCTION Mob. - 9431815725/ 9431815726

Plan

Lakh

isar

ai

3068

.390

000

/ 182

1(s)

/ 28

Feb

201

4

RC

C/2

53.6

0

2322

.58

08 N

ov 2

014

07 N

ov 2

016

31 Ju

l 201

9

31 Ju

l 201

9 Bridge work completed. Construction of Via duct in approachroad foundation and Substructure completed. Super structurework is awaiting. Other side (A2 side) earth work completed.

GSB work is in progress.

Nal

anda

Construction of H.L.R.C.C Bridge6x14.50 m over lokine river Near

Radhil Chhilka of Ekangarsarai Blockunder Nalanda district. N

abar

d RW

D

Nal

anda

692.

0000

00 /

1761

/ 29

May

201

8

RC

C/8

7.00

519.

00

19 Ja

n 20

19

18 Ju

l 202

0

18 Ju

l 202

0

Foundation work is completed. A1, A2 shaft completed. RestSub structure work is in progress.

Page 17: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

17/49

Achievement for the month / till month

Physical Financial

64 585.00 M 0.00/100.00

5.00/75.00

0.00/0.00

0.00/0.00

7.13/165.12

65 0.00 M 0.00/76.00

0.00/31.00

0.00/0.00

0.00/0.00

0.00/6.76

66 300.00 M 0.00/100.00

0.00/95.00

0.00/45.00

0.00/20.00

0.00/206.21

67 300.00 M 0.00/100.00

0.00/20.00

0.00/0.00

0.00/0.00

0.00/346.67

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Nal

anda

Construction of H.L.R.C.C Bridge3x14.50 m over Mohane river Near

Sitabigha village of Parwalpur Blockunder Naward Scheme of Nalanda

district. Nab

ard

RWD

Nal

anda

366.

6500

00 /

4115

/ 07

Sep

201

8

RC

C/4

3.50

276.

32

09 F

eb 2

019

08 M

ay 2

020

08 M

ay 2

020

Foundation work completed. A1, A2, P1 P2 shaft completed.Rest Sub-structure work is in progress.

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Construction of Karpuri hostel underKishanganj District (Chhahar Divarinirman work) Ganesh Contruction

Araria Non

-Pla

n

Kis

hang

anj

66.3

8000

0 / 2

591

/ 26

Dec

201

7

Oth

ers/

1.00

41.4

3

25 S

ep 2

018

24 Ja

n 20

19 1. work Progress is slow due to rain/flood water. 2. SPErecommended for debar of the contractor vide letter no-

441(we) dt-27.5.2019 3. Pilling- 95/128 4. wall -120/387

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Construction of H.L. R.C.C. bridge(3x16.00m) including approach road,diversion and protection work in placeof damaged road in 9th km of Mastanchowk-Bagalbari-Rahamatpara-Alta-

Barbatta road in the district ofKishanganj. [Bidyanand Gupta]

FDR

Kis

hang

anj

570.

9100

00 /

1207

2(s)

/ 27

Dec

201

7

49.8

3

397.

06

24 M

ar 2

018

23 Ju

n 20

19 1. Work progress slow due to rainy season/flood. 2. LDimposed - Rs.- 1.99 Lacs 3. Recommended for Debar vide

this office letter no. 759 dt.- 30.08.2019

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Construction of of H.L. RCC bridge(5X16.00 m) in 6th km. of Kishanganj-

Bahadurganj road under FDR in theDistrict of Kishanganj. [Balram Singh]

FDR

Kis

hang

anj

791.

4400

00 /

47 (S

) / 0

2 Ja

n 20

18

83.0

5

585.

10

28 M

ar 2

018

27 S

ep 2

019 1. Work progress slow due to rainy season/flood. 2. Notice to

debar issued vide this office lt. no. 466 dt.- 03.06.2019 3. LDimposed - Rs.- 2.93 Lacs

Page 18: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

18/49

Achievement for the month / till month

Physical Financial

68 300.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/100.00

0.00/631.46

69 300.00 M 0.00/100.00

0.00/100.00

0.00/100.00

5.00/40.00

0.00/201.84

70 0.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

71 185.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/50.00

0.00/166.91

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Construction of H.L. RCC bridge(4X16.00 m) in 11th km. of

Bahadurganj-Tedhagach road in theDistrict of Kishanganj. [Binod Kumar

Singh]FD

R

Kis

hang

anj

786.

0000

00 /

1207

3(s)

/ 27

Dec

201

7

66.4

4

643.

82

24 M

ar 2

018

23 S

ep 2

019

work completed

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Construction of HL RCC bridge(2x16.00m) including approach road,diversion and protection work in place

of damaged road by flood in 2017 in the13th km of Mastan chowk-Bagalbari-

Rahamatpara-Alta-Barbatta road in thedistrict of Kishanganj. [Tirupati Balajee

Earth Work Pvt. Ltd.]

FDR

Kis

hang

anj

442.

7300

00 /

1196

8(s)

/ 21

Dec

201

7

33.2

2

304.

12

24 M

ar 2

018

23 Ju

n 20

19

1. Bridge work completed 2. Approach road work slow dueto rainy season/flood. 3. LD imposed Rs.- 1.52 Lacs. 4.

Recommended for Debar vide this office letter no. 760 dt.-30.08.2019

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Repair of Pre Stress Girder Bridge (10Span) over river Mahananda in 8th kmof Kishanganj - Bahadurganj road near

Mastan Chowk in the District ofKishanganj. [Rebuild Struct Associates,

Mumbai]

Plan

Kis

hang

anj

262.

6900

00 /

347(

s) /

09 Ja

n 20

19

Oth

ers/

425.

00

269.

00

09 M

ar 2

019

08 M

ar 2

020

1. Work order issued vide lt. no. 200 dt 09.03.2019 2.Manufacturing of bearing is in Progress.

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Construction of 2x16.50m R.C.C.Bridge over Kathliya Kochpara Dhar in

Kishanganj Block in the District ofKishanganj. [Star Construction] M

MSN

Y

Kis

hang

anj

261.

5300

00 /

6868

(s) /

23

Jul 2

014

RC

C/3

3.00

244.

23

03 O

ct 2

014

02 O

ct 2

015 1. Contractor Debared vide MD lt. No. 1015 dt 15.03.2016 2.

SPE recommended to rescind the contractor vide lt. No. 488(WE) dt 07.06.2019

Page 19: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

19/49

Achievement for the month / till month

Physical Financial

72 525.00 M 1.00/97.00

0.00/68.00

10.00/16.00

0.00/0.00

0.00/692.23

73 210.00 M 16.00/46.00

0.00/0.00

0.00/0.00

0.00/0.00

190.29/464.74

74 590.00 M 0.00/100.00

0.00/100.00

0.00/100.00

15.00/100.00

45.90/1310.86

75 420.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/5.00

0.00/248.75

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Construction of 6X24.00M H.L.R.C.CBridge in 11th km. of Muraligach-

Thakurganj Road over Chenga river atChenga Ghat in Kishanganj District.

[Shiv Kishore Construction]Pl

an

Kis

hang

anj

2085

.000

000

/ 129

2(s)

/ 18

Feb

201

7

RC

C/1

47.7

8

1682

.17

11 Ja

n 20

18

10 Ja

n 20

20 1. Work Progrees is slow due to rainy season / flood. 2. LDimposed - Rs.- 16.82 Lacs

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Construction of 5X16.00M H.L.R.C.CBridge over Kankai river under

Kochadhaman Block in 15th km. ofMastan Chowk-Bagalbari-Rahmatpara-

Alta-Barbatta road in the District ofKishanganj [Navin Chandra Sarkar,

Katihar]

Plan

Kis

hang

anj

1648

.000

000

/ 120

71(s

) / 2

7 D

ec 2

017

RC

C/8

3.05

1009

.22

06 O

ct 2

018

05 A

pr 2

020

Work Progrees is slow due to rainy season / flood.

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Construction of H.L. R.C.C. Bridge(21x24.75 m) over Koul River in Jurail

Laucha Road of RWD Road in theDistrict of Kishanganj. [Navin Chandra

Sarkar] Nab

ard

RWD

Kis

hang

anj

5205

.970

000

/ 05

/ 01

Jan

2018

RC

C/4

30.0

0

1471

.82

24 M

ar 2

018

23 S

ep 2

019

23 S

ep 2

019

work completed

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Construction of 2x30m H.L. R.C.C.Bridge on River Pahari Local Nala of

Indo-Nepal Border Road in the Districtof Kisanganj at Ch-151.00 [Bhartiya

Infrastructure Pvt. Ltd.]

Nab

ard

Kis

hang

anj

555.

6300

00 /

7209

(s) /

09

Sep

2013

RC

C/6

0.00

423.

59

01 O

ct 2

013

30 Ju

l 201

5

Handed over/ Taken over report submitted to EE, RCDKishanganj vide Letter No- 739(we), dated- 24.08.2019

Page 20: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

20/49

Achievement for the month / till month

Physical Financial

76 380.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/5.00

0.00/276.28

77 320.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/70.00

0.00/279.65

78 246.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/0.00

0.00/2330.22

79 260.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/20.00

0.00/405.07

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Construction of 2x30m H.L. R.C.C.Bridge on River Local Nala of Indo-Nepal Border Road in the District of

Kisanganj at Ch-149.00 [BhartiyaInfrastructure Pvt. Ltd.]

Nab

ard

Kis

hang

anj

691.

7300

00 /

7209

(s) /

09

Sep

2013

RC

C/6

0.00

422.

46

01 O

ct 2

013

30 Ju

l 201

5

Handed over/ Taken over report submitted to EE, RCDKishanganj vide Letter No- 739(we), dated- 24.08.2019

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Construction of 2x30.00m H.L. R.C.C.Bridge on River Surbhitha Local Nala

of Indo-Nepal Border Road in theDistrict of Kisanganj at Ch-146.850[Bhartiya Infrastructure Pvt. Ltd.]

Nab

ard

Kis

hang

anj

593.

6000

00 /

7209

(s) /

09

Sep

2013

RC

C/6

1.22

444.

16

01 O

ct 2

013

30 Ju

l 201

5

Handed over/ Taken over report submitted to EE, RCDKishanganj vide Letter No- 739(we), dated- 24.08.2019

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Construction of 14x30.00m H.L. R.C.C.Bridge on River Maichi of Indo-Nepal

Border Road in the District ofKisanganj at Ch-124.00 [S.P. Singla

Const. Pvt. Ltd.]

Nab

ard

Kis

hang

anj

3729

.170

000

/ 720

9(s)

/ 09

Sep

201

3

RC

C/4

20.0

0

2530

.49

01 O

ct 2

013

30 A

pr 2

016

Handed over/ Taken over report submitted to EE, RCDKishanganj vide Letter No- 739(we), dated- 24.08.2019

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Construction of 2x30.00m H.L. R.C.C.Bridge on River Surbhitha of Indo-

Nepal Border Road in the District ofKisanganj at Ch-123.00 [S.P. Singla

Const. Pvt. Ltd.]

Nab

ard

Kis

hang

anj

650.

8500

00 /

7209

(s) /

09

Sep

2013

RC

C/6

0.00

534.

80

01 O

ct 2

013

01 A

pr 2

016

Handed over/ Taken over report submitted to EE, RCDKishanganj vide Letter No- 739(we), dated- 24.08.2019

Page 21: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

21/49

Achievement for the month / till month

Physical Financial

80 300.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/15.00

0.00/547.05

81 537.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/20.00

0.00/6525.03

82 620.00 M 0.00/100.00

0.00/50.00

0.00/0.00

0.00/0.00

0.00/292.00

83 30.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Construction of 3x30.00m H.L. R.C.C.Bridge on River Burhi Kankai of Indo-

Nepal Border Road in the District ofKisanganj at Ch-113.640 [S.P. Singla

Const. Pvt. Ltd.]N

abar

d

Kis

hang

anj

724.

7100

00 /

7209

(S) /

09

Sep

2013

RC

C/9

0.00

650.

50

01 O

ct 2

013

30 A

pr 2

016

Handed over/ Taken over report submitted to EE, RCDKishanganj vide Letter No- 739(we), dated- 24.08.2019

Exte

rnal

Div

isio

n-2

(Kis

hang

anj)

Construction of 37x30m H.L. R.C.C.Bridge on River Burhi Kankai of IndoNepal Border Road in the District ofKisanganj at Ch- 109.65 [S.P. Singla

Pvt. Ltd.]

