49
DL=1.00 DL=1.00 DL=1.00 DL=1.00 DL=1.00 DL=1.00 DL=1.00 DL=1.00 DL=1.00 DL=1.00 18900 27+550 / ES 27+575 / ES 27+600 / ES 27+625 / ES 27+650 / ES 27+675 / ES 27+700 / ES 27+725 / ES 27+750 / ES 27+775 / ES 18900 18900 18900 18900 18900 18900 18900 18900 18900 2.5% 2.5% CTI ENGINEERING INTERNATIONAL CO., LTD. DESIGNED BY CHECKED BY SAGARA Hidetaka WATANABE Ryohei ROAD ENGINEER CHIEF ENGINEER ORIENTAL CONSULTANTS CO., LTD. NIPPON KOEI CO., LTD. CTI ENGINEERING CO., LTD. PROJECT TITLE The Inter-City Motorways Division Department of Highways Ministry of Transport OWNER APPROVED BY MINISTRY OF TRANSPORT DEPARTMENT OF HIGHWAYS KINGDOM OF THAILAND SHEET NO. SCALE : AUGUST 2012 DWG. NO. DATE : CHECKED DATE CHECKED DATE NO. REV. DESCRIPTION ENGINEER DOH NO. REV. HIGHWAY ROUTE NO. 9 The Preparatory Survey on the Outer Bangkok Ring Road the Rehabilitation Project of CROSS SECTIONS ( 64 / 70 ) SCALE 1:100 MW-115 120

CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …

DL=1.00

DL=1.00

DL=1.00

DL=1.00

DL=1.00

DL=1.00

DL=1.00

DL=1.00

DL=1.00

DL=1.00

18900

27+550

/

ES

27+575

/

ES

27+600

/

ES

27+625

/

ES

27+650

/

ES

27+675

/

ES

27+700

/

ES

27+725

/

ES

27+750

/

ES

27+775

/

ES

18900

18900

18900

18900

18900

18900

18900

18900

18900

2.5% 2.5%

CTI ENGINEERING INTERNATIONAL CO., LTD.

DESIGNED BY CHECKED BY

SAGARA Hidetaka WATANABE Ryohei

ROAD ENGINEER CHIEF ENGINEER

ORIENTAL CONSULTANTS CO., LTD.

NIPPON KOEI CO., LTD.

CTI ENGINEERING CO., LTD.

PROJECT TITLE

The Inter-City Motorways Division

Department of Highways

Ministry of Transport

OWNER

APPROVED BY

MINISTRY OF TRANSPORT

DEPARTMENT OF HIGHWAYS

KINGDOM OF THAILAND

SHEET NO.

SCALE :

AUGUST 2012

DWG. NO.

DATE :

CHECKEDDATECHECKED DATE

NO.

REV.

DESCRIPTION

ENGINEER DOH

NO.

REV.

HIGHWAY ROUTE NO. 9

The Preparatory Survey on

the Outer Bangkok Ring Road

the Rehabilitation Project of

CROSS SECTIONS

( 64 / 70 )

SCALE 1:100

MW-115 120

Page 2: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …

DL=1.00

DL=1.00

DL=1.00

DL=1.00

DL=1.00

DL=1.00

DL=1.00

DL=1.00

DL=1.00

DL=1.00

27+800

/

ES

27+825

/

ES

27+850

/

ES

27+875

/

ES

27+900

/

ES

27+925

/

ES

27+950

/

ES

27+975

/

ES

28+000

/

ES

28+025

/

ES

18900

18900

18900

18900

18900

18900

18900

18900

18900

18900

2.5% 2.5%

CTI ENGINEERING INTERNATIONAL CO., LTD.

DESIGNED BY CHECKED BY

SAGARA Hidetaka WATANABE Ryohei

ROAD ENGINEER CHIEF ENGINEER

ORIENTAL CONSULTANTS CO., LTD.

NIPPON KOEI CO., LTD.

CTI ENGINEERING CO., LTD.

PROJECT TITLE

The Inter-City Motorways Division

Department of Highways

Ministry of Transport

OWNER

APPROVED BY

MINISTRY OF TRANSPORT

DEPARTMENT OF HIGHWAYS

KINGDOM OF THAILAND

SHEET NO.

SCALE :

AUGUST 2012

DWG. NO.

DATE :

CHECKEDDATECHECKED DATE

NO.

REV.

DESCRIPTION

ENGINEER DOH

NO.

REV.

HIGHWAY ROUTE NO. 9

The Preparatory Survey on

the Outer Bangkok Ring Road

the Rehabilitation Project of

CROSS SECTIONS

( 65 / 70 )

SCALE 1:100

MW-116 121

Page 3: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …

DL=1.00

DL=1.00

DL=1.00

DL=1.00

DL=1.00

DL=1.00

DL=1.00

DL=1.00

28+050

/

ES

28+075

/

ES

28+100

/

ES

28+125

/

ES

28+150

/

ES

28+175

/

ES

28+200

/

ES

28+225

/

ES

18900

18900

18900

18900

18900

18900

18900

18900

2.571%

2.5%2.5%

DL=1.00

DL=1.00

28+250

/

ES

28+275

/

ES

18900

18900

3.0%

CTI ENGINEERING INTERNATIONAL CO., LTD.

DESIGNED BY CHECKED BY

SAGARA Hidetaka WATANABE Ryohei

ROAD ENGINEER CHIEF ENGINEER

ORIENTAL CONSULTANTS CO., LTD.

NIPPON KOEI CO., LTD.

CTI ENGINEERING CO., LTD.

PROJECT TITLE

The Inter-City Motorways Division

Department of Highways

Ministry of Transport

OWNER

APPROVED BY

MINISTRY OF TRANSPORT

DEPARTMENT OF HIGHWAYS

KINGDOM OF THAILAND

SHEET NO.

SCALE :

AUGUST 2012

DWG. NO.

DATE :

CHECKEDDATECHECKED DATE

NO.

REV.

DESCRIPTION

ENGINEER DOH

NO.

REV.

HIGHWAY ROUTE NO. 9

The Preparatory Survey on

the Outer Bangkok Ring Road

the Rehabilitation Project of

CROSS SECTIONS

( 66 / 70 )

SCALE 1:100

MW-117 122

Page 4: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …

DL=1.00

DL=1.00

DL=1.00

DL=1.00

DL=1.00

DL=1.00

DL=1.00

DL=1.00

DL=1.00

DL=1.00

28+300

/

ES

28+325

/

ES

28+350

/

ES

28+375

/

ES

25+400

/

ES

28+425

/

ES

28+450

/

ES

28+475

/

ES

28+500

/

ES

28+525

/

ES

19520

19651

19909

20141

20308

20539

20694

20910

21091

21344

3.0% 3.0%

CTI ENGINEERING INTERNATIONAL CO., LTD.

DESIGNED BY CHECKED BY

SAGARA Hidetaka WATANABE Ryohei

ROAD ENGINEER CHIEF ENGINEER

ORIENTAL CONSULTANTS CO., LTD.

NIPPON KOEI CO., LTD.

CTI ENGINEERING CO., LTD.

