263
Informe Final CESI RETE – A3/025820 ANEXO A ANÁLISIS DE FIABILIDAD CON CRITERIO PROBABILISTICO

CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

  • Upload
    vantram

  • View
    217

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/025820

ANEXO A

ANÁLISIS DE FIABILIDAD CON CRITERIO PROBABILISTICO

Page 2: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final RETE-A3/025820 Page 104/117

ANEXO A – ANALISIS DE FIABILIDAD CON CRITERIO PROBABILISTICO

A.1 INTRODUCCIÓN

El programa de cálculo GRARE (Grandi Reti – Grandes Redes) es una avanzada herramienta de cálculo implementado para realizar análisis de fiabilidad (adequacy) y de operación económica de grandes sistemas complejos (Generación + Transmisión) como los sistemas con conexiones internacionales.

El programa es particularmente apto para planes de mediano - largo plazo de interconexiones y su crecimiento. De hecho, en términos probabilísticos, puede ser usado para evaluar el volumen de transacciones de potencia y energía que pueden ser desarrollados en manera económica y fiable entre sociedades de un mismo sistema interconectado. Esto puede ser cumplido sobre la base de un efectivo modelo de costos de producción o costos de transferencia de energía mientras se consideran las pérdidas de transmisión que, en grandes distancias, pueden tener un impacto no despreciable en el resultado de las transacciones [1], [2], [3].

El programa está basado en el método de simulación directa Montecarlo, y calcula el valor numérico del índice de riesgo especial, que expresa la fiabilidad que, luego puede ser cuantificado e introducido en la optimización económica total del sistema.

El programa GRARE está integrado en el sistema de cálculo SPIRA, mediante una relación directa al DATA BASE, y está equipado con una adecuada interfaz hombre - maquina para manejar los ingresos y los procesos de simulaciones probabilísticas.

A. 2 DEFINICIÓN DE ÍNDICE DE RIESGO – HIPÓTESIS GENERAL Y ORGANIZACIÓN DE LOS CÁLCULOS DE FIABILIDAD

Índices de Riesgo

La evaluación cuantitativa de la fiabilidad de un sistema bajo condiciones estacionarias (adequacy) se realiza utilizando el índice de riesgo “ENF” (Energia Non Fornita – Energía No Suministrada) que expresa, de manera probabilística, los resultados de la comparación entre la potencia producible y transmisible y la disponibilidad de los componentes del sistema considerando su capacidad y la carga a alimentar.

Otros índices calculados de riesgo son:

- LOLP (Loss Of Load Probability, Pérdida de carga probabilística durante el pico de la carga) - LOLE (Loss Of Load Expectation, Pérdida de carga esperada, promedio horario de fallas

anual esperado) El índice de riesgo ENF se calcula para el entero sistema, para cada Área y para cada barra de carga, subdividiendolo por las determinadas causas

Page 3: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final RETE-A3/025820 Page 105/117

- Falta total de generación disponible (riesgo de potencia); - Capacidad insuficiente de la red (líneas y transformadores) (riesgo de sobrecarga); - Interconexión insuficiente entre Áreas (riesgo de potencia local + riesgo de sobrecarga en

la Interconexión) - Capacidad de generación local insuficiente debido a la separación del sistema en islas o

separación de barras debido a fallas (riesgo por separación de sistema o barras aisladas) Los resultados se dividen también teniendo en cuenta las condiciones climáticas en las cuales han ocurrido las fallas.

Hipótesis generales Las hipótesis siguientes son consideradas para asegurar una correcta aplicación del método de simulación Montecarlo.

- El período de un año, en el cual el comportamiento del sistema es analizado, se divide en intervalos base de una hora. Durante tal intervalo de tiempo, el sistema no debe sufrir cambios, se asume que se producen en el inicio de una hora;

- El estado del sistema eléctrico consiste de los siguientes elementos: - carga de cada barra, - Indisponibilidad de los sistemas componentes de producción y transmisión, - Políticas de operación (Puesta en marcha de las unidades, posibilidades de re-

despacho y criterios de alivio de carga); - Los estados de variación del sistema están determinados por:

- Los eventos son totalmente aleatorios, y por lo tanto no pueden ser previstos por los gestores de las operaciones del sistema, causando variaciones en la disponibilidad de los componentes de la red y en los valores de las cargas,

- Acciones en el despacho para ajustar el estado del sistema a las antedichas variaciones de configuraciones. Tales acciones son puestas en marcha para obtener la mejor calidad de servicio (política de máxima fiabilidad) o el mejor compromiso entre calidad de servicio y ahorro de inversiones (fiabilidad – optimización económica)

Organización de un cálculo de fiabilidad Cuando se realiza un cálculo de fiabilidad con el método Montecarlo, las condiciones de operación del sistema eléctrico analizadas son testadas por un suficientemente grande número de posibles configuraciones. Cada configuración se determina de manera aleatoria sobre las bases del índice de indisponibilidad de sus componentes. Definiciones

Ensayo: Control de los posibles estados del sistema (configuraciones de la red asociadas al valor de la carga) incluyendo los cálculos de cada alivio de carga necesario para ajustar la carga total del sistema a las reducidas capacidades del sistema, a continuación de una forzada y/o planificada indisponibilidad.

Page 4: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final RETE-A3/025820 Page 106/117

Ensayo de grupo: Secuencia automática de ensayos realizados para una específica distribución geográfica de las tasas de concentraciones de indisponibilidades forzadas. Muestra: Consiste en un grupo de ensayos de grupo que crean la combinación de concentraciones espacio – tiempo de la tasa de indisponibilidades previstas en un año (8760 horas) para el sistema bajo análisis. El resultado de una muestra es la determinación de una variable aleatoria ENF “Energía no Suministrada” o sea del índice de riesgo a ser calculado. Simulación: Consiste en N muestras que, obviamente se refieren al mismo año de análisis. El resultado de la i-ésima muestra es la determinación del ENFi de la variable aleatoria ENF.

El resultado de la simulación es la media esperada ENF de la variable ENF así obtenida:

N

ENFENF

N

ii∑

== 1

El parámetro σ (Desvio Standard de la media, expresada en p.u. de ENF ) calculado como:

ENFN

ENFiENFN

i

*

)(1

2∑=

−=σ

Provee una medida de la fiabilidad del resultado obtenido con la simulación Montecarlo: el menor valor de σ corresponde al mayor límite de seguridad del resultado.

A.3 BREVE DESCRIPCIÓN DEL PROGRAMA El código GRARE directamente vinculado al DATABASE SPIRA mediante un código interfaz consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3) que, respectivamente realizan las siguientes principales fases de cálculo.

GRARE1 Lee los datos eléctricos y topográficos obtenidos del programa de elaboración de la interfaz previa y luego los procesa y los organiza en un archivo en el formato requerido por el programa GRARE2. Elabora las curvas de carga anual y la producción no despachable para identificar, en cada área y para el entero sistema, los picos semanales y anuales. Realiza un procedimiento de flujo de carga en c.c. relativo a la situación de la carga obtenida del cálculo previo FLOWAC con el sistema entero disponible.

Page 5: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final RETE-A3/025820 Page 107/117

GRARE2 Efectúa la simulación Montecarlo en un significante número de configuraciones de la red, organizados de acuerdo a las antedichas modalidades (muestras). GRARE3 Elabora el análisis de convergencia de los resultados de las muestras obtenidas en la fase previa. En particular:

• Calcula el valor de la media esperada del índice ENF total (Energía no Suministrada) y dividido por barra, por causa y por condiciones meteorológicas;

• Elabora el análisis de convergencia mediante el cálculo del promedio progresivo y el desvío estándar del promedio.

A.4 METODOLOGÍA

Para cada configuración de interconexión posible del sistema, la metodología implementada en el GRARE es la de evaluar el grado de fiabilidad del sistema teniendo en cuenta las pérdidas de la red, los costos de producción, las obligaciones relacionadas a las interconexiones entre Áreas y los elementos de la red. Esta metodología, también utilizada para limitar los tiempos de cálculo, utiliza un procedimiento por el cual el análisis del sistema con Áreas interconectadas pueden ser divididas en dos fases:

• La primera fase considera el sistema dividido en Áreas en la cual cada una se representa con un modelo de Barra interconectada. En esta fase, se realiza una optimización del despacho sobre la base de la función del costo cuadrático, considerando las pérdidas por Joule;

• La segunda fase considera el sistema entero representado por todos los componentes. En esta fase, se realiza una optimización de re-despacho, con funciones cuadráticas de costo y considerando las pérdidas Joule, para eliminar o minimizar toda violación a las obligaciones de la red.

La siguiente es una breve descripción de los modelos introducidos en el GRARE que se utilizan para realizar la metodología propuesta. Un diagrama de flujo de la entera metodología general de cálculo se observa en la Figura 1.

La simulación Montecarlo Los cálculos se desarrollan utilizando el método estadístico de muestreo Montecarlo en la modalidad “no-secuencial” en la cual:

• una posible configuración del sistema es definida de manera aleatoria sobre la base de la probabilidad de fallas y de los programas de mantenimiento de cada componente (generadores, líneas, transformadores) además de la distribución de los valores de las cargas y de las producciones básicas,

• las acciones del operador del sistema son, simular mediante modelos de políticas más o menos complejas (puesta en marcha y despacho de grupos de activación de contratos y transacciones y cualquier ajuste) para obtener sea la mejor fiabilidad del despacho o el mejor compromiso entre calidad de servicio y el uso económico de los recursos,

• las variables importantes en términos de planificación y de proyecto del sistema de transmisión (cantidad total de alivio de carga requerida, índice de sobrecarga de las líneas

Page 6: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final RETE-A3/025820 Page 108/117

e influencia del incremento en la capacidad de tales líneas en los índices de riesgo, etc.) son calculados utilizando la formulación “corriente continua” de las ecuaciones de la red.

Modelo de Área Dado que el programa se focaliza sobre el análisis del sistema eléctrico interconectado, considera el sistema en su totalidad, con un detallado modelo en CC de la red, y como subdivisiones en subsistemas o Áreas que coinciden con sistemas nacionales o regionales, y cada uno representado con modelos de Barras. El procedimiento de cálculo desarrollado para realizar funciones horarias de despacho y para ensayar y eliminar toda congestión de la red, mediante especiales acciones correctivas, está basado en el uso integrado de los dos modelos del sistema eléctrico mencionados previamente. El despacho horario se realiza considerando las Áreas interconectadas con un esquema tipo radial, como indicado en la Figura 2.

Modelo de carga Teniendo en cuenta la no contemporaneidad de los picos de carga en los días laborales, pre-festivos y no laborales de las distintas Áreas interconectadas, el análisis se realiza considerando la secuencia horaria-semanal de los diagramas de carga de cada Área. La distribución anual de cada barra se obtiene considerando un único año calendario asociado a un específico diagrama de carga en la i-ésima semana del año. Un ejemplo de diagrama de carga semanal se muestra en la Figura 3 para dos diferentes curvas anuales de carga.

Modelo de producción no despachable Las centrales con producción no despachable tienen curvas de producción anual definidas por el usuario, con los mismos procedimientos utilizados para las curvas de carga. Este tipo de centrales pueden simular: Centrales de producción base (nuclear, hidráulicas de pasada, geotérmicas, etc.), centrales de producción independientes, contratos bilaterales y centrales de bombeo. La distribución anual de la producción de cada central se obtiene considerando un único año calendario (el mismo utilizado para la carga) que asocia un esquema de producción específica de la i-ésima semana del año. Un ejemplo de diagrama semanal de producción se muestra en la Figura 3 para dos diferentes curvas anuales de producción.

Page 7: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final RETE-A3/025820 Page 109/117

Definición de los objetivos semanales de las Unidades Para cada Área y para toda unidad térmica despachable, se define un objetivo de unidad semanal, subsecuentemente a la extracción Montecarlo, considerando:

• Unidades disponibles y su costo promedio específico; • Toda necesidad de un margen predefinido de reserva rotante; • Toda necesidad de un margen adicional para tener en cuenta las pérdidas por Joule en la

red; • Obligaciones en transitorios máximos de potencia entre Áreas; • El pico de carga térmica en cada Área.

Cálculo del despacho horario óptimo Para las unidades seleccionadas por los Objetivos de las Unidades en la sección previa, se resuelve el siguiente programa:

“Encontrar un grupo de unidades térmicas despachables que minimicen (en iguales incrementos de costos) el costo total de combustible, considerando las obligaciones, ambas mínima y máxima, de la potencia activa de las unidades y de las interconexiones entre Áreas”

El análisis viene ejecutado considerando:

• Funciones de costos horarios cuadráticos • Obligaciones de intercambios en interconexiones entre Áreas • Pérdidas en la red de transmisión, representadas con un modelo de segundo orden, con

relación a la potencia producida por las unidades, coherente con el modelo en corriente continua de las ecuaciones de la red;

• Mínima potencia que puede ser producida por las unidades puestas en operación (mínimo técnico)

Cálculo de Re-despacho Esta fase del cálculo se realiza si el cálculo del flujo de carga en CC en la red de transmisión, considerando el despacho óptimo de la fase previa, identifica uno o más elementos en sobrecarga (sobrepaso de los límites de capacidad de transporte de las líneas y/o transformadores). El objetivo de esta fase es de eliminar o minimizar la magnitud de las sobrecargas considerando:

• Funciones de costos horarios cuadráticos, • Modelos de segundo orden para evaluar las pérdidas por Joule, • Obligaciones en la potencia activa en la transmisión y generación de los sistemas

componentes

Page 8: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final RETE-A3/025820 Page 110/117

Alivio de Carga Las políticas de alivio de carga introducidas en el código GRARE varían de acuerdo a las relativas causas (generación insuficiente, interconexiones insuficientes entre Áreas, sobrecargas de red y separaciones de red). Se da una breve descripción de cada causa considerada. El programa puede operar el alivio de carga teniendo en cuenta la diferente clase de importancia de las barras de carga. Debe hacerse énfasis que antes de realizar cualquier alivio de carga debido a insuficiente generación e insuficiente interconexión entre Áreas, el código parará toda central con producción negativa (obligaciones bilaterales y bombeo).

Generación disponible insuficiente Se realiza el alivio de carga debido a generación insuficiente si la carga total del sistema es mayor a la potencia total disponible. En este caso, en las Áreas, el alivio de carga se realiza en proporción a la indisponibilidad de sea Área. El proceso utilizado en el procedimiento de optimización, integrado con el despacho, simula el alivio de carga por Áreas con generaciones ficticias con adecuados coeficientes de costos.

Interconexión insuficiente entre Áreas El alivio de carga debido a interconexión insuficiente viene ejecutado si la carga total del sistema es menor a la potencia disponible mientras, de otra forma, en algunas Áreas la carga es mayor que la disponibilidad del Área considerando el contributo debido a la interconexión. Se alivia carga solamente en las Áreas con déficit. Además en este caso, el proceso utiliza un procedimiento de optimización, integrado con el despacho, que simula el alivio de carga in las Áreas involucradas con generación ficticia con adecuados coeficientes de coatos.

Sobrecarga de red El alivio de carga por sobrecarga de la red se viene realizado de acuerdo al método del Heuristico, que utiliza la influencia de los coeficientes de las líneas. Luego del análisis del re-despacho, si la sobrecarga permanece, el programa realiza alivio de carga en las barras en las cuales la influencia de los coeficientes es máxima con respecto a las líneas que siguen sobrecargadas.

Page 9: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final RETE-A3/025820 Page 111/117

Separación de la red Las causas que dan inicio al alivio de carga incluyen las Barras Aisladas y la creación de Islas. En el primer caso, alivio total o parcial de carga viene cumplido en la barra para adaptarla a la generación disponible en ella. Se deben formar Islas sea a continuación de una indisponibilidad de las líneas de interconexión entre las Áreas o debido a una indisponibilidad de uno o más elementos del sistema de transmisión. En este caso, todo alivio de carga se identifica siguiendo la causa que ha generado la separación de la red. En lo que concierne a los puntos precedentes, pueden ser entendidos como procedimientos para determinar producciones despachables basándose en los mecanismos del mercado (Intercambios de Energía) y sus replanteos cuando ocurre la también llamada “congestión de la red”. Ambas fases descriptas en los puntos precedentes son ejecutadas en el GRARE mediante un procedimiento. Se da una breve descripción del algoritmo básico y su relativa formulación. [1]. Figura 1 – Procedimiento de cálculo del programa GRARE Figura 2 – Modelos del Sistema Eléctrico considerados en el GRARE Figura 3 – Ejemplo de curvas de carga y de producción impuestas

Page 10: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final RETE-A3/025820 Page 112/117

Figura 1 – Procedimiento de Cálculo en el Programa GRARE

GS = Available System Generation

CS = Total System Load GA = Available Area Generation CA = Total Area Load INTA = Interconnection Contribute

RANDOM GENERATION OFSYSTEM CONIFGURATION

STARTMONTE CARLO

SIMULATION

UNIT COMMITMENTWEEKLY

LOAD SHEDDINGDUE TO LACK OFGENERATION CAPACITY

LOAD SHEDDNGDUE TO LACK OFINTERCONNECTION CAP.

DISPATCHING

D.C.LOAD-FLOW

RE-DISPATCHING

D.C. LOAD-FLOW

LOAD-SHEDDINGDUE TO OVERLOADS

RESULTS RECORD AND PRINT

GS ≥CS

GA +INTA ≥CA

YES

YES

NO

NO

ANYOVERLOADS

?

YES

NO

ANYOVERLOADS

?

YES

NO

WEEKLYANALYSIS

DONE

SIMULATIONCOMPLETE?

YES

YES

NO

NO

Min Cost Dispatching withinterconnection capacityconstraints only

FUEL EXTRA-COSTS DUE TOLOCAL NETWORKCONSTRAINTS

Page 11: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final RETE-A3/025820 Page 113/117

Figura 2 – Modelo del Sistema Considerado en el programa GRARE

Step 2 : real networks (internal and external lines)

SAMPLE OF SYSTEM SITUATIONS (MONTECARLO)

QUASI BUS-BAR DISPATCHING

ONLY INTER-AREA POWER FLOW CONSTRAINTS

D.C. LOAD-FLOW

JOULE LOSSES MODELLINGLOCAL NETWORK CONSTRAINTS

RELIEF OF NETWORK OVERLOADS

GENERATION RE-DISPATCHINGLOAD SHEDDING

Step 1 : only inter-area lines

INCLUDING JOULE LOSSES

Page 12: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final RETE-A3/025820 Page 114/117

Figura 3 – Ejemplos de Curvas de Carga y de Producción Impuesta

WEEK 1

Diagram type "1"(20 step)

WEEK 2

Diagram type "2"(21 steps)

WEEK 3

Diagram type "2"(21 steps)

WEEK 4

Diagram type "3"(19 steps)

Load curve "A"

P

P

P

P

168 hours 168 hours 168 hours 168 hours

Load curve "B"

Prod. curve "A"

Prod. curve "B"

Page 13: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final RETE-A3/025820 Page 115/117

A.5 DESCRIPCIÓN DEL PROCEDIMIENTO DE CÁLCULO El procedimiento de cálculo que realiza la metodología descripta en la sección 4 consiste en los siguiente pasos principales. La descripción detallada del procedimiento y de la relativa formulación matemática están descritos en [1]. Paso 1 Extracción con el método Montecarlo de la referencia semanal y de uno de las posibles configuraciones del sistema para analizar, sobre la base del programa forzado de indisponibilidades de los sistemas componentes de la producción y de la transmisión. Paso 2 Definición de los objetivos semanales para determinar las unidades térmicas despachables ha ser considerados en el análisis. Paso 3 Despacho horario optimizado con los coeficientes originales de costos en el modelo de red simplificada (modelo semi Barra). Cálculo de la producción térmica despachable PG

0 considerando las obligaciones de las interconexiones entre las Áreas y la carga térmica Ct. Ejecución del flujo de carga en CC sobre la entera red para calcular los transitorios Fj

0. Cálculo del gradiente de pérdidas ∇i y de la matriz Hessian Hi,i para modificar los coeficientes de la curva de costos. Paso 4 Cálculo de los nuevos coeficientes de costo de la producción térmica despachable. Despacho horario optimizado para calcular las nuevas producciones térmicas PG

1. La siguiente ecuación debe ser válida:

∑ PG0 = ∑ PG

1 = Ct Paso 5 Ejecución del flujo de carga para calcular los nuevos transitorios Fj

1 y determinar las pérdidas Wj:

Wj = rj x (Fj1) 2

Despacho horario optimizado para calcular la nueva producción térmica PG2 considerando los

nuevos costos de producción y de pérdidas distribuidas en las barras de la red. La siguiente ecuación debe ser válida:

∑ PG2 = Ct + ∑ Wj

Page 14: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final RETE-A3/025820 Page 116/117

Paso 6 Ejecución del flujo de carga para determinar un punto de operación para analizar las obligaciones de transmisión. Todo re-despacho para minimizar las violaciones de las obligaciones locales de la red y todos los alivios de carga.

A.6 RESULTADOS ENTREGADOS El código de cálculo GRARE provee una gran cantidad de información que puede ser usada para medir, en términos probabilísticos, la fiabilidad del sistema en su totalidad. Provee también información importante sobre el uso, en términos económicos, de su equipamiento de producción. Para hacer más entendibles los resultados, algunos de ellos están divididos por niveles de agregación: una barra, un Área y sistema entero.

• Operación horaria anual para cada unidad; • Valores de intercambio de energía, en las dos direcciones, entre Áreas Interconectadas

bajo condiciones económicas y fiables; • Energía anual de Pérdidas de transmisión por Joule, del sistema y de Áreas. • Algunos de los resultados antes mencionados son calculados para dos condiciones

típicas de obligaciones de transmisión: o Solamente límites de intercambio en Interconexiones (obligaciones Inter.-Áreas), o Obligaciones especiales de transmisión en cada rama física de la transmisión y

red Interconectada, dividiendo las situaciones en “antes” y “después” todo alivio de carga realizado para resolver “congestiones ” de la red.

• Índices de riesgo ENF – LOLE – LOLP o Para el sistema entero o Por Área y por barra de carga solo para el índice ENF

• Estadística relativa a las líneas críticas

o Frecuencia de sobrecargas antes del re-despacho, o Ganancia marginal

• Costo anual de combustible relativo a: o Una unidad térmica despachable; o Un Área o Totalidad del sistema

• Producción anual para: o Una unidad; o Un Área, distinguiendo unidades de producción térmica despachable de unidades

con generación impuesta; o Totalidad del sistema, siempre distinguiendo unidades de producción térmica

despachable de unidades con generación impuesta.

-

Page 15: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final RETE-A3/025820 Page 117/117

A.7 BIBLIOGRAFÍA

[1] Bertoldi O., Rivoiro A. :”Fast multi-area economic dispatching for planning applications by accounting for interchange constraints and transmission losses”. 12a PSCC, Dresda, August 1996.

[2] Bertoldi O., Innorta M., Salvaderi L. et Alii: ”New Issues in bulk Power System Planning”. CIGRE General Session, September 1996.

[3] CIGRE T.F. 38.03.11: “Methods and Techniques for Reliability assessment of interconnected Systems”. CIGRE technical brochure, August 1998.

[4] Calisti R.: “The GRARE program in SPIRA - User’s guide”. CESI technical document RET-A2/019908, June 2002.

Page 16: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/025820

ANEXO B

PLANIFICACIÓN DE LARGO PLAZO Fase 1: Decisiones Estratégicas

Page 17: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

1

RETE-A3/025820

Anexo B

Planificación de Largo Plazo

Fase 1: Decisiones estratégicas

Page 18: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

2

RETE-A3/025820

TRANSMISSION NETWORK EXPANSION PLANNING

Summary

• General Formulation of the Problem: aims and constraints

• Long term expansion model (main simplifications)

• Description of the LODEN (L inear Optimized Development of Electrical Network) model

Page 19: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

3

RETE-A3/025820

• Optimization model• Calculation of the MINIMUM COST NETWORK

• Phase A (N condition)• Network overload control• Phase B (N-1 condition)

• Economic evaluation and comparisons• Models adopted for particular planning studies

• Siting of future generation units• Use of components already planned• Use of the generation reserve

• LODEN program application

Page 20: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

4

RETE-A3/025820

GENERAL CONSIDERATION about

TRANSM ISSION NETWORK EXPANSION PLANNING

The planning of transmission network expansion is a decision making process which is

aimed:to define a system development strategic plan

satisfying the following two main issues

economicsminimizing investment (capital) and operation costs

reliabilityassuring adequate levels of the quality and continuity of the electric energy supplied

respecting several constraints (e.g. social, financial, politics, environmental ,etc.).

Page 21: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

5

RETE-A3/025820

General formulation of the problem of the transmission network planning

After having localized the areas in which the new generating facilities will be installed and fixed:

• Size and type of new generating units• amount and location of future loads (e.g. at EHV/HV substations)• new possible r .o.w (rights of way) (candidates)

The problem of transmission network expansion may be stated as follows:

to define the new installations (lines and transformers) that are required to transport power from generation to loads, and that minimize the following objective function:

z = cR R + Ca + Cl (1)

Page 22: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

6

RETE-A3/025820

where:

• R is the Risk index

• cR is the unit cost related to the Risk index R

• Ca is the investment cost ( new plants )

• Cl is the operation cost ( Joule losses cost).

This means to look for the best compromise between the containment of capital cost (Ca) and operation (Cl) costs and the assurance of an acceptable reliability level (quality and continuity of service for the user). The latter quantity is measured by a risk index R, (the higher risk index R, the lower system reliability) and by a unit costcR (e.g. cost of interruption of 1Kwh supply to user).

Page 23: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

7

RETE-A3/025820

The above optimization problem cannot be limited to a comparison done over a single year t, but is to be extended to a significant period of study of T years (a long term planning study covers a period of at least 15-20 years).

Page 24: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

8

RETE-A3/025820

Therefore the optimal solution will be that which provides the lowest present costs of the future T annual costs taking into consideration technical constraints.

Then the (1) becomes:

where:i= annual discount ratet= year of developmentT= expansion period considered

A rigorous solution of the problem is extremely complex since Cat, Clt, andRt are complicated functions of the variables to be optimized (the new installations) that is:

• Cat is a not-continous function that depend on the installation year of the new plants and it is relevant to integer number of new equipments ofspecified size and cost.

( ) ( ) ( )21

1

1CCRc ltattR

T

tti

+++∑

=

Page 25: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

9

RETE-A3/025820

• Ctl (e.g cost of losses) is a quadratic function of line power flow into that depend on network structure and on Kirchoff's law.

• Rt (the Risk index) is a probabilistic function depending on network structure, on variance of the loads, on component unavailability, etc.

Moreover the network expansion planning has to take into account the following constraints:

• existing network (generally not-optimized)• difficulty and possibility of introduction of the new rights of way, new

voltage levels and new EHV/HV substations• maximum number of parallel branches on the same r.o.w

• development of the network by standard and discrete size of the new elements• and so on……………

Page 26: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

10

RETE-A3/025820

Simplifications

Due to the above outlined difficulties the planner is forced to adopt some simplifications that his experience suggests as acceptable.The decision making process is splitted into two main phases:

• Long term planning (10 years or more)• Medium-short term planning (3-5 years)

The long term studies are devoted to define the strategic choices (fundamental strategies) of the network development such as:

• Voltage levels of the new lines• typical network structures (corridors)• size of the main network components (standardization)

The short-medium term studies are devoted to the definition of the operative planning such as:

• definitive network structure• design characteristics of the main components• needs of reactive power compensation• characteristics of control and protection systems

Page 27: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

11

RETE-A3/025820

A further subdivision of long term planning process is considered:

LONG TERM PLANNING (1ST STEP)

That is selection of a limited number of near optimum expansion alternatives (more attractive solutions), using a simplified optimization procedure based on LODEN (Linear Optimized Development of Electrical Network) digital program.

Accepted simplifications are:• only peak load situations are considered• adoption of a deterministic approach for adequacy (steady stateconditions) evaluation (N-1 rule)

• use of linear flows estimation technique

Page 28: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

12

RETE-A3/025820

Main simplifications adopted in the LODEN model(long term planning)

A)

the strategic decisions (voltage levels, size of components, r.ow, etc..) are determined mainly by total load growth during the study period T and by the final location of both generating plants and loads.

B)

network redundances (network reserves) can be determined, as first approximation and for long term planning, by means deterministic criteria instead of probabilistic one.

From A) follows:The overall optimitazion problem can be subdivided into T partial problems of the same type, that is:

Page 29: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

13

RETE-A3/025820

• choice, in one step, of all the new installations that are required to pass from the initial network (existing network) at year to to the final network (horizon nertwork) at year T

• determination starting from the existing network (at year to) of the intermediates configurations (network reinforcements) for each year ti by evaluating the optimized partial development ti - ti+1 that are compatible with the basic decisions of the horizon network.

From B) follows:• for long term studies it is acceptable to check the reliability of the

transmission system by means of a sample of single contingencies (out of service of the network components) that are selected by a deterministicapproach (N-1 criteria).

Page 30: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

14

RETE-A3/025820

LODEN PROGRAM DESCRIPTION

Starting from the following data:

a) Initial state of the system (generating plants, lines and transformers, loads);b) load growth forecasting at existing or future demand centers;c) generation expansion plans at existing or possible future sites;d) environmental studies with possible new "rights-of-way" for overhead lines;e) economical studies with possible new voltage levels higher than the existing

ones;f) rate of interest;g) costs of losses and of investments.

the LODEN program determines a long term expansion plan at "minimum cost" of the transmission network including:• contingencies analysis (n-1 rule) on the base of a sample of single contingencies

that are selected by a deterministic approach;• on line economical comparison among different voltage levels;

Page 31: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

15

RETE-A3/025820

• choice of the new generating plants allocation to minimize the transmission network number

• D.C. load-flow, Joule losses and economic figures are also evaluated.

The LODEN program provides a "near optimum" development plan of the transmission network using an automatic computing procedure which defines first of all the long term choices (voltage levels and rights-of-way) and then the investment scheduling step-by-step.

The computing procedure (see the flowchart) consists of three stages.

Page 32: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

16

RETE-A3/025820

INPUT DATA

Linear optimization

for horizon year

Linear optimization

step-by-step

- DC Load Flow- Losses evaluation

- Overloads detection

Total economical

evaluations

(annual cash flow,...)

one more step?YES

NO

HORI ZON YEAR

INTERM EDIATE STEPS

FINAL ECONOM IC EVALUATIONS

Page 33: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

17

RETE-A3/025820

The 1st stage

determines the transmission system growth from year " zero" directly to " hor izon" year

a) provides the "minimum cost" transmission network structure able to meet the peak load at the "horizon" year ("Horizon solution"); voltage levels, right-of-way and number of circuits per right-of-way are selected, taking into account single contingencies and actual transmission costs, among the alternatives offered by an "Extended Graph" given by input and representing all the possible new installations;

b) provides the "Horizon Graph" consisting of the above selected rights-of-way; for each of them the maximum number of circuit in parallel is that one of the "Extended Graph".

The r ights-of-way of the " Hor izon Graph" state the boundar ies of the system expansion possibilities in the intermediate steps.

Page 34: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

18

RETE-A3/025820

The 2nd stage

determines the new lines and transformers installations step-by-step, calculates the cor responding DC load flow and eliminates network

over loads

a) evaluates the system minimum configuration for each intermediate year with reference to the Horizon Graph defined in Stage 1, as for the new rights-of-way is concerned, by taking into account single contingencies analysis;

b) evaluates the amount of Joule losses, by adopting the DC load flow approximation;

c) detects network overloads of and eliminates the violations.

Page 35: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

19

RETE-A3/025820

Page 36: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

20

RETE-A3/025820

Page 37: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

21

RETE-A3/025820

The 3r d stage

per forms the calculation of the economic figures which character ize the above defined development plan

a) provides the economic figures of the expansion alternative under study, taking into account the year-by-year new investment costs and the losses costs.

The expansion plan, obtained at the end of the step-by-step computing procedure, may be slightly different from the one provided by the Stage 1 ("Horizon solution" ) owing to the particular intermediate growth of the load and of the available generation power.

Page 38: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

22

RETE-A3/025820

OPTIMIZATION MODEL

The problem of expanding a transmission system is dealt with, from the mathematical point of view, by using linear programming.Thus, the choice of the transmission system configuration, for a given year, is based on minimization of the following linear objective function:

subject to the following constraints:

(Kirchoff’s current law)

∑=

⋅=N

iii

cFFcZ1

),(

Ni ,.......,1 =∀

network theof nodes,.......,1 01

=∀=∑=

iFjM

ii

FF ii≤

( ) CDdii FdF ∈∀→≤

Page 39: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

23

RETE-A3/025820

in which:

N = total number of links simulating the whole electric power system, consisting of existing network elements and of elements that may be installed in the future (called "candidates");

Fi = active power flow through the ith link at yearly peak load without system outage;

ci = "cost" coefficient assigned to each ith link;Fi = maximum carrying capacity (MW) on the ith link;Mj = number of links connected to the jth node of the network.CD = sample of the single contingencies to be checkedFi(d) = active power flow through the ith link when the outage dth occurs.

The flows Fi that minimize the objective function (minimum cost flows), are obtained by using the linear programming algorithm " out of kilter" (L.R. Ford, D.R. Fulkerson: Flows in networks" - Princeton Univeristy, New Jersey,1962).

This acts on a”graph”, whose “oriented arcs” give a suitable simulation of all the network components: lines, transformers, loads and generators.

Page 40: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/025820

ANEXO C

DESCRIPCIÓN DEL MODELO DE RED COMPLETO DEL SEIN

Page 41: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 1/63

ANEXO C - DESCRIPCIÓ N DEL MODELO DE RED COMPLETO DEL SEIN

INDICE DEL CONTENIDO

INTRODUCCIÓ N .................................................................................................................................. 3FUENTE DE INFORMACIÓ N ..................................................................................................................3DESARROLLO DE LOS MODELOS DE LAS MÁQUINAS SÍNCRONAS..........................................................3

Aná lisis de los datos particulares de cada una de las unidades........................................................7DESARROLLO DE LOS MODELOS DE LOS MOTORES SÍNCRONOS..........................................................7

Aná lisis de los datos particulares de cada una de las unidades........................................................8DESARROLLO DE LOS MODELOS DE LOS MOTORES ASÍNCRONOS........................................................8

Aná lisis de los datos particulares de cada una de las unidades........................................................9MODIFICACIONES DE LOS MODELOS PARA LOS MOTORES SINCRÓ NICOS Y ASINCRÓ NICOS ..................9

Motores Sincrónos .............................................................................................................................9Motores Asincrónos............................................................................................................................9

DESARROLLO DE LOS MODELOS DE LOS SISTEMAS DE CONTROL ......................................................10Aná lisis de los datos particulares de cada una de las unidades......................................................12

DESARROLLO DE LOS MODELOS DE LOS RELÉ S PARA EL RECHAZO DE CARGA/GENERACIÓ N .............12CONCLUSIONES ..........................................................................................................................13RECOMENDACIONES..................................................................................................................13

ANEXO C1 – GENERADORES SÍNCRONOS................................ ................................ ...... 15DETALLES PARTICULARES DEL ANÁLISIS DE CADA GRUPO. ................................................................. 15RESUMEN DE LOS MODELOS DE GENERADORES UTILIZADOS .............................................................30

Diagramas de bloques de los Generadores.....................................................................................31

ANEXO C2 – MOTORES SINCRONOS ................................ ................................ ................ 33DETALLES PARTICULARES DEL ANÁLISIS DE CADA UNIDAD.................................................................. 33RESUMEN DE LOS MODELOS DE MOTORES SINCRONOS UTILIZADOS ..................................................34

Diagramas de bloques de los Motores Sincronos ...........................................................................34

ANEXO C3 – MOTORES ASINCRONOS................................ ................................ .............. 35ANÁLISIS PARTICULAR POR CADA ÍTEM DEL “ANEXO-INFORME 01-EDP.XLS” ................................. 35RESUMEN DE LOS MODELOS DE MOTORES ASINCRONOS UTILIZADOS ................................................39

Diagramas de bloques de los Motores Sincronos ...........................................................................39

ANEXO C4 – SISTEMAS DE CONTROL DE GENERADORES................................ ............ 40GRUPO 1: CENTRALES CON DATOS DE LOS SISTEMAS DE CONTROL ..................................................40GRUPO 2: CENTRALES QUE FIGURAN EN TABLAS V, VI Y VII DEL ANEXO 03– SISTEMAS DEEXCITACIÓ N, ESTABILIZADORES Y “GOVERNORS” .............................................................................47GRUPO 3: CENTRALES QUE NO DISPONEN DE DATOS DE LOS SISTEMAS DE CONTROL........................48

ANEXO C5 – MODELOS DE USUARIO DE RELÉS ................................ ............................. 51ANEXO C6 – FUENTES DE DATOS CONSULTADAS................................ ......................... 61

Page 42: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 2/63

INDICE DE LAS FIGURAS

FIGURA 1: EJEMPLO DE UNIDAD HIDRÁULICA PARA COSϕ=0.90 .............................................................................................6FIGURA 2: EJEMPLO DE UNIDAD TG O TV PARA COSϕ=0.85..................................................................................................6FIGURA 3: EJEMPLO DE UNIDAD DIESEL, COSϕ=0.80.............................................................................................................7FIGURA 4: MODELOS DEL GENERADOR SINCRONO A ROTOR CILÍNDRICO - GENROU ..........................................................31FIGURA 5: MODELOS DEL GENERADOR SINCRONO A POLOS SALIENTES - GENSAL.............................................................32FIGURA 6: MODELOS DEL MOTOR ASINCRONO – CIMTR4...................................................................................................39

Page 43: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 3/63

Introducció nEn el modelo de red utilizado se han caracterizado con suficiente detalle todoscomponentes que se consideran fundamentales para la simulació n de los fenó menosdiná micos que se observan en presencia de alivios de carga por subfrecuencia, por mínimatensió n y durante el rechazo de generació n por subfrecuencia.En los siguientes capítulos se documenta el desarrollo de las tareas de construcció n deuna base de datos para los estudios diná micos de sistemas de potencia, del SistemaEléctrico de Perú. En el mismo, se detallan las fuentes de partida, las hipó tesisconsideradas en la adopció n de los datos faltantes, y las pruebas efectuadas para verificarla consistencia.Los modelos elaborados está n orientados al uso de los recursos que provee la librería demodelos del simulador PSS/E, no obstante lo cual, los pará metros de los generadores ysistemas de control, podrían ser adaptados a cualquier simulador que disponga de larepresentació n de los sistemas de control aquí citados.Finalmente, se elaboran una serie de conclusiones respecto de la base de datosresultante, y se ofrecen una serie de recomendaciones para mejorar la informació n de estaversió n de la base de datos, con el propó sito de alcanzar una representació n realista,confiable y bien documentada para el desarrollo ulterior de los estudios de planificació n y/ode la operació n de la red.

Fuente de Informació nLa informació n fuente a partir de la cual se ha elaborado esta base de datos se cita en elANEXO C6 – FUENTES DE DATOS CONSULTADAS. También se indica en forma generalel uso que se le ha dado a cada componente de informació n.

Desarrollo de los Modelos de las Máquinas SíncronasEn el desarrollo siguiente, se designa TG a las unidades turbogas, TV a las unidadesturbovapor, H a las unidades hidrá ulicas, D a las Diesel y CS a los condensadoressíncronos.Se da una breve explicació n de las hipó tesis generales que se han adoptado paracompletar los datos faltantes.En general, las relaciones entre los pará metros de eje directo y cuadratura de lasmá quinas síncronas según el tipo de unidad (polos salientes y rotor cilíndrico), varían pocoentre diversos fabricantes y pueden referirse a la reactancia síncronas de eje directo. Noobstante, es má s preciso estimar el pará metro xq a partir del xd conocido, el pará metro x’qa partir de x’d, y los pará metros x”q, x1, x2 y x0 a partir de x”d.Todas las reactancias que intervienen en los estudios de estabilidad: xd, xq, x’q, x’q, x”d yx”q deben interpretarse como valores no saturados, a fin de computar la saturació nmediante los factores apropiados (S1.0 y S1.2 ) en funció n de la excitació n, y las

Page 44: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 4/63

reactancias x1, x2 y x0 como valores saturados para su empleo en el c á lculo decortocircuito.La relació n bá sica entre los pará metros saturados a partir de los no–saturados se tomó apartir desde valores típicos de diversos fabricantes, para unidades de rotor cilíndrico ypolos salientes.No obstante, cuando de los datos disponibles se reconoció una relació n entre pará metrossemejante a las má quinas de las cuales se dispone de datos garantizados por losfabricantes, se adoptaron estas relaciones para completar todos los datos. Las fuentesconsultadas pertenecen a unidades de General Electric (GE), Westinghouse, Siemens,Alstom, Asea Brown Boveri (ABB), SKODA Export e Industrias Metalúrgicas Pescarmona(IMPSA).Si bien cada caso se ha tratado en forma particular, las premisas bá sicas para la adopció nde los pará metros de los diversos tipos de unidades se citan a continuació n.Xd: Reactancia síncronas de eje directo no saturada

Para las unidades TG y TV de potencia menor a 40, se estima en 220 %, y depotencia mayor en 200. Para las unidades hidrá ulicas de potencia menor a 10 seestima en 110 %, y para los generadores Diesel en 160 %.

H: Constante de Inercia del Conjunto Turbina – Alternador y elementos acoplados aleje, referida a la velocidad del alternadorPara las unidades hidrá ulicas que no tienen datos se estima 3.0 s, para las unidadesTG se estima de 7 a 9 s (9 para las unidades con potencia hasta 40 MW, y 7 paralas má s grandes), y para las unidades TV se estima 4.5 s. Para los grupos Diesel seestima en 2.0 s para unidades de menos de 4 MW, y 2.5 s para las de mayortamaño.

Grupos Diesel:Para los grupos Diesel cuya velocidad es conocida y con 3 o má s pares de polos, seadopta el modelo de polos salientes, y para los de mayor velocidad los de rotorcilíndrico. Cuando no se conoce la velocidad se adopta el modelo de PolosSalientes.

x” q, x0: reactancia subtransitoria no saturada de eje en cuadratura y reactanciasaturada de secuencia ceroEn general, cuando existen los valores de x”d no saturados, los valores de x”q y x0se estiman para satisfacer relaciones de semejanza para el tipo de modelo (polossalientes o cilíndricos).

x1: reactancia subtransitoria saturada de secuencia positivaEn general, cuando x1 es igual a x”d, se asume que x”d es el valor no saturado y sereemplaza a x1 por una estimació n de su valor saturado, con el objeto de emplearlopara los cá lculos de cortocircuito. Normalmente, el factor de saturació n se consideraalrededor de 0.82, cuidando de que x1 sea menor a la reactancia de dispersió n xl.

x2: reactancia saturada de secuencia negativa

Page 45: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 5/63

Se estima como el promedio de los valores saturados de x”d y x”q. Si los valoressaturados no está n disponibles, se usa el 0.835 veces el valor obtenido con lospará metros no saturados.

r1: resistencia de secuencia positivaLos datos disponibles se han referido a 75 C. Los datos faltantes se estimaronempleando para las unidades de potencia ≥ 10MVA:

r1 = 0.04747/MVA+2.525 10-3

y para el resto:r1 = 0.0474/100*(MVA-10)+0.00727.

A partir de r1 se estiman también r2=4.25*r1, y r0=2.8*r1, valores típicos de losdatos de fabricantes. Cabe destacar que las muestras presentan bastantedispersió n.

rN: resistencia del centro de estrella del devanado estató rico al neutroLos datos faltantes se han completado teniendo en cuenta una protecció n (p) dehasta el 70% del devanado de la má quina, y considerando para tal condició n unacorriente límite (ILIM) en el neutro de 10 A, despreciando la impedancia deldevanado. Esto implica que:

rN = (1-p) (VL/√3)/ILIM; donde para ILIM = 0.010 kA, y VL medida en kV, correspondeun valor en por unidad (pu) de:

rN (pu) = (1-p) (VL/√3)/ILIM * MVA/VL2;

el cual reemplazando p=0.7 e ILIM = 0.010 [kA] resulta:rN (pu) = 17.32* MVA/VL

expresió n que se emplea en la estimació n. El r0 en el archivo de datos es r0s +3*rN, donde r0s es la reactancia de secuencia homopolar del estator.

Constantes de Tiempo:Para las unidades hidrá ulicas pequeñas y grupos Diesel se estima una T’do de 4 s;para el resto de las unidades las constantes de tiempo se estiman a partir de valorestípicos según el tipo de unidad.

Potencia Mínima:Este valor se usa como referencia para impedir que el estado operacional del flujode carga, contemple situaciones no operables en forma permanente de las unidadesde generació n. Las estimaciones se basan en el tipo de unidad y la potenciamá xima. Para unidades hidrá ulicas se adopta 0.4*Pmax, para las unidades TV0.45*Pmax y para las unidades Diesel y TG 0.60*Pmax.

Curva de Capacidad:Una gran parte de los datos disponibles en las planillas de centrales no sonconsistentes, observá ndose que los valores absolutos de Qcapacitivo y Qinductivoaumentan con la Potencia activa. Esto no responde al comportamiento de lamá quina síncrona y muestra un error de interpretació n. En tales casos y en losfaltantes, se estimaron los datos de la curva de capacidad para 0, 25, 50, 75 y 100%de la Potencia Má xima.

Page 46: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 6/63

La estimació n considera curvas típicas para 3 tipos de unidades: hidrá ulicas,térmicas TG – TV, y para las unidades Diesel. Para la regió n de sobrexcitació n seconsideraron 4 curvas para las unidades hidrá ulicas (para cosϕ de diseño 0.80,0.85, 0.90 y 0.95), 2 para las unidades TG y TV (para cosϕ de diseño 0.80 y 0.85), y1 para las unidades Diesel con cosϕ 0.80. Para el estado de subexcitació n hay unasola curva para cada tipo de unidad; el diagrama de las unidades hidrá ulicas yDiesel se representa mediante una recta, que suele ser característica de loslimitadores de subexcitació n, y en las unidades turbogas se emplean dos rectas,porque una sola provocaría una operació n muy restrictiva para despachos altos.

-0.800

-0.600

-0.400

-0.200

0.000

0.200

0.400

0.600

0.800

0 0.2 0.4 0.6 0.8 1

SOBREEXCITACIÓ N

SUBEXCITACIÓ N

Figura 1: Ejemplo de unidad Hidrá ulica para cosϕ=0.90

-0.600

-0.400

-0.200

0.000

0.200

0.400

0.600

0.800

0 0.2 0.4 0.6 0.8 1

SOBREEXCITACIÓ N

SUBEXCITACIÓ N

Figura 2: Ejemplo de unidad TG o TV para cosϕ=0.85

Page 47: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 7/63

-0.400

-0.200

0.000

0.200

0.400

0.600

0.800

1.000

0 0.2 0.4 0.6 0.8 1

SOBREEXCITACIÓ N

SUBEXCITACIÓ N

Figura 3: Ejemplo de unidad Diesel, cosϕ=0.80

Aná lisis de los datos particulares de cada una de las unidadesEn el ANEXO C1 – GENERADORES SÍNCRONOS se detalla el aná lisis efectuado sobrecada una de las unidades. En el Anexo C1 está n las planillas con los datos resultantes porcada unidad, con comentarios que indican su naturaleza (estimados, corregidos, etc.). Losdatos que no tienen comentarios han sido obtenidos desde las fuentes citadas. El archivoGs_dyda.dyr contiene los datos en formato fuente

Desarrollo de los Modelos de los Motores SíncronosLa fuente principal de datos lo constituye la solapa.Motores Síncronos del “ ANEXO-INFORME 01-EDP.xls” , y el Anexo 03 Maquinas Eléctricas.No hay datos diná micos completos en ningún caso, aunque se destaca la primer unidad(ítem 01 según la planilla “ ANEXO-INFORME 01-EDP.xls” ) que dispone de todos lospará metros excepto la inercia de la carga.Está n disponibles en todos los casos los datos de la tensió n, la potencia en el eje (HP) y elnúmero de vueltas. Só lo en dos casos el cosϕ no está presente, y los restantes datos está nen general, incompletos.Los motores suelen tener como características, impedancias transitorias y subtransitoriasrelativamente má s altas que para los generadores, y debido a su velocidad, la mayoría sonde polos salientes. Se tomó como consigna que los motores con número de vueltasmenores o iguales a 1200 se consideren de polos salientes, y el resto de rotor cilíndrico.La inercia de la carga es por lo común, una magnitud que puede ser significativa para lainercia total del conjunto expresada por la constante “H”. La inercia de la carga es funció nde la forma de los equipos, el peso, y las relaciones de los engranajes que vincula el eje

Page 48: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 8/63

del motor con el resto de los equipos. No puede predecirse directamente del tiempo deparada, porque es también una incó gnita la variació n del torque frenante con la velocidadde la unidad, ya que depende del tipo de proceso y los mecanismos de protecció nasociados que desvinculan uno o má s de los componentes del eje a ciertas velocidades.Como este valor es susceptible de una gran dispersió n, se adopta como valor de referencia2.5 veces la suma de las constantes de inercia del rotor má s el embrague.

Aná lisis de los datos particulares de cada una de las unidadesEn el ANEXO C2 – motores sincronos se detalla el aná lisis efectuado sobre cada una delas unidades. En el Anexo C2 está n las planillas con los datos resultantes por cada unidad,con comentarios que indican si son estimados o corregidos. Los datos que no tienencomentarios han sido obtenidos desde las fuentes citadas.

Desarrollo de los Modelos de los Motores AsíncronosLa fuente principal de datos lo constituye la solapa. Motores Asíncronos del “ ANEXO-INFORME 01-EDP.xls” , y el Anexo 03 Máquinas Eléctricas. En todos los casos, lainformació n bá sica contiene datos de la tensió n nominal, la potencia en el eje (HP) y elnúmero de vueltas. Por el contrario, hay pocos pará metros característicos del motordisponibles, tal como corriente de arranque, torque má ximo, etc. En este desarrollo se hanestimado sin excepció n, todos los datos necesarios para modelar estos equipos en losestudios de estabilidad.El modelado de los motores asíncronos de gran potencia será de utilidad para contemplarlas relaciones tensió n – corriente durante los transitorios en la red. Estos modelos puedenemplearse también para evaluar la posibilidad de desconexió n ante transitorios severos, ysimular las condiciones de arranque.Sin embargo, cuando es preciso realizar aná lisis de detalle, es necesario observar lanaturaleza de los datos y confiar en aquellos que son aportados por los fabricantes (cosϕde arranque, corriente de arranque, torque de arranque, etc.), en tanto que los datosestimados será n útiles para representar el efecto general de su comportamiento, pero nose puede garantizar su desempeño individual pues han sido supuestos.Ademá s de completar los datos de la inercia de los rotores de los motores, también seestimó la inercia de la carga como 2.5 veces la inercia del rotor. Esto sirve só lo para teneren cuenta su efecto, y debiera precisarse con informació n de planta. Para simular lascondiciones de arranque en vacío, debe modificarse la constante “H” considerando só lo lainercia del rotor.Se advierte que debido a las pequeñas constantes de tiempo ,resulta necesario reducir lospasos de integració n para evitar problemas de convergencia.

Page 49: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 9/63

Aná lisis de los datos particulares de cada una de las unidadesEn el ANEXO C3 – motores Asincronos se detalla el aná lisis efectuado sobre cada una delas unidades. En el Anexo C3 está n las planillas con los datos resultantes por cada unidad,con comentarios que indican si son estimados o corregidos. Los datos que no tienencomentarios han sido obtenidos desde las fuentes citadas.

Modificaciones de los Modelos para los Motores Sincró nicos y Asincró nicosMotores SincrónosSó lo se reconocen los pará metros de la unidad de 9500 HP de Millsite, siendo losrestantes nuevos datos debido a lo cual se adoptan pará metros para satisfacer lospará metros x’d y xo suministrados por COES, sin abordar en otros detalles como la inerciadel rotor, embrague o carga.Ø En el caso de Millsite se reemplazó la tensió n nominal y la reactancia de secuencia

homopolar; el resto de los pará metros se dejó sin cambios.Ø Excepto en el equivalente de motores de ILO1, el factor de potencia en el resto de

las unidades fue estimado en 0.80.Ø El rendimiento se calculó en todos los casos a partir del factor de potencia, la

potencia útil en el eje y la potencia nominal del alternador en MVA. En el caso deILO1, se supuso un rendimiento del 95% para obtener la potencia del alternador(MVA).

Ø Se considera que debido al bajo valor de x’d en la planilla de COES, éste es unvalor saturado y se ha estimado para los pará metros del modelo un valor nosaturado, dado que en los estudios se considera la saturació n. La mayoría de loscá lculos de cortocircuito empleará , sin embargo, la reactancia subtransitoria de ejedirecto saturada, cuyo valor es apreciablemente má s bajo que x´d.

Motores AsincrónosSe adoptan motores equivalentes que puedan satisfacer los pará metros suministrados porCOES, sin abordar en detalles de las características particulares por tratarse deequivalentes.Ø En el caso de ILO1 se supuso una potencia en MVA a partir de un rendimiento

estimado.Ø Se supone que el valor del cosfi de los motores de Botiflaca BT2 (56016) y BT3

(56014), y el de San Nicolá s en la barra 26064, incluye la compensació n capacitivadeclarada debido a su alto valor. Por lo tanto, se recalculó el cosfi y necesariamentelos MVA base adoptando un rendimiento típico.

Equivalentes en San Nicolá sSe desarrolló la red de alimentació n a los motores a fin de calcular los equivalentes paracortocircuito. Los datos de secuencia homopolar no resultan de interés, puesto que todoslos transformadores está n en triá ngulo en 13.8 kV, interrumpiendo la red de secuencia.COES estableció un equivalente de motores en 13.8 kV que representa a:

Page 50: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 10/63

Ø todos los motores que se alimentan desde el sistema de 33 kV,Ø los vinculados a la barra de 13.8 kV con transformadores con tensió n secundaria

inferior a 4.16 kV,Ø los motores de la alimentació n designada como SWP, yØ los motores de la alimentació n designada como DP cuya tensió n en bornes es

4.16 kV.El resto de los motores se modela junto con los motores síncronos y el generadorCUMMINS en 4.16 kV, con un equivalente para los motores síncronos, otro para losmotores asíncronos, y el generador modelado independientemente.Las potencias coinciden excepto en el equivalente de 13.8 kV en que faltan 800 HP, y paracontemplar esta falta, se supuso que los motores de la alimentació n SWP son de só lo100 HP.En estas condiciones, se obtuvo como equivalente para el aporte de los motores en13.8 kV:

zpos = 0.08415 + j1.19403, en base 100 MVAy el aporte en la barra de 13.8 kV de los motores representados en 4.16 kV es:

zpos = 0.01347 + j 0.45692, en base 100 MVA

Para tomar en cuenta este efecto, el equivalente de los motores en 13.8 kV que acompañaa este documento, tiene agregado un transformador de bloque con una impedancia de0.00673+j0.05217 en base 18.7 MVA (que es la del equivalente), y restaría queTRANSENER modifique la impedancia del transformador entre 13.8 kV a 4.16 kV,agregando 0.00168+j0.02997 en base 100. Con estos cambios, los cá lculos decortocircuito darían los mismos resultados que el equivalente en las fallas simétricas. Enlas fallas asimétricas, el transformador de bloque del equivalente siempre es interpretadopor el PSS/E como perteneciente al grupo YNd, lo cual no es correcto en este caso.

Desarrollo de los Modelos de los Sistemas de ControlA partir de los datos suministrados por COES en el ANEXO 03 e informació ncomplementaria, es posible modelar un número reducido de equipamientos de control delos equipos de generació n, lo cual no resulta suficiente para desarrollar estudios con elgrado de detalle que requiere el propó sito de este proyecto.

Resulta necesario entonces, adoptar hipó tesis para modelar los sistemas de controlfaltantes, a fin de contemplar la influencia de estos equipos, sobre todo durante lasexcursiones de gran señal.

Una hipó tesis posible es asumir que los equipos reales presentan una respuestarazonablemente aceptable para cumplir su funció n, exhibiendo tiempos de crecimiento y deestablecimiento acordes a las prá cticas en la materia, con sobrepicos moderados.

Page 51: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 11/63

Tal hipó tesis dará por resultado sistemas de control “bien ajustados” para propó sitosgenerales, pero dicha respuesta podría ser insuficiente para tolerar fallas severas enlocalizaciones específicas. Si bien el suponer un desempeño razonable podría también“enmascarar” desempeños deficientes de algunos sistemas de control, se considera que elnúmero de unidades que pudieran caer en esta clasificació n debería ser menor, puestoque en la fase de puesta en marcha de los equipos, generalmente realizados por lospropios fabricantes, la respuesta de los sistemas de control se ajusta para exhibir unaevolució n al menos suave y bien amortiguada de las variables controladas, aunque no sepueda garantizar que tenga siempre la velocidad de respuesta necesaria.

Se ha verificado la respuesta de los sistemas de control de las unidades que tienendisponibles los pará metros de ajuste del regulador. Si la respuesta es aceptable, estospará metros se preservan en la base de datos, pero si la respuesta resulta oscilatoria seinforma la anormalidad y se modifican los pará metros de ajuste.

Para las unidades que no disponen de esta informació n, los ajustes se adoptaron parasatisfacer criterios de desempeño que son habituales en la prá ctica de los sistemas depotencia. Como guía para ajustar la respuesta de los sistemas de control en estos casos,se usaron los siguientes criterios:

Abreviaturas:

Tc : Tiempo de crecimiento (entre el 10 y el 90% del cambio de consigna)

T90%: Es el tiempo necesario para alcanzar por primera vez el 90 % del valor final

Sp: Sobrepico

Tp: Tiempo al primer pico positivo

Desempeño estipulado de los Sistemas de Excitación:

• Sistemas de Excitació n (SE) de Corriente Alterna (CA) para unidades grandes:

Tp = 0.750 – 0.850s; Tc = 0.325 – 0.375s; T90% = 0.450 – 0.550s; Sp <15%

• SE Brushless para unidades Diesel (Má s saturadas y de menor respuesta):

Tp = 0.900 – 1.100s; Tc = 0.400 – 0.450; T90% = 0.550 – 0.650s; Sp <15%

• SE Está ticos para todas las unidades:

Tp = 0.625 – 7.25; Tc = 0.275 – 0.325; T90% = 0.300 – 0.375s; Sp <15%

• SE de Corriente Continua para todas las unidades:

Tp = 1.200 – 1.400; Tc = 0.400 – 0.500; T90% = 0.625 – 0.725s; Sp <15%

Desempeño estipulado de los Sistemas de Regulación Carga – Frecuencia:

• Unidades TG:

Page 52: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 12/63

Tp = 4.0 – 6.0s; Sobrepico <30%. En unidades de mayor antigü edad se supone unarespuesta má s lenta.

• Unidades Diesel:

Tp = 15.0 – 17.0s; Sobrepico <30%

• Unidades TV:

Tp = 7.0 – 10.0s; según los estatismos, y en general mayores para las unidades má spequeñas. El sobrepico es <30%. Ante cambios de consigna del 2.5 al 5%, larespuesta exhibe el Tp postulado, pero para mayores cambios de consigna larespuesta aparece “saturada” debido al efecto de la caldera.

• Unidades Hidrá ulicas con algunos datos de los sistemas de control:

Tp = 5.0 – 9.0s; Sobrepico <30%

• Unidades Hidrá ulicas sin datos (con elementos de control supuestos):

Tp = 10.0 – 12.0s; Sobrepico < 30%

El desarrollo de los modelos se ha dividido en tres grupos para los generadores. El primergrupo tiene en cuenta los equipos que cuentan con datos aportados por los fabricantes omodelos usados en simulaciones previas; el segundo pertenece a una adaptació n demodelos descritos en una planilla del Anexo 03, de la cual no se conoce si los datos sincomentarios han sido previamente estimados, propuestos por el fabricante, resultado deensayos en campo, o de estudios previos; el tercer grupo está compuesto por datosestimados, de los cuales no se conoce ni la naturaleza de la tecnología, fecha defabricació n, etc.

Aná lisis de los datos particulares de cada una de las unidadesEn el ANEXO C4 – SISTEMAS DE CONTROL DE GENERADORES se detalla el aná lisisefectuado sobre cada una de las unidades. En el Anexo C4 consta un reporte de los datosde los modelos, incluyendo el modelo de la má quina síncrona, producido por la actividadDOCU del PSS/E.

Desarrollo de los Modelos de los Relés para el Rechazo de Carga/Generació nNo encontrá ndose disponibles en la librería de modelos Standard del simulador PSS/E lostipos de relés para el Rechazo de Carga/Generació n por subfrecuencia, mínima tensió n osobrefrecuencia, que representen correctamente el funcionamiento requerido, se handebido desarrollar modelos del Usuario ad hoc para representar los relés de alivios decarga propuestos. En el ANEXO C5 – modelos de usuario de relé s se detallan a través delas planillas típicas, los pará metros requeridos por los modelos desarrollados.

Page 53: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 13/63

CONCLUSIONESEsta versió n de la base de datos representa una aproximació n al sistema eléctrico enestudio, contemplando las diversas tecnologías y sobre todo, la respuesta que es deesperar de los sistemas de control con un desempeño aceptable.

Los pará metros de los generadores síncronos, representan una estimació n razonable paramuchos de los equipos encontrados en la industria, y permitirá n poner de manifiesto almenos, la naturaleza de su respuesta ante los fenó menos transitorios ocasionados por lasfallas, en dependencia de la ubicació n específica y severidad de las perturbació n, y lascondiciones operativas previas.

La documentació n de los pará metros es pormenorizada, indicando la naturaleza de cadadato, con el propó sito de sentar una primer referencia ante la ausencia de una base dedatos previa. Se ha perseverado en incluir aún datos que no son fá cilmente disponibles enlas bases de datos de los estudios eléctricos de sistemas de potencia, con el objeto deforzar a que se tengan en cuenta en ulteriores revisiones, recabá ndolos desde las fuentesdisponibles en las centrales y confrontá ndolos con esta primera aproximació n dereferencia.

Se han verificado todos los sistemas de control modelados, para asegurar que susrespuestas exhiban desempeños satisfactorios, descartando así la introducció n deproblemas de inestabilidad por oscilaciones no amortiguadas. Por lo tanto, las oscilacionesque pudieran originarse en las simulaciones deberían adjudicarse a “problemaspotenciales” de acoplamiento electromecá nico entre unidades, que deberían investigarsecon mayor profundidad mediante modelos contrastados por medio de ensayos en planta.

Se han desarrollado los modelos de Usuario para implementar en el simulador PSS/E querepresentan el funcionamiento de los relés propuestos para los esquemas de Rechazo deCarga/Generació n.

RECOMENDACIONESEsta primer versió n de la base de datos, debería ser revisada y paulatinamente mejoradacon informació n obtenida desde ensayos, informació n de los fabricantes, datos de placa,etc., hasta obtener una representació n conforme al sistema bajo estudio.

Se recomienda que esta primer versió n se tome como referencia, porque má s allá de lasimprecisiones que pudiera contener, posee una documentació n homogénea de todos loselementos, y consigna la naturaleza o fuente de cada dato.

Para controlar el contenido de la base de datos, se recomienda distribuir a losresponsables de las plantas de generació n una copia de los datos de los equipos queestá n bajo su control, para que éstos sean revisados por sus técnicos/especialistas,avalando u observando el contenido de manera fundada, y aporten la informació ndisponible a la luz de los requerimientos de esta primera referencia.

Page 54: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 14/63

En la primera revisió n, es recomendable también que los propietarios de las plantasadjunten datos característicos de los equipos, tal como el fabricante, modelo del equipo(para los sistemas de excitació n, controladores de turbina, etc.), y describan la tecnologíaempleada (para las excitatrices por ejemplo, debiera constar si son está ticas, de corrientealterna con rectificadores controlados, con rectificadores rotantes no controlados, decorriente continua, etc.). Esta informació n permitirá en una segunda fase, una mejorselecció n de los modelos de los sistemas de control para representar aquellos equipos queaún no cuentan con informació n respaldada por ensayos, y asociarles el desempeño quepuede esperarse de ellos:

Con los datos recabados de los propietarios de las plantas de generació n, debe realizarsela actualizació n de la informació n puntualizando rigurosamente la fuente de los nuevosdatos y el fundamento de los cambios.

Es conveniente revisar la representació n de los sistemas de control carga/frecuencia enPSS/E a partir de datos disponibles en otros simuladores, porque se pueden originaralgunos inconvenientes relacionados con la base de referencia que se utiliza. En PSS/E losmodelos está n referidos a la potencia base (MBASE), excepto en los modelos GAST2A yGASTWD (en general, aquellos que especifican TRATE), y en otros simuladores estopodría no ser así. De modo que los datos de estatismo, que por lo común se refieren a lapotencia mecá nica má xima de la unidad (debieran siempre referirse a la potencia nominalo de placa, al igual que el resto de los pará metros), deben convertirse a la MBASE enPSS/E. Los datos diversos desde los que se ha extraído la informació n, no permiten darcuenta de su origen y siempre se adoptó que estaban referidos a la potencia mecá nicamá xima. Para salvar estas inconsistencias, deberían especificarse claramente los datos alos responsables de las plantas para evitar malas interpretaciones, para caracterizaradecuadamente las respuestas de los equipos en el simulador.

Page 55: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 15/63

ANEXO C1 – GENERADORES SÍNCRONOS

Detalles particulares del aná lisis de cada grupo.Las conexió n con las planillas de pará metros (Tabla “Generadores Sincronicos”), sematerializa mediante el número de Item.Notas:1 El número de Item se refiere al designado en la planilla “ANEXO-01 INFORME

EDP.XLS”, en la solapa Má quinas Síncronas. Los condensadores síncronos se hanhecho correlativos a los generadores sincronos, y se han agregado itemsadicionales para indicar grupos nuevos.

2 Cuando se hace referencia a planillas EGASA, ELECTROPERU, etc., se refiere alas contenidas en los libros Excel “FICHA EGASA.XLS”, etc.

3 Se usan abreviaturas para indicar Snom: Potencia nominal (MVA), Pmax/Pmin:Potencia Má xima/Mínima (MW) cosϕ: factor de potencia.

4 Para indicar que una reactancia es saturada, suele añadírsele una “s” a su símbolo(x”qs), y la “u” para los valores no saturados (unsatured).

5 El número de Item se refiere al designado en la planilla ANEXO-01 INFORMEEDP.XLS, en la solapa Má quinas Síncronas

Item 1: CH CahuaLos datos del ELECTROPERU se contrastan con la informació n de ALSTOM, y secomplementan con datos estimados. La reactancia de secuencia inversa deALSTOM se reemplaza por una estimació n del valor saturado 0.5∗(x”d+x”q)∗0.835.La curva de capacidad en sobreexcitació n se adopta desde ALSTOM, y para lasubexcitació n se supone una característica recta típica de un limitador.

Item 2: CH Gallito CiegoSe completan los datos faltantes, y se estiman valores saturados para lasimpedancias de secuencia.

Item 3: CT Pascamayo, Grupos MANSe adopta un generador de polos salientes con reactancia de eje directo alta (1.6).

Item 4: CT Pascamayo, Grupos SulzerSe adopta un generador de polos salientes con reactancia de eje directo alta (1.6).La inercia se considera 2.5, por similitud de unidades de Snom> 4 MVA

Item 5: Pariac CH1Se modelan en 13.2 kV, pero la estimació n de la rN se conservó en 5.2 kV. Para lasunidades Hidro de PARIAC, se adoptan constantes de tiempo bajas. El resto es unaestimació n a partir de una baja reactancia síncrona (xd=90%). El factor de potenciay la potencia má xima se adoptan desde las Planillas de la Central CAHUA. Losdatos de la curva de capacidad se estimaron, porque superan la Snom.

Page 56: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 16/63

Item 6: Pariac CH2Idem comentarios Pariac CH1, excepto que la rN original se calculó para 0.440 kV.

Item 7: Pariac CH3AIdem comentarios Pariac CH1, excepto que la rN original se calculó para 0.440 kV.

Item 8: Pariac CH3NIdem comentarios Pariac CH1, excepto que la rN original se calculó para 0.440 kV.

Item 9: Pariac CH4 – G1Idem comentarios Pariac CH1, excepto que la rN original se calculó para 0.440 kV.

Item 10: Pariac CH4 – G2Idem comentarios Pariac CH1, excepto que la rN original se calculó para 0.440 kV.

Item 11: CH Callahuanca, grupos G1, G2 y G3Los datos provienen de un estudio de CESI y aunque no hay datos de saturació n,los pará metros lucen como no-saturados y se interpretan como tales. La resistenciade armadura está fuera de rango, y se corrigió suponiendo que estaba en %. Seconsidera que los datos de curvas de capacidad desde la Planilla de EDEGEL noson consistentes, y se adoptan curvas estimadas conforme a las potencias má ximasde los 3 grupos.

Item 12: CH Callahuanca, grupo G4Los datos se toman desde un estudio de CESI, y aunque no hay datos desaturació n, los pará metros lucen como no-saturados, y se interpretan como tales. Sereemplaza xd=1.60 por xd=1.30, porque se considera fuera de rango en relació n alresto de los pará metros. También se reemplazó la resistencia de armadura por unvalor estimado. Se considera que los datos de curvas de capabilidad desde laPlanilla de EDEGEL no son consistentes y se adopta una curva estimada.

Item 13: C.H. ChimayEn CHIMAY se adoptó la Snom en 85 MVA conforme a los datos de la curva decapabilidad (90 MVA de la planilla de EDEGEL es la capacidad en sobrecarga). LaPmax también se adoptó desde dichas planillas. Es sospechoso T’do tan alto, y elvalor de X’d que parece corresponder al valor saturado por la escasa diferencia conX”d no-saturado. No obstante, se respetan los valores preexistentes, puesto que nointroducirá n conflictos con la representació n matemá tica. La curva de capabilidad setoma del diagrama (ANEXO 03).

Item 14: CH Huampani G1 y 2Se estiman los valores faltantes al igual que la curva de capacidad, puesto que losvalores contenidos en la planilla de EDEGEL no lucen consistentes.

Item 15: CH Huinco G1 a G4Las reactancias parecen valores no-saturados, por lo tanto se estiman los valoressaturados faltantes (x1, etc.). Las cuatro unidades difieren únicamente en la Pmax.

Page 57: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 17/63

Los datos de las curvas de capacidad lucen no consistentes en la planilla deEDEGEl, y se las reemplaza por valores estimados.

Item 16: CH Matucana, G1 y 2Se corrige la resistencia de armadura, porque se presume que está en %. Los datosde las curvas de capacidad lucen no consistentes en la planilla de EDEGEl, y se lasreemplaza por valores estimados.

Item 17: CH MoyopampaCambia la Snom desde 30 a 35MVA según planillas de EDEGEL. Se corrigió laresistencia de armadura considerando que estaba expresada en %, y se adoptaronlas curvas de capacidad consistentes con 35 MVA referidos a la Pmax de cadaunidad. Los datos de las curvas en la planilla de EDEGEL no lucen consistentes, yse estimaron.

Item 18: CT Santa Rosa A, grupos UTI5 y 6Xq no debe ser mayor que xd, y se corrige como xq=0.96xd. El valor de x’d y x”d esrelativamente bajo, por lo que se consideran valores saturados. Por lo tanto, se losreemplaza por una estimació n de los valores no-saturados. Los datos de la curva decapacidad se estiman para la Pmax porque en la planilla de EDEGEL no lucenconsistentes. Se supone que la constante de inercia 7.31 kgm2 corresponde a J(WR2) en lugar de GD2, porque de lo contrario resultan valores fuera de rango paraunidades turbogas convencionales.

Item 19: CT Santa Rosa, grupos BBC2 y 3De acuerdo a su potencia, se estima xd=220, y H=9, considerando que la turbinatiene mayor número de revoluciones. Los datos de la curva de capacidad se estimanpara la Pmax porque en la planilla de EDEGEL no lucen consistentes para lapotencia de las unidades. Se supone que la constante de inercia 2.12 kgm2corresponde a J (WR2) en lugar de GD2, porque de lo contrario resultan valoresfuera de rango para unidades turbogas convencionales.

Item 20: CT Santa Rosa, grupos BBC4T”qo se divide por 10, considerando un error tipográ fico. Se modifican los valores dex”q considerando un 5% má s de x”d para calcular x2 como 0.5*(x”d+x”q)*0.835. Losdatos de la curva de capacidad se estiman porque en la planilla de EDEGEL nolucen consistentes. Se supone que la constante de inercia 2.85 kgm2 corresponde aJ (WR2) en lugar de GD2, porque de lo contrario resultan valores fuera de rango paraunidades turbogas convencionales.

Item 21: CT Santa Rosa nueva (Westinghouse)Se estimó la inercia en 7, y se modificaron los valores de x1 y x2 considerando losvalores saturados a partir de x”d (x1 se toma como 0.82*xd, y x2 como en el item20.Se supuso un valor de resistencia de neutro, porque la informació n no da cuenta deello, y un generador de este tamaño seguramente debe tenerla. Los datos desaturació n se verificaron con las curvas del ANEXO 03, de donde también se sacó la

Page 58: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 18/63

curva de capacidad. Se supone que la constante de inercia 14.29 kgm2 correspondea J (WR2) en lugar de GD2, porque de lo contrario resultan valores fuera de rangopara unidades turbogas convencionales.

Item 22: CH YanangoSe corrige el valor de Snom, a partir de la informació n de EDEGEL. Los datos de lacurva de capacidad se toman desde el ANEXO 03, los cuales no coinciden con lasplanillas de EDEGEL. Algunos datos diná micos difieren de los contenidos en elANEXO 03, pero se adoptan los del ANEXO 01. La Vnom original (13.8 kV) fuereemplazada por 10.0 kV

Item 23: CT Malacas, grupo TG4Se modificó x2 por un valor en concordancia con x”d. Del Anexo 03 se adoptó lacurva de capacidad má s restrictiva (modificada con comentarios en la hoja) y laresistencia estató rica, pero no se le impuso ningún límite de seguridad. Los datos ensobrexcitació n en la planilla de EEPSA no son consistentes. También de esteANEXO se obtuvieron datos no saturados desde una má quina similar (AGUAYTIA),que sirvieron de referencia para la estimació n. Los datos de la curva de saturació nse obtuvieron del Infome Nº 8.

