Cryogenics for crab cavities – SPS/LHC 2 nd HiLumi LHC meeting – Frascati (Italy) 15 November 2012 K. Brodzinski and L. Tavian on behalf of cryogenic team at CERN K. Brodzinski - HiLumi LHC, Frascati 2012 1

Cryogenics for crab cavities SPS/LHC 2 nd HiLumi LHC meeting Frascati (Italy) 15 November 2012 K. Brodzinski and L. Tavian on behalf of cryogenic team

Embed Size (px)

DESCRIPTION

Baseline for the tests Crab Cavity test will be performed at 2 K firstly at SPS ring then integrated on LHC. (LHC is not considered as a test bench … -> that is why SPS test is required) P4 - Test on SPS then LHC P4 ?- Planned final destination on LHC K. Brodzinski - HiLumi LHC, Frascati 20123

Citation preview

Page 1: Cryogenics for crab cavities  SPS/LHC 2 nd HiLumi LHC meeting  Frascati (Italy) 15 November 2012 K. Brodzinski and L. Tavian on behalf of cryogenic team

K. Brodzinski - HiLumi LHC, Frascati 2012 1

Cryogenics for crab cavities – SPS/LHC

2nd HiLumi LHC meeting – Frascati (Italy) 15 November 2012

K. Brodzinski and L. Tavian on behalf of cryogenic team at CERN

Page 2: Cryogenics for crab cavities  SPS/LHC 2 nd HiLumi LHC meeting  Frascati (Italy) 15 November 2012 K. Brodzinski and L. Tavian on behalf of cryogenic team

K. Brodzinski - HiLumi LHC, Frascati 20122

Contents

• Baseline for the cavities testing – general assumptions

• SPS BA4 cryogenic infrastructure

• Existing cryogenics and required modifications

• Budget and planning

• LHC cryogenics at P4 and at Hi Lumi experiments (P1 & 5)

• Conclusions

Page 3: Cryogenics for crab cavities  SPS/LHC 2 nd HiLumi LHC meeting  Frascati (Italy) 15 November 2012 K. Brodzinski and L. Tavian on behalf of cryogenic team

K. Brodzinski - HiLumi LHC, Frascati 20123

Baseline for the testsCrab Cavity test will be performed at 2 K firstly at SPS ring then integrated on LHC.

(LHC is not considered as a test bench … -> that is why SPS test is required)

P4

- Test on SPS then LHC P4 ? - Planned final destination on LHC

Page 4: Cryogenics for crab cavities  SPS/LHC 2 nd HiLumi LHC meeting  Frascati (Italy) 15 November 2012 K. Brodzinski and L. Tavian on behalf of cryogenic team

K. Brodzinski - HiLumi LHC, Frascati 20124

Sulzer-Linde TCF20 in BA4

Nicolas Delruelle

At SPS BA4 there is a 4.5 K cryogenic infrastructure used last time about 8 years ago for COLDEX experiment. It is foreseen to test its capacity and upgrade it for 2 K refrigeration – refurbishment is underway

Page 5: Cryogenics for crab cavities  SPS/LHC 2 nd HiLumi LHC meeting  Frascati (Italy) 15 November 2012 K. Brodzinski and L. Tavian on behalf of cryogenic team

TCF20 – and required upgradeExisting 4.5 K cryogenics

Coupler heatintercept

Subcooling HX

VLP heater (~2 kW)

He guard

Warmpumping unit

(1 g/s @ 15 mbar 1500 m3/h)

JT valve

VLP line

5

TU1

TU2

JT

HPLP

TCF20

CC

TU1

TU2

JT

HPLP

TCF20

CC

Cryolines

Thermal shield

Pressure relief valves

War

m re

cove

ry li

ne

Required 2 K cryogenics

All parts marked in red have to be developed, integrated, installed and commissioned.

Service module

Crab cavity cryostat

COLDEX

K. Brodzinski - HiLumi LHC, Frascati 2012

Page 6: Cryogenics for crab cavities  SPS/LHC 2 nd HiLumi LHC meeting  Frascati (Italy) 15 November 2012 K. Brodzinski and L. Tavian on behalf of cryogenic team

K. Brodzinski - HiLumi LHC, Frascati 20126

Crab-cavity test in SPSAdditional specific 2 K equipments

Warm pumping unit to be integrated in BA4 !(new or recovered from AMS – needs service)

Subcooling heat exchanger and JT valve to be integrated in dedicated service module.

Page 7: Cryogenics for crab cavities  SPS/LHC 2 nd HiLumi LHC meeting  Frascati (Italy) 15 November 2012 K. Brodzinski and L. Tavian on behalf of cryogenic team

K. Brodzinski - HiLumi LHC, Frascati 20127

Crab-cavity test in SPS – limitations Crab cavity cooling at 2 K TCF20 cryoplant used in pure liquefactionTCF20 means 20 l/h = 0.7 g/s of LHe

Estimated thermal loads:• Coupler heat intercepts: 2 W => ~0.1 g/s of liquefaction• Dynamic RF load at 2 K: ~12 W => ~0.57 g/s of liquefaction• Static heat inleaks (service module, cryostat, transfer lines): ?