PROJECT TITLE

The Inter-City Motorways Division

Department of Highways

Ministry of Transport

OWNER

APPROVED BY

MINISTRY OF TRANSPORT

DEPARTMENT OF HIGHWAYS

KINGDOM OF THAILAND

SHEET NO.

SCALE :

AUGUST 2012

DWG. NO.

DATE :

CHECKEDDATECHECKED DATE

NO.

REV.

DESCRIPTION

ENGINEER DOH

NO.

REV.

HIGHWAY ROUTE NO. 9

The Preparatory Survey on

the Outer Bangkok Ring Road

the Rehabilitation Project of

CROSS SECTIONS

( 67 / 70 )

SCALE 1:100

MW-118 123

Page 5: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …

DL=1.00

DL=1.00

DL=1.00

DL=1.00

/

ES

28+725

/

ES

28+750

/

ES

28+775

/

ES

22537

22494

22555

22486

3.0%

DL=1.00

DL=1.00

DL=1.00

DL=1.00

DL=1.00

DL=1.00

28+550

/

ES

28+575

/

ES

28+600

/

ES

28+625

/

ES

28+650

/

ES

28+700

/

ES

21623

21778

21978

22103

22311

22497

3.0%

28+675

2.767%

2.5%

CTI ENGINEERING INTERNATIONAL CO., LTD.

DESIGNED BY CHECKED BY

SAGARA Hidetaka WATANABE Ryohei

ROAD ENGINEER CHIEF ENGINEER

ORIENTAL CONSULTANTS CO., LTD.

NIPPON KOEI CO., LTD.

CTI ENGINEERING CO., LTD.

PROJECT TITLE

The Inter-City Motorways Division

Department of Highways

Ministry of Transport

OWNER

APPROVED BY

MINISTRY OF TRANSPORT

DEPARTMENT OF HIGHWAYS

KINGDOM OF THAILAND

SHEET NO.

SCALE :

AUGUST 2012

DWG. NO.

DATE :

CHECKEDDATECHECKED DATE

NO.

REV.

DESCRIPTION

ENGINEER DOH

NO.

REV.

HIGHWAY ROUTE NO. 9

The Preparatory Survey on

the Outer Bangkok Ring Road

the Rehabilitation Project of

CROSS SECTIONS

( 68 / 70 )

SCALE 1:100

MW-119 124

Page 6: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …

DL=1.00

DL=1.00

DL=1.00

DL=1.00

DL=1.00

DL=1.00

DL=1.00

DL=1.00

DL=1.00

DL=1.00

28+800

/

ES

28+825

/

ES

28+850

/

ES

28+875

/

ES

28+900

/

28+925

/

ES

28+950

/

ES

/

28+975

ES

/

29+000

ES

/

29+025

ESES

22479

22478

22607

22915

23114

23581

23968

24276

24499

24928

2.5% 2.5%

CTI ENGINEERING INTERNATIONAL CO., LTD.

DESIGNED BY CHECKED BY

SAGARA Hidetaka WATANABE Ryohei

ROAD ENGINEER CHIEF ENGINEER

ORIENTAL CONSULTANTS CO., LTD.

NIPPON KOEI CO., LTD.

CTI ENGINEERING CO., LTD.

PROJECT TITLE

The Inter-City Motorways Division

Department of Highways

Ministry of Transport

OWNER

APPROVED BY

MINISTRY OF TRANSPORT

DEPARTMENT OF HIGHWAYS

KINGDOM OF THAILAND

SHEET NO.

SCALE :

AUGUST 2012

DWG. NO.

DATE :

CHECKEDDATECHECKED DATE

NO.

REV.

DESCRIPTION

ENGINEER DOH

NO.

REV.

HIGHWAY ROUTE NO. 9

The Preparatory Survey on

the Outer Bangkok Ring Road

the Rehabilitation Project of

CROSS SECTIONS

( 69 / 70 )

SCALE 1:100

MW-120 125

Page 7: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …

DL=1.00

DL=1.00

DL=1.00

DL=1.00

DL=1.00

DL=1.00

DL=1.00

DL=1.00

DL=1.00

DL=1.00

/

29+050

ES

/

29+075

ES

/

29+100

ES

/

29+125

ES

/

29+150

ES

/

29+175

ES

/

29+200

ES

25285

25589

25850

26023

26152

26430

26407

2.5% 2.5%

CTI ENGINEERING INTERNATIONAL CO., LTD.

DESIGNED BY CHECKED BY

SAGARA Hidetaka WATANABE Ryohei

ROAD ENGINEER CHIEF ENGINEER

ORIENTAL CONSULTANTS CO., LTD.

NIPPON KOEI CO., LTD.

CTI ENGINEERING CO., LTD.

PROJECT TITLE

The Inter-City Motorways Division

Department of Highways

Ministry of Transport

OWNER

APPROVED BY

MINISTRY OF TRANSPORT

DEPARTMENT OF HIGHWAYS

KINGDOM OF THAILAND

SHEET NO.

SCALE :

AUGUST 2012

DWG. NO.

DATE :

CHECKEDDATECHECKED DATE

NO.

REV.

DESCRIPTION

ENGINEER DOH

NO.

REV.

HIGHWAY ROUTE NO. 9

The Preparatory Survey on

the Outer Bangkok Ring Road

the Rehabilitation Project of

CROSS SECTIONS

( 70 / 70 )

SCALE 1:100

MW-121 126

Page 8: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …

3. TOLL GATE

Page 9: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …
Page 10: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …

CTI ENGINEERING INTERNATIONAL CO., LTD.

DESIGNED BY CHECKED BY

SAGARA Hidetaka WATANABE Ryohei

ROAD ENGINEER CHIEF ENGINEER

ORIENTAL CONSULTANTS CO., LTD.

NIPPON KOEI CO., LTD.

CTI ENGINEERING CO., LTD.

PROJECT TITLEOWNER

APPROVED BY

MINISTRY OF TRANSPORT

DEPARTMENT OF HIGHWAYS

KINGDOM OF THAILAND

SHEET NO.

SCALE :

DWG. NO.

DATE :

CHECKEDDATECHECKED DATE

NO.

REV.

DESCRIPTION

ENGINEER DOH

NO.

REV.

HIGHWAY ROUTE NO. 9

The Inter-City Motorways Division

Department of Highways

Ministry of Transport

The Preparatory Survey on

the Outer Bangkok Ring Road

the Rehabilitation Project of

AUGUST 2012

TOLL GATE

-

TG-01 127

Page 11: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …

CTI ENGINEERING INTERNATIONAL CO., LTD.

DESIGNED BY CHECKED BY

SAGARA Hidetaka WATANABE Ryohei

ROAD ENGINEER CHIEF ENGINEER

ORIENTAL CONSULTANTS CO., LTD.

NIPPON KOEI CO., LTD.

CTI ENGINEERING CO., LTD.

PROJECT TITLEOWNER

APPROVED BY

MINISTRY OF TRANSPORT

DEPARTMENT OF HIGHWAYS

KINGDOM OF THAILAND

SHEET NO.

SCALE :

DWG. NO.