Item 24: CT Malacas, grupos TG1, 2 y 3Se estimaron todos los valores, excepto la tensió n, potencia y el cosϕ. Los datos dela curva de capacidad de la planilla de EEPSA se reemplazaron por valoresestimados porque son muy restrictivos en relació n a la capacidad de la unidad. Laconstante de inercia H se estimó partiendo de las características suministradas porEEPSA, las constantes de inercia de la turbina, reductor y suponiendo que la delalternador es un 30% de la de la turbina (en kgm2).

Item 25: CH Charcani IAdemá s de estimar valores faltantes, se modifica la reactancia x2 considerando lax1 saturada y una x”q estimada. La Snom se modifica al valor de la planilla deEGASA. Se considera que H es 1.6, similar al dato de la unidad Charcani 3S. Losdatos de la curva de capacidad se estiman a cosϕ=0.95.

Item 26: CH Charcani IISe adopta H=1.6, similar al de la unidad Charcani 3S. Los datos de la curva decapacidad se estiman a cosϕ=0.95.

Item 27: Charcani IIIASe estiman datos faltantes, y se supone Sn=2.864 tanto para esta unidad como parala siguiente de Charcani III (3A y 3S). Los datos de la curva de capacidad seestiman a cosϕ=0.80.

Item 28: Charcani IIISVer anterior.

Item 29: Charcani IV

Page 59: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 19/63

Se modifica la Snom a 6.75 como en la planilla de EGASA. Los datos de la curva decapacidad se estiman a cosϕ=0.95.

Item 30: Charcani VISe modifica la Snom a 10.8, según planilla de EGSA Los datos de la curva decapacidad se estiman a cosϕ=0.95.

Item 31: Charcani VLos datos del Anexo 01 se complementaron con xq, x2 (no saturada), xd saturada ylas constantes de tiempo subtransitorias a circuito abierto provistas por ABB Alstom.Se estimó la reactancia de dispersió n, y se descartó el valor de x0 reemplazá ndolopor un valor coherente con x”d; x2 saturado se estimó a partir del valor no saturado.La inercia se adoptó del cá lculo del GD2 y el número de vueltas. Se extrajeron datosde la curva de capacidad del ANEXO 03, y de éste se confirmaron los valores nosaturados de xd, x’d y x”d, y de T’do.

Item 32: Máquina síncrona convertidora de frecuencia, lado 50 HzEste modelo y el siguiente, se representaran en conjunto en el modelo FRECHG, demodo que los pará metros deben extraerse de los estimados aqui.

Item 33: Máquina síncrona convertidora de frecuencia, lado 60 HzVer anterior.

Item 34: CT Chilina, grupos SLZ1 y 2Se estimaron los pará metros necesarios, se corrigió r1 porque estaba fuera derango, para x1 se estimó el valor saturado de x”d; el valor de x2 y x0 estaban fuerade rango. Los datos de la curva de capacidad de la planilla de EGASA no lucenconsistentes y se estimaron.

Item 35: CT Chilina CCSe estimaron todos los valores. Los datos de la curva de capacidad no lucenconsistentes para el tipo de unidad (|Qcapacitivo| > |Qinductivo|) y se estiman.

Item 36: CT Chilina TV1Esta unidad está trabajando a 50 Hz. Aunque se conserva, es llamativa la altainercia y se sospecha que se podría deber a una inercia equivalente en 60 Hz, queinvolucre la constante de inercia de la unidad conversora, aunque aún así parecealta. Los datos de la curva de capacidad no lucen consistentes para el tipo deunidad (|Qcapacitivo| > |Qinductivo|) y se estiman.

Item 37: CT Chilina TV2Idem anterior.

Item 38: CT Chilina TV3Se reemplaza x2 por un valor estimado de x2 saturado, coherente con un valor dex1 (igual a x”d saturado). Los datos de la curva de capacidad no lucen consistentespara el tipo de unidad (|Qcapacitivo| > |Qinductivo|) y se estiman.

Item 39: CT Mollendo, grupos D01 a D03

Page 60: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 20/63

Se estimaron los pará metros faltantes.Item 40: Mollendo TG

Se mejoraron datos obtenidos desde planillas de Alstom en un informe de EGASA alCOES (GG/TC-074/99-EGASA)(Carpeta 34), los cuales está n indicadosexplícitamente. El resto de los datos se adoptó desde el ANEXO 01 de COES. Lacurva de capacidad se relevó del ANEXO 03.

Item 41: Dolorespata ALCO1 y 2Se estimaron todos los datos. Se adoptó Pmax aunque supere la capacidad delalternador, pero se descartan los valores de la curva de capacidad porque superanampliamente Snom.

Item 42: Dolorespata GM1 a 3Se estimaron todos los datos. Se adoptó Pmax aunque supere la capacidad delalternador, pero se descartan los valores de la curva de capacidad porque superanampliamente Snom.

Item 43: Dolorespata SLZ1Se estimaron todos los datos. Se adoptó Pmax aunque supere la capacidad delalternador, pero se descartan los valores de la curva de capacidad porque superanampliamente Snom.

Item 44: Dolorespata SLZ2Se estimaron todos los datos. Se adoptó Pmax aunque supere la capacidad delalternador, pero se descartan los valores de la curva de capacidad porque superanampliamente Snom; éstos se estimaron.

Item 45: CH HercaSe estimaron todos los datos. Se descartan los valores de la curva de capacidadporque superan ampliamente Snom.

Item 46: CH MachupichuEn Machupichu se accedió a los datos de la renovació n de la central, obteniendoalgunos valores saturados aptos para los estudios de cortocircuito, y los valores nosaturados para los estudios de estabilidad. Resulta llamativo el valor de x”q, el cualindicaría que no dispone de anillos amortiguadores continuos. No obstante, el valorde la constante de tiempo T”q es significativo y hace presumir que el amortiguadorestá presente. Por esta razó n, se estima que existe el amortiguador, que x”q tomalos valores habituales, de modo que x2 se modifica considerando estas hipó tesis.También se obtiene de este informe la curva de capacidad, y se verifica que lasaturació n en las curvas de ensayos es representativa del valor del ANEXO 01 paratodas las unidades. Se constata que los pará metros del alternador en el ANEXO 03son valores saturados, y algunos difieren levemente de los contenidos en los datosde la renovació n de la central.

Item 47: CH Cañó n del Pato

Page 61: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 21/63

Los valores del Informe 8 en planillas de ABB no coinciden en general con losvalores del “ANEXO-INFORME 01-EDP.xls”, pero si con los valores saturadospublicados en el Anexo 03, en una planilla de ABB Hydro. Es sospechoso que estacoincidencia de sus valores numéricos se logre con bases diferentes de potencia (enel Anexo 03 es de 42.810 y en esta última informació n es de 43.260 MVA). Comocriterio, se adoptaron los valores NO saturados correspondientes en el Anexo 03,considerando el mismo valor numérico como si la base de referencia fuese de43.260 MVA. El dato de la impedancia de puesta a tierra del centro de estrella seadopta del plano adjunto a la informació n. La resistencia estató rica tiene un valorfuera de rango, y se conserva el del “ANEXO-INFORME 01-EDP.xls”. El estudio queconsta en el Anexo 03: “Deflector Governing Gains–Rev.1” y el diagrama de bloquesque lo acompaña, informan una inercia expresada en base al tiempo de arranque olanzamiento (Ta=5.33 s → H=2.532 s) que difiere del que aparece en la planilla dedatos de ABB (J=90 Tm2 → H=1.478 s). Se asume que este último valorcorresponde só lo al rotor, y que el otro (2.532 s) agrega la inercia de las dosturbinas que está n acopladas a cada generador. La curva de capacidad se toma delAnexo 03 para cosϕ=0.95, y se verifican los datos de saturació n de una grá fica deensayo. Se estiman los valores faltantes.

Item 48: CH CarhuaqueroSe corrigió la Snom que figuraba en ANEXO 01 (27.8 MVA del año 1991) por elúltimo dato (32.27 del año 1999, aparentemente repotenciada) del ANEXO 03. Noobstante, los pará metros conocidos corresponden a la potencia anterior, por lo tanto,se los corrige a la nueva base. Del Anexo 03 se obtuvo también la curva decapacidad, verificando los datos para Pmax.

Item 49: CT Chiclayo Oeste, grupos GMT1 a 3Se adoptaron Pmax y Pmin para cada unidad desde planilla de EGENOR. Los datosde la curva de capacidad no lucen consistentes y se estimaron. Cambia la potenciay tensió n nominales de las unidades. Desde informació n suministrada por la centralChiclayo, se obtiene los datos de la potencia y tensió n nominal, diferentes a los delAnexo 01. Para las unidades GMT1-2, se obtuvo desde la informació n de la centraldatos de la cte. de tiempo transitoria de eje directo de circuito abierto, y lasreactancias xd, x’d, x”d, x2 y x0. De esta fuente también se obtuvieron las mismasreactancias para el grupo GMT3. En ambos casos, se estimaron los datos faltantes.

Item 50: CT Chiclayo Oeste, grupos SLZ1 y 2Se estimaron todos los valores, adoptando Pmax y Pmin para ambas unidadesdesde planilla de EGENOR. Los datos de la curva de capacidad no lucenconsistentes y se estimaron. Desde informació n suministrada por la central, semodificó la tensió n nominal.

Item 51: CT Chimbote, grupos TG1 y 2La tensió n nominal se reemplazó a 13.8 kV, según los datos de placa. La Pmax enlas TG1 y 2 se obtuvieron de las planillas de EGENOR. Los datos del Anexo 01 se

Page 62: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 22/63

desestimaron, puesto que corresponden a la unidad TG3, fabricada por GE. Por lotanto, se estimaron todos los datos en semejanza a la unidad de Trujillo Sur, que sibien tiene tensió n nominal diferente, está construida por el mismo fabricante (Brush).

Item 52: CT Chimbote, grupo TG3La tensió n nominal se reemplazó a 13.8 kV, según los datos de placa. Seexaminaron los datos provistos por el fabricantes (GE) y se confirmaron la mayoríade las impedancias, pero se reemplazaron las reactancias saturadas de secuenciapositiva, negativa y cero, la reactancia subtransitoria de eje en cuadratura y laresistencia de armadura. Las curvas de saturació n y de capacidad también seobtuvieron a partir de datos de GE. La Pmax se obtuvo de la planilla de EGENOR.

Item 53: CT Paita 1, grupos EMD1 a 3Se estimaron todos los valores, adoptando Pmax y Pmin desde planillas deEGENOR. La tensió n nominal se corrige a 4.16 kV. Los datos de la curva decapacidad no lucen consistentes y se estimaron.

Item 54: CT Paita 2, grupos SKODA1 a 3Se estimaron todos los valores, adoptando Pmax y Pmin desde planillas deEGENOR. Los datos de la curva de capacidad no lucen consistentes y se estimaron.

Item 55: CT Piura 2, grupo MIR1Se estimaron todos los valores, adoptando Pmax y Pmin desde planillas deEGENOR. Los datos de la curva de capacidad no lucen consistentes y se estimaron.La tensió n nominal es 5.0 kV según datos de la central, pero se deja la establecidaen los unifilares (4.8 kV)

Item 56: CT Piura 2, grupo MIR4Se estimaron todos los valores, adoptando Pmax y Pmin desde planillas deEGENOR. Los datos de la curva de capacidad no lucen consistentes y se estimaron.La tensió n nominal es 5.0 kV según datos de la central, pero se deja la establecidaen los unifilares (4.8 kV)

Item 57: CT Piura 2, grupo MIR5Se estimaron todos los valores, adoptando Pmax y Pmin desde planillas deEGENOR. Los datos de la curva de capacidad no lucen consistentes y se estimaron.La tensió n nominal es 5.0 kV según datos de la central, pero se deja la establecidaen los unifilares (4.8 kV)

Item 58: CT Piura TGLa capacidad del alternador de la unidad se obtiene desde informació n de lascaracterísticas nominales de la unidad (Informe Nº 22). Se estiman todos losvalores, siguiendo los valores saturados xd y x’d del Informe Nº 27, excepto Pmax yPmin que se adoptan desde la planilla de EGENOR. Los datos de la curva decapacidad de esta planilla son notablemente bajos y se prefiere una estimació n devalores típicos.

Item 59: CT Piura 1, grupo GMT1 y GMT2

Page 63: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 23/63

Se estimaron todos los valores, adoptando Pmax y Pmin para cada unidad desdeplanilla de EGENOR. Los datos de la curva de capacidad no lucen consistentes y seestimaron. La tensió n nominal es 10.5 kV según datos de la central, pero se deja laestablecida en los unifilares (10.0 kV), en virtud de que funcionan en una mismabarra con otras unidades cuya tensió n nominal es 10 kV.

Item 60: CT Piura 1, grupo MANSe estimaron todos los valores, adoptando Pmax y Pmin desde planilla deEGENOR. Se estimaron los datos de la curva de capacidad.

Item 61: CT Piura 1, grupo SWDSe estimaron todos los valores, adoptando Pmax y Pmin desde planillas deEGENOR. Los datos de la curva de capacidad no lucen consistentes y se estimaron.

Item 62: CT Santiago del CAO (Trupal), grupo TVSe reemplaza los valores x”q=x2=x1=x”d no saturada, por estimaciones razonablespara x”q, y de valores saturados para x1, x2. El valor de Pmax se adoptó de laplanilla de EGENOR, y los datos de la curva de capacidad se estimaron porque nolucían consistentes.

Item 63: CT Sullana, grupos ALCO1 a 4Se estimaron todos los valores, adoptando Pmax y Pmin para cada unidad desdeplanillas de EGENOR. La tensió n nominal se corrige a 4.16 kV. Los datos de lacurva de capacidad no lucen consistentes y se estimaron.

Item 64: CT Trujillo SUR, grupo Trujillo TGDe los datos de placa, se corrigió la tensió n nominal a 10.0 kV. Se examinaron losdatos provistos por el fabricante del alternador (BRUSH): xd, x’d, x”d, x2, x0, T’do yresistencia de armadura, y se completaron los datos faltantes a partir de una unidadde similares características, reemplazando los datos del Anexo 01 quecorrespondían a la unidad TG3 de Chimbote, fabricada por GE. Estos datos está nen un documento de John Brown Engineering (Informe 21). De la descripció n, seobtuvo también la curva de saturació n en vacío del campo principal. La curva decapacidad del informe de J.Brawn corresponde a una má quina de mayor tamaño(30.4 MVA), y no figura explícitamente su correspondencia con unidad alguna, por lotanto se estiman los datos de capacidad en funció n del tipo de unidad y factor depotencia. El valor de Pmax se adoptó de la planilla de EGENOR

Item 65: CH Aricota I, grupos G1 y G2Se toman en cuenta las potencias má ximas individuales. Los datos de la curva decapacidad se estimaron porque no lucen consistentes en la planilla de EGESUR.

Item 66: CH Aricota IIEl grupo de Aricota2 se estimó igual a los de Aricota1, excepto la inercia H cuyodato se da. La curva de capacidad se estimaró porque los datos no lucenconsistentes en la planilla de EGESUR.

Item 67: CT Calana, grupos GD1 a GD4

Page 64: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 24/63

Se reemplazan x1 y x2 por una estimació n de valores saturados. El resto de lospará metros son originales. Los datos de la curva de capacidad fueron reemplazadospor valores estimados, porque no lucen consistentes en la planilla de EGESUR.

Item 68: CT Moquehua, grupos GD1 y 2Se estimaron todos los valores, excepto Pmax y Pmin. Los datos de la curva decapacidad fueron reemplazados por valores estimados, porque no lucenconsistentes en la planilla de EGESUR.

Item 69: CH Malpaso, grupos G1 a G4Se corrigieron valores de x”d y los pará metros asociados. Los datos de la curva decapacidad no lucen consistentes, y se estimaron en relació n con la Pmax de cadaunidad.

Item 70: CH Oroya, grupos G1 a G3El valor de xd es muy bajo, y los valores de x’d=x”d no son aceptables. Se consideraconveniente estimar todo el conjunto de valores partiendo de xd=90. La inercia seconserva. Los datos de la curva de capacidad no lucen consistentes, y se estimanen relació n con la Pmax de cada grupo.

Item 71: CH Pachachaca, grupos G1 a G4El valor de xd es muy bajo, y los valores de x’d=x”d no son aceptables. Se consideraconveniente estimar todo el conjunto de valores partiendo de xd=90. La inercia seconserva. Los datos de la curva de capacidad no lucen consistentes, y se estimanpara cada grupo.

Item 72: CH Yaupi, grupos 1 a 5Se consideran adecuados los pará metros H, xd y x’d. El pará metro x”d está fuera derango en relació n con x’d. Se estima por lo tanto x”d y el resto de los pará metrosfaltantes.

Item 73: CH Mantaro II (Unidades 1 a 4)Los valores se adoptan desde la planilla “Maquinas_(021003)_PREP.xls”. El valorde r1 está fuera de rango y se presume que estaba expresado en %. Se reemplazael valor de x1 por una estimació n de x”d saturada, al igual que x2; la reactancia dedispersió n se corrige en relació n a la x”d saturada. Del ANEXO 03 se adopta lacurva de capacidad con las siguientes consideraciones: El límite en la regió n desobreexcitació n se adopta de la curva pues se observa correspondencia con losdatos de la planilla de ELECTROPERU. En subexcitació n los datos de la planilladifieren bastante de la curva, por lo que se considera responden a la característicade un limitador de subexcitació n, la cual se supone recta y pasante por los puntosMínimo Técnico, 50% y 100% de la planilla de ELECTROPERU.

Item 74: CH Mantaro I (Unidades 5 a 7)Se adoptan Idem a Mantaro II, según “Maquinas_(021003)_PREP.xls” (columnaobservaciones). La curva de capacidad se adopta igual que la de las unidades 1 a 4

Page 65: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 25/63

con respecto a la capacidad del alternador. Esto determina que para la diferentepotencia activa má xima de estas unidades, la potencia reactiva sea diferente.

Item 75: CH Restitució nSe modifican x1, x2 y x0 estimando la influencia de la saturació n, y se corrige lainercia según la planilla “Maquinas_(021003)_PREP.xls”. Los datos de la curva decapacidad del ANEXO 03 (tomada desde la CH Mantaro, pero adecuando la Snom)se compararon con la planillas de ELECTROPERU, resultando que es má srestrictiva. Por seguridad se adopta la curva de capacidad del ANEXO 03. De esteanexo se toma la curva de saturació n en vacío (Ensayo Nº 27 y 219), reemplazandolos valores de saturació n anteriores.

Item 76: CT Tumbes NuevaSe completan los datos a partir de la planilla “Maquinas_(021003)_PREP.xls”: T’do,xd, xq, x’d, x”d y H. El valor de x1 se estima como un valor saturado de x”d, sedescarta x”q porque es menor que x”d, y se estiman los valores restantes enrelació n a los datos existentes. Los datos de la curva de capacidad no lucenconsistentes en la planilla de ELECTROPERU, y se estiman.

Item 77: CT ILO 2Se corrige xq a un valor típico en relació n xd; los valores restantes se han adoptadode la informació n detallada de la central. La curva de capacidad se toma desde elANEXO 03, tomando de la grá fica la parte de sobreexcitació n y desde el informeadjunto (CESI) la característica del limitador para la regió n de subexcitació n. Estacaracterística de limitació n es levemente má s restrictiva que la del diagrama(ANEXO 4B, UEL CHARACTERISTICS). Se observa que en la planilla de ILO2 losdatos del rango capacitivo no son consistentes, y que en el rango inductivo sonlevemente mayores a los valores adoptados.

Item 78: CT ILO1, grupo CATKATOSe estimaron todos los datos incluyendo a la curva de capacidad.

Item 79: CT ILO1, grupo TG1Se corrige x’d saturada a no-saturada, el valor de x’q era saturado y se estimó unvalor no-saturado, se corrigió el valor de x”d desde saturado a no saturado. El valorde x2 saturado es sospechoso por ser menor a x1 saturado, al igual que x”qsaturada, por lo tanto, se adopta x2=x1 para valores saturados. Se corrigen losvalores de rN al de las planillas de ILO “Características de los Generadores”. Seestima una curva de capacidad ajustada aproximadamente a los datos de la planillade ENERSUR.

Item 80: CT ILO1, grupo TG2Se corrige x’d saturada a una estimació n del valor no-saturado, el valor de x’q erasaturado y se estimó un valor no-saturado, se corrigió el valor de x”d desde saturadoa no saturado. El valor de x2 saturado se estimó . Se corrigen los valores de rN a lasplanillas de ILO “Características de los Generadores”. Los datos de la curva de

Page 66: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 26/63

capacidad estimados se aproximan al único dato disponible en la planilla deENERSUR. Se supuso la cte. de inercia típica para una unidad del tipoaeroderivada.

Item 81: CT ILO1, grupo TV1 y TV2Se adoptan valores típicos para T’qo y T”qo, aceptando T’do y T”do. Se estima x’dno saturada a partir del saturado, al igual que el de x”d. Se considera desde elesquema de ILO, que la rN es de 53 ohm en lugar de 5.2. Se observa en la planillade ENERSUR que los datos de la curva de capacidad no son consistentes, y seadoptan valores estimados acordes a las características de la unidad.

Item 82: CT ILO1, grupo TV3Se reemplazo x’d por el valor no saturado, se estimó el valor no saturado de x’q, sereemplazó x”d por el valor no saturado, y se estimó el valor de x2. Los datos de lacurva de capacidad estimados son aproximados a los datos disponibles en la planillade ENERSUR para el estado de sobreexcitació n.

Item 83: CT ILO1, grupo TV3Se reemplazo x’d por el valor no saturado, se estimó el valor no saturado de x’q, sereemplazó x”d por el valor no saturado y se estimó el valor de x2. Los datos de lacurva de capacidad estimados son aproximados a los datos disponibles en la planillade ENERSUR para el estado de sobreexcitació n.

Item 84: Ventanilla TG SiemensLos valores se comparan con datos de unidades TG de SIEMENS de mó dulosemejante, se reemplazan valores fuera de rango y estiman pará metros nosaturados. X’d se reemplaza por una estimació n del valor no saturado, x’q está fuerade rango y se estima un valor no saturado razonable, las constantes de tiempo sonrelativamente bajas para el tamaño de la unidad, por lo que se estiman valoresnuevos. Los factores de saturació n corresponden a grupos de tamaño semejante deSIEMENS.La constante de inercia del grupo se estima 4 veces el valor dato, considerando unposible error de interpretació n en la inercia de las masas rotantes (WR2 por GD2), yaque de la descripció n suministrada por ETEVENSA las unidades no sonaeroderivadas (en cuyo caso la inercia sería relativamente baja).

Item 85: CH BotiflacaSe elimina de la Base de Datos por sugerencia de COES.

Item 86: CH CurumuyCurumuy no tiene má s antecedentes que la planilla Gen32_7_02.xls, por lo que seestiman todos los datos, excepto Snom, Unom y cosϕ.

Item 87: CT Paramonga ASe elimina de la Base de Datos por sugerencia de COES.

Item 88: CT Paramonga B

Page 67: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 27/63

Se elimina de la Base de Datos por sugerencia de COES.Item 89: CT Paramonga C

Se elimina de la Base de Datos por sugerencia de COES.Item 90: CH Rumipunco

Se elimina de la Base de Datos por sugerencia de COES.Item 91: CT Bella Vista, Grupo ALCO

Se estiman todos los datos del grupo ALCO de la CT Bella Vista, excepto Snom,Vnom, cosϕ, Pmax y Pmin. Los datos de la curva de capacidad no lucenconsistentes y se estimaron. La Vnom original (4.16 kV) fue reemplazada por 2.4 kV

Item 92: CT Bella Vista, grupo DeutzSe estiman todos los datos del grupo Deutz de la CT Bella Vista, excepto Snom,Vnom, cosϕ, Pmax y Pmin. Los datos de la curva de capacidad no lucenconsistentes y se estimaron. La Vnom original (4.16 kV) fue reemplazada por 2.4 kV

Item 93: CT Bella Vista, grupos MANSe estiman todos los datos de los grupos MAN de la CT Bella Vista, excepto Snom,Vnom, cosϕ, Pmax y Pmin. Los datos de la curva de capacidad no lucenconsistentes y se estimaron.

Item 94: San Gabán IISe estimaron los pará metros faltantes y se considero que x”d es no saturada, por locual se estimaron pará metros de los valores saturados. La Pmin se estimó . Losdatos de capacidad de las planillas de SAN GABAN no son consistentes, y seadoptaron desde la curva de capacidad del ANEXO 03, considerando que ensubexcitació n la característica está impuesta por una recta de limitació n.

Item 95: CT San Rafael grupos 1 a 3La Planilla de San Gaban para la CT San Rafael está vacía, de modo que seestiman todos los pará metros (a excepció n de Snom, Vnom y cosϕ), incluyendo aPmax y Pmin de los grupos 1 a 3.

Item 96: CT San Rafael grupos 4 a 7La Planilla de San Gabá n para la CT San Rafael está vacía, de modo que seestiman todos los pará metros (a excepció n de Snom, Vnom y cosϕ), incluyendo aPmax y Pmin de los grupos 4 a 7.

Item 97: CT Taparachi – MAN1Se estimaron todos los pará metros de MAN1 (a excepció n de Snom, Vnom y cosϕ,Pmax y Pmin). Los datos de la curva de capacidad no lucen consistentes y seestimaron.

Item 98: CT Taparachi – MAN3 y 4

Page 68: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 28/63

Se estimaron todos los pará metros de MAN3-4 (a excepció n de Snom, Vnom ycosϕ, Pmax y Pmin). Los datos de la curva de capacidad no lucen consistentes y seestimaron.

Item 99: CT Taparachi – SKODA1 y 2Se estimaron todos los pará metros de SKODA 1–2 (a excepció n de Snom, Vnom ycosϕ, Pmax y Pmin). Los datos de la curva de capacidad no lucen consistentes y seestimaron.

Item 100: Tintaya MAN1 a MAN8Se estimaron todos los pará metros de MAN 1 a 8, a excepció n de Snom, Vnom,Pmax y Pmin. Los datos de la curva de capacidad se estimaron porque no lucenconsistentes.

Item 101: CT San Nicolás, Grupo DieselSe estimaron todos los pará metros del grupo Diesel, a excepció n de Snom, Vnom ycosϕ.

Item 102: San Nicolá s TV1 y TV2Se estimaron las ctes. de tiempo T’qo y T”qo. El valor de x’d se reemplazó por unaestimació n del valor no-saturado, igual para el valor de x”d. R1 y r2 se adoptarondesde datos aproximados de GE para estas unidades en la carpeta 38. Para elcá lculo de x2, llama la atenció n que el valor de x”q sea tan inferior al de x”d, por esose lo descarta y se prefiere estimar x”q no saturado. É ste, junto con el valor de x”d yconsiderando una saturació n razonable se obtiene x2. La curva de capacidad seobtuvo del ANEXO 03, que coincide con las planillas de SHOUGESA para la unidadTV2; la unidad TV1 presenta anomalías para los valores del 50%, por lo que se lodesestima y se adoptan los valores de TV2.

Item 103: CT San Nicolás TV3Se estimaron las ctes. de tiempo T’qo y T”qo. El valor de x”d se reemplazó por unaestimació n del valor no saturado, la r1 se supuso que estaba expresada en ohms.La curva de capacidad se obtuvo del ANEXO 03 confirmando aproximadamente losdatos de las planillas de SHOUGESA.

Item 104: CT Aguaytia 1 y 2Se corrigió el valor de xq como una aproximació n de xd. Se reemplazó x’d y x”d porlos valores no saturados. Se corrigió xl por un valor estimado porque resultabamayor a x”d. X2 se estimó para una relació n típica con x”d. Los datos saturados setomaron como referencia desde MALACAS, y las reactancias no saturadas seobtuvieron de datos del fabricante en el ANEXO 03. La curva de capacidad seadopta también de este ANEXO 03, verificando que coincide con la planilla deAGUAYTIA ENERGY.

Item 105: CT Verdun, grupos V8 y V9Se elimina de la Base de Datos porque no figuran en unifilar de COES

Item 106: CT Para

Page 69: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 29/63

Se elimina de la Base de Datos por sugerencia de COES.Item 107: Compensador Síncrono de Independencia

Se consideró que x’d y x”d eran saturados, por lo cual se estimaron valores nosaturados.

Item 108: Compensador Síncrono de AntaminaSe consideró que x’d y x”d eran saturadas, por lo cual se estimaron valores nosaturados. Del ANEXO 03 se precisó la informació n de la cte. de inercia “H”, laresistencia estató rica y los datos de la curva de capacidad.

Item 109: CT Mercedes, grupos EMD1 y 2Se elimina de la Base de Datos porque no figuran en unifilar de COES

Item 110: CT Mercedes, grupo SKODASe elimina de la Base de Datos porque no figuran en unifilar de COES

Item 111: CT ZarumillaSe elimina de la Base de Datos porque no figuran en unifilar de COES

Item 112: CH ChaprinSe modelaron tres unidades en 2.4 kV, de 2.25 MVA y cosϕ=0.90. Se supusierontodos los datos incluso la curva de capacidad.

Item 113: CH MarcopampaSe modeló una unidad en 4.16 kV, de 1.425 MVA y cosϕ=0.90. Se supusieron todoslos datos incluso la curva de capacidad.

Item 114: CH HuanchorSe emplearon los datos publicados en “Maquinas_(021003)_PREP.xls”, y seestiman el resto de los pará metros faltantes, incluso la curva de capacidad.

Item 115: CT CyprusSe estimaron todos los pará metros y curva de capacidad para un grupo turbogas de18.75 MVA, cosϕ=0.80, tensió n nominal 10 kV y Pmax de 15 MW. También seestimó la Pmin.

Item 116: CT ArcataLos datos indican cuatro unidades de 0.430 MVA, cosϕ=0.80 y 0.460 kV. Se hace unequivalente en 0.46 kV con todos los datos estimados.

Item 117: CH MisapuquioLos datos indican dos unidades de 2.30 MVA, cosϕ=0.80 y 0.660 kV. Se estimantodos los pará metros, la curva de capacidad y la potencia mínima.

Item 118: CT AresLos datos en la planilla “Maquinas_(021003)_PREP.xls” indican seis unidades de1.060 MVA, cosϕ=0.80 y 0.460 kV. Se hace un equivalente en 0.46 kV con todos losdatos estimados.

Page 70: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 30/63

Unidades incorporadas con todos los datos estimados, a partir del esquema unifilarCOES-SEIN del 03/07/02.La incorporació n de estas unidades tuvo como objeto generar una planilla con datossupuestos, para que sea corregido en la revisió n de los responsables de la planta.Item 119: CT Millsite

Se elimina de la Base de Datos porque no figuran en unifilar de COESItem 120: CH Candelario

Se elimina de la Base de Datos porque no figuran en unifilar de COES

Resumen de los modelos de Generadores utilizadosA continuació n se listan los modelos de los generadores con sus respectivos diagramas debloques que se han adoptado a partir de la librería de modelos standard del programaPSS/E.

GeneradorTérmico

GeneradorHidráulico

Convertidor deFrecuencia

GENROU GENS01 FRECHGGENR01

Los modelos GENR01 y GENS01 son modelos desarrollados por el usuario ycorresponden respectivamente a los modelos standard de la librería PSS/E: GENROU yGENSAL .GENR01 y GENS01 han sido desarrollados en el contexto de este estudio para subsanarlos errores de comportamiento de los modelos GENROU y GENSAL de frente a fuertesexcursiones de la frecuencia en la red. En el ANEXO C1B se adjunta un documentoexplicativo de la respuesta de los modelos standard, documento que ha sido enviado a laPTI denunciando el malfuncionamiento.

Page 71: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 31/63

Diagramas de bloques de los Generadores

Figura 4: Modelos del Generador Sincrono a rotor cilíndrico - GENROU

Page 72: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 32/63

Figura 5: Modelos del Generador Sincrono a polos salientes - GENSAL

Page 73: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 33/63

ANEXO C2 – MOTORES SINCRONOS

Detalles particulares del aná lisis de cada unidad.Notas:1 Todas las resistencias se convirtieron a 75 C.2 Ante la ausencia de los datos de inercia de la carga, se estimó un valor igual a 2.5

veces la inercia del rotor de la unidad.

Item 01: ToquepalaLos datos está n completos, excepto la constante de inercia que se estimó .

Item 02: TintayaSó lo hay datos de xd, x’d y x”d, ra, la cte. de inercia del rotor y del embrague, y eltiempo de parada. Los datos restantes se estimaron.

Item 03: TintayaSó lo hay datos de xd, x’d y x”d, ra, la cte. de inercia del rotor y del embrague, y eltiempo de parada. Los datos restantes se estimaron.

Item 04: Chimbote 2Só lo hay dato de ra, la cte. de inercia del rotor y del embrague. Los datos restantesse estimaron. La ra se corrigió suponiendo que estaba en ohm, puesto que su valorlucía fuera de rango.

Item 05: Chimbote 2Só lo hay dato de ra, la cte. de inercia del rotor y del embrague. Los datos restantesse estimaron. La ra se corrigió suponiendo que estaba en ohm porque estaba fuerade rango.

Item 06: Chimbote 2Só lo hay dato de ra, y se corrigió suponiendo que estaba en ohm porque su valorestaba fuera de rango. Los datos restantes se estimaron.

Item 07: Chimbote 2Só lo hay dato de ra y se corrigió suponiendo que estaba en ohm, puesto que suvalor estaba fuera de rango. Los datos restantes se estimaron.

Item 08: Chimbote 3Só lo hay dato de ra y se corrigió suponiendo que estaba en ohm, puesto que suvalor estaba fuera de rango. Los datos restantes se estimaron suponiendo rotorcilíndrico por la velocidad (1800 rpm).

Item 09: Chimbote 4Só lo hay dato de la inercia del rotor. Los datos restantes se estimaron suponiendoque por la velocidad (1800 rpm), tiene el rotor cilíndrico. La estimació n tambiénincluyó la potencia aparente y el rendimiento.

Page 74: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 34/63

Item 10: Chimbote 5Só lo hay dato de la inercia del rotor. Los datos restantes se estimaron suponiendoque por la velocidad (1800 rpm), tiene el rotor cilíndrico. La estimació n tambiénincluyó la potencia aparente y el rendimiento.

Item 11: San Nicolá sTodos los datos se estimaron incluyendo la potencia aparente y el rendimiento.

Item 12: San Nicolá sTodos los datos se estimaron incluyendo la potencia aparente y el rendimiento.

Item 13: San Nicolá sTodos los datos se estimaron incluyendo la potencia aparente, cosϕ y elrendimiento.

Item 14: San Nicolá sTodos los datos se estimaron incluyendo la potencia aparente, cosϕ y elrendimiento.

Item 15: Talleres Compresoras – Minera Huaró n S.A.Se calculó el rendimiento a partir de los datos de Potencia [HP], la potencia aparentey cosϕ. También está n disponibles la tensió n nominal y las revoluciones nominales,que debieron corregirse a la velocidad sincró nica má s pró xima (514 rpm). Seestimaron el resto de los datos y la curva de capacidad.

Item 16: Talleres Compresoras – Minera Huaró n S.A.Idem anterior.

Resumen de los modelos de Motores Sincronos utilizadosA continuació n se lista el modelo del motore sincrono con su respectivo diagramas debloques que se ha adoptado a partir de la librería de modelos standard del programaPSS/E. Para estas má quinas no se han modelado los sistemas de control.

Motor Sincrono

GENSAL

Diagramas de bloques de los Motores SincronosEl diagrama corresponde al del modelo GENSAL mostrado nel capitolo precedente de losgeneradores sincronos Figura 5.

Page 75: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 35/63

ANEXO C3 – MOTORES ASINCRONOS

Aná lisis particular por cada ítem del “ ANEXO-INFORME 01-EDP.xls”

Notas:3 Por brevedad, se designará el “ANEXO-INFORME 01-EDP.xls” como ANEXO 01.4 Se designa ra a la resistencia estató rica o de armadura. Nó tese que en PSS/E no se

toma en cuenta el rendimiento del motor, puesto que no resultan de interés lasmagnitudes mecá nicas en el eje, sino la potencia eléctrica reflejada en el estator.Por esta razó n es posible que hayan diferencias apreciables entre la resistenciamedida en los ensayos y la que se emplea para modelar este equipo en elsimulador.

5 Todas las resistencias se convirtieron a 75 C.6 Ante la ausencia de los datos de inercia de la carga, se estimó un valor igual a 2.5

veces la inercia del rotor de la unidad.

Item 01: BHP TINTAYASe asume que ra estaba a 24 C. Los pará metros pudieron estimarse sin dificultadpara satisfacer los datos del motor, excepto el cosϕ de arranque (obtenido desde losdatos del ensayo a Rotor Bloqueado (RB)), que presenta gran diferencia. Seobserva sin embargo que la grá fica del torque no es adecuada en el ANEXO03,puesto que el torque nominal (que debiera corresponder a la corriente en el 100%),debiera ser pró ximo al torque de arranque (102%). Por otra parte, esta grá fica dacuenta de un efecto demasiado pronunciado en torno del torque má ximo.

Item 02: BHP TINTAYAEl motor de rotor bobinado se supone en condiciones de régimen, con alimentació nfija en el rotor, y por lo tanto, reducido a un rotor de doble jaula de ardilla. En PSS/Eno hay disponibles modelos para rotores bobinados. Se adoptó por lo tanto la curva2 correspondiente a un torque de arranque de 1.5 veces el torque nominal, con unaresistencia externa de 0.0327 Ω. El cosϕ de arranque obtenido desde los datos delensayo a RB presenta gran diferencia con el resto de los pará metros.

Item 03: BHP TINTAYASe asume que ra estaba a 24 C. Del ANEXO 03 se obtuvieron datos adicionales delTorque y Corriente de Arranque, y en forma aproximada se obtuvo el TorqueMá ximo. El modelo empleado por PSS/E concuerda con los datos bá sicos mediblesdel motor, pero no reproduce la relació n X1/X2 indicada en los datos del ANEXO 03.El cosϕ de arranque obtenido desde los datos del ensayo a RB presenta grandiferencia con el resto de los pará metros.

Item 04: BHP TINTAYADispone de todos los datos necesarios, excepto el cosϕ de arranque.

Page 76: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 36/63

Item 05: CHIMBOTE 2Se asume que ra estaba a 20 C. Se respetó el cosϕ de arranque (que difierelevemente desde el obtenido por ensayo a RB), y se estimaron el resto de los datos.

Item 06: CHIMBOTE 2La velocidad es síncrona, y se la reemplaza por un valor estimado(3570 rpm). Se asume que ra estaba a 20 C. Se respetó la corriente y cosϕ de arranque;los demá s datos se supusieron.Item 07: CHIMBOTE 2

A partir de los datos de corriente y cosϕ de arranque se adoptaron los demá s.Item 08: CHIMBOTE 2

Los pará metros concuerdan con el torque, corriente y cosϕ nominal, ademá s de lacorriente y torque de arranque, pero el torque má ximo (2.81) resultó superior al datode la planilla ANEXO 01 (2.4)

Item 09: CHIMBOTE 2Se asume que ra estaba a 20 C. Se modelizó con los pará metros estipulados, y só lose encontró una diferencia apreciable (17%) con el cosϕ de arranque obtenidodesde el ensayo de RB.

Item 10: CHIMBOTE 2Só lo se tiene como referencia la corriente de arranque. Los demá s pará metros sesupusieron.

Item 11: CHIMBOTE 2Só lo se tiene como referencia la corriente de arranque. Los demá s pará metros sesupusieron.

Item 12: CHIMBOTE 2El cosϕ=1 resulta sospechoso, y se lo reemplaza por 0.90. No hay datos de lascaracterísticas del torque y corriente de arranque, por lo que se adoptaron. Lospará metros verifican el cosϕ y el deslizamiento.

Item 13: CHIMBOTE 2No hay datos de las características del torque y corriente de arranque, por lo que seadoptaron. Los pará metros verifican el cosϕ y el deslizamiento.

Item 14: CHIMBOTE 2Se asume que ra estaba a 20 C. Se toman en cuenta los datos de corriente y torquede arranque, y del torque má ximo.

Item 15: CHIMBOTE 2La velocidad es síncrona y se la reemplaza por un valor estimado (710rpm). Seasume que ra estaba a 20 C. El motor de rotor bobinado se supone en condicionesde régimen, con alimentació n fija en el rotor, y por lo tanto, reducido a un rotor dejaula de ardilla. En PSS/E no hay disponibles modelos para rotores bobinados. No

Page 77: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 37/63

hay datos de las características del torque y corriente de arranque, por lo que seadoptaron. Los pará metros verifican el cosϕ y el deslizamiento asumido.

Item 16: CHIMBOTE 2Se asume que ra estaba a 20 C. El motor de rotor bobinado se supone encondiciones de régimen, con alimentació n fija en el rotor, y por lo tanto, reducido aun rotor de jaula de ardilla. En PSS/E no hay disponibles modelos para rotoresbobinados. Se adopta el dato del torque má ximo y se estima el resto de lascaracterísticas.

Item 17: CHIMBOTE 2La velocidad es superior a la síncrona y se la reemplaza por un valor estimado(510 rpm). No hay datos de las características del torque y corriente de arranque,por lo que se adoptaron. Los pará metros verifican el cosϕ y el deslizamiento.

Item 18: CT SAN NICOLÁSNo hay datos de las características del torque y corriente de arranque, por lo que seadoptaron desde el item 7 porque tienen el mismo deslizamiento. Los pará metrosverifican el cosϕ y el deslizamiento.

Item 19: CT SAN NICOLÁSNo hay datos de las características del torque y corriente de arranque, por lo que seadoptaron. Los pará metros verifican el cosϕ y el deslizamiento.

Item 20: CT SAN NICOLÁSNo hay datos de las características del torque y corriente de arranque, por lo que seadoptaron desde el item 7 porque tienen el mismo deslizamiento. Los pará metrosverifican el cosϕ y el deslizamiento.

Item 21: CT SAN NICOLÁSNo hay datos de las características del torque y corriente de arranque, por lo que seadoptaron iguales que los del item 17 por coincidencia del deslizamiento. Lospará metros verifican el cosϕ y el deslizamiento.

Item 22: CT SAN NICOLÁSNo hay datos de las características del torque y corriente de arranque, por lo que seadoptaron desde 15 porque coincide el deslizamiento. Los pará metros verifican elcosϕ y el deslizamiento.

Item 23: CT SAN NICOLÁSNo hay datos de las características del torque y corriente de arranque, por lo que seadoptaron. Los pará metros verifican el cosϕ y el deslizamiento.

Item 24: CT SAN NICOLÁSNo hay datos de las características del torque y corriente de arranque, por lo que seadoptaron. Los pará metros verifican el cosϕ y el deslizamiento.

Item 25: CT SAN NICOLÁS

Page 78: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 38/63

No hay datos de las características del torque y corriente de arranque, por lo que seadoptaron. Los pará metros verifican el cosϕ y el deslizamiento.

Item 26: CT SAN NICOLÁSNo hay datos de las características del torque y corriente de arranque, por lo que seadoptaron desde el item 7 porque tienen el mismo deslizamiento. Los pará metrosverifican el cosϕ y el deslizamiento.

Item 27: CT SAN NICOLÁSNo hay datos de las características del torque y corriente de arranque, por lo que seadoptaron iguales que los del item 14 por coincidir el deslizamiento. Los pará metrosverifican el cosϕ y el deslizamiento.

Item 28: CT SAN NICOLÁSNo hay datos de las características del torque y corriente de arranque, por lo que seadoptaron iguales que los del item 17 por coincidencia del deslizamiento. Lospará metros verifican el cosϕ y el deslizamiento.

Item 29: CT SAN NICOLÁSNo hay datos de las características del torque y corriente de arranque, por lo que seadoptaron. Los pará metros verifican el cosϕ y el deslizamiento.

Item 30: CT SAN NICOLÁSNo hay datos de las características del torque y corriente de arranque, por lo que seadoptaron. Los pará metros verifican el cosϕ y el deslizamiento.

Item 31: CT SAN NICOLÁSNo hay datos de las características del torque y corriente de arranque, por lo que seadoptaron. Los pará metros verifican el cosϕ y el deslizamiento.

Item 32: Nueva planta de Oxígeno Oxígeno – DOE RUNEstos datos constan en una versió n denominada “Maquinas_(021003)_PREP.xls”.La capacidad en MVA no coincide con la deducció n a partir de la potencia en el eje(HP), cosϕ y el rendimiento η. Se adoptó la que surge de los cá lculos. La relació nentre torque má ximo, torque y cosϕ de arranque, y el resto de los pará metros no severifica con los datos de la planilla. Se asumen los valores má s cercanos,verificando para el deslizamiento nominal el cosϕ, torque y corriente nominal, y lacorriente de arranque.

Item 33: Plantas Concentradoras – Minera Huaró n S.A.Estos datos constan en una versió n denominada “Maquinas_(021003)_PREP.xls”.La capacidad en MVA no coincide con la deducció n a partir de la potencia en el eje(HP), cosϕ y el rendimiento η; se adoptó la que surge de los cá lculos. Se adoptó delensayo en carga la velocidad nominal. El torque má ximo no puede ser menor que elnominal, y se asumió un valor. El torque y cosϕ resultan bajos, para corrientes bajasde arranque. Se asumen pará metros para dar una aproximació n pero debieran serrevisados.

Page 79: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 39/63

Item 34: Plantas Concentradoras – Minera Huaró n S.A.Estos datos constan en una versió n denominada “Maquinas_(021003)_PREP.xls”.Se estimó el rendimiento η para satisfacer la potencia nominal, y se obtuvo lavelocidad del ensayo en carga. No hay datos de las características del arranque ytorque má ximo, por lo cual se adoptaron.

Resumen de los modelos de Motores Asincronos utilizadosA continuació n se lista el modelo del motore asincrono con su respectivo diagramas debloques que se ha adoptado a partir de la librería de modelos standard del programaPSS/E.

Motor Asincrono

CIMTR4

Diagramas de bloques de los Motores Sincronos

Figura 6: Modelos del Motor Asincrono – CIMTR4

Page 80: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 40/63

ANEXO C4 – SISTEMAS DE CONTROL DE GENERADORES

Notas:1 Se designa EXC a los Sistemas de Excitació n, GOV a los sistemas de control carga-

frecuencia, PSS a los estabilizadores del sistema de potencia, UEL a los limitadoresde mínima excitació n y OEL a los limitadores de má xima excitació n.

2 Se hará referencia al informe Carta 418-DO COES SUR/2000 de EDF, como informeEDF.

3 Todos los nombres en la columna Modelo, corresponden a modelos de librería delsimulador PSS/E versió n 26

Grupo 1: Centrales con datos de los sistemas de control

Central Equipo

Modelo Observaciones

EXC EXAC1 Hay dos esquemas no coincidentes en la carpeta 34. Uno da cuentade un sistema tipo AC Brushless, y el otro, que muestra en detalle elAVR, es un sistema completamente está tico. Se interpreta que laexcitatriz principal es AC con rectificadores rotantes no controlados,y que el AVR que controla la excitació n del campo del generador ACes está tico. Los pará metros son estimados

56050,1 y 56052,2Mollendo TG1 y 2

GOV GAST2A Del tipo MARKV de GE con combustible líquido. Según informe EDFel estatismo es por velocidad y del 4 %

EXC EXAC1 Se supone un sistema de excitació n moderno tipo Brushless conrespuesta moderada

56048,1–3Mollendo Diesel

GOV DEGOV1 Se adopta un regulador carga/frecuencia específico para motores decombustió n interna, con todos los pará metros estimados, excepto elestatismo que figura en el informe EDF

EXC IEEET5 En la carpeta 38 se describe un sistema de excitació n del tipo DCcon Excitatriz principal y Excitatriz piloto, tipo acoplado directo. Lospará metros son estimados para sistemas reostá ticos de acció nindirecta

26064,1–3San Nicolá s

GOV TGOV5 Para las 3 unidades se supuso un sistema de alta y baja presió n,contemplando la diná mica de caldera con combustible líquido, y enmodo “caldera seguidora”. Los pará metros son estimados

EXC EXAC1 Se supone un sistema de excitació n moderno tipo Brushless conrespuesta moderada

26066,4San Nicolas Diesel

GOV DGOV1 Se adopta un regulador carga/frecuencia específico para motores decombustió n interna, con todos los pará metros estimados

EXC EXAC1 Se estiman todos los datos suponiendo un sistema de excitació nelectró nico, con excitatriz de alterna tipo Brushless

56122,1ILOTG1

GOV GAST2A Se estiman todos los datos suponiendo una turbina de gasconvencional con combustible líquido. El estatismo y velocidad derespuesta se obtiene del informe de EDF

EXC EXAC1 Se estiman todos los datos suponiendo un sistema de excitació nelectró nico, con excitatriz de alterna tipo Brushless

56124,2ILOTG2

GOV GASTWD Se estiman todos los datos suponiendo una turbina de gas tipoaeroderivada, con regulador tipo Woodward. El estatismo yvelocidad de respuesta se obtiene del informe de EDF

Page 81: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 41/63

Central Equipo

Modelo Observaciones

EXC EXAC4 Se supone una excitatriz de corriente alterna con rectificadorescontrolados. Todos los pará metros son estimados

56114,1 y 56116,2ILO1 TV 1 y 2

GOV TGOV5 Se modela un “governor” y caldera funcionando en modo calderaseguidora. Hay datos de estatismo, los pará metros de caldera seestiman y los ajustes del “governor” se adecuan para aproximar larespuesta grá fica en el informe de EDF. El estatismo y velocidad derespuesta se obtiene del informe de EDF

EXC EXAC4 Se supone una excitatriz de corriente alterna con rectificadorescontrolados. Todos los pará metros son estimados

56118,3 y 56120,4ILO1 TV 3 y 4

GOV TGOV5 Se modela un “governor” y caldera funcionando en modo calderaseguidora. Hay datos de estatismo, los pará metros de caldera seestiman y los ajustes del “governor” se adecuan para aproximar larespuesta grá fica en el informe de EDF. El estatismo y velocidad derespuesta se obtiene del informe de EDF

EXC EXAC1 Datos de Hitachi. No hay un modelo de libreria del PSS/E pararepresentarlo exactamente. El modelo adoptado tomará una Cte. deTiempo de primer orden igual a 2Tr en el transductor de entrada, laexcitatriz de alterna considera baja saturació n, con la cte. de tiempoTE dato y límite inferior cero debido al rectificador. La realimentació nsale de EFD y se elimina la regulació n del rectificador (Fex). No setoma en cuenta la funció n Kex(1+Tdz)/(1+Tga) en el diagrama deHitachi, considerando que la realimentació n derivativa y el filtro deadelanto – atraso alcanzan para lograr un desempeño adecuado y/uhomologar la respuesta global. Los límites y ganancias expresadosen base de 100 V, no pueden relacionarse con los adecuados parael simulador puesto que se desconoce la curva de saturació n envacío. El desempeño se ha estimado

GOV TGOV5 No hay modelo de libreria en PSS/E para representar en detalle lascaracterísticas alineales del sistema de control que afecta elrecalentador, por lo tanto se considerará como un retardo constante.El resto de la diná mica de las turbinas y distribució n de potencia deldiagrama de Hitachi es conservado por el modelo TGOV5. Estemodelo incluye también la diná mica de la caldera funcionando concarbó n (con pará metros estimados). Se adopta el “ControlCoordinado” como estrategia y un estatismo del 4 % enconcordancia con el informe de EDF

56106,1ILO 2

UEL MNLEX3 Dispone de limitador, y por el tamaño del equipo se consideraconveniente incorporarlo. La recta de ajuste corresponde a datos delinforme A2/021865 de CESI, pero los pará metros de control sonestimados

60126,1; 60128,2 y60130,3Machupichu

EXC EXPIC1 El modelo EXPIC1 considera el bloque PI y transductor de entrada,pero no puede representar el lazo de control de la corriente decampo. Por lo tanto, se ajusta el control PI para obtener undesempeño típico de sistemas está ticos

Page 82: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 42/63

Central Equipo

Modelo Observaciones

GOV HYGOV Según el informe A1/035628 de CESI, en el funcionamientoacoplado a grandes redes la acció n derivativa de entrada se anula, yla funció n de transferencia del sistema de control electró nico es unPI con realimentació n por estatismo. Esta funció n está representadaen el modelo HYGOV, agregando una cte. de tiempo que contemplaa los transductores (Tf). No hay datos del sistema de mandohidrá ulico, pero puede ser representado por un cte. de tiempo delservomotor principal, cuyo valor se estima. La cte. de tiempo delsistema de aducció n se obtiene del informe. La respuesta esobtenida a partir de los datos

PSS IEEEST La representació n es conforme al modelo del informe A1/035628 deCESI. La respuesta obtenida corresponde a los datos informados

UEL,OEL

N/D Los limitadores ingresan en la cadena principal de control deexcitació n, y los modelos del PSS/E só lo pueden actuar modificandola referencia de tensió n, por eso no se incluyen

EXC EXPIC1 Según Alstom Atlantique y la pá gina 13/19 del informe A2/021863 deCESI, el equipo es del tipo está tico y la etapa de control es PID. Laexcitatriz se representa según las recomendaciones IEEE paramodelos ST3. El modelo (IEEET1) de la carta del 22/07 norepresenta un sistema de excitació n está tico, ya que modela unaexcitatriz con cte. de tiempo elevada y saturació n. Se adoptanpará metros para un desempeño típico de este tipo de equipos

GOV HYGOV El modelo identificado en el informe A2/021863 de CESI es del tipoElectrohidrá ulico, tal cual lo describe Neyrpic. El modelo HYGOV4adjunto a la carta del 22/07/02 no representa bien este esquema yes preferible adoptar el modelo HYGOV. Excepto el estatismopermanente, que se adopta del informe A2/021863, el resto de lospará metros se toman desde el modelo HYGOV4. La respuestaobtenida corresponde a los datos informados

PSS IEEEST Según la informació n de Alstom Atlantique procesa la señal de depotencia eléctrica, tal como se menciona en el informe A2/021863 deCESI. Al parecer, só lo tiene un filtro “washout”, por lo tanto seincluye con datos estimados y demuestra un aporte positivo alamortiguamiento

UEL MNLEX3 Dispone de limitador según Alstom Atlantique, que coincide con eldiagrama de bloques del informe A2/021863 de CESI; es del tipo PIy no hay pará metros. El modelo adoptado tiene control proporcional,y el ajuste se adapta a la curva de capacidad

56134,1 y 56136,2Charcani V

OEL MAXEX2 Dispone de limitador según Alstom Atlantique, y según el diagramade bloques del informe A2/021863 de CESI actúa en modosuperposició n. No hay pará metros. El ajuste se aproxima siguiendolas recomendaciones ANSI C50.13-1977

EXC EXPIC1 El modelo THYNE5 es de propó sito general y el control debeopcionalmente funcionar como PI o con un filtro de adelanto-atraso.No hay datos de ajustes, solo el diagrama de bloques. Se adopta uncontrol PI, y la representació n de la excitatriz está tica incluye lainfluencia de la fuente de potencia y la regulació n de losrectificadores

46158,1 y 46160,2Chimay

GOV IEEEG3 Este modelo representa el regulador del HYGOV4, la turbina y elsistema de aducció n es linealizado. La respuesta es obtenida a partirde los datos

Page 83: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 43/63

Central Equipo

Modelo Observaciones

EXC ESST1A Este modelo representa al UNITROL, excepto en algunos límitesindividuales por bloque y el factor de compensació n por carga activa.La respuesta es obtenida a partir de los datos

46150,1CH Yanango

GOV IEEEG3 Este modelo representa el regulador del HYGOV4, la turbina y elsistema de aducció n es linealizado. La respuesta es obtenida a partirde los datos

EXC ESAC2A Según los datos la excitatriz es de alterna y el regulador eselectró nico (está tico). La respuesta es la obtenida a partir de losdatos

26088,3Santa Rosa Nueva

GOV GASTWD Los datos son supuestos y se estima un regulador digital tipo PIEXC EXBAS Este modelo representa bien el regulador de tensió n UNITROL-M,

excepto en el bloque compensador puesto que no se considera laseñal suplementaria debido a la IT ni el producto de la cadena directapor la UT. En este caso, só lo se considera un aumento en el límiteVRMAX=UP

++UCPMAX para admitir un rango diná mico mayor enausencia del efecto de la corriente terminal. La excitatriz de alternase representa de acuerdo a las recomendaciones del Std 421.5 deIEEE, aunque se desprecia el efecto desmagnetizante de laarmadura como se recomienda en UNITROL-M. El desempeñocorresponde a los pará metros informados

GOV GAST2A El modelo GAST del Anexo 03, cuyos pará metros producían uncomportamiento estable pero muy oscilatorio, se reemplaza porGAST2A para mejorar su representació n. Se estiman todos los datospara obtener una respuesta aceptable, preservando el estatismo

16072,1Malacas TG4

PSS IEEEST Es de potencia eléctrica. Como la única señal de entrada posible enel modelo EXBAS es en la referencia, se modifica la ganancia ydeberían agregarse dos filtros atraso-adelanto compensadores delregulador de tensió n (filtro de adelanto inicial y el debido al lazo deestabilizació n del regulador) pero la respuesta se degrada respectodel funcionamiento sin estabilizador. Por lo tanto, se suprimen estosfiltros compensadores porque de esto modo el estabilizadorcontribuye levemente al amortiguamiento

EXC EXPIC1 La descripció n de ABB del regulador de voltaje HPC 840, esaplicable a diversos tipos de excitatrices. Se interpreta que el controles PI y que la excitatriz es está tica. Los datos de la excitatriz seasumen, al igual que los límites de salida. Las verificaciones hacenpresumir (lenta respuesta) que falta alguna ganancia en la excitatriz;para contemplarla y tener en cuenta ademá s que la salida de laexcitatriz varía con la tensió n de alimentació n, se supuso unaganancia de 1.25 que afecta el lazo principal

16000,1; 16002,216004,3; 16006,416008,5 y 16010,6Cañó n del Pato

GOV WPIDHY Una memoria de cá lculo para ABB: “Deflector Governing GainsRev.1”, evalúa pará metros del “governor” a partir de ciertossupuestos. Luego se presenta un diagrama de bloques del mismoconsultor, con pará metros diferentes que supuestamente debenemplearse en los estudios. En el regulador seleccionado lasconstantes de tiempo TA y TB representan aproximadamente losretardos de 0.150 s descriptos en el informe, y el tiempo de carreradel actuador se ha supuesto en 2.5 s en conformidad con dichoinforme, considerando que el valor de 250 s que figura en eldiagrama de bloques responde a un error tipográ fico

Page 84: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 44/63

Central Equipo

Modelo Observaciones

PSS PSS2A Los datos del estabilizador se adoptan desde la informació n de ABBpara el regulador de voltaje HPC 840. El equipo procesa la señal dePotencia Eléctrica. La representació n mediante PSS2A esaproximada só lo en que el filtro de bajas frecuencias de entrada esal cuadrado, en lugar de al cubo como el de ABB, pero estaaproximació n se estima aceptable. La ganancia corresponde a lainercia adoptada, demostrando una contribució n poco apreciable alamortiguamiento de las oscilaciones locales

EXC EXAC1 Se adoptan los datos desde Trujillo Sur (16084,1), porque coincide ladescripció n del fabricante

16068,1–2Sidernor(Chimbote) GOV GAST2A Se adoptan los datos desde Trujillo Sur (16084,1), porque coincide la

descripció n del fabricanteEXC EXST2 Este modelo representa las excitatrices está ticas de GE del tipo

SCPT, la cual se presume para esta unidad. Los pará metros fijosson típicos para el modelo, y los ajustables se adoptaron paraobtener una respuesta aceptable.

16070,1Sidersur(Chimbote)

GOV GAST2A Este modelo representa una turbina de gas convencional de serviciopesado, con combustible líquido y con un sistema de control del tipoMark IV. Todos los datos son estimados según recomendaciones deGE

EXC EXAC1 Este modelo responde a la descripció n del fabricante (Brush), queindica una excitatriz de CA con diodos rotantes. Los pará metros seadoptaron para obtener una respuesta aceptable

16084,1Trujillo Sur

GOV GAST2A Este modelo representa una turbina de gas convencional de serviciopesado, con combustible líquido y con un sistema de control del tipoMark IV. Todos los datos son estimados según recomendaciones deGE

EXC EXPIC1 El sistema es está tico, según la informació n de ABB, con uncontrolador tipo PI. Los datos específicos de la excitatriz está tica seestimaron

16012,1; 16016,2 y16018,3Carhuaquero

GOV HYGOV Los datos del control está n disponibles, pero el tiempo de arranquedel agua no. Se adopta el de la planilla de HYGOV4 (Tw=0.99)

EXC EXBAS Se adopta desde la má quina de MalacasGOV GAST2A Se adopta igual al de Malacas cambiando la Potencia nominal

46068,1 y 46070,2Aguaytia

PSS IEEEST Se adopta desde la má quina de MalacasEXC EXPIC1 De la informació n de Ansaldo se deduce que es del tipo PI. No hay

datos de ajustes ni de la excitatriz está tica. El transductor de entradabicuadrá tico se representa como un retardo de primer orden. Losdatos de ajuste son estimados para dar una respuesta acorde alequipo

46090,1; 46092,2 y46094,3Restitució n

GOV HYGOV La informació n descriptiva es de Ansaldo y semejante a la queintegra la informació n de Machupichu, por lo cual se adopta elmismo modelo asumiendo que el aceleró metro no está presente enred interconectada. No hay datos de ajustes, de modo que lospará metros se estiman para obtener una respuesta típica deunidades con “governor” del tipo electrohidrá ulico

Page 85: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 45/63

Central Equipo

Modelo Observaciones

PSS PSS2A Procesa la señal de frecuencia y potencia eléctrica. Hay datos de losfiltros “washout” de señales de baja frecuencia y de la ganancia decada rama; los filtros bicuadrá ticos no pueden simularse y serepresentaron como transductores de primer orden con datosestimados. La influencia del estabilizador para oscilaciones de modolocal es despreciable, por lo que se opta interpretar Kc (ganancia delsistema de potencia eléctrica), como 0.35 veces la ganancia del lazode frecuencia

UEL MNLEX3 La informació n de Ansaldo da cuenta de la existencia de estelimitador, y su característica es una recta. La estructura de controlsuele ser del tipo PI, pero se adoptará Proporcional con retardoporque es el modelo disponible en PSS/E. Los pará metros seestiman para satisfacer la curva de capacidad, y brindar uncompromiso entre una respuesta suave y rá pida

OEL MAXEX2 La informació n de Ansaldo da cuenta de la existencia de estelimitador, y su característica es del tipo integral, el modelo de PSS/Ees de las mismas características. La temporizació n T=f(I) esestimada

EXC EXPIC1 El informe de CESI A2/021260 modela, en concordancia con losdatos de campo de Alstom, un regulador está tico y cita suspará metros. Los datos de límites y la dependencia con la tensió n dela excitatriz está tica se obtienen desde infomació n de Alstom. Eldesempeño es el resultante de los datos

GOV HYGOV El informe de CESI presenta una estructura asimilable al modeloHYGOV, y da sus pará metros considerando que en red de granpotencia el aceleró metro no está en servicio. La constante de tiempodel agua y datos del sistema de mando se extraen de un estudio deestabilidad adjunto de Neyrpic. El desempeño resulta de los datos

PSS IEEEST Se dispone de datos de la ganancia y del reset de filtrado de bajasfrecuencias. Se estiman nulos los filtros de adelanto-atraso de fase,de lo cual resulta una contribució n al amortiguamiento apreciable

UEL MNLEX3 El modelo MNLEX3 sintetiza la misma señal de proceso que elsistema real, pero la estrategia de control es PI mientras que estemodelo só lo contempla P con un retardo de tiempo. La pendienteresponde a la curva de capacidad, pero el Qo inicial (para cosϕ=0)es muy restrictivo, y podría deberse a una erró nea interpretació n delvalor en pu. Se modifica este valor para que sea compatible con eldiagrama

66094,1 y 66096,2San Gabá n

OEL MAXEX2 Puede representarse la caracterísitca integral, pero los ajustes parala curva de tiempo inverso no. Se adopta entonces unatemporizació n conforme a las recomendaciones ANSI C50.13-1977

EXC EXAC1 Se supone un sistema de excitació n moderno tipo Brushless conrespuesta moderada

56108,1 y 56110,2Chilina Diesel

GOV DGOV1 Se adopta un regulador carga/frecuencia específico para motores decombustió n interna, con todos los pará metros estimados. Elestatismo se supuso bajo (1%), para simular su condici ó n deisó crono y evitar oscilaciones permanentes

Page 86: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 46/63

Central Equipo

Modelo Observaciones

EXC EXST2 Se supone un sistema de excitació n está tico, del tipo IEEE ST2.Todos los pará metros son estimados. Nota: se considera que launidad es de 21 MW, tal como figura en el esquema unifilar y el“ANEXO 01 – INFORME EDP.XLS”, aunque en el informe de EDFconsta de 6 MW. Se adoptó el estatismo que consta en el informeEDF

56080,1Chilina TG

GOV GAST2A Se estima un “governor” típico de turbinas de gas con combustiblelíquido, con un sistema de control del tipo Mark II de GE

EXC EXDC2 Se supuso un sistema de excitació n con excitatriz de corrientecontinua

56076,1–2Chilina TV01 y 02(50Hz) GOV TGOV5 Para las 2 unidades se supuso un sistema de alta y baja presió n,

contemplando la diná mica de caldera con combustible líquido, y enmodo “caldera seguidora”. Los pará metros son estimados, exceptoel estatismo que se adoptó del informe de EDF

EXC EXDC2 Se supuso un sistema de excitació n con excitatriz de corrientecontinua.

56078,3Chilina TV03(60Hz) GOV TGOV5 Se supuso un sistema de alta y baja presió n, contemplando la

diná mica de caldera con combustible líquido y en modo “calderaseguidora”. Los pará metros son estimados, excepto el estatismo quese adoptó del informe de EDF

56084,60Conv. deFrecuencia

EXC EXCD2 Se supuso un sistema de excitació n con excitatriz de corrientecontinua en lado 60 Hz

56076,50Conv. deFrecuencia

EXC EXCD2 Se supuso un sistema de excitació n con excitatriz de corrientecontinua en el lado 50 Hz

EXC EXAC1 Se supone un sistema de excitació n moderno tipo Brushless conrespuesta moderada, y pará metros estimados

56044,1–3Calana G1 a 3

GOV DGOV1 Se adopta un regulador carga/frecuencia específico para motores decombustió n interna, con todos los pará metros estimados. Elestatismo se adoptó del informe de EDF

EXC EXAC1 Se supone un sistema de excitació n moderno tipo Brushless conrespuesta moderada, y pará metros estimados

56046,4Calana G4

GOV DGOV1 Se adopta un regulador carga/frecuencia específico para motores decombustió n interna, con todos los pará metros estimados. Elestatismo se adoptó del informe de EDF

EXC EXDC2 Se supuso un sistema de excitació n con excitatriz de corrientecontinua

56034,1–2Aricota 1

GOV IEEEG3 Se modela un regulador hidrá ulico con estatismo transitorio conrespuesta lenta, y con el estatismo permanente que figura en elinforme de EDF

EXC EXDC3 Se supuso un sistema de excitació n con excitatriz de corrientecontinua

56028,1Aricota 2

GOV IEEEG3 Se modela un regulador hidrá ulico con estatismo transitorio conrespuesta lenta, con el estatismo permanente que figura en elinforme de EDF

Page 87: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 47/63

Grupo 2: Centrales que figuran en Tablas V, VI y VII del Anexo 03– Sistemas deExcitació n, Estabilizadores y “Governors”

Central Equipo

Modelo Observaciones

EXC IEEEX1 El modelo representa al informado en la tabla, pero el desempeño noes aceptable. Se reajusta el estabilizador del lazo de excitaci ó n

GOV IEEEG3 En la librería de modelos del PSS/E no se puede representar elaceleró metro, y los pará metros bt y Td resultan fuera del rangohabitual, pero es posible que se deba a una adaptació n de otro tipode ló gica. La respuesta es lenta e inestable en red aislada, semodificaron entonces bt y Td para obtener una respuesta aceptable

46124,5; 46126,6 y46128,7Mantaro I

PSS IEE2ST Este equipo representa exactamente los datos de las tablas. Eldesempeño es muy modesto y podría mejorarse

EXC ESST1A El modelo representa al informado en la Tabla. La respuesta esobtenida a partir de los datos

GOV IEEEG3 En la librería de modelos del PSS/E no se puede representar elaceleró metro, y los pará metros bt y Td resultan fuera del rangohabitual, pero es posible que se deba a una adaptació n de otro tipode ló gica. La respuesta es lenta e inestable en red aislada, semodificaron entonces bt y Td para obtener una respuesta aceptable

46116,1; 46118,246120,3 y 46122,4Mantaro II

PSS IEE2ST Este equipo representa exactamente los datos. El desempeño esmodesto y podría mejorarse

EXC EXPIC1 El modelo representa los datos de la Tabla. El desempeño esmodesto, pero responde a los datos especificados

46096,1; 46098,246100,3 y 46102,4Huinco GOV IEEEG3 En la librería de modelos del PSS/E no se puede representar el

aceleró metro, y los pará metros bt y Td resultan fuera del rangohabitual, pero es posible que se deba a una adaptació n de otro tipode ló gica. La respuesta es lenta y poco estable en red aislada, semodificaron entonces bt y Td para obtener una respuesta aceptable

EXC EXPIC1 El modelo representa los datos de la Tabla. El desempeño esmodesto, pero responde a los datos especificados

46016,1 y 46118,2Matucana

GOV IEEEG3 En la librería de modelos del PSS/E no se puede representar elaceleró metro, y los pará metros bt y Td resultan fuera del rangohabitual, pero es posible que se deba a una adaptació n de otro tipode ló gica. La respuesta es lenta y poco amortiguada en red aislada,se modificaron bt y Td para obtener una respuesta aceptable

EXC EXPIC1 El modelo representa los datos de la Tabla. El desempeño queresponde a los datos especificados es modesto

46022,1–2Huampani

GOV IEEEG3 El modelo corresponde al de la tabla. Se estiman nuevos valores develocidad de apertura y cierre del distribuidor, puesto que sonvalores hipotizados y no está n en relació n con el tiempo derespuesta del servomotor Ty. Se modifican también los datos de Tdy bt porque, siendo estimados, dan una respuesta demasiado lenta

EXC EXPIC1 El modelo representa los datos de la Tabla. El desempeño esmodesto aunqueresponde a los datos especificados

46062,1; 46064,2 y46066,3Moyopampa GOV IEEEG3 El modelo corresponde al de la tabla. Se estiman nuevos valores de

velocidad de apertura y cierre del distribuidor, puesto que sonvalores hipotizados y no está n en relació n con el tiempo derespuesta del servomotor Ty. Se modifica también la estimació n deTd para acelerar levemente la respuesta

46082,1; 46084,2 y46086,3Callahuanca 6.5kV

EXC EXPIC1 El modelo representa los datos de la Tabla. El desempeño esmodesto, pero responde a los datos especificados

Page 88: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 48/63

Central Equipo

Modelo Observaciones

GOV IEEEG3 El modelo corresponde al de la tabla. Se estiman nuevos valores develocidad de apertura y cierre del distribuidor, puesto que sonvalores hipotizados y no está n en relació n con el tiempo derespuesta del servomotor Ty. Se reduce la estimació n de bt

EXC EXPIC1 El modelo representa los datos de la Tabla. El desempeño esmodesto aunque responde a los datos especificados

46088,4Callahuanca 8.0kV

GOV IEEEG3 El modelo corresponde al de la tabla. Se estiman nuevos valores develocidad de apertura y cierre del distribuidor, puesto que sonvalores hipotizados y no está n en relació n con el tiempo derespuesta del servomotor Ty. Se reduce el bt estimado

EXC EXPIC1 El modelo representa el diagrama de la Tabla. Se ajustó el sistemade control para obtener un desempeño aceptable

16052,1 y 16054,2Cahua

GOV IEEEG3 No se puede representar el aceleró metro, pero visto que lospará metros excepto el estatismo son estimados, se ajustan paraobtener una respuesta aceptable

EXC EXPIC1 El modelo representa el diagrama de la Tabla. Visto que lospará metros son estimados, se reajustó para obtener un desempeñoaceptable

16032,1; 46034,246036,3 y 46038,4Malpaso

GOV IEEEG3 Según la informació n, los pará metros son estimados. Se corrigió lavelocidad de apertura y cierre del distribuidor, porque no guardarelació n con el tiempo de respuesta del servomotor. Se reajustó eltiempo de reset para acelerar la respuesta porque era lenta

EXC EXPIC1 El modelo representa el diagrama de la Tabla. Visto que lospará metros son estimados, se reajustó para obtener un desempeñoaceptable

46104, 1–3 y46106,4–5Yaupi

GOV IEEEG3 Según la informació n, los pará metros son estimados. Se corrigió lavelocidad de apertura y cierre del distribuidor, porque no guardarelació n con el tiempo de respuesta del servomotor. Se reajustó eltiempo de reset para acelerar la respuesta porque era muy lenta

EXC EXAC4 Se supone una excitatriz de corriente alterna con rectificadorescontrolados. Todos los pará metros son estimados

16066,1Trupal (Santiagodel Cao) GOV TGOV5 Se supone un regulador convencional y caldera, en modo caldera

seguidora. Todos los pará metros son estimados

Grupo 3: Centrales que no disponen de datos de los sistemas de control

Central Equipo

Modelo Observaciones

EXC EXAC1 Se estiman todos los datos suponiendo un sistema de excitació nelectró nico, con excitatriz de alterna tipo Brushless

16098,1–3Malacas TG1–3

GOV GAST2A Se estiman todos los datos suponiendo una turbina de gasconvencional con combustible líquido

EXC EXAC1 Se estiman todos los datos suponiendo un sistema de excitació nelectró nico, con excitatriz de alterna tipo Brushless

16014,1–3 y16050, 4–5Chiclayo Oeste GOV DEGOV1 Se estiman todos los datos suponiendo un regulador carga

frecuencia típico para unidades Diesel16024,1–4Piura Diesel GMT,MAN y SWD

EXC EXAC1 Se estiman todos los datos suponiendo un sistema de excitació nelectró nico, con excitatriz de alterna tipo Brushless

Page 89: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 49/63

Central Equipo

Modelo Observaciones

GOV DEGOV1 Se estiman todos los datos suponiendo un regulador cargafrecuencia típico para unidades Diesel

EXC EXAC1 Se estiman todos los datos suponiendo un sistema de excitació nelectró nico, con excitatriz de alterna tipo Brushless

16024,5Piura TG

GOV GAST2A Se estiman todos los datos suponiendo una turbina de gasconvencional con combustible líquido

EXC EXAC1 Se estiman todos los datos suponiendo un sistema de excitació nelectró nico, con excitatriz de alterna tipo Brushless

16026,1–3Piura Diesel MIR

GOV DEGOV1 Se estiman todos los datos suponiendo un regulador cargafrecuencia típico para unidades Diesel

EXC EXDC2 Se estiman todos los datos suponiendo un sistema de excitació n decorriente continua

16034,5; 16036,6 y16044,4Pariac GOV IEEEG3 Se estiman todos los datos, suponiendo un regulador carga

frecuencia típico con estatismo transitorio para unidades hidrá ulicasEXC EXAC1 Se estiman todos los datos, suponiendo un sistema de excitació n

electró nico con excitatriz de alterna tipo Brushless16092,1–3 y16090,4Cempacas GOV DEGOV1 Se estiman todos los datos suponiendo un regulador carga

frecuencia típico para unidades DieselEXC EXAC4 Se estiman todos los datos suponiendo un sistema de excitació n

electró nico, con excitatriz de alterna tipo Brushless16108,1–2Curumuy

GOV IEEEG3 Se estiman todos los datos, suponiendo un regulador cargafrecuencia típico para unidades Diesel

EXC EXAC1 Se estiman todos los datos suponiendo un sistema de excitació nelectró nico, con excitatriz de alterna tipo Brushless

16120,1–2Tumbes Nueva

GOV DEGOV1 Se estiman todos los datos, suponiendo un regulador cargafrecuencia típico para unidades Diesel

EXC EXAC1 Se estiman todos los datos suponiendo un sistema de excitació nelectró nico, con excitatriz de alterna tipo Brushless

26030,1–326032,1 y 26034,2Santa Rosa GOV GAST2A Se estiman todos los datos suponiendo una turbina de gas

convencional con combustible líquidoEXPIC1 Se estiman todos los datos suponiendo un sistema de excitació n

está tico moderno26092,1 y 26096,2Ventanilla

GAST2A Se estiman todos los datos suponiendo una turbina de gasconvencional con combustible líquido

36000,1 y 36002,2CS Antamina

EXC EXAC1 Se estiman todos los datos suponiendo un sistema de excitació nelectró nico, con excitatriz de alterna tipo Brushless

EXC EXDC2 Se estiman todos los datos suponiendo un sistema de excitació n decorriente continua

46004,1–3Oroya

GOV IEEEG3 Se estiman todos los datos, suponiendo un regulador cargafrecuencia típico con estatismo transitorio para unidades hidrá ulicas

EXC EXDC2 Se estiman todos los datos suponiendo un sistema de excitació n decorriente continua

46058,1–4Pachacha2

GOV IEEEG3 Se estiman todos los datos, suponiendo un regulador cargafrecuencia típico con estatismo transitorio para unidades hidrá ulicas.

