Asset Preservaon & Rehabilitaon When Risk Matters Sydney Water - OMPA Joint Venture Locaon Scope Concrete Remediaon – Primary Sedimentaon of Tanks/ Grit Tanks in Stage 1. Done in accordance with SWC specificaons and standards Ultra High Pressure surface preparaon High build epoxy compound and cemenous repairs Protecve coang Supply & install HDPE (AKS) liner Localised crack repair with cemenous products Chemical crack injecon treatment Formwork & concrete pour for slabs and filling trenches Non-shrink groung repair of expansion joints Client Sydney, Australia CRONULLA STP CONCRETE REMEDIATION WORKS

CRONULLA STP CONCRETE REMEDIATION WORKS...CRONULLA STP CONCRETE REMEDIATION WORKS Contact Details Head Office: 463-467 Harris Street, Ultimo, Sydney Phone: 02 9034 6969 | Fax: 02 9034

  • Upload
    others

  • View
    9

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CRONULLA STP CONCRETE REMEDIATION WORKS...CRONULLA STP CONCRETE REMEDIATION WORKS Contact Details Head Office: 463-467 Harris Street, Ultimo, Sydney Phone: 02 9034 6969 | Fax: 02 9034

Asset Preservation & Rehabilitation When Risk Matters

Sydney Water - OMPA Joint Venture

Location

Scope • Concrete Remediation – Primary Sedimentation of Tanks/ Grit Tanks in Stage 1. Done in accordance with SWC specifications and standards

• Ultra High Pressure surface preparation• High build epoxy compound and cementitious repairs• Protective coating• Supply & install HDPE (AKS) liner• Localised crack repair with cementitious products• Chemical crack injection treatment• Formwork & concrete pour for slabs and filling trenches• Non-shrink grouting repair of expansion joints

Client

Sydney, Australia

CRONULLA STP CONCRETE REMEDIATION WORKS

Page 2: CRONULLA STP CONCRETE REMEDIATION WORKS...CRONULLA STP CONCRETE REMEDIATION WORKS Contact Details Head Office: 463-467 Harris Street, Ultimo, Sydney Phone: 02 9034 6969 | Fax: 02 9034

Contact DetailsHead Office: 463-467 Harris Street, Ultimo, Sydney

Phone: 02 9034 6969 | Fax: 02 9034 6970 | Email: [email protected] | Web: www.eptec.com.au

Cronulla Sewage Treatment Plant (STP) upgrade is part of Sydney Water Corporation’s Odour Management Program (OMP). Its purpose is to minimise odour releases by improving onsite odour management and treatment. It serves approximately 200,000 people, treating approximately 54 mega litres of wastewater per day in dry weather. The OMP has nominated Cronulla STP as a ‘high risk’ plant.

Eptec successfully completed stage 1 of the works within the prescribed time frame assisting the client to progress with the forthcoming stages of the project. Eptec carried out the works in a highly sensitive area with strict safety and environmental controls.

Eptec’s expertise and professional approach was highly commended by the Client with an award being presented for safe working practices.

CRONULLA STP CONCRETE REMEDIATION WORKS

Project Details