DATE :

CHECKEDDATECHECKED DATE

NO.

REV.

DESCRIPTION

ENGINEER DOH

NO.

REV.

HIGHWAY ROUTE NO. 9

The Inter-City Motorways Division

Department of Highways

Ministry of Transport

The Preparatory Survey on

the Outer Bangkok Ring Road

the Rehabilitation Project of

AUGUST 2012

TOLL GATE

-

TG-02 128

Page 12: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …

CTI ENGINEERING INTERNATIONAL CO., LTD.

DESIGNED BY CHECKED BY

SAGARA Hidetaka WATANABE Ryohei

ROAD ENGINEER CHIEF ENGINEER

ORIENTAL CONSULTANTS CO., LTD.

NIPPON KOEI CO., LTD.

CTI ENGINEERING CO., LTD.

PROJECT TITLEOWNER

APPROVED BY

MINISTRY OF TRANSPORT

DEPARTMENT OF HIGHWAYS

KINGDOM OF THAILAND

SHEET NO.

SCALE :

DWG. NO.

DATE :

CHECKEDDATECHECKED DATE

NO.

REV.

DESCRIPTION

ENGINEER DOH

NO.

REV.

HIGHWAY ROUTE NO. 9

The Inter-City Motorways Division

Department of Highways

Ministry of Transport

The Preparatory Survey on

the Outer Bangkok Ring Road

the Rehabilitation Project of

AUGUST 2012

TOLL GATE

AS SHOWN

TG-03 129

Page 13: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …

CTI ENGINEERING INTERNATIONAL CO., LTD.

DESIGNED BY CHECKED BY

SAGARA Hidetaka WATANABE Ryohei

ROAD ENGINEER CHIEF ENGINEER

ORIENTAL CONSULTANTS CO., LTD.

NIPPON KOEI CO., LTD.

CTI ENGINEERING CO., LTD.

PROJECT TITLEOWNER

APPROVED BY

MINISTRY OF TRANSPORT

DEPARTMENT OF HIGHWAYS

KINGDOM OF THAILAND

SHEET NO.

SCALE :

DWG. NO.

DATE :

CHECKEDDATECHECKED DATE

NO.

REV.

DESCRIPTION

ENGINEER DOH

NO.

REV.

HIGHWAY ROUTE NO. 9

The Inter-City Motorways Division

Department of Highways

Ministry of Transport

The Preparatory Survey on

the Outer Bangkok Ring Road

the Rehabilitation Project of

AUGUST 2012

TOLL GATE

AS SHOWN

TG-04 130

Page 14: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …

CTI ENGINEERING INTERNATIONAL CO., LTD.

DESIGNED BY CHECKED BY

SAGARA Hidetaka WATANABE Ryohei

ROAD ENGINEER CHIEF ENGINEER

ORIENTAL CONSULTANTS CO., LTD.

NIPPON KOEI CO., LTD.

CTI ENGINEERING CO., LTD.

PROJECT TITLEOWNER

APPROVED BY

MINISTRY OF TRANSPORT

DEPARTMENT OF HIGHWAYS

KINGDOM OF THAILAND

SHEET NO.

SCALE :

DWG. NO.

DATE :

CHECKEDDATECHECKED DATE

NO.

REV.

DESCRIPTION

ENGINEER DOH

NO.

REV.

HIGHWAY ROUTE NO. 9

The Inter-City Motorways Division

Department of Highways

Ministry of Transport

The Preparatory Survey on

the Outer Bangkok Ring Road

the Rehabilitation Project of

AUGUST 2012

TOLL GATE

AS SHOWN

TG-05 131

Page 15: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …

CTI ENGINEERING INTERNATIONAL CO., LTD.

DESIGNED BY CHECKED BY

SAGARA Hidetaka WATANABE Ryohei

ROAD ENGINEER CHIEF ENGINEER

ORIENTAL CONSULTANTS CO., LTD.

NIPPON KOEI CO., LTD.

CTI ENGINEERING CO., LTD.

PROJECT TITLEOWNER

APPROVED BY

MINISTRY OF TRANSPORT

DEPARTMENT OF HIGHWAYS

KINGDOM OF THAILAND

SHEET NO.

SCALE :

DWG. NO.

DATE :

CHECKEDDATECHECKED DATE

NO.

REV.

DESCRIPTION

ENGINEER DOH

NO.

REV.

HIGHWAY ROUTE NO. 9

The Inter-City Motorways Division

Department of Highways

Ministry of Transport

The Preparatory Survey on

the Outer Bangkok Ring Road

the Rehabilitation Project of

AUGUST 2012

TOLL GATE

AS SHOWN

TG-06 132

Page 16: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …

CTI ENGINEERING INTERNATIONAL CO., LTD.

DESIGNED BY CHECKED BY

SAGARA Hidetaka WATANABE Ryohei

ROAD ENGINEER CHIEF ENGINEER

ORIENTAL CONSULTANTS CO., LTD.

NIPPON KOEI CO., LTD.

CTI ENGINEERING CO., LTD.

PROJECT TITLEOWNER

APPROVED BY

MINISTRY OF TRANSPORT

DEPARTMENT OF HIGHWAYS

KINGDOM OF THAILAND

SHEET NO.

SCALE :

DWG. NO.

DATE :

CHECKEDDATECHECKED DATE

NO.

REV.

DESCRIPTION

ENGINEER DOH

NO.

REV.

HIGHWAY ROUTE NO. 9

The Inter-City Motorways Division

Department of Highways

Ministry of Transport

The Preparatory Survey on

the Outer Bangkok Ring Road

the Rehabilitation Project of

AUGUST 2012

TOLL GATE

AS SHOWN

TG-07 133

Page 17: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …

CTI ENGINEERING INTERNATIONAL CO., LTD.

DESIGNED BY CHECKED BY

SAGARA Hidetaka WATANABE Ryohei

ROAD ENGINEER CHIEF ENGINEER

ORIENTAL CONSULTANTS CO., LTD.

NIPPON KOEI CO., LTD.

CTI ENGINEERING CO., LTD.

PROJECT TITLEOWNER

APPROVED BY

MINISTRY OF TRANSPORT

DEPARTMENT OF HIGHWAYS

KINGDOM OF THAILAND

SHEET NO.

SCALE :

DWG. NO.

DATE :

CHECKEDDATECHECKED DATE

NO.

REV.

DESCRIPTION

ENGINEER DOH

NO.

REV.

HIGHWAY ROUTE NO. 9

The Inter-City Motorways Division

Department of Highways

Ministry of Transport

The Preparatory Survey on

the Outer Bangkok Ring Road

the Rehabilitation Project of

AUGUST 2012

TOLL GATE

AS SHOWN

TG-08 134

Page 18: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …

CTI ENGINEERING INTERNATIONAL CO., LTD.

DESIGNED BY CHECKED BY

SAGARA Hidetaka WATANABE Ryohei

ROAD ENGINEER CHIEF ENGINEER

ORIENTAL CONSULTANTS CO., LTD.

NIPPON KOEI CO., LTD.

CTI ENGINEERING CO., LTD.

