CS3724 Human-computer Interaction An Iterative, Evaluation- Centered Life Cycle For Interaction Development Copyright © 2005 H. Rex Hartson and Deborah Hix.

CS3724 Human-computer Interactioncourses.cs.vt.edu/~cs3724/summer1-2005-pyla/notes-1/02-LC.pdf · 4 LC The Process of User Interaction Development zConnections of user interaction

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CS3724 Human-computer Interactioncourses.cs.vt.edu/~cs3724/summer1-2005-pyla/notes-1/02-LC.pdf · 4 LC The Process of User Interaction Development zConnections of user interaction

CS3724 Human-computer Interaction

An Iterative, Evaluation-Centered Life Cycle For Interaction Development

Copyright © 2005 H. Rex Hartson and Deborah Hix.

Page 2: CS3724 Human-computer Interactioncourses.cs.vt.edu/~cs3724/summer1-2005-pyla/notes-1/02-LC.pdf · 4 LC The Process of User Interaction Development zConnections of user interaction

LC2

Topics

Connections of user interaction development to software engineeringDevelopment activities in the usability engineering life cycleUsability managementUser interface development team

Page 3: CS3724 Human-computer Interactioncourses.cs.vt.edu/~cs3724/summer1-2005-pyla/notes-1/02-LC.pdf · 4 LC The Process of User Interaction Development zConnections of user interaction

LC3

Typical Software Engineering LC

The Waterfall Model

System feasibility

Operations and maintenance

Implementation

Integration

Code

Detailed design

Product design

Software plans and requirements

System feasibility

Operations and maintenance

Implementation

Integration

Code

Detailed design

Product design

Software plans and requirements

System feasibilitySystem feasibility

Operations and maintenanceOperations and maintenance

ImplementationImplementation

IntegrationIntegration

CodeCode

Detailed designDetailed design

Product designProduct design

Software plans and requirementsSoftware plans and requirements

Page 4: CS3724 Human-computer Interactioncourses.cs.vt.edu/~cs3724/summer1-2005-pyla/notes-1/02-LC.pdf · 4 LC The Process of User Interaction Development zConnections of user interaction

LC4

The Process of User Interaction Development

Connections of user interaction development to software engineeringAll these figures depict communication paths, not temporal ordering of activitiesDistinction between design and implementationStart with basic software engineering concept:

Software design

Software implemen-

tation

Spec'ns

Con-straints and problems

Software design

Software implemen-

tation

Spec'ns

Con-straints and problems

Page 5: CS3724 Human-computer Interactioncourses.cs.vt.edu/~cs3724/summer1-2005-pyla/notes-1/02-LC.pdf · 4 LC The Process of User Interaction Development zConnections of user interaction

LC5

The Process of User Interaction Development

Adding systems analysis, testing, and problem (application) domain

Req'ts

Software design

Spec'ns

Software implemen-

tation

Pgms

Main feedback: design flaws, errors, modifications

Test plan, criteria

Problem domain design

Req'ts

Errors, bugs

Major reconsiderations

Systems analysis

Software testing

Con-straints and problems

Con-straints and problems

Con-straints and problems

Req'ts

Software design

Spec'ns

Software implemen-

tation

Pgms

Main feedback: design flaws, errors, modifications

Test plan, criteria

Problem domain design

Req'ts

Errors, bugs

Major reconsiderations

Systems analysis

Software testing

Con-straints and problems

Con-straints and problems

Con-straints and problems

Page 6: CS3724 Human-computer Interactioncourses.cs.vt.edu/~cs3724/summer1-2005-pyla/notes-1/02-LC.pdf · 4 LC The Process of User Interaction Development zConnections of user interaction

