CSEPs Update
Chris Warner
2
Background
Review Group 0157
Incremental Improvements (eg: UNC Modifications 0167,
0180V, 0200)
Ofgem CSEP Group
Long term options (options 1, 2, 3)
Incremental improvements (option 4)
SPAA iGT Single Service Provision Scoping Group
Development of Option 3
3
Ofgem CSEP Group – Incremental improvements (option 4)
Change Order 1216
Issue:
– date of registration in DNO Settlement Systems does not match that
within iGT Supply Point Register
– results in Supply Point mis-match
Resolution:
– DNOs to allow registration in their Settlement Systems earlier in the
connection process
– enables co-ordination of iGT and DNO start dates where notification
received from the iGT
Implementation:
– Scheduled for 1 October 2009
4
Ofgem CSEP Group – Incremental improvements (option 4)
UNC Modification 0226 / Change Order 1262
Issue:
– DNO unable to match iGT’s first LMN request to the DNO authorised connection
(disconnect between engineering and commercial processes)
– lack of nested CSEP data
– results in Supply Point mis-match
Resolution:
– iGT obligation to provide DNO reference number in LMN requests
– DNO ability to receive and process data issued from nesting iGTs
Implementation:
– Scheduled for 1 October 2009
Dependency:
– iGT UNC obligation for ‘lead’ iGT to issue relevant DNO reference to all nesting
iGTs and for nesting iGT to issue relevant data to DNOs
5
Ofgem CSEP Group – Incremental improvements (option 4)
Reconciliation
Implementation of change requests 1216 / 1262 and UNC
Modification 0226 seek to address prospective registration activity
There is pre existing issue with a mismatch in iGT and DNO
Settlement information
The key to the successful implementation of the changes is
therefore the conduct of an exercise at implementation to reconcile
all relevant portfolio information in DNO and iGT systems
Implementation plan will make provision for this
6
SPAA iGT Single Service Provision Scoping Group (1)
SSP
The CSEP NExA Governance group has discussed data
quality issues between iGT’s and GDN’s.
This group has discussed a number of models to eradicate
the incorrect gas allocation issue and those challenges
faced by shippers and suppliers as a result of iGT’s varying
approaches to Supply Point Administration and AQ Review.
As a result the SSP project has been set up by the SPAA
Executive Committee to deliver the procurement of a single
service provider for Independent Gas Transporters.
7
SPAA iGT Single Service Provision Scoping Group (2)
Progress so far
Cost Analysis
Comments Matrix
Alternative Options
Project plan for completion end 2012
Recommendations Report to SPAA EC in May 2009
8
SPAA iGT Single Service Provision Scoping Group (3)
SSP Issues and Benefits
Issues
– Requires licence changes for either the Suppliers or the
Transporters to ensure compliance
– Funding
Benefits
– Provide more timely and accurate data exchange between
DN’s and iGT’s
– Potential for reduced costs
9
Questions?