PROJECT TITLEOWNER

APPROVED BY

MINISTRY OF TRANSPORT

DEPARTMENT OF HIGHWAYS

KINGDOM OF THAILAND

SHEET NO.

SCALE :

DWG. NO.

DATE :

CHECKEDDATECHECKED DATE

NO.

REV.

DESCRIPTION

ENGINEER DOH

NO.

REV.

HIGHWAY ROUTE NO. 9

The Inter-City Motorways Division

Department of Highways

Ministry of Transport

The Preparatory Survey on

the Outer Bangkok Ring Road

the Rehabilitation Project of

AUGUST 2012

TOLL GATE

AS SHOWN

TG-09 135

Page 19: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …

CTI ENGINEERING INTERNATIONAL CO., LTD.

DESIGNED BY CHECKED BY

SAGARA Hidetaka WATANABE Ryohei

ROAD ENGINEER CHIEF ENGINEER

ORIENTAL CONSULTANTS CO., LTD.

NIPPON KOEI CO., LTD.

CTI ENGINEERING CO., LTD.

PROJECT TITLEOWNER

APPROVED BY

MINISTRY OF TRANSPORT

DEPARTMENT OF HIGHWAYS

KINGDOM OF THAILAND

SHEET NO.

SCALE :

DWG. NO.

DATE :

CHECKEDDATECHECKED DATE

NO.

REV.

DESCRIPTION

ENGINEER DOH

NO.

REV.

HIGHWAY ROUTE NO. 9

The Inter-City Motorways Division

Department of Highways

Ministry of Transport

The Preparatory Survey on

the Outer Bangkok Ring Road

the Rehabilitation Project of

AUGUST 2012

TOLL GATE

AS SHOWN

TG-10 136

Page 20: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …

CTI ENGINEERING INTERNATIONAL CO., LTD.

DESIGNED BY CHECKED BY

SAGARA Hidetaka WATANABE Ryohei

ROAD ENGINEER CHIEF ENGINEER

ORIENTAL CONSULTANTS CO., LTD.

NIPPON KOEI CO., LTD.

CTI ENGINEERING CO., LTD.

PROJECT TITLEOWNER

APPROVED BY

MINISTRY OF TRANSPORT

DEPARTMENT OF HIGHWAYS

KINGDOM OF THAILAND

SHEET NO.

SCALE :

DWG. NO.

DATE :

CHECKEDDATECHECKED DATE

NO.

REV.

DESCRIPTION

ENGINEER DOH

NO.

REV.

HIGHWAY ROUTE NO. 9

The Inter-City Motorways Division

Department of Highways

Ministry of Transport

The Preparatory Survey on

the Outer Bangkok Ring Road

the Rehabilitation Project of

AUGUST 2012

TOLL GATE

25 CM. CONCRETE PAVEMENT (1 / 2)

AS SHOWN

TG-11 137

Page 21: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …

CTI ENGINEERING INTERNATIONAL CO., LTD.

DESIGNED BY CHECKED BY

SAGARA Hidetaka WATANABE Ryohei

ROAD ENGINEER CHIEF ENGINEER

ORIENTAL CONSULTANTS CO., LTD.

NIPPON KOEI CO., LTD.

CTI ENGINEERING CO., LTD.

PROJECT TITLEOWNER

APPROVED BY

MINISTRY OF TRANSPORT

DEPARTMENT OF HIGHWAYS

KINGDOM OF THAILAND

SHEET NO.

SCALE :

DWG. NO.

DATE :

CHECKEDDATECHECKED DATE

NO.

REV.

DESCRIPTION

ENGINEER DOH

NO.

REV.

HIGHWAY ROUTE NO. 9

The Inter-City Motorways Division

Department of Highways

Ministry of Transport

The Preparatory Survey on

the Outer Bangkok Ring Road

the Rehabilitation Project of

AUGUST 2012

TOLL GATE

25 CM. CONCRETE PAVEMENT (2 / 2)

1:50

TG-12 138

Page 22: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …

4. PEDESTRIAN OVERPASS FOR TOLL GATE ACCESS

Page 23: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …
Page 24: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …

CTI ENGINEERING INTERNATIONAL CO., LTD.

DESIGNED BY CHECKED BY

SAGARA Hidetaka WATANABE Ryohei

ROAD ENGINEER CHIEF ENGINEER

ORIENTAL CONSULTANTS CO., LTD.

NIPPON KOEI CO., LTD.

CTI ENGINEERING CO., LTD.

PROJECT TITLEOWNER

APPROVED BY

MINISTRY OF TRANSPORT

DEPARTMENT OF HIGHWAYS

KINGDOM OF THAILAND

SHEET NO.

SCALE :

DWG. NO.

DATE :

CHECKEDDATECHECKED DATE

NO.

REV.

DESCRIPTION

ENGINEER DOH

NO.

REV.

HIGHWAY ROUTE NO. 9

The Inter-City Motorways Division

Department of Highways

Ministry of Transport

The Preparatory Survey on

the Outer Bangkok Ring Road

the Rehabilitation Project of

AUGUST 2012

TOLL GATE

PEDESTRIAN BRIDGE

AS SHOWN

PO-01 139

Page 25: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …

CTI ENGINEERING INTERNATIONAL CO., LTD.

DESIGNED BY CHECKED BY

SAGARA Hidetaka WATANABE Ryohei

ROAD ENGINEER CHIEF ENGINEER

ORIENTAL CONSULTANTS CO., LTD.

NIPPON KOEI CO., LTD.

CTI ENGINEERING CO., LTD.

PROJECT TITLEOWNER

APPROVED BY

MINISTRY OF TRANSPORT

DEPARTMENT OF HIGHWAYS

KINGDOM OF THAILAND

SHEET NO.

SCALE :

DWG. NO.

DATE :

CHECKEDDATECHECKED DATE

NO.

REV.

DESCRIPTION

ENGINEER DOH

NO.

REV.

HIGHWAY ROUTE NO. 9

The Inter-City Motorways Division

Department of Highways

Ministry of Transport

The Preparatory Survey on

the Outer Bangkok Ring Road

the Rehabilitation Project of

AUGUST 2012

TOLL GATE

PEDESTRIAN BRIDGE

AS SHOWN

PO-02 140

Page 26: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …

CTI ENGINEERING INTERNATIONAL CO., LTD.

DESIGNED BY CHECKED BY

SAGARA Hidetaka WATANABE Ryohei

ROAD ENGINEER CHIEF ENGINEER

ORIENTAL CONSULTANTS CO., LTD.

NIPPON KOEI CO., LTD.

CTI ENGINEERING CO., LTD.

PROJECT TITLEOWNER

APPROVED BY

MINISTRY OF TRANSPORT

DEPARTMENT OF HIGHWAYS

KINGDOM OF THAILAND

SHEET NO.

SCALE :

DWG. NO.

DATE :

CHECKEDDATECHECKED DATE

NO.

REV.

DESCRIPTION

ENGINEER DOH

NO.

REV.