26000,1CS Independencia

EXC EXAC1 Se estiman todos los datos suponiendo un sistema de excitació nelectró nico, con excitatriz de alterna tipo Brushless

46212,1–2Huanchor

EXC EXAC4 Se estiman todos los datos suponiendo un sistema de excitació n decorriente continua

Page 90: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 50/63

Central Equipo

Modelo Observaciones

GOV IEEEG3 Se estiman todos los datos, suponiendo un regulador cargafrecuencia típico con estatismo transitorio para unidades hidrá ulicas

EXC EXDC2 Se estiman todos los datos suponiendo un sistema de excitació n decorriente contínua

56144,1; 56146,256148,3Charcani IV GOV IEEEG3 Se estiman todos los datos, suponiendo un regulador carga

frecuencia típico con estatismo transitorio para unidades hidrá ulicasEXC EXAC4 Se estiman todos los datos suponiendo un sistema de excitació n de

corriente contínua56140,1Charcani VI

GOV IEEEG3 Se estiman todos los datos, suponiendo un regulador cargafrecuencia típico con estatismo transitorio para unidades hidrá ulicas

Page 91: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 51/63

ANEXO C5 – MODELOS DE USUARIO DE RELÉS

LDSH01

Combined Undefrequency and Rate of Frequency Load Shedding Relay

CALL LDSH01 (I,J,0,L) from CONET

This model is called at the bus

whose number is in ICON# I,

It uses CONs starting with # J,

And VARs starting with # L,

and ICONs starting with # I+1.

ICONs Value Description InternalsICONs Description

I Bus Number I+8 First rate’s stage delay flag

I+1 Suplementary signal for FRAC-1 I+9 First rate’s stage time-out flag

I+2 Suplementary signal for FRAC-2 I+10 First rate’s stage timer status

I+3 Suplementary signal for FRAC-3 I+11 Second rate’s stage delay flag

I+4 Suplementary signal for FRAC-4 I+12 Second rate’s stage time-out flag

I+5 Suplementary signal for FRAC-5 I+13 Second rate’s stage timer status

I+6 Suplementary signal for FRAC-6 I+14 Third rate’s stage delay flag

I+7 Suplementary signal for FRAC-7 I+15 Third rate’s stage time-out flag

I+16 Third rate’s stage timer status

CONs Value Description I+17 Fourth rate’s stage delay flag

J NC, Number of periods for frequency metering I+18 Fourth rate’s stage time-out flag

J+1 DF-1, First rate of frequency setting (Hz/s) I+19 Fourth rate’s stage timer status

J+2 HZDF-1, First metering start frequency (Hz) I+20 Fifth rate’s stage delay flag

J+3 TD1, First rate’s stage pickup time (Seconds) I+21 Fifth rate’s stage time-out flag

J+4 DF-2, Second rate of frequency setting (Hz/s) I+22 Fifth rate’s stage timer status

J+5 HZDF-2, Second metering start frequency (Hz) I+23 Sixth rate’s stage delay flag

J+6 TD2, Second rate’s stage pickup time (Seconds) I+24 Sixth rate’s stage time-out flag

J+7 DF-3, Third rate of frequency setting (Hz/s) I+25 Sixth rate’s stage timer status

J+8 HZDF-3, Third metering start frequency (Hz) I+26 Seventh rate’s stage delay flag

J+9 TD3, Third rate’s stage pickup time (Seconds) I+27 Seventh rate’s stage time-out flag

J+10 DF-4, Fourth rate of frequency setting (Hz/s) I+28 Seventh rate’s stage timer status

J+11 HZDF-4, Fourth metering start frequency (Hz) I+29 First point delay flag

J+12 TD4, Fourth rate’s stage pickup time (Seconds) I+30 First point time-out flag

J+13 DF-5, Fifth rate of frequency setting (Hz/s) I+31 First point timer status

J+14 HZDF-5, Fifth metering start frequency (Hz) I+32 Second point delay flag

J+15 TD5, Fifth rate’s stage pickup time (Seconds) I+33 Second point time-out flag

J+16 DF-6, Sixth rate of frequency setting (Hz/s) I+34 Second point timer status

J+17 HZDF-6, Sixth metering start frequency (Hz) I+35 Third point delay flag

Page 92: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 52/63

J+18 TD6, Sixth rate’s stage pickup time (Seconds) I+36 Third point time-out flag

J+19 DF-7, Seventh rate of frequency setting (Hz/s) I+37 Third point timer status

J+20 HZDF-7, Seventh metering start frequency (Hz) I+38 Fourth point delay flag

J+21 TD7, Seventh rate’s stage pickup time (Seconds) I+39 Fourth point time-out flag

J+22 HZ-1, First load shedding point (Hz) I+40 Fourth point timer status

J+23 T1, First point pickup time (Seconds) I+41 Fifth point delay flag

J+24 FRAC-1, First fraction of load to be shed (Pu) I+42 Fifth point time-out flag

J+25 HZ-2, Second load shedding point (Hz) I+43 Fifth point timer status

J+26 T2, Second point pickup time (Seconds) I+44 Sixth point delay flag

J+27 FRAC-2, Second fraction of load to be shed (Pu) I+45 Sixth point time-out flag

J+28 HZ-3, Third load shedding point (Hz) I+46 Sixth point timer status

J+29 T3, Third point pickup time (Seconds) I+47 Seventh point delay flag

J+30 FRAC-3, Third fraction of load to be shed (Pu) I+48 Seventh point time-out flag

J+31 HZ-4, Fourth load shedding point (Hz) I+49 Seventh point timer status

J+32 T4, Fourth point pickup time (Seconds)

J+33 FRAC-4, Fourth fraction of load to be shed (Pu) VARs Description

J+34 HZ-5, Fifth load shedding point (Hz) L First rate timer memory

J+35 T5, Fifth point pickup time (Seconds) L+1 Second rate timer memory

J+36 FRAC-5, Fifth fraction of load to be shed (Pu) L+2 Third rate timer memory

J+37 HZ-6, Sixth load shedding point (Hz) L+3 Fourth rate timer memory

J+38 T6, Sixth point pickup time (Seconds) L+4 Fifth rate timer memory

J+39 FRAC-6, Sixth fraction of load to be shed (Pu) L+5 Sixth rate timer memory

J+40 HZ-7, Seventh load shedding point (Hz) L+6 Seventh rate timer memory

J+41 T7 Seventh point pickup time (Seconds) L+7 First absolute timer memory

J+42 FRAC-7, Seventh fraction of load to be shed (Pu) L+8 Second absolute timer memory

J+43 TB, Breaker time (Seconds) L+9 Third absolute timer memory

L+10 Fourth absolute timer memory

L+11 Fifth absolute timer memory

L+12 Sixth absolute timer memory

L+13 Seventh absolute timer memory

L+14 Memory for derivative of bus frecuency

L+15 Bus frecuency derivative (pu/seconds)

L+16 Internal

L+17 Internal

0, 'USRMDL', 0, 'LDSH01' , 0, 2, 50, 44, 0, 18, ICONs list, CONs list /

Page 93: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 53/63

GTRPUF

Undefrequency Trip Motor/Generator Relay

CALL GTRPUF (I,J,0,L) from CONET

This model is called at the bus

whose number is in ICON# I,

It uses CONs starting with # J,

VARs starting with # L,

and ICONs starting with # I+1.

ICON Value Description InternalsICONs Description

I Machine Bus Number I+3 Frequency signal delay flag

I+1 IM Machine I+4 Frequency signal time-out flag

I+2 ID Relay (for documentation purposes only) I+5 Frequency signal timer status

CONs Value Description VARs Description

J FREQ, Treshold trip point (Hz) L Rate timer memory

J+1 TD, Delay pickup time (Seconds)

J+2 TB, Breaker time (Seconds)

0, 'USRMDL', 0, 'GTRPUF' , 0, 2, 6, 3, 0, 1, ICONs list, CONs list /

Notes:

(*) If Machine identifier (IM) ranges 1 to 99, the ICON(I+2) would be specified like integer, otherwise must bespecified among single quotes (for example: ‘M1’)

Page 94: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 54/63

GTRDUF

Combined Undefrequency and Rate of Frequency Trip Motor/Generator Relay

CALL GTRDUF (I,J,0,L) from CONET

This model is called at the bus

whose number is in ICON# I,

It uses CONs starting with # J,

VARs starting with # L,

and ICONs starting with # I+1.

ICON Value Description InternalsICONs Description

I Machine Bus Number I+3 Rate signal delay flag

I+1 IM Machine I+4 Rate signal time-out flag

I+2 ID Relay (for documentation purposes only) I+5 Rate signal timer status

I+6 Frequency signal delay flag

CONs Value Description I+7 Frequency signal time-out flag

J NC, Number of periods for frequency metering I+8 Frequency signal timer status

J+1 DF, Rate of frequency setting (Hz/s)

J+2 HZDF, Rate metering start frequency (Hz) VARs Description

J+3 TDF, Rate delay pickup time (Seconds) L Rate timer memory

J+4 HZ, Treshold trip point (Hz) L+1 Frequency timer memory

J+5 THZ, Thrershold pickup time (Seconds) L+2 Memory for derivative of bus frecuency

J+6 TB, Breaker time (Seconds) L+3 Bus frecuency derivative (pu/seconds)

L+4 Internal

L+5 Internal

0, 'USRMDL', 0, 'GTRDUF' , 0, 2, 9, 7, 0, 6, ICONs list, CONs list /

Notes:

(*) If Machine identifier (IM) ranges 1 to 99, the ICON(I+2) would be specified like integer, otherwise must bespecified among single quotes (for example: ‘M1’)

Page 95: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 55/63

GTRPOF

Overfrequency Trip Motor/Generator Relay

CALL GTRPOF (I,J,0,L) from CONET

This model is called at the bus

whose number is in ICON# I,

It uses CONs starting with # J,

VARs starting with # L,

and ICONs starting with # I+1.

ICON Value Description InternalsICONs Description

I Machine Bus Number I+3 Frequency signal delay flag

I+1 IM Machine I+4 Frequency signal time-out flag

I+2 ID Relay (for documentation purposes only) I+5 Frequency signal timer status

CONs Value Description VARs Description

J FREQ, Treshold trip point (Hz) L Rate timer memory

J+1 TD, Delay pickup time (Seconds)

J+2 TB, Breaker time (Seconds)

0, 'USRMDL', 0, 'GTRPOF' , 0, 2, 6, 3, 0, 1, ICONs list, CONs list /

Notes:

(*) If Machine identifier (IM) ranges 1 to 99, the ICON(I+2) would be specified like integer, otherwise must bespecified among single quotes (for example: ‘M1’)

Page 96: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 56/63

GTRDOF

Combined Overfrequency and Rate of Frequency Trip Motor/Generator Relay

CALL GTRDUF (I,J,0,L) from CONET

This model is called at the bus

whose number is in ICON# I,

It uses CONs starting with # J,

VARs starting with # L,

and ICONs starting with # I+1.

ICON Value Description InternalsICONs Description

I Machine Bus Number I+3 Rate signal delay flag

I+1 IM Machine (*) I+4 Rate signal time-out flag

I+2 ID Relay (for documentation purposes only) I+5 Rate signal timer status

I+6 Frequency signal delay flag

CONs Value Description I+7 Frequency signal time-out flag

J NC, Number of periods for frequency metering I+8 Frequency signal timer status

J+1 DF, Rate of frequency setting (Hz/s)

J+2 HZDF, Rate metering start frequency (Hz) VARs Description

J+3 TDF, Rate delay pickup time (Seconds) L Rate timer memory

J+4 HZ, Treshold trip point (Hz) L+1 Frequency timer memory

J+5 THZ, Thrershold pickup time (Seconds) L+2 Memory for derivative of bus frecuency

J+6 TB, Breaker time (Seconds) L+3 Bus frecuency derivative (pu/seconds)

L+4 Internal

L+5 Internal

0, 'USRMDL', 0, 'GTRDOF' , 0, 2, 9, 7, 0, 6, ICONs list, CONs list /

Notes:

(*) If Machine identifier (IM) ranges 1 to 99, the ICON(I+2) would be specified like integer, otherwise must bespecified among single quotes (for example: ‘M1’)

Page 97: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 57/63

CAPDUF

Combined Undefrequency and Rate of Frequency Trip Capacitor Relay

CALL CAPDUF (I,J,0,L) from CONET

This model is called at the bus

whose number is in ICON# I,

It uses CONs starting with # J,

VARs starting with # L,

and ICONs starting with # I+1.

ICON Value Description InternalsICONs Description

I Bus Number I+2 Rate signal delay flag

I+1 ID Relay (for documentation purposes only) I+3 Rate signal time-out flag

I+4 Rate signal timer status

CONs Value Description I+5 Frequency signal delay flag

J NC, Number of periods for frequency metering I+6 Frequency signal time-out flag

J+1 DF, Rate of frequency setting (Hz/s) I+7 Frequency signal timer status

J+2 HZDF, Rate metering start frequency (Hz)

J+3 TDF, Rate delay pickup time (Seconds) VARs Description

J+4 HZ, Treshold trip point (Hz) L Rate timer memory

J+5 THZ, Thrershold pickup time (Seconds) L+1 Frequency timer memory

J+6 TB, Breaker time (Seconds) L+2 Memory for derivative of bus frecuency

L+3 Bus frecuency derivative (pu/seconds)

L+4 Internal

L+5 Internal

0, 'USRMDL', 0, 'CAPDUF' , 0, 2, 8, 7, 0, 6, ICONs list, CONs list /

Notes: The model droop all capacitors modeled like switched shunt in Mode 1 (Discrete).

Page 98: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 58/63

SGNDUF

Combined Undefrequency and Rate of Frequency Condition Signal Relay

CALL SGNDUF (I,J,0,L) from CONET

This model is called at the bus

whose number is in ICON# I,

It uses CONs starting with # J,

VARs starting with # L,

and ICONs starting with # I+1.

ICON Value Description InternalsICONs Description

I Bus Number I+2 Rate signal delay flag

I+1 ID Relay (for documentation purposes only) I+3 Rate signal time-out flag

I+4 Rate signal timer status

CONs Value Description I+5 Frequency signal delay flag

J NC, Number of periods for frequency metering I+6 Frequency signal time-out flag

J+1 DF, Rate of frequency setting (Hz/s) I+7 Frequency signal timer status

J+2 HZDF, Rate metering start frequency (Hz)

J+3 TDF, Rate delay pickup time (Seconds) VARs Description

J+4 HZ, Treshold trip point (Hz) L Rate timer memory

J+5 THZ, Thrershold pickup time (Seconds) L+1 Frequency timer memory

J+6 TB, Breaker time (Seconds) L+2 Memory for derivative of bus frecuency

L+3 Bus frecuency derivative (pu/seconds)

L+4 Internal

L+5 Internal

0, 'USRMDL', 0, 'SGNDUF' , 0, 2, 8, 7, 0, 6, ICONs list, CONs list /

Page 99: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 59/63

SGNDOF

Combined Overfrequency and Rate of Frequency Condition Signal Relay

CALL SGNDOF (I,J,0,L) from CONET

This model is called at the bus

whose number is in ICON# I,

It uses CONs starting with # J,

VARs starting with # L,

and ICONs starting with # I+1.

ICON Value Description InternalsICONs Description

I Bus Number I+2 Rate signal delay flag

I+1 ID Relay (for documentation purposes only) I+3 Rate signal time-out flag

I+4 Rate signal timer status

CONs Value Description I+5 Frequency signal delay flag

J NC, Number of periods for frequency metering I+6 Frequency signal time-out flag

J+1 DF, Rate of frequency setting (Hz/s) I+7 Frequency signal timer status

J+2 HZDF, Rate metering start frequency (Hz)

J+3 TDF, Rate delay pickup time (Seconds) VARs Description

J+4 HZ, Treshold trip point (Hz) L Rate timer memory

J+5 THZ, Thrershold pickup time (Seconds) L+1 Frequency timer memory

J+6 TB, Breaker time (Seconds) L+2 Memory for derivative of bus frecuency

L+3 Bus frecuency derivative (pu/seconds)

L+4 Internal

L+5 Internal

0, 'USRMDL', 0, 'SGNDOF' , 0, 2, 8, 7, 0, 6, ICONs list, CONs list /

Page 100: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 60/63

POWLUM

Power Load Unbalance Trip Generator/Branch Relay

CALL POWLUN (I,J,0,L) from CONET

This model is called at the bus

whose number is in ICON# I,

It uses CONs starting with # J,

VARs starting with # L,

and ICONs starting with # I+1.

ICON Value Description InternalsICONs Description

I Machine Bus Number I+7 Delay flag

I+1 IM Machine (1) I+8 Time-out flag

I+2 ID Relay (for documentation purposes only) I+9 Timer status

I+3 From Bus Branch

I+4 To Bus Branch VARs Description

I+5 Circuit Branch (1) L Timer Memory

I+6 Trip Mode (0, 1 or 2)(2) L+1 Internal

L+2 Internal

CONs Value Description L+3 Internal

J Power Threshold (MW) (≥0)

J+1 Umbalance Pelec-Pmech (pu) (<0)

J+2 Delay (Seconds)

J+3 TB, Breaker time (Seconds)

0, 'USRMDL', 0, 'POWLUN' , 0, 2, 10, 4, 0, 4, ICONs list, CONs list /

Notes:

(1) If Machine or Line identifier ranges 1 to 99, the ICON(I+2) would be specified like integer, otherwise must bespecified among single quotes (for example: ‘M1’)

(2) Mode 0 trip Line only, Mode 1 trip Generator only; Mode 2 trip both Line and Generator.

Page 101: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 61/63

ANEXO C6 – FUENTES DE DATOS CONSULTADAS

Se detalla la informació n consultada, la cual fue provista por COES para el desarrollo delas tareas de construcció n de la Base de Datos para estudios diná micos de sistemas depotencia. En donde resulta claro, se menciona la clase de datos que se obtuvo desde cadafuente.− La informació n primaria de los pará metros de las má quinas síncronas y asíncronas se

obtuvo del “ANEXO-INFORME 01-EDP.xls”, y del informe adjunto “INFORME TECNICO01-ECP.doc” que describe el origen de tales datos. Se recogieron también lasactualizaciones en la versió n “Maquinas_(021003)_PREP.xls”

− De las planillas entregadas en la “Reunió n Lima 4 de junio” como “Datos Oficiales delCOES”, se extrajeron datos de potencias má ximas, mínimas, y curvas de capacidad.También se revisaron los datos de potencia nominal (MVA). Las planillas empleadas selistan a continuació n:• Gener-ter.xls• Gener-hid.xls• Ficha Aguaytia.xls• Ficha Cahua.xls• Ficha Enersur(Centrales Termicas).xls• Ficha Edegel.xls• Ficha Eepsa.xls• Ficha Egasa.xls• Ficha Egecen.xls• Ficha Egemsa.xls• Ficha Egenor.xls• Ficha Egesur.xls• Ficha Electroperu.xls• Ficha San Gaban.xls• Ficha Shougesa.xls

− Del ANEXO 03 (MAQUINAS ELECTRICAS) suministrado por COES, se adoptaron lamayoría de los modelos disponibles de los sistemas de control de los generadores, lascurvas de capacidad y se complementaron datos de inercia y pará metros de losalternadores. De este Anexo se obtuvo también la informació n con má s detalledisponible de los grandes motores síncronos y asíncronos. Se revisó también unanueva versió n de este Anexo en medio magnético (pdf).

− Informació n en papel correspondientes a diversos estudios previos, de las cuales seextrajeron datos de algunas unidades:

Page 102: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 62/63

Carpeta Empresa/Estació n Documento14 SE Tintaya Estudio de Estabilidad15 SICN Aná lisis estabilidad34 EGASA-CT Mollendo Datos de equipos38 SHOUGANG Unifilares y datos equipos para protecciones39 ENERSUR-CT Ilo Unifilares y datos de equipos49 ISA Estudios Eléctricos

− De la carpeta Informes de nuevas incorporaciones en Perú en “CD”, se adoptaron datosde MACHUPICHU contenidos en el documento “Expediente Técnico.doc”, específicopara dicha central.

− De la Planilla EXCEL “Gen31_7_02.xls”, se contrastaron datos para flujo de cargas ycortocircuito.

Otros datos obtenidos en medio magnético:• desde “CH Charcani 2 modelos.zip” se obtuvo “ch charcani 2 modelos.tif”, con los

modelos diná micos recomendados para los sitemas de control.• desde el documento “datos_ilo.doc” se obtuvieron los datos de la central ILO 1 y 2.• desde el documento “equivalentes generador Zarumilla_Merced.doc”

Otros datos en forma impresa (papel), contienen extractos de los informes que se citan acontinuació n:

Informe Nº 5: Datos adicionales de la unidad Westinghouse de Santa Rosa para laactualizació n de la base de datos diná micos del sistema. Recibidopor el COES el 8/8/2002

Informe Nº 6: Pedido de datos acerca de la central ILO2. Recibido por el COES el9/8/2002

Informe Nº 8: Estudio Actualizació n de la base de datos diná micos del sistema.Recibido por el COES el 14/8/2002 (Primera pá gina: listado delenvío, última pá gina: curvas características del alternador)

Informe Nº 10: Estudio Actualizació n de la base de datos diná micos del sistema.Recibido por el COES el 22/8/2002

Informe Nº 19: Características Técnicas de los Grupos de Generació n de la C.T.Chiclayo. Recibido por el COES el 20/8/2002

Informe Nº 20: Pará metros Eléctricos y Mecá nicos de los Sistemas de. Recibido porel COES el 20/8/2002

Informe Nº 21: Informe Ejecutivo de Características Técnicas de las C.T. Chimbotey C.T. Trujillo. Recibido por el COES el 20/8/2002 (Capítulos 5 y 6)

Informe Nº 22: C.T. Piura. Datos generales de los grupos, transformadores decorriente, de tensió n, interruptor principal, diagrama unifilar deprotecció n. Recibido por el COES el 20/8/2002)

Page 103: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 63/63

Informe Nº 27: C.T. Piura - Turbogas. Recibido por el COES el 20/8/2002(Observació n: la primer pá gina posee datos del generador)

Informe Nº 29: Características técnicas y diagramas unifilares de las C.T. Sullana yC.T. Paita. Recibido por el COES el 20/8/2002 (Pá ginas 3 y 4)

Informe Nº 30: SSEE Huallanca, ajustes de relés. Recibido por el COES el20/8/2002 (Solamente se envían los datos de los grupos ydiagramas unifilares de la central, 10 pá ginas y 2 planos)

Otros datos se obtuvieron desde el esquema unifilar:Esquema Unifilar “ PLANO SEIN 021003_TOTAL.dwg”

Page 104: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 1/3

INDICE DEL CONTENIDO

ANEXO C1B................................ ................................ ................................ ............................ 2

Page 105: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 2/3

ANEXO C1B

We have been involved in one study for the design and the review of the load-shedding plan on the electrical interconnected system. The study, as required by ourcustomer in the contract, must be executed using the simulator PSS/E.

The simulations to be executed involve perturbations that lead to importantfrequency deviations in the network.

We have detected an anomalous behaviour on the standard generator models of thesynchronous machine GENROU and GENSAL (Round Rotor and Salient Pole GeneratorModel); these models are normally used in dynamics analyses with PSS/E.

We have carried out a test with the simplest network shown in the scheme below.The figure shows the curves of the frequency in bus 1 LOAD. In this figure there is acomparison of the results when we use a classic model of generator GENCLS (constantinternal voltage model) with a GENSAL model. Saturation and damping haven’t beenconsidered in the generator, no Governors have been implemented (constant Pmech ), theload has been considered at constant P (active power), an AVR has been implemented inorder to keep constant the voltage in bus 1 LOAD.

Fig. 1 Network scheme used for the test

G1

100 MW

5 MW at t=0-

95 MW at t=0-

Opened at t=0.100sec-

1 LOAD

G2

Page 106: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 3/3

Fig. 2 Comparison between GENSAL and CLASSIC generator models

After the perturbation (switch off the generator G2) the frequency on bus 1 LOAD must startto decrease permanently towards zero due to the negative acceleration (Pload=100MW,Pmech=95MW). From the curves it is possible to derive that the classic model GENCLShas a response as we expected, while the generator with a more elaborate representationGENSAL reaches a stable condition.

We checked this behaviour, and we can confirm that in the rotor acceleration

equation used for GENSAL and GENROU model,the term Telec isn't an electrical torque but it is an electrical power.

To detect the above mentioned mistake, we have carried out the following test: theload in bus 1 LOAD has been modelled with a dependence on frequency with negativeexponent equal 1; in this case, the GENSAL behaviour becomes identical to the GENCLSmodel.

CLASSIC

GENSAL

Page 107: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/025820

ANEXO D

DESCRIPCIÓN DEL FORMATO PARA LA RECOPILACIÓN Y EL INTERCAMBIO DE LOS DATOS

Page 108: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final

RETE-A3/025820 Page 2/13

Datos necesarios para los estudios de planificación En este anexo se presenta el formato a utilizar para la entrega de los datos necesarios para realizar los estudios de planificación. Los datos están relacionados con los componentes específicos de la red, es decir:

a) BARRAS b) CARGAS c) CAPACITORES Y REACTORES d) LÍNEAS AÉREAS e) CABLES f) TRANSFORMADORES g) GENERADORES Y MOTORES SINCRONICOS

Además, en las secciones h) e i) están descritas las modalidades de entrega de indicaciones relativas a:

h) CURVAS DE DURACIÓN DE CARGA Y GENERACIÓN i) PLANES DE EXPANSIÓN DE LA RED

Indisponibilidades: - para las líneas se debe suministrar el “ ” (indisponibilidad) en p.u. y para cada 100 km de

línea. - Para los generadores y transformadores se suministra el “ ” en p.u.

Page 109: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final

RETE-A3/025820 Page 3/13

a) Sección BARRAS

Datos

Unidad (pr opuesta)

Comentar ios

Código de la barra (ID de barra) Nombre geográfico de la subestación Tensión nominal Tensión de funcionamiento mínima en condiciones normales de funcionamiento Tensión de funcionamiento mínima en situaciones de emergencia Tensión de funcionamiento máxima en condiciones normales de funcionamiento Tensión de funcionamiento mínima en situaciones de emergencia Nombre de identificación de área Código de identificación de área

kV

kV

kV

kV

kV

Entre Fases

Page 110: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final

RETE-A3/025820 Page 4/13

b) Sección CARGAS

Datos

Unidad (pr opuesta)

Comentar ios

Código de la barra (1) Carga activa (2) Carga reactiva Factor de prioridad para el alivio de carga (3)

MW

Mvar

De 1 a 4

(1) El código de la barra debe pertenecer a la lista de barras (véase la sección BARRAS). (2) Se piden valores sin pérdidas. (3) Utilizado en el análisis de fiabilidad, 1 es la prioridad más alta para la desconexión de la carga. Comentario: Los valores de las cargas son aquellos que corresponden al estado de consumo sincrónico (por lo tanto, estos valores difieren de los valores máximos que pueden alcanzarse en cada subestación).

Page 111: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final

RETE-A3/025820 Page 5/13

c) Sección CAPACITORES y REACTORES

Datos

Unidad (pr opuesta)

Comentar ios

Código de la barra (1) Tensión nominal entre fases Valor máximo de capacitor Valor máximo de reactor Tamaño de los escalones Conmutable Barra candidata (1) (2)

kV

Mvar Mvar

Número

Sí o No

> 0 si presente < 0 si presente Siempre > 0 Sí o No

(1) la ID de la barra debe pertenecer a la lista de barras (véase la sección BARRAS). (2) Se utiliza para el cálculo del reactivo óptimo. No se requieren los valores de compensación shunt para las barras

candidatas. Podría proporcionarse sobre los límites eventuales de la clasificación de reactivo.

Page 112: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final

RETE-A3/025820 Page 6/13

d) Sección LÍNEAS AÉREAS

Datos Unidad

(pr opuesta) Comentar ios

Código de la barra primer extremo (1)

Código de la barra segundo extremo (1)

Código de la línea Código diferente si varias líneas en paralelo

Para circuito doble en la misma torre, código de la otra línea (2)

Tensión nominal kV Longitud de la línea km Parámetros de secuencia positiva a frecuencia nominal: -resistencia de la línea Ω/km -reactancia de la línea Ω/km -capacitancia de la línea nF/km

Parámetros de secuencia cero a frecuencia nominal: -resistencia de la línea Ω/km -reactancia de la línea Ω/km -capacitancia de la línea nF/km

Corriente máxima en condiciones normales: Imax1 kA Límite térmico de la línea: Imax2 (2) kA Fiabilidad: Tasa de averías (3) p.u. Averías para circuito doble en la misma torre (3) p.u. Primera semana de mantenimiento programado De 1 a 52 Duración del mantenimiento programado en semanas Numérico (1) Los nombres de las barras de los dos extremos deben pertenecer a la lista de barras (véase la sección BARRAS). (2) Utilizado para análisis de contingencia. (3) Valor medio anual para 100 km.

Page 113: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final

RETE-A3/025820 Page 7/13

e) Sección CABLES

Datos Unidad

(pr opuesta) Comentar ios

Código de la barra primer extremo (1)

Código de la barra segundo extremo (1)

Código de línea Código diferente si varias líneas en paralelo

Para circuito doble en la misma torre, código de la otra línea (2)

Tensión nominal kV Longitud km Parámetros de secuencia positiva a frecuencia nominal: -resistencia de la línea Ω/km -reactancia de la línea Ω/km -capacitancia de la línea nF/km

Parámetros de secuencia cero a frecuencia nominal: -resistencia de la línea Ω/km -reactancia de la línea Ω/km -capacitancia de la línea nF/km

Corriente máxima bajo condiciones normales: Imax1 kA Límite térmico de la línea: Imax2 (2) kA Fiabilidad: Tasa de averías (3) p.u. Averías para circuito doble en la misma torre (4) p.u. Primera semana de mantenimiento programado de 1 a 52 Duración del mantenimiento programado en semanas numérico (1) Los nombres de las barras de los dos extremos deben pertenecer a la lista de barras (véase la sección BARRAS). (2) Utilizado para análisis de contingencia. (3) Valor medio anual para 100 km.

Page 114: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final

RETE-A3/025820 Page 8/13

f) Sección TRANSFORMADORES

Datos Unidad

(pr opuesta) Comentar ios

Código de la barra primer extremo (1)

Código de la barra segundo extremo (1)

Código de transformador

Tensión nominal del lado de mayor tensión kV lado primario

Tensión nominal del lado de menor tensión kV lado secundario

Tensiones de funcionamiento a potencia nominal: - Tensión máxima kV - Tensión mínima kV

Potencia nominal del transformador: Sn MVA

Características

Pérdidas en el cobre p.u o % Sn base

Reactancia de cortocircuito p.u o % Sn base

Pérdidas en el hierro p.u o % Sn base SN1: coeficiente de sobrecarga bajo condiciones de funcionamiento normales

p.u. Sn base

SN2: coeficiente de sobrecarga bajo condiciones de funcionamiento de emergencia

p.u. Sn base

Conmutador de toma - Lado Alta tensión o baja

tensión

- Bajo carga Sí o no - Sin carga Sí o no

Campo de variación de la tensión - Máximo % o p.u - Mínimo % o p.u

Puesta a tierra Conexión del devanado del: -lado de mayor tensión Y, D o Z Estrella, delta o Zig-Zag -lado de menor tensión Y, D o Z Estrella, delta o Zig-Zag

Puesta a tierra del neutro (si existe) Alta tensión o baja

tensión Proporcionar el lado de la conexión

Resistencia Ohm Reactancia Ohm

Fiabilidad Tasa de salidas de servicio forzadas p.u. Primera semana de mantenimiento programado de 1 a 52 Duración del mantenimiento programado en semanas Numérico (1) el nombre de la barra debe pertenecer a la lista de barras (véase la sección BARRAS). Se supone que la mayoría de los transformadores de la red sean de dos devanados; en caso de existir algún tipo de transformador con mayor número de devanados, se incluirá una descripción especial.

Page 115: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final

RETE-A3/025820 Page 9/13

Si existiese algún tipo de transformador con relación de transformación en cuadratura o en diagonal, se incluirá una descripción especial. Los transformadores step-up para las transformaciones de tensión media / tensión alta de los grupos de generación deben introducirse en la presente sección como transformadores de transmisión normales.

Page 116: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final

RETE-A3/025820 Page 10/13

g) Sección GENERADORES – MOTORES SINCRONICOS Se pretende que se describan en esta sección tanto las unidades de generación como los compensadores sincrónicos. La tensión terminal de la máquina debe entenderse como la media tensión la barra del transformador step-up en el lado del generador.

Datos Unidad

(pr opuesta) Comentar ios

Código del generador

Código de la barra (1)

Tipo de generador (2) Código: L, R, GT, T, D,

CC, N

Parámetros eléctr icos Tensión nominal MVA Frecuencia nominal Hz Número de polos número Tensión entre fases Potencia activa generada MW Un valor para la hipótesis de

estudio Factor de potencia nominal Entre 0 y 1 cos phi Potencia activa máxima MW Valor disponible del lado de

la red Potencia activa mínima MW Potencia reactiva máxima Mvar Potencia reactiva mínima Mvar Q<0 si bajo excitación Potencia máxima para energizar una línea de transmisión, en sub excitación, a velocidad y tensión nominales

MVA

Potencia máxima al funcionar como compensador sincrónico, con excitación, a velocidad y tensión nominales

MVA

Conexión del devanado del estator y estado del neutro (Y,D)

p.u.

Datos del fabr icante (expresados en p.u. de kV nominal y base MVA)

p.u.

-Xd: reactancia sincrónica longitudinal no saturada. p.u. -Xq: reactancia sincrónica transversal no saturada. p.u. -X'd: reactancia transitoria longitudinal no saturada. p.u. -X'q: reactancia transitoria transversal no saturada. p.u.

Page 117: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final

RETE-A3/025820 Page 11/13

-X''d: reactancia subtransitoria longitudinal no saturada. p.u. -X''q: reactancia subtransitoria transversal no saturada. p.u. -X2: reactancia de secuencia inversa no saturada. p.u. -X0: reactancia de secuencia cero no saturada. p.u. -X1: reactancia del flujo disperso no saturada. p.u. -Ra: resistencia de armadura Ω -Rn: parte real de la reactancia de puesta a tierra del neutro

Ω

-Xn: parte imaginaria de la impedancia de puesta a tierra del neutro

Ω

Xp: Reactancia de Potier. p.u. Datos del fabr icante (expresados en segundos): -T'd0: constante de tiempo transitoria longitudinal en circuito abierto.

s

-T''d0: constante de tiempo subtransitoria longitudinal en circuito abierto.

s

-T'q0: constante de tiempo transitoria transversal en circuito abierto.

s

-T''q0: constante de tiempo subtransitoria transversal en circuito abierto.

s

o (preferiblemente) s -T'd: constante de tiempo transitoria longitudinal en cortocircuito

s

-T''d: constante de tiempo subtransitoria longitudinal en cortocircuito

s

-T'q: constante de tiempo transitoria transversal en cortocircuito.

s

-T''q: constante de tiempo subtransitoria transversal en cortocircuito.

s

-H: constante de inercia (generador más motor primario) sobre base de MVA nominal

s

Sistema de excitación -Tipo (fabricante, número de modelo). -diagrama funcional: -tensión máxima nominal del excitador (polaridad +). -tensión máxima nominal del excitador nominal (polaridad -).

-ganancias, constantes de tiempo del diagrama funcional, etc.

Sistema regulador -Tipo de motor primario. -Tipo de regulador. -Diagrama funcional

Fiabilidad: Tasa de averías incluido el transformador step-up Entre 0 y 1 Duración del mantenimiento programado en semanas (sobre una base anual)

Numérico

Tipo de combustible (4) Código

Page 118: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final

RETE-A3/025820 Page 12/13

(1) La barra debe pertenecer a la lista de barras (véase la sección BARRAS). Cualquier transformador step-up que

esté conectado a esta barra debe incluirse en la lista de transformadores. (2) Puede utilizarse la siguiente codificación:

Generadores hidráulicos L Lago R Agua fluyente

Generadores térmicos T Generador de vapor clásico GT Turbina de gas D Diesel CC Ciclo combinado N Nuclear

(3) Para el cálculo de potencia de cortocircuito (4) Puede utilizarse la siguiente codificación (en blanco para unidades hidráulicas):

C Carbón F Aceite L Lignito D Gasóleo o aceite fluido G Gas N Nuclear

Page 119: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final

RETE-A3/025820 Page 13/13

h) Sección CURVAS DE DURACIÓN DE CARGAS Y GENERACIÓN Para los análisis de fiabilidad, deben proporcionarse los valores horarios (8760 puntos, empezando el 1 de enero) de la carga regional total (en MW) para el año en curso, con el fin de poder determinar las curvas de duración de carga relativa. También se deberá incluir la tasa de crecimiento para los años siguientes hasta el horizonte temporal definido.

(i) Sección PLANES DE EXPANSIÓN DE LA RED Tomando como referencia las tablas que aparecen más arriba, se deberá proporcionar la información necesaria acerca de la expansión y las retiradas de servicio de la red hasta el último año del horizonte temporal a estudiar. Para las nuevas subestaciones, barras, líneas, transformadores y unidades de generación, la información proporcionada deberá incluir el año de entrada en servicio, mientras que para los elementos que vayan a ser retirados del servicio, únicamente será necesario citar la fecha de esta ocurrencia (en este caso, el componente debe pertenecer a alguno ya descrito).

Page 120: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/025820

ANEXO E

BASE DE DATOS DEL SEIN

Page 121: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag. 1 de 65

# Nombre # Nombre # Nombre1 COSTANORTE 1 AREAOP01 1 ANTAMINA2 COSTACENTRO 2 AREAOP02 2 TRANSMAN3 SIERRANORTE 3 AREAOP03 3 CAHUA 4 SIERRACENTRO 4 AREAOP04 4 CNPENERG5 COSTASUR 5 AREAOP05 5 CONENHUA6 SIERRASUR 6 AREAOP06 6 EDEGEL

7 AREAOP07 7 EDELNOR 8 AREAOP08 8 EEPSA 9 AREAOP09 9 EGASA

10 AREAOP10 10 EGEMSA 11 AREAOP11 11 EGENOR 12 AREAOP12 12 EGESUR 13 AREAOP13 13 ELCENTRO14 AREAOP14 14 ELNOROES15 AREAOP15 15 ELENORTE16 AREAOP16 16 ELECPUNO17 AREAOP17 17 ELECTSUR18 AREAOP18 18 ELEANDES19 AREAOP19 19 ELECPERU20 AREAOP20 20 ENERSUR

21 ETECEN 22 ETESELVA23 ETESUR 24 ETEVENSA25 HIDRANDI26 LUDELSUR27 REDESUR 28 SGABAN 29 SEAL 30 SHOUGESA32 TERMOSEL33 COELVISA34 DOERUNPE36 ELSURMED37 ADINELSA38 DESCONOC39 COES 40 ISAPERU

AREA ZONA PROPIETARIO

Page 122: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag. 2 de 65

Vn Area Zona Propiet.# Nombre kV # # #11000 HUALLANC 138.0 1 7 1111002 MOTIL 138.0 1 18 2511004 CHIMBSUR 138.0 1 7 2511006 NEPEÑA 138.0 1 7 2511008 CASMA 138.0 1 7 2511010 SANJACIN 138.0 1 7 2511012 SANTA 138.0 1 7 2511014 PIERINA 138.0 1 7 2511032 CHIMBNOR 138.0 1 7 2511038 PORVENIR 138.0 1 6 2511042 CHIMBOTE 138.0 1 7 5111044 CHIMBOT2 138.0 1 7 1111046 PARAMONU 138.0 1 8 2111048 PARAMEXI 138.0 1 8 311050 CAHUA 138.0 1 8 311064 SANTICAO 138.0 1 18 2511078 TRUJINOR 138.0 1 18 2511082 TRUJISUR 138.0 1 6 2512000 GUADALUP 220.0 1 5 2112002 SIDELFON 220.0 1 21 5112008 CHICLAOE 220.0 1 4 2112010 CARHUAQU 220.0 1 4 1112016 PIURAOES 220.0 1 3 2112036 CHIMBOT1 220.0 1 7 2112040 PARAMONU 220.0 1 8 2112062 TRUJINOR 220.0 1 18 2112074 TALARA 220.0 1 2 2112108 ZORRITOS 220.0 1 1 1912112 HUACHO 220.0 1 8 2112114 CAJAMARC 220.0 1 11 514000 CTTUMBES 60.0 1 1 1914002 MANCORA 60.0 1 1 1914004 CHICLANO 60.0 1 4 1514006 CHICLAYO 60.0 1 4 2114008 ZARUMILL 60.0 1 1 1414010 LAUNION 60.0 1 3 1414012 SECHURA 60.0 1 3 1414014 HUALLANC 66.0 1 7 2514016 CONSTANT 60.0 1 3 1414018 PIURAOES 60.0 1 3 2114020 PIURACEN 60.0 1 3 1414022 CARHUAZ 66.0 1 7 2514024 HUARAZ 66.0 1 7 2514026 TICAPAMP 66.0 1 7 2514028 SULLANA 60.0 1 3 1414030 CARAZ 66.0 1 7 2514032 ELARENAL 60.0 1 3 1414034 PAITA 60.0 1 3 1414036 PARIAC 66.0 1 7 2514038 T-COLAN 60.0 1 3 1414040 T-TPIUSU 60.0 1 3 1414042 CHULUCAN 60.0 1 3 1414044 CARHUAQU 60.0 1 4 1114046 POMALCA 60.0 1 4 1514048 TUMAN 60.0 1 4 1514050 CAYALTI 60.0 1 4 1514052 MOTUPE 60.0 1 4 1514054 TEXTPIUR 60.0 1 3 1414058 GUADALUP 60.0 1 5 2114060 OLMOS 60.0 1 4 1514062 PACASPUE 60.0 1 5 2514064 CAJAMARC 60.0 1 5 2514066 LAPAJUEL 60.0 1 11 514068 LAPAMPA 66.0 1 7 2514070 T-HUALLA 66.0 1 7 2514072 SIHUAS 66.0 1 7 2514074 PALLASCA 66.0 1 7 2514076 EJIDOS 60.0 1 3 1414078 9DEOCTUB 66.0 1 8 714080 CASTILLA 60.0 1 3 1414082 SUPE 66.0 1 8 714086 PARAMON1 66.0 1 8 2114088 PARAMON2 66.0 1 8 2114090 CEMPACAS 60.0 1 5 2514092 ANDAHUAS 66.0 1 8 51

BARRASBARRAS

Page 123: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag. 3 de 65

Vn Area Zona Propiet.# Nombre kV # # #

BARRASBARRAS

14094 GALLCIEG 60.0 1 5 2514096 TEMBLADE 60.0 1 5 2514098 CHILETE 60.0 1 5 2514100 T-PARIAC 66.0 1 7 2514104 CURUMUY 60.0 1 3 1414106 PTOANTAM 66.0 1 8 114110 ZORRITOS 60.0 1 1 1914116 HUACHO 66.0 1 8 2114118 TUMBES 60.0 1 1 1914124 COLAN 60.0 1 1 1414130 CAJMARCN 60.0 1 5 2514132 HUALMAY 66.0 1 8 5114134 SANMARCO 60.0 1 5 2514136 T-SUPE 66.0 1 8 714138 LAMBAYEQ 60.0 1 4 1514140 ILLIMO 60.0 1 4 1514142 LAVIÑA 60.0 1 4 1514144 CAJABAMB 60.0 1 5 2514146 TUNEL 60.0 1 4 1514148 HUARMEY 66.0 1 8 2514150 CHIMBSUR 66.0 1 7 2516000 CAÑDPAT1 13.8 1 7 1116002 CAÑDPAT2 13.8 1 7 1116004 CAÑDPAT3 13.8 1 7 1116006 CAÑDPAT4 13.8 1 7 1116008 CAÑDPAT5 13.8 1 7 1116010 CAÑDPAT6 13.8 1 7 1116012 CARHUAQ1 10.0 1 4 1116014 CHICLGMT 10.5 1 4 1116016 CARHUAQ2 10.0 1 4 1116018 CARHUAQ3 10.0 1 4 1116020 L.MERCED 10.0 1 1 1916024 PIURATG 10.0 1 3 1116026 PIURA 4.8 1 3 1116030 INADE 10.0 1 3 1116032 ZARUMILL 10.0 1 1 1916034 PARIAC 13.2 1 7 316050 CHICLSLZ 10.5 1 4 1116052 CAHUA1 10.0 1 8 316054 CAHUA2 10.0 1 8 316056 SULLANA1 4.2 1 3 1116058 SULLANA2 4.2 1 3 1116060 SULLANA3 4.2 1 3 1116066 TRUPAL 13.8 1 18 1116068 SIDERNOR 13.2 1 7 1116070 SIDERSUR 13.8 1 7 1116072 MALACAS 13.8 1 2 816084 TRUJISUR 10.0 1 6 1116090 CEMPACAS 2.3 1 5 416092 CEMPACSZ 6.3 1 5 416094 GALLCIE1 10.5 1 5 416096 GALLCIE2 10.5 1 5 416098 MALACAS 13.2 1 2 816100 PAITAEMD 4.2 1 3 1116102 PAITASK1 2.4 1 3 1116104 PAITASK2 2.4 1 3 1116106 PAITASK3 2.4 1 3 1116108 CURUMUY 10.0 1 3 5116120 TUMBES 10.0 1 1 1917000 CHIMBO13 13.8 1 7 2117002 CTTUMBES 33.0 1 1 1917004 MANCORA 22.9 1 1 1917006 MANCORA 10.0 1 1 1917008 ZORRITOS 10.0 1 1 1917010 L.MERCED 33.0 1 1 1417012 ZARUMILL 22.9 1 1 1417016 MALACAS1 33.0 1 2 817018 REF.TALA 33.0 1 2 817020 REF.TALA 2.4 1 2 817022 PIURA 10.0 1 3 1117024 PIURAOE1 10.0 1 3 2117026 PIURAOE2 10.0 1 3 2117028 LAUNION 10.0 1 3 1417032 SECHURA 10.0 1 3 1417034 CONSTANT 22.9 1 3 14

Page 124: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag. 4 de 65

Vn Area Zona Propiet.# Nombre kV # # #

BARRASBARRAS

17036 CONSTANT 10.0 1 3 1417038 PAITA 10.0 1 3 1117040 ELARENAL 13.8 1 3 1417042 COLAN 4.8 1 3 1417044 CHULUCAN 10.0 1 3 1417046 CHULUCAN 22.9 1 3 1417048 CHICLAYO 10.5 1 4 1117050 CHICLAY1 0.4 1 4 2117052 CHICLAY2 0.4 1 4 2117054 CHICLAN1 10.0 1 4 1517056 POMALCA 10.0 1 4 1517058 TUMAN 10.0 1 4 1517060 CHIMBNOR 13.8 1 7 2517062 CAYALTI 10.0 1 4 1517064 POMALCA 22.9 1 4 1517066 TUMAN 22.9 1 4 1517068 CAYALTI 22.9 1 4 1517070 MOTUPE 10.0 1 4 1517072 OLMOS 10.0 1 4 1517074 CEMPACAS 6.3 1 5 417076 PARAMEXI 13.8 1 8 2117078 CEMPACA2 6.3 1 5 417080 TRUJINO3 10.0 1 6 2117082 PACASPUE 10.0 1 5 2517084 CAJAMARC 10.0 1 5 2517086 TRUJSUR2 10.0 1 6 2517088 MOTIL 7.0 1 18 2517090 SANTICAO 34.5 1 18 2517092 TRUJNSVC 8.0 1 6 2117094 PORVENIR 10.0 1 6 2517096 SALAVERR 33.0 1 6 2517098 TRUJINO1 10.0 1 18 2117100 TRUJINO2 10.0 1 18 2117102 CAJAMNOR 10.0 1 11 517104 LAPAJUEL 10.0 1 11 517106 CHIMBO11 13.8 1 7 2117108 CHIMBO12 13.8 1 7 2117110 CHIMBSUR 13.8 1 7 2517112 NEPEÑA 13.8 1 7 2517114 SANJACIN 13.8 1 7 2517116 SANTA 13.8 1 7 2517118 CASMA 10.0 1 7 2517122 PIERINA 13.8 1 7 2517124 HUALLANC 13.8 1 7 1117126 CARAZ 13.8 1 7 2517128 CARHUAQU 22.9 1 4 1117130 CARHUAZ 13.2 1 7 2517132 HUARAZ 13.2 1 7 2517134 TICAPAMP 13.2 1 7 2517136 PALLASCA 10.0 1 7 2517138 PALLASCA 22.9 1 7 2517140 CAJABAMB 22.9 1 5 2517142 GUADALU1 10.0 1 5 2117144 GUADALU2 10.0 1 5 2117146 SIHUAS 2.4 1 7 2517148 LAPAMPA 13.8 1 7 2517150 SUPE 10.0 1 8 717152 CHICLSVC 8.0 1 4 2117154 LAMBAYEQ 10.0 1 4 1517156 HUARMEY 22.9 1 8 2517158 HUARMEY 10.0 1 8 2517162 PARAMONU 10.0 1 8 2117164 HUALMAY 10.0 1 8 717168 ANDAHUAS 10.0 1 8 717170 HUACHO 10.0 1 8 2117172 SULLANA 10.0 1 3 1117174 TEXTPIUR 10.0 1 3 1417176 CHICLAN2 10.0 1 4 1517178 CHIMBOT2 13.8 1 7 1117180 ANDAHUAS 22.9 1 8 717182 MOTIL 33.0 1 18 2517184 MALACAS2 33.0 1 2 817186 MALACAS3 33.0 1 2 817188 CAJABAMB 10.0 1 5 2517190 MALACAS 3.6 1 2 8

Page 125: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag. 5 de 65

Vn Area Zona Propiet.# Nombre kV # # #

BARRASBARRAS

17192 CASTILLA 10.0 1 3 1417194 ILLIMO 10.0 1 4 1517196 ILLIMO 22.9 1 4 1517198 TEMBLADE 13.2 1 5 2517200 TEMBLADE 2.4 1 5 2517202 CHILETE 10.0 1 5 2517204 CHILETE 22.9 1 5 2517206 PTOANTA1 4.2 1 8 117208 PTOANTA2 4.2 1 8 117210 LAPAJUEL 22.9 1 11 517212 YURACMAR 13.8 1 7 2517214 LAVIÑA 10.0 1 4 4717216 SANMARCO 22.9 1 5 2517218 SANMARCO 10.0 1 5 2519000 N-TUMBES 1.0 1 1 1919002 N-MANCOR 1.0 1 1 1919004 N-ZORRIT 1.0 1 1 1919006 N-ZARUMI 1.0 1 1 1419008 N-PIURO1 1.0 1 3 2119010 N-PIURO2 1.0 1 3 2119012 N-CONSTA 1.0 1 3 1419014 N-CHULUC 1.0 1 3 1419016 N-CARHUA 1.0 1 4 1119018 N-CHICL1 1.0 1 4 2119020 N-CHICL2 1.0 1 4 2119022 N-POMALC 1.0 1 4 1519024 N-TUMAN 1.0 1 4 1519026 N-CAYALT 1.0 1 4 1519028 N-SANTIC 1.0 1 18 2519030 N-TRUJN1 1.0 1 18 2119032 N-TRUJN2 1.0 1 18 2119034 N-PALLSC 1.0 1 7 2519036 N-HUACHO 1.0 1 8 2119038 N-ANDAHS 1.0 1 8 5119040 N-CTTUMB 1.0 1 1 1419042 N-CAJAMN 1.0 1 11 519044 N-HUALLA 1.0 1 7 1119046 N-LAPAJU 1.0 1 11 519048 MALACAZZ 1.0 1 2 819050 CHICLAZZ 1.0 1 4 1519146 N-CHMB11 1.0 1 7 2119148 N-CHMB12 1.0 1 7 2119150 N-PARAM1 1.0 1 8 2119152 N-PAITA 1.0 1 3 1119154 N-GUADA1 1.0 1 5 2119156 N-GUADA2 1.0 1 5 2119158 N-PARAM2 1.0 1 8 2119160 N-MOTIL 1.0 1 18 2519162 N-ILLIMO 1.0 1 4 1519164 N-TEMBLA 1.0 1 5 2519166 N-CHILET 1.0 1 5 2519168 N-HUARME 1.0 1 8 2519170 N-CHIMBS 1.0 1 8 2519172 N-CAJABA 1.0 1 5 2519174 N-SNMARC 1.0 1 5 2522000 ZAPALLAL 220.0 2 9 2122002 VENTANIL 220.0 2 9 2122004 CHAVARR 220.0 2 9 2122006 STA.ROSA 220.0 2 9 2122008 CJMARQUI 220.0 2 9 622010 BARSI 220.0 2 17 722012 C1-BARSI 220.0 2 17 722014 C2-BARSI 220.0 2 17 722016 T-ICA 220.0 2 12 2122044 BALNEARI 220.0 2 19 2622046 SANJUAN 220.0 2 9 2122050 INDEPEND 220.0 2 12 2122056 ICA 220.0 2 12 2122058 MARCONA 220.0 2 10 2122122 ACE.AREQ 220.0 2 12 2124000 CHAVASVC 60.0 2 9 724002 NARANJAL 60.0 2 9 724004 INFANTAS 60.0 2 9 724006 CAUDIVIL 60.0 2 9 724008 CHAVARR 60.0 2 9 7

Page 126: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag. 6 de 65

Vn Area Zona Propiet.# Nombre kV # # #

BARRASBARRAS

24010 PTEPIEDR 60.0 2 9 724012 TOMVALLE 60.0 2 9 724014 OQUENDO 60.0 2 9 724016 ZAPALLAL 60.0 2 9 724018 CHANCAY 60.0 2 9 724020 VENTANIL 60.0 2 9 724026 ANCON 60.0 2 9 724028 HUARAL 60.0 2 9 724030 PAMPILLA 60.0 2 9 724034 PERSHING 60.0 2 17 724036 MARANGA 60.0 2 17 724038 STAMARIA 60.0 2 17 724040 BALNEARI 60.0 2 19 2624042 INDUSTRI 60.0 2 17 724048 SANJUAN 60.0 2 9 2624052 INDEPEND 60.0 2 12 2124054 CHORRILL 60.0 2 9 2624056 TRENELEC 60.0 2 9 2624058 VILMARIA 60.0 2 9 2624060 MARCONA 60.0 2 10 2124062 SNICOLAS 60.0 2 10 2124064 VIELSALV 60.0 2 9 2624066 ICA 60.0 2 12 2124068 BARSI 60.0 2 17 724070 ATOCONGO 60.0 2 9 2624072 PACHACAM 60.0 2 9 2624074 LURIN 60.0 2 9 2624076 LASPRADE 60.0 2 9 2624078 SBARTOLO 60.0 2 9 2624082 TAMBDMOR 60.0 2 12 3624084 CHINCHA 60.0 2 12 3624086 PISCO 60.0 2 12 3624088 ELCARMEN 60.0 2 12 3624090 STA.ROSV 60.0 2 9 724092 ALTDLUNA 60.0 2 12 3624094 PARACAS 60.0 2 12 3624096 CAÑETE 60.0 2 12 3624098 ICANORTE 60.0 2 12 3624100 SANJUAN2 60.0 2 9 2624102 MEPSA 60.0 2 9 2624104 MIRONES 60.0 2 9 2624106 PANDO 60.0 2 17 2624108 STAMARGA 60.0 2 12 3624110 PALPA 60.0 2 10 3624112 NAZCA 60.0 2 10 3624114 PUQUIO 60.0 2 10 3624116 BELUNION 60.0 2 10 3624118 JGALVEZ 60.0 2 9 2624120 LIMATAM1 60.0 2 19 2624122 LIMATAM2 60.0 2 19 2624124 BALNESVC 60.0 2 19 2624126 BARRANCO 60.0 2 19 2624128 NEYRA 60.0 2 19 2624130 SISIDRO1 60.0 2 19 2624132 SISIDRO2 60.0 2 19 2624134 C3-BARSI 60.0 2 17 724136 C1-PANDO 60.0 2 17 724138 C4-BARSI 60.0 2 17 724140 C5-BARSI 60.0 2 17 724142 C1-PERSH 60.0 2 17 724144 C-TOMVAL 60.0 2 9 724146 C6-BARSI 60.0 2 17 724148 T-PALPA 60.0 2 10 3624150 T-PARACA 60.0 2 12 3624152 T-ALTLUN 60.0 2 12 3624154 T-ICANOR 60.0 2 12 3624156 TACAMA 60.0 2 12 3624158 VILLACUR 60.0 2 12 3624160 T-CARMEN 60.0 2 12 3624162 T-MORA 60.0 2 12 3624164 T-PEDREG 60.0 2 12 3624166 T-PNUEVO 60.0 2 12 3624168 T-MEPSA 60.0 2 9 2624170 PEDREGAL 60.0 2 12 3624172 SANJUAN3 60.0 2 9 26

Page 127: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag. 7 de 65

Vn Area Zona Propiet.# Nombre kV # # #

BARRASBARRAS

24174 STAROSV2 60.0 2 9 724176 T-PACHAC 60.0 2 9 2624178 C2-PERSH 60.0 2 17 726000 INDECS01 10.0 2 12 2126002 ATOCGEA1 4.2 2 9 5826004 ATOCGEA2 4.4 2 9 5826006 ATOCGEA3 4.2 2 9 5826030 STA.ROSA 10.0 2 9 626032 STAROSA1 13.8 2 9 626034 STAROSA2 13.8 2 9 626064 SNICOLAS 13.8 2 10 3026066 SNICOLAS 4.2 2 10 3026088 S.ROSAWE 13.8 2 9 626092 VENTAN1 16.0 2 9 2426096 VENTAN2 16.0 2 9 2427000 CHAVARR1 10.0 2 9 2127002 CHAVARR2 10.0 2 9 2127004 CHAVARR3 10.0 2 9 2127006 CAUDIVIL 10.0 2 9 727008 INFANTAS 10.0 2 9 727010 NARANJAL 10.0 2 9 727012 TOMVALLE 10.0 2 9 727014 CHAVARR4 10.0 2 9 727016 MIRONES 10.0 2 9 727018 OQUENDO 10.0 2 9 727020 PTEPIEDR 10.0 2 9 727022 ZAPALLAL 10.0 2 9 727024 VENTANIL 10.0 2 9 727026 ANCON 10.0 2 9 727028 HUARAL 10.0 2 9 727030 CEMLIMA1 6.6 2 9 5927032 PAMPILL1 4.2 2 9 6227034 PAMPILL2 4.2 2 9 6227036 CEMLIMA2 6.6 2 9 5927038 CHANCAY 10.0 2 9 727044 CHAVASVC 4.8 2 9 727046 BARSI1 10.0 2 17 727048 BARSI2 10.0 2 17 727050 BARSI3 10.0 2 17 727052 BARSI4 10.0 2 17 727054 PANDO 10.0 2 17 727056 PERSHING 10.0 2 17 727058 MARANGA 10.0 2 17 727060 STAMARIA 10.0 2 17 727062 INDUSTRI 10.0 2 17 727064 PACHACAM 10.0 2 9 2627066 LURIN 10.0 2 9 2627068 SBARTOLO 10.0 2 9 2627070 MARCONA 10.0 2 10 2127072 LASPRADE 10.0 2 9 2627074 ATOCONG1 6.6 2 9 5927076 ATOCONG2 6.6 2 9 5927078 VIELSALV 10.0 2 9 2627080 VILMARIA 10.0 2 9 2627082 CHORRILL 10.0 2 9 2627084 SANJUAN1 10.0 2 9 2627086 SANJUAN2 10.0 2 9 2627088 SANJUAN3 10.0 2 9 2127090 LASPRADE 23.0 2 9 2627094 INDEPEND 10.0 2 12 3627096 TAMBDMOR 10.0 2 12 3627098 SANJUAN4 10.0 2 9 2127100 CHINCHA 10.0 2 12 3627102 PISCO 10.0 2 12 3627104 ALTDLUNA 10.0 2 12 3627108 PARACAS1 10.0 2 12 3627110 CAÑETE 10.0 2 12 3627112 ELCARMEN 10.0 2 12 3627114 STAMARGA 10.0 2 12 3627116 ICANORT1 10.0 2 12 3627118 ICA 10.0 2 12 3627120 PALPA 10.0 2 10 3627122 PUQUIO 22.9 2 10 3627124 NAZCA 10.0 2 10 3627126 BELUNION 10.0 2 10 36

Page 128: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag. 8 de 65

Vn Area Zona Propiet.# Nombre kV # # #

BARRASBARRAS

27128 BELUNION 22.9 2 10 3627130 CJMARQUI 30.0 2 9 627132 JGALVEZ 10.0 2 9 2627134 MEPSA 10.0 2 9 2627136 STAROSA1 10.0 2 9 727138 STAROSA2 10.0 2 9 727140 STAROSA3 10.0 2 9 727142 STAROSA4 10.0 2 9 727144 BALNEAR1 10.0 2 9 2627146 BALNEAR2 10.0 2 9 2627148 BALNEAR3 10.0 2 9 2627150 S.ISIDR1 10.0 2 19 2627152 S.ISIDR2 10.0 2 19 2627154 LIMATAM2 10.0 2 19 2627156 LIMATAM1 10.0 2 19 2627158 NEYRA 10.0 2 19 2627160 NEYRA 10.0 2 19 2627162 BARRANCO 10.0 2 19 2627164 EMBAEEUU 10.0 2 19 2627166 CUARTEL 10.0 2 19 2627168 BALNESVC 7.3 2 19 2627170 S.ISIDRO 23.0 2 19 2627172 ACE.AREQ 10.0 2 12 2127174 ACE.AREQ 20.0 2 12 2127176 PEDREGAL 10.0 2 12 3627178 ICANORT2 10.0 2 12 3627180 TACAMA 10.0 2 12 3627182 STAMARGA 22.9 2 10 3627184 PALPA 22.9 2 10 3627186 PARACAS1 22.9 2 10 3627188 PUQUIO 10.0 2 10 3627194 ACE.AREQ 4.2 2 12 2129000 N-CHAVA1 1.0 2 9 2129002 N-CHAVA2 1.0 2 9 2129004 N-CHAVA3 1.0 2 9 2129006 N-INDEP1 1.0 2 12 2129008 N-ICA 1.0 2 12 2129010 N-SROSA1 1.0 2 9 729012 N-SROSA2 1.0 2 9 729014 N-SROSA3 1.0 2 9 729016 N-SROSNU 1.0 2 9 629018 N-BALNE1 1.0 2 9 2629020 N-BALNE2 1.0 2 9 2629022 N-BALNE3 1.0 2 9 2629024 N-SISIDR 1.0 2 19 2629026 N-BARSI1 1.0 2 17 729028 N-BARSI2 1.0 2 17 729030 N-BARSI3 1.0 2 17 729032 N-LPRADE 1.0 2 9 2629034 N-SMARGA 1.0 2 10 3629036 N-BELLUN 1.0 2 10 3629038 N-PALPA 1.0 2 10 3629040 N-PUQUIO 1.0 2 10 3629042 N-PARAC1 1.0 2 10 3629124 N-MARCON 1.0 2 10 2129128 N-SROSA4 1.0 2 9 729130 N-INDEP2 1.0 2 12 2129132 N-SANJUA 1.0 2 9 2629134 N-SANJUA 1.0 2 9 2629136 N-SANJUA 1.0 2 9 2132144 VIZCARRA 220.0 3 11 132146 ANTAMINA 220.0 3 11 136000 ANTACS01 6.6 3 11 136002 ANTACS02 6.6 3 11 137000 VIZCASVC 16.0 3 11 137198 ANTAMINA 23.0 3 11 141000 UCHUCHAC 138.0 4 11 541002 YAUPI2 138.0 4 11 1841004 OXAPAMPA 138.0 4 11 1841006 CONDORCO 138.0 4 11 1841022 TINGMARI 138.0 4 11 2141024 HUANUCO 138.0 4 11 2141044 PARAGSHA 138.0 4 11 2141046 CARHUAMA 138.0 4 11 1841050 YAUPI 138.0 4 11 18

Page 129: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag. 9 de 65

Vn Area Zona Propiet.# Nombre kV # # #

BARRASBARRAS

41052 CARIPA 138.0 4 11 1841054 OROYANUE 138.0 4 11 1841064 PARAGSH2 138.0 4 11 1841142 YUNCAN 138.0 4 11 1841152 AUCAYACU 138.0 4 11 2141154 TOCACHE 138.0 4 11 2141214 AGUAYTIA 138.0 4 11 2141216 PUCALLPA 138.0 4 11 5142000 POMACOCH 220.0 4 12 2142002 C.ARMIÑO 220.0 4 12 1942004 YUNCAN 220.0 4 11 5142008 HUAYUCA 220.0 4 12 2142010 PACHACHA 220.0 4 12 2142012 OROYANUE 220.0 4 11 1842014 MATUCANA 220.0 4 9 642016 HUANCAVE 220.0 4 12 2142018 RESTITU1 220.0 4 12 1942020 RESTITU2 220.0 4 12 1942022 RESTITU3 220.0 4 12 1942036 HUINCO 220.0 4 9 642070 TINGMARI 220.0 4 11 2242072 AGUAYTIA 220.0 4 11 2242080 CALLAHUA 220.0 4 9 2142082 CALLAHED 220.0 4 9 642148 YANANGO 220.0 4 12 642156 CHIMAY 220.0 4 12 642160 COTARU21 220.0 4 12 242162 COTARUSE 220.0 4 12 242164 COTARU11 220.0 4 12 242166 COTARU12 220.0 4 12 242168 COTARU22 220.0 4 12 242204 PARAGSH2 220.0 4 11 1842206 CARHUAMA 220.0 4 11 1844000 NUCONDOR 60.0 4 9 2644002 LAPLANIC 60.0 4 9 2644004 SNMATEO1 60.0 4 9 2644006 SURCO 60.0 4 9 2644008 CHOSICA 60.0 4 9 2644010 JICAMARC 60.0 4 9 2644012 CANTGRAN 60.0 4 9 2644014 SALAMAN2 60.0 4 9 2644016 PACHACAY 69.0 4 11 1844018 HUANCAVE 60.0 4 12 2144020 HUAYUCA 60.0 4 12 2144022 HUAMPANI 60.0 4 9 644024 SNMATEO2 60.0 4 11 1844026 PUCALLP1 60.0 4 11 5144028 STA.ROSA 60.0 4 9 744030 JAUJA 60.0 4 12 2144032 CONCEPCI 60.0 4 12 2144034 P.INDUST 60.0 4 12 2144036 SALESIAN 60.0 4 12 2144038 PAMPAS 69.0 4 12 1844040 COBRIZII 69.0 4 12 1844048 INGENIO 60.0 4 12 2144050 CAUDALOS 60.0 4 12 2144052 PINDPUC 60.0 4 12 5144054 AUCAYACU 60.0 4 11 1844056 STAROSA2 60.0 2 9 744058 C-JICAMA 60.0 4 9 2644072 MOYOPAMP 60.0 4 9 644074 COBRIZAI 69.0 4 12 1844076 PUENTE 60.0 4 9 2644078 CALLAHU1 60.0 4 9 644080 SALAMAN1 60.0 4 9 2644082 CALLAHU2 60.0 4 9 644084 HUACHIPA 60.0 4 9 2644086 ÑAÑA 60.0 4 9 2644088 T-PUENT1 60.0 4 9 2644090 T-PUENT2 60.0 4 9 2644092 OXAPAMPA 60.0 4 11 1844110 S.CLARA 60.0 4 9 2644112 S.ANITA 60.0 4 9 2644114 MONTERRI 60.0 4 9 2644130 OROYANUE 69.0 4 11 18

Page 130: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag. 10 de 65

Vn Area Zona Propiet.# Nombre kV # # #

BARRASBARRAS

44132 CHUMPE 69.0 4 11 1844138 TACNA 60.0 4 9 2644148 TOCACHE 60.0 4 11 2144218 PUCALLP2 60.0 4 11 5146000 CHAPRIN 10.5 4 11 1846002 YARINACO 10.0 4 11 4046004 OROYA 2.3 4 11 1846006 NPLTOXIG 4.2 4 11 1846016 MATUCAN1 12.5 4 9 646018 MATUCAN2 12.5 4 9 646020 MARCOPAM 4.2 4 11 5146022 HUAMPANI 10.0 4 9 646024 YUNCAN1 13.8 4 11 1846026 YUNCAN2 13.8 4 11 1846032 MALPASO1 6.9 4 11 1846034 MALPASO2 6.9 4 11 1846036 MALPASO3 6.9 4 11 1846038 MALPASO4 6.9 4 11 1846058 PACHACHA 2.3 4 11 1846062 MOYOPAM1 10.0 4 9 646064 MOYOPAM2 10.0 4 9 646066 MOYOPAM3 10.0 4 9 646068 AGUAYTI1 13.8 4 11 3246070 AGUAYTI2 13.8 4 11 3246082 CALLAHU1 6.5 4 9 646084 CALLAHU2 6.5 4 9 646086 CALLAHU3 6.5 4 9 646088 CALLAHUA 8.0 4 9 646090 RESTITU1 13.8 4 12 1946092 RESTITU2 13.8 4 12 1946094 RESTITU3 13.8 4 12 1946096 HUINCO1 12.5 4 9 646098 HUINCO2 12.5 4 9 646100 HUINCO3 12.5 4 9 646102 HUINCO4 12.5 4 9 646104 YAUPI1 13.8 4 11 1846106 YAUPI2 13.8 4 11 1846116 MANTARO1 13.8 4 12 1946118 MANTARO2 13.8 4 12 1946120 MANTARO3 13.8 4 12 1946122 MANTARO4 13.8 4 12 1946124 MANTARO5 13.8 4 12 1946126 MANTARO6 13.8 4 12 1946128 MANTARO7 13.8 4 12 1946150 YANANGO 10.0 4 12 646158 CHIMAY1 13.8 4 12 646160 CHIMAY2 13.8 4 12 646212 HUANCHOR 10.0 4 11 5147000 TINGMARI 10.0 4 11 2147002 NUCONDOR 10.0 4 9 2647004 ÑAÑA 10.0 4 9 2647006 BUENAVIS 50.0 4 11 1847008 VISTALEG 50.0 4 11 1847010 PACHACHA 50.0 4 11 1847012 PLANTZIN 50.0 4 11 1847014 OROYANUE 50.0 4 11 1847016 CASPNO2 50.0 4 11 1847018 S.CLARA 10.0 4 9 2647020 S.CLARA 23.0 4 9 2647022 S.ANITA 10.0 4 9 2647024 S.ANITA 23.0 4 9 2647026 OROYA 50.0 4 11 1847028 HUACHIPA 10.0 4 9 2647030 MALPASO 50.0 4 11 1847032 CARHUAMA 50.0 4 11 1847034 JUNIN 50.0 4 11 1847036 EXCELSIO 50.0 4 11 1847038 SHELBY 50.0 4 11 1847040 PARAGSH1 50.0 4 11 1847042 PARAGSH1 12.0 4 11 1847044 CIENEGU1 10.0 4 9 2647046 CIENEGU2 10.0 4 9 2647048 CALLAHUA 10.0 4 9 2647050 SANMATEO 10.0 4 9 2647052 SANMATEO 23.0 4 9 26