Nab

ard

Kis

hang

anj

6654

.940

000

/ 720

9(S)

/ 09

Sep

201

3

RC

C/1

110.

00

6696

.14

30 O

ct 2

013

30 Ju

l 201

6

Handed over/ Taken over report submitted to EE, RCDKishanganj vide Letter No- 739(we), dated- 24.08.2019

Nal

anda

Construction of H.L. Bridge 5 x14.50 mBerma-Arai Road of Karai-Parsurai

block under nalanda district. district ofNalanda N

abar

d RW

D

Nal

anda

536.

0000

00 /

1760

/ 29

May

201

8

RC

C/7

2.50

434.

83

19 Ja

n 20

19

18 A

pr 2

020

18 A

pr 2

020

Foundation work completed. A1, A2, P1,P2 P3 & P4 shaftcompleted. A1 & A2 Shaft cap is in progress.

Cha

mpa

ran(

Mot

ihar

i) Construction of High Level R.C.C.Bridge (5x18.00 Mtr.) with approachroad and Protection work on 4.05 KMof Manuapul - Yogapatti-Nawalpur-

Ratwal Road over Tirhut Canal in theDistrict of West Champaran, BridgeLength - 93.00 Mtr. Pile Foundation.

CR

F

Pach

im C

ham

parn

1324

4.54

0000

/ 12

53(S

) / 1

5 Fe

b 20

18

RC

C/9

3.00

30 Ja

n 20

19

29 Ju

l 202

0

29 Ju

l 202

0

Work order issued For NOC awaited from WRD team visitedon at site

Page 22: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

22/49

Achievement for the month / till month

Physical Financial

84 400.00 M 0.00/100.00

0.00/100.00

5.00/80.00

5.00/60.00

68.07/1219.44

85 150.00 M 0.00/85.00

5.00/30.00

0.00/0.00

0.00/0.00

30.96/507.83

86 120.00 M 0.00/100.00

0.00/100.00

5.00/60.00

0.00/20.00

0.00/587.25

87 240.00 M 0.00/100.00

0.00/100.00

0.00/100.00

20.00/100.00

0.00/369.37

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Cha

mpa

ran(

Mot

ihar

i)

Construction of H.L. R.C.C. Bridge(8x16.00m) over Balore River on 1st

km. of Narkatiyaganj - Binwalia Road.Pile Foundation. M/S Aditya

Construction Pvt. Ltd.Pl

an

Pach

im C

ham

parn

1759

.380

000

/ 116

12(s

) / 1

3 D

ec 2

017

RC

C/9

6.00

09 M

ay 2

018

08 M

ay 2

020

08 M

ay 2

020

Work is in progress

Cha

mpa

ran(

Mot

ihar

i)

Construction of H.L. R.C.C. Bridge(5x12.00m) on 1st Km. of Lauriya -

Sikarpur-Thori Road. Pile FoundationM/S Parmar Construction .

FDR

Pach

im C

ham

parn

862.

0000

00 /

1383

(s) /

21

Feb

2018

RC

C/6

0.00

27 S

ep 2

018

26 D

ec 2

019

26 D

ec 2

019

work restarted and Progress hampered due to heavy rain andflood

Cha

mpa

ran(

Mot

ihar

i)

Construction of H.L. R.C.C. Bridge(7x12.00m) on 1st Km. of Lauriya -

Ramnagar Road. Pile Foundation M/SHaque Construction.

FDR

Pach

im C

ham

parn

1125

.530

000

/ 292

(s) /

10

Jan

2018

RC

C/8

4.00

29 M

ay 2

018

28 N

ov 2

019

28 N

ov 2

019

work restarted and Progress hampered due to heavy rain andflood

Cha

mpa

ran(

Mot

ihar

i)

Construction Of H.L. R.C.C. Bridge(4x21.75m) over Pandai River on

Narkatiyaganj - Balthar Road in WestChamparan . Pile Foundation M/S

Rohan Construction Pvt. Ltd. Nab

ard

RWD

Pach

im C

ham

parn

524.

0600

00 /

9379

(s) /

11

Dec

201

7

RC

C/8

7.00

20 O

ct 2

018

19 Ja

n 20

20

19 Ja

n 20

20

Work Completed

Page 23: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

23/49

Achievement for the month / till month

Physical Financial

88 200.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/100.00

0.00/328.06

89 200.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/100.00

0.00/600.38

90 60.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

91 2713.13M

0.00/100.00

0.00/100.00

0.00/100.00

0.00/55.00

0.00/1027.40

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Cha

mpa

ran(

Mot

ihar

i)

Construction Of H.L. R.C.C. Bridge(3x18.75m) over Harpatbeni River onSukhlahi Path. Pile Foundation. M/SSG. Piling and Construction Pvt. Ltd. N

abar

d RW

D

Pach

im C

ham

parn

571.

2700

00 /

180

/ 16

Jan

2017

RC

C/5

6.00

19 F

eb 2

018

18 A

ug 2

019

18 A

ug 2

019

Work Completed

Cha

mpa

ran(

Mot

ihar

i)

Construction of H.L. R.C.C. Bridge(4x21.75 m) on 7th km. of Balther -

Narkatiyaganj Road over Kartaha River.Pile Foundation. M/S SG Piling and

Construction Pvt. Ltd. Nab

ard

RWD

Pach

im C

ham

parn

716.

6100

00 /

179

/ 16

Jan

2017

RC

C/8

7.00

19 F

eb 2

018

18 A

ug 2

019

18 A

ug 2

019

Work Completed

Cha

mpa

ran(

Mot

ihar

i) Construction of (3x21.00m) size H.L.R.C.C. Bridge work beside of 2nd

minor bridge in the approach road ofConstructed H.L. RCC Bridge overriver Gandak between Gopalganj-

Bettiah (Bishunpur Panchayat) PileFoundation M.K. Enterprises Ph. No.

9431212686

Nab

ard

Pach

im C

ham

parn

778.

0000

00 /

4699

(S) /

05

Jun

2014

RC

C/6

3.00

23 O

ct 2

018

22 A

pr 2

020 Work order issued But work has been stopped by villagers

and vide Letter No. 23 dated 05.01.2019 and letter No. 559dated 23.05.2019 submitted to DM, Gopalganj to resolve the

problem

Cha

mpa

ran(

Mot

ihar

i)

Construction of 5x24.75M R.C.C.brdige over Trimuhan river in

Dhankutawa village (Sikata Block)-Shivpur (Lauria or Chanpatia Block)

Road. Well foundation. Chankyaconstruction Pvt. Ltd.

Nab

ard

Pach

im C

ham

parn

1998

.200

000

/ 221

1(s)

/ 27

Feb

201

7

RC

C/1

27.0

0

24 Ja

n 20

13

23 Ju

l 201

4

31 D

ec 2

018

Bridge Completed and App. Road balance both side due toL.A. LA under Section-11 Preparation for publication.

Page 24: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

24/49

Achievement for the month / till month

Physical Financial

92 2340.00M

0.00/100.00

0.00/100.00

0.00/100.00

0.00/67.00

0.00/1355.00

93 20.00 M 0.00/100.00

20.00/30.00

0.00/0.00

0.00/0.00

13.74/254.79

94 40.00 M 0.00/100.00

0.00/85.00

0.00/0.00

0.00/15.00

0.00/472.08

95 240.00 M 7.00/72.00

15.00/40.00

0.00/0.00

0.00/0.00

0.00/437.15

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Cha

mpa

ran(

Mot

ihar

i)

Construction of 5x24.75M R.C.C.brdige over Sikarhana river in

Maheshara village (Sikata Block) -Sarisawa bazar (Majhaulia Block)Road. Well foundation Barhonia

Engicon Pvt. Ltd.N

abar

d

Pach

im C

ham

parn

1927

.090

000

/ 237

0(s)

/ 12

Mar

201

2

RC

C/1

27.0

0

13 S

ep 2

012

12 S

ep 2

014

31 D

ec 2

018 Bridge Completed and Sarisawa bazar side approach road

completed and Maheshara side approach uncompleted. due toL.A. but traffic movement through Kachchi road. LA under

Section-11 Preparation for publication.

Cha

mpa

ran(

Mot

ihar

i)

Construction of H.L. R.C.C. 2x30.00mtr. In the district of West Champaran

under Indo-Nepal Border Ch. 5.819 km.Near Inerwa Bazar.

Nab

ard

Pach

im C

ham

parn

990.

9700

00 /

5590

(s) /

27

May

201

7

RC

C/4

0.00

05 Ju

l 201

8

04 A

ug 2

019

31 D

ec 2

019

Work stopped due to water flowing in canal but Abutmentcap in Progress L.D. deducted, Agency debarred

Cha

mpa

ran(

Mot

ihar

i)

Construction of 7x25M size Bridge inMadanpur-Bhangha Road in Chainage43.400 Km Pakage No. 03.C.K.Infra

structure

Nab

ard

-Ind

o-N

epal

-RID

F-X

VII

I

Pach

im C

ham

parn

1402

.910

000

/ 216

0(s)

/ 14

Mar

201

3

RC

C/1

75.0

0

30 N

ov 2

016

30 Ju

l 201

8

31 D

ec 2

019

All Connectivity disturbed due to flood, but work restartedand L.D. deducted

Cha

mpa

ran(

Mot

ihar

i)

Construction of 5x21.00 m H.L. R..C.C.Bridge work in 11th km. of Motihari-

Madhubani ghat Road in EastChamparan. Well Foundation. M/S

Royal Engineers b

FDR

East

Cha

mpa

ran(

Mot

ihar

i)

1523

.870

000

/ 130

0(s)

/ 16

Feb

201

8

RC

C/1

07.0

0

15 O

ct 2

018

14 O

ct 2

020

14 O

ct 2

020

Work in progress but work stop due to water logged

Page 25: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

25/49

Achievement for the month / till month

Physical Financial

96 240.00 M 0.00/100.00

0.00/100.00

0.00/100.00

30.00/40.00

0.00/145.93

97 240.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/5.10

98 240.00 M 0.00/100.00

35.00/65.00

0.00/0.00

0.00/0.00

0.00/227.90

99 1700.00M

1.00/10.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/195.27

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Cha

mpa

ran(

Mot

ihar

i)

Construction of 2x12.50 m H.L. R..C.C.Bridge with Approach Road, Safety

work, Diversion work and Misclaneouswork in 7th km. of Dhaka - Phulwariya

Road in East Champaran. PileFoundation. M/S. Royal Engineers.

FDR

East

Cha

mpa

ran(

Mot

ihar

i)

523.

8800

00 /

1301

(s) /

16

Feb

2018

RC

C/2

5.00

27 S

ep 2

018

26 S

ep 2

019

26 S

ep 2

019

Bridge work Completed Approach work in Progress workstop due to heavy rain.

Cha

mpa

ran(

Mot

ihar

i)

Construction of 2x10.50 m H.L. R..C.C.Bridge with Approach Road, Safety

work, Diversion work and Misclaneouswork in 11th km. of Dhaka -

Phulwariya Road in East Champaran.Pile Foundation. M/S Royal Engineers

FDR

East

Cha

mpa

ran(

Mot

ihar

i)

751.

5000

00 /

689(

s) /

19 Ja

n 20

18

RC

C/6

6.00

23 M

ay 2

018

22 N

ov 2

019

22 N

ov 2

019

Agreement will be closed as per direction of higher authority.

Cha

mpa

ran(

Mot

ihar

i)

Construction of 5x21.75 m H.L. R..C.C.Bridge with Approach Road, Safety

work, Diversion work and Misclaneouswork in 5th km. of Sugauli - Piparpati

Road in East Champaran.

FDR

East

Cha

mpa

ran(

Mot

ihar

i)

1259

.860

000

/ 474

(s) /

15

Oct

201

8

RC

C/1

08.7

5

05 M

ay 2

018

04 M

ay 2

020

04 M

ay 2

020

Work in progress but work stop due to water logged

Cha

mpa

ran(

Mot

ihar

i) Construction of HL RCC Bridge (Sizes12x24.5M) over River Sikarahana withapproach road at Semara Ghat in BlockMehasi in Dist.- East Champaran underNABARD. Type of Foundation - Well,

Bridge Length - 304.32M. M/SAMBER INFRA PROJECT PVT. LTD.

