7/28/2019 Critical Lifting Mobile Crane http://slidepdf.com/reader/full/critical-lifting-mobile-crane 1/1 GE ENERGY MAJOR CRITICAL LIFT PERMIT MOBILE CRANE Tab V Issue Date: 1. Project Name 2. Contractor 3. Lift Date 4.Lift Location 5. Crane Manufacturer 6. Model # 7.Serial # 8. Total Boom/Boom Ext.&/or Jib Length @ time of Lift: 10. Max radius during lift (pick, swing, and set) 11. Swing Dir. And Degrees of swing 12. Lift Elevation (ft.) Max. Min. 13. Boom Angle: Pick Set If Yes: Length (ft) Name: Erected ( ) Stowed ( ) How: 16. Component Weights 17. Load Description: 15 Jib / Boom extension: 1 Headache Ball Size: 1 19. Weight of Load: 3 Load Block Size: 1 20. Total Lift Load - (Block 16+19) 12 Auxiliary Boom Head: 1 21. Load % of Crane Capacity, (Divide Block 20 by 18) 80.00% Weight of Cable (Load Fall): 1 Slings, Rigging, Shackles, E 1 Lifting Booms or Bars: 1 22. Inspection/Testing: Allowance for Unaccounted 1 23. Crane Level Yes No Date of Last Certification/inspection: Material in Equipment: 1 24. Soil Conditions? Poor Good Other: Calculations? Required Not Required Total Component Weights: 9 Crane Mats? Required Not Required 25 . Ta gline Required? 2 6. Ha zards - attach add ition al she ets a s req uired: Yes Electrical? Yes No If Yes, exp No Overhead? Yes No If Yes, exp 27. Communications by: Underground? Yes No If Yes, exp HAND OR RADIO Others? Yes No If Yes, exp 28. Sketch of Crane relative to lift and rigging to component attach additional sheets if required: 29. Rigging Component List  Pre-Lift Meeting Date: 1. Operator Date: 4. Project Construction Manager Date: 2. Rigger Date: 5. Safety Manager Date: 3. Designated Signal Person Date: 6. Supervisor Date: 7. Client (Enter NA if not required ) Date: File a completed copy of this form in the Site Safety Folder 9. Parts of Load cable on Block: Major & Critical Lift Permit ~ Mobile Crane If load is 75% or below proceed with lift If load is between 76 and 85% proceed w/ caution If load is above 85% DO NOT proceed w/ lift 15. Who determined weight of load and Lift? 14. Will Jib &/or Boom Ext be used? Yes No 18. Mfg. (100%chart) rated capacity from chart as outlined in Blocks 5 - 14 Section B - Signatures: Section A - Load & Capacity Data  May, 2008 1 of 1 Rev 1

Critical Lifting Mobile Crane

Embed Size (px)

Citation preview

Page 1: Critical Lifting Mobile Crane

7/28/2019 Critical Lifting Mobile Crane

http://slidepdf.com/reader/full/critical-lifting-mobile-crane 1/1

GE ENERGY MAJOR CRITICAL LIFT PERMIT MOBILE CRANE Tab VIssue Date:

1. Project Name 2. Contractor 3. Lift Date 4.Lift Location

5. Crane Manufacturer 6. Model # 7.Serial # 8. Total Boom/Boom Ext.&/or Jib Length @

time of Lift:

10. Max radius during lift (pick,swing, and set)

11. Swing Dir. And Degrees of swing

12. Lift Elevation (ft.) Max. Min. 13. Boom Angle: Pick Set

If Yes: Length (ft)Name:

Erected ( ) Stowed ( )

How:

16. Component Weights 17. Load Description: 15

Jib / Boom extension: 1

Headache Ball Size: 119. Weight of Load: 3

Load Block Size: 1 20. Total Lift Load - (Block 16+19) 12

Auxiliary Boom Head:1

21. Load % of Crane Capacity, (Divide Block

20 by 18) 80.00%

Weight of Cable (Load Fall): 1

Slings, Rigging, Shackles, E 1

Lifting Booms or Bars: 1 22. Inspection/Testing:

Allowance for Unaccounted 1 23. Crane Level Yes No Date of Last Certification/inspection:

Material in Equipment: 1 24. Soil Conditions? Poor Good

Other: Calculations? Required Not Required

Total Component Weights:  9 Crane Mats? Required Not Required

25. Tagline Required? 26. Hazards - attach additional sheets as required:

Yes Electrical? Yes No If Yes, exp

No Overhead? Yes No If Yes, exp

27. Communications by: Underground? Yes No If Yes, exp

HAND OR RADIO Others? Yes No If Yes, exp

28. Sketch of Crane relative to lift and rigging to component attach additional sheets if required: 29. Rigging Component List

 

Pre-Lift Meeting Date:

1. Operator Date: 4. Project Construction Manager Date:

2. Rigger Date: 5. Safety Manager Date:

3. Designated Signal Person Date: 6. Supervisor Date:

7. Client (Enter NA if not required ) Date:

File a completed copy of this form in the Site Safety Folder 

9. Parts of Load

cable on Block:

Major & Critical Lift Permit ~ Mobile Crane

If load is 75% or below proceed with lift

If load is between 76 and 85% proceed w/ caution

If load is above 85% DO NOT proceed w/ lift

15. Who determined weight of load and Lift?14. Will Jib &/or Boom Ext be used? Yes No

18. Mfg. (100%chart) rated capacity from

chart as outlined in Blocks 5 - 14

Section B - Signatures:

Section A - Load & Capacity Data

 

May, 2008 1 of 1 Rev 1