HIGHWAY ROUTE NO. 9

The Inter-City Motorways Division

Department of Highways

Ministry of Transport

The Preparatory Survey on

the Outer Bangkok Ring Road

the Rehabilitation Project of

AUGUST 2012

TOLL GATE

PEDESTRIAN BRIDGE

AS SHOWN

PO-03 141

Page 27: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …

CTI ENGINEERING INTERNATIONAL CO., LTD.

DESIGNED BY CHECKED BY

SAGARA Hidetaka WATANABE Ryohei

ROAD ENGINEER CHIEF ENGINEER

ORIENTAL CONSULTANTS CO., LTD.

NIPPON KOEI CO., LTD.

CTI ENGINEERING CO., LTD.

PROJECT TITLEOWNER

APPROVED BY

MINISTRY OF TRANSPORT

DEPARTMENT OF HIGHWAYS

KINGDOM OF THAILAND

SHEET NO.

SCALE :

DWG. NO.

DATE :

CHECKEDDATECHECKED DATE

NO.

REV.

DESCRIPTION

ENGINEER DOH

NO.

REV.

HIGHWAY ROUTE NO. 9

The Inter-City Motorways Division

Department of Highways

Ministry of Transport

The Preparatory Survey on

the Outer Bangkok Ring Road

the Rehabilitation Project of

AUGUST 2012

TOLL GATE

PEDESTRIAN BRIDGE

AS SHOWN

PO-04 142

Page 28: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …

AUGUST 2012

TOLL GATE

PEDESTRIAN BRIDGE

AS SHOWN

CTI ENGINEERING INTERNATIONAL CO., LTD.

DESIGNED BY CHECKED BY

SAGARA Hidetaka WATANABE Ryohei

ROAD ENGINEER CHIEF ENGINEER

ORIENTAL CONSULTANTS CO., LTD.

NIPPON KOEI CO., LTD.

CTI ENGINEERING CO., LTD.

PROJECT TITLEOWNER

APPROVED BY

MINISTRY OF TRANSPORT

DEPARTMENT OF HIGHWAYS

KINGDOM OF THAILAND

SHEET NO.

SCALE :

DWG. NO.

DATE :

CHECKEDDATECHECKED DATE

NO.

REV.

DESCRIPTION

ENGINEER DOH

NO.

REV.

HIGHWAY ROUTE NO. 9

The Inter-City Motorways Division

Department of Highways

Ministry of Transport

The Preparatory Survey on

the Outer Bangkok Ring Road

the Rehabilitation Project of

PO-05 143

Page 29: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …

CTI ENGINEERING INTERNATIONAL CO., LTD.

DESIGNED BY CHECKED BY

SAGARA Hidetaka WATANABE Ryohei

ROAD ENGINEER CHIEF ENGINEER

ORIENTAL CONSULTANTS CO., LTD.

NIPPON KOEI CO., LTD.

CTI ENGINEERING CO., LTD.

PROJECT TITLEOWNER

APPROVED BY

MINISTRY OF TRANSPORT

DEPARTMENT OF HIGHWAYS

KINGDOM OF THAILAND

SHEET NO.

SCALE :

DWG. NO.

DATE :

CHECKEDDATECHECKED DATE

NO.

REV.

DESCRIPTION

ENGINEER DOH

NO.

REV.

HIGHWAY ROUTE NO. 9

The Inter-City Motorways Division

Department of Highways

Ministry of Transport

The Preparatory Survey on

the Outer Bangkok Ring Road

the Rehabilitation Project of

AUGUST 2012

TOLL GATE

PEDESTRIAN BRIDGE

AS SHOWN

PO-06 144

Page 30: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …

CTI ENGINEERING INTERNATIONAL CO., LTD.

DESIGNED BY CHECKED BY

SAGARA Hidetaka WATANABE Ryohei

ROAD ENGINEER CHIEF ENGINEER

ORIENTAL CONSULTANTS CO., LTD.

NIPPON KOEI CO., LTD.

CTI ENGINEERING CO., LTD.

PROJECT TITLEOWNER

APPROVED BY

MINISTRY OF TRANSPORT

DEPARTMENT OF HIGHWAYS

KINGDOM OF THAILAND

SHEET NO.

SCALE :

DWG. NO.

DATE :

CHECKEDDATECHECKED DATE

NO.

REV.

DESCRIPTION

ENGINEER DOH

NO.

REV.

HIGHWAY ROUTE NO. 9

The Inter-City Motorways Division

Department of Highways

Ministry of Transport

The Preparatory Survey on

the Outer Bangkok Ring Road

the Rehabilitation Project of

AUGUST 2012

TOLL GATE

PEDESTRIAN BRIDGE

AS SHOWN

PO-07 145

Page 31: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …

CTI ENGINEERING INTERNATIONAL CO., LTD.

DESIGNED BY CHECKED BY

SAGARA Hidetaka WATANABE Ryohei

ROAD ENGINEER CHIEF ENGINEER

ORIENTAL CONSULTANTS CO., LTD.

NIPPON KOEI CO., LTD.

CTI ENGINEERING CO., LTD.

PROJECT TITLEOWNER

APPROVED BY

MINISTRY OF TRANSPORT

DEPARTMENT OF HIGHWAYS

KINGDOM OF THAILAND

SHEET NO.

SCALE :

DWG. NO.

DATE :

CHECKEDDATECHECKED DATE

NO.

REV.

DESCRIPTION

ENGINEER DOH

NO.

REV.

HIGHWAY ROUTE NO. 9

The Inter-City Motorways Division

Department of Highways

Ministry of Transport

The Preparatory Survey on

the Outer Bangkok Ring Road

the Rehabilitation Project of

AUGUST 2012

TOLL GATE

PEDESTRIAN BRIDGE

AS SHOWN

PO-08 146

Page 32: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …

CTI ENGINEERING INTERNATIONAL CO., LTD.

DESIGNED BY CHECKED BY

SAGARA Hidetaka WATANABE Ryohei

ROAD ENGINEER CHIEF ENGINEER

ORIENTAL CONSULTANTS CO., LTD.

NIPPON KOEI CO., LTD.

CTI ENGINEERING CO., LTD.

PROJECT TITLEOWNER

APPROVED BY

MINISTRY OF TRANSPORT

DEPARTMENT OF HIGHWAYS

KINGDOM OF THAILAND

SHEET NO.

SCALE :

DWG. NO.

DATE :

CHECKEDDATECHECKED DATE

NO.

REV.

DESCRIPTION

ENGINEER DOH

NO.

REV.

HIGHWAY ROUTE NO. 9

The Inter-City Motorways Division

Department of Highways

Ministry of Transport

The Preparatory Survey on

the Outer Bangkok Ring Road

the Rehabilitation Project of

The Preparatory Survey on

the Outer Bangkok Ring Road

the Rehabilitation Project of

AUGUST 2012

TOLL GATE

PEDESTRIAN BRIDGE

AS SHOWN

PO-09 147

Page 33: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …

CTI ENGINEERING INTERNATIONAL CO., LTD.

DESIGNED BY CHECKED BY

SAGARA Hidetaka WATANABE Ryohei

ROAD ENGINEER CHIEF ENGINEER

ORIENTAL CONSULTANTS CO., LTD.

NIPPON KOEI CO., LTD.

CTI ENGINEERING CO., LTD.