Nab

ard

RWD

East

Cha

mpa

ran(

Mot

ihar

i)

4596

.000

000

/ 36

/ 03

Jan

2019

RC

C/3

04.3

2

05 M

ar 2

019

04 S

ep 2

021

04 S

ep 2

021

Work in progress but work stopped due to again flash flood atsite and L.D. deducted

Page 26: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

26/49

Achievement for the month / till month

Physical Financial

100 770.00 M 0.00/100.00

0.00/100.00

0.50/96.50

0.00/84.00

0.00/2482.30

101 260.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/2.13

102 200.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/70.00

0.00/616.58

103 260.00 M 0.00/100.00

0.00/100.00

0.00/100.00

10.00/80.00

16.91/236.07

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Cha

mpa

ran(

Mot

ihar

i)

Construction of HLRCC bridge withapproach road at kataha ghat in

sikrahna river under mehsi block in thedistrict of East champaran(12 x 24.750M), Well foundation. M/S Jay shankar

rai,9934867236N

abar

d

East

Cha

mpa

ran(

Mot

ihar

i)

3539

.550

000

/ 807

9(s)

/ 07

Oct

201

3

RC

C/2

97.0

0

30 M

ar 2

014

30 M

ar 2

016

30 Ju

n 20

19

31 D

ec 2

019

Bridge work Completed Approach road in progress L.A.Preparation for Section -11 is published and L.D. deducted

Kat

ihar

Construction of of H.L. RCC bridge(2X16.00 m) in Place of Damaged by

flood in 2017 in the 12th Km ofBairagachi-Banglacol road in the

District of Araria. ARZU CONST.LTD, PATNA

FDR

Ara

ria

557.

0700

00 /

286(

s) /

01 Ja

n 20

18

33.2

2

386.

42

19 A

ug 2

018

18 N

ov 2

019

31 M

ar 2

020

A joint inspection visited was done with EE RCD Araria &SPE Katihar on 27-12-2018 to located position of bridge to

start the work but due to public Hindrens work was notstarted. Second joint inspection also done by both on 24-06-2019 and decided to change it at 17th km chainage of this

road. and sent to Dy chief Engineer, work circle- 2 forapproval. After approval of change location Contractor willstart the work on 17th km. Super Structure work completed.

Approach road work in progress.

Cha

mpa

ran(

Mot

ihar

i)

Construction of HLRCC bridge in Indo-Nepal border road at channage 40.772km in the district of Purvi champaranPackage No- 7 (2 x 30M),Barhonia

engicor Pvt ltd,9431269809

Nab

ard

East

Cha

mpa

ran(

Mot

ihar

i)

693.

3000

00 /

7209

(s) /

09

Sep

2013

RC

C/6

0.00

28 F

eb 2

014

30 M

ay 2

016

30 D

ec 2

018

31 O

ct 2

019

Bridge work Completed

Kat

ihar

Construction of of H.L. RCC bridge(3X18.75 m) in Place of Damaged byflood in 2017 in the 4th km. of ArariaMeerganj Chowk Kuwari Bypass Skiti

Dhabeli road under in the DistrictAraria. RAJ KISHOR SINGH,

ARARIA

FDR

Ara

ria

604.

5000

00 /

285(

s) /

10 Ja

n 20

18

55.8

3

499.

77

19 A

ug 2

018

18 N

ov 2

019

super structure work completed. Approach road work inprogress.

Page 27: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

27/49

Achievement for the month / till month

Physical Financial

104 200.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/90.00

0.00/713.15

105 300.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/90.00

0.00/826.40

106 260.00 M 0.00/15.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/36.60

107 250.00 M 0.00/100.00

0.00/100.00

10.00/25.00

20.00/20.00

0.00/274.81

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Cha

mpa

ran(

Mot

ihar

i)

Construction of HLRCC bridge in Indo-Nepal border road at channage 35.650km in the district of Purvi champaranPackage No- 7 (2 x 35M),Barhonia

engicor Pvt ltd,9431269809N

abar

d

East

Cha

mpa

ran(

Mot

ihar

i)

802.

9400

00 /

7209

(s) /

09

Sep

2013

RC

C/7

0.00

28 F

eb 2

014

30 M

ay 2

016

17 D

ec 2

018

31 O

ct 2

019

Bridge work Completed

Cha

mpa

ran(

Mot

ihar

i)

Construction of HLRCC bridge in Indo-Nepal border road at channage 32.875km in the district of Purvi champaranPackage No- 7 (2 x 35M),Barhonia

engicor Pvt ltd,9431269809

Nab

ard

East

Cha

mpa

ran(

Mot

ihar

i)

849.

0600

00 /

7209

(s) /

09

Sep

2013

RC

C/6

0.00

28 F

eb 2

014

30 M

ay 2

016

17 D

ec 2

018

31 O

ct 2

019

Bridge work Completed

Kat

ihar

Construction of of H.L. RCC bridge(2X16.00 m) in Place of Damaged by

flood in 2017 in the 9th Km ofBairagachi-Banglacol road in the

District of Araria. MS SONACONSTRUCTION, SUPAUL

FDR

Ara

ria

547.

0800

00 /

287(

s) /

10 Ja

n 20

18

33.2

2

395.

50

19 A

ug 2

018

18 N

ov 2

019

31 M

ar 2

020

5/22 pile cap completed. Rest pile stop due to flood water.. ALatter has written to contractor to expedise the work other

wise. LD will be imposed. Latter No-432 dt-15.04.19.noticegive to start work otherwise you will be resigned to work. ALetter has written to contractor to speedup the works other

wise be debar vide latter no-867 dated-03-08-2019. A DebarLetter given to contractor vide letter N0- 1096 dt-28-09-2019

Kat

ihar

Construction of of H.L. RCC bridge(3X18.75 m) in 3rd km. of Araria

Meerganj Chowk Kuwari Bypass SkitiDhabeli road under FDR in the DistrictofAraria. SHIV CHANDRA KUMAR

FDR

Ara

ria

577.

4200

00 /

46(s

) / 0

2 Ja

n 20

18

58.0

8

416.

85

17 O

ct 2

018

16 Ja

n 20

20

A1 = 28/28m, P1 = 30/30m, P2=4.6/30m, P3=4.6/30m,P5=19/30m concreting & sinking work in progress. A L/Dhas imposed to contractor for Rs. 5,90,304.00 for delay ofwork vide letter No.- 238, dt. 22.02.19 & Lt. No. - 491 dt.-03.05.2019. 1st span Super Structure work completed. 2nd

spna s.s. work in progress.

Page 28: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

28/49

Achievement for the month / till month

Physical Financial

108 260.00 M 0.00/100.00

0.00/100.00

0.00/100.00

10.00/90.00

0.00/470.76

109 260.00 M 0.00/100.00

0.00/100.00

5.00/100.00

10.00/70.00

0.00/362.66

110 250.00 M 0.00/100.00

0.00/100.00

10.00/100.00

10.00/50.00

0.00/297.25

111 280.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Kat

ihar

Construction of of H.L. RCC bridge(3X18.00 m) including approach road,diversion and protection work in placeof damaged by flood in 2017 in the ch.

Ch. 9th Km of Meerganj-Kuwari bypass- sikti- Dhabeli road in the distric of

Araria. M/S JAI MATA DI CONST.BEGUSARAI.

FDR

Ara

ria

742.

8400

00 /

479(

s) /

15 Ja

n 20

18

55.8

3

550.

10

19 A

ug 2

018

18 N

ov 2

019

Super structure work completed. Approach work in progress.

Kat

ihar

Construction of of H.L. RCC bridge(3X12.00 m) including approach road,diversion and protection work in placeof damaged by flood in 2017 in the ch.Ch. 7th Km of Araria Kurshakatta road

in the distric of Araria. TIRUPATIBALAJI EARTH WORK PVT LTD.

PATNA

FDR

Ara

ria

584.

1200

00 /

477(

s) /

15 Ja

n 20

18

37.2

2

403.

92

17 A

ug 2

018

16 N

ov 2

019

Bridge work completed. Approach Road work in progress.

Kat

ihar

Construction of of H.L. RCC bridge(2X16.00 m) including approach road,diversion and protection work in placeof damaged by flood in 2017 in 10thKm of Meerganj chowk -Kuwari by

pass to sikti-dhabeli road in the districof Araria. SHAILESH KR. SINGH

FDR

Ara

ria

554.

5000

00 /

283(

s) /

10 Ja

n 20

18

33.2

0

481.

89

19 O

ct 2

018

18 O

ct 2

020

22/22 Pilling work completed. super structure work inprogress. A Letter has written to contractor to Expedise the

work other wise LD will be imposed. Letter No- 2080 dt- 31-12-2018. s.s. work completed. Bridge work

completed.Approach work in progress.

Kat

ihar

Construction of of H.L. RCC bridge(2X16.00 m) including approach road,diversion and protection work in placeof damaged by flood in 2017 in 7th Km

of Bairgachhi-Banglacol road in thedistrict of Araria. SAIYAD MUMTAZ

AKHTAR

FDR

Ara

ria

557.

9200

00 /

677(

s) /

19 Ja

n 20

18

33.2

0

19 O

ct 2

018

18 Ja

n 20

20

A joint inspection visited was done with EE RCD Araria &SPE Katihar on 27-12-2018 to located position of bridge to

start the work but due to public Hindrens work was notstarted. Second joint inspection also done by both on 24-06-2019 and decided to change it at 25th km chainage of this

road. and sent to Dy chief Engineer, work circle- 2 forapproval. after approval of change location tender will be

done

Page 29: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

29/49

Achievement for the month / till month

Physical Financial

112 300.00 M 0.00/100.00

0.00/100.00

15.00/75.00

5.00/30.00

0.00/288.88

113 65.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/80.00

0.00/153.16

114 280.00 M 10.00/90.00

10.00/40.00

0.00/0.00

0.00/25.00

0.00/172.50

115 300.00 M 0.00/95.00

75.00/75.00

0.00/0.00

0.00/0.00

0.00/219.89

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Kat

ihar

Construction of of H.L. RCC bridge(3X16.00 m) including approach road,diversion and protection work in placeof damaged by flood in 2017 in 8th Kmof Meerganj chowk- kuwari by pass to

sikti dhabeli road in the district ofAraria.ARJU CONST. PATNA

FDR

Ara

ria

762.

4600

00 /

678(

s) /

13 Ja

n 20

18

49.8

0

599.

75

19 O

ct 2

018

18 A

pr 2

020

28/28 Pilling work completed. super structere work inprogress.. A Letter has written to contractor to Expedise the

work other wise LD will be imposed. Letter No- 2081 dt- 31-12-2018. Approach work is started. A L/D has been imposedto contractor of amount 2,99,877/- vide letter No-580 dated-30.05.2019. 3rd span Super Structure work in progress. 3rd

span super structure work completed. Approach work inprogress.

Dar

bhan

ga

costruction of HLRCC bridge in NH-28through chand chourdih to pathan tol

before river under ujiyarpur block(2x14.50).Sri RajeshKumar,94308343626

MM

SNY

Sam

astip

ur

204.

5900

00 /

7370

(s) /

06

Aug

201

4

RC

C/3

0.26

1576

5739

.00

30 S

ep 2

014

30 S

ep 2

015

Remarks for LA: Section-7 is in progress.Expert committeeto be formed.

Kat

ihar

Construction of of H.L. RCC bridge(2X18.00 m) including approach road,diversion and protection work in placeof damaged by flood in 2017 in 82Km

of Refujee colony-Meerganj chowk(NH57A) road in the district of Araria.

ARJU CONST. PATNA

FDR

Ara

ria

557.

6900

00 /

478(

s) /

15 Ja

n 20

18

37.2

0

388.

63

19 O

ct 2

018

18 Ja

n 20

20

22/22 Pilling work in progress. Pile cap work in progress. ALetter has written to contractor to Expedise the work other

wise LD will be imposed. Letter No- 2017 dt- 17.12.2018 &Letter No- 2086 dt- 31.12.2018 & Latter No-490 dt-03.05.19.

A L/D has Imposed of 0-.5% amount 1,94,315/- vide latterNo-866 date-03-08-2019 Work is stop due to design changesand study to NIT Patna for Approval. A Letter has given tocontractor for debar vide latter N0-763 Dated-16-07-2019.