Page 131: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag. 11 de 65

Vn Area Zona Propiet.# Nombre kV # # #

BARRASBARRAS

47054 SURCO 10.0 4 9 2647056 CHOSICA 10.0 4 9 2647058 TACNA 10.0 4 9 747060 CURIPATA 50.0 4 11 1847062 JICAMARC 10.0 4 9 747064 CANTGRAN 10.0 4 9 747066 MAYUPAMP 50.0 4 11 1847068 PUENTE1 10.0 4 9 747070 PUENTE2 10.0 4 9 747072 SALAMANC 10.0 4 9 747074 MONTERRI 10.0 4 9 747076 HUARON 50.0 4 11 1847078 SANJUAN 50.0 4 11 1847080 SANJUAN 2.4 4 11 1847082 SANJUAN 11.0 4 11 1847084 LAFUNDIC 50.0 4 11 1847086 CASAPIED 12.0 4 11 1847092 DERMILPO 50.0 4 11 1847094 HUICRA 50.0 4 11 1847096 HUICRA 2.4 4 11 1847098 GOYLLAR 50.0 4 11 1847100 MOROCOCH 50.0 4 11 1847102 AUSDUVAZ 50.0 4 11 1847104 YAULIALP 50.0 4 11 1847106 MOROCOCH 2.4 4 11 1847108 CASPNO1 50.0 4 11 1847110 TICLIO 50.0 4 11 1847112 CASAPNOR 4.2 4 11 1847114 CASAPALC 4.2 4 11 1847116 CASAPALC 2.4 4 11 1847118 ANTUQUIT 50.0 4 11 1847120 ANTUQUIT 2.4 4 11 1847122 BELLAVIS 50.0 4 11 1847124 SANMATEO 50.0 4 11 1847126 BELLAVIS 2.4 4 11 1847132 CFRANCIS 50.0 4 11 1847134 CHUMPE 12.0 4 11 1847136 CHUMPE 2.4 4 11 1847138 MOROCOH2 50.0 4 11 1847140 ALAMBRON 50.0 4 11 1847142 MILPO 13.2 4 11 1847144 MONTERRI 23.0 4 9 747146 UCHUCHAC 2.3 4 11 547148 GOYLLAR 13.2 4 12 1847150 HUANUCO 10.0 4 11 2147152 UCHUCHAC 33.0 4 11 547154 SANJOSE 50.0 4 11 1847156 PARAGSH2 10.0 4 11 1847158 TINGMARI 10.0 4 11 3247160 CARHUAMA 11.0 4 11 1847162 OROYANUE 13.8 4 11 1847164 OROYANU1 11.0 4 11 1847166 OROYANU2 11.0 4 11 1847168 HUAYUCA1 10.3 4 11 2147170 CASAPALC 50.0 4 11 1847172 ANDAYCHA 50.0 4 11 1847174 ANDAYCHA 4.2 4 11 1847176 ANDAYELC 50.0 4 11 1847178 SANCRIST 50.0 4 11 1847180 SANCRIST 4.2 4 11 1847184 SANANTON 50.0 4 11 1847186 SANANTON 4.2 4 11 1847188 CARAMINA 50.0 4 11 5647190 CARACONC 50.0 4 11 1847192 MAHRTUNE 50.0 4 11 1847194 MAHRTUNE 2.4 4 11 1847196 SANJOSE 2.4 4 11 1847198 CHICRIN 50.0 4 11 1847200 AUCAYACU 22.9 4 11 2147202 TOCACHE 10.0 4 11 2147204 LAFUNDIC 2.4 4 11 1847206 LAFUNDIC 10.0 4 11 1847208 HUANUCO 24.0 4 11 2147210 HUANCHOR 50.0 4 11 1847212 T-SALESI 60.0 4 12 21

Page 132: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag. 12 de 65

Vn Area Zona Propiet.# Nombre kV # # #

BARRASBARRAS

47214 T-CONCEP 60.0 4 12 2147216 CONDORCO 44.0 4 11 1847218 NINATAMB 44.0 4 11 1847220 MILPO 50.0 4 11 1847222 CHAPRIN 50.0 4 11 1847224 MINATACO 50.0 4 11 1847226 HUAYUCA2 10.3 4 11 2147230 NINATAMB 10.0 4 11 1847232 NINATAMB 22.9 4 11 1847234 COBRIZAI 10.0 4 12 1847236 PAMPAS 10.0 4 12 1847238 PAMPAS 22.9 4 12 1847240 SHELBY 10.0 4 11 1847242 COBRIZII 10.0 4 12 1847246 COBRIZII 4.2 4 12 1847254 HUANCAVE 10.0 4 12 2147256 CARHUAMA 13.2 4 11 1347258 CARHUAMA 22.9 4 11 1347260 SANCRIS2 50.0 4 11 1847262 TORRE2 50.0 4 11 1847264 VISTALE2 50.0 4 11 1847266 MOROCOH3 50.0 4 11 1847268 EXCELSI1 2.4 4 11 1847270 EXCELSI2 2.4 4 11 1847272 MINATAC1 0.5 4 11 1847274 MINATAC2 4.2 4 11 1847276 CASADFUE 50.0 4 11 1847278 CASADFU1 2.4 4 11 1847280 CASADFU2 2.4 4 11 1847282 CASADFU3 2.4 4 11 1847284 SANCRIST 2.4 4 11 1847286 PLANTZN1 11.0 4 11 1847288 PLANTZN2 11.0 4 11 1847290 PLANTZN3 11.0 4 11 1847292 CURIPATA 10.0 4 11 1847296 AGUAYTIA 22.9 4 11 3847298 PUCALLPA 10.0 4 11 3847300 P.INDUST 10.0 4 12 2147302 SALESIAN 10.0 4 12 2147304 JAUJA 13.2 4 12 2147306 CONCEPCI 13.2 4 12 2147308 JAUJA 10.0 4 12 2147310 CONCEPCI 6.0 4 12 2147312 COTRELL 50.0 4 11 1847314 MAYUPAMP 2.4 4 11 1847316 CARAMINA 2.4 4 11 5647318 CARACONC 2.4 4 11 1847320 ALAMBRON 2.3 4 11 1847322 ALAMBRON 10.0 4 11 1847326 CFRANCI1 2.4 4 11 1847328 CFRANCI2 2.4 4 11 1847330 AUSDUVAZ 10.0 4 11 1847332 YAULIALP 4.2 4 11 1847334 TICLIO 0.4 4 11 1847336 TORREN8 10.0 4 11 1847338 OXAPAMPA 22.9 4 11 1847340 YAUPI 22.9 4 11 1847342 INGENIO 22.9 4 12 1347344 OROYA2 2.3 4 11 1847346 PINDPUC 10.0 4 11 4047348 PINDPUC 22.9 4 11 4047350 PUCALLPA 10.0 4 11 4047352 PUCALLPA 22.9 4 11 4047354 CFRANC-T 50.0 4 11 1847356 CHICRIN 0.5 4 11 1847358 TORREN8 50.0 4 11 1847360 CASHUACR 33.0 4 11 1847362 IZCAYCRU 33.0 4 11 1849000 N-CALLNC 1.0 4 9 649002 N-MONTRR 1.0 4 9 749004 N-TOCACH 1.0 4 11 2149006 N-AUCYCU 1.0 4 11 1849008 N-HUANUC 1.0 4 11 1849010 N-PARAG2 1.0 4 11 1849012 N-TINGMA 1.0 4 11 32

Page 133: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag. 13 de 65

Vn Area Zona Propiet.# Nombre kV # # #

BARRASBARRAS

49014 N-CARMY1 1.0 4 11 1849016 N-OROYAN 1.0 4 11 1849018 N-OROYN1 1.0 4 11 1849020 N-OROYN2 1.0 4 11 1849022 N-HUAYU1 1.0 4 11 2149024 N-HUAYU2 1.0 4 11 2149026 N-CHIMAY 1.0 4 12 649028 N-NINATA 1.0 4 11 1849030 N-COBRI1 1.0 4 12 1849032 N-PAMPAS 1.0 4 12 1849034 N-CARMY2 1.0 4 11 1349036 N-COBRI2 1.0 4 12 1849038 N-HUANCV 1.0 4 12 2149040 N-AGUAYT 1.0 4 11 3849042 N-PUCALY 1.0 4 11 3849044 N-SCLARA 1.0 4 9 2649046 N-SANITA 1.0 4 9 2649048 N-SMATEO 1.0 4 9 2649050 N-JAUJA 1.0 4 12 2149052 N-CONCEP 1.0 4 12 2149054 N-OXAPAM 1.0 4 11 1849056 N-YAUPI 1.0 4 11 1849058 N-PQIND 1.0 4 11 4049060 N-PUCALL 1.0 4 11 4049062 N-CHICRI 1.0 4 11 1849064 N-UCHUCH 1.0 4 11 549066 N-YUNCAN 1.0 4 11 1849126 N-MATUCA 1.0 4 9 649220 N-PARAG1 1.0 4 11 1851000 CERROVER 138.0 5 14 2351002 CYPRUS 138.0 5 14 2351004 MILLSITE 138.0 5 15 2051006 BOTIFLAC 138.0 5 15 2051008 ELALTO 138.0 5 14 2051010 LIXIVIAC 138.0 5 15 2051012 T-JESUS 138.0 5 14 951018 ILO1 138.0 5 15 2051020 ILOELECT 138.0 5 15 2051022 REFILO2 138.0 5 15 2051026 ARICOTA 138.0 5 16 2351028 REFILO1 138.0 5 15 2051046 MOLLENDO 138.0 5 14 2351048 T-ILO 138.0 5 15 2051054 TOQUEPAL 138.0 5 15 2351058 SOCABAYA 138.0 5 12 2351062 SANTUAR 138.0 5 14 2351070 MOQUEGUA 138.0 5 15 2051084 QUEBHOND 138.0 5 15 2051086 JESUS 138.0 5 14 2351090 PUSHBACK 138.0 5 15 2051106 REPARTIC 138.0 5 14 2351144 CHILINA 138.0 5 14 2952000 PUNO-MOQ 220.0 5 15 2752072 ILO2 220.0 5 15 2052076 MOQUEGUA 220.0 5 15 2052078 L.HEROES 220.0 5 16 2752090 SOCABAYA 220.0 5 12 252098 PUNO 220.0 5 13 2754000 ELALTO 60.0 5 14 954002 MOLLENDO 60.0 5 14 954004 BOTIFHID 69.0 5 15 3154006 ALTOZAPA 66.0 5 15 1754008 BOTIFLAC 69.0 5 15 2054010 ICHUPAMP 66.0 5 15 1754030 ARICOTA2 66.0 5 16 1254032 ARICOTA1 66.0 5 16 1254036 TOMASIRI 66.0 5 16 1254038 TACNA 66.0 5 16 1754040 PAINDTAC 66.0 5 16 1754042 CALANA 66.0 5 16 1254050 SARITA 66.0 5 16 1254092 PUSHBACK 69.0 5 15 2054104 LAYARADA 66.0 5 16 1754108 L.HEROES 66.0 5 16 1256000 MALIXIVI 4.2 5 15 31

Page 134: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag. 14 de 65

Vn Area Zona Propiet.# Nombre kV # # #

BARRASBARRAS

56002 MILLSIT1 4.2 5 15 3156004 MILLSIT2 4.2 5 15 3156006 MILLSIT3 4.2 5 15 3156008 MILLSMLB 13.8 5 15 3156010 BOTIFLA1 6.9 5 15 2056012 CYPRUS 10.0 5 14 5756014 BOTIFLA3 13.8 5 15 2056016 BOTIFLA2 13.8 5 15 2056018 BOTIFLA2 6.9 5 15 2056020 BOTIFLA3 6.9 5 15 2056022 BOTIFLA1 13.8 5 15 2056024 MOTSILO1 4.2 5 15 2056028 ARICOTA2 11.0 5 16 1256030 BOTIFH1 4.2 5 15 3156032 BOTIFH2 4.2 5 15 3156034 ARICOTA1 11.0 5 16 1256044 CALAN123 10.5 5 16 1256046 CALANA4 10.5 5 16 1256048 MOLLENGD 13.8 5 14 956050 MOLLETG1 13.8 5 14 956052 MOLLETG2 13.8 5 14 956076 CHILTV12 5.3 5 14 956078 CHILITV3 10.5 5 14 956080 CHILINCC 13.8 5 14 956100 MOQUEGUA 4.2 5 15 1256106 ILO2 17.0 5 15 2056108 CHILIND1 10.4 5 14 956110 CHILIND2 10.4 5 14 956112 ILOCATK 4.2 5 15 2056114 ILOTV1 13.8 5 15 2056116 ILOTV2 13.8 5 15 2056118 ILOTV3 13.8 5 15 2056120 ILOTV4 13.8 5 15 2056122 ILOTG1 13.8 5 15 2056124 ILOTG2 13.8 5 15 2056125 CHARCAI1 4.2 5 14 956126 CHARCAI2 4.2 5 14 956128 CHARCAII 5.3 5 14 956130 CHARCIII 5.3 5 14 956134 CHARCAV1 13.8 5 14 956136 CHARCAV2 13.8 5 14 956138 CHARCAV3 13.8 5 14 956140 CHARCAVI 5.3 5 14 956144 CHARCIV1 5.3 5 14 956146 CHARCIV2 5.3 5 14 956148 CHARCIV3 5.3 5 14 957002 MILLSIT2 13.8 5 15 2057004 CHILINCC 33.0 5 14 957006 S.LAZARO 33.0 5 14 957010 S.LAZARO 10.0 5 14 957016 CHALLAPA 10.0 5 14 2957018 CERVESUR 33.0 5 14 2957020 CERVESUR 10.0 5 14 2957022 PARQINDU 10.0 5 14 2957024 REFILO1 10.5 5 15 2057034 JESUS1 33.0 5 14 957036 JESUS 10.0 5 14 957038 SOCABAY1 10.0 5 14 957040 REPARTIC 22.9 5 14 957042 REPARTIC 10.0 5 14 957044 ELALTO 10.0 5 14 957046 MOLLENDO 33.0 5 14 957050 CHARCANI 33.0 5 14 957052 CHILINA 33.0 5 14 957054 JESUS2 33.0 5 14 957056 CHALLAPA 33.0 5 14 957058 ARICOTA1 10.5 5 16 1257060 SOCABAYA 33.0 5 14 957062 ESTSERVI 0.4 5 16 1257064 L.HEROES 10.5 5 16 1757068 ARICOTA2 10.5 5 16 1257070 SARITA 33.0 5 16 1757072 CHARCAVI 33.0 5 14 957086 QUEBHOND 13.8 5 15 2057088 ILOELEC2 10.5 5 15 17

Page 135: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag. 15 de 65

Vn Area Zona Propiet.# Nombre kV # # #

BARRASBARRAS

57094 MOQUEGU1 10.0 5 15 2057098 MOQUEGU2 10.0 5 15 2057100 CHARCAIV 33.0 5 14 957108 TOMASIRI 10.5 5 16 1757110 PARQINDU 33.0 5 14 957114 LOCUMBA 10.5 5 16 1757116 PAINDTAC 10.5 5 16 1757118 TACNA1 10.5 5 16 1757120 TACNA2 10.5 5 16 1757122 TACNA3 10.5 5 16 1757124 TACNA4 10.5 5 16 1757126 LAYARAD1 10.5 5 16 1757128 LAYARAD2 10.5 5 16 1757130 LIXIVIAC 13.8 5 15 2057144 ILOELEC1 10.5 5 15 2057146 REFILO2 10.5 5 15 2057148 SOCABAY2 10.0 5 12 2057150 SOCABAY3 10.0 5 12 2057154 MOQUEGUA 10.2 5 15 2057156 CHILINA1 33.0 5 14 957160 CHILCHA1 33.0 5 14 957162 CHILCHA2 33.0 5 14 957164 CHARC123 5.3 5 14 957166 CHILINA1 10.0 5 14 2957168 CHILINA2 10.0 5 14 2957170 MILLSIT1 13.8 5 15 2057172 CHAR1234 33.0 5 14 959002 N-SOCAB1 1.0 5 12 259004 N-SOCAB2 1.0 5 12 259006 N-MOQUE1 1.0 5 16 259008 N-MOQUE2 1.0 5 16 259010 N-LHEROE 1.0 5 16 2759012 N-REPART 1.0 5 14 2959014 N-ELALTO 1.0 5 14 2959016 N-MOLLEN 1.0 5 14 2959018 ILO1T1ZZ 1.0 5 15 2059020 ILO1T2ZZ 1.0 5 15 2059114 N-ARICOT 1.0 5 16 1259116 N-BOTIF1 1.0 5 15 2059118 N-BOTIF2 1.0 5 15 2059120 N-PUNO 1.0 5 13 2359122 N-BOTIF3 1.0 5 15 2061000 JULIACA 138.0 6 13 2361002 T1-CACHI 138.0 6 13 1061004 T2-CACHI 138.0 6 13 1061006 T-COMBAP 138.0 6 13 2361008 T-AYAVIR 138.0 6 13 2361020 DOLORESP 138.0 6 13 1061026 QUENCORO 138.0 6 13 2361030 COMBAPAT 138.0 6 13 2361034 TINTAYA 138.0 6 13 2361036 AYAVIRI 138.0 6 13 2361040 AZANGARO 138.0 6 13 2361088 CACHIELP 138.0 6 13 1061092 SANGABAN 138.0 6 13 2861104 MACHUPIC 138.0 6 13 1061108 CALLALLI 138.0 6 20 2361120 PUNO 138.0 6 13 2361130 SANRAFAE 138.0 6 13 2861132 CACHIMAY 138.0 6 13 5561138 ABANCAY 138.0 6 13 2364000 HUANCARA 66.0 6 20 3964002 JULIACA 60.0 6 13 2864004 T-CHUQUI 60.0 6 13 5164006 BELLAVIS 60.0 6 13 2364008 ABANCAY 60.0 6 13 1064010 ANDAHUAY 60.0 6 13 1064012 CHALHUAN 60.0 6 13 1064014 CHUQUIBA 60.0 6 13 1064016 CACHIMAY 60.0 6 13 1064018 PAUCARTA 60.0 6 13 1064020 ANTAUTA 60.0 6 13 1064022 CAYLLOMA 66.0 6 20 5164024 ARES 66.0 6 20 5164026 ILAVE 60.0 6 13 23

Page 136: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag. 16 de 65

Vn Area Zona Propiet.# Nombre kV # # #

BARRASBARRAS

64028 POMATA 60.0 6 13 5164030 PISAC 60.0 6 13 1064032 COMBAPAT 66.0 6 13 2364042 AZANGARO 60.0 6 13 2864102 SICUANI 66.0 6 13 1064112 SANRAFAE 60.0 6 13 2864126 MACHUPIC 60.0 6 13 1064144 PUNO 60.0 6 13 2364150 CALLALLI 66.0 6 20 2366000 ARCATA 0.5 6 20 3966002 MISAPUQ 0.7 6 20 3966004 HUANCARA 2.4 6 20 3966006 HUAYLLAC 0.7 6 20 366008 SANTONIO 0.5 6 20 366010 ARES 0.5 6 20 3966012 BELLAVIS 10.0 6 13 2866014 BELLALCO 4.2 6 13 2866016 BELLAVID 4.2 6 13 2866018 SIGNAC1 3.2 6 20 366020 SIGNAC23 0.4 6 20 366026 TAPAMAN1 2.4 6 13 2866028 TAPARACH 10.5 6 13 2866030 TAPARSKD 2.4 6 13 2866094 SANGAB1 13.8 6 13 2866096 SANGAB2 13.8 6 13 2866106 HERCCA 2.3 6 13 1066116 SANRAFAE 2.2 6 13 2866118 TINTAYA 4.2 6 13 2866126 MACHUPI1 13.8 6 13 1066128 MACHUPI2 13.8 6 13 1066130 MACHUPI3 13.8 6 13 1066138 DOLORESP 11.5 6 13 1066140 DOLOALCO 4.2 6 13 1066142 DOLOGM 4.2 6 13 1067006 RACCHI 33.0 6 13 5167008 RACCHI 10.5 6 13 5167010 JULIACA 10.5 6 13 2367012 HUAYLLAC 15.0 6 20 367026 PAUCARTA 22.9 6 13 5167028 QUENCORO 34.5 6 13 2367030 PAUCARTA 10.0 6 13 5167032 CACHIMAY 22.9 6 13 1067034 SICUANI 10.5 6 13 1067036 ABANCAY 13.2 6 13 1067038 AYAVIRI 22.9 6 13 2367042 ANDAHUAY 22.9 6 13 1067044 AZANGARO 22.9 6 13 2367046 COMBAPAT 24.0 6 13 2367048 QUENCORO 10.5 6 13 2367050 CHUQUIBA 22.9 6 13 1067052 CHALHUAN 22.9 6 13 1067054 ANDAHUAY 13.2 6 13 1067056 CHUQUIBA 10.0 6 13 1067058 CHALHUAN 10.0 6 13 1067072 TINTASVC 10.5 6 13 2367074 TINTAPOX 10.0 6 13 2367076 TINTAYA1 10.0 6 13 2367078 CALLALLI 24.0 6 20 2367080 CAYLLOMA 15.0 6 20 2367082 ARES 4.2 6 20 5167084 ARES 33.0 6 20 5167090 ANTAUTA 22.9 6 13 2867092 JULIACA 10.0 6 20 2367096 TINTAYA2 10.0 6 13 2367104 ILAVE 10.0 6 13 2367106 ILAVE 23.0 6 13 2367108 POMATA 10.0 6 13 2367110 POMATA 23.0 6 13 2367112 PUNO 10.5 6 13 2367114 SANRAFAE 10.0 6 13 2867116 PUNO 23.0 6 13 2767118 HUANCARA 22.0 6 20 3967120 ARCATA1 33.0 6 20 3967122 QUENCOPM 33.0 6 13 2367124 MACHUPIC 10.5 6 13 10

Page 137: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag. 17 de 65

Vn Area Zona Propiet.# Nombre kV # # #

BARRASBARRAS

67126 ARCATA2 33.0 6 20 3967128 ARCATA 10.0 6 20 3967130 MISAPUQ 33.0 6 20 3967134 CACHIMAY 33.0 6 13 1067136 CACHIMAY 10.0 6 13 1067140 YURACAC1 6.9 6 13 5567142 YURACAC2 6.9 6 13 5567146 PISAC 10.0 6 13 1067148 PISAC 22.9 6 13 1067152 AYAVIRI 10.0 6 13 2369002 N-PAUCAR 1.0 6 13 5169004 N-CACHI1 1.0 6 13 1069006 N-CACHI2 1.0 6 13 1069008 N-ABANCA 1.0 6 13 1069010 N-ANDAHY 1.0 6 13 1069012 N-CHUQUI 1.0 6 13 1069014 N-CHALHU 1.0 6 13 1069016 N-ARES 1.0 6 20 5169018 DOLORPZZ 1.0 6 13 1069020 N-PUNO 1.0 6 13 2769022 N-ILAVE 1.0 6 13 1669024 N-POMATA 1.0 6 13 1669026 N-PISAC 1.0 6 13 5169028 TINTAYZZ 1.0 6 13 2369030 JULIACZZ 1.0 6 13 2369032 COMBAPZZ 1.0 6 13 2369034 QUENCOZZ 1.0 6 13 2369154 N-JULIAC 1.0 6 13 2369156 N-COMBAP 1.0 6 13 2369158 N-QUENCO 1.0 6 13 2369160 N-MACHUP 1.0 6 13 1069162 N-CALLAL 1.0 6 20 5169164 N-AYAVIR 1.0 6 13 2369166 N-AZANGA 1.0 6 13 23

Page 138: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag. 18 de 65

Vn ID# Nombre kV MW MVAr14034 PAITA 60.0 1 13.84 6.7014044 CARHUAQU 60.0 1 0.00 0.0014078 9DEOCTUB 66.0 1 0.19 0.0916000 CAÑDPAT1 13.8 1 0.50 0.0016012 CARHUAQ1 10.0 1 0.25 0.0016014 CHICLGMT 10.5 1 17.17 8.3116020 L.MERCED 10.0 1 5.68 2.7516024 PIURATG 10.0 1 22.96 11.1216024 PIURATG 10.0 2 3.25 1.5716026 PIURA 4.8 1 0.00 0.0016032 ZARUMILL 10.0 1 1.52 0.7416052 CAHUA1 10.0 1 0.30 0.1016066 TRUPAL 13.8 1 6.20 3.0016068 SIDERNOR 13.2 1 3.56 1.7116070 SIDERSUR 13.8 1 3.56 1.7116072 MALACAS 13.8 1 4.81 2.3316098 MALACAS 13.2 1 6.67 3.2317002 CTTUMBES 33.0 1 0.48 0.2317004 MANCORA 22.9 1 0.19 0.0917006 MANCORA 10.0 1 0.14 0.0717010 L.MERCED 33.0 1 0.48 0.2317012 ZARUMILL 22.9 1 0.48 0.2317020 REF.TALA 2.4 1 6.76 2.4517028 LAUNION 10.0 1 2.15 1.0417032 SECHURA 10.0 1 0.76 0.3717034 CONSTANT 22.9 1 2.40 1.1617038 PAITA 10.0 1 6.42 3.1117040 ELARENAL 13.8 1 2.56 1.2417042 COLAN 4.8 1 0.37 0.1817044 CHULUCAN 10.0 1 1.91 0.9217046 CHULUCAN 22.9 1 2.16 1.0417054 CHICLAN1 10.0 1 18.69 9.0517056 POMALCA 10.0 1 0.00 0.0017058 TUMAN 10.0 1 1.16 0.5617060 CHIMBNOR 13.8 1 19.32 9.3617062 CAYALTI 10.0 1 0.00 0.0017064 POMALCA 22.9 1 2.37 1.1517066 TUMAN 22.9 1 1.40 0.6817068 CAYALTI 22.9 1 0.74 0.3617070 MOTUPE 10.0 1 1.58 0.5717072 OLMOS 10.0 1 0.19 0.0917074 CEMPACAS 6.3 1 5.42 2.9317076 PARAMEXI 13.8 1 2.51 0.9117076 PARAMEXI 13.8 2 2.51 0.9117076 PARAMEXI 13.8 3 2.51 0.9117076 PARAMEXI 13.8 4 3.35 1.2217076 PARAMEXI 13.8 5 3.35 1.2217076 PARAMEXI 13.8 6 3.35 1.2217076 PARAMEXI 13.8 7 3.35 1.2217078 CEMPACA2 6.3 1 4.52 2.4417080 TRUJINO3 10.0 1 19.32 9.3617082 PACASPUE 10.0 1 1.93 0.7917084 CAJAMARC 10.0 1 10.24 4.9617086 TRUJSUR2 10.0 1 33.81 16.3817086 TRUJSUR2 10.0 2 1.93 0.9417090 SANTICAO 34.5 1 4.83 2.3417094 PORVENIR 10.0 1 5.31 2.5717096 SALAVERR 33.0 1 0.97 0.5217106 CHIMBO11 13.8 1 0.97 0.4717110 CHIMBSUR 13.8 1 23.74 11.5017112 NEPEÑA 13.8 1 1.35 0.6617114 SANJACIN 13.8 1 1.35 0.6617116 SANTA 13.8 1 2.42 1.1717118 CASMA 10.0 1 2.61 1.2617122 PIERINA 13.8 1 4.99 1.6417126 CARAZ 13.8 1 2.59 1.0717128 CARHUAQU 22.9 1 0.45 0.2217130 CARHUAZ 13.2 1 2.12 0.8717132 HUARAZ 13.2 1 5.07 2.0817134 TICAPAMP 13.2 1 1.77 0.8617136 PALLASCA 10.0 1 0.15 0.0717138 PALLASCA 22.9 1 0.53 0.2617140 CAJABAMB 22.9 1 0.29 0.1417142 GUADALU1 10.0 1 7.25 3.5117146 SIHUAS 2.4 1 0.54 0.26

BARRAS DEMANDADEMANDA - ESCENARIO DE MAXIMA

Page 139: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag. 19 de 65Vn ID

# Nombre kV MW MVArBARRAS DEMANDA

17148 LAPAMPA 13.8 1 0.22 0.1117150 SUPE 10.0 1 7.81 3.7817154 LAMBAYEQ 10.0 1 2.72 1.3217158 HUARMEY 10.0 1 2.42 1.1717164 HUALMAY 10.0 1 11.37 5.5017168 ANDAHUAS 10.0 1 0.77 0.3717172 SULLANA 10.0 1 11.10 5.3717174 TEXTPIUR 10.0 1 4.41 2.1417180 ANDAHUAS 22.9 1 0.19 0.0917182 MOTIL 33.0 1 4.83 1.7517188 CAJABAMB 10.0 1 0.29 0.1417192 CASTILLA 10.0 1 0.77 0.3717194 ILLIMO 10.0 1 0.98 0.4717196 ILLIMO 22.9 1 0.61 0.2917198 TEMBLADE 13.2 1 0.24 0.0917202 CHILETE 10.0 1 0.19 0.0917204 CHILETE 22.9 1 0.19 0.0917206 PTOANTA1 4.2 1 1.25 0.4617208 PTOANTA2 4.2 1 1.25 0.4617210 LAPAJUEL 22.9 1 24.00 3.4217216 SANMARCO 22.9 1 0.29 0.1417218 SANMARCO 10.0 1 0.39 0.1924014 OQUENDO 60.0 1 0.97 0.4724016 ZAPALLAL 60.0 1 0.07 0.0324038 STAMARIA 60.0 1 1.52 0.7424038 STAMARIA 60.0 2 1.52 0.7424056 TRENELEC 60.0 1 2.90 1.4024078 SBARTOLO 60.0 1 2.40 1.0924078 SBARTOLO 60.0 2 7.84 3.3424158 VILLACUR 60.0 1 6.19 3.0026030 STA.ROSA 10.0 1 29.43 15.0826030 STA.ROSA 10.0 2 29.43 15.0826092 VENTAN1 16.0 1 0.50 0.2027006 CAUDIVIL 10.0 1 22.39 9.5427008 INFANTAS 10.0 1 41.69 17.7627010 NARANJAL 10.0 1 17.98 8.7127012 TOMVALLE 10.0 1 36.39 15.5027014 CHAVARR4 10.0 1 54.26 23.1127016 MIRONES 10.0 1 50.65 27.3427018 OQUENDO 10.0 1 18.17 9.8127020 PTEPIEDR 10.0 1 12.16 6.5627022 ZAPALLAL 10.0 1 8.38 3.5727024 VENTANIL 10.0 1 10.80 4.6027026 ANCON 10.0 1 3.74 1.8127028 HUARAL 10.0 1 7.88 3.3627032 PAMPILL1 4.2 1 2.80 1.5127034 PAMPILL2 4.2 1 2.80 1.5127038 CHANCAY 10.0 1 4.34 2.1027052 BARSI4 10.0 1 27.02 14.5827054 PANDO 10.0 1 35.89 17.3827056 PERSHING 10.0 1 41.77 21.4027058 MARANGA 10.0 1 30.68 13.0727060 STAMARIA 10.0 1 30.57 13.0227062 INDUSTRI 10.0 1 18.78 9.1027064 PACHACAM 10.0 1 11.36 4.8427066 LURIN 10.0 1 8.27 3.5227068 SBARTOLO 10.0 1 5.71 2.4327072 LASPRADE 10.0 1 0.48 0.2327074 ATOCONG1 6.6 1 20.00 10.8027076 ATOCONG2 6.6 1 20.00 10.8027078 VIELSALV 10.0 1 17.06 7.2727080 VILMARIA 10.0 1 35.60 15.1727082 CHORRILL 10.0 1 25.17 10.7227090 LASPRADE 23.0 1 3.66 1.7727094 INDEPEND 10.0 1 0.57 0.2727096 TAMBDMOR 10.0 1 1.82 0.8827098 SANJUAN4 10.0 1 15.12 6.4427100 CHINCHA 10.0 1 9.05 4.3827102 PISCO 10.0 1 4.72 2.2927104 ALTDLUNA 10.0 1 4.88 2.3627108 PARACAS1 10.0 1 0.59 0.2927110 CAÑETE 10.0 1 9.91 4.8027112 ELCARMEN 10.0 1 1.42 0.6927114 STAMARGA 10.0 1 0.55 0.2727116 ICANORT1 10.0 1 5.62 2.7227118 ICA 10.0 1 8.19 3.9727120 PALPA 10.0 1 0.53 0.25

Page 140: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag. 20 de 65Vn ID

# Nombre kV MW MVArBARRAS DEMANDA

27122 PUQUIO 22.9 1 0.15 0.0727124 NAZCA 10.0 1 2.13 1.0327126 BELUNION 10.0 1 0.19 0.0927128 BELUNION 22.9 1 0.19 0.0927130 CJMARQUI 30.0 1 34.32 11.2827132 JGALVEZ 10.0 1 41.72 20.2127134 MEPSA 10.0 1 2.70 0.8927150 S.ISIDR1 10.0 1 14.98 6.8227152 S.ISIDR2 10.0 1 29.96 13.6527154 LIMATAM2 10.0 1 25.29 11.5227154 LIMATAM2 10.0 2 12.65 5.7627156 LIMATAM1 10.0 1 12.65 5.7627158 NEYRA 10.0 1 13.03 5.9427160 NEYRA 10.0 1 26.06 11.8827160 NEYRA 10.0 2 13.03 5.9427162 BARRANCO 10.0 1 36.17 16.4827164 EMBAEEUU 10.0 1 1.29 0.6227164 EMBAEEUU 10.0 2 16.61 7.5727166 CUARTEL 10.0 1 38.75 17.6527166 CUARTEL 10.0 2 0.43 0.2127170 S.ISIDRO 23.0 1 0.45 0.2127172 ACE.AREQ 10.0 1 2.64 1.2827174 ACE.AREQ 20.0 1 8.36 4.0527176 PEDREGAL 10.0 1 5.83 2.8227178 ICANORT2 10.0 1 5.62 2.7227180 TACAMA 10.0 1 0.56 0.2727182 STAMARGA 22.9 1 0.56 0.2727184 PALPA 22.9 1 1.48 0.7127186 PARACAS1 22.9 1 0.56 0.2727188 PUQUIO 10.0 1 0.45 0.2237198 ANTAMINA 23.0 1 88.00 28.9244016 PACHACAY 69.0 1 0.25 0.1044040 COBRIZII 69.0 1 5.77 1.6644040 COBRIZII 69.0 2 0.96 0.4644040 COBRIZII 69.0 3 1.13 0.5544040 COBRIZII 69.0 4 0.19 0.0944040 COBRIZII 69.0 5 0.69 0.3344050 CAUDALOS 60.0 1 2.22 1.0844052 PINDPUC 60.0 1 0.19 0.0944054 AUCAYACU 60.0 1 0.43 0.2144092 OXAPAMPA 60.0 1 0.36 0.1744148 TOCACHE 60.0 1 0.52 0.2546000 CHAPRIN 10.5 1 0.42 0.2046016 MATUCAN1 12.5 1 0.30 0.1046062 MOYOPAM1 10.0 1 0.30 0.1046082 CALLAHU1 6.5 1 0.30 0.1046088 CALLAHUA 8.0 1 0.30 0.1046096 HUINCO1 12.5 1 0.40 0.1046104 YAUPI1 13.8 1 0.50 0.0046106 YAUPI2 13.8 1 3.08 1.4946116 MANTARO1 13.8 1 0.60 0.2047000 TINGMARI 10.0 1 2.87 1.3947002 NUCONDOR 10.0 1 1.00 0.4847004 ÑAÑA 10.0 1 13.55 6.5647010 PACHACHA 50.0 1 14.48 6.4747016 CASPNO2 50.0 1 0.52 0.0947018 S.CLARA 10.0 1 5.95 2.8847020 S.CLARA 23.0 1 2.55 1.2347022 S.ANITA 10.0 1 6.59 3.1947024 S.ANITA 23.0 1 6.59 3.1947026 OROYA 50.0 1 0.00 0.0047028 HUACHIPA 10.0 1 10.97 5.3147030 MALPASO 50.0 1 0.00 0.0047042 PARAGSH1 12.0 1 19.97 4.0647044 CIENEGU1 10.0 1 3.66 1.7747046 CIENEGU2 10.0 1 21.07 8.9847050 SANMATEO 10.0 1 2.55 1.2447052 SANMATEO 23.0 1 0.64 0.3147054 SURCO 10.0 1 1.53 0.7447056 CHOSICA 10.0 1 7.95 3.8547058 TACNA 10.0 1 51.32 23.3847062 JICAMARC 10.0 1 10.89 3.9547064 CANTGRAN 10.0 1 28.70 12.2247068 PUENTE1 10.0 1 33.77 15.3947070 PUENTE2 10.0 1 33.77 15.3947072 SALAMANC 10.0 1 37.46 17.0747074 MONTERRI 10.0 1 15.18 6.92

Page 141: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag. 21 de 65Vn ID

# Nombre kV MW MVArBARRAS DEMANDA

47076 HUARON 50.0 1 5.40 1.8547080 SANJUAN 2.4 1 1.31 0.0847082 SANJUAN 11.0 1 0.85 0.3047084 LAFUNDIC 50.0 1 3.65 1.2047086 CASAPIED 12.0 1 2.28 1.5447086 CASAPIED 12.0 2 2.28 1.5447096 HUICRA 2.4 1 0.77 0.2347100 MOROCOCH 50.0 1 2.31 0.2547106 MOROCOCH 2.4 1 2.07 0.6447112 CASAPNOR 4.2 1 0.42 0.0847114 CASAPALC 4.2 1 0.54 0.1947116 CASAPALC 2.4 1 6.08 2.2147118 ANTUQUIT 50.0 1 4.95 3.2147120 ANTUQUIT 2.4 1 0.16 0.1447124 SANMATEO 50.0 1 0.11 0.0747126 BELLAVIS 2.4 1 0.37 0.1547134 CHUMPE 12.0 1 0.63 0.1947136 CHUMPE 2.4 1 1.79 1.1047140 ALAMBRON 50.0 1 9.86 6.5247142 MILPO 13.2 1 5.46 0.5547144 MONTERRI 23.0 1 5.06 2.3147148 GOYLLAR 13.2 1 0.26 0.0847150 HUANUCO 10.0 1 7.39 3.5847160 CARHUAMA 11.0 1 0.68 0.2947168 HUAYUCA1 10.3 1 2.57 1.2547170 CASAPALC 50.0 1 3.75 1.5547174 ANDAYCHA 4.2 1 3.86 2.0247176 ANDAYELC 50.0 1 0.03 0.0147180 SANCRIST 4.2 1 2.35 1.2347186 SANANTON 4.2 1 0.68 0.3547194 MAHRTUNE 2.4 1 2.99 1.5747200 AUCAYACU 22.9 1 0.35 0.1747202 TOCACHE 10.0 1 0.64 0.3147208 HUANUCO 24.0 1 2.17 1.0547216 CONDORCO 44.0 1 3.64 1.2747218 NINATAMB 44.0 1 8.09 2.8347230 NINATAMB 10.0 1 0.99 0.3547232 NINATAMB 22.9 1 1.98 0.6947236 PAMPAS 10.0 1 0.12 0.0647238 PAMPAS 22.9 1 0.47 0.2347240 SHELBY 10.0 1 0.15 0.1047242 COBRIZII 10.0 1 4.18 2.1947242 COBRIZII 10.0 2 4.18 2.1947246 COBRIZII 4.2 1 1.79 0.9447246 COBRIZII 4.2 2 1.79 0.9447254 HUANCAVE 10.0 1 2.11 1.0247256 CARHUAMA 13.2 1 0.26 0.1347258 CARHUAMA 22.9 1 0.78 0.3847268 EXCELSI1 2.4 1 1.32 0.8347270 EXCELSI2 2.4 1 0.17 0.0947272 MINATAC1 0.5 1 1.78 0.3347274 MINATAC2 4.2 1 1.78 0.3347278 CASADFU1 2.4 1 3.54 1.3147280 CASADFU2 2.4 1 3.53 1.3047282 CASADFU3 2.4 1 3.53 1.3047284 SANCRIST 2.4 1 2.61 1.3747286 PLANTZN1 11.0 1 14.08 5.2047288 PLANTZN2 11.0 1 14.08 5.2047290 PLANTZN3 11.0 1 14.12 5.2247292 CURIPATA 10.0 1 0.52 0.3247298 PUCALLPA 10.0 1 11.50 5.5747300 P.INDUST 10.0 1 7.61 3.6847302 SALESIAN 10.0 1 12.39 6.0047304 JAUJA 13.2 1 3.48 1.6847306 CONCEPCI 13.2 1 4.66 2.2647314 MAYUPAMP 2.4 1 0.62 0.2547316 CARAMINA 2.4 1 1.19 0.4447318 CARACONC 2.4 1 2.03 0.5747326 CFRANCI1 2.4 1 1.80 0.5747328 CFRANCI2 2.4 1 1.80 0.5747330 AUSDUVAZ 10.0 1 1.83 0.4247332 YAULIALP 4.2 1 0.33 0.0947334 TICLIO 0.4 1 0.15 0.0947336 TORREN8 10.0 1 28.39 10.4947338 OXAPAMPA 22.9 1 1.07 0.5247340 YAUPI 22.9 1 1.83 0.8947342 INGENIO 22.9 1 0.72 0.35

Page 142: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag. 22 de 65Vn ID

# Nombre kV MW MVArBARRAS DEMANDA

47346 PINDPUC 10.0 1 5.72 2.7747356 CHICRIN 0.5 1 2.16 0.4047360 CASHUACR 33.0 1 5.13 1.9047362 IZCAYCRU 33.0 1 5.13 1.9051004 MILLSITE 138.0 1 1.84 0.0051004 MILLSITE 138.0 2 1.84 0.0054000 ELALTO 60.0 1 0.29 0.1454002 MOLLENDO 60.0 1 0.97 0.4754004 BOTIFHID 69.0 1 3.20 0.0054008 BOTIFLAC 69.0 1 4.90 0.0054092 PUSHBACK 69.0 1 4.00 0.0056002 MILLSIT1 4.2 1 1.00 0.0056004 MILLSIT2 4.2 1 1.00 0.0056006 MILLSIT3 4.2 1 1.00 0.0056012 CYPRUS 10.0 1 42.39 0.0056014 BOTIFLA3 13.8 1 8.66 2.1656014 BOTIFLA3 13.8 2 11.82 3.8956016 BOTIFLA2 13.8 1 6.33 1.5956016 BOTIFLA2 13.8 2 11.82 3.8956022 BOTIFLA1 13.8 1 1.91 0.4856106 ILO2 17.0 1 10.00 4.0056114 ILOTV1 13.8 1 0.89 0.0056116 ILOTV2 13.8 1 1.29 0.4356118 ILOTV3 13.8 1 0.50 0.0056120 ILOTV4 13.8 1 0.50 0.0056122 ILOTG1 13.8 1 0.50 0.0056124 ILOTG2 13.8 1 0.50 0.0056134 CHARCAV1 13.8 1 0.10 0.0057010 S.LAZARO 10.0 1 10.48 5.0857016 CHALLAPA 10.0 1 8.20 3.4957020 CERVESUR 10.0 1 2.50 0.9157022 PARQINDU 10.0 1 23.96 8.7057024 REFILO1 10.5 1 12.20 0.0057036 JESUS 10.0 1 14.25 6.9057040 REPARTIC 22.9 1 0.29 0.1457042 REPARTIC 10.0 1 0.19 0.0957044 ELALTO 10.0 1 0.19 0.0957046 MOLLENDO 33.0 1 5.80 1.9157050 CHARCANI 33.0 1 6.29 2.2857058 ARICOTA1 10.5 1 0.50 0.0057060 SOCABAYA 33.0 1 7.02 3.4057068 ARICOTA2 10.5 1 0.10 0.0057070 SARITA 33.0 1 1.04 0.4457086 QUEBHOND 13.8 1 3.70 0.0057088 ILOELEC2 10.5 1 5.36 0.0057108 TOMASIRI 10.5 1 0.65 0.2657110 PARQINDU 33.0 1 2.50 0.9157110 PARQINDU 33.0 2 2.58 0.9357116 PAINDTAC 10.5 1 4.93 2.3957118 TACNA1 10.5 1 3.72 1.8057120 TACNA2 10.5 1 2.33 1.1357122 TACNA3 10.5 1 3.72 1.8057124 TACNA4 10.5 1 1.86 0.9057126 LAYARAD1 10.5 1 1.05 0.5757128 LAYARAD2 10.5 1 1.70 0.9257130 LIXIVIAC 13.8 1 12.65 0.0057154 MOQUEGUA 10.2 1 2.03 0.8057166 CHILINA1 10.0 1 6.05 2.9357168 CHILINA2 10.0 1 6.05 2.9364126 MACHUPIC 60.0 1 2.22 1.0864126 MACHUPIC 60.0 2 0.58 0.2866010 ARES 0.5 1 4.50 2.1866094 SANGAB1 13.8 1 0.10 0.0066116 SANRAFAE 2.2 1 1.29 0.0066126 MACHUPI1 13.8 1 0.10 0.0066138 DOLORESP 11.5 1 23.19 11.2367006 RACCHI 33.0 1 0.42 0.2067008 RACCHI 10.5 1 0.54 0.2667026 PAUCARTA 22.9 1 0.48 0.2367028 QUENCORO 34.5 1 1.52 0.6067030 PAUCARTA 10.0 1 0.66 0.3267032 CACHIMAY 22.9 1 0.18 0.0967034 SICUANI 10.5 1 1.75 0.7467036 ABANCAY 13.2 1 0.97 0.3267038 AYAVIRI 22.9 1 0.40 0.2467042 ANDAHUAY 22.9 1 0.37 0.1867044 AZANGARO 22.9 1 1.89 0.75

Page 143: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag. 23 de 65Vn ID

# Nombre kV MW MVArBARRAS DEMANDA

67046 COMBAPAT 24.0 1 1.53 0.8767048 QUENCORO 10.5 1 5.26 2.5567050 CHUQUIBA 22.9 1 0.65 0.3167052 CHALHUAN 22.9 1 0.37 0.1867054 ANDAHUAY 13.2 1 0.65 0.3167056 CHUQUIBA 10.0 1 0.37 0.1867058 CHALHUAN 10.0 1 0.65 0.3167074 TINTAPOX 10.0 1 0.77 0.3367074 TINTAPOX 10.0 2 9.61 0.0067076 TINTAYA1 10.0 1 9.61 0.0067078 CALLALLI 24.0 1 0.10 0.0567080 CAYLLOMA 15.0 1 0.97 0.4767090 ANTAUTA 22.9 1 0.29 0.1467092 JULIACA 10.0 1 9.66 4.6867104 ILAVE 10.0 1 1.68 0.8167106 ILAVE 23.0 1 4.29 2.0867108 POMATA 10.0 1 0.77 0.3767110 POMATA 23.0 1 0.48 0.2367112 PUNO 10.5 1 5.08 2.4667114 SANRAFAE 10.0 1 11.61 0.0067116 PUNO 23.0 1 0.97 0.4767120 ARCATA1 33.0 1 0.48 0.2367122 QUENCOPM 33.0 1 0.52 0.2167124 MACHUPIC 10.5 1 0.44 0.1467136 CACHIMAY 10.0 1 1.41 0.6867140 YURACAC1 6.9 1 6.24 3.3767142 YURACAC2 6.9 1 6.24 3.3767152 AYAVIRI 10.0 1 0.86 0.34

Page 144: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag.24 de 65

Vn Modo Total# Nombre kV Reg. MVAr # MVAr # MVAr # MVAr # MVAr12000 GUADALUP 220.0 0 -20.00 1 -20.0012016 PIURAOES 220.0 0 -20.00 1 -20.0012040 PARAMONU 220.0 1 0.00 1 -40.0012074 TALARA 220.0 0 -20.00 1 -20.0014064 CAJAMARC 60.0 0 3.00 1 3.0016030 INADE 10.0 0 3.60 1 3.6017022 PIURA 10.0 0 6.00 1 6.0017038 PAITA 10.0 0 0.90 1 0.9017040 ELARENAL 13.8 0 0.60 1 0.6017054 CHICLAN1 10.0 0 5.00 1 5.0017070 MOTUPE 10.0 0 0.45 1 0.4517074 CEMPACAS 6.3 0 8.00 1 8.0017078 CEMPACA2 6.3 0 4.00 1 4.0017092 TRUJNSVC 8.0 1 -20.00 1 -20.0017092 TRUJNSVC 8.0 1 30.00 1 30.0017108 CHIMBO12 13.8 0 35.00 1 20.00 1 15.0017150 SUPE 10.0 0 2.40 1 2.4017152 CHICLSVC 8.0 0 -30.00 1 -30.0017152 CHICLSVC 8.0 0 30.00 1 30.0017164 HUALMAY 10.0 0 3.60 1 1.80 1 1.8022050 INDEPEND 220.0 1 0.00 1 -20.0024078 SBARTOLO 60.0 0 3.00 1 3.0024100 SANJUAN2 60.0 0 30.00 1 30.0024172 SANJUAN3 60.0 1 60.00 1 30.0026030 STA.ROSA 10.0 0 9.60 1 4.8026064 SNICOLAS 13.8 0 5.50 1 5.5027008 INFANTAS 10.0 0 4.80 1 4.8027012 TOMVALLE 10.0 0 7.20 1 1.8027016 MIRONES 10.0 0 9.60 1 4.8027018 OQUENDO 10.0 0 4.80 1 4.8027022 ZAPALLAL 10.0 0 3.60 1 1.8027024 VENTANIL 10.0 0 3.60 1 1.8027028 HUARAL 10.0 0 3.60 1 1.8027038 CHANCAY 10.0 0 3.60 1 1.8027044 CHAVASVC 4.8 1 -20.00 1 -20.0027044 CHAVASVC 4.8 1 40.00 1 40.0027054 PANDO 10.0 0 7.80 1 1.9527056 PERSHING 10.0 0 14.40 1 1.8027058 MARANGA 10.0 0 7.20 1 1.8027070 MARCONA 10.0 0 -10.00 1 -5.00 1 -5.0027080 VILMARIA 10.0 0 4.00 1 4.0027082 CHORRILL 10.0 0 6.00 1 6.0027088 SANJUAN3 10.0 0 15.00 1 15.0027130 CJMARQUI 30.0 0 23.30 1 4.90 1 5.10 1 8.30 1 5.0027132 JGALVEZ 10.0 0 6.00 1 6.0027152 S.ISIDR2 10.0 0 8.00 1 8.0027156 LIMATAM1 10.0 0 10.00 1 10.0027158 NEYRA 10.0 0 10.00 1 10.0027162 BARRANCO 10.0 0 6.00 1 6.0027166 CUARTEL 10.0 0 10.00 1 10.0027168 BALNESVC 7.3 0 -30.00 1 -30.0027168 BALNESVC 7.3 0 60.00 1 60.0037000 VIZCASVC 16.0 1 -45.00 1 -45.0037000 VIZCASVC 16.0 1 90.00 1 90.0041216 PUCALLPA 138.0 1 0.00 1 -8.0042070 TINGMARI 220.0 0 -30.00 1 -30.0047000 TINGMARI 10.0 0 2.00 1 2.0047010 PACHACHA 50.0 0 9.60 1 9.6047014 OROYANUE 50.0 0 9.60 1 9.6047040 PARAGSH1 50.0 0 12.00 1 12.0047046 CIENEGU2 10.0 0 6.00 1 6.0047058 TACNA 10.0 0 14.40 1 4.8047064 CANTGRAN 10.0 0 9.60 1 4.8047072 SALAMANC 10.0 0 6.00 1 6.0047100 MOROCOCH 50.0 0 6.00 1 6.0047142 MILPO 13.2 0 9.60 1 9.6047150 HUANUCO 10.0 0 2.00 1 2.0047170 CASAPALC 50.0 0 6.00 1 6.0047268 EXCELSI1 2.4 0 0.00 1 4.8056014 BOTIFLA3 13.8 0 1.20 1 1.2056016 BOTIFLA2 13.8 0 1.20 1 1.2056022 BOTIFLA1 13.8 0 1.80 1 1.8057024 REFILO1 10.5 0 6.00 1 6.0057118 TACNA1 10.5 0 2.00 1 2.0057126 LAYARAD1 10.5 0 1.00 1 1.00

COMPENSACION SHUNTBanco 4BARRAS Banco 1 Banco 2 Banco 3

Page 145: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag.25 de 65

Vn Modo Total# Nombre kV Reg. MVAr # MVAr # MVAr # MVAr # MVAr

COMPENSACION SHUNTBanco 4BARRAS Banco 1 Banco 2 Banco 3

57128 LAYARAD2 10.5 0 0.45 1 0.4557130 LIXIVIAC 13.8 0 7.00 1 1.89 1 1.54 1 1.52 1 1.2266138 DOLORESP 11.5 0 10.00 4 2.5067072 TINTASVC 10.5 1 -15.0067072 TINTASVC 10.5 1 15.0067092 JULIACA 10.0 0 -5.00 1 -5.0067092 JULIACA 10.0 0 7.50 1 2.50 1 5.0067140 YURACAC1 6.9 0 3.00 1 2.00 1 1.0067142 YURACAC2 6.9 0 3.00 1 2.00 1 1.00

Nota 1: los MVAr (-) son reactores, los MVAr (+) son capacitoresNota 2: el Modo de Regulación 0 si es discreta o 1 para continua

Page 146: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag.26 de 65

Vn ID R X B Str Long.# Nombre # Nombre kV # Ω/km Ω/km nF/km MVA MW MVAr MW MVAr km42002 C.ARMIÑO 42164 COTARU11 220.0 1 0.03959 0.38434 11.4730 304.83 0.0000 0.0000 0.0000 50.0000 294.0042002 C.ARMIÑO 42166 COTARU12 220.0 2 0.03959 0.38434 11.4730 304.83 0.0000 0.0000 0.0000 50.0000 294.0042160 COTARU21 52090 SOCABAYA 220.0 1 0.03960 0.38434 11.4729 304.83 0.0000 50.0000 0.0000 0.0000 315.0042168 COTARU22 52090 SOCABAYA 220.0 2 0.03960 0.38434 11.4729 304.83 0.0000 50.0000 0.0000 0.0000 315.0052072 ILO2 52076 MOQUEGUA 220.0 1 0.07202 0.38954 11.2334 400.09 0.0000 0.0000 0.0000 0.0000 72.4552072 ILO2 52076 MOQUEGUA 220.0 2 0.07202 0.38954 11.2334 400.09 0.0000 0.0000 0.0000 0.0000 72.4542010 PACHACHA 42080 CALLAHUA 220.0 1 0.05630 0.48886 9.0077 152.42 0.0000 0.0000 0.0000 0.0000 72.6442010 PACHACHA 42080 CALLAHUA 220.0 2 0.05630 0.48880 9.0077 152.42 0.0000 0.0000 0.0000 0.0000 72.6452076 MOQUEGUA 52090 SOCABAYA 220.0 1 0.06620 0.49094 9.0002 149.75 0.0000 0.0000 0.0000 0.0000 106.7452076 MOQUEGUA 52090 SOCABAYA 220.0 2 0.06620 0.49094 9.0002 149.75 0.0000 0.0000 0.0000 0.0000 106.7442002 C.ARMIÑO 42008 HUAYUCA 220.0 1 0.05558 0.49999 8.9993 152.42 0.0000 0.0000 0.0000 0.0000 79.5912112 HUACHO 22000 ZAPALLAL 220.0 1 0.08989 0.49998 8.9991 228.62 1.4340 0.0000 1.4340 0.0000 103.8612036 CHIMBOT1 12062 TRUJINOR 220.0 1 0.06700 0.47999 8.9991 152.42 1.1460 0.0000 1.1460 0.0000 134.0012036 CHIMBOT1 12062 TRUJINOR 220.0 2 0.05768 0.48292 8.9991 152.42 0.0000 0.0000 0.0000 0.0000 134.0042002 C.ARMIÑO 42010 PACHACHA 220.0 1 0.06010 0.50240 8.9990 152.42 0.0000 0.0000 0.0000 0.0000 195.1342002 C.ARMIÑO 42010 PACHACHA 220.0 2 0.06010 0.50240 8.9990 152.42 0.0000 0.0000 0.0000 0.0000 195.1322000 ZAPALLAL 42008 HUAYUCA 220.0 1 0.05791 0.50000 8.9989 152.42 0.0760 0.0000 0.0760 0.0000 244.4022016 T-ICA 22050 INDEPEND 220.0 1 0.08296 0.48996 8.9989 140.98 0.2520 0.0000 0.2520 0.0000 55.1922046 SANJUAN 22050 INDEPEND 220.0 1 0.08301 0.49000 8.9988 152.42 1.6120 0.0000 1.6120 0.0000 214.7512036 CHIMBOT1 12040 PARAMONU 220.0 1 0.08999 0.48000 8.9988 152.42 2.6620 0.0000 2.6620 0.0000 221.1712040 PARAMONU 12112 HUACHO 220.0 1 0.08987 0.50001 8.9986 152.42 1.6900 0.0000 1.6900 0.0000 55.6322016 T-ICA 22058 MARCONA 220.0 1 0.08297 0.49000 8.9983 152.42 0.1590 0.0000 0.1590 0.0000 155.0012008 CHICLAOE 12010 CARHUAQU 220.0 1 0.08998 0.49001 8.9921 114.31 0.0000 0.0000 0.0000 0.0000 83.0022050 INDEPEND 22122 ACE.AREQ 220.0 1 0.08991 0.50997 8.9917 0 0.0000 0.0000 0.0000 0.0000 24.6022002 VENTANIL 22004 CHAVARR 220.0 1 0.08708 0.49958 8.9889 152.42 0.0000 0.0000 0.0000 0.0000 10.5622000 ZAPALLAL 22002 VENTANIL 220.0 1 0.08820 0.49502 8.9881 228.62 0.0000 0.0000 0.0000 0.0000 18.0022000 ZAPALLAL 22002 VENTANIL 220.0 2 0.08443 0.53348 8.9881 228.62 0.0000 0.0000 0.0000 0.0000 18.0022002 VENTANIL 22004 CHAVARR 220.0 2 0.08708 0.49958 8.9785 152.42 0.0000 0.0000 0.0000 0.0000 10.5612002 SIDELFON 12108 ZORRITOS 220.0 1 0.06500 0.50000 8.9497 0 0.2660 0.0000 0.2660 0.0000 137.0012074 TALARA 12108 ZORRITOS 220.0 1 0.06479 0.49990 8.9497 228.62 0.2660 0.0000 0.2660 0.0000 137.0012008 CHICLAOE 12016 PIURAOES 220.0 1 0.07680 0.49360 8.9491 152.42 0.9970 0.0000 0.9970 0.0000 211.1912000 GUADALUP 12062 TRUJINOR 220.0 1 0.09309 0.53254 8.9491 152.42 0.4650 0.0000 0.4650 0.0000 103.2112000 GUADALUP 12008 CHICLAOE 220.0 1 0.09307 0.53250 8.9490 152.42 1.0630 0.0000 1.0630 0.0000 83.6222046 SANJUAN 22050 INDEPEND 220.0 2 0.08239 0.48660 8.9368 152.42 1.6230 0.0000 1.6230 0.0000 216.2422004 CHAVARR 22008 CJMARQUI 220.0 1 0.07366 0.49688 8.9347 339.89 0.0000 0.0000 0.0000 0.0000 21.4222008 CJMARQUI 42082 CALLAHED 220.0 1 0.07353 0.49690 8.9345 339.89 0.0000 0.0000 0.0000 0.0000 36.4022004 CHAVARR 42082 CALLAHED 220.0 2 0.07356 0.49684 8.9341 339.89 0.0000 0.0000 0.0000 0.0000 55.4022004 CHAVARR 22006 STA.ROSA 220.0 1 0.07303 0.49791 8.9264 228.62 0.0000 0.0000 0.0000 0.0000 8.3522004 CHAVARR 22006 STA.ROSA 220.0 2 0.07303 0.49791 8.9264 228.62 0.0000 0.0000 0.0000 0.0000 8.3542080 CALLAHUA 42082 CALLAHED 220.0 1 0.07510 0.50069 8.8823 429.81 0.0000 0.0000 0.0000 0.0000 0.5812016 PIURAOES 12074 TALARA 220.0 1 0.07111 0.49990 8.8681 152.42 1.1870 0.0000 1.1870 0.0000 103.8052000 PUNO-MOQ 52076 MOQUEGUA 220.0 1 0.04672 0.49750 8.8545 149.75 0.0000 0.0000 0.0000 0.0000 163.1532144 VIZCARRA 42204 PARAGSH2 220.0 1 0.05320 0.49439 8.8432 0 0.0000 0.0000 0.0000 0.0000 123.9042012 OROYANUE 42206 CARHUAMA 220.0 1 0.05321 0.49439 8.8429 0 0.0000 0.0000 0.0000 0.0000 75.5042204 PARAGSH2 42206 CARHUAMA 220.0 1 0.05322 0.49444 8.8429 0 0.0000 0.0000 0.0000 0.0000 42.2022006 STA.ROSA 42036 HUINCO 220.0 1 0.07361 0.50242 8.8263 342.94 0.0000 0.0000 0.0000 0.0000 62.0022006 STA.ROSA 42036 HUINCO 220.0 2 0.07361 0.50242 8.8263 342.94 0.0000 0.0000 0.0000 0.0000 62.0022006 STA.ROSA 22046 SANJUAN 220.0 1 0.07256 0.49247 8.8235 228.62 0.0000 0.0000 0.0000 0.0000 26.2822006 STA.ROSA 22046 SANJUAN 220.0 2 0.07256 0.49247 8.8235 228.62 0.0000 0.0000 0.0000 0.0000 26.2842148 YANANGO 42156 CHIMAY 220.0 1 0.04997 0.52006 8.8072 200.05 0.0000 0.0000 0.0000 0.0000 40.00

Compens. 2do Estr.LINEAS

Barra 1er. Estremo Barra 2do. Estremo Compens. 1er Estr.

Page 147: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag.27 de 65

Vn ID R X B Str Long.# Nombre # Nombre kV # Ω/km Ω/km nF/km MVA MW MVAr MW MVAr km

Compens. 2do Estr.LINEAS

Barra 1er. Estremo Barra 2do. Estremo Compens. 1er Estr.

32144 VIZCARRA 42070 TINGMARI 220.0 1 0.05751 0.50501 8.8067 190.52 0.0000 0.0000 0.0000 0.0000 173.7012040 PARAMONU 32144 VIZCARRA 220.0 1 0.05750 0.50499 8.8064 190.52 0.0000 0.0000 0.0000 0.0000 145.2912062 TRUJINOR 12114 CAJAMARC 220.0 1 0.05475 0.49269 8.8064 247.68 0.0000 0.0000 0.0000 0.0000 137.0242014 MATUCANA 42082 CALLAHED 220.0 1 0.07507 0.50099 8.8054 228.62 0.0000 0.0000 0.0000 0.0000 22.5022050 INDEPEND 42016 HUANCAVE 220.0 1 0.06099 0.53000 8.8002 152.42 0.0000 0.0000 0.0000 0.0000 180.7842002 C.ARMIÑO 42016 HUANCAVE 220.0 1 0.06097 0.53002 8.7991 152.42 0.0000 0.0000 0.0000 0.0000 67.0042000 POMACOCH 42010 PACHACHA 220.0 1 0.06005 0.49982 8.7990 152.42 0.0590 0.0000 0.0590 0.0000 13.4622050 INDEPEND 42002 C.ARMIÑO 220.0 2 0.06099 0.53000 8.7989 152.42 0.0000 0.0000 0.0000 0.0000 248.5322046 SANJUAN 42000 POMACOCH 220.0 1 0.06098 0.48997 8.7988 152.42 0.0960 0.0000 0.0960 0.0000 113.5022046 SANJUAN 42000 POMACOCH 220.0 2 0.06098 0.48997 8.7988 152.42 0.0960 0.0000 0.0960 0.0000 113.5022004 CHAVARR 22014 C2-BARSI 220.0 2 0.07359 0.50255 8.7933 327.69 0.0000 0.0000 0.0000 0.0000 8.0922044 BALNEARI 22046 SANJUAN 220.0 1 0.07336 0.50271 8.7923 228.62 0.0000 0.0000 0.0000 0.0000 9.8322044 BALNEARI 22046 SANJUAN 220.0 2 0.07336 0.50271 8.7923 228.62 0.0000 0.0000 0.0000 0.0000 9.8322004 CHAVARR 22012 C1-BARSI 220.0 1 0.07350 0.50266 8.7906 327.69 0.0000 0.0000 0.0000 0.0000 8.5622002 VENTANIL 22004 CHAVARR 220.0 3 0.08693 0.49710 8.7896 152.42 0.0000 0.0000 0.0000 0.0000 11.0842070 TINGMARI 42072 AGUAYTIA 220.0 1 0.05747 0.50501 8.7799 190.52 0.0000 0.0000 0.0000 0.0000 73.2722016 T-ICA 22056 ICA 220.0 1 0.09680 0.48400 8.7689 140.98 0.0000 0.0000 0.0000 0.0000 0.1042000 POMACOCH 42002 C.ARMIÑO 220.0 1 0.06100 0.50979 8.7535 152.42 0.0000 0.0000 0.0000 0.0000 192.3342000 POMACOCH 42002 C.ARMIÑO 220.0 2 0.06100 0.50981 8.7534 152.42 0.0000 0.0000 0.0000 0.0000 192.2452000 PUNO-MOQ 52098 PUNO 220.0 1 0.05667 0.50554 8.7086 149.75 0.0000 0.0000 0.0000 0.0000 33.4832144 VIZCARRA 32146 ANTAMINA 220.0 1 0.05762 0.51011 8.6817 190.52 0.0000 0.0000 0.0000 0.0000 52.0842004 YUNCAN 42206 CARHUAMA 220.0 1 0.05504 0.50902 8.6607 0 0.0000 0.0000 0.0000 0.0000 53.2042010 PACHACHA 42012 OROYANUE 220.0 1 0.05281 0.50884 8.6604 228.62 0.0000 0.0000 0.0000 0.0000 21.6352076 MOQUEGUA 52078 L.HEROES 220.0 1 0.06143 0.51156 8.6010 149.75 0.0000 0.0000 0.0000 0.0000 124.3342010 PACHACHA 42148 YANANGO 220.0 1 0.05002 0.52000 8.5942 200.05 0.0000 0.0000 0.0000 0.0000 89.4042002 C.ARMIÑO 42018 RESTITU1 220.0 1 0.07469 0.49296 8.5929 152.42 0.0000 0.0000 0.0000 0.0000 1.6242002 C.ARMIÑO 42020 RESTITU2 220.0 2 0.07469 0.49296 8.5929 152.42 0.0000 0.0000 0.0000 0.0000 1.6242002 C.ARMIÑO 42022 RESTITU3 220.0 3 0.07469 0.49296 8.5929 152.42 0.0000 0.0000 0.0000 0.0000 1.6242160 COTARU21 42162 COTARUSE 220.0 1 -71.99984 0.0000 300 0.0000 0.0000 0.0000 0.0000 1.0042162 COTARUSE 42164 COTARU11 220.0 1 -55.99880 0.0000 300 0.0000 0.0000 0.0000 0.0000 1.0042162 COTARUSE 42166 COTARU12 220.0 2 -55.99880 0.0000 300 0.0000 0.0000 0.0000 0.0000 1.0042162 COTARUSE 42168 COTARU22 220.0 2 -71.99984 0.0000 300 0.0000 0.0000 0.0000 0.0000 1.0042160 COTARU21 42162 COTARUSE 220.0 F 0.00010 0 0.0000 0.0000 0.0000 0.0000 0.0042162 COTARUSE 42164 COTARU11 220.0 F 0.00010 0 0.0000 0.0000 0.0000 0.0000 0.0042162 COTARUSE 42166 COTARU12 220.0 F 0.00010 0 0.0000 0.0000 0.0000 0.0000 0.0042162 COTARUSE 42168 COTARU22 220.0 F 0.00010 0 0.0000 0.0000 0.0000 0.0000 0.0051028 REFILO1 51048 T-ILO 138.0 1 0.08068 0.48991 9.5162 59.99 0.0000 0.0000 0.0000 0.0000 2.6251020 ILOELECT 51048 T-ILO 138.0 1 0.13397 0.49012 9.5137 59.99 0.0000 0.0000 0.0000 0.0000 9.7851004 MILLSITE 51084 QUEBHOND 138.0 1 0.13420 0.49138 9.5077 59.99 0.0000 0.0000 0.0000 0.0000 28.0451020 ILOELECT 51084 QUEBHOND 138.0 1 0.12220 0.49019 9.5066 59.99 0.0000 0.0000 0.0000 0.0000 62.4651004 MILLSITE 51090 PUSHBACK 138.0 1 0.12188 0.49095 9.4994 59.99 0.0000 0.0000 0.0000 0.0000 5.0041000 UCHUCHAC 41064 PARAGSH2 138.0 1 0.14591 0.46679 9.4672 47.8 0.0000 0.0000 0.0000 0.0000 47.8651006 BOTIFLAC 51070 MOQUEGUA 138.0 1 0.07603 0.48000 9.1877 195.99 0.0000 0.0000 0.0000 0.0000 30.7651062 SANTUAR 51144 CHILINA 138.0 1 0.14701 0.49404 9.1439 130.26 0.0000 0.0000 0.0000 0.0000 17.6711042 CHIMBOTE 11044 CHIMBOT2 138.0 1 0.14182 0.47991 9.1274 115.92 0.0000 0.0000 0.0000 0.0000 8.5011042 CHIMBOTE 11044 CHIMBOT2 138.0 2 0.14182 0.47991 9.1274 115.92 0.0000 0.0000 0.0000 0.0000 8.5051008 ELALTO 51106 REPARTIC 138.0 1 0.13459 0.48608 9.0506 83.66 0.0000 0.0000 0.0000 0.0000 46.0041050 YAUPI 41142 YUNCAN 138.0 1 0.09081 0.49056 9.0442 175.99 0.0000 0.0000 0.0000 0.0000 14.0341052 CARIPA 41054 OROYANUE 138.0 1 0.14476 0.48871 9.0091 117 0.0000 0.0000 0.0000 0.0000 20.4741006 CONDORCO 41052 CARIPA 138.0 1 0.14442 0.48864 9.0072 0 0.0000 0.0000 0.0000 0.0000 12.00

Page 148: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag.28 de 65

Vn ID R X B Str Long.# Nombre # Nombre kV # Ω/km Ω/km nF/km MVA MW MVAr MW MVAr km

Compens. 2do Estr.LINEAS

Barra 1er. Estremo Barra 2do. Estremo Compens. 1er Estr.

