CrossCross--border trade and transport border trade and transport infrastructure development infrastructure development
in NEAin NEA
By: Prof. Gotov Dugerjav, Dr.ScBy: Prof. Gotov Dugerjav, Dr.Sc
ContentsContents
— NEA and Mongolia cooperation— Mongolia’s Macroeconomic Review— Brief description of the Eastern Mongolia— Infrastructure capacity review— Future Development Potential (on-
going/planned megaprojects, traffic forecasts)
— Road and Rail Transport corridors— Conclusions and Recommendations
2Gotov Dugerjav
I. NEA and Mongolia cooperation
Gotov Dugerjav 3
NEA cooperationNEA cooperation
Gotov Dugerjav 4
Northeast Asia :• 3 of the world’s major powers, • 2 of the 5 permanent members of the
UN Security Council, and • 2 of the largest economies of the world• 2 of the BRIC’s countries.
It is also a home to one of the world’s hottest flash points. The situation in the sub-region remains fragile, although it is relatively stable.
Basis of CooperationBasis of Cooperation
Gotov Dugerjav 5
This area of the World includes countries with very diverse political and economic conditions. The basis of an international economic cooperation framework could be a combination of rich mineral resources of Mongolia and investment capital and advanced technology from South Korea and Japan, as well as a considerable pool of workforce from China (PRC) and North Korea.
MongoliaMongolia’’s foreign trade with s foreign trade with NEA, million USDNEA, million USD
Gotov Dugerjav 6
Export Import
2009 2010 2011 2009 2010 2011Total 1888 385.1 2 908 502.2 4 780 350.5 2 137 673.5 3 200 053.3 6 526 882.4
NEA 1 414 023 2 499 662.6 4 449 328.7 794 553.8 1 355 282.5 2 851 436.7
DPRK - 25.5 - 47.1 798.5 740.0
ROK 15 458.1 30 519.9 1 896.1 155 102.2 181 781.9 350 648.5
PRC 1 393 906.7 2 466 265.5 4 400 735.7 538 582.6 970 976.0 2 007 572.2
Taiwan 94.0 182.0 10.0 3 768.4 5 238.1 8 966.5
Japan 4 564.2 2 669.7 10 694.6 97 053.5 196 488.0 483 509.5
Source: National Statistical Office, Mongolia
II. Mongolia’s economy
Gotov Dugerjav 7
GDP growth, MongoliaGDP growth, MongoliaSpurred By:— Development of large coal,
copper and gold mining projects;
— Continued strong flows of FDI doubled between 2010 and 2011;
— Public investment being raised;
— Strong consumer demand due to disbursement of cash to the citizens.
8Gotov Dugerjav
InfrastructureInfrastructure capacity review capacity review
2007 2008 2009 2010 2011
Freight (Thousand tones)By RailBy RoadBy Air
23,281.614,072.6
9,207.11,887.2
23,904.414,646.9
9,255.71,847.0
24,729.714,164.510,563.8
1,369.3
29,415.916,753.212,610.2
1,641.6
43,956.618,327.425,635.3
2,930.9
Freight (Million TKM)By RailBy RoadBy Air
9,030.28,360.7
661.97,720.6
9,051.48,261.4
782.17,926.5
8,981.37,817.01,160.73,666.7
12,106.410,286.7
1,834.04,169.5
16,300.211,382.2
4,910.37,708.6
Passengers (Million)By RailBy RoadBy Air
209.94.5
205.00.4
231.64.4
226.90.4
232.43.1
229.00.3
250.73.5
246.70.4
296.23.8
291.80.6
Passengers (Million PKM)By RailBy RoadBy Air
3,263.11,406.4
869.7987.1
3,607.31,400.51,215.0
991.9
3,173.11,003.11,535.9
634.1
3,607.41,220.01,480.2
907.2
4,696.11,400.12,321.8
974.1
Summary Transportation Statistics for Mongolia
Source: Mongolia Statistical Yearbook 2011, National Statistical Office, Ulaanbaatar 2011
9Gotov Dugerjav
Brief description of the Eastern MongoliaBrief description of the Eastern Mongolia
10Gotov Dugerjav
Shares to total GDPShares to total GDP
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
2009 2010 2011
Share to total GDP, Eastern aimags
Agriculture Industry Services
11Gotov Dugerjav
III. Current situation of Transport corridors in Mongolia and NEA
Gotov Dugerjav 12
Millennium Road RoutesMillennium Road Routes
Source: Ministry of Roads, Transportation, Construction and Urban Development, Mongolia
13Gotov Dugerjav
Main Mongolia Road CorridorsMain Mongolia Road Corridors
Route 1 (GTI Road corridor- 1a among the studied trans-GTR transport corridors): Ulaanbaatar- Undurkaan-Choibalsan- Sumber- Nomrog.This route will be constructed in the framework of the Millennium Road in nearest future.
