L&T Heavy Engineering

© 2019 Larsen & Toubro Limited : All rights reserved 1Sensitivity : This Document is Classified as "LNT Internal Use".

Criticality in Coke Drum Repair

End to End solution…

By Nilesh Shah

Page 2: Criticality in Coke Drum Repair - Refining Community

L&T Heavy Engineering

© 2019 Larsen & Toubro Limited : All rights reserved 2Sensitivity : This Document is Classified as "LNT Internal Use".

Contents

Coke drum Repair

In-situ Dry Slot cutting

Site & Shop Fabrication

Modification & Upgradation of associated systems

12/4/2019

Page 3: Criticality in Coke Drum Repair - Refining Community

L&T Heavy Engineering

© 2019 Larsen & Toubro Limited : All rights reserved 3Sensitivity : This Document is Classified as "LNT Internal Use".

Bulge Overlay,Base Metal Repair

&Clad Repair

Coke Drum Repair

Page 4: Criticality in Coke Drum Repair - Refining Community

L&T Heavy Engineering

© 2019 Larsen & Toubro Limited : All rights reserved 4Sensitivity : This Document is Classified as "LNT Internal Use".

Methodology

▪ Resource arrangement for bulge overlay/crack repair at various elevation &orientation

▪ Temper bead technique for weld overlay & crack repair▪ Confined space working with climate control

Page 5: Criticality in Coke Drum Repair - Refining Community

L&T Heavy Engineering

© 2019 Larsen & Toubro Limited : All rights reserved 5Sensitivity : This Document is Classified as "LNT Internal Use".

Bulge Overlay

Arrangement of Resources during shutdown…

Page 6: Criticality in Coke Drum Repair - Refining Community

L&T Heavy Engineering

© 2019 Larsen & Toubro Limited : All rights reserved 6Sensitivity : This Document is Classified as "LNT Internal Use".

Bulge Overlay

Mockup

Clad Stripping

Surface finish after Gouging

Clad Stripping by Gouging

Page 7: Criticality in Coke Drum Repair - Refining Community

L&T Heavy Engineering

© 2019 Larsen & Toubro Limited : All rights reserved 7Sensitivity : This Document is Classified as "LNT Internal Use".

Bulge Overlay

Inhouse developed Fully Automatic Weld overlay Systems

▪ Multiple systems for higher productivity▪ Temper bead technique for better mechanical properties & to avoid PWHT▪ Optimized weld parameters to minimize HAZ width▪ Inhouse pool of experienced welders▪ Prompt response for emergency shutdown

Page 8: Criticality in Coke Drum Repair - Refining Community

L&T Heavy Engineering

© 2019 Larsen & Toubro Limited : All rights reserved 8Sensitivity : This Document is Classified as "LNT Internal Use".

Bulge Overlay

Surface finish after Weld Overlay

▪ Offer as weld bead finish

1:10 Taper

Page 9: Criticality in Coke Drum Repair - Refining Community

L&T Heavy Engineering

© 2019 Larsen & Toubro Limited : All rights reserved 9Sensitivity : This Document is Classified as "LNT Internal Use".12/4/2019

Overlay patch after repair

Base Metal Repair

Connected patches by taper welding

▪ Precise gouging for avoiding damage to base metal▪ Temper bead technique for better mechanical properties & to avoid PWHT

Emergency RepairPlanned Repair

Page 10: Criticality in Coke Drum Repair - Refining Community

L&T Heavy Engineering

© 2019 Larsen & Toubro Limited : All rights reserved 10Sensitivity : This Document is Classified as "LNT Internal Use".

Clad RepairAfter Gouging

After clad restoration

▪ Controlled depth gouging to avoid base metal damage▪ Clad restoration by fully automatic Welding

Page 11: Criticality in Coke Drum Repair - Refining Community

L&T Heavy Engineering

© 2019 Larsen & Toubro Limited : All rights reserved 11Sensitivity : This Document is Classified as "LNT Internal Use".

InSitu Dry Slot Cutting

Coke Drum Skirt

Page 12: Criticality in Coke Drum Repair - Refining Community

L&T Heavy Engineering

© 2019 Larsen & Toubro Limited : All rights reserved 12Sensitivity : This Document is Classified as "LNT Internal Use".

In-situ Dry Slot Cutting

▪ Space constraint: 200 mm between Skirt # Steam pipe▪ In-housed developed InSitu machine for safe working

Page 13: Criticality in Coke Drum Repair - Refining Community

L&T Heavy Engineering

© 2019 Larsen & Toubro Limited : All rights reserved 13Sensitivity : This Document is Classified as "LNT Internal Use".