11012 SANTA 11044 CHIMBOT2 138.0 1 0.30720 0.48005 9.0061 92.71 0.0000 0.0000 0.0000 0.0000 7.4741046 CARHUAMA 41064 PARAGSH2 138.0 1 0.14476 0.48865 9.0051 116.88 0.0000 0.0000 0.0000 0.0000 39.6911038 PORVENIR 11078 TRUJINOR 138.0 1 0.18567 0.47997 9.0049 90.1 0.0000 0.0000 0.0000 0.0000 11.5741046 CARHUAMA 41052 CARIPA 138.0 1 0.14473 0.48854 9.0046 117 0.0000 0.0000 0.0000 0.0000 53.4911038 PORVENIR 11082 TRUJISUR 138.0 1 0.29390 0.48013 9.0036 70.08 0.0000 0.0000 0.0000 0.0000 5.4311032 CHIMBNOR 11042 CHIMBOTE 138.0 1 0.18329 0.48012 9.0024 82.69 0.0000 0.0000 0.0000 0.0000 6.3911032 CHIMBNOR 11042 CHIMBOTE 138.0 2 0.18329 0.48012 9.0024 82.69 0.0000 0.0000 0.0000 0.0000 6.3961034 TINTAYA 61108 CALLALLI 138.0 1 0.11201 0.51029 9.0009 106.36 0.0000 0.0000 0.0000 0.0000 96.3011004 CHIMBSUR 11006 NEPEÑA 138.0 1 0.30733 0.48001 9.0008 92.71 0.0000 0.0000 0.0000 0.0000 17.2711006 NEPEÑA 11010 SANJACIN 138.0 1 0.30727 0.48593 9.0008 92.71 0.0000 0.0000 0.0000 0.0000 21.9911000 HUALLANC 11042 CHIMBOTE 138.0 1 0.12138 0.47999 9.0005 158.47 0.0000 0.0000 0.0000 0.0000 83.9711000 HUALLANC 11042 CHIMBOTE 138.0 2 0.12129 0.47999 9.0005 158.47 0.0000 0.0000 0.0000 0.0000 83.9711000 HUALLANC 11042 CHIMBOTE 138.0 3 0.12066 0.47999 9.0005 158.47 0.0000 0.0000 0.0000 0.0000 83.9761008 T-AYAVIR 61034 TINTAYA 138.0 1 0.13601 0.50329 9.0005 75.05 0.0000 0.0000 0.0000 0.0000 82.5011004 CHIMBSUR 11042 CHIMBOTE 138.0 1 0.13436 0.47996 9.0002 80.09 0.0000 0.0000 0.0000 0.0000 13.8211006 NEPEÑA 11008 CASMA 138.0 1 0.30731 0.48590 9.0002 92.71 0.0000 0.0000 0.0000 0.0000 28.9461000 JULIACA 61040 AZANGARO 138.0 1 0.13660 0.50330 9.0002 75.05 0.0000 0.0000 0.0000 0.0000 78.2051062 SANTUAR 61108 CALLALLI 138.0 1 0.09702 0.51031 9.0002 106.36 0.0000 0.0000 0.0000 0.0000 83.4061008 T-AYAVIR 61040 AZANGARO 138.0 1 0.13661 0.50331 9.0001 75.05 0.0000 0.0000 0.0000 0.0000 42.4211002 MOTIL 11078 TRUJINOR 138.0 1 0.25369 0.48000 8.9996 30.03 0.0000 0.0000 0.0000 0.0000 64.4061092 SANGABAN 61130 SANRAFAE 138.0 1 0.11101 0.50329 8.9987 92.02 0.0000 0.0000 0.0000 0.0000 76.4861040 AZANGARO 61092 SANGABAN 138.0 2 0.11100 0.50330 8.9981 92.02 0.0000 0.0000 0.0000 0.0000 159.3061040 AZANGARO 61130 SANRAFAE 138.0 1 0.11099 0.50330 8.9977 92.02 0.0000 0.0000 0.0000 0.0000 89.2911064 SANTICAO 11078 TRUJINOR 138.0 1 0.18568 0.48001 8.9965 60.07 0.0000 0.0000 0.0000 0.0000 26.8011064 SANTICAO 11078 TRUJINOR 138.0 2 0.18568 0.48001 8.9965 60.07 0.0000 0.0000 0.0000 0.0000 26.8041044 PARAGSHA 41064 PARAGSH2 138.0 1 0.14464 0.48815 8.9919 117 0.0000 0.0000 0.0000 0.0000 1.5811000 HUALLANC 11014 PIERINA 138.0 1 0.09037 0.48905 8.9429 0 0.0000 0.0000 0.0000 0.0000 87.7551000 CERROVER 51106 REPARTIC 138.0 1 0.14763 0.52785 8.9386 92.98 0.0000 0.0000 0.0000 0.0000 23.0051046 MOLLENDO 51106 REPARTIC 138.0 1 0.14759 0.52782 8.9383 80.07 0.0000 0.0000 0.0000 0.0000 64.0041214 AGUAYTIA 41216 PUCALLPA 138.0 1 0.11160 0.49139 8.9324 0 0.0000 0.0000 0.0000 0.0000 131.0051004 MILLSITE 51054 TOQUEPAL 138.0 1 0.11807 0.50657 8.9144 59.99 0.0000 0.0000 0.0000 0.0000 0.5061006 T-COMBAP 61030 COMBAPAT 138.0 1 0.15807 0.50847 8.9144 75.05 0.0000 0.0000 0.0000 0.0000 1.0051012 T-JESUS 51062 SANTUAR 138.0 1 0.15698 0.52771 8.9040 133.85 0.0000 0.0000 0.0000 0.0000 10.7051058 SOCABAYA 51062 SANTUAR 138.0 2 0.15704 0.52780 8.9023 133.85 0.0000 0.0000 0.0000 0.0000 20.7051006 BOTIFLAC 51090 PUSHBACK 138.0 1 0.12198 0.49103 8.9012 59.99 0.0000 0.0000 0.0000 0.0000 27.0461132 CACHIMAY 61138 ABANCAY 138.0 1 0.13801 0.50570 8.9007 75.05 0.0000 0.0000 0.0000 0.0000 95.6051012 T-JESUS 51058 SOCABAYA 138.0 1 0.15692 0.52809 8.9004 133.85 0.0000 0.0000 0.0000 0.0000 10.0061006 T-COMBAP 61026 QUENCORO 138.0 1 0.15800 0.50846 8.8996 75.05 0.0000 0.0000 0.0000 0.0000 87.5261006 T-COMBAP 61034 TINTAYA 138.0 1 0.15800 0.50800 8.8995 75.05 0.0000 0.0000 0.0000 0.0000 101.0961000 JULIACA 61120 PUNO 138.0 1 0.11200 0.50328 8.8993 166.12 0.0000 0.0000 0.0000 0.0000 37.0051000 CERROVER 51058 SOCABAYA 138.0 1 0.15694 0.52777 8.8989 133.85 0.0000 0.0000 0.0000 0.0000 10.8051000 CERROVER 51058 SOCABAYA 138.0 2 0.15694 0.52777 8.8989 133.85 0.0000 0.0000 0.0000 0.0000 10.8051004 MILLSITE 51010 LIXIVIAC 138.0 1 0.11638 0.48562 8.8989 164.92 0.0000 0.0000 0.0000 0.0000 1.8051026 ARICOTA 51054 TOQUEPAL 138.0 1 0.12000 0.50598 8.8987 75.05 0.0000 0.0000 0.0000 0.0000 35.5051018 ILO1 51048 T-ILO 138.0 1 0.13352 0.51607 8.8776 59.99 0.0000 0.0000 0.0000 0.0000 4.5551018 ILO1 51022 REFILO2 138.0 1 0.13397 0.51602 8.8728 59.99 0.0000 0.0000 0.0000 0.0000 9.7851006 BOTIFLAC 51070 MOQUEGUA 138.0 2 0.07243 0.47692 8.8287 159.9 0.0000 0.0000 0.0000 0.0000 32.5051012 T-JESUS 51086 JESUS 138.0 1 0.15553 0.52688 8.8215 133.85 0.0000 0.0000 0.0000 0.0000 0.6041024 HUANUCO 41064 PARAGSH2 138.0 1 0.13800 0.50801 8.8103 44.94 0.0030 0.0000 0.0030 0.0000 86.2151018 ILO1 51070 MOQUEGUA 138.0 1 0.07240 0.49801 8.7763 130.02 0.0000 0.0000 0.0000 0.0000 58.50

Page 149: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag.29 de 65

Vn ID R X B Str Long.# Nombre # Nombre kV # Ω/km Ω/km nF/km MVA MW MVAr MW MVAr km

Compens. 2do Estr.LINEAS

Barra 1er. Estremo Barra 2do. Estremo Compens. 1er Estr.

61002 T1-CACHI 61104 MACHUPIC 138.0 1 0.15701 0.50121 8.7494 93.22 0.0000 0.0000 0.0000 0.0000 78.5061020 DOLORESP 61132 CACHIMAY 138.0 1 0.15701 0.50121 8.7493 93.22 0.0000 0.0000 0.0000 0.0000 13.5041046 CARHUAMA 41142 YUNCAN 138.0 1 0.05498 0.50875 8.6583 244.99 0.0000 0.0000 0.0000 0.0000 53.2041022 TINGMARI 41152 AUCAYACU 138.0 1 0.13891 0.51829 8.6482 44.94 0.0000 0.0000 0.0000 0.0000 44.4241002 YAUPI2 41004 OXAPAMPA 138.0 1 0.13889 0.51829 8.6476 0 0.0000 0.0000 0.0000 0.0000 28.3041152 AUCAYACU 41154 TOCACHE 138.0 1 0.13476 0.51003 8.6475 44.94 0.0000 0.0000 0.0000 0.0000 109.9041022 TINGMARI 41024 HUANUCO 138.0 1 0.16556 0.50337 8.6392 44.94 0.0510 0.0000 0.0510 0.0000 89.4011048 PARAMEXI 11050 CAHUA 138.0 1 0.28650 0.51562 8.5472 47.8 0.0000 0.0000 0.0000 0.0000 63.3611048 PARAMEXI 11050 CAHUA 138.0 2 0.28650 0.51562 8.5472 47.8 0.0000 0.0000 0.0000 0.0000 63.3611046 PARAMONU 11048 PARAMEXI 138.0 1 0.26355 0.52002 8.4193 84.61 0.0000 0.0000 0.0000 0.0000 9.4361004 T2-CACHI 61104 MACHUPIC 138.0 2 0.14600 0.51981 8.4007 122.38 0.0000 0.0000 0.0000 0.0000 75.6461020 DOLORESP 61026 QUENCORO 138.0 1 0.14591 0.51994 8.4006 59.99 0.0000 0.0000 0.0000 0.0000 8.3461004 T2-CACHI 61026 QUENCORO 138.0 2 0.14600 0.51981 8.3984 0 0.0000 0.0000 0.0000 0.0000 23.7051000 CERROVER 51002 CYPRUS 138.0 1 0.15870 0.52688 8.3572 59.99 0.0000 0.0000 0.0000 0.0000 0.3061002 T1-CACHI 61088 CACHIELP 138.0 1 0.15235 0.49514 8.3572 93.22 0.0000 0.0000 0.0000 0.0000 0.0561002 T1-CACHI 61132 CACHIMAY 138.0 1 0.15235 0.49514 8.3572 93.22 0.0000 0.0000 0.0000 0.0000 0.0561008 T-AYAVIR 61036 AYAVIRI 138.0 1 0.13331 0.49514 8.3572 75.05 0.0000 0.0000 0.0000 0.0000 0.1051004 MILLSITE 51070 MOQUEGUA 138.0 1 0.14408 0.53372 8.3140 99.91 0.0000 0.0000 0.0000 0.0000 38.7051054 TOQUEPAL 51070 MOQUEGUA 138.0 1 0.14408 0.53372 8.3140 99.91 0.0000 0.0000 0.0000 0.0000 38.7061004 T2-CACHI 61088 CACHIELP 138.0 2 0.19044 0.47610 6.9644 122.38 0.0000 0.0000 0.0000 0.0000 0.0251022 REFILO2 51028 REFILO1 138.0 1 #¡DIV/0! 0.00010 0 0.0000 0.0000 0.0000 0.0000 0.0044040 COBRIZII 44074 COBRIZAI 69.0 1 0.12060 0.45030 9.7647 58 0.0000 0.0000 0.0000 0.0000 57.4054004 BOTIFHID 54008 BOTIFLAC 69.0 1 0.25160 0.45960 9.6665 0 0.0000 0.0000 0.0000 0.0000 20.0044016 PACHACAY 44132 CHUMPE 69.0 1 0.17097 0.48055 9.1173 44.6 0.0000 0.0000 0.0000 0.0000 63.9244016 PACHACAY 44130 OROYANUE 69.0 1 0.17094 0.48047 9.1089 44.6 0.0000 0.0000 0.0000 0.0000 37.8044038 PAMPAS 44074 COBRIZAI 69.0 1 0.27476 0.51783 8.7486 0 0.0000 0.0000 0.0000 0.0000 27.8314082 SUPE 14136 T-SUPE 66.0 1 0.12324 0.42869 10.3967 61.73 0.0000 0.0000 0.0000 0.0000 1.6454032 ARICOTA1 54050 SARITA 66.0 1 0.25120 0.46028 10.1492 25.03 0.0000 0.0000 0.0000 0.0000 0.3014116 HUACHO 14132 HUALMAY 66.0 1 0.12291 0.43961 10.0888 61.73 0.0000 0.0000 0.0000 0.0000 13.4614132 HUALMAY 14136 T-SUPE 66.0 1 0.17248 0.45695 9.6878 31.21 0.0000 0.0000 0.0000 0.0000 37.8454038 TACNA 54108 L.HEROES 66.0 1 0.25158 0.45959 9.6833 25.03 0.0000 0.0000 0.0000 0.0000 6.1014088 PARAMON2 14136 T-SUPE 66.0 1 0.12263 0.45713 9.6804 31.21 0.0000 0.0000 0.0000 0.0000 16.6754030 ARICOTA2 54032 ARICOTA1 66.0 1 0.25164 0.45964 9.6779 25.03 0.0000 0.0000 0.0000 0.0000 5.6054036 TOMASIRI 54108 L.HEROES 66.0 1 0.25161 0.45960 9.6642 25.03 0.0000 0.0000 0.0000 0.0000 29.3054038 TACNA 54104 LAYARADA 66.0 1 0.25159 0.45960 9.6584 13.72 0.0000 0.0000 0.0000 0.0000 27.3054030 ARICOTA2 54036 TOMASIRI 66.0 1 0.25160 0.45960 9.6513 25.03 0.0000 0.0000 0.0000 0.0000 58.3054006 ALTOZAPA 54010 ICHUPAMP 66.0 1 0.25160 0.45959 9.6458 0 0.0000 0.0000 0.0000 0.0000 25.0054038 TACNA 54040 PAINDTAC 66.0 1 0.25162 0.45962 9.6417 25.03 0.0000 0.0000 0.0000 0.0000 7.2054040 PAINDTAC 54042 CALANA 66.0 1 0.25156 0.45956 9.5909 25.03 0.0000 0.0000 0.0000 0.0000 4.0014092 ANDAHUAS 14116 HUACHO 66.0 1 0.21310 0.47072 9.3440 24.01 0.0000 0.0000 0.0000 0.0000 32.5264000 HUANCARA 64024 ARES 66.0 1 0.21310 0.47076 9.3372 0 0.0000 0.0000 0.0000 0.0000 25.5014078 9DEOCTUB 14148 HUARMEY 66.0 1 0.30731 0.48590 8.9892 0 0.0000 0.0000 0.0000 0.0000 4.2014078 9DEOCTUB 14088 PARAMON2 66.0 1 0.30730 0.48590 8.9835 44.35 0.0000 0.0000 0.0000 0.0000 80.8014078 9DEOCTUB 14106 PTOANTAM 66.0 1 0.30732 0.48592 8.9478 0 0.0000 0.0000 0.0000 0.0000 4.9014068 LAPAMPA 14070 T-HUALLA 66.0 1 0.30727 0.49106 8.9000 34.52 0.0000 0.0000 0.0000 0.0000 2.6014068 LAPAMPA 14074 PALLASCA 66.0 1 0.30730 0.49110 8.8909 34.52 0.0000 0.0000 0.0000 0.0000 56.3064032 COMBAPAT 64102 SICUANI 66.0 1 0.25190 0.53630 8.7841 20 0.0000 0.0000 0.0000 0.0000 28.7014036 PARIAC 14100 T-PARIAC 66.0 1 0.49375 0.43996 8.6775 0 0.0000 0.0000 0.0000 0.0000 4.0014024 HUARAZ 14100 T-PARIAC 66.0 1 0.49380 0.44000 8.6471 26.18 0.0000 0.0000 0.0000 0.0000 20.0014026 TICAPAMP 14100 T-PARIAC 66.0 1 0.49380 0.44000 8.6471 26.18 0.0000 0.0000 0.0000 0.0000 10.00

Page 150: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag.30 de 65

Vn ID R X B Str Long.# Nombre # Nombre kV # Ω/km Ω/km nF/km MVA MW MVAr MW MVAr km

Compens. 2do Estr.LINEAS

Barra 1er. Estremo Barra 2do. Estremo Compens. 1er Estr.

14014 HUALLANC 14030 CARAZ 66.0 1 0.49380 0.44000 8.6425 26.18 0.0000 0.0000 0.0000 0.0000 29.1014070 T-HUALLA 14072 SIHUAS 66.0 1 0.50489 0.44000 8.6381 26.18 0.0000 0.0000 0.0000 0.0000 27.0014022 CARHUAZ 14024 HUARAZ 66.0 1 0.49379 0.44000 8.6337 26.18 0.0000 0.0000 0.0000 0.0000 29.2014024 HUARAZ 14030 CARAZ 66.0 1 0.49380 0.44000 8.6333 0 0.0000 0.0000 0.0000 0.0000 62.0014022 CARHUAZ 14030 CARAZ 66.0 1 0.49380 0.44000 8.6268 26.18 0.0000 0.0000 0.0000 0.0000 32.4014014 HUALLANC 14070 T-HUALLA 66.0 1 0.50490 0.44000 8.4948 26.18 0.0000 0.0000 0.0000 0.0000 20.0064022 CAYLLOMA 64150 CALLALLI 66.0 1 0.16612 0.51632 8.4948 0 0.0000 0.0000 0.0000 0.0000 60.0064022 CAYLLOMA 64024 ARES 66.0 1 0.16900 0.51630 8.4840 0 0.0000 0.0000 0.0000 0.0000 46.8744072 MOYOPAMP 44078 CALLAHU1 60.0 1 0.14900 0.25599 17.0784 56.12 0.0000 0.0000 0.0000 0.0000 12.9014058 GUADALUP 14090 CEMPACAS 60.0 1 0.08000 0.41000 11.5292 41.57 0.0000 0.0000 0.0000 0.0000 17.0024060 MARCONA 24062 SNICOLAS 60.0 1 0.07630 0.43420 10.8299 83.14 0.0000 0.0000 0.0000 0.0000 14.9024060 MARCONA 24062 SNICOLAS 60.0 2 0.07630 0.43200 10.8299 41.98 0.0000 0.0000 0.0000 0.0000 14.9024036 MARANGA 24142 C1-PERSH 60.0 1 0.11198 0.41798 10.7377 56.12 0.0000 0.0000 0.0000 0.0000 3.9824106 PANDO 24136 C1-PANDO 60.0 1 0.11148 0.42910 10.6959 56.12 0.0000 0.0000 0.0000 0.0000 0.6224038 STAMARIA 24068 BARSI 60.0 2 0.11271 0.41824 10.6088 56.12 0.0000 0.0000 0.0000 0.0000 3.8224036 MARANGA 24038 STAMARIA 60.0 1 0.11207 0.41778 10.5828 56.12 0.0000 0.0000 0.0000 0.0000 5.5724038 STAMARIA 24068 BARSI 60.0 1 0.11279 0.41849 10.5261 56.12 0.0000 0.0000 0.0000 0.0000 4.1324122 LIMATAM2 44014 SALAMAN2 60.0 1 0.11000 0.44000 10.5007 0 0.0000 0.0000 0.0000 0.0000 4.1424042 INDUSTRI 24068 BARSI 60.0 1 0.12259 0.41798 10.4707 56.12 0.0000 0.0000 0.0000 0.0000 1.9024042 INDUSTRI 24068 BARSI 60.0 2 0.12278 0.41855 10.4707 56.12 0.0000 0.0000 0.0000 0.0000 1.9044078 CALLAHU1 44084 HUACHIPA 60.0 1 0.15500 0.45540 10.4023 40.53 0.0000 0.0000 0.0000 0.0000 40.8024002 NARANJAL 24004 INFANTAS 60.0 1 0.12295 0.43560 10.3912 56.12 0.0000 0.0000 0.0000 0.0000 3.9024002 NARANJAL 24008 CHAVARR 60.0 1 0.12288 0.43546 10.3600 56.12 0.0000 0.0000 0.0000 0.0000 6.9724012 TOMVALLE 24014 OQUENDO 60.0 1 0.13192 0.43019 10.3586 56.12 0.0000 0.0000 0.0000 0.0000 7.5424008 CHAVARR 24010 PTEPIEDR 60.0 1 0.11220 0.43117 10.3449 0 0.0000 0.0000 0.0000 0.0000 15.1044008 CHOSICA 44072 MOYOPAMP 60.0 1 0.10295 0.45284 10.3415 62.35 0.0000 0.0000 0.0000 0.0000 0.5724146 C6-BARSI 24178 C2-PERSH 60.0 1 0.11195 0.43188 10.3394 0 0.0000 0.0000 0.0000 0.0000 6.2024104 MIRONES 24134 C3-BARSI 60.0 1 0.11193 0.43184 10.3386 56.12 0.0000 0.0000 0.0000 0.0000 4.4924016 ZAPALLAL 24020 VENTANIL 60.0 1 0.12282 0.42785 10.3356 38.45 0.0000 0.0000 0.0000 0.0000 4.4244028 STA.ROSA 44058 C-JICAMA 60.0 1 0.12298 0.42792 10.3345 56.12 0.0000 0.0000 0.0000 0.0000 14.8324016 ZAPALLAL 24030 PAMPILLA 60.0 1 0.12286 0.43066 10.3300 38.45 0.0000 0.0000 0.0000 0.0000 10.2044010 JICAMARC 44012 CANTGRAN 60.0 1 0.12285 0.42751 10.3188 56.12 0.0000 0.0000 0.0000 0.0000 9.1424014 OQUENDO 24030 PAMPILLA 60.0 1 0.13189 0.43041 10.3178 56.12 0.0000 0.0000 0.0000 0.0000 6.5724008 CHAVARR 24104 MIRONES 60.0 1 0.11197 0.43134 10.3177 56.12 0.0000 0.0000 0.0000 0.0000 7.0724008 CHAVARR 24104 MIRONES 60.0 2 0.11197 0.43134 10.3177 56.12 0.0000 0.0000 0.0000 0.0000 7.0724102 MEPSA 24168 T-MEPSA 60.0 1 0.11880 0.45576 10.3156 0 0.0000 0.0000 0.0000 0.0000 0.5024010 PTEPIEDR 24016 ZAPALLAL 60.0 1 0.11262 0.43141 10.3036 56.12 0.0000 0.0000 0.0000 0.0000 6.1544012 CANTGRAN 44028 STA.ROSA 60.0 1 0.12288 0.43110 10.2998 56.12 0.0000 0.0000 0.0000 0.0000 8.3724008 CHAVARR 24012 TOMVALLE 60.0 1 0.13191 0.43024 10.2986 56.12 0.0000 0.0000 0.0000 0.0000 6.9424008 CHAVARR 24014 OQUENDO 60.0 1 0.13177 0.42996 10.2978 56.12 0.0000 0.0000 0.0000 0.0000 8.3024004 INFANTAS 24008 CHAVARR 60.0 1 0.12296 0.43585 10.2643 56.12 0.0000 0.0000 0.0000 0.0000 4.0224106 PANDO 24138 C4-BARSI 60.0 1 0.11209 0.43235 10.2578 0 0.0000 0.0000 0.0000 0.0000 5.1024036 MARANGA 24140 C5-BARSI 60.0 1 0.11207 0.43200 10.2515 56.12 0.0000 0.0000 0.0000 0.0000 2.3044022 HUAMPANI 44086 ÑAÑA 60.0 1 0.12262 0.44059 10.1922 40.53 0.0000 0.0000 0.0000 0.0000 7.8844076 PUENTE 44088 T-PUENT1 60.0 1 0.11048 0.42952 10.1632 0 0.0000 0.0000 0.0000 0.0000 0.2944076 PUENTE 44090 T-PUENT2 60.0 2 0.11048 0.42952 10.1632 0 0.0000 0.0000 0.0000 0.0000 0.2924048 SANJUAN 24064 VIELSALV 60.0 1 0.13120 0.43141 10.1519 0 0.0000 0.0000 0.0000 0.0000 6.7524048 SANJUAN 24070 ATOCONGO 60.0 1 0.11000 0.41001 10.1146 62.35 0.0000 0.0000 0.0000 0.0000 11.0024048 SANJUAN 24074 LURIN 60.0 1 0.14779 0.43540 10.1125 0 0.0000 0.0000 0.0000 0.0000 17.5624090 STA.ROSV 24118 JGALVEZ 60.0 1 0.10994 0.42965 10.1003 0 0.0000 0.0000 0.0000 0.0000 4.45

Page 151: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag.31 de 65

Vn ID R X B Str Long.# Nombre # Nombre kV # Ω/km Ω/km nF/km MVA MW MVAr MW MVAr km

Compens. 2do Estr.LINEAS

Barra 1er. Estremo Barra 2do. Estremo Compens. 1er Estr.

24040 BALNEARI 24128 NEYRA 60.0 1 0.10905 0.45205 10.0965 0 0.0000 0.0000 0.0000 0.0000 3.4324040 BALNEARI 24128 NEYRA 60.0 2 0.10905 0.45205 10.0965 0 0.0000 0.0000 0.0000 0.0000 3.4324048 SANJUAN 24070 ATOCONGO 60.0 2 0.11001 0.41000 10.0944 0 0.0000 0.0000 0.0000 0.0000 12.1924040 BALNEARI 24126 BARRANCO 60.0 1 0.10899 0.43699 10.0854 0 0.0000 0.0000 0.0000 0.0000 6.2124040 BALNEARI 24126 BARRANCO 60.0 2 0.10899 0.43699 10.0854 0 0.0000 0.0000 0.0000 0.0000 6.2124090 STA.ROSV 24118 JGALVEZ 60.0 2 0.11002 0.42998 10.0777 56.12 0.0000 0.0000 0.0000 0.0000 4.4624006 CAUDIVIL 24008 CHAVARR 60.0 1 0.11832 0.45542 10.0721 56.12 0.0000 0.0000 0.0000 0.0000 13.6844086 ÑAÑA 44110 S.CLARA 60.0 1 0.12455 0.43360 10.0685 0 0.0000 0.0000 0.0000 0.0000 11.2724048 SANJUAN 24056 TRENELEC 60.0 1 0.13060 0.42587 10.0676 0 0.0000 0.0000 0.0000 0.0000 5.0524006 CAUDIVIL 24016 ZAPALLAL 60.0 1 0.10928 0.42094 10.0657 56.12 0.0000 0.0000 0.0000 0.0000 18.5244084 HUACHIPA 44112 S.ANITA 60.0 1 0.17009 0.47020 10.0555 0 0.0000 0.0000 0.0000 0.0000 8.5024008 CHAVARR 24144 C-TOMVAL 60.0 2 0.12302 0.44413 10.0477 56.12 0.0000 0.0000 0.0000 0.0000 3.7424090 STA.ROSV 44084 HUACHIPA 60.0 1 0.17146 0.43014 10.0448 40.53 0.0000 0.0000 0.0000 0.0000 11.5944056 STAROSA2 44088 T-PUENT1 60.0 1 0.11002 0.42998 10.0278 0 0.0000 0.0000 0.0000 0.0000 6.7644056 STAROSA2 44090 T-PUENT2 60.0 2 0.11002 0.42998 10.0278 0 0.0000 0.0000 0.0000 0.0000 6.7624090 STA.ROSV 44112 S.ANITA 60.0 1 0.16996 0.46992 10.0253 0 0.0000 0.0000 0.0000 0.0000 11.9824040 BALNEARI 44088 T-PUENT1 60.0 1 0.10998 0.43002 9.9768 0 0.0000 0.0000 0.0000 0.0000 7.0944090 T-PUENT2 44114 MONTERRI 60.0 1 0.10999 0.43001 9.9262 0 0.0000 0.0000 0.0000 0.0000 5.7924048 SANJUAN 24058 VILMARIA 60.0 1 0.18902 0.44500 9.8310 0 0.0000 0.0000 0.0000 0.0000 7.4214000 CTTUMBES 14110 ZORRITOS 60.0 1 0.15840 0.46920 9.8244 49.88 0.0000 0.0000 0.0000 0.0000 0.3024000 CHAVASVC 24008 CHAVARR 60.0 1 0.13200 0.43080 9.8244 0 0.0000 0.0000 0.0000 0.0000 0.3024040 BALNEARI 24124 BALNESVC 60.0 1 0.13200 0.43080 9.8244 0 0.0000 0.0000 0.0000 0.0000 0.3024090 STA.ROSV 44056 STAROSA2 60.0 1 0.10320 0.47040 9.8244 0 0.0000 0.0000 0.0000 0.0000 0.3024048 SANJUAN 24058 VILMARIA 60.0 2 0.18902 0.44500 9.8133 93.53 0.0000 0.0000 0.0000 0.0000 4.4344006 SURCO 44008 CHOSICA 60.0 1 0.26999 0.47000 9.7948 62.35 0.0000 0.0000 0.0000 0.0000 28.2124040 BALNEARI 44014 SALAMAN2 60.0 1 0.10509 0.43878 9.7473 46.76 0.0000 0.0000 0.0000 0.0000 4.4664016 CACHIMAY 64030 PISAC 60.0 1 0.26500 0.50999 9.6893 0 0.0000 0.0000 0.0000 0.0000 20.0024168 T-MEPSA 44072 MOYOPAMP 60.0 1 0.11850 0.45630 9.6851 56.01 0.0000 0.0000 0.0000 0.0000 38.8064018 PAUCARTA 64030 PISAC 60.0 1 0.26500 0.51000 9.6840 0 0.0000 0.0000 0.0000 0.0000 24.5024174 STAROSV2 44072 MOYOPAMP 60.0 2 0.11850 0.45370 9.6824 56.01 0.0000 0.0000 0.0000 0.0000 39.8024040 BALNEARI 44072 MOYOPAMP 60.0 1 0.10510 0.43880 9.6813 46.76 0.0000 0.0000 0.0000 0.0000 46.3544072 MOYOPAMP 44080 SALAMAN1 60.0 1 0.10510 0.43880 9.6792 46.76 0.0000 0.0000 0.0000 0.0000 44.0064002 JULIACA 64006 BELLAVIS 60.0 1 0.43540 0.45960 9.6749 19.95 0.0000 0.0000 0.0000 0.0000 34.5064006 BELLAVIS 64144 PUNO 60.0 1 0.39490 0.42280 9.6672 0 0.0000 0.0000 0.0000 0.0000 37.5024040 BALNEARI 44114 MONTERRI 60.0 1 0.10902 0.45203 9.6560 0 0.0000 0.0000 0.0000 0.0000 4.9614066 LAPAJUEL 14130 CAJMARCN 60.0 1 0.09182 0.50820 9.5983 121.24 0.0000 0.0000 0.0000 0.0000 10.2114066 LAPAJUEL 14130 CAJMARCN 60.0 2 0.09182 0.50820 9.5983 121.24 0.0000 0.0000 0.0000 0.0000 10.2114094 GALLCIEG 14096 TEMBLADE 60.0 2 0.13140 0.45710 9.5858 0 0.0000 0.0000 0.0000 0.0000 16.6844034 P.INDUST 47212 T-SALESI 60.0 1 0.26604 0.45931 9.5811 42.61 0.0000 0.0000 0.0000 0.0000 3.2324168 T-MEPSA 24174 STAROSV2 60.0 1 0.11844 0.45648 9.5788 56.01 0.0000 0.0000 0.0000 0.0000 1.0014064 CAJAMARC 14094 GALLCIEG 60.0 1 0.13140 0.45710 9.5741 51.75 0.0000 0.0000 0.0000 0.0000 94.2014064 CAJAMARC 14098 CHILETE 60.0 1 0.13140 0.45710 9.5724 0 0.0000 0.0000 0.0000 0.0000 38.4114096 TEMBLADE 14098 CHILETE 60.0 1 0.13140 0.45710 9.5660 0 0.0000 0.0000 0.0000 0.0000 39.3644004 SNMATEO1 44006 SURCO 60.0 1 0.27001 0.47001 9.5598 20.78 0.0000 0.0000 0.0000 0.0000 21.3544084 HUACHIPA 44110 S.CLARA 60.0 1 0.14307 0.43836 9.5515 0 0.0000 0.0000 0.0000 0.0000 8.1044002 LAPLANIC 44084 HUACHIPA 60.0 1 0.27000 0.47001 9.5040 0 0.0000 0.0000 0.0000 0.0000 13.8044002 LAPLANIC 44084 HUACHIPA 60.0 2 0.27000 0.47001 9.5040 0 0.0000 0.0000 0.0000 0.0000 13.8044036 SALESIAN 47212 T-SALESI 60.0 1 0.26611 0.45936 9.4314 42.61 0.0000 0.0000 0.0000 0.0000 1.2514058 GUADALUP 14062 PACASPUE 60.0 1 0.16380 0.46559 9.3946 40.05 0.0000 0.0000 0.0000 0.0000 16.0044032 CONCEPCI 47214 T-CONCEP 60.0 1 0.26558 0.47746 9.3665 42.61 0.0000 0.0000 0.0000 0.0000 2.36

Page 152: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag.32 de 65

Vn ID R X B Str Long.# Nombre # Nombre kV # Ω/km Ω/km nF/km MVA MW MVAr MW MVAr km

Compens. 2do Estr.LINEAS

Barra 1er. Estremo Barra 2do. Estremo Compens. 1er Estr.

44020 HUAYUCA 47212 T-SALESI 60.0 1 0.26599 0.47310 9.3600 42.61 0.0000 0.0000 0.0000 0.0000 6.7724060 MARCONA 24116 BELUNION 60.0 1 0.25100 0.46050 9.3393 0 0.0000 0.0000 0.0000 0.0000 64.3024018 CHANCAY 24028 HUARAL 60.0 1 0.12263 0.46514 9.3018 31.18 0.0000 0.0000 0.0000 0.0000 14.1024016 ZAPALLAL 24018 CHANCAY 60.0 1 0.25997 0.46495 9.2895 31.18 0.0000 0.0000 0.0000 0.0000 34.9024026 ANCON 24028 HUARAL 60.0 1 0.26001 0.46501 9.2885 31.18 0.0000 0.0000 0.0000 0.0000 42.4424016 ZAPALLAL 24026 ANCON 60.0 1 0.25997 0.46494 9.2859 31.18 0.0000 0.0000 0.0000 0.0000 9.7644034 P.INDUST 47214 T-CONCEP 60.0 1 0.26559 0.47749 9.2593 42.61 0.0000 0.0000 0.0000 0.0000 16.9544030 JAUJA 47214 T-CONCEP 60.0 1 0.26560 0.47750 9.2484 42.61 0.0000 0.0000 0.0000 0.0000 24.2214038 T-COLAN 14124 COLAN 60.0 1 0.57600 0.50040 9.2104 0 0.0000 0.0000 0.0000 0.0000 0.4024164 T-PEDREG 24170 PEDREGAL 60.0 1 0.30600 0.46800 9.2104 0 0.0000 0.0000 0.0000 0.0000 0.0844026 PUCALLP1 44218 PUCALLP2 60.0 1 0.20058 0.48536 9.1204 0 0.0000 0.0000 0.0000 0.0000 6.1444026 PUCALLP1 44218 PUCALLP2 60.0 2 0.20058 0.48536 9.1204 0 0.0000 0.0000 0.0000 0.0000 6.1424048 SANJUAN 24054 CHORRILL 60.0 1 0.25999 0.45000 9.0952 31.18 0.0000 0.0000 0.0000 0.0000 6.4024048 SANJUAN 24054 CHORRILL 60.0 2 0.25999 0.45000 9.0952 31.18 0.0000 0.0000 0.0000 0.0000 6.4044000 NUCONDOR 44078 CALLAHU1 60.0 1 0.10128 0.48256 9.0630 0 0.0000 0.0000 0.0000 0.0000 30.0044026 PUCALLP1 44052 PINDPUC 60.0 1 0.14632 0.48529 9.0620 0 0.0000 0.0000 0.0000 0.0000 6.8344018 HUANCAVE 44048 INGENIO 60.0 1 0.10128 0.48255 9.0507 0 0.0000 0.0000 0.0000 0.0000 60.0024098 ICANORTE 24154 T-ICANOR 60.0 1 0.30600 0.46800 9.0429 0 0.0000 0.0000 0.0000 0.0000 2.2044048 INGENIO 44050 CAUDALOS 60.0 1 0.10128 0.48254 9.0384 0 0.0000 0.0000 0.0000 0.0000 15.0044022 HUAMPANI 44078 CALLAHU1 60.0 1 0.17200 0.48600 9.0301 40.53 0.0000 0.0000 0.0000 0.0000 23.5024096 CAÑETE 24166 T-PNUEVO 60.0 1 0.30600 0.46800 9.0215 35.33 0.0000 0.0000 0.0000 0.0000 17.5624052 INDEPEND 24160 T-CARMEN 60.0 1 0.30600 0.46800 9.0188 0 0.0000 0.0000 0.0000 0.0000 25.0024052 INDEPEND 24166 T-PNUEVO 60.0 1 0.30600 0.46800 9.0140 0 0.0000 0.0000 0.0000 0.0000 39.4024084 CHINCHA 24166 T-PNUEVO 60.0 1 0.30600 0.46800 9.0057 0 0.0000 0.0000 0.0000 0.0000 4.5024112 NAZCA 24114 PUQUIO 60.0 1 0.29160 0.52920 9.0024 0 0.0000 0.0000 0.0000 0.0000 101.0024156 TACAMA 24158 VILLACUR 60.0 1 0.30600 0.46800 8.9923 0 0.0000 0.0000 0.0000 0.0000 24.5024066 ICA 24154 T-ICANOR 60.0 1 0.30600 0.46800 8.9893 0 0.0000 0.0000 0.0000 0.0000 5.0024092 ALTDLUNA 24152 T-ALTLUN 60.0 1 0.30600 0.46800 8.9857 0 0.0000 0.0000 0.0000 0.0000 1.6424150 T-PARACA 24152 T-ALTLUN 60.0 1 0.30609 0.46800 8.9857 0 0.0000 0.0000 0.0000 0.0000 2.0524086 PISCO 24152 T-ALTLUN 60.0 1 0.30600 0.46800 8.9701 0 0.0000 0.0000 0.0000 0.0000 2.3014058 GUADALUP 14094 GALLCIEG 60.0 1 0.15651 0.48850 8.9437 50.06 0.0000 0.0000 0.0000 0.0000 30.4014058 GUADALUP 14094 GALLCIEG 60.0 2 0.15651 0.48850 8.9437 50.06 0.0000 0.0000 0.0000 0.0000 30.4024094 PARACAS 24150 T-PARACA 60.0 1 0.30600 0.46800 8.9421 0 0.0000 0.0000 0.0000 0.0000 18.5424052 INDEPEND 24150 T-PARACA 60.0 1 0.30600 0.46800 8.9304 0 0.0000 0.0000 0.0000 0.0000 25.0024112 NAZCA 24148 T-PALPA 60.0 1 0.29159 0.52920 8.9287 0 0.0000 0.0000 0.0000 0.0000 17.3324110 PALPA 24148 T-PALPA 60.0 1 0.30600 0.46800 8.9285 0 0.0000 0.0000 0.0000 0.0000 41.1824082 TAMBDMOR 24164 T-PEDREG 60.0 1 0.30600 0.46800 8.9270 0 0.0000 0.0000 0.0000 0.0000 5.2024060 MARCONA 24148 T-PALPA 60.0 1 0.29160 0.52920 8.9249 0 0.0000 0.0000 0.0000 0.0000 35.1724154 T-ICANOR 24156 TACAMA 60.0 1 0.30600 0.46800 8.9195 0 0.0000 0.0000 0.0000 0.0000 3.8014008 ZARUMILL 14118 TUMBES 60.0 1 0.29600 0.49700 8.9178 0 0.0000 0.0000 0.0000 0.0000 23.3024084 CHINCHA 24162 T-MORA 60.0 1 0.30600 0.46800 8.9162 0 0.0000 0.0000 0.0000 0.0000 11.9014138 LAMBAYEQ 14140 ILLIMO 60.0 1 0.37730 0.49220 8.9142 20.78 0.0220 0.0000 0.0220 0.0000 26.1224066 ICA 24108 STAMARGA 60.0 1 0.34560 0.47160 8.9085 0 0.0000 0.0000 0.0000 0.0000 17.7014006 CHICLAYO 14138 LAMBAYEQ 60.0 1 0.37729 0.49222 8.9050 20.78 0.0080 0.0000 0.0080 0.0000 9.3514002 MANCORA 14110 ZORRITOS 60.0 1 0.15800 0.46900 8.8897 0 0.0000 0.0000 0.0000 0.0000 74.6824160 T-CARMEN 24162 T-MORA 60.0 1 0.30600 0.46800 8.8887 0 0.0000 0.0000 0.0000 0.0000 6.3024162 T-MORA 24164 T-PEDREG 60.0 1 0.30600 0.46800 8.8823 0 0.0000 0.0000 0.0000 0.0000 7.3014110 ZORRITOS 14118 TUMBES 60.0 1 0.15799 0.46901 8.8813 0 0.0000 0.0000 0.0000 0.0000 23.2314004 CHICLANO 14046 POMALCA 60.0 1 0.17012 0.49601 8.8419 56.64 0.0060 0.0000 0.0060 0.0000 7.2524174 STAROSV2 44028 STA.ROSA 60.0 1 0.13104 0.42768 8.8419 56.12 0.0000 0.0000 0.0000 0.0000 0.25

Page 153: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag.33 de 65

Vn ID R X B Str Long.# Nombre # Nombre kV # Ω/km Ω/km nF/km MVA MW MVAr MW MVAr km

Compens. 2do Estr.LINEAS

Barra 1er. Estremo Barra 2do. Estremo Compens. 1er Estr.

14076 EJIDOS 14080 CASTILLA 60.0 1 0.29902 0.48499 8.8344 0 0.0000 0.0000 0.0000 0.0000 3.9214018 PIURAOES 14020 PIURACEN 60.0 1 0.27002 0.51502 8.8219 0 0.0000 0.0000 0.0000 0.0000 7.3514046 POMALCA 14048 TUMAN 60.0 1 0.17012 0.49599 8.8071 56.64 0.0070 0.0000 0.0070 0.0000 8.4514018 PIURAOES 14034 PAITA 60.0 1 0.15530 0.49600 8.8040 0 0.0000 0.0000 0.0000 0.0000 45.7814048 TUMAN 14050 CAYALTI 60.0 1 0.17010 0.49600 8.8012 56.64 0.0210 0.0000 0.0210 0.0000 23.8614018 PIURAOES 14076 EJIDOS 60.0 1 0.15530 0.50000 8.8010 0 0.0000 0.0000 0.0000 0.0000 10.8014042 CHULUCAN 14076 EJIDOS 60.0 1 0.15530 0.50000 8.7944 0 0.0000 0.0000 0.0000 0.0000 49.6014032 ELARENAL 14038 T-COLAN 60.0 1 0.30399 0.50001 8.7827 0 0.0000 0.0000 0.0000 0.0000 14.4314034 PAITA 14038 T-COLAN 60.0 1 0.30400 0.50000 8.7812 0 0.0000 0.0000 0.0000 0.0000 11.1664004 T-CHUQUI 64008 ABANCAY 60.0 1 0.26501 0.50999 8.7637 0 0.0000 0.0000 0.0000 0.0000 8.6664026 ILAVE 64144 PUNO 60.0 1 0.27800 0.47720 8.7583 0 0.0000 0.0000 0.0000 0.0000 53.5964004 T-CHUQUI 64012 CHALHUAN 60.0 1 0.32300 0.54500 8.7567 0 0.0000 0.0000 0.0000 0.0000 67.4064008 ABANCAY 64010 ANDAHUAY 60.0 1 0.26950 0.45450 8.7549 0 0.0000 0.0000 0.0000 0.0000 58.2464026 ILAVE 64028 POMATA 60.0 1 0.27800 0.47720 8.7535 0 0.0000 0.0000 0.0000 0.0000 50.0064004 T-CHUQUI 64014 CHUQUIBA 60.0 1 0.26500 0.51000 8.7532 0 0.0000 0.0000 0.0000 0.0000 55.8164020 ANTAUTA 64042 AZANGARO 60.0 1 0.27800 0.47700 8.7437 0 0.0000 0.0000 0.0000 0.0000 30.0024074 LURIN 24078 SBARTOLO 60.0 1 0.23771 0.45521 8.7414 0 0.0000 0.0000 0.0000 0.0000 18.4614140 ILLIMO 14142 LAVIÑA 60.0 1 0.37729 0.50540 8.6866 20.78 0.0170 0.0000 0.0170 0.0000 21.6314040 T-TPIUSU 14104 CURUMUY 60.0 1 0.30397 0.46502 8.6794 0 0.0000 0.0000 0.0000 0.0000 3.9924088 ELCARMEN 24160 T-CARMEN 60.0 1 0.46800 0.48960 8.6610 35.33 0.0000 0.0000 0.0000 0.0000 5.7014052 MOTUPE 14060 OLMOS 60.0 1 0.37731 0.50541 8.6563 20.78 0.0130 0.0000 0.0130 0.0000 17.6214052 MOTUPE 14142 LAVIÑA 60.0 1 0.37730 0.50539 8.6562 20.78 0.0160 0.0000 0.0160 0.0000 20.9414060 OLMOS 14146 TUNEL 60.0 1 0.37730 0.50539 8.6546 20.78 0.0170 0.0000 0.0170 0.0000 21.7114018 PIURAOES 14054 TEXTPIUR 60.0 1 0.30401 0.46503 8.6310 0 0.0000 0.0000 0.0000 0.0000 4.6114004 CHICLANO 14006 CHICLAYO 60.0 1 0.32951 0.47939 8.6166 35.33 0.0030 0.0000 0.0030 0.0000 6.6714004 CHICLANO 14006 CHICLAYO 60.0 2 0.32951 0.47939 8.6166 35.33 0.0030 0.0000 0.0030 0.0000 6.6714010 LAUNION 14012 SECHURA 60.0 1 0.31060 0.45899 8.6114 0 0.0000 0.0000 0.0000 0.0000 21.2214040 T-TPIUSU 14054 TEXTPIUR 60.0 1 0.30401 0.46501 8.6038 0 0.0000 0.0000 0.0000 0.0000 21.4114010 LAUNION 14018 PIURAOES 60.0 1 0.24099 0.45901 8.6033 0 0.0000 0.0000 0.0000 0.0000 31.8614028 SULLANA 14032 ELARENAL 60.0 1 0.30400 0.51300 8.5989 0 0.0000 0.0000 0.0000 0.0000 43.5314012 SECHURA 14016 CONSTANT 60.0 1 0.31060 0.45900 8.5963 0 0.0000 0.0000 0.0000 0.0000 18.0014028 SULLANA 14040 T-TPIUSU 60.0 1 0.52391 0.46500 8.5855 21.1 0.0000 0.0000 0.0000 0.0000 13.5624072 PACHACAM 24176 T-PACHAC 60.0 1 0.26729 0.46134 8.5795 0 0.0000 0.0000 0.0000 0.0000 1.4624076 LASPRADE 24078 SBARTOLO 60.0 1 0.26739 0.46131 8.5088 0 0.0000 0.0000 0.0000 0.0000 12.2124076 LASPRADE 24176 T-PACHAC 60.0 1 0.26741 0.46131 8.4738 0 0.0000 0.0000 0.0000 0.0000 13.1324064 VIELSALV 24176 T-PACHAC 60.0 1 0.12256 0.46131 8.4370 0 0.0000 0.0000 0.0000 0.0000 3.9314134 SANMARCO 14144 CAJABAMB 60.0 1 0.30730 0.51930 8.3926 0 0.0000 0.0000 0.0000 0.0000 33.4514064 CAJAMARC 14134 SANMARCO 60.0 1 0.30730 0.51930 8.3764 0 0.0000 0.0000 0.0000 0.0000 44.9524048 SANJUAN 24172 SANJUAN3 60.0 1 0.13320 0.43200 7.3683 0 0.0000 0.0000 0.0000 0.0000 0.1047036 EXCELSIO 47040 PARAGSH1 50.0 1 0.17070 0.41844 12.1758 42.35 0.0000 0.0000 0.0000 0.0000 1.2247032 CARHUAMA 47038 SHELBY 50.0 1 0.26858 0.43763 10.0831 0 0.0000 0.0000 0.0000 0.0000 22.9447032 CARHUAMA 47076 HUARON 50.0 1 0.26858 0.43763 10.0831 0 0.0000 0.0000 0.0000 0.0000 22.9447076 HUARON 47154 SANJOSE 50.0 1 0.33900 0.46900 9.5493 0 0.0000 0.0000 0.0000 0.0000 1.0047132 CFRANCIS 47170 CASAPALC 50.0 1 0.33925 0.46913 9.5493 0 0.0000 0.0000 0.0000 0.0000 2.0047010 PACHACHA 47100 MOROCOCH 50.0 1 0.43027 0.46126 9.5116 0 0.0000 0.0000 0.0000 0.0000 12.9447010 PACHACHA 47266 MOROCOH3 50.0 2 0.43027 0.46126 9.5116 0 0.0000 0.0000 0.0000 0.0000 12.9447012 PLANTZIN 47014 OROYANUE 50.0 1 0.14487 0.46175 9.5018 0 0.0000 0.0000 0.0000 0.0000 2.6847016 CASPNO2 47354 CFRANC-T 50.0 1 0.34045 0.47053 9.4889 0 0.0000 0.0000 0.0000 0.0000 1.2347108 CASPNO1 47132 CFRANCIS 50.0 2 0.34045 0.47053 9.4889 0 0.0000 0.0000 0.0000 0.0000 1.2347012 PLANTZIN 47014 OROYANUE 50.0 2 0.14484 0.46154 9.4505 0 0.0000 0.0000 0.0000 0.0000 2.47

Page 154: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag.34 de 65

Vn ID R X B Str Long.# Nombre # Nombre kV # Ω/km Ω/km nF/km MVA MW MVAr MW MVAr km

Compens. 2do Estr.LINEAS

Barra 1er. Estremo Barra 2do. Estremo Compens. 1er Estr.

47006 BUENAVIS 47008 VISTALEG 50.0 1 0.33949 0.46934 9.4016 0 0.0000 0.0000 0.0000 0.0000 7.1147076 HUARON 47264 VISTALE2 50.0 1 0.33936 0.46914 9.3897 0 0.0000 0.0000 0.0000 0.0000 13.5647016 CASPNO2 47110 TICLIO 50.0 1 0.33910 0.46876 9.3867 0 0.0000 0.0000 0.0000 0.0000 6.3347124 SANMATEO 47210 HUANCHOR 50.0 1 0.30959 0.46401 9.3766 0 0.0000 0.0000 0.0000 0.0000 4.3047006 BUENAVIS 47038 SHELBY 50.0 1 0.33919 0.46891 9.3766 0 0.0000 0.0000 0.0000 0.0000 6.4547108 CASPNO1 47266 MOROCOH3 50.0 2 0.33917 0.46889 9.3716 0 0.0000 0.0000 0.0000 0.0000 13.0247100 MOROCOCH 47110 TICLIO 50.0 1 0.33928 0.46898 9.3574 0 0.0000 0.0000 0.0000 0.0000 6.6947008 VISTALEG 47036 EXCELSIO 50.0 1 0.33962 0.46951 9.3278 0 0.0000 0.0000 0.0000 0.0000 4.5547014 OROYANUE 47066 MAYUPAMP 50.0 1 0.17102 0.47019 9.3278 0 0.0000 0.0000 0.0000 0.0000 1.8247036 EXCELSIO 47264 VISTALE2 50.0 1 0.33962 0.46945 9.3278 0 0.0000 0.0000 0.0000 0.0000 4.5547040 PARAGSH1 47092 DERMILPO 50.0 1 0.14466 0.46403 9.2264 0 0.0000 0.0000 0.0000 0.0000 2.5347012 PLANTZIN 47358 TORREN8 50.0 1 0.17065 0.49728 9.2264 0 0.0000 0.0000 0.0000 0.0000 0.4647026 OROYA 47262 TORRE2 50.0 1 0.16793 0.47935 9.2264 0 0.0000 0.0000 0.0000 0.0000 0.4647198 CHICRIN 47222 CHAPRIN 50.0 1 0.16100 0.48700 9.1956 0 0.0000 0.0000 0.0000 0.0000 1.5047014 OROYANUE 47060 CURIPATA 50.0 1 0.21474 0.47528 9.1654 0 0.0000 0.0000 0.0000 0.0000 9.8447030 MALPASO 47066 MAYUPAMP 50.0 1 0.16985 0.48687 9.0647 0 0.0000 0.0000 0.0000 0.0000 18.2647030 MALPASO 47262 TORRE2 50.0 1 0.16985 0.48687 9.0647 0 0.0000 0.0000 0.0000 0.0000 18.2647010 PACHACHA 47060 CURIPATA 50.0 1 0.18704 0.49261 9.0301 0 0.0000 0.0000 0.0000 0.0000 8.9347010 PACHACHA 47104 YAULIALP 50.0 1 0.42772 0.48620 8.9986 0 0.0000 0.0000 0.0000 0.0000 7.9047198 CHICRIN 47224 MINATACO 50.0 1 0.16100 0.48700 8.9834 0 0.0000 0.0000 0.0000 0.0000 15.0047040 PARAGSH1 47198 CHICRIN 50.0 1 0.16144 0.48648 8.9448 0 0.0000 0.0000 0.0000 0.0000 17.2047092 DERMILPO 47094 HUICRA 50.0 1 0.43075 0.50249 8.9436 0 0.0000 0.0000 0.0000 0.0000 2.6147026 OROYA 47276 CASADFUE 50.0 1 0.17071 0.49707 8.8789 0 0.0000 0.0000 0.0000 0.0000 2.3947010 PACHACHA 47014 OROYANUE 50.0 1 0.35610 0.49296 8.8662 0 0.0000 0.0000 0.0000 0.0000 18.1947276 CASADFUE 47312 COTRELL 50.0 1 0.17083 0.49792 8.8419 0 0.0000 0.0000 0.0000 0.0000 0.1247118 ANTUQUIT 47354 CFRANC-T 50.0 1 0.33862 0.51186 8.8419 0 0.0000 0.0000 0.0000 0.0000 1.5647118 ANTUQUIT 47354 CFRANC-T 50.0 2 0.33862 0.51186 8.8419 0 0.0000 0.0000 0.0000 0.0000 1.5647010 PACHACHA 47260 SANCRIS2 50.0 1 0.33762 0.50172 8.7438 0 0.0000 0.0000 0.0000 0.0000 17.1147118 ANTUQUIT 47122 BELLAVIS 50.0 1 0.42967 0.50115 8.6836 0 0.0000 0.0000 0.0000 0.0000 3.9147122 BELLAVIS 47124 SANMATEO 50.0 1 0.42993 0.50143 8.6398 0 0.0000 0.0000 0.0000 0.0000 7.0047008 VISTALEG 47078 SANJUAN 50.0 1 0.42998 0.50148 8.6136 0 0.0000 0.0000 0.0000 0.0000 2.7147010 PACHACHA 47192 MAHRTUNE 50.0 1 0.42783 0.52571 8.5914 0 0.0000 0.0000 0.0000 0.0000 2.4747172 ANDAYCHA 47176 ANDAYELC 50.0 1 0.32537 0.52096 8.5819 0 0.0000 0.0000 0.0000 0.0000 1.3647188 CARAMINA 47190 CARACONC 50.0 1 0.32507 0.52047 8.5710 0 0.0000 0.0000 0.0000 0.0000 3.5947014 OROYANUE 47140 ALAMBRON 50.0 1 0.35489 0.49109 8.5370 0 0.0000 0.0000 0.0000 0.0000 0.8747092 DERMILPO 47220 MILPO 50.0 1 0.43017 0.50632 8.5370 23 0.0000 0.0000 0.0000 0.0000 0.8747176 ANDAYELC 47260 SANCRIS2 50.0 1 0.32468 0.51980 8.5192 0 0.0000 0.0000 0.0000 0.0000 5.4847312 COTRELL 47358 TORREN8 50.0 1 0.17075 0.49725 8.4883 0 0.0000 0.0000 0.0000 0.0000 1.0047190 CARACONC 47192 MAHRTUNE 50.0 1 0.32475 0.51991 8.4507 0 0.0000 0.0000 0.0000 0.0000 7.9147178 SANCRIST 47184 SANANTON 50.0 1 0.32579 0.52156 8.4209 0 0.0000 0.0000 0.0000 0.0000 1.8947032 CARHUAMA 47034 JUNIN 50.0 1 0.33977 0.52699 8.3939 0 0.0000 0.0000 0.0000 0.0000 27.4347006 BUENAVIS 47084 LAFUNDIC 50.0 1 0.33919 0.52826 8.3896 0 0.0000 0.0000 0.0000 0.0000 2.1547030 MALPASO 47032 CARHUAMA 50.0 1 0.33972 0.52691 8.3800 0 0.0000 0.0000 0.0000 0.0000 64.7047030 MALPASO 47034 JUNIN 50.0 1 0.33970 0.52688 8.3743 0 0.0000 0.0000 0.0000 0.0000 37.2547094 HUICRA 47098 GOYLLAR 50.0 1 0.45790 0.52839 8.3408 0 0.0000 0.0000 0.0000 0.0000 24.1747184 SANANTON 47188 CARAMINA 50.0 1 0.32549 0.52124 8.3218 0 0.0000 0.0000 0.0000 0.0000 1.5347102 AUSDUVAZ 47104 YAULIALP 50.0 1 0.42770 0.52983 8.2832 0 0.0000 0.0000 0.0000 0.0000 2.6947102 AUSDUVAZ 47138 MOROCOH2 50.0 1 0.42694 0.52888 8.2251 0 0.0000 0.0000 0.0000 0.0000 1.2947216 CONDORCO 47218 NINATAMB 44.0 1 0.33740 0.48680 9.0175 20.58 0.0000 0.0000 0.0000 0.0000 15.6557004 CHILINCC 57156 CHILINA1 33.0 1 0.34521 0.48297 12.1790 0 0.0000 0.0000 0.0000 0.0000 0.20

Page 155: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag.35 de 65

Vn ID R X B Str Long.# Nombre # Nombre kV # Ω/km Ω/km nF/km MVA MW MVAr MW MVAr km

Compens. 2do Estr.LINEAS

Barra 1er. Estremo Barra 2do. Estremo Compens. 1er Estr.

57050 CHARCANI 57172 CHAR1234 33.0 1 0.34521 0.48297 12.1790 18.92 0.0000 0.0000 0.0000 0.0000 0.2057050 CHARCANI 57172 CHAR1234 33.0 2 0.34521 0.48297 12.1790 0 0.0000 0.0000 0.0000 0.0000 0.2057052 CHILINA 57156 CHILINA1 33.0 1 0.34521 0.48297 12.1790 0 0.0000 0.0000 0.0000 0.0000 0.2057052 CHILINA 57156 CHILINA1 33.0 2 0.34521 0.48297 12.1790 0 0.0000 0.0000 0.0000 0.0000 0.2057018 CERVESUR 57110 PARQINDU 33.0 1 0.34500 0.48297 9.7432 18.92 0.0000 0.0000 0.0000 0.0000 1.0057018 CERVESUR 57110 PARQINDU 33.0 2 0.34500 0.48297 9.7432 18.92 0.0000 0.0000 0.0000 0.0000 1.0057060 SOCABAYA 57110 PARQINDU 33.0 1 0.29200 0.45499 9.5405 21.03 0.0000 0.0000 0.0000 0.0000 8.1757060 SOCABAYA 57110 PARQINDU 33.0 2 0.29200 0.45499 9.5405 21.03 0.0000 0.0000 0.0000 0.0000 8.1757006 S.LAZARO 57156 CHILINA1 33.0 1 0.35614 0.50000 9.5148 18.92 0.0000 0.0000 0.0000 0.0000 1.2857006 S.LAZARO 57156 CHILINA1 33.0 2 0.35614 0.50000 9.5148 18.92 0.0000 0.0000 0.0000 0.0000 1.2857100 CHARCAIV 57172 CHAR1234 33.0 1 0.34500 0.48299 9.4184 18.92 0.0000 0.0000 0.0000 0.0000 7.5057100 CHARCAIV 57172 CHAR1234 33.0 2 0.34500 0.48299 9.4184 18.92 0.0000 0.0000 0.0000 0.0000 7.5057156 CHILINA1 57172 CHAR1234 33.0 1 0.34500 0.48299 9.4184 18.92 0.0000 0.0000 0.0000 0.0000 7.5057156 CHILINA1 57172 CHAR1234 33.0 2 0.34500 0.48299 9.4184 18.92 0.0000 0.0000 0.0000 0.0000 7.5057018 CERVESUR 57056 CHALLAPA 33.0 1 0.34499 0.48299 9.3473 18.92 0.0000 0.0000 0.0000 0.0000 4.4357018 CERVESUR 57056 CHALLAPA 33.0 2 0.34499 0.48299 9.3473 18.92 0.0000 0.0000 0.0000 0.0000 4.4317018 REF.TALA 17184 MALACAS2 33.0 1 0.34500 0.48301 9.3372 18.92 0.0000 0.0000 0.0000 0.0000 6.0017018 REF.TALA 17186 MALACAS3 33.0 2 0.34500 0.48301 9.3372 18.92 0.0000 0.0000 0.0000 0.0000 6.0057054 JESUS2 57060 SOCABAYA 33.0 1 0.34501 0.48300 9.3125 18.92 0.0000 0.0000 0.0000 0.0000 8.3757054 JESUS2 57060 SOCABAYA 33.0 2 0.34501 0.48300 9.3125 18.92 0.0000 0.0000 0.0000 0.0000 8.3767006 RACCHI 67134 CACHIMAY 33.0 1 0.22500 0.51400 9.3088 0 0.0000 0.0000 0.0000 0.0000 15.7067084 ARES 67120 ARCATA1 33.0 1 0.31793 0.48190 9.2499 0 0.0000 0.0000 0.0000 0.0000 19.7567126 ARCATA2 67130 MISAPUQ 33.0 1 0.69000 0.45200 9.2470 0 0.0000 0.0000 0.0000 0.0000 21.6057160 CHILCHA1 57162 CHILCHA2 33.0 1 0.34500 0.48300 9.2265 18.92 0.0000 0.0000 0.0000 0.0000 13.2057160 CHILCHA1 57162 CHILCHA2 33.0 2 0.34500 0.48300 9.2265 18.92 0.0000 0.0000 0.0000 0.0000 13.2057052 CHILINA 57054 JESUS2 33.0 1 0.34500 0.48301 9.2246 18.92 0.0000 0.0000 0.0000 0.0000 9.7757052 CHILINA 57054 JESUS2 33.0 2 0.34500 0.48301 9.2246 18.92 0.0000 0.0000 0.0000 0.0000 9.7757052 CHILINA 57056 CHALLAPA 33.0 1 0.34500 0.48301 9.0215 18.92 0.0000 0.0000 0.0000 0.0000 2.9757052 CHILINA 57056 CHALLAPA 33.0 2 0.34500 0.48301 9.0215 18.92 0.0000 0.0000 0.0000 0.0000 2.9747152 UCHUCHAC 47362 IZCAYCRU 33.0 1 0.24420 0.50030 8.8788 0 0.0000 0.0000 0.0000 0.0000 22.7747152 UCHUCHAC 47360 CASHUACR 33.0 1 0.40100 0.49800 8.7789 0 0.0000 0.0000 0.0000 0.0000 17.4857052 CHILINA 57160 CHILCHA1 33.0 1 0.00010 0 0.0000 0.0000 0.0000 0.0000 0.0057072 CHARCAVI 57162 CHILCHA2 33.0 1 0.00010 0 0.0000 0.0000 0.0000 0.0000 0.0067012 HUAYLLAC 67080 CAYLLOMA 15.0 1 0.55000 0.50000 11.7893 0 0.0000 0.0000 0.0000 0.0000 2.0016070 SIDERSUR 17178 CHIMBOT2 13.8 1 0.15502 0.37298 0.0000 0 0.0000 0.0000 0.0000 0.0000 0.2017106 CHIMBO11 17108 CHIMBO12 13.8 1 0.00010 0 0.0000 0.0000 0.0000 0.0000 0.0057108 TOMASIRI 57114 LOCUMBA 10.5 1 0.25160 0.45960 9.3566 0 0.0000 0.0000 0.0000 0.0000 36.0016014 CHICLGMT 16050 CHICLSLZ 10.5 1 0.17089 0.41123 0.0000 0 0.0000 0.0000 0.0000 0.0000 0.5016050 CHICLSLZ 17048 CHICLAYO 10.5 1 0.17089 0.41123 0.0000 0 0.0000 0.0000 0.0000 0.0000 0.5066028 TAPARACH 67010 JULIACA 10.5 1 0.15501 0.37298 0.0000 0 0.0000 0.0000 0.0000 0.0000 0.2066028 TAPARACH 67010 JULIACA 10.5 2 0.15501 0.37298 0.0000 0 0.0000 0.0000 0.0000 0.0000 0.2016024 PIURATG 17022 PIURA 10.0 1 0.15500 0.37300 0.0000 0 0.0000 0.0000 0.0000 0.0000 0.8016024 PIURATG 17022 PIURA 10.0 2 0.15500 0.37300 0.0000 0 0.0000 0.0000 0.0000 0.0000 0.8016030 INADE 17172 SULLANA 10.0 1 0.15500 0.37300 0.0000 0 0.0000 0.0000 0.0000 0.0000 1.0067076 TINTAYA1 67096 TINTAYA2 10.0 1 0.15500 0.37300 0.0000 0 0.0000 0.0000 0.0000 0.0000 0.5067076 TINTAYA1 67096 TINTAYA2 10.0 2 0.15500 0.37300 0.0000 0 0.0000 0.0000 0.0000 0.0000 0.5017024 PIURAOE1 17026 PIURAOE2 10.0 1 0.00010 0 0.0000 0.0000 0.0000 0.0000 0.0017142 GUADALU1 17144 GUADALU2 10.0 1 0.00010 0 0.0000 0.0000 0.0000 0.0000 0.0026000 INDECS01 27094 INDEPEND 10.0 1 0.00010 0 0.0000 0.0000 0.0000 0.0000 0.0057094 MOQUEGU1 57098 MOQUEGU2 10.0 1 0.00010 0 0.0000 0.0000 0.0000 0.0000 0.00

Page 156: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag.36 de 65

Vn ID R X B Str Long.# Nombre # Nombre kV # Ω/km Ω/km nF/km MVA MW MVAr MW MVAr km

Compens. 2do Estr.LINEAS

Barra 1er. Estremo Barra 2do. Estremo Compens. 1er Estr.

