Critical Facilities Roundtable Data Center Update William Tschudi [email protected] June 15, 2007

Embed Size (px)

Citation preview

Page 1: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

Critical Facilities Roundtable Data Center Update

William Tschudi

[email protected]

June 15, 2007

Page 2: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

AgendaAgenda

DOE Data Center Energy Efficiency DOE Data Center Energy Efficiency initiativeinitiative

EPA Report to Congress – EPA Report to Congress –

Server and data center efficiencyServer and data center efficiency Demonstration ProjectsDemonstration Projects Discussion/Q&ADiscussion/Q&A

Page 3: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

LBNL resources involved with LBNL resources involved with DOE and EPA projectsDOE and EPA projects

DOEDOE– Bill Tschudi Bill Tschudi – Dale SartorDale Sartor

EPAEPA– Rich BrownRich Brown– Eric MasanetEric Masanet– Bruce NordmanBruce Nordman– Jon KoomeyJon Koomey– Arman ShehabeArman Shehabe– Bill TschudiBill Tschudi– Dale SartorDale Sartor

– 5 Subcontractors5 Subcontractors

Page 4: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

DOE – Data Center InitiativeDOE – Data Center Initiative

Energy Efficiency and Renewable Energy Efficiency and Renewable Energy (EERE)Energy (EERE)– Industrial Technologies Program (ITP)Industrial Technologies Program (ITP)

– Building Technologies ProgramBuilding Technologies Program

– Hydrogen, Fuel Cells, & Infrastructure Hydrogen, Fuel Cells, & Infrastructure TechnologiesTechnologies

– Federal Energy Management Program Federal Energy Management Program (FEMP)(FEMP)

– DOE National LaboratoriesDOE National Laboratories

Page 5: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

Save Energy Now ProgramSave Energy Now Program

Pilot Assessments of six centers – LBNL Pilot Assessments of six centers – LBNL working with 5 subcontractorsworking with 5 subcontractors

Starting with LBNL self-benchmarking Starting with LBNL self-benchmarking protocol - refine and develop protocol - refine and develop assessment toolsassessment tools

Develop training for assessment Develop training for assessment contractorscontractors

Train and qualify assessorsTrain and qualify assessors

Page 6: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

Save Energy Now ProgramSave Energy Now Program

Solicitation - Many assessments Solicitation - Many assessments performed by subcontractors – robust performed by subcontractors – robust benchmark infobenchmark info

Expand and disseminate best practice Expand and disseminate best practice informationinformation

National demonstrations of new or National demonstrations of new or underutilized technologiesunderutilized technologies

Research new solutionsResearch new solutions

Page 7: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

Save Energy Now ProgramSave Energy Now Program

Coordinate with EPA Energy Star Coordinate with EPA Energy Star Collaborate with IndustryCollaborate with Industry Outreach Outreach Lead by example: Lead by example:

– Assess Federal centersAssess Federal centers– Energy efficiency in Federal procurement specsEnergy efficiency in Federal procurement specs– High performance computingHigh performance computing

Ultimately a voluntary certification program Ultimately a voluntary certification program (e.g. ISO) leading to continuous improvement(e.g. ISO) leading to continuous improvement

Page 8: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

How do you participate?How do you participate?

Register on web site to get regular updatesRegister on web site to get regular updates Participate in peer review of products, protocols Participate in peer review of products, protocols

and best practicesand best practices Sign up for technical working groups on web siteSign up for technical working groups on web site Conduct self benchmarking and report resultsConduct self benchmarking and report results Use tools from LBNL site and download protocol Use tools from LBNL site and download protocol

at :at :http://hightech.lbl.gov/datacenters.htmlhttp://hightech.lbl.gov/datacenters.html

Apply for data center assessments Apply for data center assessments (solicitation coming in Fall)(solicitation coming in Fall)

Page 9: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

WebsitesWebsites

DOEDOE

www.eere.energy.gov/datacenters/www.eere.energy.gov/datacenters/

LBNLLBNL

http://hightech.lbl.govhttp://hightech.lbl.gov

http://hightech.lbl.gov/datacentershttp://hightech.lbl.gov/datacenters

Page 10: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

Design guidelines were Design guidelines were developed in collaboration with developed in collaboration with PG&E PG&E

