Upload
evan-ruiz
View
214
Download
2
Embed Size (px)
Citation preview
CS-TR-095
Transactions Detail Inquiry, 3.21.1
RCT - WO
DR 1500 (Inventory) $1,220.01Qty issued x Total GL cost1,000 x 1.22001 = 1,220.01
CR 1600 (WIP) $1,220.01GL transaction type = IC
OVH POST
DR 1600 (WIP) $100Qty issued x GL Overhead cost: 1,000 x 0.10 = 100
CR 6490 (Overhead Applied) $100
WO Receipt – Transactions Detail
CS-CS-218
Work Order Receipt, 16.11
WO Receipt
CS-TR-194
Work Order Topics
Work OrderLife Cycle
Introduction
Work OrderCost Report
• WO Maintenance Screen
• Component Issues
• WIP Material Cost Revaluation
• Floor Stock
• Intersite Transfers/Multi-site Component Issues
• Labor Reporting
• Work Order Receipts
• Non-Std Work Orders
• WO Accounting Close
Information Sources
CS-TR-083
Variance When Calculated
Subcontract Rate PO Receipt, 5.13.1
• Calculated only if WO number and operation are specified
Cause
Difference between actual subcontract rate (PO price) and the subcontract rate entered in the routing detail
• View both actual and standard subcontract rates in Receipt Transactions Report, 5.9.14
Subcontract Usage WO Accounting Close, 16.21 Difference between the subcontracted quantities received and the work order quantity completed. This variance can be due to yield differences, rework requirements, etc.
Formula
[Qty Rcvd on PO - (Qty Complete + Qty Reject)] x Subcontract Frozen WO BOM Unit Rate
Formula
(Subcontract PO Unit Rate - Subcontract Frozen WO BOM Unit Rate) x Qty Received
Subcontract-Related Variances
CS-TR-079
Subcontract PO Receipt GL Trans Type
DR Cost of Production (COP) ICCR PO Receipts
Issue to WIP
DR WIP WOCR Cost of Production
DR Subcontract Rate Variance WOCR WIP
Positive amounts = unfavorable varianceNegative amounts = favorable variance
• If purchase order, of type “S,” does not reference a work order, then subcontract amount stays in COP
Subcontract – GL Effect
*
*
CS-TR-063
Variance When Calculated Cause
[(Act Set-Up Hrs - Std Set-Up Hrs) x Set-Up Bdn] + [(Act Run Hrs - Std Run Hrs) x Std Run Bdn]
Where:
Set-Up Bdn = (Std Set-Up Rate x Lbr Bdn%) + Lbr Bdn Rate + (Mach Bdn Rate x Mach/Op)
Run Bdn = (Std Run Rate x Lbr Bdn%) + Lbr Bdn Rate + Mach Bdn Rate
Labor Burden Usage VariancesManufacturing-Related Variances
Work Order Cost Report, 16.3.4View in Report
Formula
Labor Burden Usage SFC feedback (17.1, 17.2, 17.3); or WO Receipt (16.11/12)
Equivalent to labor usage variance with burden rates factored in
CS-TR-063a
Variance When Calculated Cause
Labor Usage SFC feedback (17.1, 17.2, 17.3); or WO Receipt (16.11 or 16.12)
• Can be deferred until WO Receipt, 16.11/16.12, based on WO Control File setting
Difference between actual lbr hrs reported and the std time that should have been required to complete the quantity received
• View both actual and earned hours in WO Routing Maintenance, 16.13.13
[(Act Set-up Hrs - Std Set-up Hrs) x Std Set-Up Rate] +[(Act Run Hrs - Std Run Hrs) x Std Lbr Rate]
Std Run Hrs = Run Hrs/Unit x (Qty Complete + Qty Reject)
Formula
Labor Usage VariancesManufacturing-Related Variances
Work Order Cost Report, 16.3.4View in Report