Kat

ihar

Construction of of H.L. RCC bridge(3X14.00 m) including approach road,diversion and protection work in placeof damaged by flood in 2017 in 15th

Km of Parwaha-Mirdaul PWD road inthe distrtict of Araria. AAKASH

KUMAR, PATNA

FDR

Ara

ria

685.

1500

00 /

476(

s) /

15 Ja

n 20

18

43.8

0

517.

20

19 O

ct 2

018

18 Ja

n 20

20

28/28 Pile work completed. pile cap work in progress. L/Dimposed to contractor vide Letter No- 476 dt-29.04.19 and

Rs-2,58,600/- A notice send to contrator to speedop the workotherwise 2nd L/D will be imposed.2nd L/D has been

imposed to contractor of amount 2,58,600/- vide letter No-556 dated-23.05.2019. A letter has to given for Debar Noticevide Latter No-760 Date-16-07-2019. Sub structure work in

progress.

Page 30: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

30/49

Achievement for the month / till month

Physical Financial

116 250.00 M 0.00/100.00

0.00/100.00

20.00/50.00

30.00/30.00

81.07/354.53

117 300.00 M 10.00/70.00

0.00/0.00

0.00/0.00

0.00/0.00

46.14/670.84

118 350.00 M 0.00/100.00

0.00/100.00

10.00/30.00

0.00/0.00

40.10/733.49

119 200.00 M 0.00/100.00

40.00/100.00

10.00/10.00

0.00/0.00

0.00/199.65

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Kat

ihar

Construction of of H.L. RCC bridge(3X18.75 m) in 2nd km. of Araria

Meerganj Chowk Kuwari Bypass SkitiDhabeli road under FDR in the DistrictAraria. SHIV CHANDRA KUMKAR

FDR

Ara

ria

573.

7200

00 /

45 (S

) / 0

2 Ja

n 20

18

58.0

8

427.

76

17 O

ct 2

018

16 Ja

n 20

20

28/28 Pilling work in completed. Pile cap work completed. ALetter has written to contractor to Expedise the work other

wise LD will be imposed. Letter No- 2015 dt- 17.12.2018. AL/D Letter has imposed to contractor 0.5% amount 2,13,881/-vide letter No-560 dated-24.05.2019. work stop due to floodwater.Debar Notice has given vide letter No-868 dated-03-08-2019. 2/3 SS Completed.Approach work in progress.

Railway/wearing coat work in prgroess.

Kat

ihar

Construction of RCC HL bridge(6x21.00m) at 28th KM of Belauri-

Shivganj-Sonaili-Salmari Bazar road inthis district of Katihar. ARJUN

PRASAD,

FDR

Kat

ihar

1471

.000

000

/ 254

1(s)

/ 28

Mar

201

8

129.

60

1180

.60

10 O

ct 2

018

17 O

ct 2

020

A2 cutting edge placed. A1-28m/28m,P1=30/30m,P2=15/30,P3=15/30,P4=12.5/30M,P5=

30/30m concreting & sinking work in progress. A L/D hasimposed to contractor for Rs. 5,90,304.00 for delay of work

vido letter No-238 Dt-22.2.19 & Letter No. 491 dt-03.05.2019. Diversion completed. Traffic on contractor given

Debar Notice vide Latter No-764 Dated- 16-07-2019.

Kat

ihar

Construction of RCC HL bridge(6x21.00m) in the 15th Km of Katihar-

Sonaili-Jhowa-salmari-Barsoi-Balrampur road including approach

road diversion, protection work in placeof damaged road by flood in 2017 in thedistric of Katihar. MUKESH KUMAR,

KATIHAR

FDR

Kat

ihar

1379

.210

000

/ 234

8(s)

/ 28

Mar

201

8

127.

22

1006

.22

24 A

ug 2

018

23 A

ug 2

020 Foundation work completed. Sub structure work in

Progress.to contractor 0.5% amount 5,03,114/- vide letter No-557 dated-23.05.2019. Super Structure work in progress.

Kat

ihar

Construction of RCC HL bridge(2x21.75m) at 9th KM of Kadwa Block

headquarter-chowki via bharriAashiyani road including approach road

diversion, protection work and roadsefty in place of dmaged road by floodin 2017 in the district of Katihar. M/SSHIV SHAKTI CONST. PURNEA

FDR

Kat

ihar

517.

1100

00 /

1390

(s) /

21

Feb

2018

44.7

2

357.

59

24 A

ug 2

018

23 A

ug 2

019

31 M

ar 2

020

22/22 Pilling work completed. Super structure work inprogress. A LD has imposed to constructor for Rs.

1,78,800.00 for Delay of work. by Letter No- 2090 dt-31.12.2018. A Debar Notice has given vide letter No-873

dated-04-08-2019. 2nd LD imposed of Rs. 1,78,800.00 videlatter No-846 dated- 01-08-2019. 3rd LD Rs 1788000 vide

letter no 1077 dt- 28-09-2019

Page 31: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

31/49

Achievement for the month / till month

Physical Financial

120 290.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/95.00

0.00/653.97

121 200.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/100.00

0.00/258.53

122 250.00 M 0.00/100.00

0.00/100.00

0.00/100.00

10.00/60.00

0.00/368.02

123 240.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/100.00

0.00/319.90

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Dar

bhan

ga

Construction of HLRCC bridge withLand acquisition ,approach road and

protection work in tilyuga river betweendwalak village and janki nagar tola

under madhepur block in the district ofmadhubani (5x18.75 m)Shreem

Construction,9470627503

BD

F

Mad

huba

ni

995.

7400

00 /

1867

(s) /

03

Mar

201

4

RC

C/9

6.84

7277

0925

.00

30 Ju

n 20

15

30 O

ct 2

014

31 D

ec 2

018 Approach upto GSB complted. B.T. work could not be done

as there is no access of Road Rollar to the Site. TrafficStarted.

Dar

bhan

ga Construction of HL RCCbridge(2x16.50M) in 1st km of

Bishanpur Atarbel Road in the Districtof Darbhanga.

FDR

Dar

bhan

ga

442.

5300

00 /

291(

s) /

13 Ja

n 20

18

RC

C/3

4.26

3329

6953

.00

10 A

ug 2

018

09 N

ov 2

019

09 N

ov 2

019

Traffic Started.

Kat

ihar

Construction of RCC HL bridge(2x21.75 m) including approach road,diversion and protection work in placeof damaged by flood in 2017 in the 4thKm of Damdama-Azamnagar-KeshariChwok via Azamnagar railway Station

road in the district of Katihar. OMCONT. KATIHAR

FDR

Kat

ihar

586.

0000

00 /

1391

(s) /

21

Feb

2018

44.7

2

382.

58

10 O

ct 2

018

17 Ja

n 20

20 Bridge work in progress. Wearing Coat & Railing workcompleted.. Approach work in progress.

Kat

ihar

Construction of RCC HL bridge(2x16.00 m) including approach road,diversion and protection work in place

of damaged by flood in 2017 in the 42thkm of Katihar-Sonali-Jhowa-Salmari-

Barsoi-Balrampur road in the district ofKatihar. M/S SHAILESH KUMAR

FDR

Kat

ihar

458.

7200

00 /

480(

s) /

15 Ja

n 20

18

49.2

2

382.

85

01 Ju

n 20

18

31 A

ug 2

019

31 D

ec 2

019

Bridge work and approach road work completed.

Page 32: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

32/49

Achievement for the month / till month

Physical Financial

124 230.00 M 0.00/100.00

0.00/100.00

0.00/90.00

10.00/50.00

0.00/291.41

125 240.00 M 0.00/100.00

0.00/100.00

5.00/100.00

10.00/50.00

0.00/459.39

126 300.00 M 0.00/100.00

0.00/100.00

35.00/45.00

10.00/60.00

94.93/1046.10

127 250.00 M 0.00/75.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/278.80

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Kat

ihar

Construction of H.L. RCC bridge(3X16.00 M) in Belauri-Shivganj-

Salmari Bazar 19th km. of (1st Cutting)in the district of Katihar. BABAN

KUMAR SINGHFD

R

Kat

ihar

639.

7300

00 /

294(

s) /

10 Ja

n 20

18

49.8

3

415.

50

13 Ju

n 20

18

12 S

ep 2

019

31 D

ec 2

019

3rd span super structure work completed. Approach roadwork in progress.

Kat

ihar

Construction of H.L. RCC bridge(5X16.00 M) in Belauri-Shivganj-

Salmari Bazar 19th km. of (2ndCutting) in the district of Katihar.

GOKUL HITECH INFRA PVT. LTD.

FDR

Kat

ihar

866.

8800

00 /

293(

s) /

10 Ja

n 20

18

83.0

5

605.

43

13 Ju

n 20

18

12 S

ep 2

019

31 D

ec 2

019

Bridge work completed. Approach Road work in progress.

Kat

ihar

"Construction of RCC HL bridge(5X24.00 m) including approach road,diversion and protection work in placeof damaged by flood in 2017 in the 4thKm of Plasi-Baraili road in the district

of Purnea. PRABHAT KR. "

FDR

Purn

ia

1606

.000

000

/ 167

7(S)

/ 05

Mar

201

8

123.

00

1115

.17

10 O

ct 2

018

17 A

pr 2

020

17 A

pr 2

020

Super Structure work in progress.

Kat

ihar

"Construction of RCC HL bridge(3X24.75 m) including approach road,diversion and protection work in placeof damaged by flood in 2017 in the 1st

Km of Belgachi PWD Road ViaNitendra-Macharhatta-goria road in thedistrict of Purnea. M/S SHIV SHAKTI

CONST. PURNEA"

FDR

Purn

ia

1185

.000

000

/ 138

4(S)

/ 21

Feb

201

8

76.0

8

571.

44

10 O

ct 2

018

17 A

pr 2

020

17 A

pr 2

020

A1-30/32m,P1-30/32m,P2-30/32m,A2-30/32m, concretingand sinking work in progress. A Letter has written to

contractor to Expedise the work other wise LD will beimposed. Letter No- 2097 dt- 31.12.2018. A L/D imposed to

contractor of 0.5% amount 2,85,721 dated 25.5.2019. ALatter has given to contractor for Debar vide latter No-876

dated-04-08-2019.

Page 33: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

33/49

Achievement for the month / till month

Physical Financial

128 500.00 M 0.00/100.00

0.00/50.00

10.00/10.00

0.00/0.00

0.00/1126.68

129 240.00 M 0.00/100.00

0.00/100.00

0.00/100.00

10.00/100.00

0.00/502.19

130 240.00 M 0.00/100.00

0.00/100.00

0.00/100.00

10.00/70.00

0.00/576.99

131 240.00 M 0.00/100.00

0.00/100.00

20.00/80.00

10.00/60.00

0.00/308.68

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Kat

ihar

"Construction of RCC HL bridgeincluding approach road, diversion andprotection work in place of damaged byflood in 2017 in 1st Km of Palsa- KaliMandir-Baraili Road (4x21.00m)span(Ch. 245m to 340m) and (5x21.00m)span in (Ch. 480m to 600m ) in the

district of Purnea. HAQUECONSTRUCTION Muzaffarpur"

FDR

Purn

ia

2791

.300

000

/ 130

7(S)

/ 16

Feb

201

8

218.

40

1953

.79

10 O

ct 2

018

17 Ja

n 20

20

17 Ja

n 20

20

1st bridge A2=30/30m, P3=30/30m, A1=30/30m, P1=30/30,P2=30/30 well cap work in progress. 2nd bridge A1=30/30,

A2=30/30, P1=30/30, P2=30/30, P3=30/30, P4=30/30 ALetter has written to contractor to Expedise the work other

wise LD will be imposed. Letter No- 2009 dt- 17.12.2018. AL/D imposed 0.5% and Rs 9,76,899/- vide latter no 858 dt-

02-08-2019

Kat

ihar

"Construction of RCC HL bridge(2X24.00 m) including approach road,diversion and protection work in place

of damaged by flood in 2017 in the 29thkm of Biasi-Amor-Bahadurganj

road(SH-99) in the district of Purnea.HAQUE CONSTRUCTION"

FDR

Purn

ia

794.

7500

00 /

690(

S) /

19 Ja

n 20

18

49.2

2

562.

65

13 Ju

n 20

18

12 D

ec 2

019

12 D

ec 2

019

Bridge work completed. Approach Road work alsocompleted.

