IMPLEMENTATION OF PILOT PROJECT
TO IMPROVE ENVIRONMENTAL CONDITIONS IN
ESTERO DE PACO
Javier Coloma Brotons
September, 2014
8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons
http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 2/30
INTERVENTIONS OUTLINE
1. Wastewater treatment pilot
2. Flood gates management guidelines
3. Interceptors and combined sewer overflow management
4. Drainage and sewer lines management (MMDA and Maynilad)
5. Headwaters: coordination with MWSS and Manila Water6. Solid waste management improvement
7. Paco Market water and waste management
8. Others: dredging, stakeholder awareness, capacity building,
institutional arrangements
8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons
http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 3/30
ESTERO DE PACO
BENEFICIARY AREA
8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons
http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 4/30
CURRENT SITUATION
Before clean up After clean up
• Estero water still does not meet quality standards
• Need to reduce the pollutant load reaching the
Estero, rather than treating the water within it
8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons
http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 5/30
1. WASTEWATER TREATMENT PILOT
• Main Goal: Show the way to improve water quality.
• Capture and treat sewage flowing into the
Estero and grey water received by drainage
network (black and grey waters)
• Allow the water of the Estero flow into the
Pasig River, through flood gates operation.
• Improve the CSOs.
• Pilot easily replicable example.
• USD 60,000 and minimum O&M expenses
8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons
http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 6/30
Proposed Site for the Wastewater
Management
SELECTED SITE: BARANGAY 672
• Objectives:
• show how intercepting and
treating discharges with a
low cost system can result
in good quality effluent
• prove its efficiency, and
feasibility for larger scale
replication
• 58 houses, 7 existing septic tanks
• Direct discharge to estero
• Population: ~496 people
• Est. water consumption ~30m3/d
• Average BOD est.: 127 mg/l
8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons
http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 7/30
1. WASTEWATER TREATMENT PILOT
Infrastructure• Condominial Sewerage System
• Solar-powered submersible pumps
• Anaerobic Baffled Reactor (ABR)
• Constructed Wetland (CW)
• Combined sewer overflow (CSO)
construction and connection to sewer line
• Complementedwith
• Training (masonry,
construction of CSS)
• O&M Workshop
community
association
barangay officials
River Warriors
8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons
http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 8/30
ESTERO
DE PACO
ABR
CONSTRUCTED WETLAND
ANAEROBIC BAFFLED
REACTOR (ABR)
BOD: 127 mg/l
Flow: 30 m3/d
G r e y
a n d B l a c k
W
a t e r
BOD: 127 mg/l
Flow: 30 m3 /d
Hydraulic retention time: 1.5 days
BOD: 38 mg/l
Flow: 24 m3 /d
BOD: 9 mg/l
Flow: 6 m3 /d
70% BOD removal
Size: 9 m (length) x 2 m (width) x 2.5 m (depth)
75% BOD removal
Size: 19 m (length) x 2 m (width)
Marsh plant: 3 -4 plants/m2
PILOT PROJECT
PROCESS
BOD: 38 mg/l
Flow: 6 m3 /d
CONDOMINIAL
SEWER SYSTEM
8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons
http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 9/30
PILOT PROJECT LOCATION
ABRWETLAND
CSS
SUMP PIT
8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons
http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 10/30
8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons
http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 11/30
PILOT PROJECT
ABR
constructed wetland
sump pit, 2 pumps, solar panel
8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons
http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 12/30
MOU SIGNING
MOU between PRRC and Barangay 672
• Turnover of pilot project to Barangay 672 and Kilusang
Pang-kapitbahay at Pang-kabuhayan, Inc.
• Financing mechanism for O&M and sustainability• Roles and responsibilities: Barangay, City Government,
PRRC, national government agencies, Maynilad
8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons
http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 13/30
2. FLOOD GATE MANAGEMENT
Objective: to avoid water stagnancy
Flood gate operator:
Metro Manila Development Authority (MMDA)
Recommendation
• Flood gates should be opened if water level in
Estero de Paco is higher than in Pasig River.
8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons
http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 14/30
3. INTERCEPTORS AND COMBINED SEWER
OVERFLOW MANAGEMENT
Operators: Maynilad / MMDA
Recommendations: Avoid overflowing in the CSO duringdays with no rain.
Inspect the CSO weekly, esp. afterstorms.
Clean the CSOs, avoid screensblocking.
Improve design to ensure easiermaintenance.
If overflowing is due to sewer pipe
clog, unclog immediately.
8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons
http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 15/30
4. SEWER AND DRAINAGE LINES
MANAGEMENT
Operators: Maynilad / MMDARecommendations:
s
e w e rwastewater
from toilets,
bathroomsandkitchens
d r a
i n a g edrainage is
for
rainwater. c l o g g i n g Avoid
clogging in
sewers anddrains toavoiddischarges
f r e q u
e n c yIf frequent
in the same
place:analyze thecause,
come up
with asuitablesolution.
8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons
http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 16/30
CSO, SEWER AND DRAINAGE MGT.
INTERVENTIONS
Pilot new design of interceptorchambers
• Improve the CSO to avoid effluents
leaking in dry season
Connection of 50 households to
sewer system• Pilot financing scheme (similar to
wastewater pilot project)
8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons
http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 17/30
5. HEADWATERS
• Large outfall discharge in the headwater , between
Osmena Highway and the railroad.
• Two barangays are connected to this pipe
(discharge 370 m3
/d)• Manila Water will connect outfall to its network.