LC6

The Process of User Interaction Development

Analogous activities for user interface development

Software design require-mentsUser

interface interaction

design

User interface software

design

User interface software

implemen-tation

User-based

evalua-tion of

interface software

Interface design req'ts, usability spec'ns

Software imple-mentation spec'ns Pgms

Test plan, usability spec'ns

Main feedback is due to low usability: design flaws, errors, modifications

Errors, bugs

Major reconsiderations

Systems analysis

Con-straints and problems

Con-straints and problems

Con-straints and problems

Software design require-mentsUser

interface interaction

design

User interface software

design

User interface software

implemen-tation

User-based

evalua-tion of

interface software

Interface design req'ts, usability spec'ns

Software imple-mentation spec'ns Pgms

Test plan, usability spec'ns

Main feedback is due to low usability: design flaws, errors, modifications

Errors, bugs

Major reconsiderations

Systems analysis

Con-straints and problems

Con-straints and problems

Con-straints and problems

Page 7: CS3724 Human-computer Interactioncourses.cs.vt.edu/~cs3724/summer1-2005-pyla/notes-1/02-LC.pdf · 4 LC The Process of User Interaction Development zConnections of user interaction

LC7

The Process of User Interaction Development

Connecting the processes together and adding rapid prototyping

Page 8: CS3724 Human-computer Interactioncourses.cs.vt.edu/~cs3724/summer1-2005-pyla/notes-1/02-LC.pdf · 4 LC The Process of User Interaction Development zConnections of user interaction

