CS-P12_Drawing Control Procedure

Embed Size (px)

Citation preview

  • 8/10/2019 CS-P12_Drawing Control Procedure

    1/4

    CSL TECHNOLOGIES (M) SDN BHD

    LRC TECH (M) SDN BHD

    Ref. No. CS-P12

    Revision No. 01

    DRAWING CONTROL PROCEDUREEffective Date 01/03/2011

    Page 1 of 4

    This procedure is a controlleddocument and authorized for use. When printed from this share drive, thisdocument is uncontrolled. Before using a printed copy of this document, ensure that it is the same as the latestversion on share drive.

    REVISION HISTORY

    Rev

    No.

    Effective Date Affected

    Page

    Change Descriptions Reviewed

    By

    Approved

    By

    00 01/11/2010 All New Issue01 01/03/2011 1, 4 4.2 Drawing Control Table

    Document Distribution Acknowledgement:

    Dept. /Position

    Business

    Development

    Director

    Admin Sales &

    Marketing

    Design Production R&D

    Acknowledgement

    Date

    Note: The details and the reason of change are documented in the Revision History state above and file at DCC.

    http://www.pdfcomplete.com/cms/hppl/tabid/108/Default.aspx?r=q8b3uige22http://www.pdfcomplete.com/cms/hppl/tabid/108/Default.aspx?r=q8b3uige22http://www.pdfcomplete.com/cms/hppl/tabid/108/Default.aspx?r=q8b3uige22http://www.pdfcomplete.com/cms/hppl/tabid/108/Default.aspx?r=q8b3uige22
  • 8/10/2019 CS-P12_Drawing Control Procedure

    2/4

    CSL TECHNOLOGIES (M) SDNBHD

    LRC TECH (M) SDN BHD

    Ref. No. CS-P12

    Revision No. 01

    DRAWING CONTROL PROCEDUREEffective Date 01/03/2011

    Page 2 of 4

    THIS IS AN UNCONTROLLED COPY OF A CONTROLLED DOCUMENT PRINTED

    1.0 PURPOSE

    To ensure all drawings with all dimension and approved by head of department, it shall distributedto production department used are the latest revision.

    2.0 SCOPE

    This procedure shall apply to all the drawings received from customer, generated by CSL & LRCand must be indicate project code and distributed to users.

    3.0 DEFINITIONS

    http://www.pdfcomplete.com/cms/hppl/tabid/108/Default.aspx?r=q8b3uige22http://www.pdfcomplete.com/cms/hppl/tabid/108/Default.aspx?r=q8b3uige22http://www.pdfcomplete.com/cms/hppl/tabid/108/Default.aspx?r=q8b3uige22http://www.pdfcomplete.com/cms/hppl/tabid/108/Default.aspx?r=q8b3uige22
  • 8/10/2019 CS-P12_Drawing Control Procedure

    3/4

    CSL TECHNOLOGIES (M) SDNBHD

    LRC TECH (M) SDN BHD

    Ref. No. CS-P12

    Revision No. 01

    DRAWING CONTROL PROCEDUREEffective Date 01/03/2011

    Page 3 of 4

    THIS IS AN UNCONTROLLED COPY OF A CONTROLLED DOCUMENT PRINTED

    4.0 PROCEDURE4.1 DRAWING CONTROL

    Process Flow Description Documents/ Ref.

    Personnel

    Drawing Required From Customer

    - Design Department are responsible toliaise with client and determine the clientrequirements on the design.

    - Refer to procedure CS-P07 (Sales &marketing Process) for thedetermination & reviewing of clientrequirements.

    - All customer requirements shall be

    documented. Drawing shall then bepresented to client for confirmation.

    - Any amendment from the customershall be documented.

    - The amendment shall be making knownto the Design personnel to amend thedrawing.

    - Revised drawing shall be re-approvedby the customer.

    - Refer to 4.2

    - Drawing JobSheet(CS-F17)

    - Title Block

    - DrawingTransmittalNote (CS-F31)

    - Refer to 4.2

    - Design/Project Dept.

