    CRITICAL LIFT PLAN Page 1 of 2

    1.0 General

    Location:

    Date of lift

    Description of the object to be raised:

    Lift description:

    Diagram of Crane Lift and Load Placement Attached? ____ Yes ____No

    Diagram of Rigging and Load Attached? ____ Yes ____No

    2.0 How weight of the object wa obtaine! ".0 #tabilit$ of Gro%n! Area

    Certified scale weight lbs! "oil or pa#ement bearing capacit$:

    "cale weight tic%et n&mber: "o&rce of soil or pa#ement information:

    Calc&lated independentl$ b$ more than one so&rce: "i'e of mats:

    "o&rce (: N&mber of mats:

    )eight lbs!: An$ &ndergro&nd installations? ____ Yes ____No

    "o&rce *: Ratio of soil bearing capacit$ to act&al

    )eight lbs!:

    ".0 Loa! Calc%lation &.0 Crane Infor'ation

    +$pe of crane _____________________ 

    Crane capacit$ tons!

    )eight empt$ Load or ,as%et! lbs! -a./ dist/ center of load to center pin ft!

    )eight of contents lbs! Rated capacit$ in tons of crane

    )eight of a&./ bloc% or headache ball lbs!

    )eight of main bloc% lbs!

    )eight of lifting beam0bar lbs!

    )eight of slings and shac%les lbs! Length of ,oom ft!

    )eight of jib erected or stowed! lbs!

    )eight of hoist rope e.tra! lbs! (.0 )ib *e

    )eight of e.cess load material lbs!

    Allowance for 1nacco&nted -aterial lbs!

    2thers lbs! Length of 3ib ft!:

    0 Angle of 3ib deg!:

    Rated Capacit$ of 3ib from chart! tons!:

    0

    (.0 Lifting Arrange'entRadi&s at pic% &p ft! -a.im&m Rated Capacit$ of crane at this

    Radi&s at set down ft! Radi&s and ,oom Angle for this lift tons!:

    Crane capacit$ at radi&s tons!: -a.im&m Load tons! on Crane is:

    Crane capacit$ o#er side tons!: Percent of lift to crane4s rated capacit$

    Crane capacit$ o#er rear tons!: Clearance between boom and lift ft!:

    Crane capacit$ o#er front tons!: Clearance to s&rro&nding facilities ft!:

    ,oom angle at pic% &p deg!: Clear path for load mo#ement ____ Yes ____No

    ,oom angle at set down deg!:

    Does this lift 5n#ol#e Lifting Personnel? ____ Yes ____No

    Load condition ____ New ____1sed

     

    2#er Rear tons!

    2#er 6ront tons!

    2#er "ide tons!

    7rected_____ "tored ____

    5s 3ib to be &sed ? ____ Yes ____No

    +otal )eight lbs!

    Total +eight  tons!

    "o&rce of Load )eight 5nformation

    (Name Plate, Drawings, Calculated)

    +eight ,erifie! -$

  • 8/18/2019 Critical Lift Plan (1)

    2/2

    CRITICAL LIFT PLAN Page 2 of 2

    /.0 Cable Hoit Roe .0 Rigging

    "i'e of Cable diameter in inches! +$pe "ling Arrangement or 8itch arrangement _________________  

     N&mber of Parts of Cable N&mber of "lings in hoo%9&p

    Lift capacit$ based on parts0load tons!:

    Rated capacit$ of slings lbs!:

    "hac%le si'e

    "hac%le capacit$ tons!

     N&mber of shac%les

    "hac%le attached to load b$

    10.0 PreLift Chec3lit   YES NO

    Crane inspected

    Crane set &p

    -atting acceptable

    2&triggers f&ll$ e.tended

    Load chart in crane

    Rigging inspected

    "wing room chec%ed

    8oist height chec%ed

    8ead room chec%ed

    Crane co&nterweight &sed

    Load test performed

    2perator &alified

    2bstacles in tra#el? "ignal s$stem established

    6lagman "afet$ "potter! &alified

    Rigger &alified

    +ag lines read$ and &sed

    "wing Direction and Degree ,oom "wing ! )ind and climate acceptable

    +raffic controlled

    +ailboard

    "ite controlled

    "pecial 5nstr&ctions or Restrictions for Crane; Rigging or lift; 7tc:

     ____________________________________________________________________________________

     ____________________________________________________________________________________

    11.0 Critical Lift Aro4al

    Crane inspectors signat&re and date

    Rigging inspectors signat&re and date

    Lift s&per#isors signat&re and dateProject engineer signat&re and date

    Project managers signat&re and date

    "ignal men names

    Crane operator name

    "ling Length ft!:

    5. 0 Crane Place'ent

    An$ de#iation from smooth solid fo&ndation in the area?

     ___________________________________________

     ___________________________________________

     ___________________________________________

    7lectrical 8a'ards in the Area ?

      ___________________________________________

     ___________________________________________

     ___________________________________________

    2bstacles or 2bstr&ctions to Lift or "wing ?

      ___________________________________________

     ___________________________________________

     ___________________________________________

     ___________________________________________

     ___________________________________________

     ___________________________________________

     ___________________________________________

     ___________________________________________