LC8

Systems analysis

Req'ts Spec'ns Pgms

Main feedback: design flaws, errors, modifications

Test plan, criteria

Problem domain design

Req'ts

Errors, bugs

Major reconsiderations

Software design require-mentsUser

interface interaction

design

User interface software

design

User interface software

implemen-tation

Interface design req'ts, usability spec'ns

Software imple-mentation spec'ns Pgms

Main feedback is due to low usability: design flaws, errors, modifications

Test plan, usability spec'ns

User-based

testing and

evalua-tion of

interface and non-interface software

Rapid proto-typing

Formative user-based

evaluation

Usability spec'ns

Con-straints

and problems

Con-straints

and problems

Con-straints

and problems

Errors, bugs

Con-straints

and problems

Con-straints

and problems

Con-straints

and problems

Applica-tion

software design

Applica-tion

software implemen-

tation

Systems analysis

Req'ts Spec'ns Pgms

Main feedback: design flaws, errors, modifications

Test plan, criteria

Problem domain design

Req'ts

Errors, bugs

Major reconsiderations

Software design require-mentsUser

interface interaction

design

User interface software

design

User interface software

implemen-tation

Interface design req'ts, usability spec'ns

Software imple-mentation spec'ns Pgms

Main feedback is due to low usability: design flaws, errors, modifications

Test plan, usability spec'ns

User-based

testing and

evalua-tion of

interface and non-interface software

Rapid proto-typing

Formative user-based

evaluation

Usability spec'ns

Con-straints

and problems

Con-straints

and problems

Con-straints

and problems

Errors, bugs

Con-straints

and problems

Con-straints

and problems

Con-straints

and problems

Applica-tion

software design

Applica-tion

software implemen-

tation

Systems analysis

Req'ts Spec'ns Pgms

Main feedback: design flaws, errors, modifications

Test plan, criteria

Problem domain design

Req'ts

Errors, bugs

Major reconsiderations

Software design require-mentsUser

interface interaction

design

User interface software

design

User interface software

implemen-tation

Interface design req'ts, usability spec'ns

Software imple-mentation spec'ns Pgms

Main feedback is due to low usability: design flaws, errors, modifications

Test plan, usability spec'ns

User-based

testing and

evalua-tion of

interface and non-interface software

Rapid proto-typing

Formative user-based

evaluation

Usability spec'ns

Con-straints

and problems

Con-straints

and problems

Con-straints

and problems

Errors, bugs

Con-straints

and problems

Con-straints

and problems

Con-straints

and problems

Applica-tion

software design

Applica-tion

software implemen-

tation

Systems analysis

Req'ts Spec'ns Pgms

Main feedback: design flaws, errors, modifications

Test plan, criteria

Problem domain design

Req'ts

Errors, bugs

Major reconsiderations

Software design require-mentsUser

interface interaction

design

User interface software

design

User interface software

implemen-tation

Interface design req'ts, usability spec'ns

Software imple-mentation spec'ns Pgms

Main feedback is due to low usability: design flaws, errors, modifications

Test plan, usability spec'ns

User-based

testing and

evalua-tion of

interface and non-interface software

Rapid proto-typing

Formative user-based

evaluation

Usability spec'ns

Con-straints

and problems

Con-straints

and problems

Con-straints

and problems

Errors, bugs

Con-straints

and problems

Con-straints

and problems

Con-straints

and problems

Applica-tion

software design

Applica-tion

software implemen-

tation

Page 9: CS3724 Human-computer Interactioncourses.cs.vt.edu/~cs3724/summer1-2005-pyla/notes-1/02-LC.pdf · 4 LC The Process of User Interaction Development zConnections of user interaction

LC9

The Process of User Interaction Development

The rest of this course is about just this part:

Systems analysis

User interface

interaction design

Interface design req'ts, usability spec'ns

Rapid proto-typing

Formative user-based

evaluation

Usability spec'ns

Con-straints

and problems

Systems analysis

User interface

interaction design

Interface design req'ts, usability spec'ns

Rapid proto-typing

Formative user-based

evaluation

Usability spec'ns

Con-straints

and problems

Page 10: CS3724 Human-computer Interactioncourses.cs.vt.edu/~cs3724/summer1-2005-pyla/notes-1/02-LC.pdf · 4 LC The Process of User Interaction Development zConnections of user interaction

LC10

The Wheel – Usability Engineering Life Cycle Process Model

Iterative, evaluation-centered process model for interaction developmentNew life cycle concept comes from:– The waterfall model – movement toward completion– Star (Hartson & Hix, 1989) – evaluation centered– LUCID (Cognetics, Inc.) – development activities– Boehm’s Spiral Model – iteration – New work by Helms & Hartson (2001) – put it

together

Page 11: CS3724 Human-computer Interactioncourses.cs.vt.edu/~cs3724/summer1-2005-pyla/notes-1/02-LC.pdf · 4 LC The Process of User Interaction Development zConnections of user interaction

LC11

The Wheel – Usability Engineering Life Cycle Process Model

– Star (Hartson & Hix, 1989)Evaluation centered

Page 12: CS3724 Human-computer Interactioncourses.cs.vt.edu/~cs3724/summer1-2005-pyla/notes-1/02-LC.pdf · 4 LC The Process of User Interaction Development zConnections of user interaction

LC12

The Wheel – Usability Engineering Life Cycle Process Model

– Boehm’s spiral model-evolution through iteration

Page 13: CS3724 Human-computer Interactioncourses.cs.vt.edu/~cs3724/summer1-2005-pyla/notes-1/02-LC.pdf · 4 LC The Process of User Interaction Development zConnections of user interaction

LC13

The Wheel – Usability Engineering Life Cycle Process Model

Determine objectives, alternatives, constraints

Evaluate alternatives, identify, resolve risks

Develop, verify next-level product

Plan next phases

Cumulative Cost

Commitment

Review

Determine objectives, alternatives, constraints

Evaluate alternatives, identify, resolve risks

Develop, verify next-level product

Plan next phases

Cumulative Cost

Commitment

Review

– Boehm’s spiral model abstracted

Page 14: CS3724 Human-computer Interactioncourses.cs.vt.edu/~cs3724/summer1-2005-pyla/notes-1/02-LC.pdf · 4 LC The Process of User Interaction Development zConnections of user interaction