Kat

ihar

"Construction of RCC HL bridge(4x16.00 m) including approach road,diversion and protection work in placeof damaged by flood in 2017 in the 6thkm of Jokihat-Dalmalpur-Garua road in

the district of Purnea. RAJ KISHORSINGH"

FDR

Purn

ia

877.

5300

00 /

683(

S) /

19 Ja

n 20

18

66.4

4

667.

60

13 Ju

n 20

18

12 D

ec 2

019

12 D

ec 2

019

Bridge work completed. Approach Road work in progress.

Kat

ihar

"Construction of H.L. RCC bridge(3X16.50 M) in the 9th km of

Belgachhi PWD road via Nitendra-Machharhatta-Geria road in the districtof Purnia. HAQUE CONSTRUCTION"

FDR

Purn

ia

729.

4500

00 /

295(

S) /

10 Ja

n 20

18

51.3

3

469.

61

13 Ju

n 20

18

12 S

ep 2

019

31 D

ec 2

019

3rd S.S work in progress, Approach Road work in progress.

Page 34: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

34/49

Achievement for the month / till month

Physical Financial

132 240.00 M 0.00/100.00

0.00/100.00

0.00/100.00

10.00/100.00

0.00/310.05

133 240.00 M 0.00/100.00

0.00/100.00

20.00/80.00

40.00/40.00

0.00/923.88

134 240.00 M 0.00/100.00

0.00/100.00

0.00/100.00

10.00/100.00

0.00/313.94

135 240.00 M 0.00/100.00

0.00/100.00

0.00/100.00

10.00/100.00

142.85/571.67

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Kat

ihar

"Construction of H.L. RCC bridge(3X16.50 M) in the 7th km of Ekba-Mahammodia-Dubouli road in thedistrict of Purnia. M/S SHAILESH

KUMAR"FD

R

Purn

ia

552.

1700

00 /

296(

S) /

10 Ja

n 20

18

51.3

3

375.

41

04 A

pr 2

018

03 Ju

l 201

9

31 D

ec 2

019

Bridge work completed. Approach work also completed.

Kat

ihar

"Construction of RCC HL bridge(8x18.00m) including approach road,diversion and protection work in the

place of 10th km of Jokihat-Dalmalpur-Gerua road in the district of Purnia.

SHANKAR SHARMA & BAIJNATHSHARMA (J.V.)"

FDR

Purn

ia

1478

.980

000

/ 120

92(s

) / 2

7 D

ec 2

017

148.

88

1113

.48

27 M

ar 2

018

23 M

ar 2

020

23 M

ar 2

020

8th span super structure work completed. Approach Roadwork in progress.

Kat

ihar

"Construction of H.L. RCC bridge(3x16.50 M) in 2nd Km. of Ekhua

mahmadodia-Bareli-Duboli road in thedistrict of Purnea. BAIJNATH

SHARMA"

FDR

Purn

ia

619.

2400

00 /

42(s

) / 0

2 Ja

n 20

18

51.3

3

404.

68

05 A

pr 2

018

04 Ju

l 201

9

31 D

ec 2

019

Superstructure & Approach Road completed.

Kat

ihar

"Construction of of H.L. RCC bridge(3X16.00 m) in (SH-99) 9th km. of

Baisi-Amour-Bahadurganj road in theDistrict of Purnea. RAJKISHOR

SINGH"

FDR

Purn

ia

739.

0000

00 /

41(s

) / 0

2 Ja

n 20

18

49.8

3

536.

33

28 M

ar 2

018

22 S

ep 2

019

Super Structure completed. Approach Road also completedupto black top. Traffic open.

Page 35: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

35/49

Achievement for the month / till month

Physical Financial

136 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

137 240.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/40.00

0.00/384.33

138 240.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/60.00

0.00/813.98

139 350.00 M 0.00/80.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/628.12

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Kha

garia Construction of HL RCC Bridge over

Bagmati River at Nawada Ghat inChautham Block of Khagaria district

Nab

ard

RWD

Kha

garia

5614

.000

000

/ 885

/ 01

Mar

201

9

RC

C/5

07.2

0

Executive Engineer, RWD, Works Division Gogri hassubmitted proposal for land acquisition in 4 copy to DLAO,Khagaria vide letter no. 1038 (Anu), dt - 16.08.2019 LOA

Issued to the Contractor from this office vide letter no. 1621dt 27.08.19

Kat

ihar

Construction of of H.L. RCC bridge(3X16.50 m) in 9th km. of Kali Mandir

to Baraily road in the District ofPurnea.SHANKAR SHARMA

FDR

Purn

ia

723.

7600

00 /

43(s

) / 0

2 Ja

n 20

18

51.3

3

523.

96

16 M

ar 2

018

15 S

ep 2

019

Super structure completed. Approach Work in Progress.

Kat

ihar

"Construction of Balance work of H.L.RCC bridge (4x21.00 m) in 9th km ofJokihat-Dalmalpur-Gerua road in the

district of Purnia BAIJNATHSHARMA"

FDR

Purn

ia

1196

.000

000

/ 44(

s) /

02 Ja

n 20

18

86.4

4

864.

94

15 A

pr 2

018

14 A

pr 2

020

Super structure completed. Approach Work in Progress.

Exte

rnal

Pro

ject

Div

isio

n Construction of H.L., R.C.C.Bridge(3X25) with its approach roadover Tilyuga river in Theho village-

Sonapur road in Dagmara Panchyat ofNirmali block in the District of Supaul.

(Devraha Construction Pvt. Ltd.,Goutam Nagar, Ward No.-12, Saharsa-

852201)(PKG-38 B)

WB

P Ph

ase-

2

Supa

ul

867.

7700

00 /

770

/ 25

Sep

2014

HL/

75.0

0

15 F

eb 2

017

14 F

eb 2

019

31 M

ar 2

021 1. Abutment A1, P2 Plugging completed. 2. A2-P2 Well Cap

completed. 3. P1 & A2 stenning work in progress. 4. Show-cause issued to contractor and LD is imposed.

Page 36: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

36/49

Achievement for the month / till month

Physical Financial

140 0.00 M 9.30/95.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/345.91

141 350.00 M 0.00/70.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/628.12

142 250.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/0.00

0.00/254.20

143 225.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/10.00

0.00/860.68

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Kha

garia

Construction of H.L. RCC Bridge overChanha River at Chhanch Ghat in 3rd

km. of Bishanpur-Sumbha Road ofKhagaria District St

ate

Plan

Kha

garia

1817

.490

000

/ 300

(S) /

10

Jan

2018

RC

C/1

08.0

4

1038

3277

9.00

23 O

ct 2

018

22 A

pr 2

020 Executive Engineer, RCD, Works Division Khagaria has

submitted proposal for land acquisition in 4 copy to DLAO,Khagaria vide letter no. 103, dt - 13.02.2019

Exte

rnal

Pro

ject

Div

isio

n Construction of H.L., R.C.C.Bridge(4X25)with its approach roadover Tilyuga river besides screw pilebridge in Kewtapatti-Nirmali Bazar

road in Nirmali Block in the district ofSupaul. (Devraha Construction Pvt.Ltd., Goutam Nagar, Ward No.-12,

Saharsa-852201)(PKG-38 A)

WB

P Ph

ase-

2

Supa

ul

1172

.780

000

/ 770

/ 25

Sep

201

4

HL/

100.

00

15 F

eb 2

017

14 F

eb 2

019

31 M

ar 2

021

1. Abutment A1 Plugging Completed. 2. Pier P1 in pluggingstage. 3. P2 & P3 well stenning in progress. 4. Abutment A2well curb in progress. 5. Land Acquition by perpetual lease is

under process and request has been sent to RWD forallotment. 6. So cause issued to contractor and LD is

imposed.

Kat

ihar

"Construction of 4x16.50m span H.L.R.C.C. Bridge over on BakhriKola

Dhar in Bakhrikol to Vishhariya in theDistrict of Purnea. Baba Construction."

Nab

ard

Purn

ia

421.

1400

00 /

1807

(s) /

06

Mar

201

3

RC

C/6

8.44

309.

52

30 Ju

n 20

13

30 S

ep 2

014

L/A was under Perpesual lease process.

Kha

garia

costruction of HLRCC bridge in theriver Balan at basahi ghat under

bhagwanpur block(6x21.75 m)MansaEngicom Pvt. Ltd.,9431060060 RWD M

MSN

Y

Beg

usar

ai

658.

7200

00 /

9410

(s) /

23

Jun

2010

RC

C/3

4.20

07 M

ay 2

010

05 M

ar 2

012

Possession of land received from D.L.A.O Begusarai videletter no. 295 dt 16.08.19 Estimate for revised A/A has been

sent to RCD. M/s Chhinamastika Construction andDevelopers and Developers Pvt. Ltd. been awarded work by

retndering of remaining approach road.

Page 37: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

37/49

Achievement for the month / till month

Physical Financial

144 420.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/0.00

0.00/162.40

145 350.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/40.00

41.93/1142.13

146 300.00 M 0.00/100.00

0.00/100.00

0.00/76.00

0.00/10.00

0.00/1689.19

147 365.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/90.00

0.00/1616.14

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Kat

ihar

Construction of 2x12.50m span R.C.C.Bridge over hara dhar in betweenGogra-Lalganj of Katihar District.

Ashwani Kr. Singh, Katihar. MM

SNY

Kat

ihar

251.

6400

00 /

1026

5(s)

/ 13

Sep

201

2

RC

C/3

0.00

155.

56

30 D

ec 2

012

30 D

ec 2

013 L/A was under lease process. But land owners were not

Agree. So L/A in converted in permanent L/A vide this officeletter No-1030(we) dated- 07-09-2019

Exte

rnal

Pro

ject

Div

isio

n Construction R.C.C. Bridge(7X25) withits approach road in Dubhari-Chakla

Ghat to Kosi Embankment road (NearSpur) on 57.20 R.D. of Kosi

Embankment in the district of Supaul.{Vishwanath Sharma, Vill. + P.O.-

Rahua, P.S.-Rosera, District-Samastipur-848210 (Bihar)}(PKG-34 )

WB

P Ph

ase-

2

Supa

ul

1530

.910

000

/ 404

/ 28

May

201

4

HL/

175.

00

17 O

ct 2

016

16 O

ct 2

018

31 D

ec 2

019

1. Bridge Completed. 2. Earth work in progress. 3. LandAcquition by perpetual lease is under process and Six man

committee has submitted the report and request has been sentto RWD for allotment. 4. People is asking for higher ratefrom D.M. 5. By the help of administration the work is

started. 6. Press release is published for Perpetual Lease ofLand.

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L, R.C.CBridge(7X33) with its approach road in

5th K.M. of Chhatapur-Girdharpu-Chunni road in the district of Supaul.

(Lall Construction Co., AA-105,Shalimar Bagh, Delhi-110088)(PKG-

25)

WB

P Ph

ase-

2

Supa

ul

1988

.260

000

/ 404

/ 28

May

201

4

HL/

231.

00

14 F

eb 2

017

13 F

eb 2

019

31 D

ec 2

019

1. 21/21 Girder completed. 2. 5/7 Deck Slab completed. 3.Earth work in progress. 4. By December,2019 it will be

completed. 5. EOT applied by Contractor uptoDecember,2019. 6. So cause issued to contractor and LD is

imposed.

Kat

ihar

Construction of H.L. R.C.C. Bridge onGanjan Ghat in Barsoi NeemtalaChowk to Dakaita Puja Road via

Beghour Hat to Katihar District. RajConstruction N

abar

d RW

D

Kat

ihar

1691

.510

000

/ 920

/ 11

Jun

2013

RC

C/2

01.0

0

1181

.75

30 O

ct 2

013

30 Ju

l 201

5

Bridge work completed. Traffic open L/A in under perpisuallease process. onlu SDBC work remaining.

Page 38: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

38/49

Achievement for the month / till month

Physical Financial

148 415.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/60.00

0.00/1685.33

149 300.00 M 0.00/100.00

0.00/100.00

0.00/100.00

10.00/90.00

41.13/1068.50

150 350.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/70.00

43.48/862.83

151 160.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/90.00

0.00/862.84

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Kat

ihar

Construction of H.L. R.C.C. bridge in10th Km of Barsoi Banbhui-Dhachana

Road of Katihar District. ShankarSharma

Nab

ard

Kat

ihar

1965

.650

000

/ 958

5(s)

/ 13

Dec

201

3

RC

C/1

94.0

0

1599

.75

30 M

ar 2

014

30 M

ar 2

016 Bridge work completed. one End Approach completed. other

end L/A problem. 3 Farmer registray completed 17 farmersare not read they demanding Residential price.