Guides available through PG&E’s Energy Design Resources Website

Page 11: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

Design guidance is summarized Design guidance is summarized in a web based training in a web based training resource resource

http://hightech.lbl.gov/dctraining/TOP.html

Page 12: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

EPA Report to CongressEPA Report to Congress

HR5646 - Public Law 109-431 requires HR5646 - Public Law 109-431 requires EPA to report to congress by June 22, EPA to report to congress by June 22, 20072007

Subject: What is energy implications of Subject: What is energy implications of Servers and data centers? What can be Servers and data centers? What can be done to improve efficiency?done to improve efficiency?

LBNL and EPA prepared report with input LBNL and EPA prepared report with input from industry through a workshop and from industry through a workshop and comments to the review draft – over 50 comments to the review draft – over 50 commenterscommenters

Page 13: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

Recommendations - guiding Recommendations - guiding principlesprinciples

Change will accelerate with top down Change will accelerate with top down interventionintervention

All areas of data center need to be addressedAll areas of data center need to be addressed Objective, credible information is neededObjective, credible information is needed Prescriptive approaches won’t work due to Prescriptive approaches won’t work due to

rapidly changing industryrapidly changing industry Federal government can lead by exampleFederal government can lead by example Any action should be part of a more Any action should be part of a more

comprehensive program for buildings and comprehensive program for buildings and industryindustry

Page 14: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

Advanced look at Advanced look at recommendations recommendations (selected (selected recommendations - subject to change pending EPA final recommendations - subject to change pending EPA final review)review)

1.1. Develop objective, credible Develop objective, credible performance rating system for data performance rating system for data centerscenters– Partner with industry to develop Energy Partner with industry to develop Energy

Star rating systemStar rating system– Develop standards for energy Develop standards for energy

management and continuous management and continuous improvementimprovement

– Utilities use ratings for incentive Utilities use ratings for incentive programsprograms

Page 15: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

Advanced look at Advanced look at recommendations recommendations (selected (selected recommendations - subject to change pending EPA final recommendations - subject to change pending EPA final review)review)

2.2. Challenge executive-level managers Challenge executive-level managers to commit to continuous to commit to continuous improvementimprovement– Public recognition for best performersPublic recognition for best performers– Direct Federal Government CIO’s and Direct Federal Government CIO’s and

data center operators to adopt data center operators to adopt improvement goalsimprovement goals

Page 16: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

Advanced look at Advanced look at recommendations recommendations (selected (selected recommendations - subject to change pending EPA final recommendations - subject to change pending EPA final review)review)

3.3. Develop and promote use of TCODevelop and promote use of TCO– Require use of TCO methods in Require use of TCO methods in

procurement and utility incentive procurement and utility incentive programsprograms

– Encourage the use of cross discipline Encourage the use of cross discipline data center management teamsdata center management teams

Page 17: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

Advanced look at Advanced look at recommendations recommendations (selected (selected recommendations - subject to change pending EPA final recommendations - subject to change pending EPA final review)review)

4.4. Develop objective, and credible Develop objective, and credible energy performance metrics for all energy performance metrics for all data center equipmentdata center equipment– Work with stakeholders to develop energy Work with stakeholders to develop energy

efficiency metrics for servers, network efficiency metrics for servers, network equip., CRAC units, UPS, etc.equip., CRAC units, UPS, etc.