Outfall
8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons
http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 18/30
5. HEADWATERS
• Septic tank blocking the flowbetween Estero de Paco and
Estero Tripa de Gallina
• Septic tank will be removed
• Manila Water will connect
the outfall to its sewer
system by pumping.
• MWSS endorsed the plan.
8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons
http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 19/30
6. SOLID WASTE MANAGEMENT
INITIAL ACTION PLAN
Operator: Manila LGU
• Solid waste management issues:
• Large quantities involved
• Small alleys not accessible to
collection trucks
• Inefficient waste collection,
transportation and disposal.
• Segregation will allow gettingrevenues from ‘valuables’:
• Organic matter, plastics, paper,
glass and metal.
8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons
http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 20/30
6. SOLID WASTE MANAGEMENT PILOT
Improved collection system
• Containers for disposal,
collection and Recycling Points
• Collection schedule
• Transfer/Storage points
established for selected alleys.
• Routes for LGU’s garbage
trucks reviewed and discussed.
8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons
http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 21/30
6. SOLID WASTE MANAGEMENT PILOT
Composting
• Collection of organic waste from
Paco Market
• vermi-composting at LukbanElementary School
• Compost to be taken by City Parks
administrator
MRF
• new MRF in Paco Market
• Segregation Bins
C
8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons
http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 22/30
7. PACO MARKETStrategies for Wastewater and Solid Waste
Management Improvement
• Operator: Paco Market Admin
• Issues:
• Septic tank, which receiveswastewater from the fish section,
overflows to the estero
• Other discharges directed to the
drainage of the public market.
• Solid waste is not properly collected
8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons
http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 23/30
Guidelines for maintenance:
• Inspected frequently, every three months.
• Check system :
• no overflowing,
• scum layer above 8 cm of scum baffle bottom
• sludge layer is below of 30 cm of the outlet.
• Ensure outlet pipe is not clogged.
• Remove sludge and scum build-up.
• Clear access to the septic tank.
• Connect the overflow to the sewerage system.
• Avoid solid waste entering system
SEPTIC TANKS IN PACO MARKET
8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons
http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 24/30
Wastewater
from Market
Anaerobic
Baffled
Reactor
Maynilad
Centralized
Treatment
Plant
Market
Sewer Line
• De-commissioning of existing septic tank
• Pre-treatment using screens and oil/grease removal
• Wastewater treatment using ABR
• Discharge of effluent to Maynilad sewer line
OPTION 1
Maynilad
Sewer Line
8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons
http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 25/30
OPTION 2
• ABS-CBN Foundation accept
equipment donation
• De-commissioning of old
septic tank
• New WWTP (SBR or CAS)
• Discharge effluent to Estero
or re-use • Issues• Complicated O&M
• Energy-intensive
• Sludge management
REMOVAL OF ISLAND AERATORS
8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons
http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 26/30
REMOVAL OF ISLAND AERATORS
AND DREDGING OF ESTERO
• Issues
• Did not improve water quality
•Costly operation
• Created sludge
Need to dredge the estero
• Obstruction of water flow
Remove aerators to avoid
floods
8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons
http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 27/30
STAKEHOLDER AWARENESS
Play:“The Monster in the Water”
Mural painting
Paco Market (26 April 2014)
8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons
http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 28/30
CAPACITY DEVELOPMENT
• Training at Escuela Taller Intramuros
• Waste Analysis and Characterization
• O&M Training for the pilot project
• Workshops
• Barangay Convention
• Wastewater and Waterways
Management Workshop
8/11/2019 CS66: Implementation of Pilot Project to Improve Environmental Conditions in Estero De Paco by Javier Coloma Brotons
http://slidepdf.com/reader/full/cs66-implementation-of-pilot-project-to-improve-environmental-conditions-in 29/30
INSTITUTIONAL ARRANGEMENTS
ASSESSMENT
PLANNING
&COORDINATION
RESETTLEMENT
OF ISFs
CLEARING OF
EASEMENT
CLEARING &
CLEANING OF
WATERWAY
INFRASTRUCTURE& LANDSCAPING
COMMUNITY
ORGANIZATION
&TRAINING
COMMUNITYINFORMATION &
EDUCATION
SOLID WASTE
MANAGEMENT
WASTEWATER
MANAGEMENT URBAN
REDEVELOPMENT
MAINTENANCE
OF PEACE &
ORDER
INFRASTRUCTURE
MAINTENANCE
REGULAR CLEAN
UP & WATER
QUALITY
MONITORING
1
GENERAL GOALS: IMPROVEMENT IN WATER QUALITY, PHYSICAL ENVIRONMENT, URBAN
QUALITY OF LIFE, LOCAL ECONOMY, COMMUNITY INVOLVEMENT
2
37
4
5
6
8
9
10
11
12
13
MMDA, KBPIP,
PRRC, CEO, DPS, AFP
KBPIP, PRRC, River
Warriors, Barangay,
Block & Cluster
Leaders, Maynilad
PRRC, DPWH, LGU,
BarangayPRRC, KBPIP
14
PUBLIC
ADVOCACY,
MARKETING
KBPIP, PPRC,
River Warriors, AFP,PNP
Adamson
Maynilad, Manila
Water, Sanitary
Inspector KBPIP, DPWH, PAGCOR
(Paco Market)
Homeowners
NHA, KBPIP, LIAC
MMDA, CEO, AFP
LGU, River Warriors,
NSWMC
MMDA
PPRC, KBPIP
PRRC, KBPIP,
River Warriors, PEEP,
City Engineering,
Residents
AFP, River Warriors
PRRC, River Warriors,