Route 2: Altanbulag-Darkan-Ulaanbaatar-Choir- Sainshand-Zamyn UudThis route is being built now and will be completed in 2013. The development plans for the route include implementation of an international highway construction project.
14Gotov Dugerjav
Road conditions in the Road Road conditions in the Road CorridorCorridor--1a1a
Paved road between Ulaanbaatar and Undurkhaan (331 km)
Earth road between Undurkhaan and Choibalsan (324 km )
Earth road between Choibalsan and Sumber (Nomrog)
15Gotov Dugerjav
Transport Network in Eastern Transport Network in Eastern MongoliaMongolia
Type of Road State (Km) State (%) Local (Km) Local (%)
Paved 546 15.6 215 3.0
Gravel 556 15.9 57 0.8
Improved Earth 305 8.7 7 0.1
Earth 2,095 59.8 6,876 96.1
Total 3,502 100.0 7,155 100.0
Types of Roads in Eastern Mongolia
From To Distance (Km)Ulaanbaatar Ondorhaan 331
Ondorhaan Baruun Urt 229
Ondorhaan Choibalsan 324
Choibalsan Baruun Urt 191
Choibalsan Ereentsav 240
Choibalsan Khavirga Port 135
Choibalsan Tamsagbulag 200
Road Distances in Eastern Mongolia
16Gotov Dugerjav
Main Mongolia Rail CorridorsMain Mongolia Rail Corridors
Rail Corridor 1: Suhbaatar-Darkhan-Ulaanbaatar-Sainshand-Zamyn Uud (existing main line);
Rail Corridor 2: Ukhaa Hudag (Tavantogoi)- Zuunbayan- Sainshand-Baruun Urt-Khuut-Choibalsan- Ereentsav;The section ”Uhaa Hudag-Zuunbayan-Sainshand-Khuut-Choibalsan” is going to built within 2.5 years. Therefore, the existing section between Choibalsan and Ereentsav needs to be upgraded.
Rail Corridor 3 (GTI Rail Corridor -1b among the studied trans-GTR transport corridors): Ukhaa Khudag-Zuunbayan-Sainshand-Khuut- Tansagbulag- Sumber BCP (Nomrog bridge).The section of Rail line “Ukhaa Khudag-Zuunbayan-Khuut” will be built under the route 2. Thus, the new construction of the section between Khuut and Nomrog with total length of 338 km would be main focus area under GTI Transport Corridors Project.