Site & Shop Fabrication

Coke Drum Manufacturing

Page 14: Criticality in Coke Drum Repair - Refining Community

L&T Heavy Engineering

© 2019 Larsen & Toubro Limited : All rights reserved 14Sensitivity : This Document is Classified as "LNT Internal Use".

Field Fabrication @ IOCL-Gujarat & IOCL Panipat

▪ Site fabrication meeting all stringent quality norms▪ Stringent delivery & site installation in working refinery▪ Critical Heat treatment & Hydrotest at site

Total 08 nos Coke Drums anufactured

at site

Coke Drum Manufacturing

Page 15: Criticality in Coke Drum Repair - Refining Community

L&T Heavy Engineering

© 2019 Larsen & Toubro Limited : All rights reserved 15Sensitivity : This Document is Classified as "LNT Internal Use".

Workshop Fabrication:

▪ State-of-the art manufacturing facility▪ Meeting all stringent customer / process licensor requirements▪ Largest Coke Drum manufactured; Dia. 10 m, Length 35 m▪ Timely delivery

Total 72 nos Coke Drums

manufactured

Coke Drum Manufacturing

Page 16: Criticality in Coke Drum Repair - Refining Community

L&T Heavy Engineering

© 2019 Larsen & Toubro Limited : All rights reserved 16Sensitivity : This Document is Classified as "LNT Internal Use".

Coke Drum Manufacturing

Workshop Fabrication:

▪ Largest order executed : 8 nos. of Coke drum delivered in single dispatch

Page 17: Criticality in Coke Drum Repair - Refining Community

L&T Heavy Engineering

© 2019 Larsen & Toubro Limited : All rights reserved 17Sensitivity : This Document is Classified as "LNT Internal Use".

Modification & Upgradationof

associated systems

Coke Drum

Page 18: Criticality in Coke Drum Repair - Refining Community

L&T Heavy Engineering

© 2019 Larsen & Toubro Limited : All rights reserved 18Sensitivity : This Document is Classified as "LNT Internal Use".

CFD Nozzle Installation

▪ Critical set-up & fabrication at site▪ PWHT with +/- 5 deg. Temperature control Source: Delta Valve, USA

Page 19: Criticality in Coke Drum Repair - Refining Community

L&T Heavy Engineering

© 2019 Larsen & Toubro Limited : All rights reserved 19Sensitivity : This Document is Classified as "LNT Internal Use".

Delta Valve Handling

▪ Critical Rigging of valves at larger radius distance & height▪ Design & fabrication of a dedicated fixture for safe handling

Page 20: Criticality in Coke Drum Repair - Refining Community

L&T Heavy Engineering

© 2019 Larsen & Toubro Limited : All rights reserved 20Sensitivity : This Document is Classified as "LNT Internal Use".

Vapor Line Revamp

▪ Critical Rigging of spools at various elevations▪ Critical Heat Treatment & NDT▪ Working in congested area for modification / replacement

Page 21: Criticality in Coke Drum Repair - Refining Community

L&T Heavy Engineering

© 2019 Larsen & Toubro Limited : All rights reserved 21Sensitivity : This Document is Classified as "LNT Internal Use".

Coke Drum: CapabilitiesField Repair

1. Bulge Overlay2. Clad Repair3. Base Metal/Seam Repair4. In-situ Dry Slot Cutting – Skirt5. Slot Crack Repair - Skirt

Manufacturing

1. Field Fabrication2. Workshop Fabrication

Other Services

1. Center Feed Nozzle2. Delta Valve Handling (BUD, TUD)3. Vapor Line Revamp4. FEA Services5. Bottom Flange Machining

Digital Solution

1. Life Cycle Assessment using IoT

Manufacturing

Other Services

Field Repair

Digital Solutions

Page 22: Criticality in Coke Drum Repair - Refining Community

L&T Heavy Engineering

© 2019 Larsen & Toubro Limited : All rights reserved 22Sensitivity : This Document is Classified as "LNT Internal Use".

Thank You

L&T MRU Team:

Rajesh SinghSr. DGM – Marketing, MRUEmail: [email protected]: +91 9920991424,

+91 022 6705 1676

Nilesh ShahHead – Execution, MRUEmail: [email protected]: +91 9925232468,

+91 261 280 7424