– Label better performing equipment e.g. Label better performing equipment e.g. Energy Star ratingsEnergy Star ratings

– Require use of Energy Star equipment in Require use of Energy Star equipment in Federal Data CentersFederal Data Centers

Page 18: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

Advanced look at Advanced look at recommendations recommendations (selected (selected recommendations - subject to change pending EPA final recommendations - subject to change pending EPA final review)review)

5.5. Promote new technologies and Promote new technologies and practicespractices– Objective and credible information on Objective and credible information on

reliability and performancereliability and performance– DOE sponsored demonstrationsDOE sponsored demonstrations– Develop National real-world Develop National real-world

demonstration facilitiesdemonstration facilities– Publish case studies Publish case studies

Page 19: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

Advanced look at Advanced look at recommendations recommendations (selected (selected recommendations - subject to change pending EPA final recommendations - subject to change pending EPA final review)review)

6.6. Training on efficiency issues and Training on efficiency issues and strategies to address themstrategies to address them– Develop energy awareness campaignDevelop energy awareness campaign– Identify actions that data center Identify actions that data center

managers can takemanagers can take– Develop training with cross functional Develop training with cross functional

emphasisemphasis

Page 20: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

Advanced look at Advanced look at recommendations recommendations (selected (selected recommendations - subject to change pending EPA final recommendations - subject to change pending EPA final review)review)

7.7. Promote use of distributed generation Promote use of distributed generation and combined heat and powerand combined heat and power– Provide financial incentivesProvide financial incentives– Demonstration and education projectsDemonstration and education projects

Page 21: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

Advanced look at Advanced look at recommendations recommendations (selected (selected recommendations - subject to change pending EPA final recommendations - subject to change pending EPA final review)review)

8.8. Provide for research and developmentProvide for research and development– Performance metricsPerformance metrics– Improve virtualization softwareImprove virtualization software– Improve software development tools to Improve software development tools to

allow software to better use chip level allow software to better use chip level multiprocessingmultiprocessing

– Software efficiencySoftware efficiency– Improve power conversionImprove power conversion– Improve power managmentImprove power managment

Page 22: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

Advanced look at Advanced look at recommendations recommendations (selected (selected recommendations - subject to change pending EPA final recommendations - subject to change pending EPA final review)review)

8.8. Provide for research and development Provide for research and development – continued:– continued:– Encourage adoption of liquid coolingEncourage adoption of liquid cooling– Develop active power management Develop active power management

strategiesstrategies– Market assessment and evaluationMarket assessment and evaluation– Basic research (e.g. semiconductor Basic research (e.g. semiconductor

materials)materials)

Page 23: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

EPA Report - observationsEPA Report - observations

Very comprehensive considering time Very comprehensive considering time for preparationfor preparation

US load estimates – from Koomey reportUS load estimates – from Koomey report– 1.2% of nation’s electricity1.2% of nation’s electricity– ~ = color television electricity~ = color television electricity– large and growing marketlarge and growing market

Policy recommendations favor solutions Policy recommendations favor solutions developed with industrydeveloped with industry

Voluntary programsVoluntary programs

Page 24: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

EPA WebsiteEPA Website

http://www.energystar.gov/index.cfm?http://www.energystar.gov/index.cfm?c=prod_development.server_efficiencyc=prod_development.server_efficiency

Page 25: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

PG&E Sponsored Data Center PG&E Sponsored Data Center demonstration projectsdemonstration projects

Outside air economizer demonstration Outside air economizer demonstration – Contamination concernsContamination concerns– Humidity control concernsHumidity control concerns

““Air management” demonstration Air management” demonstration

Page 26: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

Encouraging outside air Encouraging outside air economizerseconomizers

Issue: Issue: – Many are reluctant to use economizersMany are reluctant to use economizers– Outdoor pollutants and humidity control Outdoor pollutants and humidity control

considered equipment riskconsidered equipment risk Goal: Goal:

– Encourage use of outside air economizers where Encourage use of outside air economizers where climate is appropriateclimate is appropriate

Strategy: Strategy: – Address concerns: contamination/humidity controlAddress concerns: contamination/humidity control– Quantify energy savings benefitsQuantify energy savings benefits

Page 27: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

Project objectivesProject objectives

Identify potential failure mechanisms Identify potential failure mechanisms

Measure contamination levels in data centersMeasure contamination levels in data centers

Observe humidity controlObserve humidity control

Evaluate economizer effect on contamination Evaluate economizer effect on contamination

levelslevels

Compare particle concentrations to guidelines Compare particle concentrations to guidelines