17Gotov Dugerjav
Carrying capacity of the Main rail lineCarrying capacity of the Main rail line
Gotov Dugerjav 18
ZAMYN UUD BCPZAMYN UUD BCPq Besides petroleum products 90%- of the total importq 75% of the total export pass through Zamyn Uud BCPq Transit traffic is significant as well.Year/traffic 2007 2008 2009 2010Imports (tons) 728,056 1,232,829 668,489 870,744Exports (tons) 34,257 52,719 74,260 75,651Trucks inward 18,919 34,501 21,446 19,190Trucks outward 18,106 34,302 21,152 17,453Cars in/out 80,634/81,659 95,350/95,059 98,493/99,246 116,089/104,844Passengers in and out figures rounded
750,000/766,000 809,000/810,000 698,000/702,000 861,000/863,000
19Gotov Dugerjav
New logistics center in Zamyn UudNew logistics center in Zamyn Uud
Gotov Dugerjav 20
Mongolia and NEA transportation Mongolia and NEA transportation connectionsconnections
21Gotov Dugerjav
Border crossing points Between Border crossing points Between Mongolia and ChinaMongolia and China
Gotov Dugerjav 22
- Border crossing point
IV. Railway Plans in Mongolia
Gotov Dugerjav 23
MongoliaMongolia’’s railway policys railway policy
Gotov Dugerjav 24
New railway construction phasesNew railway construction phases
Phase I: Dalanzadgad-Tavantolgoi –Tsagaan Suvarga-Sainshand-Baruun Urt-Khuut-
Choibalsan
Phase I: Ukhaa Khudag - Gashuun
Sukhait
Phase II: Nariin Sukhait -
Shiveekhuran
Phase II: Khuut -Numrug
Phase II:Khuut -Bichigt
Phase III: Western Vertical Corridor
Under construction (Samsung)
25Gotov Dugerjav
Planned Rail networks in Eastern aimags Planned Rail networks in Eastern aimags of Mongoliaof Mongolia
26Gotov Dugerjav
Applicable legal frameworks Applicable legal frameworks
Road sector legal and regulatory framework:— Between Mongolia and PRC :
Road Transportation Agreement between the People’s Republic of China and Mongolia on June 24, 1991;
— Between Mongolia and Russian Federation:International Road Transportation Agreement between Russian Federation and Mongolia on February
07, 1996.Railway sector:The applicable laws of a specific nature applying to the railway subsector as a whole are:— 1996 Law on Railway Safety (1996 Law);— the Law on Railway Transport (LRT);— Parliamentary Resolution approving the establishment of Mongolian Railway Authority (MRA);— MoRTT (now MRTCUD) Regulation dated February 2, 2005 Amendment 2; and— Law of Government Inspection 2003.The applicable agreements of a specific nature applying to the railway subsector as a whole are:— the 1949 Agreement between Russia and Mongolia on the Establishment of the Ulaanbaatar Railway
Joint Stock Company (UBTZ) and its protocols (1949 Agreement), and— Multi-Lateral Agreements on Rail Transit Transportation:
– the Border Railway Agreement between Mongolia and Russia, 1953;– the Border Railway Agreement between Mongolia and PRC, 1954; and– the Border Railway Agreement between Mongolia, Russia and PRC, 1956.
27Gotov Dugerjav
V. Traffic demand
Gotov Dugerjav 28
Review of onReview of on--going/planned economic going/planned economic development projects likely to impact future traffic development projects likely to impact future traffic — 1/ Tavan Tolgoi (TT) coal mine project. In 2020, volume of the unprocessed products of the mine
would be 67.7 million tons. s:
— 2/ Nariin Sukhait (NS) coal mine project. In 2020, volume of the unprocessed products of the mine would be 30.5 million tons.
— 3/ Oyu Tolgoi (OT) copper mine project. Expected production volume is 2.1 million tons of copper concentrate.
29Gotov Dugerjav
Traffic and Transport demand forecasting Traffic and Transport demand forecasting Years Growth rate GDP/capita traffic elasticity Growth percentage
GDP Population GDP/capita Passenger traffic (IEp)
Freight traffic(IEf)
Passenger traffic
Freight traffic
2015 7.7 2.0 5.7 1.75 1.39 25.2 10.702020 7.0 2.0 5.0 1.62 1.35 23.5 9.452025 7.0 2.0 5.0 1.35 1.15 19.9 8.05
Traffic forecast diagram between Choibalsan and Sumber BCP (Nomrog bridge)
30Gotov Dugerjav
Demand for coal in Northeast Asia, million Demand for coal in Northeast Asia, million tons per year, 2020tons per year, 2020
31Gotov Dugerjav
Coal and copper markets in Asian Coal and copper markets in Asian countriescountries
Gotov Dugerjav 32
Potential markets of MongoliaPotential markets of Mongolia’’s s mineralsminerals
Gotov Dugerjav 33
Coal extraction estimates per year, 2020Coal extraction estimates per year, 2020
34Gotov Dugerjav
Coal traffic forecast, 2010Coal traffic forecast, 2010--10201020(thousand tons)(thousand tons)
35Gotov Dugerjav
Possible routes for coal transportation Possible routes for coal transportation from Tavan Tolgoi coalfieldfrom Tavan Tolgoi coalfield
Gotov Dugerjav 36
Possible routes for coal transportation Possible routes for coal transportation from Tavan Tolgoi coalfieldfrom Tavan Tolgoi coalfield
Gotov Dugerjav 37
Mineral transportation flow, million tonsMineral transportation flow, million tons
38Gotov Dugerjav
Traffic flow forecasts (coal) in 2020, Traffic flow forecasts (coal) in 2020, million tones million tones
Gotov Dugerjav 39
Copper transportation demand, 2020Copper transportation demand, 2020
Òàéëáàð: Áàÿí-Àéðàã /çýñ, àëò/ æèëä 980 ìÿí òí õ¿äýð îëáîðëîæ, áàÿæóóëíà /2012 îíîîñ 2 æèëä áàðèíà/, Îþóòîëãîé/çýñ, àëò/ 2012 îíä ýõä¿¿ëæ, 2013 îíîîñ çýñèéí áàÿæìàë ¿éëäâýðëýíý. Öàãààí ñóâàðãà /çýñ, ìîëåáäåí/ 2014 îíä êàòîäûíçýñíèé ¿éëäâýõ àøèãëàëòàíä îðóóëíà.