PROJECT TITLE

The Preparatory Survey on

the Outer Bangkok Ring Road

OWNER

APPROVED BY

MINISTRY OF TRANSPORT

DEPARTMENT OF HIGHWAYS

KINGDOM OF THAILAND

SHEET NO.

SCALE :

DWG. NO.

DATE :

CHECKEDDATECHECKED DATE

NO.

REV.

DESCRIPTION

ENGINEER DOH

NO.

REV.

HIGHWAY ROUTE NO. 9

the Rehabilitation Project of

The Inter-City Motorways Division

Department of Highways

Ministry of Transport

AUGUST 2012

TOLL GATE

PEDESTRIAN BRIDGE

AS SHOWN

PO-10 148

Page 34: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …

CTI ENGINEERING INTERNATIONAL CO., LTD.

DESIGNED BY CHECKED BY

SAGARA Hidetaka WATANABE Ryohei

ROAD ENGINEER CHIEF ENGINEER

ORIENTAL CONSULTANTS CO., LTD.

NIPPON KOEI CO., LTD.

CTI ENGINEERING CO., LTD.

PROJECT TITLEOWNER

APPROVED BY

MINISTRY OF TRANSPORT

DEPARTMENT OF HIGHWAYS

KINGDOM OF THAILAND

SHEET NO.

SCALE :

DWG. NO.

DATE :

CHECKEDDATECHECKED DATE

NO.

REV.

DESCRIPTION

ENGINEER DOH

NO.

REV.

HIGHWAY ROUTE NO. 9

The Inter-City Motorways Division

Department of Highways

Ministry of Transport

The Preparatory Survey on

the Outer Bangkok Ring Road

the Rehabilitation Project of

AUGUST 2012

TOLL GATE

PEDESTRIAN BRIDGE

AS SHOWN

PO-11 149

Page 35: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …

CTI ENGINEERING INTERNATIONAL CO., LTD.

DESIGNED BY CHECKED BY

SAGARA Hidetaka WATANABE Ryohei

ROAD ENGINEER CHIEF ENGINEER

ORIENTAL CONSULTANTS CO., LTD.

NIPPON KOEI CO., LTD.

CTI ENGINEERING CO., LTD.

PROJECT TITLEOWNER

APPROVED BY

MINISTRY OF TRANSPORT

DEPARTMENT OF HIGHWAYS

KINGDOM OF THAILAND

SHEET NO.

SCALE :

DWG. NO.

DATE :

CHECKEDDATECHECKED DATE

NO.

REV.

DESCRIPTION

ENGINEER DOH

NO.

REV.

HIGHWAY ROUTE NO. 9

The Inter-City Motorways Division

Department of Highways

Ministry of Transport

The Preparatory Survey on

the Outer Bangkok Ring Road

the Rehabilitation Project of

AUGUST 2012

TOLL GATE

PEDESTRIAN BRIDGE

AS SHOWN

PO-12 150

Page 36: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …

5. DRAINAGE WORK

Page 37: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …
Page 38: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …

5-1 HEIGHT ADJUSTMENT OF

EXISTING CATCH BASIN AT

MEDIAN

Page 39: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …
Page 40: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …

0.10 0.70 0.10

0.90

STEEL GRATING COVER

SECTION A-A

CONCRETE

0.10 1.35

1.55

SECTION B-B

0.10

0.08

SCALE          1:20

HEIGHT ADJUSTMENT OF EXISTING CATCH BASIN (MEDIAN)

CONCRETE

STEEL GRATING COVER

1.35

0.10

1.55

0.15 0.60 0.15

0.10 0.70 0.10

0.90

PLAN

AA

BB

1.25

0.15

0.10

0.15

REMOVES

0.10 0.70 0.10

0.90

STEEL GRATING COVER

SECTION A-A

0.10 1.35

1.55

SECTION B-B

0.10

STEEL GRATING COVER

0.08

H=Ave.0.540

(RAISE)

0.08

0.46

0.08

H=Ave.0.540

(RAISE)

0.08

0.46

0.15 0.60 0.15 0.15 1.25 0.15DB ∅12 [email protected] M.

0.10

DB ∅12 MM. @0.20 M.

0.10

EXISTING EXISTING

EXISTING EXISTING

φ9MM. @ 0.20M.

L=1.49M.

φ9MM. @ 0.20M.

L=0.48M.

φ9MM. @ 0.20M.

L=0.56M.

φ9MM. @ 0.20M.

L=0.84M.

φ9MM. @ 0.20M.

L=0.48M.

φ9MM. @ 0.20M.

L=0.56M.

0.62

0.62

CONCRETE

(REMOVE)

1. ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE INDICATED.

3. CONCRETE SHALL HAVE A MINIMUM ULTIMATE COMPRESSIVE STRENGTH OF

210 KSC. FOR 15x15x15 CM. CUBE AT 28 DAYS. AN APPROXIMATEMIX DESIGN

PER CUBIC METER IS SUGGESTED AS FOLLOW :

PORTLAND CEMENT TYPE 1 350 KG. (MIN.)

SAND 0.43 M.

CRUSHED ROCK OR GRAVEL 0.86 M.

CONCRETE SLUMP 10 CM.

4. REINFORCING STEEL SHALL CONORM TO TIS.20 GRADE SR24 FOR ROUND BARS

AND TIS.24 GRADE SD30 FOR DEFORMED BARS.

5. STRUCTURAL STEEL SHALL CONFORM TO TIS.116 GRADE FE 30.

NOTES :

2. THE SHADED AREAS REPRESENT PORTIONS TO BE DEMOLISHED.

TRAFFIC FLOW

0.08

REMOVES

(NORTH BOUND)

SCALE   1:20

REMOVAL WORK

VARIES

VARIES

0.69

1.34

DETAIL OF STEEL GRATING COVERSCALE         1:10

0.0512 MM. × 7.5CM.

12 MM. × 7.5CM. STEEL BARS

SCHEDULED LIST OF HEIGHT ADJUSTMENT OF EXISTING CATCH BASIN (MEDIAN)

CTI ENGINEERING INTERNATIONAL CO., LTD.

DESIGNED BY CHECKED BY

SAGARA Hidetaka WATANABE Ryohei

ROAD ENGINEER CHIEF ENGINEER

ORIENTAL CONSULTANTS CO., LTD.

NIPPON KOEI CO., LTD.

CTI ENGINEERING CO., LTD.

PROJECT TITLEOWNER

APPROVED BY

MINISTRY OF TRANSPORT

DEPARTMENT OF HIGHWAYS

KINGDOM OF THAILAND

SHEET NO.

SCALE :

DWG. NO.

DATE :

CHECKEDDATECHECKED DATE

NO.

REV.

DESCRIPTION

ENGINEER DOH

NO.

REV.

