Case Study Decommissioning
Janice ‘A’ Floating Production Unit
Maersk Oil UK Ltd2016North Sea/Norway
Client:Date:
Location:
CS-028
Rigmar Group operates worldwide from offices in the UK, Canada, UAE, Ghana, Singapore and Angola
For more information, contact Interocean Marine Services Ltd on:
+44 (0)1224 294900 [email protected] www.interocean.co.uk
Hareness CircleAltens Industrial Estate
AberdeenAB12 3LY
Interocean Marine Services was contracted by Maersk Oil UK Ltd to complete a landmark offshore operation by disconnecting the Janice FPU from its moorings and production risers and relocating the unit to AF Decom Base, Vats, Norway for decommissioning and recycling.
Key Services:
To ensure the operation to disconnect and deliver the unit could be undertaken safely and efficiently, Interocean was contracted to undertake a comprehensive scope of work, which included:
• Marine Project Management• Marine procedures including class-approved Emergency Response Plans and SOPEP• In-depth port reviews and recommendations• Quayside mooring analysis and equipment selection• Engineering analyses and comprehensive fairlead trials for towing analysis• Management of project interfaces• Readiness surveys and site surveys• Offshore team for mooring disconnection and tow, including mariners, tow masters, mooring engineers and survey personnel• Docking Supervision• Development of Handover Document pack from Client to recycling company• Provision of Client’s Representative during decommissioning
Rigmar Group is a leading international provider of asset integrity, fabric maintenance and marine services, including:
• Engineering, Design & Analysis• Marine Operations• Survey & Positioning• Mooring Equipment• Inspection & Certification• Coatings & Fabric Maintenance• Fabrication & Construction• Accommodation• Electrical Instrumentation• Specialist Access
Following the safe delivery of the FPU to the disposal facility, Interocean then managed the operation to recover all FPU moorings and their return to the UK for disposal.
Utilising a multi-disciplined expert team, the work was delivered safely and without incident, on schedule and on budget.
From commencement until completion, the project duration was approximately seven months. During the planning phase, Interocean worked closely with Maersk and had responsibility for project management of all marine and engineering work and supervised the subsequent offshore operation for disconnection and tow of the unit.
AberdeenHareness CircleAltens Industrial EstateAberdeenAB12 3LYTel: +44 (0)1224 243000Email: [email protected]
InvergordonUnit 8/9, Supply BaseShore RoadInvergordon, Ross-shireIV18 0EXTel: +44 (0)1349 856300Email: [email protected]
Sheffield7th Floor, The Balance,2 Pinfold StreetSheffieldS1 2GUTel: +44 (0)1142 094049Email: [email protected]
Contact us
www.rigmar.co.uk
Abu DhabiPO Box 31455Abu DhabiUAETel: +971 (0)2447 7741Email: [email protected]
AngolaRua Banto Banha CardosoNo. 20/22Bairro MaculussoLuandaTel: +244 943 026 139Email: [email protected]
GhanaNo. 2 Parkview PlazaCommunity 1TemaTel: +233 (0)303 209863Email: [email protected]
Canada120 Conception Bay HighwayConception Bay SouthNewfoundlandA1W 3J1Tel: +1 709 743 4904Email: [email protected]
Singapore74 Tras Street#02/01Singapore079013Tel: +65 6224 8851Email: [email protected]