Kat

ihar

Construction of 6X21.75m H.L.R.C.CBridge at Kundi Tola in Mohna

Chandpur Panchayat of Barari Block ofKatihar District. Vishundev Yadav M

MK

VY

Kat

ihar

1800

.000

000

/ 145

4(s)

/ 21

Mar

201

7

83.0

5

1167

.71

30 N

ov 2

017

30 N

ov 2

019 Bridge work completed. Approach work in progress. GSB

completed. MWM work completed. B.T. Work remaining dueto rain.

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L, R.C.CBridge(2X25) with its approach road in3rd K.M. of Supaul Station to Bariya

Manch in the district of Supaul.(Tirupati Balaji Earth Work Pvt. Ltd.,

A/230, P.C. Colony, Kankarbagh,Patna-800020)(PKG-21A )

WB

P Ph

ase-

2

Supa

ul

943.

4700

00 /

404

/ 28

May

201

4

HL/

50.0

0

27 F

eb 2

016

26 F

eb 2

018

30 A

pr 2

019

31 D

ec 2

019 1. Bridge work completed. 2. WMM work completed. 3.

Show-cause issued to contractor for debarment and LD isimposed.

Exte

rnal

Pro

ject

Div

isio

n Construction of H.L, R.C.CBridge(1X33) with its approach road in

3rd K.M. Sesouni-East KoshiEmbankment (near Khakhi) in the

district of Supaul.(Tirupati Balaji EarthWork Pvt. Ltd., A/230, P.C. Colony,

Kankarbagh, Patna-800020)(PKG-21B)

WB

P Ph

ase-

2

Supa

ul

387.

2900

00 /

404

/ 28

May

201

4

HL/

33.0

0

27 F

eb 2

016

26 F

eb 2

018

30 A

pr 2

019

31 D

ec 2

019 1. Bridge work completed. 2. Earth Work in progress. 3.

Show-cause issued to contractor for debarment and LD isimposed.

Page 39: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

39/49

Achievement for the month / till month

Physical Financial

152 250.00 M 0.00/85.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/155.94

153 370.00 M 0.00/100.00

0.00/100.00

0.00/60.00

0.00/0.00

0.00/205.75

154 250.00 M 0.00/100.00

0.00/100.00

0.00/35.00

0.00/10.00

0.00/1363.32

155 200.00 M 0.00/100.00

0.00/100.00

30.00/130.00

0.00/15.00

0.00/1363.32

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Kat

ihar

Construction of 3x18.75m H.L R.C.Cbridge in river Barjan near Palasmani of

Kursakanta block in the District ofAraria. ARZU CONST. LTD, PATNA N

abar

d RW

D

Ara

ria

475.

0700

00 /

1095

(s) /

28

Mar

201

8

RC

C/5

8.08

374.

62

18 O

ct 2

018

17 Ja

n 20

20

30/30 pilling work completed, pile cap work in progress. ALetter has written to contractor to Expedise the work other

wise LD will be imposed. Letter No- 2014 dt- 17.12.2018 &Letter No- 2099 dt- 31.12.2018,131 dt-31.01.2019 & 486 dt-29.04.2019..notice give to start work otherwise you will be

resined to work.A L/D has impose of 0.5% amount1,87,312/- vide Latter No-860 Dated-02-08-2019. work is

slow due to flood water.

Kat

ihar

Construction of 2x30m Size of H.L.R.C.C. bridge at (Velbwa River)

Mieerganj Railway crossing to DhabeliRoad Chainage 30.75 of Indo-NepalBorder Road in the District of Araria.

Baba Const.

Nab

ard

Ara

ria

570.

8000

00 /

2160

(s) /

13

Mar

201

3

RC

C/6

0.00

509.

41

30 A

pr 2

013

30 Ju

n 20

14

A CWJC No........../2018 has filled in the Hon'ble High courtby baba contractor. A latter had written to contractor to start

the work other wise you will be resigned vide this officeLatter No-460 dt-25.04.19. A request case 52/19 to be fill on

05-08-2019 in Honerable H.C. 2nd span stagging workstarted by contractor

Exte

rnal

Pro

ject

Div

isio

n Construction of H.L, R.C.CBridge(2X28) with its approach road in

4th K.M. of Parsara-Chikni road(Bardwari Station-Simra road) in Placeof damaged Old R.C.C. Bridge in thedistrict of Supaul. (Lall ConstructionCo., AA-105, Shalimar Bagh, Delhi-

110088)(PKG-16C)

WB

P Ph

ase-

2

Supa

ul

792.

7400

00 /

609

/ 25

Jul 2

014

HL/

56.0

0

12 A

ug 2

017

11 A

ug 2

019

31 M

ar 2

020 1. 3/6 Girder completed and other Girder staging work in

progress. 2. Earth work in progress. 3. By March,2020 it willbe completed. 4. So cause issued to contractor and LD is

imposed.

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L, R.C.CBridge(1X33)with its approach road in1st K.M. of Parsarma-chinkni road in

the district of Supaul. (LallConstruction Co., AA-105, Shalimar

Bagh, Delhi-110088)(PKG-16A) WB

P Ph

ase-

2

Supa

ul

531.

8800

00 /

404

/ 28

May

201

4

HL/

33.0

0

12 A

ug 2

017

11 A

ug 2

019 1. Deck Slab Complete. 2. By March,2020 it will be

completed. 3. So cause issued to contractor and LD isimposed.

Page 40: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

40/49

Achievement for the month / till month

Physical Financial

156 200.00 M 0.00/100.00

0.00/100.00

0.00/15.00

0.00/0.00

141.89/1363.32

157 350.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/85.00

0.00/157.57

158 495.00 M 0.00/100.00

0.00/100.00

10.00/50.00

0.00/30.00

0.00/384.28

159 475.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/75.00

0.00/564.80

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L, R.C.CBridge(2X25) in 4th K.M. of Perserma-

Chikni road in Palce of damaged OldS.P. Bridge (on Khardaha Dhar) in thedistrict of Supaul. (Lall ConstructionCo., AA-105, Shalimar Bagh, Delhi-

110088)(PKG-16B)

WB

P Ph

ase-

2

Supa

ul

550.

6600

00 /

404

/ 28

May

201

4

HL/

50.0

0

12 A

ug 2

017

11 A

ug 2

019

31 M

ar 2

020 1. 2/6 Girder Completed. 2. By March,2020 it will be

completed. 3. So cause issued to contractor and LD isimposed.

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L, R.C.CBridge(1X21) with its approach road in

Chandradei-Kamaldha-Paratha roadalong Laliahi Dhar in 2nd Km in the

district of Araria.(Tirupati Balaji EarthWork Pvt. Ltd., A/230, P.C. Colony,

Kankarbagh, Patna-800020)(PKG-22)

WB

P Ph

ase-

2

Ara

ria

509.

9500

00 /

404

/ 28

May

201

4

HL/

21.0

0

27 F

eb 2

016

26 M

ay 2

017

31 M

ar 2

020

1. Bridge work completed and opened for traffic. 2. WMMunder Progress (B) EOT applied by Agency to SPE office. (C

) Land dispute created by local villagers during WMMwork.Letter Written to Administration for resolving the issueand follow up being done with them to speed up in resolving

the issue.

Exte

rnal

Pro

ject

Div

isio

n Construction of H.L, R.C.CBridge(5X21) with its approach road in

11th K.m of Chandradei-Bangama-Matiyari-Mogra road in the district ofAraria.(PKG-10) {Nirman Engicons

Pvt. Ltd., At + P.O.- Mohanpur,District-Begusarai (Bihar)-851131}

(PKG-10)

WB

P Ph

ase-

2

Ara

ria

857.

6100

00 /

404

/ 28

May

201

4

HL/

105.

00

27 F

eb 2

016

26 A

ug 2

017

30 Ju

n 20

19

30 Ju

n 20

20

1. 2/5 deck slab completed. 2. P2-P3 span Girder shutteringunder progress. 3. Approach road work under progress. 4.Contractor is debarred. 5. EOT Granted upto June,2020. 6.

Due to flood work is stopped.

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L, R.C.CBridge(2x25) with its approach road in4th K.M. of Falka-Sripur-Bhawanipur-Karman Chowk road in the District of

Purnea. {Basant Vanijya Limited,Lakhibagh, Manpur, Gaya-825003

(Bihar)} (PKG- 19 A)

WB

P Ph

ase-

2

Purn

ia

685.

3300

00 /

404

/ 28

May

201

4

HL/

50.0

0

27 F

eb 2

016

26 F

eb 2

018

31 M

ay 2

019

31 D

ec 2

019 1. Bridge Completed. 2. WMM under progress. 3. By

December,2019 it will be completed. 4. So cause issued tocontractor and LD is imposed.

Page 41: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

41/49

Achievement for the month / till month

Physical Financial

160 320.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/60.00

0.00/702.68

161 320.00 M 0.00/100.00

0.00/100.00

0.00/80.00

0.00/0.00

0.00/702.69

162 300.00 M 5.00/85.00

0.00/0.00

0.00/0.00

0.00/0.00

83.18/546.17

163 300.00 M 0.00/80.00

0.00/0.00

0.00/0.00

0.00/0.00

89.82/515.00

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L, R.C.CBridge(2X21) with its approach road in5th K.m of Alamnagar-Budhma- Mali

road in the district of Madhepura.(Haque Construction Co., Sarai SyedAli, Muzaffarpur-842001)(PKG-7B) W

BP

Phas

e-2

Mad

hepu

ra

595.

8000

00 /

404

/ 28

May

201

4

HL/

42.0

0

07 D

ec 2

016

06 D

ec 2

018

31 Ju

l 201

9

31 O

ct 2

019 1. Bridge Completed. 2. GSB completed. 3. Vehicle

movement started. 4. By July,2019 it will be completed. 5.LD is imposed and show-cause asked. 6. Debared from

Division.

Exte

rnal

Pro

ject

Div

isio

n Construction of H.L, R.C.CBridge(4x25) with its approach road in10th K.m in Khurhan-Parel-Ratwara-

Kapasia road in the district ofMadhepura (Extended part of RCD road0 to 15 k.m.) (Haque Construction Co.,Sarai Syed Ali, Muzaffarpur-842001

(PKG.7A)

WB

P Ph

ase-

2

Mad

hepu

ra

851.

6700

00 /

404

/ 28

May

201

4

HL/

100.

00

07 D

ec 2

016

06 D

ec 2

018

31 Ju

l 201

9

31 O

ct 2

019 1. All Deck Slab Completed & Crash Barrier work in

progress. 2. By October,2019 it will be completed. 3. LD isimposed and show-cause asked. 4. Debared from Division.

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L. R.C.C.-P.S.C.Bridge with its approach road in 9thK.m of Sour-Patarghat road in the

district of Saharsa.(PKG-29 ) (M/s JaiMata Di Construction, Shri Krishnapuri

(South), Begusarai (Bihar)-851101) WB

P Ph

ase-

2

Saha

rsa

1265

.510

000

/ 404

/ 28

May

201

4

HL/

99.0

0

08 M

ar 2

019

07 M

ar 2

021

07 M

ar 2

021 1. New Scheme started in March 19. 2. A2 Shaft Completed.

3. P2 Shaft under Progress. 4. A1 Well Cap reinforcementcompleted. 5. P1 Stenning Under Progress.

Exte

rnal

Pro

ject

Div

isio

n Construction of H.L. R.C.C.-P.S.CBridge with its approach road in 3rd

Km of Baluwahat Kosibandh viaAghori-Sakra-Paharpur-Baghwa road inthe district of Saharsa.(PKG-13 ) (M/s

Jai Mata Di Construction, ShriKrishnapuri (South), Begusarai

(Bihar)-851101)

WB

P Ph

ase-

2

Saha

rsa

1031

.430

000

/ 404

/ 28

May

201

4

HL/

112.

00

08 M

ar 2

019

07 M

ar 2

021

07 M

ar 2

021 1. New Scheme started in March 19. 2. A2 Abutment shaft

casted. 3. P3 Well Cap Casted. 4. P1, P2, A1 Well Stenningunder progress.