Document economizers use in data centersDocument economizers use in data centers

Page 28: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

Data center contamination Data center contamination guidelinesguidelines

Limited literature connecting pollutants to equipment Limited literature connecting pollutants to equipment

failurefailure

ASHRAE Technical CommitteeASHRAE Technical Committee– ““Design Considerations for Data/Com Equipment Centers”Design Considerations for Data/Com Equipment Centers”– Guidelines for particles, gases, humidity Guidelines for particles, gases, humidity – Industry Sources: Telcordia GR-63-CORE/IEC 60721-3-3 Industry Sources: Telcordia GR-63-CORE/IEC 60721-3-3 – Designed for telephone switching centers Designed for telephone switching centers

– Based on research over 20 years oldBased on research over 20 years old

Primary concern: current leakage Primary concern: current leakage

caused by particle bridgingcaused by particle bridgingContaminants Concentration

Airborne Particles (TSP) 20mg/m3

Coarse Particles <10mg/m3

Fine Particles 15mg/m3

Water Soluble Salts 10mg/m3 max-total

Sulfate 10mg/m3

Nitrites 5 mg/m3

Total 55 mg/m3

Page 29: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

Particle bridgingParticle bridging

Only documented pollutant problemOnly documented pollutant problem

Over time, deposited particles bridge Over time, deposited particles bridge isolated conductorsisolated conductors

Increased relative humidity causes Increased relative humidity causes particles to absorb moistureparticles to absorb moisture

Particles dissociate, become electrically Particles dissociate, become electrically conductiveconductive

Causes current leakageCauses current leakage Can damage equipmentCan damage equipment

Page 30: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

Particle measurementsParticle measurements

Measurements taken at eight data centersMeasurements taken at eight data centers

Approximately week long measurementsApproximately week long measurements

Before and after capability at three centersBefore and after capability at three centers

Continuous monitoring equipment in place at Continuous monitoring equipment in place at one one center (data collection over several months)center (data collection over several months)

Page 31: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

Some reference concentrationsSome reference concentrations

Fine Particulate Matter

0

20

40

60

80

100

120

140

160

12:00PM

6:00PM

12:00AM

6:00AM

12:00PM

6:00PM

12:00AM

6:00AM

12:00PM

6:00PM

12:00AM

6:00AM

12:00PM

6:00PM

12:00AM

6:00AM

12:00PM

6:00PM

12:00AM

Par

ticl

e C

on

c. (

mg

/m3)