40Gotov Dugerjav
Iron ore transportation forecast, 2020 Iron ore transportation forecast, 2020
41Gotov Dugerjav
Coal transportation estimates from Khuut Coal transportation estimates from Khuut to Sumber BCP (Nomrog)to Sumber BCP (Nomrog)
According to our estimates, 15.2 million tons coal would be delivered mainly to Chinese market. However, some shares of the coal would be exported to Republic of Korea (ROK) and Japan as well.
On the basis of the interviews’ of officers from the freight forwarders, transport operators and railway specialists, we assume that very rough shares would be as follows:
Eastern China: 10.6 million tons (70%) per yearROK: 2.3 million tons (15%) per yearJapan: 2.3 million tons (15%) per year.
42Gotov Dugerjav
Margin from the Coal export, USDMargin from the Coal export, USD
Extraction Transpor-tation by trucks to the border
Extractor’sprofit
Price of extractor
Washing cost
Washing loss
Rail cost to Baotou
Rail cost to Tanshani
Trader’s cost
Trader’s margin
SPOT price in China
Possible profit margin from Mongolian coking coal export
Margin from Mongolian coking coal export to China
43Gotov Dugerjav
VI. Tourism development in Eastern Mongolia
Gotov Dugerjav 44
Natural and Cultural Sites in the Eastern Natural and Cultural Sites in the Eastern aimags of Mongoliaaimags of Mongolia
Source: TERA Consultant
45Gotov Dugerjav
Tourism Products for Eastern MongoliaTourism Products for Eastern MongoliaTourism Resources Existing and Potential
ProductsPotential Market Segments By
ActivityUnique steppe flora and fauna,especially Mongolian gazelle
Steppe and Flora Tours Ecotourism, education, photography, and research
Unique landscapes and lakes ofSukhbaatar and Dornod Aimags
Adventure 4WD Safari Tours Hard and Soft adventure travel based on walking,climbing, riding, swimming, fishing, photogrpahy, and visits to herdsmen's ger camps
Historic and archeological sites ofthe Mongols and other groups inHentii, Dornod, and Sukhbaatar
Archeological Discovery Tours
Culture, research, education, and ecotourism
Culture of nomadic herdsmen andunique steppe landscape
Soft Adventure, Sightseeing Tours
Sightseeing and photography based on visits to herdsmen; optional horseback riding tours andhiking tours
Buir, Ganga, and Sumiin Steppelakes
Lake Resort Facilities; Fishing Tours
Rest, relaxation, entertainment, and medicaltreatments; special interest in freshwater fishing
Hunting Areas at Khenti-Batashreet,Dornod-Bayan Uul, Dornod-Matad-Sumber, and Sukhbaatar
Hunting Expeditions Hunting Segments
Unique Landscapes, flora andfauna, lakes
Incentive Tours Team building exercises in unique environment:horseback riding, paragliding, survival games
Unique Landscapes, flora andfauna, lakes, and nomadic lifestyle
Caravan Tours Hard and Soft adventure travel based on camping, visiting herdsmen’s gers, photography
Source: Marketing and Product Development; UNDP; WTO Project RAS/00/088; Madrid 2002
46Gotov Dugerjav
Map of Tourism RouteMap of Tourism Route
Gotov Dugerjav 47
Weaknesses Related to Poor Weaknesses Related to Poor InfrastructureInfrastructure
According to the JICA Study, the ease of moving tourists to and from points of interest and to satisfy their basic needs is a fundamental prerequisite for tourism development. Unfortunately,Mongolia has significant deficiencies in this regard. These deficiencies include:
•Poor Access – this is considered to be one of the biggest constraints for tourism in Mongolia. Improvement in international access in particular was cited as a key need in the sector, along with selective improvement in roads.