LC14

The Wheel – Usability Engineering Life Cycle Process Model

– Spiral model adapted

Page 15: CS3724 Human-computer Interactioncourses.cs.vt.edu/~cs3724/summer1-2005-pyla/notes-1/02-LC.pdf · 4 LC The Process of User Interaction Development zConnections of user interaction

LC15

The Wheel – Usability Engineering Life Cycle Process Model

– Spiral unwound

Page 16: CS3724 Human-computer Interactioncourses.cs.vt.edu/~cs3724/summer1-2005-pyla/notes-1/02-LC.pdf · 4 LC The Process of User Interaction Development zConnections of user interaction

LC16

The Wheel – Usability Engineering Life Cycle Process Model

– Spiral unwound and stretched out

Page 17: CS3724 Human-computer Interactioncourses.cs.vt.edu/~cs3724/summer1-2005-pyla/notes-1/02-LC.pdf · 4 LC The Process of User Interaction Development zConnections of user interaction

LC17

The Wheel – Usability Engineering Life Cycle Process Model

– Waterfall with whirlpools

Page 18: CS3724 Human-computer Interactioncourses.cs.vt.edu/~cs3724/summer1-2005-pyla/notes-1/02-LC.pdf · 4 LC The Process of User Interaction Development zConnections of user interaction

LC18

Wheel

Connect-ing into Wheel, for inter-cycle iteration

Product concept

User/taskmodel

Usage scenarios

Screendesigns

Lo-fiprototype

Hi-fiprototype

Integration

Deployment

Operationalsystem

Close down

Global evaluation

hub

Direction of evolutionary advancement

Product concept

User/taskmodel

Usage scenarios

Screendesigns

Lo-fiprototype

Hi-fiprototype

Integration

Deployment

Operationalsystem

Close down

Global evaluation

hub

Direction of evolutionary advancement

Product concept

User/taskmodel

Usage scenarios

Usage scenarios

Screendesigns

Lo-fiprototype

Hi-fiprototype

Integration

Deployment

Operationalsystem

Close down

Global evaluation

hub

Direction of evolutionary advancement

Page 19: CS3724 Human-computer Interactioncourses.cs.vt.edu/~cs3724/summer1-2005-pyla/notes-1/02-LC.pdf · 4 LC The Process of User Interaction Development zConnections of user interaction

LC19

The Wheel – Usability Engineering Life Cycle Process Model

Life cycle=iterative configuration of cycles (each associated with a stage/form of the product)– Example: System analysis model, scenarios and

screen designs, lo-fi prototype, hi-fi prototype, software production & integration

Cycle is a sequence of four development activity types:

– Analyze– Design– Build– Evaluate

Page 20: CS3724 Human-computer Interactioncourses.cs.vt.edu/~cs3724/summer1-2005-pyla/notes-1/02-LC.pdf · 4 LC The Process of User Interaction Development zConnections of user interaction

LC20

The Wheel – Usability Engineering Life Cycle Process Model

Cycle as sequence of four types of development activities

Evaluate

Design

Analyze ImplementCycle ofactivities

Product

form in

Product form out

Evaluate

Design

Analyze ImplementCycle ofactivities

Product

form in

Product form out

Page 21: CS3724 Human-computer Interactioncourses.cs.vt.edu/~cs3724/summer1-2005-pyla/notes-1/02-LC.pdf · 4 LC The Process of User Interaction Development zConnections of user interaction

LC21

The Wheel – Usability Engineering Life Cycle Process Model

Zoom in on details of a generic cycle activity Activity type/

instance

Project role

Activity role

Tools/templates

Common databaseof documentation

TechniqueTechnique

Technique selection criteria

Product form in Product form

out

Relationships with other activities

Work products

Work products

Activity type/instance

Project role

Activity role

Tools/templates

Common databaseof documentation

TechniqueTechnique

Technique selection criteria

Product form in Product form

out

Relationships with other activities

Work products

Work products

Activity type/instance

Activity type/instance

Project roleProject role

Activity roleActivity role

Tools/templatesTools/templates

Common databaseof documentation

TechniqueTechniqueTechniqueTechnique

Technique selection criteria

Technique selection criteria

Product form in Product form

out

Relationships with other activities

Work products

Work products

Page 22: CS3724 Human-computer Interactioncourses.cs.vt.edu/~cs3724/summer1-2005-pyla/notes-1/02-LC.pdf · 4 LC The Process of User Interaction Development zConnections of user interaction