IBM Standard

EPA Annual Health Standard

EPA 24-Hour Health Standard

and ASHRAE Standard

Page 32: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

Outdoor MeasurmentsFine Particulate Matter

0

20

40

60

80

100

120

140

160

12:00PM

6:00PM

12:00AM

6:00AM

12:00PM

6:00PM

12:00AM

6:00AM

12:00PM

6:00PM

12:00AM

6:00AM

12:00PM

6:00PM

12:00AM

6:00AM

12:00PM

6:00PM

12:00AM

Par

ticl

e C

on

c. (

mg

/m3) LBNL

NERSC

Center 3

Center 4

Center 5

Center 6

Center 7

Center 8

Outdoor measurementsOutdoor measurements

IBM Standard

EPA Annual Health Standard

EPA 24-Hour Health Standard

and ASHRAE Standard

Note scale

Page 33: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

Indoor Measurments Fine Particulate Matter

0

20

40

60

80

100

120

140

160

12:00PM

6:00PM

12:00AM

6:00AM

12:00PM

6:00PM

12:00AM

6:00AM

12:00PM

6:00PM

12:00AM

6:00AM

12:00PM

6:00PM

12:00AM

6:00AM

12:00PM

6:00PM

12:00AM

Par

ticl

e C

on

c. (

mg

/m3) LBNL

NERSC

Center 3

Center 4

Center 5

Center 6

Center 7

Center 8

Indoor measurementsIndoor measurements

IBM Standard

EPA Annual Health Standard

EPA 24-Hour Health Standard

and ASHRAE Standard

Note scale

Page 34: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

Indoor measurementsIndoor measurements

Indoor Measurments Fine Particulate Matter

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

4.5

5.0

12:00PM

6:00PM

12:00AM

6:00AM

12:00PM

6:00PM

12:00AM

6:00AM

12:00PM

6:00PM

12:00AM

6:00AM

12:00PM

6:00PM

12:00AM

6:00AM

12:00PM

6:00PM

12:00AM

Par

ticl

e C

on

c. (

mg

/m3) LBNL

NERSC

Center 3

Center 4

Center 5

Center 6

Center 7

Center 8

Note scale

Page 35: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

Data center w/economizerData center w/economizer

Center 8w/economizer

0.3-5 Particulate Matter

0

10

20

30

40

50

60

70

80

90

100

8/18/060:00

8/18/0612:00

8/19/060:00

8/19/0612:00

8/20/060:00

8/20/0612:00

8/21/060:00

8/21/0612:00

8/22/060:00

8/22/0612:00

8/23/060:00

8/23/0612:00

8/24/060:00

8/24/0612:00

8/25/060:00

8/25/0612:00

8/26/060:00

Part

icle

Co

nc. (m g

/m3)

Outside

Outside (PostFilter)

PreServer

RmAmb

Note scale

EPA Annual Health Standard

EPA 24-Hour Health Standard

and ASHRAE Standard

Page 36: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

Improved FiltrationImproved Filtration

Center 8 at Server Rack

0.00

0.20

0.40

0.60

0.80

1.00

1.20

1.40

1.60

1.80

0.3-.05 0.5-0.7 0.7-1.0 1.0-2.0 2.0-5.0 >5.0

Particle Diameter (mm)

Par

ticl

e C

on

c. (

m g/m

)

ASHRAE 40%

ASHRAE 85%

Filter Efficiency

Page 37: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

Indoor Relative Humidity

10.0

20.0

30.0

40.0

50.0

60.0

70.0

80.0

90.0

12:00PM

6:00PM

12:00AM

6:00AM

12:00PM

6:00PM

12:00AM

6:00AM

12:00PM

6:00PM

12:00AM

6:00AM

12:00PM

6:00PM

12:00AM

6:00AM

12:00PM

6:00PM

12:00AM

RH

(%

)

Center 8

Center 7

Center 5

Humidity measurements Humidity measurements without economizerwithout economizer

ASHRAE Recommended Upper Limit

ASHRAE Recommended Lower Limit

ASHRAE Allowable Lower Limit

ASHRAE Allowable Upper Limit

Page 38: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

Indoor Relative Humidity

w/economizer

10.0

20.0

30.0

40.0

50.0

60.0

70.0

80.0

90.0

12:00PM

6:00PM

12:00AM

6:00AM

12:00PM

6:00PM

12:00AM

6:00AM

12:00PM

6:00PM

12:00AM

6:00AM

12:00PM

6:00PM

12:00AM

6:00AM

12:00PM

6:00PM

12:00AM

RH

(%

)

Center 8

Center 6

Humidity measurements Humidity measurements with economizerwith economizer

ASHRAE Recommended Upper Limit

ASHRAE Recommended Lower Limit

ASHRAE Allowable Lower Limit

ASHRAE Allowable Upper Limit

Page 39: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

FindingsFindings

Water soluble salts in combination with high Water soluble salts in combination with high humidity can cause failureshumidity can cause failures

It is assumed that very low humidity can allow It is assumed that very low humidity can allow potentially damaging static electricitypotentially damaging static electricity

ASHRAE particle limits are drastically lower than one ASHRAE particle limits are drastically lower than one manufacturer’s standardmanufacturer’s standard

Particle concentration in closed centers is typically Particle concentration in closed centers is typically an order of magnitude lower than ASHRAE limitsan order of magnitude lower than ASHRAE limits

Economizers, without other mitigation, can allow Economizers, without other mitigation, can allow particle concentration to approach ASHRAE limitsparticle concentration to approach ASHRAE limits