• Poor Public and Private Infrastructure – Inadequate infrastructure such as telecommunications and hotels that are not built for those seeking higher standards of comfort were listed as areas for selective upgrading.
48Gotov Dugerjav
Map of the constructed and proposed Map of the constructed and proposed locations of the Nomrog bridgelocations of the Nomrog bridge
GPS reading:E119’28’24o
N47’19’40o
49Gotov Dugerjav
Nomrog river bridge (Sumber BCP) Nomrog river bridge (Sumber BCP)
50Gotov Dugerjav
VII. Potential Transport Corridors
Gotov Dugerjav 51
TransTrans--GTI corridorsGTI corridors
52Gotov Dugerjav
Missing road
Missing road
Rail link to modernize
Absent rail link
Major bottlenecks along the Major bottlenecks along the transtrans--GTI corridorsGTI corridors
Gotov Dugerjav 53
Source: Final report of the GTI transport corridors
Investment programsInvestment programs— Feasibility studies, design and construction
Railway section between Khuut and Sumber (Nomrog) BCP (FS cost: 1.2 million USD);
— Feasibility study, detailed design and construction of paved road between Choibalsan city vicinity and Sumber (Nomrog) BCP (FS:300 thousand USD).
— Upgrading Rail section between Choibalsan and Ereentsav including replacement of existing wooden sleepers with concrete ones, introducing modern signalization system and electrification.
Gotov Dugerjav 54
VIII. Conclusions
Gotov Dugerjav 55
Conclusions and recommendations:Conclusions and recommendations:
Ø The Halkgol (Sumber) - Rashaan BCPs (Rail Corridor 1b) connection through the Nomrog Bridge seems to be the most cost-effective and feasible connection between Mongolia and NEA especially between Mongolia and PRC, at this time for further development of the tourism sector in both countries.
Ø Due to environmental considerations on both sides of the border, however, it is recommended that this bridge is only used for ecotourism and environmental protection related activities and all the other freight traffic should be carried through another route to be developed further north, away from the Nomrog SPA.
Ø Even though significant mineral resources exist in the Project Area, it will be very difficult to attract private sector investors without building the basic transportation and other required infrastructure. With the exception of some megaprojects, such as the Tavantolgoi (coal mine with proven reserves of 6 billion tons of coking coal) and Oyu Tolgoi (copper and gold mine) Project, it is very unlikely that mining companies will assist in the required transportation infrastructure investment in the Project Area.
56Gotov Dugerjav
Conclusions and recommendations:Conclusions and recommendations:(continued)(continued)
Ø Main constraints and problems limiting the use of the transport corridors are inadequate development of the infrastructure, especially missing rail and paved road sections along the Corridors.
Ø If the constraints were lift up, traffic would be increased to great extent. Particularly, tourism and border trade between Mongolia and PRC would be much increased along the Road Corridor and freight traffic of coal, coking coal, copper concentrate and iron ore to PRC and further to ROK and Japan would be increased enormously along the Rail Corridor.
Ø Investment Programs are required to missing infrastructure links, namely:§ Conduct feasibility studies, design and construction Railway section between Khuut and Sumber (Nomrog) BCP;§ Upgrading Rail section between Choibalsan and Ereentsav including replacement of existing wooden sleepers with concrete ones, introducing modern signalization system and electrification, and § Preparing feasibility study, detailed design and construction of paved road between Choibalsan city vicinity and Sumber (Nomrog) BCP.
Ø If the Corridors are in operation, Mongolia would have a reliable gate to the ocean. Foreign trade transportation expenses would be reduced to some degree. They will create favorable conditions to develop agriculture especially crop farming, meat and dairy farms in the Eastern region of Mongolia.
57Gotov Dugerjav
Thank You!Thank You!