Page 42: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

42/49

Achievement for the month / till month

Physical Financial

164 350.00 M 0.00/100.00

0.00/100.00

5.00/45.00

0.00/25.00

0.00/333.21

165 300.00 M 0.00/100.00

0.00/30.00

0.00/0.00

0.00/0.00

0.00/1481.28

166 300.00 M 0.00/100.00

0.00/100.00

0.00/90.00

0.00/30.00

0.00/1444.76

167 300.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/40.00

0.00/1444.76

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Exte

rnal

Pro

ject

Div

isio

n Construction of H.L, R.C.CBridge(2X28)with its approach road in14th K.M. of Chaudhara-Amha-Lokha-Saharsa road in Place of damaged OldR.C.C Bridge in the district of Saharsa.

(Sincon Infrastructure Pvt. Ltd., S.KPuri, LG-1 & 2, Majestic Plaza, WestBoring Canal Road, Patna-800001)

(PKG-32)

WB

P Ph

ase-

2

Saha

rsa

870.

0000

00 /

609

/ 25

Jul 2

014

HL/

56.0

0

27 F

eb 2

016

26 A

ug 2

017

30 Ju

n 20

19

30 D

ec 2

019 1. 1/2 Deck Slab Casted. 2. 4/6 Girder Casted 3. P1-A2

Girder Reinforcement under Progress. 4. Approach roadwork in Progress. 5. By December,2019 it will be completed.

6. So cause issued to contractor and LD is imposed.

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L, R.C.CBridge(4X33) with its approach road in15th K.M. of Ranginiya-Sonbarsa Road

in Palce of Old S.P. Bridge in thedistrict of Saharsa. (Lall ConstructionCo., AA-105, Shalimar Bagh, Delhi-

110088) (PKG-24)

WB

P Ph

ase-

2

Saha

rsa

1549

.360

000

/ 404

/ 28

May

201

4

HL/

132.

00

29 Ju

n 20

17

28 Ju

n 20

19

30 Ju

n 20

20

30 Ju

n 20

20

1. Foundation completed progress. 2. A2 and P3 Shaft CapCompleted. 3. P2 Shaft Completed. 4. Due to encroachment

at site in Bridge alignment work started in the month ofMarch 2018 starting. Encroachment was removed with the

help of administration in Feb.2018 and work started inmarch. 5. Due to raised water level in river work stopped. ByJune,2020 it will be completed. 6. EOT applied by Contractor

upto March,2020.

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L, R.C.CBridge(2X25) with its approach road in

7th K.m of Panchgachhiya-Nauhattaroad in Palce of damaged Old R.C.CBridge in the district of Saharsa. (LallConstruction Co., AA-105, ShalimarBagh, Delhi-110088)(Package- 3 B)

WB

P Ph

ase-

2

Saha

rsa

764.

6700

00 /

609

/ 25

Jul 2

014

HL/

50.0

0

21 D

ec 2

016

20 D

ec 2

018

30 Ju

n 20

19

30 D

ec 2

019

1. 2/2 Deck Slab Complete. 2. Crash Barrier under progress.3. Approach Road under progress. 4. Due to local hindrancein fixing alignment work delayed. 5. By December,2019 it

will be completed. 6. So cause issued to contractor and LD isimposed.

Exte

rnal

Pro

ject

Div

isio

n

Construction of H.L, R.C.CBridge(2X33) with its approach road in3rd K.M. of Panchgachhiya - NauhattaRoad in Palce of Old S.P. Bridge in thedistrict of Saharsa. (Lall ConstructionCo., AA-105, Shalimar Bagh, Delhi-

110088)( Package- 3 A)

WB

P Ph

ase-

2

Saha

rsa

1018

.280

000

/ 404

/ 28

May

201

4

HL/

66.0

0

21 D

ec 2

016

20 D

ec 2

018

30 Ju

n 20

19

30 D

ec 2

019 1. Bridge completed. 2. Approach road under Progress. 3. By

December,2019 it will be completed 4. So cause issued tocontractor and LD is imposed.

Page 43: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

43/49

Achievement for the month / till month

Physical Financial

168 1306.00M

0.00/100.00

0.00/100.00

0.00/73.00

0.00/0.00

12.04/2384.18

169 2030.00M

0.00/100.00

0.00/100.00

0.00/95.00

0.00/60.00

1.64/2975.50

170 60.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/90.00

19.32/126.02

171 1100.00M

0.00/95.00

0.00/85.00

0.00/35.00

0.00/0.00

0.00/3352.29

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Muz

affa

rpur

"Construction of 12x24.00 mH.L.R.C.C. Bridge in Dr JagarnathMishra College in between Soda

Godaun to Ahiyapur with approachroad in the district of Muzaffarpur.

(Nabard). Ganesh Ram Dokania, Mob-9471637819"

Nab

ard

Muz

affa

rpur

4329

.610

000

/ 788

9(S)

/ 03

Jan

2013

RC

C/3

00.0

0

3107

1017

1.00

19 F

eb 2

014

18 F

eb 2

016

30 Ju

n 20

20

30 Ju

n 20

20

Work in Progress.

Remarks for LA: LA Issue for approach road. ChaqmohabbatMauja-2.547acres,Nazirpur Mauja- 2.43 acres, ChandrawaraMauja- 8.043 acres, Total Land- 13.02 acres, Total Raiyat-

38, Documents are being prepared for registry.

Muz

affa

rpur

"Construction of 12x24.00 mH.L.R.C.C. Bridge in Athar Ghat overBhudhi Gandak river under BochahaBlock in the district of Muzaffapur.(Plan) Ganesh Ram Dokania, Mob-

9471637819"

Plan

Muz

affa

rpur

3554

.810

000

/ 181

7(S)

/ 28

Feb

201

4

RC

C/2

97.0

0

2815

5918

6.00

22 N

ov 2

014

21 N

ov 2

016

31 M

ar 2

020

31 M

ar 2

020

Work in Progress.

Remarks for LA: Athar banshman Mauja-5.485 acres.Bishunpur Jagdish Mauja-2.605 acres. Binda Mauja-

10.615acres.Total land- 18.705 acres. Total Raiyat- 66 LPC,received from DM,Muzaffarpur Registred, LPC- 34

Registred Area- 6.07 Acres. Corrected LPC awaited fromD.M.Muzaffarpur.

Muz

affa

rpur Construction of 2x10.37M size Bridge

over Canal to Siman chakjamal SimanRoad in ward No. 33 of Vaishali

District MM

SNY

Vais

hali

169.

0400

00 /

6066

(S) /

08

Jul 2

014

RC

C/2

2.00

1297

4000

.00

21 N

ov 2

014

20 N

ov 2

015

Work in Progress.

Remarks for LA: L.A issue in approach road under P/L. 2.Total Area:- 0.1375 Acre. 3.Formalities of News Paper

publication has been completed. 4. 02 LPC has beenreceived, but 01 LPC is Legal objection. Registered Area-

0.07 Dismal.

Muz

affa

rpur

Construction of R.C.C H.L BridgeChandauli Ghat in Bagmati River

District of Sitamarhi.

Plan

Sita

mar

hi

7089

.380

000

/ 739

4(S)

/ 10

Aug

201

6

RC

C/4

32.0

0

4443

6794

3.00

10 F

eb 2

016

09 A

pr 2

019

30 Ju

n 20

20

30 Ju

n 20

20

Work in Progress.

Remarks for LA: It was decided to execute the LandAcquisition by perpetual Lease process by the feasibility

committee in the meeting held on 24.01.2019. A request hasbeen sent to D.M, Sitamarhi to certify the ownership of Land

awards (Rayaits) Vide letter no 419 dated 30.04.2019 (i)Mauja Chandauli Timaha - 7.285 Acres, Raiyat-59 No. (ii)Mauja Bharwari - 5.540 Acres Raiyat- 58 No. (iii) Mauja

Bharwari Nankar- 1.548Acres, Raiyat- 09 No. Total Area tobe acquired- 14.365, Total No. of Raiyat- 126 A camp was

organised with C.O. Belsand at site on06.06.2019.Verification of Rayatee Land ownership is under

process.

Page 44: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

44/49

Achievement for the month / till month

Physical Financial

172 240.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/0.00

0.00/823.65

173 240.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/60.00

0.00/338.33

174 240.00 M 0.00/100.00

0.00/100.00

0.00/95.00

0.00/60.00

0.00/329.85

175 700.00 M 0.00/100.00

0.00/75.00

10.00/20.00

0.00/20.00

0.00/489.68

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Muz

affa

rpur

Construction of R.C.C H.L BridgeBelsand-chhitauni-Tariyani Road in 2nd

Km. 4x21.00M District of Sitamarhi.N

abar

d R

CD

Sita

mar

hi

851.

4600

00 /

1012

5 / 1

0 Se

p 20

12

RC

C/8

4.00

7562

9157

.00

30 D

ec 2

012

30 Ju

n 20

14

30 Ju

n 20

20

Bridge work has been completed & Agreement Closed.

Remarks for LA: LPC & Classification for registration ofland acquisition have been received. Objections against

classification of land from land owners (Rayatee) have beensubmitted said objections have been forwarded to DLAO

Sitamarhi vide this office letter 989 (WE) dated 16.08.2019fo the redressal of objections.

Muz

affa

rpur "Construction of 3x18.75m H.L.R.C.C.

Bridge in 3rd km of Aurai- Jale Road inthe district of Muzaffarpur. Ram Swarth

Rai, Mob- 9471091378"

FDR

Muz

affa

rpur

590.

4000

00 /

277(

S) /

10 Ja

n 20

18

RC

C/5

8.12

4350

3004

.00

24 M

ay 2

018

23 A

ug 2

019

31 O

ct 2

019

Work in Progress.

Muz

affa

rpur "Construction of 3x18.75m H.L.R.C.C.

Bridge in 7th km of Aurai- Jale Road inthe district of Muzaffarpur. Ram Swarth

Rai, Mob- 9471091378"

FDR

Muz

affa

rpur

588.

4700

00 /

152(

S) /

05 Ja

n 20

18

RC

C/5

8.12

4415

5189

.00

24 M

ay 2

018

23 A

ug 2

019

31 O

ct 2

019

Work in Progress.

Muz

affa

rpur "Construction of 4x24.00m H.L.R.C.C.

Bridge in 1st km of Meenapur BelsandRoad in the district of Muzaffarpur. Jay

Shankar Kumar, Mob-9431006580 "

Plan

Muz

affa

rpur

1246

.610

000

/ 842

8(S)

/ 22

Sep

201

7

RC

C/9

6.00

9642

9600

.00

24 M

ay 2

018

23 M

ay 2

020

31 M

ar 2

020

Work in Progress.

Page 45: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

45/49

Achievement for the month / till month

Physical Financial

176 200.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/30.00

0.00/305.32

177 200.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/90.00

0.00/394.94

178 1500.00M

0.00/84.00

0.00/67.00

0.00/65.00

0.00/12.00

0.00/3947.28

179 650.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/85.00

0.00/2997.49

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Dar

bhan

ga Construction of HL RCC bridge in 3rdkm of (5x16.50M) Bindha gamaChaksaho Road in the District of

Samastipur.FD

R

Sam

astip

ur

760.

7100

00 /

1676

(s) /

05

Mar

201

8

RC

C/8

2.50

5937

3268

.00

10 O

ct 2

018

31 D

ec 2

019

31 D

ec 2

019

Approach Road work in progress.

Dar

bhan

ga Construction of HL RCC bridge inTajpur-Halai Road in 14th KM of Noon

River (5x21.75M) in the District ofSamastipur

Plan

Sam

astip

ur

879.

1000

00 /

1207

7(s)

/ 27

Dec

201

7

RC

C/1

08.7

5

5056

7152

.00

11 A

pr 2

018

10 O

ct 2

019

10 O

ct 2

019

Work Completed .Trffic Started

Dar

bhan

ga

Construction of HLRCC bridge withLand acquisition ,approach road and

protection work in kareh river betweenhasanpur to soharwa sati ghat in

samastipur distrcit(21x24.00 m)RamKripal Singh Constructon Pvt Ltd.,

RCD

Plan

Sam

astip

ur

6813

.400

000

/ 717

1(s)

/ 05

Aug

201

5

RC

C/5

16.6

4

5917

3775

9.00

01 A

ug 2

015

30 O

ct 2

018

30 Ju

n 20

20

30 Ju

n 20

20 Work in progress.

Remarks for LA: Sec.-37 Completed and payments beingmade to Raiyats.