Filters used today are typically 40% (MERV 8) Filters used today are typically 40% (MERV 8) efficiency efficiency

Page 40: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

Next steps: building the case Next steps: building the case for air economizers for air economizers

Analyze material captured on filtersAnalyze material captured on filters Collaborate with ASHRAE data center Collaborate with ASHRAE data center

technical committeetechnical committee– Contamination bookContamination book– Electrostatic dischargeElectrostatic discharge

Collect failure data and study failure Collect failure data and study failure mechanismsmechanisms

Evaluate improved filtration optionsEvaluate improved filtration options Develop recommendationsDevelop recommendations

Page 41: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

““Air Management” Air Management” demonstrationdemonstration

Goal:

Demonstrate better cooling and energy savings through improvements in air distribution in a high density environment.

Page 42: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

Demonstration descriptionDemonstration description

The as-found conditions were monitoredThe as-found conditions were monitored– TemperaturesTemperatures– Fan energyFan energy– IT equipment energyIT equipment energy

Two high-intensity rows and three Two high-intensity rows and three computer room air conditioning units computer room air conditioning units were physically isolated from rest of the were physically isolated from rest of the center – approximately 175W/sfcenter – approximately 175W/sf

Page 43: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

Demonstration description, Demonstration description, con’tcon’t

Two configurations were demonstratedTwo configurations were demonstrated Air temperatures monitored at key pointsAir temperatures monitored at key points IT equipment and computer room air IT equipment and computer room air

conditioner fans energy were measuredconditioner fans energy were measured Chilled water temperature was monitoredChilled water temperature was monitored Chilled water flow was not able to be Chilled water flow was not able to be

measured measured

Page 44: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

First configuration - cold aisle First configuration - cold aisle isolationisolation

Page 45: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

Second configuration – Second configuration – hot aisle isolationhot aisle isolation

Page 46: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

Demonstration procedureDemonstration procedure

Once test area was isolated, air conditioner Once test area was isolated, air conditioner fan speed was reduced using existing VFD’sfan speed was reduced using existing VFD’s

Temperatures at the servers were Temperatures at the servers were monitored – top, middle, bottom of rackmonitored – top, middle, bottom of rack

IT equipment and CRAC fan energy were IT equipment and CRAC fan energy were monitoredmonitored

Chilled water temperatures were monitoredChilled water temperatures were monitored Hot aisle return air temperatures were Hot aisle return air temperatures were

monitored – monitored – ΔΔT was determinedT was determined

Page 47: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

Fan energy savingsFan energy savings – 75%– 75%

Since there was no mixing Since there was no mixing of cold supply air with hot of cold supply air with hot return air - fan speed could return air - fan speed could be reduced resulting in be reduced resulting in large fan energy savingslarge fan energy savings

Page 48: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

Temperature variation Temperature variation improvedimproved

Cold Aisle NW - PGE12813

40

45

50

55

60

65

70

75

80

85

90

6/13/2006 12:00 6/14/2006 0:00 6/14/2006 12:00 6/15/2006 0:00 6/15/2006 12:00 6/16/2006 0:00 6/16/2006 12:00

Time

Tem

per

atu

re (

deg

F)

Low

Med

High

Baseline Alternate 1

Setup

Setup

Alternate 2

Page 49: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

Better temperature control Better temperature control would allow raising the would allow raising the temperature in the entire data temperature in the entire data center!center!

Cold Aisle NW - PGE12813

40

45

50

55

60

65

70

75

80

85

90

6/13/2006 12:00 6/14/2006 0:00 6/14/2006 12:00 6/15/2006 0:00 6/15/2006 12:00 6/16/2006 0:00 6/16/2006 12:00

Time

Tem

per

atu

re (

deg

F)

Low

Med

High

Baseline Alternate 1

Setup

Setup

Alternate 2

ASHRAE Recommended Range

Ranges during demonstration

Page 50: Critical Facilities Roundtable Data Center Update William Tschudi wftschudi@lbl.gov June 15, 2007

Discussion/Questions??Discussion/Questions??