HIGHWAY ROUTE NO. 9

The Inter-City Motorways Division

Department of Highways

Ministry of Transport

The Preparatory Survey on

the Outer Bangkok Ring Road

the Rehabilitation Project of

AUGUST 2012

HEIGHT ADJUSTMENT OF EXISTING

CATCH BASIN AT MEDIAN

1:10 / 1:20

DR-1 151

Page 41: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …
Page 42: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …

5-2 HEIGHT ADJUSTMENT OF

EXISTING CATCH BASIN AT

SHOULDER

Page 43: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …
Page 44: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …

0.135

0.73

0.135

1.00

0.085

0.83

0.085

0.20 0.60 0.15

0.45 0.40 0.10

0.95

0.15 0.60 0.15

0.90

0.50 0.30

1.063

0.15 0.70 0.15

1.00

PLAN

SCALE         1:20

AA

BB

HEIGHT ADJUSTMENT OF EXISTING CATCH BASIN (SHOULDER)

SECTION A-A SECTION B-B

0.155 0.17

0.098

0.075

0.085 0.83 0.085

1.063

0.155 0.098

0.810

0.45 0.40 0.10

0.95

0.15 0.60 0.15

0.90

0.50 0.30

Ave.1.378

0.15 0.70 0.15

1.00

SECTION A-A SECTION B-B

0.155

0.17

0.483

0.098

0.075

0.085 0.83 0.085

0.098

0.810

Ave.0.480

Ave.1.378

0.155

Ave.0.480

0.908

0.908

H=

0.255

Ave.0.568

0.069

0.152

0.05

0.179

0.45 0.40 0.10

0.95

0.483

0.255

0.069

0.152

0.05

0.179

(RAISE)

H=

(RAISE)

STEEL GRATING COVERSTEEL GRATING COVER

DB ∅12 MM. @0.20 M.

0.10

VARIES

DB ∅12 MM. @0.20 M.

0.10

EXISTING EXISTING

EXISTING

EXISTING

1.00

1.00

φ9MM. @ 0.20M.

L=0.94M.

φ9MM. @ 0.20M.

L=0.42M.

φ9MM. @ 0.20M.

L=0.50M.

φ9MM. @ 0.20M.

L=0.89M.

φ9MM. @ 0.20M.

L=0.42M.

φ9MM. @ 0.20M.

L=0.50M.

TRAFFIC FLOW

(NORTH BOUND)

SCALE   1:20

REMOVAL WORK

1. ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE INDICATED.

3. CONCRETE SHALL HAVE A MINIMUM ULTIMATE COMPRESSIVE STRENGTH OF

210 KSC. FOR 15x15x15 CM. CUBE AT 28 DAYS. AN APPROXIMATEMIX DESIGN

PER CUBIC METER IS SUGGESTED AS FOLLOW :

PORTLAND CEMENT TYPE 1 350 KG. (MIN.)

SAND 0.43 M.

CRUSHED ROCK OR GRAVEL 0.86 M.

CONCRETE SLUMP 10 CM.

4. REINFORCING STEEL SHALL CONORM TO TIS.20 GRADE SR24 FOR ROUND BARS

AND TIS.24 GRADE SD30 FOR DEFORMED BARS.

5. STRUCTURAL STEEL SHALL CONFORM TO TIS.116 GRADE FE 30.

NOTES :

2. THE SHADED AREAS REPRESENT PORTIONS TO BE DEMOLISHED.

VARIES

0.40

0.83

DETAIL OF STEEL GRATING COVERSCALE          1:10

12 MM. × 7.5CM.

0.05

12 MM. × 7.5CM. STEEL BARS

SCALE             1 : 10

AT CORNERS (TYP.)

RB ∅9 MM.

0.20

0.10 0.10

RB ∅9 MM. @0.20 M.

RB ∅9 MM. @0.20 M.

RB ∅9 MM. @0.20 M.

REINFORCEMENT DETAIL

L=1.64M

Ave. L=1.30M

Ave. L=0.82M

RB ∅9 MM.

SCHEDULED LIST OF HEIGHT ADJUSTMENT OF EXISTING CATCH BASIN (SHOULDER)

CTI ENGINEERING INTERNATIONAL CO., LTD.

DESIGNED BY CHECKED BY

SAGARA Hidetaka WATANABE Ryohei

ROAD ENGINEER CHIEF ENGINEER

ORIENTAL CONSULTANTS CO., LTD.

NIPPON KOEI CO., LTD.

CTI ENGINEERING CO., LTD.

PROJECT TITLEOWNER

APPROVED BY

MINISTRY OF TRANSPORT

DEPARTMENT OF HIGHWAYS

KINGDOM OF THAILAND

SHEET NO.

SCALE :

DWG. NO.

DATE :

CHECKEDDATECHECKED DATE

NO.

REV.

DESCRIPTION

ENGINEER DOH

NO.

REV.

HIGHWAY ROUTE NO. 9

The Inter-City Motorways Division

Department of Highways

Ministry of Transport

The Preparatory Survey on

the Outer Bangkok Ring Road

the Rehabilitation Project of

AUGUST 2012

HEIGHT ADJUSTMENT OF EXISTING

CATCH BASIN AT SHOULDER

1:10 / 1:20

DR-2 152

Page 45: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …
Page 46: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …

5-3 DETAILS OF INLET CATCH BASIN

AT MEDIAN & PIPE CULVERT

Page 47: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …
Page 48: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …

0.15

0.70

0.15

1.00

0.085

0.83

0.085

0.20 0.60 0.15

0.45 0.40 0.10

0.95

0.15 0.60 0.15

0.90

0.30

1.063

PLAN

SCALE                 1:20

AA

BB

CATCH BASIN (SHOULDER)

SECTION A-A SECTION B-B

0.325

0.085 0.83 0.085

1.063

0.253

0.810

0.45 0.40 0.10

0.95

0.483

0.255

0.069

0.152

0.05

0.179

1.00

1.30

0.150.10

1.297

0.15

1.147

1.55

0.50

0.05 0.05

0.20 0.20

0.15 0.70

1.00

1.40

0.150.10

0.20

0.15

0.20

0.15

1.40

1.55

0.30

LEAN CONCRETE BEDDING

1:3:6 BY VOLUME

SAND BEDDING

LEAN CONCRETE BEDDING

1:3:6 BY VOLUME

SAND BEDDING

DB φ12 MM. L=0.60M. @0.20 M.

0.30

0.30

φ9MM. @ 0.20M.

L=0.94M.

φ9MM. @ 0.20M.

L=1.24M.

φ9MM. @ 0.20M.

L=0.84M.

φ9MM. @ 0.20M.

L=3.57M.

φ0.40 RC. PIPE CULVERT

φ0.40 RC. PIPE CULVERT

φ9MM. @ 0.20M.

L=1.41M.

0.155

0.170

0.075

φ9MM. @ 0.20M.

L=0.84M.

φ0.40 RC. PIPE CULVERT

φ9MM. @ 0.20M.

L=1.24~1.41M. Ave.1.33M.

0.075

1.325

φ9MM. @ 0.20M.

L=0.94M.

φ9MM. @ 0.20M.

0.30

L=3.42~3.92M. Ave.3.67M.

STEEL GRATING COVERSTEEL GRATING COVER

STEEL GRATING COVER

1. ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE INDICATED.