Dar

bhan

ga Construction of HLRCC bridge at kakarghat in rosra morwara road in kareh

river(16x24.75 m) Shiv KishoreConstruction Pvt. Ltd.,9431858543 N

abar

d R

CD

Sam

astip

ur

3009

.420

000

/ 780

2(s)

/ 13

Jul 2

012

RC

C/4

05.8

0

2199

2700

5.00

30 D

ec 2

012

30 M

ar 2

015

Traffic Started

Remarks for LA: Rs.171.92 Lacs has been deposited toDLAO Samastipur vide letter no.-949 dated-02.09.2013.

Rs.-5.93 Lacs has been Deposited to DLAO Samastipur forPayment of SIA Work Vide Letter No-40(WE) date-

10.01.2019 . SIA work completed. Public Hearing done.Section- 07 is in Progress.

Page 46: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

46/49

Achievement for the month / till month

Physical Financial

180 780.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/80.00

0.00/1469.39

181 1620.00M

0.00/78.00

0.00/55.00

0.00/40.00

0.00/0.00

0.00/1300.56

182 350.00 M 0.00/90.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/246.32

183 440.00 M 0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

0.00/0.00

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Dar

bhan

ga Construction of HLRCC bridge at angarghat in the budhi gandak river

(10x24.75 m) Braj KishorRai,9430800861 N

abar

d R

CD

Sam

astip

ur

2096

.720

000

/ 158

3(s)

/ 09

Feb

201

2

RC

C/2

53.6

4

1385

3592

1.00

30 M

ar 2

012

30 Ju

l 201

4

Traffic Started

Remarks for LA: Rs. 231.65 Lacs has been Deposited toDLAO Samastipur vide letter No 487 dated 06.06.2015.

Rs.-3.7 Lacs has been Deposited to DLAO Samastipur forPayment of SIA Work Vide letter no-29 Date-04.01.2019 SIA

work completed. Public Hearing done. Section- 07 is inProgress.

Dar

bhan

ga

Construction of HLRCC bridge withLand acquisition ,approach road and

protection work near jhanjharpur at oldNH-57 in kamala balan river in

madhubani distrcit(9x24.00 m)TusharConstruction Company, Gaziabad.,

RCD

Plan

Mad

huba

ni

4197

.050

000

/ 622

0(S)

/ 09

Jul 2

015

RC

C/2

21.4

4

2772

8170

7.00

27 A

pr 2

016

27 D

ec 2

018

30 Ju

n 20

20

30 Ju

n 20

20 Work in progress.

Remarks for LA: In LA Sec-19 is in Progress.

Ara

Construction of High Level RCCbridge(3x14.50m) over river Gangi inlieu of Damaged Balbatra Lakri pul at

Ward No-03 in Ara Block in the Districtof Bhojpur (Ara)

Plan Ara

639.

3400

00 /

7459

(S) /

26

Sep

2018

RC

C/4

3.50

05 F

eb 2

019

04 A

ug 2

020

Foundation almost completed. Flooding at site due to rise inwater level in river Gangi

Ara

Construction of High Level RCCBridge (4x18.0)m in 40th K.M. ofBhabhua Adhaura Road (At Tala

Village) across Suara River in Kaimur(Bhabhua) District

Plan

Kai

mur

(Bha

bua)

560.

0000

00 /

9156

(S) /

03

Dec

201

8

RC

C/7

2.00

04 Ju

n 20

19

03 S

ep 2

020

Diversion Completed. Flooding at site due to rise in waterlevel in river Suara.

Page 47: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

47/49

Achievement for the month / till month

Physical Financial

184 150.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/65.00

0.00/129.83

185 360.00 M 0.00/65.00

0.00/5.00

0.00/0.00

0.00/0.00

0.00/547.21

186 1690.00M

0.00/100.00

0.00/100.00

0.00/100.00

0.00/95.00

0.00/6942.84

187 360.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/90.00

122.39/1699.19

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Ara

Construction of H.L. R.C.C. BridgerOver Kauw river in samta Bigha -

Dhasadih at Sambhal bigha-Semaradihin Sasaram Block in the District of

Rohtas under MMSNY. (Brajesh KumarSingh)

MM

SNY

Roh

tas

214.

5000

00 /

1949

(s) /

04

Mar

201

4

RC

C/2

2.40

18 Ju

n 20

16

17 Ju

n 20

17

30 N

ov 2

019

30 N

ov 2

019

Contractor debarred for delay. Warning letter for Rescindinghas been issued.

Ara

Construction of H.L.RCC Bridge at19th K.M. of Mohania-Ramgarh road

across Durgawati River in KaimurDistrict. Jai Mata Dee Maa SitaConstruction. Mob-9934462616

Plan

Kai

mur

(Bha

bua)

1751

.040

000

/ 902

6(s)

/ 13

Oct

201

7

RC

C/1

40.0

0

21 A

ug 2

018

20 A

ug 2

020

Flooding at site due to rise in water level in river Durgawati.

Kat

ihar

Construction of 27x30m Size of H.L.R.C.C. bridge at (Saidabad) Mieerganj

Railway crossing to Dhabeli RoadChainage 50.80 of Indo-Nepal Border

Road in the District of Araria. D2SInfra Structures Pvt. Ltd.

Nab

ard

Ara

ria

7896

.720

000

/ 216

0(s)

/ 14

Mar

201

3

RC

C/8

10.0

0

6160

.18

30 Ju

l 201

3

30 Ju

l 201

6

Bridge work completed 1620 m Approach B.T. completed 70m left which is transfer to RCD Araria.

Kat

ihar

Construction of 7x21.75M Bridge overPaharia Ghat of Bakra River in

Kursakanta to Teera Road of DomSadak Road in the District of Araria.

M/S Raj Construction Nab

ard

RWD

Ara

ria

1915

.810

000

/ 318

/ 19

Jan

2018

RC

C/1

57.0

0

1744

.65

28 F

eb 2

012

30 D

ec 2

019 Bridge work completed. Approach work in progress. 150m

work approach washed out due to heavy flood during11.07.2019 to 14.07.2019 high officials visit required. work

is in progress.

Page 48: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

48/49

Achievement for the month / till month

Physical Financial

188 3107.00M

0.00/100.00

0.00/100.00

0.00/100.00

0.00/95.00

95.87/3602.55

189 300.00 M 0.00/95.00

15.00/30.00

0.00/0.00

0.00/0.00

0.00/773.34

190 200.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/40.00

0.00/188.55

191 295.00 M 0.00/100.00

0.00/95.00

0.00/90.00

0.00/50.00

0.00/482.09

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Kat

ihar

Const. of 11x18.75m H.L.R.C.C Bridgeover Parmar river on Diyari Ghat inbetween Dumariya to Diyari in the

district of Araria Braj KishorConstruction.

Plan

Ara

ria

4244

.200

000

/ 708

1(s)

/ 30

Jul 2

015

RC

C/2

06.2

5

2974

.63

03 Ja

n 20

16

02 Ja

n 20

18

31 M

ar 2

020

Bridge work completed. Approach work in progress.

Kat

ihar

Construction of 6X24.00m H.L. R.C.C.Bridge over Bakra river at 1st km. of

Udahat Tekni road under PLAN in theDistrict of Araria. Tirupati Balajee

Earth Work Pvt. Ltd.

Plan

Ara

ria

2211

.730

000

/ 129

3(s)

/ 16

Feb

201

7

RC

C/1

47.8

5

1487

.67

01 Ja

n 20

18

01 Ja

n 20

20

A1=30m/30m, P1=27m/27m, P2=25m/25m, A2=15m/30mP3=25/25,P4=25/25m, P5=27/27m well staining ,L/D has

imposed to contructor for Rs. 7,43,838.00 for Delay of work.by letter no- 1991 dt- 15-12-2018. work slow due to flood

water. 2nd LD has imposed 0.5% Rs. 7,43,838.00 vide LetterNo.- 859 dt. 02.08.2019.

Kat

ihar

Construction of 3x16.50m H.L. R.C.C.Bridge including approach Road in 3rdKm. of Saifganj Road in the District of

Araria. Shivdani Engineers Patna. Non

-Pla

n

Ara

ria

317.

2200

00 /

1435

3(s)

/ 28

Dec

201

1

RC

C/5

0.00

244.

61

30 Ju

n 20

12

30 Ju

n 20

13

Bridge work completed. LA work is in progress. A latter sentto contractor to start the work vide latter no-852 dated 02-08-2019. Land owner demanding residantial cost but sanctioned

in two times for agriculture land

Kat

ihar

Construction of 4x22.00m span H.L.R.C.C. Bridge over Retva River in

P.W.D. Nehru Chowk to DharamganjRoad of Araria District. S.K.

Construction

MM

SNY

Ara

ria

415.

2200

00 /

6776

(s) /

21

Jul 2

014

RC

C/6

8.00

326.

00

30 Ja

n 20

14

30 O

ct 2

015

30 D

ec 2

019 28/28 pole cap completed. super sturcture work in progress.

A latter has to written to contractor to expedise the work.Other wise LD will be imposed vide latter no 2068 dt-28-12-

2018 & latter no-492 dt-03-05-2019

Page 49: ct eement Amount - Bihar Rajya Pul Nirman Nigam Ltd.brpnn.bih.nic.in/Reports/MPR Non Mega Sep_2019.pdf · (Shree Tirupati Balaji Enterprises, 9470664329) Plan Gaya 450.620000 / 1

10/22/2019 MPR Report :: Sep_2019

49/49

Achievement for the month / till month

Physical Financial

192 320.00 M 0.00/100.00

0.00/100.00

0.00/0.00

0.00/0.00

0.00/216.51

193 320.00 M 0.00/100.00

0.00/100.00

0.00/100.00

0.00/100.00

0.00/362.80

194 320.00 M 0.00/100.00

0.00/100.00

0.00/85.00

0.00/90.00

0.00/385.60

Sl.N

o

Div

isio

n

Nam

e O

f Wor

k

Hea

d / S

ub H

ead

Dis

tirct

Adm

inis

trat

ive

App

rova

l

Type

/Len

gth

Of B

ridg

e(M

)

Agr

eem

ent A

mou

nt

Len

gth

of A

ppro

ach

(in M

)

Dat

e of

Com

men

cem

ent

Dat

e O

f Sch

edul

ed c

ompl

etio

n

Rev

ised

Dat

e of

com

plet

ion

Lik

ely

date

of c

ompl

etio

n

Rem

arks

Foun

datio

n (in

%)

Sub-

Stru

ctur

e (in

%)

Supe

r-St

ruct

ure

(in %

)

App

roac

h (in

%)

Cum

ulat

ive

Kat

ihar

Construction of 3x21.75m span R.C.C.Bridge over Dhiwha (Chakka) dhar in

front of Yogipur in farhi to kanholiRoad of Narpatganj block in the District

of Araria District. Pankaj KumarM

MSN

Y

Ara

ria

331.

9400

00 /

9346

(s) /

24

Aug

201

2

RC

C/6

5.00

338.

76

30 D

ec 2

012

28 F

eb 2

014

1st span super structure work in progress. A letter has writtento contractor to Expedise the work. Other wise LD will beimposed vide this office letter No- 2039 Dt- 21-12-2018 .

Rescind Reminder Letter No-494 dt-03.05.19, Letter No-683dt-29.06.2019.

Kat

ihar

Construction of 4x21.75m span R.C.C.Bridge over Adiwashi Tola in Dumariyato Rampur Road of Palasi Panchayat inthe District of Araria District. Pankaj

Kumar

MM

SNY

Ara

ria

410.

6500

00 /

9348

(s) /

24

Aug

201

2

RC

C/8

7.00

390.

01

30 D

ec 2

012

28 F

eb 2

014

Bridge and approach road work completed.

Kat

ihar

Construction of 3x21.75m span R.C.C.Bridge over Jahanpur Ghat in theDistrict of Araria District. Pankaj

Kumar MM

SNY

Ara

ria

420.

6600

00 /

9272

(s) /

23

Aug

201

2

RC

C/7

0.00

357.

37

30 O

ct 2

012

30 Ja

n 20

14

1st and 2nd deck slab work completed. Stagging work inprogress in 3rd span. A letter has writtern to contractor to

Expedise the work. Other wise LD will be imposed vide thisoffice letter No- 2041 Dt- 21-12-2018.Rescind Reminder

Latter No-494 dt-03.05.19. Wearing coat & Railing work inprogress in 1st and 2nd span.