LC22

The Wheel – Usability Engineering Life Cycle Process Model

Choose a technique for each activity type in each cycle

Page 23: CS3724 Human-computer Interactioncourses.cs.vt.edu/~cs3724/summer1-2005-pyla/notes-1/02-LC.pdf · 4 LC The Process of User Interaction Development zConnections of user interaction

LC23

The Wheel – Usability Engineering Life Cycle Process Model

– Shows how each activity type is assigned a technique, the role of the person doing the activity, support tools, and documentation

Example: In scenario and screen design cycles, design walk-through is used as evaluation technique

Basic Principles– Process is product oriented– Products evolve through cycles (cycles named for

product forms)

Page 24: CS3724 Human-computer Interactioncourses.cs.vt.edu/~cs3724/summer1-2005-pyla/notes-1/02-LC.pdf · 4 LC The Process of User Interaction Development zConnections of user interaction

LC24

The Wheel – Usability Engineering Life Cycle Process Model

– Each cycle is iterative– Each cycle contains same activity types– Each cycle is evaluation-centered– Work products (documentation) evolve over cycles– Process can be viewed at different levels

Process, cycle, activity, documentation

Page 25: CS3724 Human-computer Interactioncourses.cs.vt.edu/~cs3724/summer1-2005-pyla/notes-1/02-LC.pdf · 4 LC The Process of User Interaction Development zConnections of user interaction

LC25

The Wheel – Usability Engineering Life Cycle Process Model

Any part of the process is an instance of what is possible– Pick and choose cycles, activities, iterations to meet

schedule, budget, management styleIntegrate with software engineering development processValidated by Helms & Hartson (2001) in e-commerce start-up company

Page 26: CS3724 Human-computer Interactioncourses.cs.vt.edu/~cs3724/summer1-2005-pyla/notes-1/02-LC.pdf · 4 LC The Process of User Interaction Development zConnections of user interaction

LC26

The Wheel – Usability Engineering Life Cycle Process Model

Any part of process is instance of what is possible– Developers include their favorite UE methods and

techniques– Omit activities, cycles, iterations indicated by

management, budget, schedule, project scope, team composition

– Can be different every time

Page 27: CS3724 Human-computer Interactioncourses.cs.vt.edu/~cs3724/summer1-2005-pyla/notes-1/02-LC.pdf · 4 LC The Process of User Interaction Development zConnections of user interaction

LC27

Usability Management

The control mechanism for the iterationControl involves:– Establishing usability specifications– Evaluating against usability specifications– Performing impact and cost/benefit analyses

Page 28: CS3724 Human-computer Interactioncourses.cs.vt.edu/~cs3724/summer1-2005-pyla/notes-1/02-LC.pdf · 4 LC The Process of User Interaction Development zConnections of user interaction

LC28

Usability Management

– Deciding on changes to make to interaction design– Deciding when to stop iterating

Same process can be applied to develop user documentation or training course

Page 29: CS3724 Human-computer Interactioncourses.cs.vt.edu/~cs3724/summer1-2005-pyla/notes-1/02-LC.pdf · 4 LC The Process of User Interaction Development zConnections of user interaction

LC29

Roles on user interface development teamNote: Different roles, but not necessarily different people

– User interaction designer (or usability engineer or usability specialist)

– Evaluator (or facilitator)– User (and/or user representative)– Software engineer and/or programmer – Technical writer– Graphic designer– Application domain expert (also called subject

matter expert)

Meet the User Interface Development Team