16092 CEMPACSZ 17074 CEMPACAS 6.3 1 0.15500 0.37300 0.0000 0 0.0000 0.0000 0.0000 0.0000 1.0056128 CHARCAII 57164 CHARC123 5.3 1 0.00000 0.00069 0.0000 0 0.0000 0.0000 0.0000 0.0000 0.2056130 CHARCIII 57164 CHARC123 5.3 1 0.00000 0.00014 0.0000 0 0.0000 0.0000 0.0000 0.0000 1.0056130 CHARCIII 57164 CHARC123 5.3 2 0.00000 0.00014 0.0000 0 0.0000 0.0000 0.0000 0.0000 1.00

Page 157: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag.37 de 65

Vn ID R X B Str Long.# Nombre # Nombre kV # Ω/km Ω/km nF/km MVA km22010 BARSI 22012 C1-BARSI 220.0 1 0.01452 0.33880 360.0168 335.32 1.0022010 BARSI 22014 C2-BARSI 220.0 2 0.01452 0.33880 360.0168 335.32 1.0024068 BARSI 24138 C4-BARSI 60.0 1 0.06504 0.14304 900.6412 80.00 3.3624040 BALNEARI 24120 LIMATAM1 60.0 1 0.05997 0.09998 230.0419 80.00 4.6724040 BALNEARI 24120 LIMATAM1 60.0 2 0.05997 0.09998 230.0419 80.00 4.6724122 LIMATAM2 24132 SISIDRO2 60.0 2 0.13997 0.11996 209.9843 80.00 3.1344010 JICAMARC 44058 C-JICAMA 60.0 0 0.05040 0.25056 191.5754 77.94 0.2524128 NEYRA 24132 SISIDRO2 60.0 1 0.14004 0.11997 179.4177 80.00 4.0024120 LIMATAM1 24130 SISIDRO1 60.0 1 0.13997 0.11996 179.3812 80.00 3.1324068 BARSI 24134 C3-BARSI 60.0 1 0.04873 0.21358 169.6938 55.08 2.9724104 MIRONES 24136 C1-PANDO 60.0 1 0.04873 0.21358 169.6938 55.08 2.9724012 TOMVALLE 24144 C-TOMVAL 60.0 2 0.04114 0.23934 157.0821 77.94 0.9124174 STAROSV2 44138 TACNA 60.0 3 0.06126 0.10251 156.8570 52.48 2.9544028 STA.ROSA 44138 TACNA 60.0 1 0.09550 0.10625 156.8319 23.38 2.8824034 PERSHING 24142 C1-PERSH 60.0 1 0.03903 0.24480 156.6730 77.94 1.9024034 PERSHING 24178 C2-PERSH 60.0 1 0.03865 0.24480 156.6730 80.00 1.9044028 STA.ROSA 44138 TACNA 60.0 2 0.06245 0.10232 156.6091 42.61 2.7924068 BARSI 24140 C5-BARSI 60.0 1 0.04085 0.23885 156.5760 55.08 1.0424068 BARSI 24146 C6-BARSI 60.0 1 0.04085 0.23919 156.5760 80.00 1.04

Barra 1er. Estremo Barra 2do. EstremoCABLES

Page 158: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag.38 de 65

Vn1 Vn2 ID Vn1/Vn2 Vcc Sn Lado Tap Tap Aut. Rmax Rmin Vmax Vmin Variac.# Nombre kV # Nombre kV pu % MVA Estrem. pu pu pu pu pu

11000 HUALLANC 138.0 16000 CAÑDPAT1 13.8 1 1.0000 8.2002 60.0000 1er. N 1.0500 0.9500 1.030 1.000 0.025011000 HUALLANC 138.0 16002 CAÑDPAT2 13.8 2 1.0000 8.2002 60.0000 1er. N 1.0500 0.9500 1.030 1.000 0.025011000 HUALLANC 138.0 16004 CAÑDPAT3 13.8 3 1.0000 8.2002 60.0000 1er. N 1.0500 0.9500 1.030 1.000 0.025011000 HUALLANC 138.0 16006 CAÑDPAT4 13.8 4 1.0000 8.2002 60.0000 1er. N 1.0500 0.9500 1.030 1.000 0.025011000 HUALLANC 138.0 16008 CAÑDPAT5 13.8 5 1.0000 8.2002 60.0000 1er. N 1.0500 0.9500 1.030 1.000 0.025011000 HUALLANC 138.0 16010 CAÑDPAT6 13.8 6 1.0000 8.2002 60.0000 1er. N 1.0500 0.9500 1.030 1.000 0.025011000 HUALLANC 138.0 19044 N-HUALLA 1.0 1 0.9900 8.7000 25.0000 1er. Y 1.0800 0.9200 1.050 0.950 0.010011002 MOTIL 138.0 19160 N-MOTIL 1.0 1 1.0000 8.3499 13.4000 1er. Y 1.0787 0.8706 1.050 0.950 0.006511004 CHIMBSUR 138.0 19170 N-CHIMBS 1.0 1 0.9500 7.8780 31.0000 1er. Y 1.1300 0.8700 1.050 0.950 0.010011006 NEPEÑA 138.0 17112 NEPEÑA 13.8 1 1.0000 11.4576 6.6000 1er. N 1.0500 0.9500 1.030 1.000 0.010011008 CASMA 138.0 17118 CASMA 10.0 1 1.0000 9.1250 12.5000 1er. N 1.0500 0.9500 1.030 1.000 0.025011010 SANJACIN 138.0 17114 SANJACIN 13.8 1 1.0000 11.5368 6.6000 1er. N 1.0500 0.9500 1.030 1.000 0.025011012 SANTA 138.0 17116 SANTA 13.8 1 1.0000 7.8588 33.3000 1er. N 1.0500 0.9500 1.030 1.000 0.025011014 PIERINA 138.0 17122 PIERINA 13.8 1 1.0000 8.4960 12.0000 1er. N 1.1000 0.9000 1.030 1.000 0.006311014 PIERINA 138.0 17122 PIERINA 13.8 2 1.0000 8.4960 12.0000 1er. N 1.1000 0.9000 1.030 1.000 0.006311032 CHIMBNOR 138.0 17060 CHIMBNOR 13.8 1 0.9500 12.8019 26.0000 1er. N 1.0500 0.9500 1.030 1.000 0.025011038 PORVENIR 138.0 17094 PORVENIR 10.0 1 1.0000 11.7000 26.0000 1er. Y 1.1689 0.8311 1.050 0.950 0.018811042 CHIMBOTE 138.0 19146 N-CHMB11 1.0 1 1.0000 -0.2136 120.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000011042 CHIMBOTE 138.0 19148 N-CHMB12 1.0 2 1.0000 -0.4356 120.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000011044 CHIMBOT2 138.0 16068 SIDERNOR 13.2 2 0.9565 9.1809 45.0000 1er. N 1.0043 0.9087 1.030 1.000 0.023911044 CHIMBOT2 138.0 17178 CHIMBOT2 13.8 1 0.9500 8.4002 45.0000 1er. N 1.0500 0.9500 1.030 1.000 0.025011046 PARAMONU 138.0 19150 N-PARAM1 1.0 1 1.0000 -0.3050 50.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000011048 PARAMEXI 138.0 17076 PARAMEXI 13.8 1 1.0000 9.7001 27.5000 1er. N 1.0250 0.9750 1.030 1.000 0.025011048 PARAMEXI 138.0 17076 PARAMEXI 13.8 2 1.0000 9.7001 27.5000 1er. N 1.0250 0.9750 1.030 1.000 0.025011050 CAHUA 138.0 16052 CAHUA1 10.0 1 1.0300 9.7000 27.6000 1er. N 1.1087 1.0000 1.030 1.000 0.054411050 CAHUA 138.0 16054 CAHUA2 10.0 2 1.0300 9.7000 27.6000 1er. N 1.1087 1.0000 1.030 1.000 0.054411064 SANTICAO 138.0 19028 N-SANTIC 1.0 1 0.9625 14.1409 37.5000 1er. Y 1.1625 0.8375 1.050 0.950 0.012511078 TRUJINOR 138.0 17080 TRUJINO3 10.0 1 0.9689 12.1173 33.0000 1er. Y 1.0269 0.7312 1.050 0.950 0.015611078 TRUJINOR 138.0 17092 TRUJNSVC 8.0 1 1.0000 10.0599 30.0000 1er. N 1.0000 1.0000 1.030 1.000 0.000011078 TRUJINOR 138.0 19030 N-TRUJN1 1.0 1 1.0000 -0.8800 100.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000011078 TRUJINOR 138.0 19032 N-TRUJN2 1.0 2 1.0000 -0.4700 100.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000011082 TRUJISUR 138.0 16084 TRUJISUR 10.0 1 1.0000 11.6811 30.0000 1er. Y 1.0912 0.7758 1.050 0.950 0.017511082 TRUJISUR 138.0 17086 TRUJSUR2 10.0 2 0.9335 11.0157 30.0000 1er. N 1.0269 0.8402 1.030 1.000 0.023312000 GUADALUP 220.0 19154 N-GUADA1 1.0 1 0.9900 14.0499 30.0000 1er. Y 1.1000 0.9000 1.050 0.950 0.010012000 GUADALUP 220.0 19156 N-GUADA2 1.0 2 0.9900 13.7331 30.0000 1er. Y 1.1000 0.9000 1.050 0.950 0.010012008 CHICLAOE 220.0 19018 N-CHICL1 1.0 1 1.0000 10.4650 50.0000 1er. Y 1.1000 0.9000 1.050 0.950 0.012512008 CHICLAOE 220.0 19020 N-CHICL2 1.0 2 1.0000 10.4650 50.0000 1er. Y 1.1000 0.9000 1.050 0.950 0.012512010 CARHUAQU 220.0 16012 CARHUAQ1 10.0 1 1.0000 10.1801 35.0000 1er. N 1.0500 0.9500 1.030 1.000 0.025012010 CARHUAQU 220.0 16016 CARHUAQ2 10.0 2 1.0000 10.1801 35.0000 1er. N 1.0500 0.9500 1.030 1.000 0.0250

Barra 2do. EstremoBarra 1er. EstremoTRANSFORMADORES

Page 159: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag.39 de 65

Vn1 Vn2 ID Vn1/Vn2 Vcc Sn Lado Tap Tap Aut. Rmax Rmin Vmax Vmin Variac.# Nombre kV # Nombre kV pu % MVA Estrem. pu pu pu pu pu

Barra 2do. EstremoBarra 1er. EstremoTRANSFORMADORES

12010 CARHUAQU 220.0 16018 CARHUAQ3 10.0 3 1.0000 10.1801 35.0000 1er. N 1.0500 0.9500 1.030 1.000 0.025012010 CARHUAQU 220.0 19016 N-CARHUA 1.0 1 1.0000 12.8100 25.0000 1er. Y 1.1300 0.8700 1.050 0.950 0.010012016 PIURAOES 220.0 19008 N-PIURO1 1.0 1 0.9400 9.6135 50.0000 1er. Y 1.1000 0.9000 1.050 0.950 0.010012016 PIURAOES 220.0 19010 N-PIURO2 1.0 2 0.9400 9.6135 50.0000 1er. Y 1.1000 0.9000 1.050 0.950 0.010012036 CHIMBOT1 220.0 19146 N-CHMB11 1.0 1 1.0000 11.1240 120.0000 1er. Y 1.1000 0.9000 1.050 0.950 0.012512036 CHIMBOT1 220.0 19148 N-CHMB12 1.0 2 1.0000 11.0652 120.0000 1er. Y 1.1000 0.9000 1.050 0.950 0.012512040 PARAMONU 220.0 19150 N-PARAM1 1.0 1 0.9875 15.5935 65.0000 1er. Y 1.1000 0.9000 1.050 0.950 0.012512040 PARAMONU 220.0 19158 N-PARAM2 1.0 2 0.9875 12.8136 30.0000 1er. Y 1.1000 0.9000 1.050 0.950 0.010012062 TRUJINOR 220.0 19030 N-TRUJN1 1.0 1 0.9800 7.6000 100.0000 1er. Y 1.1000 0.9000 1.050 0.950 0.010012062 TRUJINOR 220.0 19032 N-TRUJN2 1.0 2 0.9800 7.9800 100.0000 1er. Y 1.1000 0.9000 1.050 0.950 0.010012074 TALARA 220.0 16072 MALACAS 13.8 1 1.0000 12.3700 125.0000 1er. N 1.1168 0.8832 1.030 1.000 0.014612074 TALARA 220.0 16098 MALACAS 13.2 1 0.9700 12.0998 75.0000 1er. Y 1.1000 0.9000 1.050 0.950 0.012512108 ZORRITOS 220.0 19004 N-ZORRIT 1.0 1 0.9625 11.9900 50.0000 1er. Y 1.1000 0.9000 1.050 0.950 0.012512112 HUACHO 220.0 19036 N-HUACHO 1.0 1 0.9900 13.3500 30.0000 1er. Y 1.1300 0.8700 1.050 0.950 0.010012114 CAJAMARC 220.0 19042 N-CAJAMN 1.0 1 1.0000 -0.4665 75.0000 1er. Y 1.1500 0.9400 1.050 0.950 0.013114000 CTTUMBES 60.0 19040 N-CTTUMB 1.0 1 0.9666 12.1800 30.0000 1er. Y 1.0890 0.8443 1.050 0.950 0.009414002 MANCORA 60.0 19002 N-MANCOR 1.0 1 1.0000 9.2125 10.0000 1er. Y 1.1300 0.8700 1.050 0.950 0.010014004 CHICLANO 60.0 17054 CHICLAN1 10.0 1 0.9875 10.2001 17.5000 1er. Y 1.1000 0.9000 1.050 0.950 0.012514004 CHICLANO 60.0 17176 CHICLAN2 10.0 2 1.0125 8.1000 14.0000 1er. Y 1.1000 0.9000 1.050 0.950 0.012514006 CHICLAYO 60.0 16014 CHICLGMT 10.5 1 0.9712 10.5215 17.5000 1er. Y 1.1550 0.9450 1.050 0.950 0.026314006 CHICLAYO 60.0 17048 CHICLAYO 10.5 2 1.0237 8.6167 14.0000 1er. Y 1.1550 0.9450 1.050 0.950 0.026314006 CHICLAYO 60.0 17152 CHICLSVC 8.0 4 1.0000 10.5000 30.0000 2do. N 1.0000 1.0000 1.030 1.000 0.000014006 CHICLAYO 60.0 19018 N-CHICL1 1.0 1 1.0000 -0.5350 50.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000014006 CHICLAYO 60.0 19020 N-CHICL2 1.0 2 1.0000 -0.5350 50.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000014008 ZARUMILL 60.0 19006 N-ZARUMI 1.0 1 0.9667 11.1950 7.0000 1er. Y 1.0891 0.8442 1.050 0.950 0.009414010 LAUNION 60.0 17028 LAUNION 10.0 1 1.0000 7.2100 7.0000 1er. Y 1.0780 0.9220 1.050 0.950 0.006014012 SECHURA 60.0 17032 SECHURA 10.0 1 1.0000 7.0000 3.5000 1er. Y 1.0600 0.9400 1.050 0.950 0.015014014 HUALLANC 66.0 17212 YURACMAR 13.8 1 1.0250 7.0000 3.0000 1er. Y 1.0500 0.9500 1.050 0.950 0.025014014 HUALLANC 66.0 19044 N-HUALLA 1.0 1 1.0000 -0.2000 25.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000014016 CONSTANT 60.0 19012 N-CONSTA 1.0 1 1.0000 7.4300 9.0000 1er. Y 1.0600 0.9400 1.050 0.950 0.015014018 PIURAOES 60.0 19008 N-PIURO1 1.0 1 1.0000 -0.6465 50.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000014018 PIURAOES 60.0 19010 N-PIURO2 1.0 2 1.0000 -0.6465 50.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000014020 PIURACEN 60.0 17022 PIURA 10.0 1 1.0300 9.0000 30.0000 1er. Y 1.0600 0.9400 1.050 0.950 0.015014022 CARHUAZ 66.0 17130 CARHUAZ 13.2 2 0.9565 6.5579 2.5000 1er. N 1.0043 0.9087 1.030 1.000 0.023914024 HUARAZ 66.0 17132 HUARAZ 13.2 3 0.9500 8.1000 9.8000 1er. N 1.1000 0.9000 1.030 1.000 0.010014026 TICAPAMP 66.0 17134 TICAPAMP 13.2 4 0.9500 7.5600 6.0000 1er. N 1.0500 0.9500 1.030 1.000 0.025014028 SULLANA 60.0 16030 INADE 10.0 1 0.9750 8.0400 7.0000 1er. N 1.0500 0.9500 1.030 1.000 0.025014028 SULLANA 60.0 16030 INADE 10.0 2 0.9750 8.0400 7.0000 1er. N 1.0500 0.9500 1.030 1.000 0.025014030 CARAZ 66.0 17126 CARAZ 13.8 1 1.0000 6.0000 5.0000 1er. N 1.1000 0.9000 1.030 1.000 0.0100

Page 160: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag.40 de 65

Vn1 Vn2 ID Vn1/Vn2 Vcc Sn Lado Tap Tap Aut. Rmax Rmin Vmax Vmin Variac.# Nombre kV # Nombre kV pu % MVA Estrem. pu pu pu pu pu

Barra 2do. EstremoBarra 1er. EstremoTRANSFORMADORES

14032 ELARENAL 60.0 17040 ELARENAL 13.8 1 0.9500 7.8800 8.0000 1er. Y 1.0600 0.9400 1.050 0.950 0.015014034 PAITA 60.0 19152 N-PAITA 1.0 1 0.9000 8.9050 8.0000 1er. Y 1.1000 0.9000 1.050 0.950 0.012514036 PARIAC 66.0 16034 PARIAC 13.2 1 1.0000 8.0000 9.2000 1er. N 1.0500 0.9500 1.030 1.000 0.025014042 CHULUCAN 60.0 19014 N-CHULUC 1.0 1 1.0000 7.3600 7.0000 1er. Y 1.0720 0.9280 1.050 0.950 0.005514044 CARHUAQU 60.0 19016 N-CARHUA 1.0 1 1.0000 -0.3136 7.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000014046 POMALCA 60.0 19022 N-POMALC 1.0 1 1.0000 9.0925 7.0000 1er. Y 1.1300 0.8700 1.050 0.950 0.010014048 TUMAN 60.0 19024 N-TUMAN 1.0 1 1.0000 9.0925 7.0000 1er. Y 1.1300 0.8700 1.050 0.950 0.010014050 CAYALTI 60.0 19026 N-CAYALT 1.0 1 1.0000 9.0925 7.0000 1er. Y 1.1300 0.8700 1.050 0.950 0.010014052 MOTUPE 60.0 17070 MOTUPE 10.0 1 1.0000 5.6800 6.0000 1er. N 1.0595 0.9405 1.030 1.000 0.029814054 TEXTPIUR 60.0 17174 TEXTPIUR 10.0 1 1.0000 10.0000 8.0000 1er. N 1.0500 0.9500 1.030 1.000 0.025014058 GUADALUP 60.0 19154 N-GUADA1 1.0 1 1.0000 -0.5301 30.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000014058 GUADALUP 60.0 19156 N-GUADA2 1.0 2 1.0000 -0.5031 30.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000014060 OLMOS 60.0 17072 OLMOS 10.0 1 1.0000 6.2000 1.6000 2do. N 1.0500 0.9500 1.030 1.000 0.025014062 PACASPUE 60.0 17082 PACASPUE 10.0 1 1.0000 7.3500 5.0000 1er. N 1.0500 0.9500 1.030 1.000 0.010014064 CAJAMARC 60.0 17084 CAJAMARC 10.0 1 1.0000 12.8000 20.0000 1er. N 1.0500 0.9500 1.030 1.000 0.025014066 LAPAJUEL 60.0 19046 N-LAPAJU 1.0 1 1.0000 12.2499 33.0000 1er. Y 1.1300 0.8700 1.050 0.950 0.010014068 LAPAMPA 66.0 17148 LAPAMPA 13.8 1 1.0000 6.9000 3.0000 1er. N 1.0500 0.9500 1.030 1.000 0.025014072 SIHUAS 66.0 17146 SIHUAS 2.4 1 1.0000 8.0000 7.2000 1er. N 1.1000 0.9000 1.030 1.000 0.010014074 PALLASCA 66.0 19034 N-PALLSC 1.0 1 1.0000 13.3050 9.0000 1er. N 1.1300 0.8700 1.030 1.000 0.010014080 CASTILLA 60.0 17192 CASTILLA 10.0 1 1.0000 8.0000 7.0000 1er. N 1.0500 0.9500 1.030 1.000 0.025014082 SUPE 66.0 17150 SUPE 10.0 1 1.0000 8.5000 17.0000 1er. Y 1.1000 0.9000 1.050 0.950 0.012514086 PARAMON1 66.0 19150 N-PARAM1 1.0 1 1.0000 6.0915 15.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000014088 PARAMON2 66.0 19158 N-PARAM2 1.0 2 1.0000 -0.7434 30.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000014090 CEMPACAS 60.0 17074 CEMPACAS 6.3 1 1.0000 8.5000 25.0000 2do. Y 1.1000 0.9000 1.050 0.950 0.012514090 CEMPACAS 60.0 17078 CEMPACA2 6.3 2 1.0000 8.5001 15.0000 1er. N 1.0500 0.9500 1.030 1.000 0.025014092 ANDAHUAS 66.0 19038 N-ANDAHS 1.0 1 1.0000 2.5070 9.0000 1er. Y 1.1950 0.8050 1.050 0.950 0.015014094 GALLCIEG 60.0 16094 GALLCIE1 10.5 1 1.0000 8.5000 25.0000 1er. N 1.0500 0.9500 1.030 1.000 0.025014094 GALLCIEG 60.0 16096 GALLCIE2 10.5 2 1.0000 8.5000 25.0000 1er. N 1.0500 0.9500 1.030 1.000 0.025014096 TEMBLADE 60.0 19164 N-TEMBLA 1.0 1 1.0000 5.9950 3.0000 1er. N 1.0600 0.9400 1.050 1.000 0.030014098 CHILETE 60.0 19166 N-CHILET 1.0 1 1.0000 10.9025 9.0000 1er. Y 1.0923 0.8410 1.050 0.950 0.009714104 CURUMUY 60.0 16108 CURUMUY 10.0 1 1.0500 9.2700 15.0000 1er. N 1.0762 0.9737 1.030 1.000 0.025614106 PTOANTAM 66.0 17206 PTOANTA1 4.2 1 0.9500 9.6000 12.0000 1er. Y 1.0500 0.9500 1.050 0.950 0.025014106 PTOANTAM 66.0 17208 PTOANTA2 4.2 2 0.9500 9.6000 12.0000 1er. N 1.0500 0.9500 1.030 1.000 0.025014110 ZORRITOS 60.0 19004 N-ZORRIT 1.0 1 1.0000 -0.6400 50.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000014116 HUACHO 66.0 19036 N-HUACHO 1.0 1 1.0000 -0.8499 30.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000014118 TUMBES 60.0 19000 N-TUMBES 1.0 1 1.0000 10.0000 25.0000 1er. Y 1.0600 0.9400 1.050 0.950 0.007514124 COLAN 60.0 17042 COLAN 4.8 1 0.9904 6.9400 1.7000 1er. Y 1.0096 0.9904 1.050 0.950 0.002414130 CAJMARCN 60.0 19042 N-CAJAMN 1.0 1 1.0000 16.6838 75.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000014132 HUALMAY 66.0 17164 HUALMAY 10.0 1 0.9806 10.0093 25.0000 1er. Y 1.1586 0.9150 1.050 0.950 0.0094

Page 161: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag.41 de 65

Vn1 Vn2 ID Vn1/Vn2 Vcc Sn Lado Tap Tap Aut. Rmax Rmin Vmax Vmin Variac.# Nombre kV # Nombre kV pu % MVA Estrem. pu pu pu pu pu

Barra 2do. EstremoBarra 1er. EstremoTRANSFORMADORES

14132 HUALMAY 66.0 17164 HUALMAY 10.0 2 0.9806 10.0093 25.0000 1er. Y 1.1586 0.9150 1.050 0.950 0.009414134 SANMARCO 60.0 19174 N-SNMARC 1.0 1 1.0000 8.1505 5.0000 1er. N 1.1000 0.9000 1.050 1.000 0.025014138 LAMBAYEQ 60.0 17154 LAMBAYEQ 10.0 1 1.0000 8.3400 7.0000 1er. Y 1.1000 0.9000 1.050 0.950 0.010014140 ILLIMO 60.0 19162 N-ILLIMO 1.0 1 1.0000 7.4250 5.0000 1er. Y 1.1000 0.9000 1.050 0.950 0.010014142 LAVIÑA 60.0 17214 LAVIÑA 10.0 1 1.0000 6.0000 5.0000 1er. Y 1.1000 0.9000 1.050 0.950 0.010014144 CAJABAMB 60.0 19172 N-CAJABA 1.0 1 1.0000 9.8900 9.0000 1er. N 1.1300 0.8700 1.030 1.000 0.010014148 HUARMEY 66.0 19168 N-HUARME 1.0 1 0.9394 17.1549 16.6000 1er. Y 1.0982 0.7806 1.050 0.950 0.012214150 CHIMBSUR 66.0 19170 N-CHIMBS 1.0 1 1.0000 -0.0454 18.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000016020 L.MERCED 10.0 19000 N-TUMBES 1.0 1 1.0000 6.1000 25.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000016024 PIURATG 10.0 16026 PIURA 4.8 1 1.0000 5.3000 5.0000 1er. N 1.0500 0.9500 1.030 1.000 0.025016024 PIURATG 10.0 16026 PIURA 4.8 2 1.0000 5.3000 5.0000 1er. N 1.0500 0.9500 1.030 1.000 0.025016032 ZARUMILL 10.0 19006 N-ZARUMI 1.0 1 1.0000 1.6700 2.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000016056 SULLANA1 4.2 17172 SULLANA 10.0 1 0.9952 5.3511 5.0000 2do. N 1.0450 0.9455 1.030 1.000 0.024916058 SULLANA2 4.2 17172 SULLANA 10.0 2 0.9952 5.3511 5.0000 2do. N 1.0450 0.9455 1.030 1.000 0.024916060 SULLANA3 4.2 17172 SULLANA 10.0 3 0.9952 5.5833 6.0000 2do. N 1.0450 0.9455 1.030 1.000 0.024916066 TRUPAL 13.8 19028 N-SANTIC 1.0 1 1.0000 7.6403 22.5000 1er. Y 1.0000 1.0000 1.050 0.950 0.000016090 CEMPACAS 2.3 17074 CEMPACAS 6.3 1 1.0000 5.5300 1.5000 2do. N 1.0500 0.9500 1.030 1.000 0.025016098 MALACAS 13.2 17016 MALACAS1 33.0 1 1.0000 8.0000 12.5000 2do. N 1.0500 0.9500 1.030 1.000 0.025016098 MALACAS 13.2 17184 MALACAS2 33.0 2 1.0100 8.0000 12.5000 2do. N 1.0500 0.9500 1.030 1.000 0.025016098 MALACAS 13.2 17186 MALACAS3 33.0 3 1.0100 8.0000 12.5000 2do. N 1.0500 0.9500 1.030 1.000 0.025016098 MALACAS 13.2 17190 MALACAS 3.6 1 1.0000 5.8000 3.0000 1er. Y 1.0500 0.9500 1.050 0.950 0.025016098 MALACAS 13.2 19048 MALACAZZ 1.0 1 1.0000 4.8569 0.1700 1er. Y 1.5000 0.5100 1.500 0.510 0.006316100 PAITAEMD 4.2 19152 N-PAITA 1.0 1 1.0000 5.7050 8.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000016102 PAITASK1 2.4 17038 PAITA 10.0 1 1.0000 5.8000 1.2000 2do. N 1.0500 0.9500 1.030 1.000 0.025016104 PAITASK2 2.4 17038 PAITA 10.0 2 1.0000 5.8000 1.2000 2do. N 1.0500 0.9500 1.030 1.000 0.025016106 PAITASK3 2.4 17038 PAITA 10.0 3 1.0000 5.8000 1.2000 2do. N 1.0500 0.9500 1.030 1.000 0.025016120 TUMBES 10.0 19040 N-CTTUMB 1.0 1 1.0000 7.5000 30.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000017000 CHIMBO13 13.8 17106 CHIMBO11 13.8 1 1.0000 6.3000 2.0000 2do. Y 1.0500 0.9500 1.050 0.950 0.025017002 CTTUMBES 33.0 19040 N-CTTUMB 1.0 1 1.0000 -0.1200 12.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000017004 MANCORA 22.9 19002 N-MANCOR 1.0 1 1.0000 -0.8505 10.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000017006 MANCORA 10.0 19002 N-MANCOR 1.0 1 1.0000 4.4156 7.5000 1er. Y 1.0000 1.0000 1.050 0.950 0.000017008 ZORRITOS 10.0 19004 N-ZORRIT 1.0 1 1.0000 1.3780 10.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000017010 L.MERCED 33.0 19000 N-TUMBES 1.0 1 1.0000 -0.1200 10.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000017012 ZARUMILL 22.9 19006 N-ZARUMI 1.0 1 1.0000 -0.8450 7.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000017018 REF.TALA 33.0 17020 REF.TALA 2.4 1 0.9800 8.0000 12.5000 1er. N 1.0500 0.9500 1.030 1.000 0.025017018 REF.TALA 33.0 17020 REF.TALA 2.4 2 0.9800 8.0000 12.5000 1er. N 1.0500 0.9500 1.030 1.000 0.025017024 PIURAOE1 10.0 19008 N-PIURO1 1.0 1 1.0000 3.2199 30.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000017026 PIURAOE2 10.0 19010 N-PIURO2 1.0 2 1.0000 3.2199 30.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000017034 CONSTANT 22.9 19012 N-CONSTA 1.0 1 1.0000 2.5713 7.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.0000

Page 162: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag.42 de 65

Vn1 Vn2 ID Vn1/Vn2 Vcc Sn Lado Tap Tap Aut. Rmax Rmin Vmax Vmin Variac.# Nombre kV # Nombre kV pu % MVA Estrem. pu pu pu pu pu

Barra 2do. EstremoBarra 1er. EstremoTRANSFORMADORES

17036 CONSTANT 10.0 19012 N-CONSTA 1.0 1 1.0000 2.5713 7.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000017038 PAITA 10.0 19152 N-PAITA 1.0 1 1.0000 -0.9050 8.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000017044 CHULUCAN 10.0 19014 N-CHULUC 1.0 1 1.0000 3.8400 4.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000017046 CHULUCAN 22.9 19014 N-CHULUC 1.0 1 1.0000 -0.6514 4.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000017048 CHICLAYO 10.5 19050 CHICLAZZ 1.0 1 1.0000 5.7000 0.2000 1er. Y 1.5000 0.5100 1.500 0.510 0.006317050 CHICLAY1 0.4 19018 N-CHICL1 1.0 1 1.0000 0.7870 10.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000017052 CHICLAY2 0.4 19020 N-CHICL2 1.0 2 1.0000 0.7870 10.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000017056 POMALCA 10.0 19022 N-POMALC 1.0 1 1.0000 2.1221 2.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000017058 TUMAN 10.0 19024 N-TUMAN 1.0 1 1.0000 2.1221 2.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000017062 CAYALTI 10.0 19026 N-CAYALT 1.0 1 1.0000 2.1221 2.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000017064 POMALCA 22.9 19022 N-POMALC 1.0 1 1.0000 -0.7425 7.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000017066 TUMAN 22.9 19024 N-TUMAN 1.0 1 1.0000 -0.7425 7.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000017068 CAYALTI 22.9 19026 N-CAYALT 1.0 1 1.0000 -0.7425 7.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000017086 TRUJSUR2 10.0 17096 SALAVERR 33.0 1 1.0000 6.3000 6.0000 1er. N 1.0500 0.9500 1.030 1.000 0.025017088 MOTIL 7.0 19160 N-MOTIL 1.0 1 1.0271 1.3153 4.7000 1er. Y 1.0271 1.0271 1.050 0.950 0.000017090 SANTICAO 34.5 19028 N-SANTIC 1.0 1 1.0000 2.7341 37.5000 1er. Y 1.0000 1.0000 1.050 0.950 0.000017098 TRUJINO1 10.0 19030 N-TRUJN1 1.0 1 1.0000 4.5700 20.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000017100 TRUJINO2 10.0 19032 N-TRUJN2 1.0 2 1.0000 3.7740 20.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000017102 CAJAMNOR 10.0 19042 N-CAJAMN 1.0 1 1.0000 5.3694 12.5000 1er. Y 1.0000 1.0000 1.050 0.950 0.000017104 LAPAJUEL 10.0 19046 N-LAPAJU 1.0 1 1.0000 6.2879 10.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000017106 CHIMBO11 13.8 19146 N-CHMB11 1.0 1 1.0000 7.3030 36.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000017108 CHIMBO12 13.8 19148 N-CHMB12 1.0 2 1.0000 7.4894 36.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000017110 CHIMBSUR 13.8 19170 N-CHIMBS 1.0 1 1.0000 2.0934 13.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000017124 HUALLANC 13.8 19044 N-HUALLA 1.0 1 1.0000 1.8020 8.5000 1er. Y 1.0000 1.0000 1.050 0.950 0.000017128 CARHUAQU 22.9 19016 N-CARHUA 1.0 1 1.0000 2.3128 7.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000017136 PALLASCA 10.0 19034 N-PALLSC 1.0 1 1.0000 2.3042 2.5000 1er. N 1.0000 1.0000 1.030 1.000 0.000017138 PALLASCA 22.9 19034 N-PALLSC 1.0 1 1.0000 -1.9950 9.0000 1er. N 1.0000 1.0000 1.030 1.000 0.000017140 CAJABAMB 22.9 19172 N-CAJABA 1.0 1 1.0000 0.8900 9.0000 1er. N 1.0000 1.0000 1.030 1.000 0.000017142 GUADALU1 10.0 19156 N-GUADA2 1.0 2 1.0000 1.7157 10.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000017144 GUADALU2 10.0 19154 N-GUADA1 1.0 1 1.0000 1.8367 10.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000017156 HUARMEY 22.9 19168 N-HUARME 1.0 1 0.9607 -0.2240 6.7000 1er. Y 0.9607 0.9607 1.050 0.950 0.000017158 HUARMEY 10.0 19168 N-HUARME 1.0 1 1.0000 6.5722 11.6000 1er. Y 1.0000 1.0000 1.050 0.950 0.000017162 PARAMONU 10.0 19158 N-PARAM2 1.0 2 1.0000 1.6798 10.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000017168 ANDAHUAS 10.0 19038 N-ANDAHS 1.0 1 1.0000 2.1964 2.5000 1er. Y 1.0000 1.0000 1.050 0.950 0.000017170 HUACHO 10.0 19036 N-HUACHO 1.0 1 1.0000 1.4550 9.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000017180 ANDAHUAS 22.9 19038 N-ANDAHS 1.0 1 1.0000 3.7930 9.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000017182 MOTIL 33.0 19160 N-MOTIL 1.0 1 1.0000 0.5800 13.4000 1er. Y 1.0000 1.0000 1.050 0.950 0.000017188 CAJABAMB 10.0 19172 N-CAJABA 1.0 1 1.0000 1.8945 2.5000 1er. N 1.0000 1.0000 1.030 1.000 0.000017194 ILLIMO 10.0 19162 N-ILLIMO 1.0 1 1.0000 1.6675 2.5000 1er. Y 1.0000 1.0000 1.050 0.950 0.0000

Page 163: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag.43 de 65

Vn1 Vn2 ID Vn1/Vn2 Vcc Sn Lado Tap Tap Aut. Rmax Rmin Vmax Vmin Variac.# Nombre kV # Nombre kV pu % MVA Estrem. pu pu pu pu pu

Barra 2do. EstremoBarra 1er. EstremoTRANSFORMADORES

17196 ILLIMO 22.9 19162 N-ILLIMO 1.0 1 1.0000 -0.2950 5.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000017198 TEMBLADE 13.2 19164 N-TEMBLA 1.0 1 1.0000 0.0025 1.5000 1er. N 1.0000 1.0000 1.030 1.000 0.000017200 TEMBLADE 2.4 19164 N-TEMBLA 1.0 1 1.0000 1.0025 1.5000 1er. N 1.0000 1.0000 1.030 1.000 0.000017202 CHILETE 10.0 19166 N-CHILET 1.0 1 1.0000 2.2965 2.5000 1er. Y 1.0000 1.0000 1.050 0.950 0.000017204 CHILETE 22.9 19166 N-CHILET 1.0 1 1.0000 -1.0225 9.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000017210 LAPAJUEL 22.9 19046 N-LAPAJU 1.0 1 1.0000 -4.2501 33.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000017216 SANMARCO 22.9 19174 N-SNMARC 1.0 1 1.0000 -0.9495 5.0000 1er. N 1.0000 1.0000 1.030 1.000 0.000017218 SANMARCO 10.0 19174 N-SNMARC 1.0 1 1.0000 2.5798 2.0000 1er. N 1.0000 1.0000 1.030 1.000 0.000022002 VENTANIL 220.0 26092 VENTAN1 16.0 1 0.9900 11.9992 215.0000 1er. Y 1.1000 0.9000 1.050 0.950 0.010022002 VENTANIL 220.0 26096 VENTAN2 16.0 2 0.9900 11.9992 215.0000 1er. Y 1.1000 0.9000 1.050 0.950 0.010022004 CHAVARR 220.0 29000 N-CHAVA1 1.0 1 0.9546 15.4500 120.0000 1er. N 1.0000 0.8182 1.100 1.000 0.045522004 CHAVARR 220.0 29002 N-CHAVA2 1.0 2 0.9546 9.6000 120.0000 1er. N 1.0000 0.8182 1.100 1.000 0.045522004 CHAVARR 220.0 29004 N-CHAVA3 1.0 3 0.9546 11.7198 180.0000 1er. N 1.0000 0.8182 1.100 1.000 0.045522006 STA.ROSA 220.0 26088 S.ROSAWE 13.8 1 1.0000 11.6004 140.0000 1er. N 1.0500 0.9500 1.030 1.000 0.025022006 STA.ROSA 220.0 29010 N-SROSA1 1.0 1 0.9545 12.3998 85.0000 1er. N 1.0000 0.8182 1.100 1.000 0.045522006 STA.ROSA 220.0 29012 N-SROSA2 1.0 2 0.9545 12.3998 85.0000 1er. N 1.0000 0.8182 1.100 1.000 0.045522006 STA.ROSA 220.0 29014 N-SROSA3 1.0 3 0.9090 12.4049 85.0000 1er. N 1.0000 0.8182 1.050 1.000 0.045522006 STA.ROSA 220.0 29016 N-SROSNU 1.0 1 1.0000 2.4005 144.0000 1er. N 1.0500 0.9500 1.050 1.000 0.025022006 STA.ROSA 220.0 29128 N-SROSA4 1.0 4 0.9090 14.7276 120.0000 1er. N 1.0000 0.8182 1.050 1.000 0.045522008 CJMARQUI 220.0 27130 CJMARQUI 30.0 1 0.9800 10.7001 81.0000 1er. Y 1.0619 0.8472 1.050 0.950 0.011922010 BARSI 220.0 29026 N-BARSI1 1.0 1 0.9546 12.3998 85.0000 1er. N 1.0000 0.8182 1.100 1.000 0.045522010 BARSI 220.0 29028 N-BARSI2 1.0 2 0.9546 12.3998 85.0000 1er. N 1.0000 0.8182 1.100 1.000 0.045522010 BARSI 220.0 29030 N-BARSI3 1.0 3 0.9546 9.4452 120.0000 1er. N 1.0000 0.8182 1.100 1.000 0.045522044 BALNEARI 220.0 29018 N-BALNE1 1.0 1 0.9546 15.5004 120.0000 1er. N 1.0000 0.8182 1.050 1.000 0.045522044 BALNEARI 220.0 29020 N-BALNE2 1.0 2 0.9546 14.9400 120.0000 1er. N 1.0000 0.8182 1.050 1.000 0.045522044 BALNEARI 220.0 29022 N-BALNE3 1.0 3 0.9546 15.3600 120.0000 1er. N 1.0000 0.8182 1.050 1.000 0.045522046 SANJUAN 220.0 29132 N-SANJUA 1.0 1 0.9773 15.1500 120.0000 1er. N 1.0000 0.9091 1.050 1.000 0.022722046 SANJUAN 220.0 29134 N-SANJUA 1.0 2 0.9773 15.0996 120.0000 1er. N 1.0000 0.9091 1.050 1.000 0.022722046 SANJUAN 220.0 29136 N-SANJUA 1.0 3 1.0500 9.6750 50.0000 1er. Y 1.0500 0.8591 1.050 0.950 0.009622050 INDEPEND 220.0 29006 N-INDEP1 1.0 1 1.0023 9.7050 50.0000 1er. Y 1.0500 0.8591 1.050 0.950 0.009622050 INDEPEND 220.0 29130 N-INDEP2 1.0 2 1.0023 7.4450 50.0000 1er. Y 1.0500 0.8591 1.050 0.950 0.009622056 ICA 220.0 29008 N-ICA 1.0 1 0.9736 9.5650 50.0000 1er. Y 1.0500 0.8591 1.050 0.950 0.009622058 MARCONA 220.0 29124 N-MARCON 1.0 1 0.9544 15.6000 75.0000 1er. Y 1.0500 0.8591 1.050 0.950 0.009622122 ACE.AREQ 220.0 27172 ACE.AREQ 10.0 2 1.0000 12.5000 16.0000 1er. Y 1.0500 0.8591 1.050 0.950 0.011922122 ACE.AREQ 220.0 27174 ACE.AREQ 20.0 3 1.0000 12.5000 50.0000 1er. Y 1.0023 0.9068 1.050 0.950 0.011922122 ACE.AREQ 220.0 27194 ACE.AREQ 4.2 1 1.0000 8.0000 12.0000 1er. Y 1.1000 0.9000 1.050 0.950 0.012524000 CHAVASVC 60.0 27044 CHAVASVC 4.8 1 0.9877 14.5572 40.0000 1er. N 0.9877 0.9877 1.030 1.000 0.000024002 NARANJAL 60.0 27010 NARANJAL 10.0 1 0.9619 9.9993 25.0000 1er. Y 1.0677 0.8464 1.050 0.950 0.009624002 NARANJAL 60.0 27010 NARANJAL 10.0 2 0.9619 9.4740 25.0000 1er. Y 1.0677 0.8464 1.050 0.950 0.0096

Page 164: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag.44 de 65

Vn1 Vn2 ID Vn1/Vn2 Vcc Sn Lado Tap Tap Aut. Rmax Rmin Vmax Vmin Variac.# Nombre kV # Nombre kV pu % MVA Estrem. pu pu pu pu pu

Barra 2do. EstremoBarra 1er. EstremoTRANSFORMADORES

24004 INFANTAS 60.0 27008 INFANTAS 10.0 1 0.9619 9.1913 25.0000 1er. Y 1.0677 0.8464 1.050 0.950 0.009624004 INFANTAS 60.0 27008 INFANTAS 10.0 2 0.9619 9.1913 25.0000 1er. Y 1.0677 0.8464 1.050 0.950 0.009624006 CAUDIVIL 60.0 27006 CAUDIVIL 10.0 1 0.9619 10.0093 25.0000 1er. Y 1.0677 0.8464 1.050 0.950 0.009624006 CAUDIVIL 60.0 27006 CAUDIVIL 10.0 2 0.9619 10.0093 25.0000 1er. Y 1.0677 0.8464 1.050 0.950 0.009624008 CHAVARR 60.0 27014 CHAVARR4 10.0 1 0.9619 9.3225 25.0000 1er. Y 1.0677 0.8464 1.050 0.950 0.009224008 CHAVARR 60.0 27014 CHAVARR4 10.0 2 0.9619 9.7468 25.0000 1er. Y 1.0837 0.8401 1.050 0.950 0.009424008 CHAVARR 60.0 27014 CHAVARR4 10.0 3 0.9619 9.7468 25.0000 1er. Y 1.0837 0.8401 1.050 0.950 0.009424008 CHAVARR 60.0 29000 N-CHAVA1 1.0 1 1.0409 -3.8496 120.0000 1er. N 1.0409 1.0409 1.030 1.000 0.000024008 CHAVARR 60.0 29002 N-CHAVA2 1.0 2 1.0409 1.8900 120.0000 1er. N 1.0409 1.0409 1.030 1.000 0.000024008 CHAVARR 60.0 29004 N-CHAVA3 1.0 3 1.0409 -1.2798 180.0000 1er. N 1.0409 1.0409 1.030 1.000 0.000024010 PTEPIEDR 60.0 27020 PTEPIEDR 10.0 1 0.9619 9.8983 25.0000 1er. Y 1.0677 0.8464 1.050 0.950 0.009624010 PTEPIEDR 60.0 27020 PTEPIEDR 10.0 2 0.9619 10.2013 25.0000 1er. Y 1.0677 0.8464 1.050 0.950 0.009624012 TOMVALLE 60.0 27012 TOMVALLE 10.0 1 0.9619 9.6963 25.0000 1er. Y 1.0836 0.8401 1.050 0.950 0.009424012 TOMVALLE 60.0 27012 TOMVALLE 10.0 2 0.9619 9.6963 25.0000 1er. Y 1.0836 0.8401 1.050 0.950 0.009424014 OQUENDO 60.0 27018 OQUENDO 10.0 1 0.9619 9.7973 25.0000 1er. Y 1.0836 0.8401 1.050 0.950 0.009424014 OQUENDO 60.0 27018 OQUENDO 10.0 2 0.9619 9.6963 25.0000 1er. Y 1.0836 0.8401 1.050 0.950 0.009424016 ZAPALLAL 60.0 27022 ZAPALLAL 10.0 1 1.0028 10.6475 17.2000 1er. Y 1.0028 0.8040 1.050 0.950 0.009024018 CHANCAY 60.0 27038 CHANCAY 10.0 1 0.9619 9.7973 25.0000 1er. Y 1.0836 0.8401 1.050 0.950 0.009424020 VENTANIL 60.0 27024 VENTANIL 10.0 1 0.9619 10.0093 25.0000 1er. Y 1.0836 0.8401 1.050 0.950 0.009424026 ANCON 60.0 27026 ANCON 10.0 1 0.9667 6.7000 6.0000 1er. Y 1.0522 0.8811 1.050 0.950 0.009524028 HUARAL 60.0 27028 HUARAL 10.0 1 0.9619 9.9993 25.0000 1er. Y 1.0677 0.8464 1.050 0.950 0.009624030 PAMPILLA 60.0 27032 PAMPILL1 4.2 1 1.0096 9.3199 12.5000 1er. N 1.0601 0.9591 1.030 1.000 0.025224030 PAMPILLA 60.0 27034 PAMPILL2 4.2 2 1.0096 7.4559 10.0000 1er. N 1.0601 0.9591 1.030 1.000 0.025224034 PERSHING 60.0 27056 PERSHING 10.0 1 0.9619 9.6963 25.0000 1er. Y 1.0836 0.8401 1.050 0.950 0.009424034 PERSHING 60.0 27056 PERSHING 10.0 2 0.9619 9.6963 25.0000 1er. Y 1.0836 0.8401 1.050 0.950 0.009424036 MARANGA 60.0 27058 MARANGA 10.0 1 0.9619 10.1913 25.0000 1er. Y 1.0836 0.8401 1.050 0.950 0.009424036 MARANGA 60.0 27058 MARANGA 10.0 2 0.9619 9.0398 25.0000 1er. Y 1.0836 0.8401 1.050 0.950 0.009424038 STAMARIA 60.0 27060 STAMARIA 10.0 1 0.9619 9.4338 25.0000 1er. Y 1.0836 0.8401 1.050 0.950 0.009424038 STAMARIA 60.0 27060 STAMARIA 10.0 2 0.9619 9.3933 25.0000 1er. Y 1.0836 0.8401 1.050 0.950 0.009424040 BALNEARI 60.0 27164 EMBAEEUU 10.0 1 1.0000 9.2923 25.0000 1er. Y 1.0475 0.8361 1.050 0.950 0.009624040 BALNEARI 60.0 27166 CUARTEL 10.0 2 0.9898 10.0903 25.0000 1er. Y 1.0831 0.8406 1.050 0.950 0.009324040 BALNEARI 60.0 27166 CUARTEL 10.0 3 0.9898 10.2113 25.0000 1er. Y 1.0831 0.8406 1.050 0.950 0.009324040 BALNEARI 60.0 29018 N-BALNE1 1.0 1 1.0409 -3.8004 120.0000 1er. N 1.0409 1.0409 1.030 1.000 0.000024040 BALNEARI 60.0 29020 N-BALNE2 1.0 2 1.0409 -3.5400 120.0000 1er. N 1.0409 1.0409 1.030 1.000 0.000024040 BALNEARI 60.0 29022 N-BALNE3 1.0 3 1.0409 -3.7596 120.0000 1er. N 1.0409 1.0409 1.030 1.000 0.000024042 INDUSTRI 60.0 27062 INDUSTRI 10.0 1 0.9619 9.4740 25.0000 1er. Y 1.0837 0.8400 1.050 0.950 0.009424048 SANJUAN 60.0 27098 SANJUAN4 10.0 1 0.9609 9.2923 25.0000 1er. Y 1.0666 0.8552 1.050 0.950 0.009624048 SANJUAN 60.0 29132 N-SANJUA 1.0 1 1.0410 -4.1496 120.0000 1er. N 1.0410 1.0410 1.030 1.000 0.000024048 SANJUAN 60.0 29134 N-SANJUA 1.0 2 1.0410 -4.2000 120.0000 1er. N 1.0410 1.0410 1.030 1.000 0.0000

Page 165: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag.45 de 65

Vn1 Vn2 ID Vn1/Vn2 Vcc Sn Lado Tap Tap Aut. Rmax Rmin Vmax Vmin Variac.# Nombre kV # Nombre kV pu % MVA Estrem. pu pu pu pu pu

Barra 2do. EstremoBarra 1er. EstremoTRANSFORMADORES

24052 INDEPEND 60.0 29006 N-INDEP1 1.0 1 1.0383 -0.3750 50.0000 1er. Y 1.0383 1.0383 1.050 0.950 0.000024052 INDEPEND 60.0 29130 N-INDEP2 1.0 2 1.0383 2.0250 50.0000 1er. Y 1.0383 1.0383 1.050 0.950 0.000024054 CHORRILL 60.0 27082 CHORRILL 10.0 1 0.9619 9.9285 25.0000 1er. Y 1.0831 0.8406 1.050 0.950 0.009324054 CHORRILL 60.0 27082 CHORRILL 10.0 2 0.9619 10.1710 25.0000 1er. Y 1.0831 0.8406 1.050 0.950 0.009324058 VILMARIA 60.0 27080 VILMARIA 10.0 1 0.9619 9.8983 25.0000 1er. Y 1.0831 0.8406 1.050 0.950 0.009324058 VILMARIA 60.0 27080 VILMARIA 10.0 2 0.9604 9.9993 25.0000 1er. Y 1.0827 0.8380 1.050 0.950 0.009424060 MARCONA 60.0 29124 N-MARCON 1.0 1 1.0383 -0.9000 75.0000 1er. Y 1.0383 1.0383 1.050 0.950 0.000024062 SNICOLAS 60.0 26064 SNICOLAS 13.8 1 0.9718 10.8529 37.5000 1er. N 1.0204 0.9232 1.030 1.000 0.024324062 SNICOLAS 60.0 26064 SNICOLAS 13.8 2 0.9718 10.8529 37.5000 1er. N 1.0204 0.9232 1.030 1.000 0.024324062 SNICOLAS 60.0 26064 SNICOLAS 13.8 3 0.9718 10.8529 37.5000 1er. N 1.0204 0.9232 1.030 1.000 0.024324064 VIELSALV 60.0 27078 VIELSALV 10.0 1 0.9619 9.8983 25.0000 1er. Y 1.0831 0.8406 1.050 0.950 0.009324066 ICA 60.0 29008 N-ICA 1.0 1 1.0383 -0.2850 50.0000 1er. Y 1.0383 1.0383 1.050 0.950 0.000024068 BARSI 60.0 27052 BARSI4 10.0 1 0.9619 9.6963 25.0000 1er. Y 1.0836 0.8401 1.050 0.950 0.009424068 BARSI 60.0 27052 BARSI4 10.0 2 0.9619 9.7973 25.0000 1er. Y 1.0836 0.8401 1.050 0.950 0.009424068 BARSI 60.0 29026 N-BARSI1 1.0 1 1.0409 -0.6503 85.0000 1er. N 1.0409 1.0409 1.030 1.000 0.000024068 BARSI 60.0 29028 N-BARSI2 1.0 2 1.0409 -0.6503 85.0000 1er. N 1.0409 1.0409 1.030 1.000 0.000024068 BARSI 60.0 29030 N-BARSI3 1.0 3 1.0409 1.7352 120.0000 1er. N 1.0409 1.0409 1.030 1.000 0.000024070 ATOCONGO 60.0 26002 ATOCGEA1 4.2 1 1.0000 6.6960 18.0000 1er. N 1.0960 0.9040 1.030 1.000 0.024024070 ATOCONGO 60.0 26004 ATOCGEA2 4.4 2 0.9978 6.0957 18.0000 1er. N 1.1487 0.9475 1.030 1.000 0.025224070 ATOCONGO 60.0 26006 ATOCGEA3 4.2 3 1.0000 6.6960 18.0000 1er. N 1.0960 0.9040 1.030 1.000 0.024024070 ATOCONGO 60.0 27030 CEMLIMA1 6.6 3 0.9944 7.6860 25.0000 1er. N 1.2056 0.9944 1.030 1.000 0.026424070 ATOCONGO 60.0 27036 CEMLIMA2 6.6 4 0.9944 7.6860 25.0000 1er. N 1.2056 0.9944 1.030 1.000 0.026424070 ATOCONGO 60.0 27074 ATOCONG1 6.6 1 0.9944 7.6860 25.0000 1er. N 1.2056 0.9944 1.030 1.000 0.026424070 ATOCONGO 60.0 27076 ATOCONG2 6.6 2 0.9944 7.6860 25.0000 1er. N 1.2056 0.9944 1.030 1.000 0.026424072 PACHACAM 60.0 27064 PACHACAM 10.0 1 0.9590 9.4120 17.2000 1er. Y 1.0677 0.8405 1.050 0.950 0.009924074 LURIN 60.0 27066 LURIN 10.0 1 0.9619 9.7568 25.0000 1er. Y 1.0634 0.8518 1.050 0.950 0.008524076 LASPRADE 60.0 29032 N-LPRADE 1.0 1 0.9667 8.9000 25.0000 1er. Y 1.0886 0.8448 1.050 0.950 0.009424078 SBARTOLO 60.0 27068 SBARTOLO 10.0 1 0.9340 10.3250 8.7500 1er. Y 1.1137 0.8196 1.050 0.950 0.016324082 TAMBDMOR 60.0 27096 TAMBDMOR 10.0 1 0.9473 8.2000 7.0000 1er. Y 1.1407 0.7927 1.050 0.950 0.019324084 CHINCHA 60.0 27100 CHINCHA 10.0 1 0.9087 8.3000 7.0000 1er. Y 1.1407 0.7927 1.050 0.950 0.019324084 CHINCHA 60.0 27100 CHINCHA 10.0 2 0.9087 8.3000 7.0000 1er. Y 1.1407 0.7927 1.050 0.950 0.019324086 PISCO 60.0 27102 PISCO 10.0 1 0.9667 8.7000 7.0000 1er. Y 1.1407 0.7927 1.050 0.950 0.019324088 ELCARMEN 60.0 27112 ELCARMEN 10.0 1 0.9667 6.4000 5.0000 1er. Y 1.1407 0.7927 1.050 0.950 0.019324092 ALTDLUNA 60.0 27104 ALTDLUNA 10.0 1 0.9667 8.3000 7.0000 1er. Y 1.1407 0.7927 1.050 0.950 0.019324094 PARACAS 60.0 29042 N-PARAC1 1.0 1 1.0000 17.4149 16.6200 1er. Y 1.2080 0.8587 1.050 0.950 0.013424096 CAÑETE 60.0 27110 CAÑETE 10.0 1 0.9500 8.5001 17.2000 1er. N 1.0500 0.9500 1.030 1.000 0.025024098 ICANORTE 60.0 27116 ICANORT1 10.0 2 0.9667 8.3000 7.0000 1er. Y 1.1407 0.7927 1.050 0.950 0.019324098 ICANORTE 60.0 27178 ICANORT2 10.0 1 1.0000 8.0000 7.0000 1er. Y 1.1800 0.8200 1.050 0.950 0.020024100 SANJUAN2 60.0 29136 N-SANJUA 1.0 3 1.0383 -0.4050 50.0000 1er. Y 1.0383 1.0383 1.050 0.950 0.0000

Page 166: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag.46 de 65

Vn1 Vn2 ID Vn1/Vn2 Vcc Sn Lado Tap Tap Aut. Rmax Rmin Vmax Vmin Variac.# Nombre kV # Nombre kV pu % MVA Estrem. pu pu pu pu pu

Barra 2do. EstremoBarra 1er. EstremoTRANSFORMADORES

24102 MEPSA 60.0 27134 MEPSA 10.0 1 1.0000 9.3000 17.2000 1er. N 1.0500 0.9500 1.030 1.000 0.025024104 MIRONES 60.0 27016 MIRONES 10.0 1 0.9619 9.8983 25.0000 1er. Y 1.0836 0.8401 1.050 0.950 0.009424104 MIRONES 60.0 27016 MIRONES 10.0 2 0.9619 9.3933 25.0000 1er. Y 1.0836 0.8401 1.050 0.950 0.009424104 MIRONES 60.0 27016 MIRONES 10.0 3 0.9619 9.2923 25.0000 1er. Y 1.0677 0.8464 1.050 0.950 0.009624106 PANDO 60.0 27054 PANDO 10.0 1 0.9619 9.7873 25.0000 1er. Y 1.0836 0.8401 1.050 0.950 0.009424106 PANDO 60.0 27054 PANDO 10.0 2 0.9619 9.0800 25.0000 1er. Y 1.0836 0.8401 1.050 0.950 0.009424108 STAMARGA 60.0 29034 N-SMARGA 1.0 1 1.0000 8.3126 15.0000 1er. Y 1.1407 0.7927 1.050 0.950 0.019324110 PALPA 60.0 29038 N-PALPA 1.0 1 0.9667 14.0405 11.7000 1er. Y 1.2180 0.7153 1.050 0.950 0.019324112 NAZCA 60.0 27124 NAZCA 10.0 1 0.9667 8.3000 7.0000 1er. Y 1.1407 0.7927 1.050 0.950 0.019324114 PUQUIO 60.0 29040 N-PUQUIO 1.0 1 1.0000 1.9500 7.0000 1er. Y 1.1800 0.8200 1.050 0.950 0.020024116 BELUNION 60.0 29036 N-BELLUN 1.0 1 1.0000 9.1025 7.0000 1er. Y 1.1300 0.8700 1.050 0.950 0.010024118 JGALVEZ 60.0 27132 JGALVEZ 10.0 1 0.9811 9.3933 25.0000 1er. Y 1.0677 0.8561 1.050 0.950 0.009624118 JGALVEZ 60.0 27132 JGALVEZ 10.0 2 0.9805 9.4943 25.0000 1er. Y 1.0831 0.8406 1.050 0.950 0.009324120 LIMATAM1 60.0 27154 LIMATAM2 10.0 2 0.9712 9.7568 25.0000 1er. Y 1.0831 0.8402 1.050 0.950 0.009324120 LIMATAM1 60.0 27154 LIMATAM2 10.0 3 0.9737 9.7973 25.0000 1er. Y 1.0671 0.8548 1.050 0.950 0.008524120 LIMATAM1 60.0 27156 LIMATAM1 10.0 1 1.0186 10.1810 25.0000 1er. Y 1.0831 0.8402 1.050 0.950 0.009324124 BALNESVC 60.0 27168 BALNESVC 7.3 1 1.0014 26.4276 60.0000 1er. N 1.0014 1.0014 1.050 0.950 0.000024126 BARRANCO 60.0 27162 BARRANCO 10.0 1 0.9805 9.7265 25.0000 1er. Y 1.0831 0.8406 1.050 0.950 0.009324126 BARRANCO 60.0 27162 BARRANCO 10.0 2 0.9805 9.9185 25.0000 1er. Y 1.0831 0.8406 1.050 0.950 0.009324128 NEYRA 60.0 27158 NEYRA 10.0 3 0.9652 9.7973 25.0000 2do. Y 1.5500 0.3300 1.000 0.900 0.048924128 NEYRA 60.0 27160 NEYRA 10.0 1 0.9705 9.5953 25.0000 1er. Y 1.0666 0.8456 1.050 0.950 0.009624128 NEYRA 60.0 27160 NEYRA 10.0 2 0.9705 9.2923 25.0000 1er. Y 1.0666 0.8456 1.050 0.950 0.009624130 SISIDRO1 60.0 27152 S.ISIDR2 10.0 1 0.9805 11.6456 40.0000 1er. Y 1.0831 0.8406 1.050 0.950 0.009324132 SISIDRO2 60.0 29024 N-SISIDR 1.0 1 0.9760 5.9150 25.0000 1er. Y 1.0886 0.8448 1.050 0.950 0.009424156 TACAMA 60.0 27180 TACAMA 10.0 1 1.0000 8.1000 7.0000 1er. N 1.1407 0.7927 1.030 1.000 0.019324170 PEDREGAL 60.0 27176 PEDREGAL 10.0 1 0.9500 8.1000 15.0000 1er. Y 1.1300 0.8700 1.050 0.950 0.010024174 STAROSV2 60.0 26030 STA.ROSA 10.0 1 0.9700 11.6779 17.2000 1er. Y 1.0028 0.8040 1.050 0.950 0.009024174 STAROSV2 60.0 26030 STA.ROSA 10.0 2 0.9700 11.0323 17.2000 1er. Y 1.0317 0.8272 1.050 0.950 0.009324174 STAROSV2 60.0 26030 STA.ROSA 10.0 3 0.9700 9.9508 25.0000 1er. Y 1.0317 0.8179 1.050 0.950 0.009724174 STAROSV2 60.0 26030 STA.ROSA 10.0 4 0.9700 10.3833 25.0000 1er. Y 1.0317 0.8179 1.050 0.950 0.009726000 INDECS01 10.0 29130 N-INDEP2 1.0 2 1.0300 7.3290 30.0000 1er. Y 1.0300 1.0300 1.050 0.950 0.000026032 STAROSA1 13.8 29016 N-SROSNU 1.0 1 1.0000 10.3997 72.0000 1er. N 1.0000 1.0000 1.030 1.000 0.000026034 STAROSA2 13.8 29016 N-SROSNU 1.0 1 1.0000 10.3997 72.0000 1er. N 1.0000 1.0000 1.030 1.000 0.000026064 SNICOLAS 13.8 26066 SNICOLAS 4.2 1 1.0000 2.0979 70.0000 1er. N 1.0500 0.9500 1.030 1.000 0.025027000 CHAVARR1 10.0 29000 N-CHAVA1 1.0 1 1.0000 11.2168 40.0000 1er. N 1.0000 1.0000 1.030 1.000 0.000027002 CHAVARR2 10.0 29002 N-CHAVA2 1.0 2 1.0000 4.6700 40.0000 1er. N 1.0000 1.0000 1.030 1.000 0.000027004 CHAVARR3 10.0 29004 N-CHAVA3 1.0 3 1.0000 5.6934 60.0000 1er. N 1.0000 1.0000 1.030 1.000 0.000027046 BARSI1 10.0 29026 N-BARSI1 1.0 1 1.0000 1.8165 28.3300 1er. N 1.0000 1.0000 1.030 1.000 0.000027048 BARSI2 10.0 29028 N-BARSI2 1.0 2 1.0000 1.8165 28.3300 1er. N 1.0000 1.0000 1.030 1.000 0.0000

Page 167: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag.47 de 65

Vn1 Vn2 ID Vn1/Vn2 Vcc Sn Lado Tap Tap Aut. Rmax Rmin Vmax Vmin Variac.# Nombre kV # Nombre kV pu % MVA Estrem. pu pu pu pu pu

Barra 2do. EstremoBarra 1er. EstremoTRANSFORMADORES

27050 BARSI3 10.0 29030 N-BARSI3 1.0 3 1.0000 4.7216 40.0000 1er. N 1.0000 1.0000 1.030 1.000 0.000027070 MARCONA 10.0 29124 N-MARCON 1.0 1 1.0300 2.3601 30.0000 1er. Y 1.0300 1.0300 1.050 0.950 0.000027072 LASPRADE 10.0 29032 N-LPRADE 1.0 1 1.0000 1.6800 10.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000027084 SANJUAN1 10.0 29132 N-SANJUA 1.0 1 1.0000 11.3168 40.0000 1er. N 1.0000 1.0000 1.030 1.000 0.000027086 SANJUAN2 10.0 29134 N-SANJUA 1.0 2 1.0000 11.3332 40.0000 1er. N 1.0000 1.0000 1.030 1.000 0.000027088 SANJUAN3 10.0 29136 N-SANJUA 1.0 3 1.0300 5.8530 30.0000 1er. Y 1.0300 1.0300 1.050 0.950 0.000027090 LASPRADE 23.0 29032 N-LPRADE 1.0 1 0.9957 -0.6000 25.0000 1er. Y 0.9957 0.9957 1.050 0.950 0.000027094 INDEPEND 10.0 29006 N-INDEP1 1.0 1 1.0300 5.8350 30.0000 1er. Y 1.0300 1.0300 1.050 0.950 0.000027108 PARACAS1 10.0 29042 N-PARAC1 1.0 1 1.0000 7.0351 11.6400 1er. Y 1.0000 1.0000 1.050 0.950 0.000027114 STAMARGA 10.0 29034 N-SMARGA 1.0 1 1.0000 4.7083 10.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000027118 ICA 10.0 29008 N-ICA 1.0 1 1.0300 5.7810 30.0000 1er. Y 1.0300 1.0300 1.050 0.950 0.000027120 PALPA 10.0 29038 N-PALPA 1.0 1 1.0000 3.1209 3.4000 1er. Y 1.0000 1.0000 1.050 0.950 0.000027122 PUQUIO 22.9 29040 N-PUQUIO 1.0 1 1.0000 2.9500 7.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000027126 BELUNION 10.0 29036 N-BELLUN 1.0 1 1.0000 2.2093 2.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000027128 BELUNION 22.9 29036 N-BELLUN 1.0 1 1.0000 -0.7325 7.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000027136 STAROSA1 10.0 29010 N-SROSA1 1.0 1 1.0000 1.8165 28.3300 1er. N 1.0000 1.0000 1.030 1.000 0.000027138 STAROSA2 10.0 29012 N-SROSA2 1.0 2 1.0000 1.8165 28.3300 1er. N 1.0000 1.0000 1.030 1.000 0.000027140 STAROSA3 10.0 29014 N-SROSA3 1.0 3 1.0000 1.8148 28.3300 1er. N 1.0000 1.0000 1.030 1.000 0.000027142 STAROSA4 10.0 29128 N-SROSA4 1.0 4 1.0000 3.4908 40.0000 1er. N 1.0000 1.0000 1.030 1.000 0.000027144 BALNEAR1 10.0 29018 N-BALNE1 1.0 1 1.0000 11.3000 40.0000 1er. N 1.0000 1.0000 1.030 1.000 0.000027146 BALNEAR2 10.0 29020 N-BALNE2 1.0 2 1.0000 11.6800 40.0000 1er. N 1.0000 1.0000 1.030 1.000 0.000027148 BALNEAR3 10.0 29022 N-BALNE3 1.0 3 1.0000 11.2468 40.0000 1er. N 1.0000 1.0000 1.030 1.000 0.000027150 S.ISIDR1 10.0 29024 N-SISIDR 1.0 1 1.0000 3.8350 25.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000027170 S.ISIDRO 23.0 29024 N-SISIDR 1.0 1 0.9957 -0.4850 25.0000 1er. Y 0.9957 0.9957 1.050 0.950 0.000027182 STAMARGA 22.9 29034 N-SMARGA 1.0 1 1.0000 -1.4583 10.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000027184 PALPA 22.9 29038 N-PALPA 1.0 1 1.0000 -1.3215 11.7000 1er. Y 1.0000 1.0000 1.050 0.950 0.000027186 PARACAS1 22.9 29042 N-PARAC1 1.0 1 1.0000 -0.3181 6.6500 1er. Y 1.0000 1.0000 1.050 0.950 0.000027188 PUQUIO 10.0 29040 N-PUQUIO 1.0 1 1.0000 1.7571 2.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000029010 N-SROSA1 1.0 44028 STA.ROSA 60.0 1 1.0409 -0.6503 85.0000 2do. N 1.0409 1.0409 1.030 1.000 0.000029012 N-SROSA2 1.0 44028 STA.ROSA 60.0 2 1.0409 -0.6503 85.0000 2do. N 1.0409 1.0409 1.030 1.000 0.000029014 N-SROSA3 1.0 44056 STAROSA2 60.0 3 1.0409 -0.5551 85.0000 2do. N 1.0409 1.0409 1.030 1.000 0.000029128 N-SROSA4 1.0 44056 STAROSA2 60.0 4 1.0409 -3.5676 120.0000 2do. N 1.0409 1.0409 1.030 1.000 0.000032144 VIZCARRA 220.0 37000 VIZCASVC 16.0 1 1.0000 10.7100 90.0000 1er. N 1.0250 0.9750 1.050 0.950 0.025032146 ANTAMINA 220.0 37198 ANTAMINA 23.0 1 0.9750 14.1500 125.0000 1er. N 1.0500 0.9500 1.030 1.000 0.025032146 ANTAMINA 220.0 37198 ANTAMINA 23.0 2 0.9750 14.2500 125.0000 1er. N 1.0500 0.9500 1.030 1.000 0.025036000 ANTACS01 6.6 37198 ANTAMINA 23.0 1 1.0000 8.4900 15.0000 2do. N 1.0500 0.9500 1.030 1.000 0.025036002 ANTACS02 6.6 37198 ANTAMINA 23.0 2 1.0000 8.4900 15.0000 2do. N 1.0500 0.9500 1.030 1.000 0.025041000 UCHUCHAC 138.0 49064 N-UCHUCH 1.0 1 0.9250 8.0500 12.0000 1er. N 1.0175 0.8325 1.030 1.000 0.009341002 YAUPI2 138.0 49056 N-YAUPI 1.0 1 1.0000 8.7000 25.0000 1er. N 1.1000 0.9000 1.030 1.000 0.0100

Page 168: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag.48 de 65

Vn1 Vn2 ID Vn1/Vn2 Vcc Sn Lado Tap Tap Aut. Rmax Rmin Vmax Vmin Variac.# Nombre kV # Nombre kV pu % MVA Estrem. pu pu pu pu pu

Barra 2do. EstremoBarra 1er. EstremoTRANSFORMADORES

41004 OXAPAMPA 138.0 49054 N-OXAPAM 1.0 1 0.9500 11.5425 15.0000 1er. N 1.1000 0.9000 1.030 1.000 0.010041006 CONDORCO 138.0 47216 CONDORCO 44.0 1 0.8606 11.1428 20.0000 1er. Y 0.9467 0.7746 1.050 0.950 0.008641022 TINGMARI 138.0 47000 TINGMARI 10.0 1 1.0000 25.5510 16.7000 1er. Y 1.0500 0.7500 1.050 0.950 0.012541022 TINGMARI 138.0 49012 N-TINGMA 1.0 1 1.0000 -0.8400 50.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000041024 HUANUCO 138.0 49008 N-HUANUC 1.0 1 0.9500 16.5556 23.3000 1er. Y 1.0500 0.7500 1.050 0.950 0.012541044 PARAGSHA 138.0 49220 N-PARAG1 1.0 1 0.9348 9.8349 44.0000 1er. N 1.0283 0.8413 1.030 1.000 0.031241046 CARHUAMA 138.0 49014 N-CARMY1 1.0 1 0.9058 6.1650 30.0000 1er. N 0.9058 0.9058 1.030 1.000 0.000041050 YAUPI 138.0 46104 YAUPI1 13.8 1 1.0000 10.0643 75.0000 1er. N 1.0250 0.9750 1.030 1.000 0.025041050 YAUPI 138.0 46106 YAUPI2 13.8 2 1.0000 10.0645 50.0000 1er. N 1.0250 0.9750 1.030 1.000 0.025041054 OROYANUE 138.0 49018 N-OROYN1 1.0 1 0.8333 5.2500 30.0000 1er. N 0.8333 0.8333 1.030 1.000 0.000041054 OROYANUE 138.0 49020 N-OROYN2 1.0 2 0.8333 5.3151 30.0000 1er. N 0.8333 0.8333 1.030 1.000 0.000041064 PARAGSH2 138.0 49010 N-PARAG2 1.0 1 0.9203 2.8500 120.0000 1er. N 0.9203 0.9203 1.030 1.000 0.000041142 YUNCAN 138.0 42004 YUNCAN 220.0 1 1.0000 10.0000 125.0000 2do. Y 1.0500 0.9500 1.050 0.950 0.025041152 AUCAYACU 138.0 49006 N-AUCYCU 1.0 1 1.0000 10.6950 15.0000 1er. Y 1.0809 0.8322 1.050 0.950 0.009641154 TOCACHE 138.0 49004 N-TOCACH 1.0 1 1.0000 3.1740 7.0000 1er. Y 1.0809 0.8322 1.050 0.950 0.009641214 AGUAYTIA 138.0 49040 N-AGUAYT 1.0 1 1.0000 3.1998 60.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000041216 PUCALLPA 138.0 49042 N-PUCALY 1.0 1 0.9300 19.9848 55.0000 1er. Y 1.1000 0.9000 1.050 0.950 0.010042002 C.ARMIÑO 220.0 46116 MANTARO1 13.8 1 1.0716 10.0800 120.0000 1er. N 1.0977 0.9932 1.030 1.000 0.026142002 C.ARMIÑO 220.0 46118 MANTARO2 13.8 2 1.0716 10.0800 120.0000 1er. N 1.0977 0.9932 1.030 1.000 0.026142002 C.ARMIÑO 220.0 46120 MANTARO3 13.8 3 1.0716 10.0800 120.0000 1er. N 1.0977 0.9932 1.030 1.000 0.026142002 C.ARMIÑO 220.0 46122 MANTARO4 13.8 4 1.0716 10.0800 120.0000 1er. N 1.0977 0.9932 1.030 1.000 0.026142002 C.ARMIÑO 220.0 46124 MANTARO5 13.8 5 1.0716 10.0800 120.0000 1er. N 1.0977 0.9932 1.030 1.000 0.026142002 C.ARMIÑO 220.0 46126 MANTARO6 13.8 6 1.0716 10.0800 120.0000 1er. N 1.0977 0.9932 1.030 1.000 0.026142002 C.ARMIÑO 220.0 46128 MANTARO7 13.8 7 1.0716 10.0800 120.0000 1er. N 1.0977 0.9932 1.030 1.000 0.026142002 C.ARMIÑO 220.0 49030 N-COBRI1 1.0 1 1.0193 12.9765 50.0000 1er. N 1.0977 0.9932 1.050 1.000 0.026142004 YUNCAN 220.0 49066 N-YUNCAN 1.0 1 1.0000 2.0549 144.0000 1er. N 1.0676 0.9324 1.030 1.000 0.033842008 HUAYUCA 220.0 49022 N-HUAYU1 1.0 1 1.0102 12.9549 30.0000 1er. Y 1.1250 0.9205 1.050 0.950 0.010242008 HUAYUCA 220.0 49024 N-HUAYU2 1.0 2 1.0102 13.0500 30.0000 1er. Y 1.1250 0.9205 1.050 0.950 0.010242012 OROYANUE 220.0 49016 N-OROYAN 1.0 1 0.9563 14.0250 100.0000 1er. Y 1.1000 0.9000 1.050 0.950 0.006342014 MATUCANA 220.0 49126 N-MATUCA 1.0 1 1.0727 0.0176 160.0000 1er. N 1.1452 1.0002 1.050 1.000 0.072542016 HUANCAVE 220.0 49038 N-HUANCV 1.0 1 1.0841 13.4934 30.0000 1er. Y 1.1250 0.9205 1.050 0.950 0.010242018 RESTITU1 220.0 46090 RESTITU1 13.8 1 1.0773 12.4938 82.5000 1er. N 1.1046 0.9954 1.030 1.000 0.027342020 RESTITU2 220.0 46092 RESTITU2 13.8 2 1.0773 12.4938 82.5000 1er. N 1.1046 0.9954 1.030 1.000 0.027342022 RESTITU3 220.0 46094 RESTITU3 13.8 3 1.0773 12.4938 82.5000 1er. N 1.1046 0.9954 1.030 1.000 0.027342036 HUINCO 220.0 46096 HUINCO1 12.5 1 1.0708 11.1002 85.0000 1er. N 1.1082 1.0336 1.030 1.000 0.037342036 HUINCO 220.0 46098 HUINCO2 12.5 2 1.0708 11.1002 85.0000 1er. N 1.1082 1.0336 1.030 1.000 0.037342036 HUINCO 220.0 46100 HUINCO3 12.5 3 1.0708 11.1002 85.0000 1er. N 1.1082 1.0336 1.030 1.000 0.037342036 HUINCO 220.0 46102 HUINCO4 12.5 4 1.0708 11.1002 85.0000 1er. N 1.1082 1.0336 1.030 1.000 0.037342070 TINGMARI 220.0 49012 N-TINGMA 1.0 1 0.9900 15.3900 50.0000 1er. Y 1.1000 0.9000 1.050 0.950 0.0100

Page 169: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag.49 de 65

Vn1 Vn2 ID Vn1/Vn2 Vcc Sn Lado Tap Tap Aut. Rmax Rmin Vmax Vmin Variac.# Nombre kV # Nombre kV pu % MVA Estrem. pu pu pu pu pu

Barra 2do. EstremoBarra 1er. EstremoTRANSFORMADORES

42072 AGUAYTIA 220.0 46068 AGUAYTI1 13.8 1 1.0136 12.0670 100.0000 1er. N 1.1150 0.9123 1.030 1.000 0.025342072 AGUAYTIA 220.0 46070 AGUAYTI2 13.8 2 1.0136 12.0670 100.0000 1er. N 1.1150 0.9123 1.030 1.000 0.025342072 AGUAYTIA 220.0 49040 N-AGUAYT 1.0 1 0.9800 6.6000 60.0000 1er. Y 1.1000 0.9000 1.050 0.950 0.010042082 CALLAHED 220.0 49000 N-CALLNC 1.0 1 1.0000 12.3548 85.0000 1er. Y 1.0500 0.8591 1.050 0.950 0.011942148 YANANGO 220.0 46150 YANANGO 10.0 1 1.0000 9.5240 50.0000 1er. Y 1.1250 0.8750 1.050 0.950 0.012542156 CHIMAY 220.0 49026 N-CHIMAY 1.0 1 1.0455 2.4007 168.0000 1er. N 1.3068 0.7841 1.250 1.000 0.261442204 PARAGSH2 220.0 49010 N-PARAG2 1.0 1 1.0300 6.3504 120.0000 1er. N 1.1000 0.9000 1.030 1.000 0.010044000 NUCONDOR 60.0 47002 NUCONDOR 10.0 1 1.0500 8.6000 12.0000 1er. N 1.0500 0.9500 1.030 1.000 0.025044002 LAPLANIC 60.0 47044 CIENEGU1 10.0 2 1.0369 9.9048 17.2000 2do. Y 1.0670 0.8064 1.050 0.950 0.010044002 LAPLANIC 60.0 47046 CIENEGU2 10.0 1 0.9712 10.2113 25.0000 1er. Y 1.0831 0.8406 1.050 0.950 0.009344004 SNMATEO1 60.0 49048 N-SMATEO 1.0 1 1.0333 11.9925 12.5000 1er. Y 1.1556 0.9111 1.050 0.950 0.009444006 SURCO 60.0 47054 SURCO 10.0 1 1.0163 6.6000 5.0000 1er. Y 1.1137 0.8196 1.050 0.950 0.016344008 CHOSICA 60.0 47056 CHOSICA 10.0 1 1.0163 8.5000 12.5000 1er. Y 1.1137 0.8196 1.050 0.950 0.016344010 JICAMARC 60.0 47062 JICAMARC 10.0 1 0.9619 9.8983 25.0000 1er. Y 1.0837 0.8400 1.050 0.950 0.009444010 JICAMARC 60.0 47062 JICAMARC 10.0 2 0.9619 9.4740 25.0000 1er. Y 1.0837 0.8400 1.050 0.950 0.009444012 CANTGRAN 60.0 47064 CANTGRAN 10.0 1 0.9712 9.4943 25.0000 1er. Y 1.0837 0.8400 1.050 0.950 0.009444012 CANTGRAN 60.0 47064 CANTGRAN 10.0 2 0.9712 9.7973 25.0000 1er. Y 1.0837 0.8400 1.050 0.950 0.009444014 SALAMAN2 60.0 47072 SALAMANC 10.0 2 0.9733 9.9790 25.0000 1er. Y 1.0671 0.8548 1.050 0.950 0.008244018 HUANCAVE 60.0 49038 N-HUANCV 1.0 1 1.0383 -0.7434 30.0000 1er. Y 1.0383 1.0383 1.050 0.950 0.000044020 HUAYUCA 60.0 49022 N-HUAYU1 1.0 1 1.0383 -0.8451 30.0000 1er. Y 1.0383 1.0383 1.050 0.950 0.000044020 HUAYUCA 60.0 49024 N-HUAYU2 1.0 2 1.0383 -0.7500 30.0000 1er. Y 1.0383 1.0383 1.050 0.950 0.000044022 HUAMPANI 60.0 46022 HUAMPANI 10.0 1 1.0481 7.7199 22.4000 1er. N 1.1825 0.9675 1.030 1.000 0.026944022 HUAMPANI 60.0 46022 HUAMPANI 10.0 2 1.0481 7.7199 22.4000 1er. N 1.1825 0.9675 1.030 1.000 0.026944024 SNMATEO2 60.0 47124 SANMATEO 50.0 1 1.0000 6.3000 1.5000 1er. N 1.0500 0.9500 1.030 1.000 0.025044026 PUCALLP1 60.0 46002 YARINACO 10.0 1 1.0000 7.9230 14.0000 1er. N 1.0750 0.9500 1.030 1.000 0.025044026 PUCALLP1 60.0 46002 YARINACO 10.0 2 1.0000 7.6720 14.0000 1er. N 1.1000 0.9000 1.030 1.000 0.012544030 JAUJA 60.0 49050 N-JAUJA 1.0 1 1.0000 8.4300 7.0000 1er. Y 1.0754 0.8579 1.050 0.950 0.012144032 CONCEPCI 60.0 49052 N-CONCEP 1.0 1 1.0000 10.2300 13.0000 1er. Y 1.1300 0.8700 1.050 0.950 0.010044034 P.INDUST 60.0 47300 P.INDUST 10.0 1 1.0000 11.7466 20.0000 1er. Y 1.1300 0.8700 1.050 0.950 0.010044036 SALESIAN 60.0 47302 SALESIAN 10.0 1 0.9667 10.2001 17.5000 1er. Y 1.1117 0.8217 1.050 0.950 0.014544038 PAMPAS 69.0 49032 N-PAMPAS 1.0 1 1.0000 12.4600 9.0000 1er. Y 1.0000 0.7391 1.050 0.950 0.010044040 COBRIZII 69.0 49036 N-COBRI2 1.0 1 0.8994 10.1270 26.0000 1er. Y 1.0500 0.7761 1.050 0.950 0.013744048 INGENIO 60.0 47342 INGENIO 22.9 1 1.0000 8.0000 12.5000 1er. N 1.0500 0.9500 1.030 1.000 0.025044052 PINDPUC 60.0 49042 N-PUCALY 1.0 1 1.0000 -11.7849 55.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000044052 PINDPUC 60.0 49058 N-PQIND 1.0 1 1.0000 12.1875 15.0000 1er. Y 1.1300 0.8700 1.050 0.950 0.010044054 AUCAYACU 60.0 49006 N-AUCYCU 1.0 1 1.0000 -0.2500 10.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000044072 MOYOPAMP 60.0 46062 MOYOPAM1 10.0 1 1.1590 8.2209 30.0000 1er. N 1.2192 1.1597 1.030 1.000 0.029744072 MOYOPAMP 60.0 46064 MOYOPAM2 10.0 2 1.1590 8.2209 30.0000 1er. N 1.2192 1.1597 1.030 1.000 0.029744072 MOYOPAMP 60.0 46066 MOYOPAM3 10.0 3 1.1590 8.2209 30.0000 1er. N 1.2192 1.1597 1.030 1.000 0.0297

