1 Critical Retail Issues RMS Update RMS Meeting Results 2/01 RMS Formed 3/01 RMS Identified “pent-up” issues Tx Set transaction development Service Order Workshops Outage workshops 4/01 RMS Identified Pilot Open Critical Issues Workshops initiated to resolve issues Permits/Inspections Critical Care Move In/Move Out Service Order/Notification Retail Metering 5/01 Approved Pilot Work arounds Identified Market Open Critical Is RMS workshops initiated to resolv 6/01 RMS Approved 62 Resolved Critica Began the Prioritizing process Developed Protocol Change Request Developed ERCOT System Change Req Developed Tx Set Transaction Chan Requests

Critical Retail Issues RMS Update

Embed Size (px)

DESCRIPTION

Critical Retail Issues RMS Update. RMS Meeting Results. 6/01 RMS Approved 62 Resolved Critical Issues Began the Prioritizing process Developed Protocol Change Requests Developed ERCOT System Change Requests Developed Tx Set Transaction Change Requests. 4/01 - PowerPoint PPT Presentation

Citation preview

Page 1: Critical Retail Issues         RMS Update

1

Critical Retail Issues RMS Update

RMS Meeting Results

2/01RMS Formed

3/01RMS Identified “pent-up” issues•Tx Set transaction development•Service Order Workshops•Outage workshops

4/01RMS Identified Pilot Open Critical Issues•Workshops initiated to resolve issues

•Permits/Inspections•Critical Care•Move In/Move Out•Service Order/Notification•Retail Metering

5/01•Approved Pilot Work arounds•Identified Market Open Critical Issues•RMS workshops initiated to resolve issues

6/01RMS Approved 62 Resolved Critical IssuesBegan the Prioritizing processDeveloped Protocol Change RequestsDeveloped ERCOT System Change RequestsDeveloped Tx Set Transaction ChangeRequests

Page 2: Critical Retail Issues         RMS Update

2

• Analysis of the 62 Critical Issues– 12 - Business process definition requiring no system change– 24 - Business system change required by point-to-point MPs– 26 - Business system change required by all MPs, ERCOT included

• Analysis of the 26 change issues effecting ERCOT– 10 - Priority 1 - essential for Market Open– 8 - Priority 2 - important for Market Open– 8 - Priority 3 - after Market Open

• Analysis of the 10 Priority 1 issues– 4 - Retail Metering, not Protocol changes required– 3 - Permit/Inspections, will require Protocol changes– 3 - Move In/Move Out, will require Protocol changes

Critical Retail Issues RMS Update

Issue Analysis

All interested MPs were involved in the workshop process. 62 Critical Issues wereidentified and a resolution consensus was gained on practically every issue

Page 3: Critical Retail Issues         RMS Update

3

• Subtractive/Additive Metering Data Requirement– ERCOT TDSPs sending netted 15 minute interval data– Non-ERCOT TDSPs sending all 15 minute interval data

Solution = Adopt ERCOT TDSP methodology

• Mid Cycle Meter Read with Profile Change– Caused by change in IDR, Demand, or TOU status– 4 Options considered, no good compromise solution determined

Solution = Change the meter on cycle read date

• Meter Reads required on Historical Usage Request– Present interpretation requires both meter read and consumption

Solution = Drop requirement to provide meter read

• Consumption Discrepancy– Interval data does not match consumption data

Solution = Revise Tx SET transaction to allow for adjustment

Critical Retail Issues RMS Update

Retail Metering

Page 4: Critical Retail Issues         RMS Update

4

• Pending order waiting completion of City Inspection– TDSPs agree to pend order

Solution = Develop a new transaction to provide electronic notification

• Move In Un-executable– Need a means to notify CR/Customer if a problem exists

Solution = Provide notification on new transaction

• Cancel Move In Request– Permit is no longer needed or required

Solution = Provide notification means to keep record accurate

Critical Retail Issues RMS Update

Permits/Inspections

Volume Summary (estimate) TXU ERCOT

Yearly volumes 240,000 600,00Daily volumes 1,000 2,500Personnel Required* 20 50

*assumed 10 minute/call processing time

Page 5: Critical Retail Issues         RMS Update

5

• Existing Process Creates Service Gaps

– Option 1 - No change, deal with customer problems

– Option 2 - CR manages and communicates problem

– Option 3 - ERCOT manages and communicates problem

• Timing Requirement when CSA in effect– Service not disconnected at Move Out

Solution = Clarify timing requirement, ERCOT ensures switch in 1 business day

• Same CR on a new Move In– CR responsible for final bill determination

Solution = Change existing reject code reason

Critical Retail Issues RMS Update

Move In/Move Outs

CR26/1

CR16/15

CR26/30

Customer BMove In # 1

Customer AMove Out

Customer BMove In # 2