TCF2

0 T-

S Di

agra

m

Guaranteed capacity: 87.5 W @ 4.5 K(i.e. isentropic equivalent to ~0.85 g/s of liquefaction)

Page 8: Cryogenics for crab cavities  SPS/LHC 2 nd HiLumi LHC meeting  Frascati (Italy) 15 November 2012 K. Brodzinski and L. Tavian on behalf of cryogenic team

K. Brodzinski - HiLumi LHC, Frascati 2012 8

Measured TCF20 refrigeration capacity

120 W available in refrigeration mode ! (+ 35 %)

Giorgio Passardi

Page 9: Cryogenics for crab cavities  SPS/LHC 2 nd HiLumi LHC meeting  Frascati (Italy) 15 November 2012 K. Brodzinski and L. Tavian on behalf of cryogenic team

K. Brodzinski - HiLumi LHC, Frascati 20129

Crab-cavity test in SPSTCF20 capacity limitation

Conclusions:• Liquefaction capacity measurement mandatory to confirm possibility of cooling @ 2 K• Only one cavity can be tested with existing cryo plant (above loads are given for one

cavity)• Realistic specification needed !

Dynamic heat loadold ass. (12 W)

new ass. (2.5 W)(5 W per module)

Coupler intercepts(2 W)(2 W)

(4 W per module)

Static heat load(4 W ?)(4 W ?)

(5 W per SM + cryostat)

Could be a difficult limit

0.7 0.85 1.2Liquefaction capacity line [g/s]

Page 10: Cryogenics for crab cavities  SPS/LHC 2 nd HiLumi LHC meeting  Frascati (Italy) 15 November 2012 K. Brodzinski and L. Tavian on behalf of cryogenic team

10

Crab-cavity test in SPSAdditional specific 2 K equipment

• Refurbishment of existing equipment (4.5 K) 150 kCHF • Sub cooling heat exchanger 12 kCHF• Warm pumping unit (WPU) 100 kCHF• He guard for pressure relief valves 10 kCHF• VLP heater 20 kCHF• JT expansion valve 4 kCHF• Service Module + piping 50 kCHF

• Total ~350 kCHF

Remarks: 1. some additional cost for cryostat design can occurred e.g. beam screen circuit2. if WPU cannot be installed underground, a new VLP line must beintegrated in the BA4 shaft (DN100 – 20 kCHF)3. No specific purifier foreseen for impurity management of the VLP circuit, i.e. availability affected in case of 2 K refrigeration.

K. Brodzinski - HiLumi LHC, Frascati 2012

Page 11: Cryogenics for crab cavities  SPS/LHC 2 nd HiLumi LHC meeting  Frascati (Italy) 15 November 2012 K. Brodzinski and L. Tavian on behalf of cryogenic team

Tentative SPS CC cryogenic schedule

K. Brodzinski - HiLumi LHC, Frascati 201211

• Surface equipment (GHe storage, compressor station and oil separation system)

– refurbishment completed (run test to be done by end of 2012)

• Cold box refurbishment is underway – run test on the beginning of LS1

• Installation of liquefaction test instrumentation and test performance –

by 15 June 2013 (cut of cooling water in SPS BA4 until ~ 15 September 2013).

• Development, installation and commissioning of 2 K equipment by end of LS1

Remark:Integration of 2 K cryo equipment in the tunnel looks tight – if not possible heavy complications – possibility of mentioned transfer line construction in the shaft to the surface = more logistics, more manpower and time required.

Page 12: Cryogenics for crab cavities  SPS/LHC 2 nd HiLumi LHC meeting  Frascati (Italy) 15 November 2012 K. Brodzinski and L. Tavian on behalf of cryogenic team

K. Brodzinski - HiLumi LHC, Frascati 201212

Crab cavity test at Point 4• The global scheme is no longer an option for the final HL-LHC, but a prototype

cavity could be installed in Point 4 after the tests in SPS.

• Installation of CC prototype could be:– Coupled to the RF cryogenic upgrade at P4 with 2 K equipment to be added– Scheduled during the LS2 (2018) for possible validation tests during 2019/20/21

(before the LS3 for P1/5 upgrade).