Page 170: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag.50 de 65

Vn1 Vn2 ID Vn1/Vn2 Vcc Sn Lado Tap Tap Aut. Rmax Rmin Vmax Vmin Variac.# Nombre kV # Nombre kV pu % MVA Estrem. pu pu pu pu pu

Barra 2do. EstremoBarra 1er. EstremoTRANSFORMADORES

44074 COBRIZAI 69.0 49030 N-COBRI1 1.0 1 1.0000 -0.5565 50.0000 1er. N 1.0000 1.0000 1.030 1.000 0.000044076 PUENTE 60.0 47068 PUENTE1 10.0 1 0.9667 11.6000 40.0000 1er. Y 1.0886 0.8448 1.050 0.950 0.009044076 PUENTE 60.0 47070 PUENTE2 10.0 2 0.9708 9.8983 25.0000 1er. Y 1.0831 0.8406 1.050 0.950 0.009044076 PUENTE 60.0 47070 PUENTE2 10.0 3 0.9644 9.7973 25.0000 1er. Y 1.0664 0.8461 1.050 0.950 0.008244078 CALLAHU1 60.0 46082 CALLAHU1 6.5 1 1.0330 9.5001 17.1500 1er. N 1.0000 0.9670 1.030 1.000 0.033044078 CALLAHU1 60.0 46084 CALLAHU2 6.5 2 1.0330 9.5001 17.1500 1er. N 1.0330 0.9670 1.030 1.000 0.033044078 CALLAHU1 60.0 46086 CALLAHU3 6.5 3 1.0330 9.5001 17.1500 1er. N 1.0330 0.9670 1.030 1.000 0.033044080 SALAMAN1 60.0 47072 SALAMANC 10.0 1 0.9712 9.8388 25.0000 1er. Y 1.0831 0.8406 1.050 0.950 0.009344082 CALLAHU2 60.0 46088 CALLAHUA 8.0 4 1.0924 10.3000 44.1000 1er. N 1.1676 1.0924 1.030 1.000 0.037644082 CALLAHU2 60.0 49000 N-CALLNC 1.0 1 1.0409 -0.6052 85.0000 1er. Y 1.0409 1.0409 1.050 0.950 0.000044084 HUACHIPA 60.0 47028 HUACHIPA 10.0 1 0.9609 9.4120 17.2000 1er. N 1.0089 0.9129 1.030 1.000 0.024044086 ÑAÑA 60.0 47004 ÑAÑA 10.0 1 0.9780 9.3107 17.2000 1er. Y 1.0532 0.8692 1.050 0.950 0.008444092 OXAPAMPA 60.0 49054 N-OXAPAM 1.0 1 1.0000 -1.4750 10.0000 1er. N 1.0000 1.0000 1.030 1.000 0.000044110 S.CLARA 60.0 49044 N-SCLARA 1.0 1 0.9854 9.1500 25.0000 1er. Y 1.0886 0.8448 1.050 0.950 0.009444112 S.ANITA 60.0 49046 N-SANITA 1.0 1 0.9760 9.9000 40.0000 1er. Y 1.0886 0.8448 1.050 0.950 0.009444114 MONTERRI 60.0 49002 N-MONTRR 1.0 1 0.9667 15.9652 40.0000 1er. N 1.0886 0.8448 1.030 1.000 0.009444130 OROYANUE 69.0 47014 OROYANUE 50.0 1 0.9982 4.0000 12.5000 1er. N 1.1033 0.9982 1.030 1.000 0.026344132 CHUMPE 69.0 47134 CHUMPE 12.0 1 0.9710 8.9082 9.0000 1er. N 0.9710 0.8785 1.030 1.000 0.023144132 CHUMPE 69.0 47136 CHUMPE 2.4 2 0.9900 7.5812 3.7500 1er. N 0.9902 0.8892 1.030 1.000 0.025344138 TACNA 60.0 47058 TACNA 10.0 1 1.0000 9.3108 25.0000 1er. Y 1.0666 0.8456 1.050 0.950 0.009644138 TACNA 60.0 47058 TACNA 10.0 2 1.0000 9.2923 25.0000 1er. Y 1.0677 0.8464 1.050 0.950 0.009644138 TACNA 60.0 47058 TACNA 10.0 3 1.0000 9.8983 25.0000 1er. Y 1.0837 0.8400 1.050 0.950 0.009444148 TOCACHE 60.0 49004 N-TOCACH 1.0 1 1.0000 3.0760 7.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000044218 PUCALLP2 60.0 49060 N-PUCALL 1.0 1 1.0000 12.1875 15.0000 1er. Y 1.2430 0.9570 1.050 0.950 0.011046000 CHAPRIN 10.5 47222 CHAPRIN 50.0 1 1.0000 7.3600 3.3000 2do. N 1.0450 0.9550 1.030 1.000 0.022546000 CHAPRIN 10.5 47222 CHAPRIN 50.0 2 1.0000 7.4000 3.7500 2do. N 1.0450 0.9550 1.030 1.000 0.022546004 OROYA 2.3 47026 OROYA 50.0 1 0.9660 11.4841 11.0000 2do. N 0.9660 0.8740 1.030 1.000 0.023046006 NPLTOXIG 4.2 47312 COTRELL 50.0 1 0.9500 7.3500 5.0000 2do. N 1.0500 0.9500 1.030 1.000 0.025046016 MATUCAN1 12.5 49126 N-MATUCA 1.0 1 1.0000 11.2504 80.0000 1er. N 1.0000 1.0000 1.030 1.000 0.000046018 MATUCAN2 12.5 49126 N-MATUCA 1.0 1 1.0000 11.2504 80.0000 1er. N 1.0000 1.0000 1.030 1.000 0.000046020 MARCOPAM 4.2 49062 N-CHICRI 1.0 1 1.0000 -0.2700 3.0000 1er. N 1.0000 1.0000 1.030 1.000 0.000046024 YUNCAN1 13.8 49066 N-YUNCAN 1.0 1 1.0000 8.9122 72.0000 1er. N 1.0000 1.0000 1.030 1.000 0.000046026 YUNCAN2 13.8 49066 N-YUNCAN 1.0 1 1.0000 8.9122 72.0000 1er. N 1.0000 1.0000 1.030 1.000 0.000046032 MALPASO1 6.9 47030 MALPASO 50.0 1 1.0500 8.5400 17.0000 2do. N 1.0500 0.9500 1.030 1.000 0.050046034 MALPASO2 6.9 47030 MALPASO 50.0 2 1.0500 8.5899 17.0000 2do. N 1.0500 0.9500 1.030 1.000 0.025046036 MALPASO3 6.9 47030 MALPASO 50.0 3 1.0500 8.5400 17.0000 2do. N 1.0500 0.9500 1.030 1.000 0.050046038 MALPASO4 6.9 47030 MALPASO 50.0 4 1.0500 8.5400 17.0000 2do. N 1.0500 0.9500 1.030 1.000 0.025046058 PACHACHA 2.3 47010 PACHACHA 50.0 1 1.0000 11.8440 18.0000 2do. N 1.0500 0.9500 1.030 1.000 0.025046106 YAUPI2 13.8 49056 N-YAUPI 1.0 1 1.0000 2.1200 10.0000 1er. N 1.0000 1.0000 1.030 1.000 0.0000

Page 171: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag.51 de 65

Vn1 Vn2 ID Vn1/Vn2 Vcc Sn Lado Tap Tap Aut. Rmax Rmin Vmax Vmin Variac.# Nombre kV # Nombre kV pu % MVA Estrem. pu pu pu pu pu

Barra 2do. EstremoBarra 1er. EstremoTRANSFORMADORES

46158 CHIMAY1 13.8 49026 N-CHIMAY 1.0 1 1.0000 10.4000 84.0000 1er. N 1.0000 1.0000 1.030 1.000 0.000046160 CHIMAY2 13.8 49026 N-CHIMAY 1.0 1 1.0000 10.4000 84.0000 1er. N 1.0000 1.0000 1.030 1.000 0.000046212 HUANCHOR 10.0 47210 HUANCHOR 50.0 1 1.0000 8.5000 10.2000 2do. N 1.0500 0.9500 1.030 1.000 0.025046212 HUANCHOR 10.0 47210 HUANCHOR 50.0 2 1.0000 8.5000 10.2000 2do. N 1.0520 0.9480 1.030 1.000 0.026047012 PLANTZIN 50.0 47286 PLANTZN1 11.0 1 1.0000 12.6120 30.0000 1er. N 1.0500 0.9500 1.030 1.000 0.025047012 PLANTZIN 50.0 47288 PLANTZN2 11.0 2 1.0000 12.6120 30.0000 1er. N 1.0500 0.9500 1.030 1.000 0.025047012 PLANTZIN 50.0 47290 PLANTZN3 11.0 3 1.0000 12.6120 30.0000 1er. N 1.0500 0.9500 1.030 1.000 0.025047014 OROYANUE 50.0 49016 N-OROYAN 1.0 1 1.0000 -1.5750 100.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000047014 OROYANUE 50.0 49018 N-OROYN1 1.0 1 0.9600 2.7501 30.0000 1er. N 1.0080 0.9600 1.100 1.000 0.048047014 OROYANUE 50.0 49020 N-OROYN2 1.0 2 0.9600 2.4849 30.0000 1er. N 1.0080 0.9120 1.100 1.000 0.048047018 S.CLARA 10.0 49044 N-SCLARA 1.0 1 1.0000 1.7400 10.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000047020 S.CLARA 23.0 49044 N-SCLARA 1.0 1 0.9957 -0.6500 25.0000 1er. Y 0.9957 0.9957 1.050 0.950 0.000047022 S.ANITA 10.0 49046 N-SANITA 1.0 1 1.0000 0.9500 20.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000047024 S.ANITA 23.0 49046 N-SANITA 1.0 1 0.9957 1.0500 30.0000 1er. Y 0.9957 0.9957 1.050 0.950 0.000047026 OROYA 50.0 47344 OROYA2 2.3 1 1.0063 7.7308 3.7500 1er. N 1.0063 0.9104 1.030 1.000 0.024047032 CARHUAMA 50.0 49014 N-CARMY1 1.0 1 0.9600 2.6649 30.0000 1er. N 1.0080 0.9120 1.100 1.000 0.048047036 EXCELSIO 50.0 47268 EXCELSI1 2.4 1 0.9912 5.0540 3.0000 1er. N 1.0360 0.9464 1.030 1.000 0.025047036 EXCELSIO 50.0 47270 EXCELSI2 2.4 3 0.9660 6.4000 1.5000 1er. N 0.9660 0.8740 1.030 0.950 0.025047036 EXCELSIO 50.0 47086 CASAPIED 12.0 2 0.9200 7.5000 10.0000 1er. N 0.9200 0.8324 1.030 1.000 0.010047040 PARAGSH1 50.0 49220 N-PARAG1 1.0 1 0.9600 -1.6825 35.0000 1er. N 1.0080 0.9120 1.050 1.000 0.023047042 PARAGSH1 12.0 49220 N-PARAG1 1.0 1 1.0500 8.1352 44.0000 1er. N 1.0500 1.0500 1.030 0.950 0.010047048 CALLAHUA 10.0 49000 N-CALLNC 1.0 1 1.0000 1.8296 28.3000 1er. Y 1.0000 1.0000 1.050 1.000 0.000047050 SANMATEO 10.0 49048 N-SMATEO 1.0 1 1.0000 0.4175 4.2000 1er. Y 1.0000 1.0000 1.050 1.000 0.025047052 SANMATEO 23.0 49048 N-SMATEO 1.0 1 0.9957 4.1250 12.5000 1er. Y 0.9957 0.9957 1.050 1.000 0.025047060 CURIPATA 50.0 47292 CURIPATA 10.0 1 1.0000 7.5000 6.0000 1er. N 1.0500 0.9500 1.030 1.000 0.010047074 MONTERRI 10.0 49002 N-MONTRR 1.0 1 1.0000 -2.3700 20.0000 1er. N 1.0000 1.0000 1.030 1.000 0.011247078 SANJUAN 50.0 47080 SANJUAN 2.4 1 0.9452 5.6093 1.5000 1er. N 1.0548 0.9452 1.030 1.000 0.025047078 SANJUAN 50.0 47082 SANJUAN 11.0 2 0.9500 9.9600 15.0000 1er. N 1.0000 0.9000 1.030 1.000 0.023847100 MOROCOCH 50.0 47106 MOROCOCH 2.4 1 0.9750 6.9586 6.0000 1er. N 1.0725 0.8288 1.030 1.000 0.023947108 CASPNO1 50.0 47112 CASAPNOR 4.2 1 0.9527 4.4997 2.5000 1er. N 0.9527 0.8661 1.030 0.950 0.000047118 ANTUQUIT 50.0 47120 ANTUQUIT 2.4 1 0.9527 4.3557 3.0000 1er. N 0.9527 0.8661 1.030 0.950 0.000047144 MONTERRI 23.0 49002 N-MONTRR 1.0 1 0.9957 5.6300 30.0000 1er. N 0.9957 0.9957 1.030 0.950 0.012547150 HUANUCO 10.0 49008 N-HUANUC 1.0 1 1.0500 4.6102 21.7000 1er. Y 1.0500 1.0500 1.050 0.950 0.000047156 PARAGSH2 10.0 49010 N-PARAG2 1.0 1 1.0000 1.3832 40.0000 1er. N 1.0000 1.0000 1.030 1.000 0.025047158 TINGMARI 10.0 49012 N-TINGMA 1.0 1 1.0000 -0.9600 0.3800 1er. Y 1.0000 1.0000 1.050 1.000 0.000047160 CARHUAMA 11.0 49014 N-CARMY1 1.0 1 1.0000 2.6411 6.5700 1er. N 1.0000 1.0000 1.030 0.950 0.024947162 OROYANUE 13.8 49016 N-OROYAN 1.0 1 1.0000 2.8958 33.0000 1er. Y 1.0000 1.0000 1.050 1.000 0.025047164 OROYANU1 11.0 49018 N-OROYN1 1.0 1 1.0000 2.7676 6.5700 1er. N 1.0000 1.0000 1.030 0.950 0.025047166 OROYANU2 11.0 49020 N-OROYN2 1.0 2 1.0000 2.7533 6.5700 1er. N 1.0000 1.0000 1.030 0.950 0.0264

Page 172: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag.52 de 65

Vn1 Vn2 ID Vn1/Vn2 Vcc Sn Lado Tap Tap Aut. Rmax Rmin Vmax Vmin Variac.# Nombre kV # Nombre kV pu % MVA Estrem. pu pu pu pu pu

Barra 2do. EstremoBarra 1er. EstremoTRANSFORMADORES

47168 HUAYUCA1 10.3 49022 N-HUAYU1 1.0 1 1.0000 1.7817 10.0000 1er. Y 1.0000 1.0000 1.050 1.000 0.025047172 ANDAYCHA 50.0 47174 ANDAYCHA 4.2 1 0.9660 6.6188 10.0000 1er. N 1.0120 0.8280 1.030 1.000 0.010047178 SANCRIST 50.0 47180 SANCRIST 4.2 1 0.9094 4.4684 3.0000 1er. N 0.9094 0.8268 1.030 1.000 0.020447178 SANCRIST 50.0 47284 SANCRIST 2.4 2 0.9200 5.9000 3.7500 1er. N 1.0028 0.8372 1.030 0.950 0.012547184 SANANTON 50.0 47186 SANANTON 4.2 1 0.9198 6.5000 1.5000 1er. N 0.9198 0.8322 1.030 0.950 0.012547192 MAHRTUNE 50.0 47194 MAHRTUNE 2.4 1 0.9600 7.8336 6.0000 1er. Y 1.0560 0.8640 1.050 1.000 0.025047200 AUCAYACU 22.9 49006 N-AUCYCU 1.0 1 1.0000 3.8990 8.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.012247202 TOCACHE 10.0 49004 N-TOCACH 1.0 1 1.0000 2.2300 2.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.023947208 HUANUCO 24.0 49008 N-HUANUC 1.0 1 1.0000 -0.0535 8.3000 1er. Y 1.0000 1.0000 1.050 1.000 0.025047224 MINATACO 50.0 47274 MINATAC2 4.2 2 0.9240 5.8469 2.0100 1er. N 0.9702 0.8778 1.030 1.000 0.025047224 MINATACO 50.0 47272 MINATAC1 0.5 1 0.9480 5.9460 1.5000 1er. N 0.9954 0.9006 1.030 0.950 0.009647226 HUAYUCA2 10.3 49024 N-HUAYU2 1.0 2 1.0000 1.7817 10.0000 1er. Y 1.0000 1.0000 1.050 1.000 0.025047234 COBRIZAI 10.0 49030 N-COBRI1 1.0 1 1.0000 3.5860 16.7000 1er. N 1.0000 1.0000 1.030 1.000 0.025047236 PAMPAS 10.0 49032 N-PAMPAS 1.0 1 1.0000 2.7161 2.5000 1er. Y 1.0000 1.0000 1.050 0.950 0.026447238 PAMPAS 22.9 49032 N-PAMPAS 1.0 1 1.0000 -1.6779 9.0000 1er. Y 1.0000 1.0000 1.050 1.000 0.004847254 HUANCAVE 10.0 49038 N-HUANCV 1.0 1 1.0300 1.9200 10.0000 1er. Y 1.0300 1.0300 1.050 1.000 0.025047276 CASADFUE 50.0 47278 CASADFU1 2.4 1 0.9600 8.2944 7.5000 1er. N 1.0080 0.9120 1.030 0.950 0.000047276 CASADFUE 50.0 47280 CASADFU2 2.4 2 0.9600 8.2944 7.5000 1er. N 1.0080 0.9120 1.030 1.000 0.025047276 CASADFUE 50.0 47282 CASADFU3 2.4 3 0.9600 8.2944 7.5000 1er. N 1.0080 0.9120 1.030 0.950 0.025047296 AGUAYTIA 22.9 49040 N-AGUAYT 1.0 1 1.0000 1.2000 20.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.025047298 PUCALLPA 10.0 49042 N-PUCALY 1.0 1 1.0000 13.0581 18.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000047304 JAUJA 13.2 49050 N-JAUJA 1.0 1 1.0530 -0.4300 7.0000 1er. Y 1.0530 1.0530 1.050 1.000 0.025047306 CONCEPCI 13.2 49052 N-CONCEP 1.0 1 1.0000 5.1045 13.0000 1er. Y 1.0000 1.0000 1.050 1.000 0.025047308 JAUJA 10.0 49050 N-JAUJA 1.0 1 1.0750 1.5857 3.0000 1er. Y 1.0750 1.0750 1.050 1.000 0.025047310 CONCEPCI 6.0 49052 N-CONCEP 1.0 1 1.0000 -0.7433 5.0000 1er. Y 1.0000 1.0000 1.050 1.000 0.025047338 OXAPAMPA 22.9 49054 N-OXAPAM 1.0 1 1.0000 3.4440 8.0000 1er. N 1.0000 1.0000 1.030 1.000 0.021647340 YAUPI 22.9 49056 N-YAUPI 1.0 1 1.0000 -0.2000 25.0000 1er. N 1.0000 1.0000 1.030 1.000 0.034851002 CYPRUS 138.0 56012 CYPRUS 10.0 2 1.0000 9.0001 21.6000 1er. N 1.1000 0.9000 1.030 0.950 0.025051002 CYPRUS 138.0 56012 CYPRUS 10.0 1 1.0000 9.9999 30.0000 1er. N 1.1000 0.9000 1.030 0.950 0.025051004 MILLSITE 138.0 57002 MILLSIT2 13.8 2 0.9750 10.5999 33.0000 1er. N 1.0500 0.9500 1.030 1.000 0.022851004 MILLSITE 138.0 57170 MILLSIT1 13.8 1 0.9750 10.5999 33.0000 1er. N 1.0500 0.9500 1.030 1.000 0.022851006 BOTIFLAC 138.0 54008 BOTIFLAC 69.0 1 1.0000 9.5400 15.0000 1er. N 1.0250 0.9250 1.030 1.000 0.025051006 BOTIFLAC 138.0 54008 BOTIFLAC 69.0 2 1.0000 9.5400 15.0000 1er. N 1.0250 0.9250 1.030 1.000 0.026151006 BOTIFLAC 138.0 59116 N-BOTIF1 1.0 1 0.9500 16.7498 58.0000 1er. N 1.0500 0.9500 1.050 1.000 0.000051006 BOTIFLAC 138.0 59118 N-BOTIF2 1.0 2 0.9500 16.7498 58.0000 1er. N 1.0500 0.9500 1.050 1.000 0.000051006 BOTIFLAC 138.0 59122 N-BOTIF3 1.0 3 0.9500 21.7999 58.0000 1er. N 1.0500 0.9500 1.050 1.000 0.000051010 LIXIVIAC 138.0 57130 LIXIVIAC 13.8 1 0.9750 8.0001 30.0000 1er. N 1.0500 0.9500 1.030 0.950 0.010051018 ILO1 138.0 56114 ILOTV1 13.8 1 1.0000 10.0000 33.0000 1er. N 1.0450 0.9100 1.030 0.950 0.025051018 ILO1 138.0 56116 ILOTV2 13.8 2 1.0000 10.0000 33.0000 1er. N 1.0450 0.9100 1.030 1.000 0.0375

Page 173: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag.53 de 65

Vn1 Vn2 ID Vn1/Vn2 Vcc Sn Lado Tap Tap Aut. Rmax Rmin Vmax Vmin Variac.# Nombre kV # Nombre kV pu % MVA Estrem. pu pu pu pu pu

Barra 2do. EstremoBarra 1er. EstremoTRANSFORMADORES

51018 ILO1 138.0 56124 ILOTG2 13.8 2 1.0043 10.4301 135.0000 1er. N 1.0043 0.9087 1.030 1.000 0.037551018 ILO1 138.0 56122 ILOTG1 13.8 1 1.0455 11.5301 48.0000 1er. N 1.1500 0.9409 1.030 0.950 0.000051018 ILO1 138.0 56120 ILOTV4 13.8 4 1.0000 11.7201 70.0000 1er. N 1.0500 0.9500 1.030 1.000 0.000051018 ILO1 138.0 56118 ILOTV3 13.8 3 1.0000 12.5001 70.0000 1er. N 1.0500 0.9500 1.030 1.000 0.000051020 ILOELECT 138.0 57088 ILOELEC2 10.5 2 1.0000 9.6900 6.0000 1er. N 1.0500 0.9500 1.030 0.950 0.025051020 ILOELECT 138.0 57144 ILOELEC1 10.5 1 1.0000 9.6900 6.0000 1er. N 1.0500 0.9500 1.030 0.950 0.025051022 REFILO2 138.0 57146 REFILO2 10.5 2 1.0000 8.8658 22.4000 1er. N 1.0500 0.9500 1.030 0.950 0.000051026 ARICOTA 138.0 59114 N-ARICOT 1.0 1 1.0000 3.8301 30.0000 1er. N 1.0000 1.0000 1.030 1.000 0.025051046 MOLLENDO 138.0 59016 N-MOLLEN 1.0 1 1.0000 5.8200 15.0000 1er. Y 1.0809 0.8322 1.050 0.950 0.011951046 MOLLENDO 138.0 56048 MOLLENGD 13.8 3 1.0000 10.0000 40.0000 1er. N 1.0500 0.9500 1.030 1.000 0.037551046 MOLLENDO 138.0 56050 MOLLETG1 13.8 1 1.0000 12.0000 50.0000 1er. Y 1.1000 0.9000 1.050 1.000 0.000051046 MOLLENDO 138.0 56052 MOLLETG2 13.8 2 1.0000 12.0000 50.0000 1er. Y 1.1000 0.9000 1.050 0.950 0.000051058 SOCABAYA 138.0 59002 N-SOCAB1 1.0 1 1.0000 11.2500 150.0000 1er. Y 1.1000 0.9000 1.050 0.950 0.000051058 SOCABAYA 138.0 59004 N-SOCAB2 1.0 2 1.0000 11.2500 150.0000 1er. Y 1.1000 0.9000 1.050 0.950 0.000051058 SOCABAYA 138.0 57060 SOCABAYA 33.0 1 0.9767 16.7568 60.0000 1er. Y 1.0225 0.8366 1.050 0.950 0.000051058 SOCABAYA 138.0 57060 SOCABAYA 33.0 2 0.9767 16.7568 60.0000 1er. Y 1.0225 0.8366 1.050 0.950 0.000051062 SANTUAR 138.0 56134 CHARCAV1 13.8 1 1.0290 13.9975 57.0000 1er. N 1.0804 0.9775 1.030 0.950 0.000051062 SANTUAR 138.0 56136 CHARCAV2 13.8 2 1.0290 13.9975 57.0000 1er. N 1.0804 0.9775 1.030 0.950 0.000051062 SANTUAR 138.0 56138 CHARCAV3 13.8 3 1.0290 13.9975 57.0000 1er. N 1.0804 0.9775 1.030 0.950 0.000051070 MOQUEGUA 138.0 59006 N-MOQUE1 1.0 1 1.0000 -0.7710 300.0000 1er. Y 1.0000 1.0000 1.050 1.000 0.027451070 MOQUEGUA 138.0 59008 N-MOQUE2 1.0 2 1.0000 -0.7710 300.0000 1er. Y 1.0000 1.0000 1.050 1.000 0.025051084 QUEBHOND 138.0 57086 QUEBHOND 13.8 1 1.0000 7.2500 7.5000 1er. N 1.0500 0.9500 1.030 0.950 0.000051090 PUSHBACK 138.0 54092 PUSHBACK 69.0 1 1.0000 4.2000 14.0000 1er. N 1.0500 0.9500 1.030 0.950 0.000051144 CHILINA 138.0 57156 CHILINA1 33.0 1 1.0000 10.8600 60.0000 1er. Y 1.0806 0.7785 1.050 1.000 0.022852072 ILO2 220.0 56106 ILO2 17.0 1 1.0000 12.0007 169.0000 1er. Y 1.1250 0.8750 1.050 1.000 0.000052076 MOQUEGUA 220.0 59006 N-MOQUE1 1.0 1 1.0150 14.3310 300.0000 1er. Y 1.1950 0.8950 1.050 0.950 0.000052076 MOQUEGUA 220.0 59008 N-MOQUE2 1.0 2 1.0150 14.3310 300.0000 1er. Y 1.1950 0.8950 1.050 0.950 0.000052078 L.HEROES 220.0 59010 N-LHEROE 1.0 1 1.0000 14.4000 50.0000 1er. Y 1.0000 1.0000 1.050 1.000 0.025052090 SOCABAYA 220.0 59002 N-SOCAB1 1.0 1 1.0000 11.2500 150.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000052090 SOCABAYA 220.0 59004 N-SOCAB2 1.0 2 1.0000 11.2500 150.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000052098 PUNO 220.0 59120 N-PUNO 1.0 1 1.0000 12.9096 120.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000054002 MOLLENDO 60.0 59016 N-MOLLEN 1.0 1 1.0000 0.2667 10.0000 1er. Y 1.0000 1.0000 1.050 1.000 0.025054030 ARICOTA2 66.0 59114 N-ARICOT 1.0 1 1.0000 3.8301 30.0000 1er. N 1.0454 0.9546 1.050 0.950 0.012254036 TOMASIRI 66.0 57108 TOMASIRI 10.5 1 1.0000 7.3900 3.0000 1er. N 1.0500 0.9500 1.030 1.000 0.025054038 TACNA 66.0 57124 TACNA4 10.5 4 1.0000 3.9000 6.0000 1er. N 1.1362 0.8638 1.030 1.000 0.013654038 TACNA 66.0 57118 TACNA1 10.5 3 1.0454 7.5200 6.0000 1er. N 1.1362 0.8638 1.030 0.950 0.000054038 TACNA 66.0 57120 TACNA2 10.5 2 1.0000 9.4600 3.7500 1er. N 1.1362 0.8638 1.030 1.000 0.050054038 TACNA 66.0 57122 TACNA3 10.5 1 1.0063 9.4800 6.0000 1er. N 1.0063 0.8695 1.030 1.000 0.050054040 PAINDTAC 66.0 57116 PAINDTAC 10.5 1 1.0000 7.1837 6.0000 1er. Y 1.0500 0.9500 1.050 0.950 0.0250

Page 174: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag.54 de 65

Vn1 Vn2 ID Vn1/Vn2 Vcc Sn Lado Tap Tap Aut. Rmax Rmin Vmax Vmin Variac.# Nombre kV # Nombre kV pu % MVA Estrem. pu pu pu pu pu

Barra 2do. EstremoBarra 1er. EstremoTRANSFORMADORES

54042 CALANA 66.0 56046 CALANA4 10.5 2 1.0000 9.6600 24.0000 1er. N 1.0500 0.9500 1.030 1.000 0.025054042 CALANA 66.0 56044 CALAN123 10.5 1 1.0000 9.9600 24.0000 1er. N 1.0500 0.9500 1.030 1.000 0.025054050 SARITA 66.0 57070 SARITA 33.0 1 1.0000 6.0000 2.0000 1er. N 1.0500 0.9500 1.030 1.000 0.025054104 LAYARADA 66.0 57128 LAYARAD2 10.5 2 1.0000 6.9000 4.0000 1er. N 1.0500 0.9500 1.030 1.000 0.023954104 LAYARADA 66.0 57126 LAYARAD1 10.5 1 1.0000 7.4000 3.0000 1er. N 1.0500 0.9500 1.030 0.950 0.000054108 L.HEROES 66.0 59010 N-LHEROE 1.0 1 1.0200 -1.6000 50.0000 1er. Y 1.0700 0.9300 1.050 1.000 0.000056028 ARICOTA2 11.0 59114 N-ARICOT 1.0 1 0.9545 4.7517 14.1000 1er. N 0.9545 0.9545 1.030 1.000 0.013656034 ARICOTA1 11.0 57058 ARICOTA1 10.5 1 1.0023 6.0000 2.1000 1er. N 1.0023 0.9068 1.030 1.000 0.025056034 ARICOTA1 11.0 57062 ESTSERVI 0.4 1 1.0023 6.0500 0.2000 1er. Y 1.0023 0.9068 1.050 1.000 0.025056034 ARICOTA1 11.0 57062 ESTSERVI 0.4 2 1.0023 6.0500 0.2000 1er. Y 1.0023 0.9068 1.050 1.000 0.025057006 S.LAZARO 33.0 57010 S.LAZARO 10.0 1 1.0000 9.3000 25.0000 1er. N 1.0500 0.9500 1.030 1.000 0.025057034 JESUS1 33.0 57036 JESUS 10.0 1 0.9761 12.7785 25.0000 1er. N 1.0982 0.8540 1.030 0.510 0.006357046 MOLLENDO 33.0 59016 N-MOLLEN 1.0 1 1.0000 0.9920 8.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.010057050 CHARCANI 33.0 57164 CHARC123 5.3 1 1.0182 5.2871 11.5000 1er. N 1.0589 0.9775 1.030 1.000 0.025057064 L.HEROES 10.5 59010 N-LHEROE 1.0 1 1.0000 1.8200 10.0000 1er. Y 1.0000 1.0000 1.050 1.000 0.000057094 MOQUEGU1 10.0 59006 N-MOQUE1 1.0 1 1.0000 5.5450 50.0000 1er. Y 1.0000 1.0000 1.050 0.970 0.012557098 MOQUEGU2 10.0 59008 N-MOQUE2 1.0 2 1.0000 5.5450 50.0000 1er. Y 1.0000 1.0000 1.050 1.000 0.025057148 SOCABAY2 10.0 59002 N-SOCAB1 1.0 1 1.0500 2.8299 30.0000 1er. Y 1.0500 1.0500 1.050 0.510 0.006357150 SOCABAY3 10.0 59004 N-SOCAB2 1.0 2 1.0500 2.8299 30.0000 1er. Y 1.0500 1.0500 1.050 0.510 0.006357156 CHILINA1 33.0 57168 CHILINA2 10.0 2 0.9761 6.2000 10.0000 1er. N 1.0982 0.8540 1.030 1.000 0.025057156 CHILINA1 33.0 57166 CHILINA1 10.0 1 0.9743 8.1000 10.0000 1er. N 0.9516 0.8610 1.030 0.950 0.010061000 JULIACA 138.0 69154 N-JULIAC 1.0 1 1.0000 14.4024 40.0000 1er. Y 1.1000 0.9000 1.050 0.950 0.000061020 DOLORESP 138.0 66138 DOLORESP 11.5 1 1.0000 9.7000 12.2000 1er. N 1.0500 0.9500 1.030 1.000 0.025061020 DOLORESP 138.0 66138 DOLORESP 11.5 2 1.0000 9.7000 12.2000 1er. N 1.0500 0.9500 1.030 1.000 0.025061020 DOLORESP 138.0 66138 DOLORESP 11.5 3 1.0000 9.7000 12.2000 1er. N 1.0500 0.9500 1.030 1.000 0.023861026 QUENCORO 138.0 67122 QUENCOPM 33.0 1 1.0000 8.0000 8.0000 1er. N 1.0500 0.9500 1.030 0.950 0.012561026 QUENCORO 138.0 69158 N-QUENCO 1.0 1 0.9750 10.4800 10.0000 1er. Y 1.1000 0.9000 1.050 1.000 0.037561030 COMBAPAT 138.0 69156 N-COMBAP 1.0 1 1.0000 12.5651 15.0000 1er. N 1.0750 0.9250 1.050 1.000 0.000061034 TINTAYA 138.0 67076 TINTAYA1 10.0 1 0.9524 12.1276 20.0000 1er. Y 1.0476 0.8571 1.050 0.510 0.006361034 TINTAYA 138.0 67072 TINTASVC 10.5 1 1.0000 12.6400 25.0000 1er. N 1.1000 0.9000 1.030 1.000 0.000061034 TINTAYA 138.0 67074 TINTAPOX 10.0 1 1.0000 13.3320 33.3300 1er. Y 1.1000 0.9000 1.050 0.950 0.000061036 AYAVIRI 138.0 69164 N-AYAVIR 1.0 1 1.0000 10.1950 6.5000 1er. N 1.0500 0.9500 1.050 1.000 0.037561040 AZANGARO 138.0 69166 N-AZANGA 1.0 1 1.0000 13.4800 12.0000 1er. Y 1.1000 0.9000 1.050 0.950 0.000061088 CACHIELP 138.0 69004 N-CACHI1 1.0 1 1.0000 8.9200 20.0000 1er. Y 1.0809 0.8322 1.050 0.950 0.025061088 CACHIELP 138.0 69006 N-CACHI2 1.0 1 1.0000 12.0000 6.0000 1er. N 1.0500 0.9500 1.050 0.510 0.006361092 SANGABAN 138.0 66094 SANGAB1 13.8 1 1.0000 11.0000 65.0000 1er. N 1.0500 0.9500 1.030 1.000 0.022861092 SANGABAN 138.0 66096 SANGAB2 13.8 2 1.0000 11.0000 65.0000 1er. N 1.0500 0.9500 1.030 1.000 0.022861104 MACHUPIC 138.0 69160 N-MACHUP 1.0 1 1.0000 3.5300 7.0000 1er. Y 1.0500 0.9500 1.050 1.000 0.020461104 MACHUPIC 138.0 66126 MACHUPI1 13.8 1 1.0000 11.0001 33.5000 1er. N 1.0500 0.9500 1.030 0.510 0.0063

Page 175: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag.55 de 65

Vn1 Vn2 ID Vn1/Vn2 Vcc Sn Lado Tap Tap Aut. Rmax Rmin Vmax Vmin Variac.# Nombre kV # Nombre kV pu % MVA Estrem. pu pu pu pu pu

Barra 2do. EstremoBarra 1er. EstremoTRANSFORMADORES

61104 MACHUPIC 138.0 66128 MACHUPI2 13.8 2 1.0000 11.0001 33.5000 1er. N 1.0500 0.9500 1.030 1.000 0.026161104 MACHUPIC 138.0 66130 MACHUPI3 13.8 3 1.0000 11.0001 33.5000 1er. N 1.0500 0.9500 1.030 0.510 0.006361108 CALLALLI 138.0 69162 N-CALLAL 1.0 1 0.9898 -1.0800 30.0000 1er. Y 1.1000 0.9000 1.050 0.950 0.000061120 PUNO 138.0 69020 N-PUNO 1.0 1 0.9500 7.6500 18.0000 1er. Y 1.1000 0.9000 1.050 0.950 0.010061130 SANRAFAE 138.0 67114 SANRAFAE 10.0 1 1.0000 7.2000 24.0000 1er. N 1.1000 0.9000 1.030 1.000 0.025061132 CACHIMAY 138.0 67140 YURACAC1 6.9 1 0.9804 12.1500 20.0000 1er. N 1.0043 0.9087 1.030 0.950 0.000061132 CACHIMAY 138.0 67142 YURACAC2 6.9 2 0.9804 12.1500 20.0000 1er. N 1.0043 0.9087 1.030 1.000 0.000061138 ABANCAY 138.0 69008 N-ABANCA 1.0 1 1.0000 7.1200 25.0000 1er. Y 1.1000 0.9000 1.050 0.950 0.012564000 HUANCARA 66.0 67118 HUANCARA 22.0 1 0.9394 6.6185 8.0000 1er. Y 1.0216 0.8220 1.050 0.950 0.012564002 JULIACA 60.0 69154 N-JULIAC 1.0 1 1.0000 -1.2976 40.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000064002 JULIACA 60.0 67010 JULIACA 10.5 1 1.0000 8.6000 12.0000 1er. N 1.0500 0.9500 1.030 0.950 0.000064006 BELLAVIS 60.0 66012 BELLAVIS 10.0 1 1.0000 8.6000 12.0000 1er. N 1.0500 0.9500 1.030 0.950 0.000064008 ABANCAY 60.0 69008 N-ABANCA 1.0 1 1.0000 -0.1920 15.0000 1er. Y 1.0000 1.0000 1.050 1.000 0.025064016 CACHIMAY 60.0 69004 N-CACHI1 1.0 1 1.0000 -0.4134 20.0000 1er. Y 1.0000 1.0000 1.050 1.000 0.037764022 CAYLLOMA 66.0 67080 CAYLLOMA 15.0 1 1.0000 5.1713 3.0000 1er. N 1.0500 0.9500 1.030 1.000 0.025064024 ARES 66.0 69016 N-ARES 1.0 1 0.9500 -3.3000 12.0000 1er. Y 1.1000 0.9000 1.050 1.000 0.021964028 POMATA 60.0 69024 N-POMATA 1.0 1 1.0000 12.1500 9.0000 1er. Y 1.1000 0.9000 1.050 1.000 0.000064032 COMBAPAT 66.0 69156 N-COMBAP 1.0 1 1.0000 0.1377 7.0000 1er. N 1.0000 1.0000 1.030 1.000 0.025064042 AZANGARO 60.0 69166 N-AZANGA 1.0 1 1.0000 -1.0400 12.0000 1er. Y 1.0000 1.0000 1.050 1.000 0.025064112 SANRAFAE 60.0 67114 SANRAFAE 10.0 1 1.0000 4.6000 20.0000 1er. Y 1.0500 0.9500 1.050 0.950 0.000064126 MACHUPIC 60.0 69160 N-MACHUP 1.0 1 1.0000 3.5300 7.0000 1er. Y 1.0000 1.0000 1.050 1.000 0.020464144 PUNO 60.0 69020 N-PUNO 1.0 1 1.0000 7.6500 18.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.010064150 CALLALLI 66.0 69162 N-CALLAL 1.0 1 1.0000 16.5600 30.0000 1er. Y 1.0000 1.0000 1.050 1.000 0.023866012 BELLAVIS 10.0 66016 BELLAVID 4.2 1 1.0000 2.3000 3.5000 1er. Y 1.0500 0.9500 1.050 0.950 0.019966012 BELLAVIS 10.0 66014 BELLALCO 4.2 1 1.0000 4.7000 2.3000 1er. Y 1.0500 0.9500 1.050 1.000 0.022766028 TAPARACH 10.5 66030 TAPARSKD 2.4 1 1.0000 4.5352 1.0000 1er. N 1.0000 0.9048 1.030 0.950 0.000066138 DOLORESP 11.5 66140 DOLOALCO 4.2 1 0.9587 4.4183 3.0000 1er. N 0.9587 0.8674 1.030 0.950 0.000066138 DOLORESP 11.5 66140 DOLOALCO 4.2 2 0.9587 4.4183 3.0000 1er. N 0.9587 0.8674 1.030 0.950 0.000066138 DOLORESP 11.5 66142 DOLOGM 4.2 3 0.9587 4.7518 3.0000 1er. N 0.9587 0.8674 1.030 0.950 0.010066138 DOLORESP 11.5 66142 DOLOGM 4.2 1 0.9587 4.8352 3.0000 1er. N 0.9587 0.8674 1.030 0.950 0.000066138 DOLORESP 11.5 66142 DOLOGM 4.2 2 0.9587 4.8352 3.0000 1er. N 0.9587 0.8674 1.030 0.950 0.012567028 QUENCORO 34.5 69158 N-QUENCO 1.0 1 1.0000 1.4550 3.0000 1er. Y 1.0000 1.0000 1.050 1.000 0.025067032 CACHIMAY 22.9 69004 N-CACHI1 1.0 1 1.0000 2.5260 9.0000 1er. Y 1.0000 1.0000 1.050 1.000 0.020067036 ABANCAY 13.2 69008 N-ABANCA 1.0 1 1.0000 1.6512 12.0000 1er. Y 1.0000 1.0000 1.050 1.000 0.000067038 AYAVIRI 22.9 69164 N-AYAVIR 1.0 1 1.0000 1.8750 6.5000 1er. N 1.0000 1.0000 1.030 1.000 0.025067044 AZANGARO 22.9 69166 N-AZANGA 1.0 1 1.0000 3.1417 5.0000 1er. Y 1.0000 1.0000 1.050 1.000 0.025067046 COMBAPAT 24.0 69156 N-COMBAP 1.0 1 1.0000 3.5014 8.0000 1er. N 1.0000 1.0000 1.030 1.000 0.020467048 QUENCORO 10.5 69158 N-QUENCO 1.0 1 1.0000 -0.2660 7.0000 1er. Y 1.0000 1.0000 1.050 1.000 0.025067078 CALLALLI 24.0 69162 N-CALLAL 1.0 1 1.0000 1.9800 9.0000 1er. Y 1.0000 1.0000 1.050 1.000 0.0239

Page 176: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag.56 de 65

Vn1 Vn2 ID Vn1/Vn2 Vcc Sn Lado Tap Tap Aut. Rmax Rmin Vmax Vmin Variac.# Nombre kV # Nombre kV pu % MVA Estrem. pu pu pu pu pu

Barra 2do. EstremoBarra 1er. EstremoTRANSFORMADORES

67082 ARES 4.2 69016 N-ARES 1.0 1 1.0000 3.7333 7.0000 1er. Y 1.0000 1.0000 1.050 1.000 0.025067084 ARES 33.0 69016 N-ARES 1.0 1 1.0000 4.6667 5.0000 1er. Y 1.0000 1.0000 1.050 0.950 0.000067092 JULIACA 10.0 69154 N-JULIAC 1.0 1 1.0000 1.9744 10.0000 1er. Y 1.0000 1.0000 1.050 1.000 0.000067108 POMATA 10.0 69024 N-POMATA 1.0 1 1.0000 2.0179 2.5000 1er. Y 1.0000 1.0000 1.050 0.950 0.023967110 POMATA 23.0 69024 N-POMATA 1.0 1 0.9957 -0.9643 9.0000 1er. Y 0.9957 0.9957 1.050 1.000 0.025067116 PUNO 23.0 69020 N-PUNO 1.0 1 0.9957 2.4750 5.0000 1er. Y 0.9957 0.9957 1.050 1.000 0.020367120 ARCATA1 33.0 67128 ARCATA 10.0 1 1.0000 7.5000 6.0000 1er. N 1.0500 0.9500 1.030 1.000 0.010067124 MACHUPIC 10.5 69160 N-MACHUP 1.0 1 1.0000 1.9586 3.0000 1er. Y 1.0000 1.0000 1.050 1.000 0.023967126 ARCATA2 33.0 67128 ARCATA 10.0 2 1.0000 8.2798 5.0000 1er. N 1.0000 0.9048 1.030 1.000 0.000067134 CACHIMAY 33.0 69006 N-CACHI2 1.0 1 1.0455 6.0000 3.0000 1er. N 1.0455 1.0455 1.030 1.000 0.025067136 CACHIMAY 10.0 69006 N-CACHI2 1.0 1 1.0500 -1.5000 3.0000 1er. N 1.0500 1.0500 1.030 0.950 0.000067152 AYAVIRI 10.0 69164 N-AYAVIR 1.0 1 1.0000 0.6615 4.0000 1er. N 1.0000 1.0000 1.030 1.000 0.0250

Page 177: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag.57 de 65

Barra Vn Grupo T'd0 T"d0 T'q0 T"q0 H Xd Xq X'd X'q X"d X"q Xl S(1.0) S(1.2) Sn# Nombre kV Ident. s s s s s pu pu pu pu pu pu pu MVA16000 CAÐDPATO 13.8 1 4.86000 0.05000 0.06000 2.53170 1.11000 0.77000 0.37000 0.24400 0.24400 0.15000 0.12629 0.37473 43.3016002 CAÐDPATO 13.8 2 4.86000 0.05000 0.06000 2.53170 1.11000 0.77000 0.37000 0.24400 0.24400 0.15000 0.12629 0.37473 43.3016004 CAÐDPATO 13.8 3 4.86000 0.05000 0.06000 2.53170 1.11000 0.77000 0.37000 0.24400 0.24400 0.15000 0.12629 0.37473 43.3016006 CAÐDPATO 13.8 4 4.86000 0.05000 0.06000 2.53170 1.11000 0.77000 0.37000 0.24400 0.24400 0.15000 0.12629 0.37473 43.3016008 CAÐDPATO 13.8 5 4.86000 0.05000 0.06000 2.53170 1.11000 0.77000 0.37000 0.24400 0.24400 0.15000 0.12629 0.37473 43.3016010 CAÐDPATO 13.8 6 4.86000 0.05000 0.06000 2.53170 1.11000 0.77000 0.37000 0.24400 0.24400 0.15000 0.12629 0.37473 43.3016012 CARHUAQU 10 1 4.40000 0.05000 0.06000 2.78000 1.32300 0.77800 0.27900 0.20900 0.20900 0.14600 0.10000 0.40000 32.3016014 CHICLAYO 10.5 1 2.80000 0.03500 0.05000 2.00000 1.10000 0.75000 0.35000 0.23000 0.23000 0.15000 0.15000 0.40000 6.4016014 CHICLAYO 10.5 2 2.80000 0.03500 0.05000 2.00000 1.10000 0.75000 0.35000 0.23000 0.23000 0.15000 0.15000 0.40000 6.4016014 CHICLAYO 10.5 3 4.00000 0.03500 0.05000 2.00000 1.70000 1.04000 0.36800 0.23300 0.23300 0.16000 0.15000 0.40000 6.3016016 CARHUAQU 10 2 4.40000 0.05000 0.06000 2.78000 1.32300 0.77800 0.27900 0.20900 0.20900 0.14600 0.10000 0.40000 32.3016018 CARHUAQU 10 3 4.40000 0.05000 0.06000 2.78000 1.32300 0.77800 0.27900 0.20900 0.20900 0.14600 0.10000 0.40000 32.3016020 L.MERCED 10 1 4.00000 0.03500 0.05000 2.00000 1.26500 0.82400 0.38300 0.29500 0.29500 0.22200 0.15000 0.40000 2.5016020 L.MERCED 10 2 4.00000 0.03500 0.05000 2.00000 1.26500 0.82400 0.38300 0.29500 0.29500 0.22200 0.15000 0.40000 2.5016020 L.MERCED 10 3 4.00000 0.03500 0.05000 2.00000 1.30080 0.84354 0.38627 0.29481 0.29481 0.21934 0.15000 0.40000 5.5016024 PIURA 10 5 5.22800 0.02300 0.41100 0.05600 9.50000 1.70000 1.63200 0.24700 0.37900 0.16200 0.16200 0.11900 0.10100 0.44100 27.9016024 PIURA 10 1 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 6.3016024 PIURA 10 2 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 6.3016024 PIURA 10 3 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 11.0016024 PIURA 10 4 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 7.1016026 PIURA 4.8 1 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 1.7016026 PIURA 4.8 2 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 2.9016026 PIURA 4.8 3 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 3.0016034 PARIAC 13.2 5 4.00000 0.03500 0.05000 3.00000 0.90000 0.58500 0.27000 0.18000 0.18000 0.12600 0.10000 0.40000 1.9016036 PARIAC 13.2 6 4.00000 0.03500 0.05000 3.00000 0.90000 0.58500 0.27000 0.18000 0.18000 0.12600 0.10000 0.40000 1.9016038 PARIAC 13.2 1 4.00000 0.03500 0.05000 3.00000 0.90000 0.58500 0.27000 0.18000 0.18000 0.12600 0.10000 0.40000 0.2016040 PARIAC 13.2 2 4.00000 0.03500 0.05000 3.00000 0.90000 0.58500 0.27000 0.18000 0.18000 0.12600 0.10000 0.40000 0.6016042 PARIAC 13.2 3 4.00000 0.03500 0.05000 3.00000 0.90000 0.58500 0.27000 0.18000 0.18000 0.12600 0.10000 0.40000 0.4016044 PARIAC 13.2 4 4.00000 0.03500 0.05000 3.00000 0.90000 0.58500 0.27000 0.18000 0.18000 0.12600 0.10000 0.40000 1.1016050 CHICLSLZ 10.5 4 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 7.1016050 CHICLSLZ 10.5 5 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 7.1016052 CAHUA 10 1 5.00000 0.06700 0.07700 3.23000 1.35000 0.75000 0.28000 0.19000 0.19000 0.13000 0.06250 0.24742 27.5016054 CAHUA 10 2 5.00000 0.06700 0.07700 3.23000 1.35000 0.75000 0.28000 0.19000 0.19000 0.13000 0.06250 0.24742 27.5016056 SULLANA 4.16 1 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 3.1016056 SULLANA 4.16 2 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 3.1016058 SULLANA 4.16 3 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 3.1016060 SULLANA 4.16 4 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 3.1016066 TRUPAL 13.8 1 6.00000 0.04000 0.70000 0.05000 5.59000 1.54000 1.47800 0.24000 0.42900 0.18000 0.18000 0.11300 0.12000 0.50000 18.8016068 SIDERNOR 13.8 1 10.46000 0.03350 1.20000 0.10000 9.50000 2.20000 2.11200 0.27500 0.54900 0.20500 0.20500 0.09500 0.11450 0.32436 27.4016068 SIDERNOR 13.8 2 10.46000 0.03350 1.20000 0.10000 9.50000 2.20000 2.11200 0.27500 0.54900 0.20500 0.20500 0.09500 0.11450 0.32436 27.4016070 SIDERSUR 13.8 1 4.86800 0.02300 0.37200 0.06300 9.50000 1.42600 1.34500 0.27500 0.40900 0.15200 0.15200 0.08500 0.10924 0.46479 23.0016072 MALACAS 13.8 1 6.99100 0.04000 0.70000 0.05000 4.84200 2.27300 2.13000 0.28400 0.45000 0.19000 0.19000 0.13000 0.11707 0.48583 119.2016084 TRUJISUR 10 1 10.46000 0.03350 1.20000 0.10000 9.50000 2.20000 2.11200 0.27500 0.54900 0.20500 0.20500 0.09500 0.11450 0.32436 27.4016090 CEMPACAS 2.3 4 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 1.9016092 CEMPACAS 6.3 1 4.00000 0.03500 0.05000 2.50000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 8.8016092 CEMPACAS 6.3 2 4.00000 0.03500 0.05000 2.50000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 8.8016092 CEMPACAS 6.3 3 4.00000 0.03500 0.05000 2.50000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 8.80

GENERADORES SINCRONICOS

Page 178: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag.58 de 65

Barra Vn Grupo T'd0 T"d0 T'q0 T"q0 H Xd Xq X'd X'q X"d X"q Xl S(1.0) S(1.2) Sn# Nombre kV Ident. s s s s s pu pu pu pu pu pu pu MVA

GENERADORES SINCRONICOS

16094 GALLCIEG 10.5 1 4.90000 0.05000 0.06000 3.00000 1.07000 0.77000 0.35000 0.22000 0.22000 0.15000 0.12122 0.33868 20.0016096 GALLCIEG 10.5 2 4.90000 0.05000 0.06000 3.00000 1.07000 0.77000 0.35000 0.22000 0.22000 0.15000 0.12122 0.33868 20.0016098 MALACAS 13.2 1 6.00000 0.04000 0.70000 0.05000 6.45000 2.20000 2.11200 0.30800 0.55000 0.20900 0.20900 0.13200 0.12000 0.50000 24.2016098 MALACAS 13.2 2 6.00000 0.04000 0.70000 0.05000 6.45000 2.20000 2.11200 0.30800 0.55000 0.20900 0.20900 0.13200 0.12000 0.50000 24.2016098 MALACAS 13.2 3 6.00000 0.04000 0.70000 0.05000 6.45000 2.20000 2.11200 0.30800 0.55000 0.20900 0.20900 0.13200 0.12000 0.50000 24.2016100 PAITAEMD 4.16 1 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 3.3016100 PAITAEMD 4.16 2 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 3.3016100 PAITAEMD 4.16 3 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 3.3016102 PAITASKD 2.4 1 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 1.4016104 PAITASKD 2.4 2 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 1.4016106 PAITASKD 2.4 3 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 1.4016108 CURUMUY 10 1 5.00000 0.05000 0.06000 3.00000 1.20000 0.72000 0.36000 0.24000 0.24000 0.16800 0.10000 0.40000 15.0016108 CURUMUY 10 2 5.00000 0.05000 0.06000 3.00000 1.20000 0.72000 0.36000 0.24000 0.24000 0.16800 0.10000 0.40000 15.0016120 TUMBES 10 1 3.30000 0.03500 0.05000 3.80000 1.51000 0.78000 0.24000 0.19000 0.19000 0.13300 0.15000 0.40000 11.3016120 TUMBES 10 2 3.30000 0.03500 0.05000 3.80000 1.51000 0.78000 0.24000 0.19000 0.19000 0.13300 0.15000 0.40000 11.3026000 INDECS01 10 1 10.00000 0.06812 0.10000 1.50000 1.72800 1.10000 0.40200 0.22000 0.22000 0.15400 0.26897 0.50000 20.0026030 STA.ROSA 10 1 9.60000 0.04500 0.70000 0.04600 8.18750 2.20000 2.11200 0.30800 0.55000 0.20900 0.20900 0.13200 0.21324 0.50602 18.4026030 STA.ROSA 10 2 9.60000 0.04500 0.70000 0.04600 8.18750 2.20000 2.11200 0.30800 0.55000 0.20900 0.20900 0.13200 0.21324 0.50602 18.4026030 STA.ROSA 10 3 9.60000 0.04500 0.70000 0.04600 7.10610 2.16000 2.09000 0.22800 0.38000 0.15200 0.15200 0.12000 0.16102 0.27407 28.5026032 STA.ROSA 13.8 1 11.87500 0.02700 0.70000 0.07000 7.40810 2.04700 1.96500 0.22110 0.39000 0.14870 0.14870 0.08200 0.12000 0.50000 70.1026034 STA.ROSA 13.8 2 11.87500 0.02700 0.70000 0.07000 7.40810 2.04700 1.96500 0.22110 0.39000 0.14870 0.14870 0.08200 0.12000 0.50000 70.1026064 SNICOLAS 13.8 1 3.61300 0.03426 0.30000 0.04400 4.13000 1.80000 1.70000 0.25400 0.45400 0.18100 0.18100 0.11500 0.20000 0.69440 22.1026064 SNICOLAS 13.8 2 3.61300 0.03426 0.30000 0.04400 4.13000 1.80000 1.70000 0.25400 0.45400 0.18100 0.18100 0.11500 0.20000 0.69440 22.1026064 SNICOLAS 13.8 3 8.65000 0.06632 1.00000 0.10000 6.50000 1.50000 1.44000 0.21600 0.37500 0.14300 0.14300 0.09000 0.12000 0.50000 29.4026066 SNICOLAS 4.16 4 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 1.6026088 S.ROSAWE 13.8 3 7.76300 0.04100 0.70000 0.04600 7.00000 1.81290 1.75590 0.24420 0.41410 0.20120 0.20120 0.14000 0.10345 0.43478 150.0026092 VENTANIL 16 1 11.00000 0.04200 2.50000 0.15000 10.00000 2.10000 1.99000 0.23900 0.47100 0.17300 0.17300 0.13000 0.16700 0.56900 192.0026096 VENTANIL 16 2 11.00000 0.04200 2.50000 0.15000 10.00000 2.10000 1.99000 0.23900 0.47100 0.17300 0.17300 0.13000 0.16700 0.56900 192.0036000 ANTACS01 6.6 1 5.50000 0.02000 0.10000 1.65000 1.22000 0.59000 0.19200 0.13600 0.13600 0.08700 0.10000 0.40000 15.0036002 ANTACS02 6.6 2 5.50000 0.02000 0.10000 1.65800 1.22000 0.59000 0.19200 0.13600 0.13600 0.08700 0.10000 0.40000 15.0044040 COBRIZII 69 1 5.00000 0.05000 0.06000 3.00000 0.90000 0.54000 0.27000 0.18000 0.18000 0.12600 0.10000 0.40000 2.3046000 CHAPRIN 2.4 1 5.00000 0.05000 0.06000 3.00000 0.90000 0.54000 0.27000 0.18000 0.18000 0.12600 0.10000 0.40000 2.3046000 CHAPRIN 2.4 2 5.00000 0.05000 0.06000 3.00000 0.90000 0.54000 0.27000 0.18000 0.18000 0.12600 0.10000 0.40000 2.3046000 CHAPRIN 2.4 3 5.00000 0.05000 0.06000 3.00000 0.90000 0.54000 0.27000 0.18000 0.18000 0.12600 0.10000 0.40000 2.3046002 YARINACO 10 1 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 7.1046002 YARINACO 10 2 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 7.1046002 YARINACO 10 3 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 7.1046002 YARINACO 10 4 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 7.1046004 OROYA 2.3 1 5.00000 0.05000 0.06000 3.24300 0.90000 0.54000 0.27000 0.18000 0.18000 0.12600 0.10000 0.40000 3.8046004 OROYA 2.3 2 5.00000 0.05000 0.06000 3.24300 0.90000 0.54000 0.27000 0.18000 0.18000 0.12600 0.10000 0.40000 3.8046004 OROYA 2.3 3 5.00000 0.05000 0.06000 3.24300 0.90000 0.54000 0.27000 0.18000 0.18000 0.12600 0.10000 0.40000 3.8046016 MATUCANA 12.5 1 5.33000 0.05300 0.07000 2.90000 1.20000 0.78000 0.24000 0.18000 0.18000 0.11000 0.10000 0.40000 80.0046018 MATUCANA 12.5 2 5.33000 0.05300 0.07000 2.90000 1.20000 0.78000 0.24000 0.18000 0.18000 0.11000 0.10000 0.40000 80.0046020 MARCOPAM 4.16 1 5.00000 0.05000 0.06000 3.00000 0.90000 0.54000 0.27000 0.18000 0.18000 0.12600 0.10000 0.40000 1.4046022 HUAMPANI 10 1 5.33000 0.06400 0.07000 1.61000 1.38000 0.70000 0.29000 0.18000 0.18000 0.11000 0.10000 0.40000 22.4046022 HUAMPANI 10 2 5.33000 0.06400 0.07000 1.61000 1.38000 0.70000 0.29000 0.18000 0.18000 0.11000 0.10000 0.40000 22.4046032 MALPASO 6.9 1 5.00000 0.05000 0.06000 2.93600 1.05000 0.63000 0.33000 0.21000 0.21000 0.14700 0.10000 0.40000 17.00

Page 179: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag.59 de 65

Barra Vn Grupo T'd0 T"d0 T'q0 T"q0 H Xd Xq X'd X'q X"d X"q Xl S(1.0) S(1.2) Sn# Nombre kV Ident. s s s s s pu pu pu pu pu pu pu MVA

GENERADORES SINCRONICOS

46034 MALPASO 6.9 2 5.00000 0.05000 0.06000 2.93600 1.05000 0.63000 0.33000 0.21000 0.21000 0.14700 0.10000 0.40000 17.0046036 MALPASO 6.9 3 5.00000 0.05000 0.06000 2.93600 1.05000 0.63000 0.33000 0.21000 0.21000 0.14700 0.10000 0.40000 17.0046038 MALPASO 6.9 4 5.00000 0.05000 0.06000 2.93600 1.05000 0.63000 0.33000 0.21000 0.21000 0.14700 0.10000 0.40000 17.0046058 PACHACHA 2.3 1 5.00000 0.05000 0.06000 3.24300 0.90000 0.54000 0.27000 0.18000 0.18000 0.12600 0.10000 0.40000 3.8046058 PACHACHA 2.3 2 5.00000 0.05000 0.06000 3.24300 0.90000 0.54000 0.27000 0.18000 0.18000 0.12600 0.10000 0.40000 3.8046058 PACHACHA 2.3 3 5.00000 0.05000 0.06000 3.24300 0.90000 0.54000 0.27000 0.18000 0.18000 0.12600 0.10000 0.40000 3.8046058 PACHACHA 2.3 4 5.00000 0.05000 0.06000 3.24300 0.90000 0.54000 0.27000 0.18000 0.18000 0.12600 0.10000 0.40000 3.8046062 MOYOPAMP 10 1 5.33000 0.06000 0.07000 3.50000 1.36000 0.80000 0.33000 0.22000 0.22000 0.13000 0.16667 0.33333 35.0046064 MOYOPAMP 10 2 5.33000 0.06000 0.07000 3.50000 1.36000 0.80000 0.33000 0.22000 0.22000 0.13000 0.16667 0.33333 35.0046066 MOYOPAMP 10 3 5.33000 0.06000 0.07000 3.50000 1.36000 0.80000 0.33000 0.22000 0.22000 0.13000 0.16667 0.33333 35.0046068 AGUAYTIA 13.8 1 6.99000 0.02000 0.89000 0.04000 4.84000 2.27300 2.13000 0.28400 0.48000 0.18500 0.18500 0.11700 0.12000 0.51667 119.2046070 AGUAYTIA 13.8 2 6.99000 0.02000 0.89000 0.04000 4.84000 2.27300 2.13000 0.28400 0.48000 0.18500 0.18500 0.11700 0.12000 0.51667 119.2046082 CALLAHUA 6.5 1 5.38000 0.05700 0.07000 1.95000 1.37000 0.76000 0.38000 0.28000 0.28000 0.17000 0.10000 0.40000 17.5046084 CALLAHUA 6.5 2 5.38000 0.05700 0.07000 1.95000 1.37000 0.76000 0.38000 0.28000 0.28000 0.17000 0.10000 0.40000 17.5046086 CALLAHUA 6.5 3 5.38000 0.05700 0.07000 1.95000 1.37000 0.76000 0.38000 0.28000 0.28000 0.17000 0.10000 0.40000 17.5046088 CALLAHUA 8 4 5.33000 0.06000 0.07000 2.18000 1.30000 0.75800 0.38000 0.22000 0.22000 0.13000 0.10000 0.40000 44.0046090 RESTITUC 13.8 1 5.50000 0.07529 0.08500 3.32120 1.01710 0.56790 0.29590 0.20830 0.20830 0.13000 0.10650 0.28855 82.5046092 RESTITUC 13.8 2 5.50000 0.07529 0.08500 3.32120 1.01710 0.56790 0.29590 0.20830 0.20830 0.13000 0.10650 0.28855 82.5046094 RESTITUC 13.8 3 5.50000 0.07529 0.08500 3.32120 1.01710 0.56790 0.29590 0.20830 0.20830 0.13000 0.10650 0.28855 82.5046096 HUINCO 12.5 1 5.33000 0.06000 0.07000 2.20000 1.35000 0.81000 0.32000 0.20000 0.20000 0.12000 0.10000 0.40000 85.0046098 HUINCO 12.5 2 5.33000 0.06000 0.07000 2.20000 1.35000 0.81000 0.32000 0.20000 0.20000 0.12000 0.10000 0.40000 85.0046100 HUINCO 12.5 3 5.33000 0.06000 0.07000 2.20000 1.35000 0.81000 0.32000 0.20000 0.20000 0.12000 0.10000 0.40000 85.0046102 HUINCO 12.5 4 5.33000 0.06000 0.07000 2.20000 1.35000 0.81000 0.32000 0.20000 0.20000 0.12000 0.10000 0.40000 85.0046104 YAUPI 13.8 1 5.00000 0.05000 0.06000 2.64000 1.02700 0.61600 0.26700 0.20500 0.20500 0.14400 0.10000 0.40000 24.0046104 YAUPI 13.8 2 5.00000 0.05000 0.06000 2.64000 1.02700 0.61600 0.26700 0.20500 0.20500 0.14400 0.10000 0.40000 24.0046104 YAUPI 13.8 3 5.00000 0.05000 0.06000 2.64000 1.02700 0.61600 0.26700 0.20500 0.20500 0.14400 0.10000 0.40000 24.0046106 YAUPI 13.8 4 5.00000 0.05000 0.06000 2.64000 1.02700 0.61600 0.26700 0.20500 0.20500 0.14400 0.10000 0.40000 24.0046106 YAUPI 13.8 5 5.00000 0.05000 0.06000 2.64000 1.02700 0.61600 0.26700 0.20500 0.20500 0.14400 0.10000 0.40000 24.0046116 MANTARO 13.8 1 7.29700 0.07000 0.07000 4.18700 1.03600 0.70240 0.34500 0.20300 0.20300 0.14200 0.05212 0.24667 120.0046118 MANTARO 13.8 2 7.29700 0.07000 0.07000 4.18700 1.03600 0.70240 0.34500 0.20300 0.20300 0.14200 0.05212 0.24667 120.0046120 MANTARO 13.8 3 7.29700 0.07000 0.07000 4.18700 1.03600 0.70240 0.34500 0.20300 0.20300 0.14200 0.05212 0.24667 120.0046122 MANTARO 13.8 4 7.29700 0.07000 0.07000 4.18700 1.03600 0.70240 0.34500 0.20300 0.20300 0.14200 0.05212 0.24667 120.0046124 MANTARO 13.8 5 7.29700 0.07000 0.07000 4.18700 1.03600 0.70240 0.34500 0.20300 0.20300 0.14200 0.05212 0.24667 120.0046126 MANTARO 13.8 6 7.29700 0.07000 0.07000 4.18700 1.03600 0.70240 0.34500 0.20300 0.20300 0.14200 0.05212 0.24667 120.0046128 MANTARO 13.8 7 7.29700 0.07000 0.07000 4.18700 1.03600 0.70240 0.34500 0.20300 0.20300 0.14200 0.05212 0.24667 120.0046150 YANANGO 10 1 8.11600 0.04900 0.12000 2.16000 1.53300 0.83500 0.37000 0.22400 0.22400 0.11500 0.10300 0.41670 49.8046158 CHIMAY 13.8 1 8.53000 0.03400 0.19600 2.63000 1.31900 0.75000 0.28000 0.24100 0.24100 0.11000 0.20000 0.68000 84.0046160 CHIMAY 13.8 2 8.53000 0.03400 0.19600 2.63000 1.31900 0.75000 0.28000 0.24100 0.24100 0.11000 0.20000 0.68000 84.0046212 HUANCHOR 10 1 4.39500 0.05000 0.06000 3.00000 1.47630 0.66252 0.28214 0.18194 0.18194 0.12700 0.10000 0.40000 10.2046212 HUANCHOR 10 2 4.39500 0.05000 0.06000 3.00000 1.47630 0.66252 0.28214 0.18194 0.18194 0.12700 0.10000 0.40000 10.2047142 MILPO 13.2 1 5.00000 0.05000 0.06000 1.60000 1.25000 0.70000 0.24000 0.18000 0.18000 0.12600 0.10000 0.40000 2.9047216 CONDORCO 44 1 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 4.1047306 CONCEPCI 13.2 1 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 3.3054008 BOTIFLAC 69 1 5.00000 0.05000 0.06000 3.00000 1.10000 0.66000 0.33000 0.22000 0.22000 0.15400 0.10000 0.40000 5.6054008 BOTIFLAC 69 2 5.00000 0.05000 0.06000 3.00000 1.10000 0.66000 0.33000 0.22000 0.22000 0.15400 0.10000 0.40000 5.6054008 BOTIFLAC 69 3 5.00000 0.05000 0.06000 3.00000 1.10000 0.66000 0.33000 0.22000 0.22000 0.15400 0.10000 0.40000 5.6056012 CYPRUS 10 1 6.00000 0.04000 0.70000 0.05000 7.00000 2.27300 2.18210 0.31822 0.56825 0.21594 0.21594 0.13638 0.12000 0.50000 18.80

Page 180: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag.60 de 65

Barra Vn Grupo T'd0 T"d0 T'q0 T"q0 H Xd Xq X'd X'q X"d X"q Xl S(1.0) S(1.2) Sn# Nombre kV Ident. s s s s s pu pu pu pu pu pu pu MVA

GENERADORES SINCRONICOS

56028 ARICOTA2 11 1 4.70000 0.05000 0.06000 6.07380 0.97000 0.58000 0.27000 0.19000 0.19000 0.13300 0.10000 0.40000 14.0056034 ARICOTA1 11 1 4.70000 0.05000 0.06000 6.49300 0.97000 0.58000 0.27000 0.19000 0.19000 0.13300 0.10000 0.40000 14.0056034 ARICOTA1 11 2 4.70000 0.05000 0.06000 6.49300 0.97000 0.58000 0.27000 0.19000 0.19000 0.13300 0.10000 0.40000 14.0056044 CALAN123 10.5 1 4.10000 0.02400 0.09800 3.28400 1.60000 0.85000 0.32500 0.21800 0.21800 0.12600 0.15000 0.40000 8.0056044 CALAN123 10.5 2 4.10000 0.02400 0.09800 3.28400 1.60000 0.85000 0.32500 0.21800 0.21800 0.12600 0.15000 0.40000 8.0056044 CALAN123 10.5 3 4.10000 0.02400 0.09800 3.28400 1.60000 0.85000 0.32500 0.21800 0.21800 0.12600 0.15000 0.40000 8.0056046 CALANA4 10.5 4 4.10000 0.02400 0.09800 3.28400 1.60000 0.85000 0.32500 0.21800 0.21800 0.12600 0.15000 0.40000 8.0056048 MOLLENGD 13.8 1 4.00000 0.03500 0.05000 6.20000 2.53600 1.64800 0.51600 0.32600 0.32600 0.22800 0.15000 0.40000 13.2056048 MOLLENGD 13.8 2 4.00000 0.03500 0.05000 6.20000 2.53600 1.64800 0.51600 0.32600 0.32600 0.22800 0.15000 0.40000 13.2056048 MOLLENGD 13.8 3 4.00000 0.03500 0.05000 6.20000 2.53600 1.64800 0.51600 0.32600 0.32600 0.22800 0.15000 0.40000 13.2056050 MOLLETG1 13.8 1 5.51000 0.04000 0.70000 0.05000 5.51000 1.73500 1.65100 0.19600 0.39500 0.15000 0.15000 0.09500 0.14000 0.65000 52.9056052 MOLLETG2 13.8 2 5.51000 0.04000 0.70000 0.05000 5.51000 1.73500 1.65100 0.19600 0.39500 0.15000 0.15000 0.09500 0.14000 0.65000 52.9056076 CHILITV2 5.25 1 6.00000 0.04000 0.70000 0.05000 11.60000 0.81000 0.77800 0.17500 0.31300 0.13000 0.13000 0.08200 0.12000 0.50000 5.3056076 CHILITV2 5.25 2 6.00000 0.04000 0.70000 0.05000 9.23000 2.08000 1.99700 0.15500 0.27800 0.12000 0.12000 0.07600 0.12000 0.50000 8.8056078 CHILITV3 10.5 3 6.00000 0.04000 0.70000 0.05000 2.91000 2.16000 2.07400 0.41000 0.54000 0.26000 0.26000 0.16400 0.12000 0.50000 12.5056080 CHILINCC 13.8 1 6.00000 0.04000 0.70000 0.05000 7.00000 2.20000 2.11200 0.30800 0.55000 0.20900 0.20900 0.13200 0.12000 0.50000 32.0056100 MOQUEGUA 4.16 1 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 0.6056100 MOQUEGUA 4.16 2 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 0.6056106 ILO2 17 1 8.20000 0.04000 1.00000 0.05000 4.11000 2.15000 2.06400 0.20000 0.50000 0.16000 0.16000 0.10000 0.07143 0.19608 169.0056108 CHILIND1 10.4 1 4.00000 0.03500 0.05000 1.32000 1.60000 1.04000 0.45000 0.32500 0.32500 0.22800 0.15000 0.40000 6.5056110 CHILIND2 10.4 2 4.00000 0.03500 0.05000 1.32000 1.60000 1.04000 0.45000 0.32500 0.32500 0.22800 0.15000 0.40000 6.5056112 ILOCATK 4.16 1 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 4.1056114 ILOTV1 13.8 1 4.00000 0.02500 0.30000 0.05000 1.60000 1.51000 1.45000 0.21100 0.37800 0.15120 0.15120 0.09600 0.12000 0.50000 29.4056116 ILOTV2 13.8 2 4.00000 0.02500 0.30000 0.05000 1.60000 1.51000 1.45000 0.21100 0.37800 0.15120 0.15120 0.09600 0.12000 0.50000 29.4056118 ILOTV3 13.8 3 4.63000 0.03100 0.33300 0.08000 3.10000 1.57500 1.51200 0.25500 0.53770 0.18800 0.18800 0.11900 0.12000 0.50000 81.2056120 ILOTV4 13.8 4 4.46000 0.03100 0.33300 0.08100 3.10000 1.49400 1.43400 0.24200 0.51330 0.17800 0.17800 0.11200 0.12000 0.50000 81.2056122 ILOTG1 13.8 1 5.44000 0.02200 0.55300 0.04600 4.50000 1.96700 1.83600 0.24000 0.39100 0.17000 0.17000 0.10700 0.12000 0.50000 45.8056124 ILOTG2 13.8 2 14.50000 0.06000 1.50000 0.12000 1.62000 2.39000 2.20000 0.19560 0.24444 0.15120 0.15120 0.09500 0.12000 0.50000 57.4056126 CHARCAI 4.16 1 5.00000 0.05000 0.06000 1.60000 1.25000 0.70000 0.22000 0.16000 0.16000 0.11200 0.10000 0.40000 1.3056126 CHARCAI 4.16 2 5.00000 0.05000 0.06000 1.60000 1.25000 0.70000 0.22000 0.16000 0.16000 0.11200 0.10000 0.40000 1.3056128 CHARCAII 5.25 1 5.00000 0.05000 0.06000 1.60000 1.25000 0.70000 0.22000 0.16000 0.16000 0.11200 0.10000 0.40000 0.3056128 CHARCAII 5.25 2 5.00000 0.05000 0.06000 1.60000 1.25000 0.70000 0.22000 0.16000 0.16000 0.11200 0.10000 0.40000 0.3056128 CHARCAII 5.25 3 5.00000 0.05000 0.06000 1.60000 1.25000 0.70000 0.22000 0.16000 0.16000 0.11200 0.10000 0.40000 0.3056130 CHARCIII 5.25 1 5.00000 0.05000 0.06000 1.60000 1.25000 0.70000 0.24000 0.18000 0.18000 0.12600 0.10000 0.40000 2.9056130 CHARCIII 5.25 2 5.00000 0.05000 0.06000 1.60000 1.25000 0.70000 0.24000 0.18000 0.18000 0.12600 0.10000 0.40000 2.9056134 CHARCAV 13.8 1 7.87000 0.08000 0.11100 2.77910 1.27500 0.79000 0.25740 0.17060 0.17060 0.11900 0.05882 0.25203 57.0056136 CHARCAV 13.8 2 7.87000 0.08000 0.11100 2.77910 1.27500 0.79000 0.25740 0.17060 0.17060 0.11900 0.05882 0.25203 57.0056138 CHARCAV 13.8 3 7.87000 0.08000 0.11100 2.77910 1.27500 0.79000 0.25740 0.17060 0.17060 0.11900 0.05882 0.25203 57.0056140 CHARCAVI 5.25 1 5.00000 0.05000 0.06000 1.60000 1.30000 0.66000 0.32000 0.22000 0.22000 0.15400 0.10000 0.40000 10.8056144 CHARCAIV 5.25 1 5.00000 0.05000 0.06000 2.10000 1.28000 0.70000 0.24000 0.18000 0.18000 0.12600 0.10000 0.40000 6.8056146 CHARCAIV 5.25 2 5.00000 0.05000 0.06000 2.10000 1.28000 0.70000 0.24000 0.18000 0.18000 0.12600 0.10000 0.40000 6.8056148 CHARCAIV 5.25 3 5.00000 0.05000 0.06000 2.10000 1.28000 0.70000 0.24000 0.18000 0.18000 0.12600 0.10000 0.40000 6.8066000 ARCATA 0.46 1 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 1.7066002 MISAPUQ 0.66 1 5.00000 0.05000 0.06000 3.00000 0.90000 0.54000 0.27000 0.18000 0.18000 0.12600 0.10000 0.40000 2.3066002 MISAPUQ 0.66 2 5.00000 0.05000 0.06000 3.00000 0.90000 0.54000 0.27000 0.18000 0.18000 0.12600 0.10000 0.40000 2.3066010 ARES 0.46 1 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 6.4066012 BELLAVIS 10 1 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 2.30