    - Design Dept.

    - Design/Project Dept.

    Control of Drawings

    - All the drawings (Hard and Soft copy)

    shall be labelled, stored, safeguarded toprevent any damage or unauthorizedamendment.

    - Detail of Drawing Control shall refer toClause 4.2 Drawing Control Table.

    - Drawing Job

    Sheet(CS-F17)

    - Design/

    Project Dept.

    Drawing Amendment & Distribution

    - R&D personnel shall inform the DesignDepartment to changes the drawings.

    - Design personnel shall carry out thechanges to drawings as instructed.

    - After amendment, R&D personnel to

    review the amended drawing to ensurethat it meet customer requirements.

    - If the review is favourable, R&D HODshall acknowledge on the reviseddrawing.

    - Design personnel shall be responsibleto distribute the drawing to the customerfor comment & approval using DrawingTransmittal Note if necessary.

    - The obsolete drawings shall be timelywithdrawn.

    - Drawing JobSheet(CS-F17)

    - Design Dept.

    Receive / Preparedrawing

    Indicate drawing no.,date & revision no.

    Reviewed & Approved

    Maintain originaldrawing in project file

    Update and revisedrawing

    Stamping

    Stamp Obsoleteonold drawing

    File revised originaldrawing

    If changes

    Duplicate drawing,stamp Controlled

    CopyWith distribution

    http://www.pdfcomplete.com/cms/hppl/tabid/108/Default.aspx?r=q8b3uige22http://www.pdfcomplete.com/cms/hppl/tabid/108/Default.aspx?r=q8b3uige22http://www.pdfcomplete.com/cms/hppl/tabid/108/Default.aspx?r=q8b3uige22http://www.pdfcomplete.com/cms/hppl/tabid/108/Default.aspx?r=q8b3uige22
  • 8/10/2019 CS-P12_Drawing Control Procedure

    4/4

    CSL TECHNOLOGIES (M) SDNBHD

    LRC TECH (M) SDN BHD

    Ref. No. CS-P12

    Revision No. 01

    DRAWING CONTROL PROCEDUREEffective Date 01/03/2011

    Page 4 of 4

    THIS IS AN UNCONTROLLED COPY OF A CONTROLLED DOCUMENT PRINTED

    4.2 DRAWING CONTROL TABLE

    Type of Drawing Customers Drawing CSL &LRC Drawing

    Drawn By Customer Design Department

    Checked by Customer Designer / Section Head / HOD

    Approved or Re-approved by Customer HOD

    DrawingIdentification (Drawing No.)

    Customer method As Project Code (eg. P2 or P1 xxxx/AC/FZ/xxx)

    Changes Identification Customer method Revision History Box identify with revision numbersuch as 0,1,2

    Distribution Record Customer method Drawing Transmittal Note

    Retention Method Keep in respectivecustomer files

    Save in computer hard disc identified with file name:File Name:P1 / P2 XXXX (Project No.)/AC/FZ/xxx (Product

    Name Refer to Appendix I)

    Back-up in CD identified with file name.One set of printed original copy (both on-going &completed manufacturing) kept by Design Dept inrespective customer files.

    Retention Period Original drawing shall be kept and obtain approval from HOD before dispose.Latest revision of obsolete drawings shall be kept and obtain approval HODbefore dispose.

    Applicable Stamp Type of Rubber Stampa. Master Copy: On the back of every original drawingb. Controlled Copy: On distributed drawing.c. Received Date: On customer s drawing upon receivingd. Obsolete: On obsolete drawings retained for any purpose

    http://www.pdfcomplete.com/cms/hppl/tabid/108/Default.aspx?r=q8b3uige22http://www.pdfcomplete.com/cms/hppl/tabid/108/Default.aspx?r=q8b3uige22http://www.pdfcomplete.com/cms/hppl/tabid/108/Default.aspx?r=q8b3uige22http://www.pdfcomplete.com/cms/hppl/tabid/108/Default.aspx?r=q8b3uige22