3. CONCRETE SHALL HAVE A MINIMUM ULTIMATE COMPRESSIVE STRENGTH OF

210 KSC. FOR 15x15x15 CM. CUBE AT 28 DAYS. AN APPROXIMATEMIX DESIGN

PER CUBIC METER IS SUGGESTED AS FOLLOW :

PORTLAND CEMENT TYPE 1 350 KG. (MIN.)

SAND 0.43 M.

CRUSHED ROCK OR GRAVEL 0.86 M.

CONCRETE SLUMP 10 CM.

4. REINFORCING STEEL SHALL CONORM TO TIS.20 GRADE SR24 FOR ROUND BARS

AND TIS.24 GRADE SD30 FOR DEFORMED BARS.

5. STRUCTURAL STEEL SHALL CONFORM TO TIS.116 GRADE FE 30.

NOTES :

2. THE SHADED AREAS REPRESENT PORTIONS TO BE DEMOLISHED.

0.40

0.83

STEEL GRATING COVERSCALE                 1:10

3-12 MM. × 7.5CM.

0.05

12 MM. × 7.5CM. STEEL BARS

SCALE             1 : 10

AT CORNERS (TYP.)

RB φ9 MM.

0.20

0.10 0.10

RB φ9 MM. @0.20 M.

RB φ9 MM. @0.20 M.

RB φ9 MM. @0.20 M.

REINFORCEMENT DETAIL

L=1.64M

L=0.98M

L=0.50M

CTI ENGINEERING INTERNATIONAL CO., LTD.

DESIGNED BY CHECKED BY

SAGARA Hidetaka WATANABE Ryohei

ROAD ENGINEER CHIEF ENGINEER

ORIENTAL CONSULTANTS CO., LTD.

NIPPON KOEI CO., LTD.

CTI ENGINEERING CO., LTD.

PROJECT TITLEOWNER

APPROVED BY

MINISTRY OF TRANSPORT

DEPARTMENT OF HIGHWAYS

KINGDOM OF THAILAND

SHEET NO.

SCALE :

DWG. NO.

DATE :

CHECKEDDATECHECKED DATE

NO.

REV.

DESCRIPTION

ENGINEER DOH

NO.

REV.

HIGHWAY ROUTE NO. 9

The Inter-City Motorways Division

Department of Highways

Ministry of Transport

The Preparatory Survey on

the Outer Bangkok Ring Road

the Rehabilitation Project of

AUGUST 2012

HEIGHT ADJUSTMENT OF EXISTING

CATCH BASIN AT SHOULDER

1:10 / 1:20

DR-3 153

Page 49: CROSS SECTIONS MINISTRY OF TRANSPORT DEPARTMENT OF …

0.10 0.60 0.10

0.80

0.150.10

1.15

0.15

0.92

0.08

0.90

0.05

0.20

0.15

0.50

0.90

0.05

0.15

φ0.40 RC. PIPE CULVERT

(OUTLET)

LEAN CONCRETE BEDDING

1:3:6 BY VOLUME

SAND BEDDING

STEEL GRATING COVER

L 50×50×6mm.

φ9MM. @ 0.20M.

SECTION A-A

0.10 0.80 0.10

1.00

0.150.10

1.15

0.15

0.92

0.08

0.20

0.20

0.15

0.70

1.40

0.20

0.15

LEAN CONCRETE BEDDING

1:3:6 BY VOLUME

SAND BEDDING

STEEL GRATING COVER

L 50×50×6mm.

φ9MM. @ 0.20M.

SECTION B-B

SCALE                 1:20

CATCH BASIN (MEDIAN)

1.00

φ0.40 RC. PIPE CULVERT

(OUTLET)

φ9MM. @ 0.20M.

L=0.94M. L=0.74M.

L=2.92M.

φ9MM. @ 0.20M.

L=1.01M.

φ9MM. @ 0.20M.

L=0.74M.

φ9MM. @ 0.20M.

L=3.12M.

φ9MM. @ 0.20M.

L=1.01M.

φ9MM. @ 0.20M.

L=0.94M.

TRAFFIC FLOW

(NORTH BOUND)

1. ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE INDICATED.

3. CONCRETE SHALL HAVE A MINIMUM ULTIMATE COMPRESSIVE STRENGTH OF

210 KSC. FOR 15x15x15 CM. CUBE AT 28 DAYS. AN APPROXIMATEMIX DESIGN

PER CUBIC METER IS SUGGESTED AS FOLLOW :

PORTLAND CEMENT TYPE 1 350 KG. (MIN.)

SAND 0.43 M.

CRUSHED ROCK OR GRAVEL 0.86 M.

CONCRETE SLUMP 10 CM.

4. REINFORCING STEEL SHALL CONORM TO TIS.20 GRADE SR24 FOR ROUND BARS

AND TIS.24 GRADE SD30 FOR DEFORMED BARS.

5. STRUCTURAL STEEL SHALL CONFORM TO TIS.116 GRADE FE 30.

NOTES :

2. THE SHADED AREAS REPRESENT PORTIONS TO BE DEMOLISHED.

6. DETAILS OF R.C.PIPE CULVERT SHALL CONFORM TO THE STANDARD OF DOH

OF THAILAND.

0.59

0.79

DETAIL OF STEEL GRATING COVERSCALE          1:10

12 MM. × 7.5CM.

12 MM. × 7.5CM.

0.05

0.52

0.60

1.12

0.30 0.52 0.30

1.12

φ0.40

0.06

0.06

BACKFILL

(ORDINARY BEDDING)SCALE                 1:10

RC. PIPE CULVERT

SCALE                VARIES

DETAILS OF INLET CATCH BASIN AT MEDIAN AND PIPE CULVERT

PRECAST

AA

BB

0.15

0.70

0.15

0.10

0.80

0.10

1.00

0.15

0.10

0.80

0.15

0.10 0.60

0.50

φ0.40 RC. PIPE CULVERT

(OUTLET)

STEEL GRATING COVER

CTI ENGINEERING INTERNATIONAL CO., LTD.

DESIGNED BY CHECKED BY

SAGARA Hidetaka WATANABE Ryohei

ROAD ENGINEER CHIEF ENGINEER

ORIENTAL CONSULTANTS CO., LTD.

NIPPON KOEI CO., LTD.

CTI ENGINEERING CO., LTD.

PROJECT TITLEOWNER

APPROVED BY

MINISTRY OF TRANSPORT

DEPARTMENT OF HIGHWAYS

KINGDOM OF THAILAND

SHEET NO.

SCALE :

DWG. NO.

DATE :

CHECKEDDATECHECKED DATE

NO.

REV.

DESCRIPTION

ENGINEER DOH

NO.

REV.

HIGHWAY ROUTE NO. 9

The Inter-City Motorways Division

Department of Highways

Ministry of Transport

The Preparatory Survey on

the Outer Bangkok Ring Road

the Rehabilitation Project of

AUGUST 2012

DETAILS OF INLET CATCH BASIN AT

MEDIAN & PIPE CULVERT

1:10 / 1:20

SCHEDULED LIST OF φ0.40 RC. PIPE CULVERT FOR CROSSING

SCHEDULED LIST OF φ0.40 RC. PIPE CULVERT FOR LONGITUDINAL

DR-4 154