• Equipment for 2 K refrigeration – a new pumping system must be added:– Additional cooling capacity: ~26 – 30 W @ 2 K per CC module, i.e. 52 – 60 W in total– Warm vs cold pumping:

• Pumping capacity: ~ 3 g/s Warm pumping probably more dedicated• Warm pumping OK for no continuous test (i.e. during MD period) but lower system availability

for continuous operation– Extra cost: ~0.5-1 MCHF depending impurity management– Amplified space – tight integration

Page 13: Cryogenics for crab cavities  SPS/LHC 2 nd HiLumi LHC meeting  Frascati (Italy) 15 November 2012 K. Brodzinski and L. Tavian on behalf of cryogenic team

13

Project Process & flow diagramwithout crab-cavities (4.5 K)

Gérard Ferlin

K. Brodzinski - HiLumi LHC, Frascati 2012

surfa

cesh

aftca

vern

and

tunn

el

Page 14: Cryogenics for crab cavities  SPS/LHC 2 nd HiLumi LHC meeting  Frascati (Italy) 15 November 2012 K. Brodzinski and L. Tavian on behalf of cryogenic team

K. Brodzinski - HiLumi LHC, Frascati 201214

P4 upgrade for RF cooling

First studies to install a cold box, 6.5 kW @ 4.5 K into UX45 cavern, above RF electrical cabinet

Gérard Ferlin et al

Page 15: Cryogenics for crab cavities  SPS/LHC 2 nd HiLumi LHC meeting  Frascati (Italy) 15 November 2012 K. Brodzinski and L. Tavian on behalf of cryogenic team

K. Brodzinski - HiLumi LHC, Frascati 201215

SPS and P4 CC tests – scheduleTentative planning of P4 cryogenics upgrade and CC integration

Remarks/remind:• If CC are going to P4 they can be connected with new RF refrigerator but its

infrastructure will be operational only during LS2 ( 2 K part to be added)• Second option is to feed CC at P4 from existing cryo distribution (2 K infrastructure

to be integrated). Clear decision about CC test at P4 is required to study corresponding requirements with related planning.

Page 16: Cryogenics for crab cavities  SPS/LHC 2 nd HiLumi LHC meeting  Frascati (Italy) 15 November 2012 K. Brodzinski and L. Tavian on behalf of cryogenic team

K. Brodzinski - HiLumi LHC, Frascati 201216

Crab cavities for the final local scheme

• Configuration: 2 modules per beam, i.e. 4 per Interaction Points (IP1 & IP5)

• Installation: during the LS2/3 (2018 – 2022) dedicated to the last phase of HL-LHC project

• Cooling capacity requirements:– 2 K cooling: ~26-30 W per CC module (i.e. 104-120 W per IP)

• Energy consumption consideration:– COP @ 2.0 K refrigeration: ~800-1000 W/W, i.e. a consumption of 21-30 kW of electrical

power per CC module

Page 17: Cryogenics for crab cavities  SPS/LHC 2 nd HiLumi LHC meeting  Frascati (Italy) 15 November 2012 K. Brodzinski and L. Tavian on behalf of cryogenic team

K. Brodzinski - HiLumi LHC, Frascati 201217

Cooling of CC modules at P1 and 5• Two possibilities:

– Via the 2 new cryoplants dedicated to the new inner triplets at IP1 and IP5 or– Via the 4 existing adjacent-sector cryoplants

• The choice will depend strongly on:– the operating temperature of the new Inner Triplets (IT): 4.5 K vs 2 K– the total added heat loads

Remarks:• It is probably preferable to link the CC with new refrigerators for ITs, if not we will recreate

currently existing in s3-4 and 4-5 unbalance which has justified upgrade of cryo at P4 • Studied schemes of cryogenic upgrade for HL-LHC at P1 and 5 will be presented on Friday

16.11.2012 at 10h00 “Cryogenics for HL-LHC” by Laurent Tavian.

Existing Cryo plants

New Cryo plant for RFs New Cryo plant for ITs and … CC

Sector 3-4 Sector 4-5 Sector 5-6LHC RFs

Page 18: Cryogenics for crab cavities  SPS/LHC 2 nd HiLumi LHC meeting  Frascati (Italy) 15 November 2012 K. Brodzinski and L. Tavian on behalf of cryogenic team

K. Brodzinski - HiLumi LHC, Frascati 201218

Conclusions• Prototype crab-cavity testing in SPS:– Test possible from end 2014.– Refrigeration at 2 K:

• liquefaction capacity of the TCF20 must be measured and sufficient.• Additional resources (P + M) must be allocated.

– Additional 2 K infrastructure to be built – could be in conflict with the LS1 activities – tight to be integrated.

• Prototype crab-cavity testing at LHC P4:– Test possible from 2018/2019 ... or before using TCF20 from SPS BA4– 2 K cooling (~1 MCHF + 2 FTE + a possible noise-insulated building tension/construction…?).

• Series crab-cavities for the final HL-LHC local scheme:– Cryogenic implementation during the LHC LS3 (2022)– 2 K cooling via new ITs cryoplants preferable:

• Option for Matching Section area to be cooled by the same cryoplant• Cooling with existing sectors cryo plants not excluded but with load unbalance wrto the other LHC sectors

• Crab cavity prototype and cryostat study dedicated meeting will be held in FermiLab on 13-14 December 2012 (key decisions to be taken)