1
“Through collaboration and leadership, we deliver a safe, reliable, and integrated transportation system that enables the movement of people and goods.” 0707_011717 WINTER • 2017 TEXAS DEPARTMENT OF TRANSPORTATION DALLAS DISTRICT SH 205 EXPANSION PROJECT (PUBLIC MEETING) CSJS: 0451-01-053; 0451-02-028; 0451-03-013; 0451-04-021 (COLLIN, ROCKWALL & KAUFMAN COUNTIES) PROGRAMMING STATUS MTP (2040 Metropolitan Transportation Plan) YES UTP (2017 Unified Transportation Program) • FUNDED YES STIP (Statewide Transportation Implementation Program, 2017-2020) NO SOURCE: TxDOT TxDOT graphic PROJECT TIMELINE 2019 2016 2021 2017 November 2017 – Schematic Approval July 7 & 12, 2016 – Public Meeting March 2019 – Environmental Clearance 2021 – Letting Mainlanes Mainlanes Mainlanes Sidewalk Sidewalk Mainlanes Mainlanes Sidewalk Sidewalk PROPOSED ULTIMATE TYPICAL SECTION TxDOT graphic SOURCE: Texas Department of Transportation. EXISTING TYPICAL SECTION PROPOSED TYPICAL SECTION PROJECT DETAILS Limits: US 80 to SH 78 CSJs: 0451-01-053; 0451-02-028; 0451-03-013 0451-04-021 Description: Widen 2 lane rural to 4 lane divided (Ultimate 6) Total Length: 23.3 miles Current Activity: Review Public Meeting Summary & Comments. Hold another Public Meeting in March 2017. ESTIMATED COSTS CSJ: 0451-01-053 (Unfunded) From N of SH 66 to S of FM 548 Length (miles) 10.74 Est. Construction Cost $76.7 M ROW $2.9 M Est. Total Cost $79.6 M CSJ: 0451-02-028 (Unfunded) From S of FM 548 to US 80 in Terrell Length (miles) 6.085 Est. Construction Cost $52 M ROW $4.8 M Est. Total Cost $56.8 M CSJ: 0451-03-013 (Funded) SH 205 from N of John King (Rockwall C/L) to SH 78 Length (miles) 2.88 Est. Construction Cost $26 M ROW $2.8 M Est. Total Cost $ 28.8 M CAT 2 FUNDS AVAILABLE $28.65 M CSJ: 0451-04-021 (Funded) SH 205 from SH 66 to Collin County Line Length (miles) 3.577 Est. Construction Cost $30.6 M ROW $2.4 M Est. Total Cost $33 M CAT 2 FUNDS AVAILABLE $32.12 M TOTAL ESTIMATED COSTS Est. Construction Cost $185.3 M Est. Total ROW $12.9 M Est. Total Project Cost $198.2 M SOURCE: TxDOT TxDOT graphic Dallas District Office 4777 E. Highway 80 Mesquite, TX 75150 CONTACT INFORMATION Nancy Peron, P.E. TxDOT Dallas Advance Project Development (214) 320-6245 [email protected] NOTE: Highlighted areas are not drawn to exact scale. TxDOT graphic

CS ˜COLLIN, ROCKWALL & KAUFMAN COUNTIES˚ DISTRICT S …...SH 205 from SH 66 to Collin County Line Length (miles) 3.577 Est. Construction Cost $30.6 M ROW $2.4 M Est. Total Cost $33

  • Upload
    others

  • View
    9

  • Download
    0

Embed Size (px)

Citation preview

  • “Through collaboration and leadership, we deliver a safe, reliable, and integrated transportation system that enables the movement of people and goods.”

    0707

    _011

    717

    WINTER • 2017TEXAS DEPARTMENT OF TRANSPORTATION

    D A L L A S D I S T R I C T

    SH 205 EXPANSION PROJECT (PUBLIC MEETING)CSJS: 0451-01-053; 0451-02-028; 0451-03-013; 0451-04-021 (COLLIN, ROCKWALL & KAUFMAN COUNTIES)

    PROGRAMMING STATUSMTP (2040 Metropolitan Transportation Plan) YES

    UTP (2017 Unified Transportation Program) • FUNDED

    YES

    STIP (Statewide Transportation Implementation Program, 2017-2020)

    NO

    SOURCE: TxDOT TxDOT graphic

    PROJECT TIMELINE

    20192016

    20212017

    November 2017 – Schematic Approval

    July 7 & 12, 2016 – Public Meeting March 2019 – Environmental Clearance

    2021 – Letting

    Mainlanes Mainlanes Mainlanes

    SidewalkSidewalk

    Mainlanes Mainlanes

    SidewalkSidewalk

    PROPOSED ULTIMATE TYPICAL SECTION

    TxDOT graphicSOURCE: Texas Department of Transportation.

    EXISTING TYPICAL SECTION PROPOSED TYPICAL SECTION

    PROJECT DETAILSLimits: US 80 to SH 78

    CSJs: 0451-01-053; 0451-02-028; 0451-03-013 0451-04-021

    Description: Widen 2 lane rural to 4 lane divided (Ultimate 6)

    Total Length: 23.3 miles

    Current Activity: Review Public Meeting Summary & Comments. Hold another Public Meeting in March 2017.

    ESTIMATED COSTS CSJ: 0451-01-053 (Unfunded)

    From N of SH 66 to S of FM 548

    Length (miles) 10.74

    Est. Construction Cost $76.7 M

    ROW $2.9 M

    Est. Total Cost $79.6 M

    CSJ: 0451-02-028 (Unfunded) From S of FM 548 to US 80 in Terrell

    Length (miles) 6.085

    Est. Construction Cost $52 M

    ROW $4.8 M

    Est. Total Cost $56.8 M

    CSJ: 0451-03-013 (Funded)SH 205 from N of John King (Rockwall C/L) to SH 78

    Length (miles) 2.88

    Est. Construction Cost $26 M

    ROW $2.8 M

    Est. Total Cost $ 28.8 M

    CAT 2 FUNDS AVAILABLE $28.65 M

    CSJ: 0451-04-021 (Funded) SH 205 from SH 66 to Collin County Line

    Length (miles) 3.577

    Est. Construction Cost $30.6 M

    ROW $2.4 M

    Est. Total Cost $33 M

    CAT 2 FUNDS AVAILABLE $32.12 M

    TOTAL ESTIMATED COSTS

    Est. Construction Cost $185.3 M

    Est. Total ROW $12.9 M

    Est. Total Project Cost $198.2 M

    SOURCE: TxDOT TxDOT graphic

    Dallas District Office4777 E. Highway 80Mesquite, TX 75150

    CONTACT INFORMATIONNancy Peron, P.E.

    TxDOT Dallas Advance Project Development(214) 320-6245

    [email protected]

    NOTE: Highlighted areas are not drawn to exact scale. TxDOT graphic