Page 181: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag.61 de 65

Barra Vn Grupo T'd0 T"d0 T'q0 T"q0 H Xd Xq X'd X'q X"d X"q Xl S(1.0) S(1.2) Sn# Nombre kV Ident. s s s s s pu pu pu pu pu pu pu MVA

GENERADORES SINCRONICOS

66012 BELLAVIS 10 2 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 2.3066014 BELLALCO 2.4 3 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 2.5066016 BELLAVID 2.4 4 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 0.8066026 TAPAMAN1 2.4 1 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 1.0066028 TAPARACH 10.5 2 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 2.3066028 TAPARACH 10.5 3 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 2.3066030 TAPARSKD 2.4 4 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 1.1066030 TAPARSKD 2.4 5 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 1.1066094 SANGABAN 13.8 1 8.50000 0.05000 0.06000 2.85300 1.19000 0.78000 0.26000 0.18000 0.18000 0.12600 0.21951 0.69000 63.5066096 SANGABAN 13.8 2 8.50000 0.05000 0.06000 2.85300 1.19000 0.78000 0.26000 0.18000 0.18000 0.12600 0.21951 0.69000 63.5066106 HERCCA 2.3 1 5.00000 0.05000 0.06000 3.00000 1.20000 0.72000 0.36000 0.24000 0.24000 0.16800 0.10000 0.40000 0.4066106 HERCCA 2.3 2 5.00000 0.05000 0.06000 3.00000 1.20000 0.72000 0.36000 0.24000 0.24000 0.16800 0.10000 0.40000 0.4066116 SANRAFAE 2.16 1 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 0.9066116 SANRAFAE 2.16 2 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 0.9066116 SANRAFAE 2.16 3 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 0.9066116 SANRAFAE 2.16 4 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 1.3066116 SANRAFAE 2.16 5 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 1.3066116 SANRAFAE 2.16 6 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 1.3066116 SANRAFAE 2.16 7 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 1.3066118 TINTAYA 4.16 1 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 2.2066118 TINTAYA 4.16 2 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 2.2066118 TINTAYA 4.16 3 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 2.2066118 TINTAYA 4.16 4 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 2.2066118 TINTAYA 4.16 5 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 2.2066118 TINTAYA 4.16 6 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 2.2066118 TINTAYA 4.16 7 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 2.2066118 TINTAYA 4.16 8 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 2.2066126 MACHUPIC 13.8 1 5.81000 0.05000 0.06000 1.82000 1.35000 0.88000 0.34000 0.24000 0.24000 0.16800 0.24627 0.79872 33.5066128 MACHUPIC 13.8 2 5.81000 0.05000 0.06000 1.82000 1.35000 0.88000 0.34000 0.24000 0.24000 0.16800 0.24627 0.79872 33.5066130 MACHUPIC 13.8 3 5.81000 0.05000 0.06000 1.82000 1.35000 0.88000 0.34000 0.24000 0.24000 0.16800 0.24627 0.79872 33.5066138 DOLORESP 11.5 1 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 1.1066138 DOLORESP 11.5 2 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 2.3066140 DOLOALCO 4.16 1 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 2.4066140 DOLOALCO 4.16 2 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 2.4066142 DOLOGM 4.16 1 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 2.4066142 DOLOGM 4.16 2 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 2.4066142 DOLOGM 4.16 3 4.00000 0.03500 0.05000 2.00000 1.60000 1.04000 0.48000 0.32000 0.32000 0.22400 0.15000 0.40000 2.40

Page 182: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag.62/65

Barra Grupo T'd0 T"d0 T"q0 H Xd Xq X'd X"d X"q Xl S(1.0) S(1.2) Sn# Nombre Ident. s s s s pu pu pu pu pu pu MVA26066 SNICOLAS S1 4.00000 0.03500 0.04500 3.50000 1.35000 0.82400 0.29300 0.21600 0.21600 0.13500 0.06000 0.17000 1.6026066 SNICOLAS S2 4.00000 0.03500 0.04500 3.50000 1.35000 0.82400 0.29300 0.21600 0.21600 0.13500 0.06000 0.17000 1.60

COMPENSADORES SINCRONICOS

Page 183: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag.63/65

Barra Vn Grupo T'd0 T"d0 T"q0 H Xd Xq X'd X"d X"q Xl S(1.0) S(1.2) Sn# Nombre kV Ident. s s s s pu pu pu pu pu pu MVA16068 SIDERNOR 13.8 MS 4.00000 0.03500 0.04500 2.10000 0.90000 0.54900 0.19500 0.14400 0.14400 0.09000 0.06000 0.17000 7.516070 SIDERSUR 13.8 MS 4.00000 0.03500 0.04500 2.10000 0.90000 0.54900 0.19500 0.14400 0.14400 0.09000 0.06000 0.17000 11.156114 ILOTV1 13.8 MS 4.00000 0.03500 0.04500 7.60000 1.35000 0.82400 0.29300 0.21600 0.21600 0.13500 0.06000 0.17000 29.4057002 MILLSITE 13.8 MS 3.52100 0.01100 0.04400 2.25000 1.92000 1.24800 0.64000 0.43000 0.43000 0.31300 0.06522 0.16071 9.357096 BOTIFLAC 6.9 MS 4.00000 0.03500 0.04500 3.20000 1.15000 0.70200 0.25000 0.18400 0.18400 0.11500 0.06000 0.17000 14.7057112 BOTIFLAC 6.9 MS 4.00000 0.03500 0.04500 3.20000 1.15000 0.70200 0.25000 0.18400 0.18400 0.11500 0.06000 0.17000 17.6057140 SELECTR4 13.8 MS 4.00000 0.03500 0.04500 7.60000 1.35000 0.82400 0.29300 0.21600 0.21600 0.13500 0.06000 0.17000 14.257170 MILLSITE 13.8 MS 4.00000 0.03500 0.04500 7.60000 1.35000 0.82400 0.29300 0.21600 0.21600 0.13500 0.06000 0.17000 14.6057178 BOTIFLAC 6.9 MS 4.00000 0.03500 0.04500 3.20000 1.15000 0.70200 0.25000 0.18400 0.18400 0.11500 0.06000 0.17000 8.80

MOTORES SINCRONICOS

Page 184: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag.64/65

Barra Vn Grupo T' T" H X X' X" Xl E1 E2 D Sn# Nombre kV Ident. s s s pu pu pu pu MVA26064 SNICOLAS 13.80 A1 0.35585 0.00972 1.80 2.54550 0.23448 0.17120 0.11650 0.6 1 1.5 9.4026064 SNICOLAS 13.80 A2 0.35585 0.00972 1.80 2.54550 0.23448 0.17120 0.11650 0.6 1 1.5 9.4026066 SNICOLAS 4.16 A3 0.35381 0.00972 1.80 2.53350 0.23445 0.17120 0.11650 0.6 1 1.5 8.6026066 SNICOLAS 4.16 A4 0.35381 0.00972 1.80 2.53350 0.23445 0.17120 0.11650 0.6 1 1.5 8.6057152 BOTIFLAC 13.80 MA 0.35804 0.00973 1.80 2.55850 0.23451 0.17121 0.11650 0.6 1 1.5 6.9057176 BOTIFLAC 13.80 MA 0.36454 0.00973 1.80 2.59680 0.23460 0.17123 0.11650 0.6 1 1.5 8.2057174 BOTIFLAC 13.80 MA 0.37256 0.00973 1.80 2.64150 0.23470 0.17125 0.11650 0.6 1 1.5 5.9016070 SIDERSUR 13.80 MA 0.37256 0.00973 1.80 2.64150 0.23470 0.17125 0.11650 0.6 1 1.5 7.5016068 SIDERNOR 13.80 MA 0.37256 0.00973 1.80 2.64150 0.23470 0.17125 0.11650 0.6 1 1.5 7.5057002 MILLSITE 13.80 MA 0.37256 0.00973 1.80 2.64150 0.23470 0.17125 0.11650 0.6 1 1.5 6.4057130 LIXIVIAC 13.80 MA 0.37256 0.00973 1.80 2.64150 0.23470 0.17125 0.11650 0.6 1 1.5 15.7057140 SELECTR4 13.80 MA 0.37256 0.00973 1.80 2.64150 0.23470 0.17125 0.11650 0.6 1 1.5 4.3056114 ILOTV1 13.80 MA 0.63138 0.00983 1.80 4.25150 0.22090 0.15572 0.10050 0.6 1 1.5 20.00

MOTORES ASINCRONICOS

Page 185: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE-A3/025820 Pag.65/65

upu/100km

220 kV 0.001375138 kV 0.00320960 kV 0.003209

< 60 kV 0.003209

upu

220/138 kV 0.0003220/60 kV 0.0003

220/<30 kV* 0.0003 138/<30 kV* 0.0003 60/<30 kV* 0.0003

*: Nivel de tensión de generación

INDISPONIBILIDADES

Nivel de Tensión

Líneas

Nivel de Tensión

Transformadores

Page 186: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESIRETE – A3/025820

Anexo E1

Sistemas de Control de Generadores

Page 187: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/025820 Pag. 1/19

INDICE DELCONTENIDO

SISTEMAS DE CONTROL DE GENERADORES................................ ................................ .... 3RESUMEN DE LOS MODELOS DE CONTROL UTILIZADOS........................................................................7

Diagramas de bloques de los reguladores de Tensión......................................................................8Diagramas de bloques de los Estabilizadores de Tensión ..............................................................13Diagramas de bloques de los Limitadores de la Corriente de Excitación........................................14Diagramas de bloques de los Reguladores de Velocidad ...............................................................15

ANEXO : Parametros de los Sistemas de Control

Page 188: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/025820 Pag. 2/19

INDICE DE LAS FIGURAS

FIGURA 1: DIAGRAMA A BLOQUES DEL MODELO IEEE TYPE AC2A EXCITATION SYSTEM ......................................................8FIGURA 2: DIAGRAMA A BLOQUES DEL MODELO IEEE TYPE ST1A EXCITATION SYSTEM.......................................................8FIGURA 3: DIAGRAMA A BLOQUES DEL MODELO IEEE TYPE AC1 EXCITATION SYSTEM.........................................................9FIGURA 4: DIAGRAMA A BLOQUES DEL MODELO IEEE TYPE AC4 EXCITATION SYSTEM.........................................................9FIGURA 5: DIAGRAMA A BLOQUES DEL MODELO EXBAS BASLER STATIC VOLTAGE REGULATOR.........................................10FIGURA 6: DIAGRAMA A BLOQUES DEL MODELO EXDC2 IEEE TYPE DC2 EXCITATION SYSTEMR .......................................10FIGURA 7: DIAGRAMA A BLOQUES DEL MODELO EXPIC1 PROPORTIONAL/INTEGRAL EXCITATION SYSTEM ..........................11FIGURA 8: DIAGRAMA A BLOQUES DEL MODELO IEEET5 MODIFIED IEEE TYPE 4 EXCITATION SYSTEM ..............................11FIGURA 9: DIAGRAMA A BLOQUES DEL MODELO EXST2 IEEE TYPE ST2 EXCITATION SYSTEM...........................................12FIGURA 10: DIAGRAMA A BLOQUES DEL MODELO SEXS SIMPLIFIED EXCITATION SYSTEM...................................................12FIGURA 11: DIAGRAMA A BLOQUES DEL MODELO IEEET5 MODIFIED IEEE TYPE 4 EXCITATION SYSTEM ............................13FIGURA 12: DIAGRAMA A BLOQUES DEL MODELO IEE2ST IEEE STABILIZING MODEL WITH DUAL-INPUT SIGNALS ..............13FIGURA 13: DIAGRAMA A BLOQUES DEL MODELO IEEEST IEEE STABILIZING MODEL .........................................................13FIGURA 14: DIAGRAMA A BLOQUES DEL MODELO PSS2A IEEE DUAL-INPUT STABILIZER MODE..........................................14FIGURA 15: DIAGRAMA A BLOQUES DEL MODELO MAXEX2 MAXIMUM EXCITATION LIMITER ................................................14FIGURA 16: DIAGRAMA A BLOQUES DEL MODELO MNLEX3 MINIMUM EXCITATION LIMITER..................................................15FIGURA 17: DIAGRAMA A BLOQUES DEL MODELO DEGOV1 WOODWARD DIESEL GOVERNOR.............................................15FIGURA 18: DIAGRAMA A BLOQUES DEL MODELO GAST2A GAS TURBINE MODEL...............................................................16FIGURA 19: DIAGRAMA A BLOQUES DEL MODELO HYGOV HYDRO TURBINE-GOVERNOR ....................................................16FIGURA 20: DIAGRAMA A BLOQUES DEL MODELO GASTWD WOODWARD GAS TURBINE-GOVERNOR MODEL......................17FIGURA 21: DIAGRAMA A BLOQUES DEL MODELO IEEEG3 IEEE TYPE 3 SPEED-GOVERNING MODEL.................................17FIGURA 22: DIAGRAMA A BLOQUES DEL TGOV5 IEEE TYPE 1 GOVERNOR MODIFIED TO INCLUDE BOILER CONTROLS .......18FIGURA 23: DIAGRAMA A BLOQUES DEL MODELO WPIDHY WOODWARD PID HYDRO GOVERNOR ......................................19

Page 189: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/025820 Pag. 3/19

SISTEMAS DE CONTROL DE GENERADORES

Notas:

1 Se designa EXC a los Sistemas de Excitación, GOV a los sistemas de control carga-frecuencia, PSS a los estabilizadores del sistema de potencia, UEL a los limitadoresde mínima excitación y OEL a los limitadores de máxima excitación.

2 Todos los nombres en la columna Modelo, corresponden a modelos de librería delsimulador PSS/E versión 26

Central Equipo Modelo

EXC EXAC156050,1 y 56052,2

Mollendo TG1 y 2 GOV GAST2A

EXC EXAC156048,1–3

Mollendo Diesel GOV DEGOV1

EXC IEEET526064,1–3

San Nicolás GOV TGOV5

EXC EXAC126066,4

San Nicolas Diesel GOV DGOV1

EXC EXAC156122,1

ILOTG1 GOV GAST2A

EXC EXAC156124,2

ILOTG2 GOV GASTWD

EXC EXAC456114,1 y 56116,2

ILO1 TV 1 y 2 GOV TGOV5

EXC EXAC456118,3 y 56120,4

ILO1 TV 3 y 4 GOV TGOV5

EXC EXAC1

GOV TGOV5

56106,1

ILO 2

UEL MNLEX3

EXC EXPIC1

GOV HYGOV

PSS IEEEST

60126,1; 60128,2 y 60130,3

Machupichu

UEL, OEL N/D

EXC EXPIC1

GOV HYGOV

PSS IEEEST

UEL MNLEX3

56134,1 y 56136,2

Charcani V

OEL MAXEX2

EXC EXPIC146158,1 y 46160,2

Chimay GOV IEEEG3

EXC ESST1A46150,1

CH Yanango GOV IEEEG3

EXC ESAC2A26088,3

Santa Rosa Nueva GOV GASTWD

Page 190: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/025820 Pag. 4/19

Central Equipo Modelo

EXC EXBAS

GOV GAST2A

16072,1

Malacas TG4

PSS IEEEST

EXC EXPIC1

GOV WPIDHY

16000,1; 16002,2

16004,3; 16006,4

16008,5 y 16010,6

Cañón del Pato

PSS PSS2A

EXC EXAC116068,1–2

Sidernor (Chimbote) GOV GAST2A

EXC EXST216070,1

Sidersur (Chimbote) GOV GAST2A

EXC EXAC116084,1

Trujillo Sur GOV GAST2A

EXC EXPIC116012,1; 16016,2 y 16018,3

Carhuaquero GOV HYGOV

EXC EXBAS

GOV GAST2A

46068,1 y 46070,2

Aguaytia

PSS IEEEST

EXC EXPIC1

GOV HYGOV

PSS PSS2A

UEL MNLEX3

46090,1; 46092,2 y 46094,3

Restitución

OEL MAXEX2

EXC EXPIC1

GOV HYGOV

PSS IEEEST

UEL MNLEX3

66094,1 y 66096,2

San Gabán

OEL MAXEX2

EXC EXAC156108,1 y 56110,2

Chilina Diesel GOV DGOV1

EXC EXST256080,1

Chilina TG GOV GAST2A

EXC EXDC256076,1–2

Chilina TV01 y 02 (50Hz) GOV TGOV5

EXC EXDC256078,3

Chilina TV03 (60Hz) GOV TGOV5

56084,60

Conv. de Frecuencia

EXC EXCD2

56076,50

Conv. de Frecuencia

EXC EXCD2

EXC EXAC156044,1–3

Calana G1 a 3 GOV DGOV1

Page 191: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/025820 Pag. 5/19

Central Equipo Modelo

EXC EXAC156046,4

Calana G4 GOV DGOV1

EXC EXDC256034,1–2

Aricota 1 GOV IEEEG3

EXC EXDC356028,1

Aricota 2 GOV IEEEG3

EXC IEEEX1

GOV IEEEG3

46124,5; 46126,6 y 46128,7

Mantaro I

PSS IEE2ST

EXC ESST1A

GOV IEEEG3

46116,1; 46118,2

46120,3 y 46122,4

Mantaro II PSS IEE2ST

EXC EXPIC146096,1; 46098,2

46100,3 y 46102,4

Huinco

GOV IEEEG3

EXC EXPIC146016,1 y 46118,2

Matucana GOV IEEEG3

EXC EXPIC146022,1–2

Huampani GOV IEEEG3

EXC EXPIC146062,1; 46064,2 y 46066,3

Moyopampa GOV IEEEG3

EXC EXPIC146082,1; 46084,2 y 46086,3

Callahuanca 6.5kV GOV IEEEG3

EXC EXPIC146088,4

Callahuanca 8.0kV GOV IEEEG3

EXC EXPIC116052,1 y 16054,2

Cahua GOV IEEEG3

EXC EXPIC116032,1; 46034,2

46036,3 y 46038,4

Malpaso

GOV IEEEG3

EXC EXPIC146104, 1–3 y

46106,4–5

Yaupi

GOV IEEEG3

EXC EXAC416066,1

Trupal (Santiago del Cao) GOV TGOV5

EXC EXAC116098,1–3

Malacas TG1–3 GOV GAST2A

EXC EXAC116014,1–3 y

16050, 4–5

Chiclayo Oeste

GOV DEGOV1

EXC EXAC116024,1–4

Piura Diesel GMT, MAN y SWD GOV DEGOV1

Page 192: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/025820 Pag. 6/19

Central Equipo Modelo

EXC EXAC116024,5

Piura TG GOV GAST2A

EXC EXAC116026,1–3

Piura Diesel MIR GOV DEGOV1

EXC EXDC216034,5; 16036,6 y 16044,4

Pariac GOV IEEEG3

EXC EXAC116092,1–3 y 16090,4

Cempacas GOV DEGOV1

EXC EXAC416108,1–2

Curumuy GOV IEEEG3

EXC EXAC116120,1–2

Tumbes Nueva GOV DEGOV1

EXC EXAC126030,1–3

26032,1 y 26034,2

Santa Rosa

GOV GAST2A

EXPIC126092,1 y 26096,2

Ventanilla GAST2A

36000,1 y 36002,2

CS Antamina

EXC EXAC1

EXC EXDC246004,1–3

Oroya GOV IEEEG3

EXC EXDC246058,1–4

Pachacha2 GOV IEEEG3

26000,1

CS Independencia

EXC EXAC1

EXC EXAC446212,1–2

Huanchor GOV IEEEG3

EXC EXDC256144,1; 56146,2

56148,3

Charcani IV

GOV IEEEG3

EXC EXAC456140,1

Charcani VI GOV IEEEG3

Page 193: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/025820 Pag. 7/19

Resumen de los modelos de Control utilizados

A continuación se listan los modelos de los sistemas de control con sus respectivosdiagramas de bloques que se han adoptado a partir de la librería de modelos standard delprograma PSS/E.

Regulador deTensión AVR Estabilizadores Limitadores

de la IfiledRegulador develocidad GOV.

ESAC2A IEE2ST MAXEX2 DEGOV1ESST1A IEEEST MNLEX3 GAST2AEXAC1 PSS2A GASTWDEXAC4 HYGOVEXBAS IEEEG3EXDC2 TGOV5EXPIC1 WPIDHYEXST2IEEET5IEEEX1SEXS

Page 194: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/025820 Pag. 8/19

Diagramas de bloques de los reguladores de Tensión

Figura 1: Diagrama a bloques del Modelo IEEE Type AC2A Excitation System

Figura 2: Diagrama a bloques del Modelo IEEE Type ST1A Excitation System

Page 195: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 9/19

Figura 3: Diagrama a bloques del Modelo IEEE Type AC1 Excitation System

Figura 4: Diagrama a bloques del Modelo IEEE Type AC4 Excitation System

Page 196: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 10/19

Figura 5: Diagrama a bloques del Modelo EXBAS Basler Static Voltage Regulator

Figura 6: Diagrama a bloques del Modelo EXDC2 IEEE Type DC2 Excitation Systemr

Page 197: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 11/19

Figura 7: Diagrama a bloques del Modelo EXPIC1 Proportional/Integral Excitation System

Figura 8: Diagrama a bloques del Modelo IEEET5 Modified IEEE Type 4 Excitation System

Page 198: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 12/19

Figura 9: Diagrama a bloques del Modelo EXST2 IEEE Type ST2 Excitation System

Figura 10: Diagrama a bloques del Modelo SEXS Simplified Excitation System

Page 199: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 13/19

Figura 11: Diagrama a bloques del Modelo IEEET5 Modified IEEE Type 4 Excitation System

Diagramas de bloques de los Estabilizadores de Tensió n

Figura 12: Diagrama a bloques del Modelo IEE2ST IEEE Stabilizing Model With Dual-Input Signals

Figura 13: Diagrama a bloques del Modelo IEEEST IEEE Stabilizing Model

Page 200: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 14/19

Figura 14: Diagrama a bloques del Modelo PSS2A IEEE Dual-Input Stabilizer Mode

Diagramas de bloques de los Limitadores de la Corriente de Excitació n

Figura 15: Diagrama a bloques del Modelo MAXEX2 Maximum Excitation Limiter

Page 201: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 15/19

Figura 16: Diagrama a bloques del Modelo MNLEX3 Minimum Excitation Limiter

Diagramas de bloques de los Reguladores de Velocidad

Figura 17: Diagrama a bloques del Modelo DEGOV1 Woodward Diesel Governor

Page 202: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 16/19

Figura 18: Diagrama a bloques del Modelo GAST2A Gas Turbine Model

Figura 19: Diagrama a bloques del Modelo HYGOV Hydro Turbine-Governor

Page 203: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 17/19

Figura 20: Diagrama a bloques del Modelo GASTWD Woodward Gas Turbine-Governor Model

Figura 21: Diagrama a bloques del Modelo IEEEG3 IEEE Type 3 Speed-Governing Model

Page 204: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 18/19

Figura 22: Diagrama a bloques del TGOV5 IEEE Type 1 Governor Modified to Include Boiler Controls

Page 205: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final C E S I RETE – A3/025820 Pag. 19/19

Figura 23: Diagrama a bloques del Modelo WPIDHY Woodward PID Hydro Governor

Page 206: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/025820

Anexo E2

Parámetros de los Sistemas de Control

Page 207: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 1/57

ANEXO – PARAMETROS DE LOS SISTEMAS DE CONTROL

BARRA 16000 [CAÑDPATO13.8]

** PSS2A ** BUS NAME BSKV MAC C O N S S T A T E S V A R S I C O N S 16000 CAÑDPATO 13.8 1 3201-3217 1306-1321 140-143 114-119

IC1 REMBUS1 IC2 REMBUS2 M N 3 0 0 0 0 0

TW1 TW2 T6 TW3 TW4 T7 KS2 KS3 4.400 4.400 0.011 1.000 0.000 0.000 0.000 0.000

T8 T9 KS1 T1 T2 T3 T4 VSTMAX VSTMIN 0.000 1.000 -0.363 1.143 2.000 0.000 0.000 0.050 -0.050

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 16000 CAÑDPATO 13.8 1 3653-3662 226 218 1569

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.213 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 16000 CAÑDPATO 13.8 1 4563-4586 1660-1666

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.010 11.6 1.720 5.250 -4.200 0.019 0.000 0.000

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 99.000 -99.000 0.000 1.000 0.000 6.500 -5.200

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 0.000 0.000 0.000 0.000 0.000 0.000 1.250 0.000 0.200

** WPIDHY ** BUS NAME BSKV MACH C O N S S T A T E S VAR 16000 CAÑDPATO 13.8 1 7331-7351 2476-2482 346

TREG REG KP KI KD TA TB VELMX VELMX 0.1000 -0.050 2.0000 0.4000 0.000 0.050 0.050 0.400 -0.400

GATMX GATMN TW PMAX PMIN D 1.011 0.000 0.900 99.000 -99.000 0.020

G0 G1 P1 G2 P2 P3 0.000 0.330 0.330 0.660 0.660 1.000

BARRA 16002 [CAÑDPATO13.8]

** PSS2A ** BUS NAME BSKV MAC C O N S S T A T E S V A R S I C O N S 16002 CAÑDPATO 13.8 2 3218-3234 1322-1337 144-147 120-125

IC1 REMBUS1 IC2 REMBUS2 M N 3 0 0 0 0 0

TW1 TW2 T6 TW3 TW4 T7 KS2 KS3 4.400 4.400 0.011 1.000 0.000 0.000 0.000 0.000

T8 T9 KS1 T1 T2 T3 T4 VSTMAX VSTMIN 0.000 1.000 -0.363 1.143 2.000 0.000 0.000 0.050 -0.050

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 16002 CAÑDPATO 13.8 2 3663-3672 227 219 1570

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.186 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 16002 CAÑDPATO 13.8 2 4587-4610 1667-1673

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.010 11.6 1.720 5.250 -4.200 0.019 0.000 0.000

Page 208: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 2/57

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 99.000 -99.000 0.000 1.000 0.000 6.500 -5.200

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 0.000 0.000 0.000 0.000 0.000 0.000 1.250 0.000 0.200

** WPIDHY ** BUS NAME BSKV MACH C O N S S T A T E S VAR 16002 CAÑDPATO 13.8 2 7352-7372 2483-2489 347

TREG REG KP KI KD TA TB VELMX VELMX 0.1000 -0.050 2.0000 0.4000 0.000 0.050 0.050 0.400 -0.400

GATMX GATMN TW PMAX PMIN D 0.980 0.000 0.900 99.000 -99.000 0.020

G0 G1 P1 G2 P2 P3 0.000 0.330 0.330 0.660 0.660 1.000

BARRA 16004 [CAÑDPATO13.8]

** PSS2A ** BUS NAME BSKV MAC C O N S S T A T E S V A R S I C O N S 16004 CAÑDPATO 13.8 3 3235-3251 1338-1353 148-151 126-131

IC1 REMBUS1 IC2 REMBUS2 M N 3 0 0 0 0 0

TW1 TW2 T6 TW3 TW4 T7 KS2 KS3 4.400 4.400 0.011 1.000 0.000 0.000 0.000 0.000

T8 T9 KS1 T1 T2 T3 T4 VSTMAX VSTMIN 0.000 1.000 -0.363 1.143 2.000 0.000 0.000 0.050 -0.050

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 16004 CAÑDPATO 13.8 3 3673-3682 228 220 1571

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.191 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 16004 CAÑDPATO 13.8 3 4611-4634 1674-1680

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.010 11.6 1.720 5.250 -4.200 0.019 0.000 0.000

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 99.000 -99.000 0.000 1.000 0.000 6.500 -5.200

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 0.000 0.000 0.000 0.000 0.000 0.000 1.250 0.000 0.200

** WPIDHY ** BUS NAME BSKV MACH C O N S S T A T E S VAR 16004 CAÑDPATO 13.8 3 7373-7393 2490-2496 348

TREG REG KP KI KD TA TB VELMX VELMX 0.1000 -0.050 2.0000 0.4000 0.000 0.050 0.050 0.400 -0.400

GATMX GATMN TW PMAX PMIN D 0.986 0.000 0.900 99.000 -99.000 0.020

G0 G1 P1 G2 P2 P3 0.000 0.330 0.330 0.660 0.660 1.000

BARRA 16006 [CAÑDPATO13.8]

** PSS2A ** BUS NAME BSKV MAC C O N S S T A T E S V A R S I C O N S 16006 CAÑDPATO 13.8 4 3252-3268 1354-1369 152-155 132-137

IC1 REMBUS1 IC2 REMBUS2 M N 3 0 0 0 0 0

TW1 TW2 T6 TW3 TW4 T7 KS2 KS3

Page 209: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 3/57

4.400 4.400 0.011 1.000 0.000 0.000 0.000 0.000

T8 T9 KS1 T1 T2 T3 T4 VSTMAX VSTMIN 0.000 1.000 -0.363 1.143 2.000 0.000 0.000 0.050 -0.050

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 16006 CAÑDPATO 13.8 4 3683-3692 229 221 1572

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.197 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 16006 CAÑDPATO 13.8 4 4635-4658 1681-1687

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.010 11.6 1.720 5.250 -4.200 0.019 0.000 0.000

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 99.000 -99.000 0.000 1.000 0.000 6.500 -5.200

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 0.000 0.000 0.000 0.000 0.000 0.000 1.250 0.000 0.200

** WPIDHY ** BUS NAME BSKV MACH C O N S S T A T E S VAR 16006 CAÑDPATO 13.8 4 7394-7414 2497-2503 349

TREG REG KP KI KD TA TB VELMX VELMX 0.1000 -0.050 2.0000 0.4000 0.000 0.050 0.050 0.400 -0.400

GATMX GATMN TW PMAX PMIN D 0.993 0.000 0.900 99.000 -99.000 0.020

G0 G1 P1 G2 P2 P3 0.000 0.330 0.330 0.660 0.660 1.000

BARRA 16008 [CAÑDPATO13.8]

** PSS2A ** BUS NAME BSKV MAC C O N S S T A T E S V A R S I C O N S 16008 CAÑDPATO 13.8 5 3269-3285 1370-1385 156-159 138-143

IC1 REMBUS1 IC2 REMBUS2 M N 3 0 0 0 0 0

TW1 TW2 T6 TW3 TW4 T7 KS2 KS3 4.400 4.400 0.011 1.000 0.000 0.000 0.000 0.000

T8 T9 KS1 T1 T2 T3 T4 VSTMAX VSTMIN 0.000 1.000 -0.363 1.143 2.000 0.000 0.000 0.050 -0.050

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 16008 CAÑDPATO 13.8 5 3693-3702 230 222 1573

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.210 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 16008 CAÑDPATO 13.8 5 4659-4682 1688-1694

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.010 11.6 1.720 5.250 -4.200 0.019 0.000 0.000

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 99.000 -99.000 0.000 1.000 0.000 6.500 -5.200

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 0.000 0.000 0.000 0.000 0.000 0.000 1.250 0.000 0.200

** WPIDHY ** BUS NAME BSKV MACH C O N S S T A T E S VAR 16008 CAÑDPATO 13.8 5 7415-7435 2504-2510 350

TREG REG KP KI KD TA TB VELMX VELMX

Page 210: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 4/57

0.1000 -0.050 2.0000 0.4000 0.000 0.050 0.050 0.400 -0.400

GATMX GATMN TW PMAX PMIN D 1.009 0.000 0.900 99.000 -99.000 0.020

G0 G1 P1 G2 P2 P3 0.000 0.330 0.330 0.660 0.660 1.000

BARRA 16010 [CAÑDPATO13.8]

** PSS2A ** BUS NAME BSKV MAC C O N S S T A T E S V A R S I C O N S 16010 CAÑDPATO 13.8 6 3286-3302 1386-1401 160-163 144-149

IC1 REMBUS1 IC2 REMBUS2 M N 3 0 0 0 0 0

TW1 TW2 T6 TW3 TW4 T7 KS2 KS3 4.400 4.400 0.011 1.000 0.000 0.000 0.000 0.000

T8 T9 KS1 T1 T2 T3 T4 VSTMAX VSTMIN 0.000 1.000 -0.363 1.143 2.000 0.000 0.000 0.050 -0.050

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 16010 CAÑDPATO 13.8 6 3703-3712 231 223 1574

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.213 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 16010 CAÑDPATO 13.8 6 4683-4706 1695-1701

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.010 11.6 1.720 5.250 -4.200 0.019 0.000 0.000

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 99.000 -99.000 0.000 1.000 0.000 6.500 -5.200

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 0.000 0.000 0.000 0.000 0.000 0.000 1.250 0.000 0.200

** WPIDHY ** BUS NAME BSKV MACH C O N S S T A T E S VAR 16010 CAÑDPATO 13.8 6 7436-7456 2511-2517 351

TREG REG KP KI KD TA TB VELMX VELMX 0.1000 -0.050 2.0000 0.4000 0.000 0.050 0.050 0.400 -0.400

GATMX GATMN TW PMAX PMIN D 1.011 0.000 0.900 99.000 -99.000 0.020

G0 G1 P1 G2 P2 P3 0.000 0.330 0.330 0.660 0.660 1.000

BARRA 16012 [CARHUAQU10.0]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 16012 CARHUAQU 10.0 1 3713-3722 232 224 1575

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.462 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 16012 CARHUAQU 10.0 1 4707-4730 1702-1708

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.025 25.0 2.000 6.400 -5.760 0.000 0.000 0.000

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 99.000 -99.000 0.000 1.000 0.000 6.400 -5.760

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 0.000 0.000 0.000 0.000 0.000 0.000 1.000 0.000 0.200

Page 211: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 5/57

** HYGOV ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 16012 CARHUAQU 10.0 1 7457-7468 2518-2521 352-353

R-PERM R-TEMP TR TF TG VELM GMAX GMIN TW AT DTURB QNL 0.067 0.337 10.00 0.020 0.250 0.460 0.91 0.00 0.99 1.00 1.50 0.000

BARRA 16014 [CHICLAYO10.5]

** EXAC1 ** BUS NAME BSKV MACH C O N S S T A T E S 16014 CHICLAYO 10.5 1 4731-4747 1709-1713

TR TB TC KA TA VRMAX VRMIN TE 0.020 0.000 0.000 350.0 0.100 5.900 -5.300 2.000

KF TF KC KD KE E1 S(E1) E2 S(E2) 0.055 0.600 0.300 0.500 1.000 5.1500 0.1500 3.8600 0.0500

** DEGOV1 ** BUS NAME BSKV MACH C O N S S T A T E S V A R S I C O N 16014 CHICLAYO 10.5 1 7469-7480 2522-2527 354-367 319

T1 T2 T3 K T4 T5 T6 TD TMAX TMIN DROOP TE 0.500 0.020 7.200 0.155 -0.018 0.130 0.250 0.040 0.687 0.000 0.082 0.000

ICON(M)=0; DEGOV1 HAS DROOP WITH THROTTLE FEEDBACK

** EXAC1 ** BUS NAME BSKV MACH C O N S S T A T E S 16014 CHICLAYO 10.5 2 4748-4764 1714-1718

TR TB TC KA TA VRMAX VRMIN TE 0.020 0.000 0.000 350.0 0.100 5.900 -5.300 2.000

KF TF KC KD KE E1 S(E1) E2 S(E2) 0.055 0.600 0.300 0.500 1.000 5.1500 0.1500 3.8600 0.0500

** DEGOV1 ** BUS NAME BSKV MACH C O N S S T A T E S V A R S I C O N 16014 CHICLAYO 10.5 2 7481-7492 2528-2533 368-381 320

T1 T2 T3 K T4 T5 T6 TD TMAX TMIN DROOP TE 0.500 0.020 7.200 0.155 -0.018 0.130 0.250 0.040 0.718 0.000 0.082 0.000

ICON(M)=0; DEGOV1 HAS DROOP WITH THROTTLE FEEDBACK

** EXAC1 ** BUS NAME BSKV MACH C O N S S T A T E S 16014 CHICLAYO 10.5 3 4765-4781 1719-1723

TR TB TC KA TA VRMAX VRMIN TE 0.020 0.000 0.000 350.0 0.100 5.900 -5.300 2.000

KF TF KC KD KE E1 S(E1) E2 S(E2) 0.055 0.600 0.300 0.500 1.000 5.1500 0.1500 3.8600 0.0500

** DEGOV1 ** BUS NAME BSKV MACH C O N S S T A T E S V A R S I C O N 16014 CHICLAYO 10.5 3 7493-7504 2534-2539 382-395 321

T1 T2 T3 K T4 T5 T6 TD TMAX TMIN DROOP TE 0.500 0.020 7.200 0.155 -0.018 0.130 0.250 0.040 0.738 0.000 0.082 0.000

ICON(M)=0; DEGOV1 HAS DROOP WITH THROTTLE FEEDBACK

BARRA 16016 [CARHUAQU10.0]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 16016 CARHUAQU 10.0 2 3723-3732 233 225 1576

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.439 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

Page 212: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 6/57

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 16016 CARHUAQU 10.0 2 4782-4805 1724-1730

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.025 25.0 2.000 6.400 -5.760 0.000 0.000 0.000

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 99.000 -99.000 0.000 1.000 0.000 6.400 -5.760

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 0.000 0.000 0.000 0.000 0.000 0.000 1.000 0.000 0.200

** HYGOV ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 16016 CARHUAQU 10.0 2 7505-7516 2540-2543 396-397

R-PERM R-TEMP TR TF TG VELM GMAX GMIN TW AT DTURB QNL 0.067 0.337 10.00 0.020 0.250 0.460 0.91 0.00 0.99 1.00 1.50 0.000

BARRA 16018 [CARHUAQU10.0]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 16018 CARHUAQU 10.0 3 3733-3742 234 226 1577

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.462 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 16018 CARHUAQU 10.0 3 4806-4829 1731-1737

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.025 25.0 2.000 6.400 -5.760 0.000 0.000 0.000

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 99.000 -99.000 0.000 1.000 0.000 6.400 -5.760

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 0.000 0.000 0.000 0.000 0.000 0.000 1.000 0.000 0.200

** HYGOV ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 16018 CARHUAQU 10.0 3 7517-7528 2544-2547 398-399

R-PERM R-TEMP TR TF TG VELM GMAX GMIN TW AT DTURB QNL 0.067 0.337 10.00 0.020 0.250 0.460 0.91 0.00 0.99 1.00 1.50 0.000

BARRA 16020 [L.MERCED10.0]

** EXAC1 ** BUS NAME BSKV MACH C O N S S T A T E S 16024 PIURA 10.0 1 4830-4846 1738-1742

TR TB TC KA TA VRMAX VRMIN TE 0.020 0.000 0.000 350.0 0.100 5.900 -5.300 2.000

KF TF KC KD KE E1 S(E1) E2 S(E2) 0.050 0.700 0.300 0.500 1.000 5.1000 0.1500 3.8000 0.0500

** DEGOV1 ** BUS NAME BSKV MACH C O N S S T A T E S V A R S I C O N 16024 PIURA 10.0 1 7529-7540 2548-2553 400-413 322

T1 T2 T3 K T4 T5 T6 TD TMAX TMIN DROOP TE 0.500 0.020 7.200 0.156 -0.018 0.130 0.250 0.050 0.818 0.000 0.075 0.000

ICON(M)=0; DEGOV1 HAS DROOP WITH THROTTLE FEEDBACK

** EXAC1 ** BUS NAME BSKV MACH C O N S S T A T E S 16024 PIURA 10.0 2 4847-4863 1743-1747

TR TB TC KA TA VRMAX VRMIN TE 0.020 0.000 0.000 350.0 0.100 5.900 -5.300 2.000

KF TF KC KD KE E1 S(E1) E2 S(E2)

Page 213: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 7/57

0.050 0.700 0.300 0.500 1.000 5.1000 0.1500 3.8000 0.0500

** DEGOV1 ** BUS NAME BSKV MACH C O N S S T A T E S V A R S I C O N 16024 PIURA 10.0 2 7541-7552 2554-2559 414-427 323

T1 T2 T3 K T4 T5 T6 TD TMAX TMIN DROOP TE 0.500 0.020 7.200 0.156 -0.018 0.130 0.250 0.050 0.785 0.000 0.078 0.000

ICON(M)=0; DEGOV1 HAS DROOP WITH THROTTLE FEEDBACK

** EXAC1 ** BUS NAME BSKV MACH C O N S S T A T E S 16024 PIURA 10.0 3 4864-4880 1748-1752

TR TB TC KA TA VRMAX VRMIN TE 0.020 0.000 0.000 350.0 0.100 5.900 -5.300 2.000

KF TF KC KD KE E1 S(E1) E2 S(E2) 0.050 0.700 0.300 0.500 1.000 5.1000 0.1500 3.8000 0.0500

** DEGOV1 ** BUS NAME BSKV MACH C O N S S T A T E S V A R S I C O N 16024 PIURA 10.0 3 7553-7564 2560-2565 428-441 324

T1 T2 T3 K T4 T5 T6 TD TMAX TMIN DROOP TE 0.500 0.020 7.200 0.155 -0.018 0.130 0.250 0.050 0.480 0.000 0.083 0.000

ICON(M)=0; DEGOV1 HAS DROOP WITH THROTTLE FEEDBACK

** EXAC1 ** BUS NAME BSKV MACH C O N S S T A T E S 16024 PIURA 10.0 4 4881-4897 1753-1757

TR TB TC KA TA VRMAX VRMIN TE 0.020 0.000 0.000 350.0 0.100 5.900 -5.300 2.000

KF TF KC KD KE E1 S(E1) E2 S(E2) 0.050 0.700 0.300 0.500 1.000 5.1000 0.1500 3.8000 0.0500

** DEGOV1 ** BUS NAME BSKV MACH C O N S S T A T E S V A R S I C O N 16024 PIURA 10.0 4 7565-7576 2566-2571 442-455 325

T1 T2 T3 K T4 T5 T6 TD TMAX TMIN DROOP TE 0.500 0.020 7.200 0.155 -0.018 0.130 0.250 0.050 0.727 0.000 0.074 0.000

ICON(M)=0; DEGOV1 HAS DROOP WITH THROTTLE FEEDBACK

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 16024 PIURA 10.0 5 3743-3752 235 227 1578

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.905 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXAC1 ** BUS NAME BSKV MACH C O N S S T A T E S 16024 PIURA 10.0 5 4898-4914 1758-1762

TR TB TC KA TA VRMAX VRMIN TE 0.010 0.000 0.000 400.0 0.050 6.500 -5.900 1.200

KF TF KC KD KE E1 S(E1) E2 S(E2) 0.032 0.700 0.200 0.400 1.000 6.5000 0.0600 4.9000 0.0200

** GAST2A ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 16024 PIURA 10.0 5 7577-7607 2572-2584 456-459

W X Y Z ETD TCD TRATE T MAX MIN ECR K3 20.00 4.500 9.000 1.00 0.020 0.100 23.00 0.13 1.01 -0.08 0.010 0.770

A B C TF KF K5 K4 T3 T4 TT T5 10.00 1.00 0.00 0.10 1.000 0.200 0.800 15.00 2.500 450.0 3.30

Page 214: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 8/57

AF1 BF1 AF2 BF2 CF2 TR K6 TC 700.0 550.0 -0.300 1.300 0.500 1001.0 0.230 1046.0

BARRA 16026 [PIURA 4.80]

** EXAC1 ** BUS NAME BSKV MACH C O N S S T A T E S 16026 PIURA 4.80 1 4915-4931 1763-1767

TR TB TC KA TA VRMAX VRMIN TE 0.020 0.000 0.000 350.0 0.100 5.850 -5.270 2.000

KF TF KC KD KE E1 S(E1) E2 S(E2) 0.050 0.700 0.300 0.500 1.000 5.1000 0.1500 3.8000 0.0500

** DEGOV1 ** BUS NAME BSKV MACH C O N S S T A T E S V A R S I C O N 16026 PIURA 4.80 1 7608-7619 2585-2590 460-473 326

T1 T2 T3 K T4 T5 T6 TD TMAX TMIN DROOP TE 0.500 0.020 7.200 0.147 -0.018 0.130 0.250 0.050 0.740 0.000 0.085 0.000

ICON(M)=0; DEGOV1 HAS DROOP WITH THROTTLE FEEDBACK

** EXAC1 ** BUS NAME BSKV MACH C O N S S T A T E S 16026 PIURA 4.80 2 4932-4948 1768-1772

TR TB TC KA TA VRMAX VRMIN TE 0.020 0.000 0.000 350.0 0.100 5.850 -5.270 2.000

KF TF KC KD KE E1 S(E1) E2 S(E2) 0.050 0.700 0.300 0.500 1.000 5.1000 0.1500 3.8000 0.0500

** DEGOV1 ** BUS NAME BSKV MACH C O N S S T A T E S V A R S I C O N 16026 PIURA 4.80 2 7620-7631 2591-2596 474-487 327

T1 T2 T3 K T4 T5 T6 TD TMAX TMIN DROOP TE 0.500 0.020 7.200 0.147 -0.018 0.130 0.250 0.050 0.730 0.000 0.086 0.000

ICON(M)=0; DEGOV1 HAS DROOP WITH THROTTLE FEEDBACK

** EXAC1 ** BUS NAME BSKV MACH C O N S S T A T E S 16026 PIURA 4.80 3 4949-4965 1773-1777

TR TB TC KA TA VRMAX VRMIN TE 0.020 0.000 0.000 350.0 0.100 5.850 -5.270 2.000

KF TF KC KD KE E1 S(E1) E2 S(E2) 0.050 0.700 0.300 0.500 1.000 5.1000 0.1500 3.8000 0.0500

** DEGOV1 ** BUS NAME BSKV MACH C O N S S T A T E S V A R S I C O N 16026 PIURA 4.80 3 7632-7643 2597-2602 488-501 328

T1 T2 T3 K T4 T5 T6 TD TMAX TMIN DROOP TE 0.500 0.020 7.200 0.150 -0.018 0.130 0.250 0.050 0.630 0.000 0.099 0.000

ICON(M)=0; DEGOV1 HAS DROOP WITH THROTTLE FEEDBACK

BARRA 16034 [PARIAC 13.2]

** EXDC2 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 16034 PARIAC 13.2 5 4966-4981 1778-1782 317

TR KA TA TB TC VRMAX VRMIN KE TE KF TF1 0.020 125.00 0.150 0.000 0.000 3.800 -3.400 1.000 0.900 0.077 0.620

SWITCH E1 S(E1) E2 S(E2) KE VAR 0.0 2.3000 0.0800 3.0000 0.2700 1.0000

Page 215: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 9/57

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 16034 PARIAC 13.2 5 7644-7657 2603-2606 502

TG TP UO UC PMAX PMIN SIGMA DELTA 1.200 0.150 0.016 -0.016 0.933 0.000 0.066 0.486

TR TW A11 A13 A21 A23 6.000 0.500 0.500 1.000 1.500 1.000

BARRA 16036 [PARIAC 13.2]

** EXDC2 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 16036 PARIAC 13.2 6 4982-4997 1783-1787 318

TR KA TA TB TC VRMAX VRMIN KE TE KF TF1 0.020 125.00 0.150 0.000 0.000 3.800 -3.400 1.000 0.900 0.077 0.620

SWITCH E1 S(E1) E2 S(E2) KE VAR 0.0 2.3000 0.0800 3.0000 0.2700 0.0000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 16036 PARIAC 13.2 6 7658-7671 2607-2610 503

TG TP UO UC PMAX PMIN SIGMA DELTA 1.200 0.150 0.016 -0.016 0.970 0.000 0.066 0.486

TR TW A11 A13 A21 A23 6.000 0.500 0.500 1.000 1.500 1.000

BARRA 16038 [PARIAC 13.2]

** EXDC2 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 16044 PARIAC 13.2 4 4998-5013 1788-1792 319

TR KA TA TB TC VRMAX VRMIN KE TE KF TF1 0.020 125.00 0.150 0.000 0.000 3.800 -3.400 1.000 0.900 0.077 0.620

SWITCH E1 S(E1) E2 S(E2) KE VAR 0.0 2.3000 0.0800 3.0000 0.2700 0.0000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 16044 PARIAC 13.2 4 7672-7685 2611-2614 504

TG TP UO UC PMAX PMIN SIGMA DELTA 1.200 0.150 0.016 -0.016 0.900 0.000 0.073 0.539

TR TW A11 A13 A21 A23 6.000 0.500 0.500 1.000 1.500 1.000

BARRA 16050 [CHICLSLZ10.5]

** EXAC1 ** BUS NAME BSKV MACH C O N S S T A T E S 16050 CHICLSLZ 10.5 4 5014-5030 1793-1797

TR TB TC KA TA VRMAX VRMIN TE 0.020 0.000 0.000 350.0 0.100 5.900 -5.300 2.000

KF TF KC KD KE E1 S(E1) E2 S(E2) 0.055 0.600 0.300 0.500 1.000 5.1500 0.1500 3.8600 0.0500

** DEGOV1 ** BUS NAME BSKV MACH C O N S S T A T E S V A R S I C O N 16050 CHICLSLZ 10.5 4 7686-7697 2615-2620 505-518 329

T1 T2 T3 K T4 T5 T6 TD TMAX TMIN DROOP TE 0.500 0.020 7.200 0.155 -0.018 0.130 0.250 0.050 0.840 0.000 0.082 0.000

ICON(M)=0; DEGOV1 HAS DROOP WITH THROTTLE FEEDBACK

** EXAC1 ** BUS NAME BSKV MACH C O N S S T A T E S 16050 CHICLSLZ 10.5 5 5031-5047 1798-1802

Page 216: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 10/57

TR TB TC KA TA VRMAX VRMIN TE 0.020 0.000 0.000 350.0 0.100 5.900 -5.300 2.000

KF TF KC KD KE E1 S(E1) E2 S(E2) 0.055 0.600 0.300 0.500 1.000 5.1500 0.1500 3.8600 0.0500

** DEGOV1 ** BUS NAME BSKV MACH C O N S S T A T E S V A R S I C O N 16050 CHICLSLZ 10.5 5 7698-7709 2621-2626 519-532 330

T1 T2 T3 K T4 T5 T6 TD TMAX TMIN DROOP TE 0.500 0.020 7.200 0.155 -0.018 0.130 0.250 0.050 0.907 0.000 0.082 0.000

ICON(M)=0; DEGOV1 HAS DROOP WITH THROTTLE FEEDBACK

BARRA 16052 [CAHUA 10.0]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 16052 CAHUA 10.0 1 3753-3762 236 228 1579

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.655 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 16052 CAHUA 10.0 1 5048-5071 1803-1809

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.010 15.0 6.000 7.200 -6.480 0.035 0.350 0.000

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 6.000 -5.400 0.000 1.000 0.000 99.000 -99.000

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 1.000 1.000 6.000 0.000 4.500 0.000 0.000 0.000 0.000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 16052 CAHUA 10.0 1 7710-7723 2627-2630 533

TG TP UO UC PMAX PMIN SIGMA DELTA 1.064 0.100 0.071 -0.053 0.735 0.000 0.042 0.563

TR TW A11 A13 A21 A23 11.000 0.970 0.500 1.000 1.500 1.000

BARRA 16054 [CAHUA 10.0]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 16054 CAHUA 10.0 2 3763-3772 237 229 1580

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.655 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 16054 CAHUA 10.0 2 5072-5095 1810-1816

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.010 15.0 6.000 7.200 -6.480 0.035 0.350 0.000

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 6.000 -5.400 0.000 1.000 0.000 99.000 -99.000

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 1.000 1.000 6.000 0.000 4.500 0.000 0.000 0.000 0.000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 16054 CAHUA 10.0 2 7724-7737 2631-2634 534

TG TP UO UC PMAX PMIN SIGMA DELTA 1.064 0.100 0.071 -0.053 0.735 0.000 0.042 0.563

TR TW A11 A13 A21 A23

Page 217: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 11/57

11.000 0.970 0.500 1.000 1.500 1.000

BARRA 16056 [SULLANA 4.16]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 16066 TRUPAL 13.8 1 3773-3782 238 230 1581

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.804 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXAC4 ** BUS NAME BSKV MACH C O N S S T A T E S 16066 TRUPAL 13.8 1 5096-5105 1817-1819

TR VIMAX VIMIN TC TB KA TA VRMAX VRMIN KC 0.020 0.200 -0.200 1.000 20.000 400.0 0.075 5.240 -4.700 0.200

** TGOV5 ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 16066 TRUPAL 13.8 1 7738-7786 2635-2651 535-541

K T1 T2 T3 UO UC VMAX VMIN T4 K1 16.00 2.000 2.200 0.500 0.100 -0.400 0.8050 0.0000 0.400 0.300

K2 T5 K3 K4 T6 K5 K6 T7 K7 K8 0.000 9.000 0.700 0.000 0.000 0.000 0.000 0.000 0.000 0.000

K9 K10 K11 K12 K13 K14 RMAX RMIN LMAX LMIN-1.000 0.000 0.000 0.000 0.000 5.000 0.0005 -0.0005 0.805 0.000

C1 C2 C3 B CB KI TI TR TR1 CMAX 0.200 0.000 1.000 0.00 150.00 0.0300 100.00 1.000 1.000 0.81

CMIN TD TF TW PSP TMW KL KMW DELTA PE 0.00 0.000 5.000 7.000 1.000 1.000 1.000 0.000 0.000

BARRA 16068 [SIDERNOR13.8]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 16068 SIDERNOR 13.8 1 3783-3792 239 231 1582

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 3.379 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXAC1 ** BUS NAME BSKV MACH C O N S S T A T E S 16068 SIDERNOR 13.8 1 5106-5122 1820-1824

TR TB TC KA TA VRMAX VRMIN TE 0.010 0.000 0.000 600.0 0.050 8.000 -6.400 1.200

KF TF KC KD KE E1 S(E1) E2 S(E2) 0.034 1.600 0.200 0.400 1.000 6.2500 0.6827 4.6900 0.1428

** GAST2A ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 16068 SIDERNOR 13.8 1 7787-7817 2652-2664 542-545

W X Y Z ETD TCD TRATE T MAX MIN ECR K3 20.00 5.000 8.000 1.00 0.020 0.100 21.50 0.13 1.01 -0.08 0.010 0.770

A B C TF KF K5 K4 T3 T4 TT T5 10.00 1.00 0.00 0.10 1.000 0.200 0.800 15.00 2.500 450.0 3.30

AF1 BF1 AF2 BF2 CF2 TR K6 TC 700.0 550.0 -0.300 1.300 0.500 1001.0 0.230 1046.0

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 16068 SIDERNOR 13.8 2 3793-3802 240 232 1583

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 3.379 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

Page 218: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 12/57

** EXAC1 ** BUS NAME BSKV MACH C O N S S T A T E S 16068 SIDERNOR 13.8 2 5123-5139 1825-1829

TR TB TC KA TA VRMAX VRMIN TE 0.010 0.000 0.000 600.0 0.050 8.000 -6.400 1.200

KF TF KC KD KE E1 S(E1) E2 S(E2) 0.034 1.600 0.200 0.400 1.000 6.2500 0.6827 4.6900 0.1428

** GAST2A ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 16068 SIDERNOR 13.8 2 7818-7848 2665-2677 546-549

W X Y Z ETD TCD TRATE T MAX MIN ECR K3 20.00 5.000 8.000 1.00 0.020 0.100 21.50 0.13 1.01 -0.08 0.010 0.770

A B C TF KF K5 K4 T3 T4 TT T5 10.00 1.00 0.00 0.10 1.000 0.200 0.800 15.00 2.500 450.0 3.30

AF1 BF1 AF2 BF2 CF2 TR K6 TC 700.0 550.0 -0.300 1.300 0.500 1001.0 0.230 1046.0

BARRA 16070 [SIDERSUR13.8]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 16070 SIDERSUR 13.8 1 3803-3812 241 233 1584

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.669 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXST2 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 16070 SIDERSUR 13.8 1 5140-5152 1830-1833 320

TR KA TA VRMAX VRMIN KE TE 0.010 120.0 0.050 4.500 -3.600 1.000 0.500

KF TF KP KI KC EFDMAX KI VAR 0.035 0.800 1.190 2.170 0.200 3.800 0.000

** GAST2A ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 16070 SIDERSUR 13.8 1 7849-7879 2678-2690 550-553

W X Y Z ETD TCD TRATE T MAX MIN ECR K3 20.00 5.000 9.000 1.00 0.020 0.100 23.00 0.13 1.01 -0.08 0.010 0.770

A B C TF KF K5 K4 T3 T4 TT T5 10.00 1.00 0.00 0.10 1.000 0.200 0.800 15.00 2.500 450.0 3.30

AF1 BF1 AF2 BF2 CF2 TR K6 TC 700.0 550.0 -0.300 1.300 0.500 1001.0 0.230 1046.0

BARRA 16072 [MALACAS13.8]

** IEEEST ** BUS NAME BSKV MC C O N S S T A T E S V A R S I C O N S 16072 MALACAS 13.8 1 3303-3319 1402-1408 164-165 150-151

IC BUS A1 A2 A3 A4 A5 A6 T1 T2 3 0 0.0300 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

T3 T4 T5 T6 KS LSMAX LSMIN VCU VCL 0.0000 0.0000 1.5000 1.5000 -0.952 0.0850 -0.0850 0.000 0.000

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 16072 MALACAS 13.8 1 3813-3822 242 234 1585

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 3.550 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXBAS ** BUS NAME BSKV MACH C O N S S T A T E S 16072 MALACAS 13.8 1 5153-5173 1834-1840

TR KP KI KA TA TB TC VRMAX VRMIN

Page 219: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 13/57

0.023 1.000 0.000 354.900 0.010 0.043 0.190 8.330 -6.660

KF TF TF1 TF2 KE TE KC KD 0.029 2.600 0.043 0.190 1.000 0.300 0.200 0.000

E1 S(E1) E2 S(E2) 6.2400 0.1700 8.3300 0.1820

** GAST2A ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 16072 MALACAS 13.8 1 7880-7910 2691-2703 554-557

W X Y Z ETD TCD TRATE T MAX MIN ECR K3 20.00 4.00012.000 1.00 0.040 0.200 99.00 0.06 0.82 -0.08 0.010 0.770

A B C TF KF K5 K4 T3 T4 TT T5 1.00 0.20 1.00 0.20 0.000 0.200 0.800 15.00 2.500 450.0 3.30

AF1 BF1 AF2 BF2 CF2 TR K6 TC 700.0 550.0 -0.300 1.300 0.500 1001.0 0.230 1046.0

BARRA 16084 [TRUJISUR10.0]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 16084 TRUJISUR 10.0 1 3823-3832 243 235 1586

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 3.354 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXAC1 ** BUS NAME BSKV MACH C O N S S T A T E S 16084 TRUJISUR 10.0 1 5174-5190 1841-1845

TR TB TC KA TA VRMAX VRMIN TE 0.010 0.000 0.000 600.0 0.050 8.000 -6.400 1.200

KF TF KC KD KE E1 S(E1) E2 S(E2) 0.034 1.600 0.200 0.400 1.000 6.2500 0.6827 4.6900 0.1428

** GAST2A ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 16084 TRUJISUR 10.0 1 7911-7941 2704-2716 558-561

W X Y Z ETD TCD TRATE T MAX MIN ECR K3 20.00 5.000 8.000 1.00 0.020 0.100 22.00 0.13 1.01 -0.08 0.010 0.770

A B C TF KF K5 K4 T3 T4 TT T5 10.00 1.00 0.00 0.10 1.000 0.200 0.800 15.00 2.500 450.0 3.30

AF1 BF1 AF2 BF2 CF2 TR K6 TC 700.0 550.0 -0.300 1.300 0.500 1001.0 0.230 1046.0

BARRA 16090 [CEMPACAS2.30]

** EXAC1 ** BUS NAME BSKV MACH C O N S S T A T E S 16090 CEMPACAS 2.30 4 5191-5207 1846-1850

TR TB TC KA TA VRMAX VRMIN TE 0.020 0.000 0.000 250.0 0.100 6.000 -5.400 2.000

KF TF KC KD KE E1 S(E1) E2 S(E2) 0.052 0.550 0.300 0.500 1.000 5.2000 0.1500 3.9000 0.0500

** DEGOV1 ** BUS NAME BSKV MACH C O N S S T A T E S V A R S I C O N 16090 CEMPACAS 2.30 4 7942-7953 2717-2722 562-575 331

T1 T2 T3 K T4 T5 T6 TD TMAX TMIN DROOP TE 0.700 0.020 7.000 0.150 -0.018 0.130 0.250 0.031 0.555 0.000 0.069 0.000

ICON(M)=0; DEGOV1 HAS DROOP WITH THROTTLE FEEDBACK

BARRA 16092 [CEMPACAS6.30]

** EXAC1 ** BUS NAME BSKV MACH C O N S S T A T E S

Page 220: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 14/57

16092 CEMPACAS 6.30 1 5208-5224 1851-1855

TR TB TC KA TA VRMAX VRMIN TE 0.020 0.000 0.000 350.0 0.100 5.900 -5.300 2.000

KF TF KC KD KE E1 S(E1) E2 S(E2) 0.061 0.730 0.300 0.500 1.000 5.1000 0.1500 3.8000 0.0500

** DEGOV1 ** BUS NAME BSKV MACH C O N S S T A T E S V A R S I C O N 16092 CEMPACAS 6.30 1 7954-7965 2723-2728 576-589 332

T1 T2 T3 K T4 T5 T6 TD TMAX TMIN DROOP TE 0.500 0.020 7.200 0.175 -0.018 0.130 0.250 0.050 0.788 0.000 0.066 0.000

ICON(M)=0; DEGOV1 HAS DROOP WITH THROTTLE FEEDBACK

** EXAC1 ** BUS NAME BSKV MACH C O N S S T A T E S 16092 CEMPACAS 6.30 2 5225-5241 1856-1860

TR TB TC KA TA VRMAX VRMIN TE 0.020 0.000 0.000 350.0 0.100 5.900 -5.300 2.000

KF TF KC KD KE E1 S(E1) E2 S(E2) 0.061 0.730 0.300 0.500 1.000 5.1000 0.1500 3.8000 0.0500

** DEGOV1 ** BUS NAME BSKV MACH C O N S S T A T E S V A R S I C O N 16092 CEMPACAS 6.30 2 7966-7977 2729-2734 590-603 333

T1 T2 T3 K T4 T5 T6 TD TMAX TMIN DROOP TE 0.500 0.020 7.200 0.175 -0.018 0.130 0.250 0.050 0.787 0.000 0.069 0.000

ICON(M)=0; DEGOV1 HAS DROOP WITH THROTTLE FEEDBACK

** EXAC1 ** BUS NAME BSKV MACH C O N S S T A T E S 16092 CEMPACAS 6.30 3 5242-5258 1861-1865

TR TB TC KA TA VRMAX VRMIN TE 0.020 0.000 0.000 350.0 0.100 5.900 -5.300 2.000

KF TF KC KD KE E1 S(E1) E2 S(E2) 0.061 0.730 0.300 0.500 1.000 5.1000 0.1500 3.8000 0.0500

** DEGOV1 ** BUS NAME BSKV MACH C O N S S T A T E S V A R S I C O N 16092 CEMPACAS 6.30 3 7978-7989 2735-2740 604-617 334

T1 T2 T3 K T4 T5 T6 TD TMAX TMIN DROOP TE 0.500 0.020 7.200 0.175 -0.018 0.130 0.250 0.050 0.787 0.000 0.071 0.000

ICON(M)=0; DEGOV1 HAS DROOP WITH THROTTLE FEEDBACK

BARRA 16094 [GALLCIEG10.5]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 16094 GALLCIEG 10.5 1 3833-3842 244 236 1587

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.453 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 16094 GALLCIEG 10.5 1 5259-5282 1866-1872

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.010 15.0 5.000 7.200 -6.480 0.035 0.350 0.000

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 6.000 -5.400 0.000 1.000 0.000 99.000 -99.000

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 1.000 1.000 6.000 0.000 4.500 0.000 0.000 0.000 0.000

Page 221: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 15/57

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 16094 GALLCIEG 10.5 1 7990-8003 2741-2744 618

TG TP UO UC PMAX PMIN SIGMA DELTA 0.800 0.100 1.000 -1.000 0.975 0.000 0.062 1.128

TR TW A11 A13 A21 A23 15.000 1.000 0.500 1.000 1.500 1.000

BARRA 16096 [GALLCIEG10.5]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 16096 GALLCIEG 10.5 2 3843-3852 245 237 1588

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.453 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 16096 GALLCIEG 10.5 2 5283-5306 1873-1879

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.010 15.0 5.000 7.200 -6.480 0.035 0.350 0.000

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 6.000 -5.400 0.000 1.000 0.000 99.000 -99.000

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 1.000 1.000 6.000 0.000 4.500 0.000 0.000 0.000 0.000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 16096 GALLCIEG 10.5 2 8004-8017 2745-2748 619

TG TP UO UC PMAX PMIN SIGMA DELTA 0.800 0.100 1.000 -1.000 0.975 0.000 0.062 1.128

TR TW A11 A13 A21 A23 15.000 1.000 0.500 1.000 1.500 1.000

BARRA 16098 [MALACAS 13.2]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 16098 MALACAS 13.2 1 3853-3862 246 238 1589

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 3.658 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXAC1 ** BUS NAME BSKV MACH C O N S S T A T E S 16098 MALACAS 13.2 1 5307-5323 1880-1884

TR TB TC KA TA VRMAX VRMIN TE 0.010 0.000 0.000 400.0 0.050 6.250 -5.620 1.200

KF TF KC KD KE E1 S(E1) E2 S(E2) 0.028 0.700 0.200 0.400 1.000 6.2500 0.0600 4.6900 0.0200

** GAST2A ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 16098 MALACAS 13.2 1 8018-8048 2749-2761 620-623

W X Y Z ETD TCD TRATE T MAX MIN ECR K3 20.00 3.000 5.000 1.00 0.020 0.100 16.00 0.13 1.01 -0.08 0.010 0.770

A B C TF KF K5 K4 T3 T4 TT T5 10.00 1.00 0.00 0.10 1.000 0.200 0.800 15.00 2.500 450.0 3.30

AF1 BF1 AF2 BF2 CF2 TR K6 TC 700.0 550.0 -0.300 1.300 0.500 1001.0 0.230 1046.0

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE

Page 222: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 16/57

16098 MALACAS 13.2 2 3863-3872 247 239 1590

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 3.630 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXAC1 ** BUS NAME BSKV MACH C O N S S T A T E S 16098 MALACAS 13.2 2 5324-5340 1885-1889

TR TB TC KA TA VRMAX VRMIN TE 0.010 0.000 0.000 400.0 0.050 6.250 -5.620 1.200

KF TF KC KD KE E1 S(E1) E2 S(E2) 0.028 0.700 0.200 0.400 1.000 6.2500 0.0600 4.6900 0.0200

** GAST2A ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 16098 MALACAS 13.2 2 8049-8079 2762-2774 624-627

W X Y Z ETD TCD TRATE T MAX MIN ECR K3 20.00 3.000 5.000 1.00 0.020 0.100 16.70 0.13 1.01 -0.08 0.010 0.770

A B C TF KF K5 K4 T3 T4 TT T5 10.00 1.00 0.00 0.10 1.000 0.200 0.800 15.00 2.500 450.0 3.30

AF1 BF1 AF2 BF2 CF2 TR K6 TC 700.0 550.0 -0.300 1.300 0.500 1001.0 0.230 1046.0

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 16098 MALACAS 13.2 3 3873-3882 248 240 1591

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 3.658 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXAC1 ** BUS NAME BSKV MACH C O N S S T A T E S 16098 MALACAS 13.2 3 5341-5357 1890-1894

TR TB TC KA TA VRMAX VRMIN TE 0.010 0.000 0.000 400.0 0.050 6.250 -5.620 1.200

KF TF KC KD KE E1 S(E1) E2 S(E2) 0.028 0.700 0.200 0.400 1.000 6.2500 0.0600 4.6900 0.0200

** GAST2A ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 16098 MALACAS 13.2 3 8080-8110 2775-2787 628-631

W X Y Z ETD TCD TRATE T MAX MIN ECR K3 20.00 3.000 5.000 1.00 0.020 0.100 16.00 0.13 1.01 -0.08 0.010 0.770

A B C TF KF K5 K4 T3 T4 TT T5 10.00 1.00 0.00 0.10 1.000 0.200 0.800 15.00 2.500 450.0 3.30

AF1 BF1 AF2 BF2 CF2 TR K6 TC 700.0 550.0 -0.300 1.300 0.500 1001.0 0.230 1046.0

BARRA 16100 [PAITAEMD4.16]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 16108 CURUMUY 10.0 1 3883-3892 249 241 1592

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.733 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXAC4 ** BUS NAME BSKV MACH C O N S S T A T E S 16108 CURUMUY 10.0 1 5358-5367 1895-1897

TR VIMAX VIMIN TC TB KA TA VRMAX VRMIN KC 0.020 0.200 -0.200 1.000 24.000 400.0 0.075 4.900 -4.400 0.200

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 16108 CURUMUY 10.0 1 8111-8124 2788-2791 632

Page 223: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 17/57

TG TP UO UC PMAX PMIN SIGMA DELTA 0.500 0.050 0.016 -0.016 0.341 0.000 0.075 0.650

TR TW A11 A13 A21 A23 6.000 1.000 0.500 1.000 1.500 1.000

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 16108 CURUMUY 10.0 2 3893-3902 250 242 1593

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.733 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXAC4 ** BUS NAME BSKV MACH C O N S S T A T E S 16108 CURUMUY 10.0 2 5368-5377 1898-1900

TR VIMAX VIMIN TC TB KA TA VRMAX VRMIN KC 0.020 0.200 -0.200 1.000 24.000 400.0 0.075 4.900 -4.400 0.200

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 16108 CURUMUY 10.0 2 8125-8138 2792-2795 633

TG TP UO UC PMAX PMIN SIGMA DELTA 0.500 0.050 0.016 -0.016 0.341 0.000 0.075 0.650

TR TW A11 A13 A21 A23 6.000 1.000 0.500 1.000 1.500 1.000

BARRA 16120 [TUMBES 10.0]

** EXAC1 ** BUS NAME BSKV MACH C O N S S T A T E S 16120 TUMBES 10.0 1 5378-5394 1901-1905

TR TB TC KA TA VRMAX VRMIN TE 0.020 0.000 0.000 350.0 0.100 5.800 -5.200 2.000

KF TF KC KD KE E1 S(E1) E2 S(E2) 0.061 0.730 0.300 0.500 1.000 5.0000 0.1500 3.8000 0.0500

** DEGOV1 ** BUS NAME BSKV MACH C O N S S T A T E S V A R S I C O N 16120 TUMBES 10.0 1 8139-8150 2796-2801 634-647 335

T1 T2 T3 K T4 T5 T6 TD TMAX TMIN DROOP TE 0.500 0.020 7.200 0.240 -0.018 0.130 0.250 0.035 0.807 0.000 0.074 0.000

ICON(M)=0; DEGOV1 HAS DROOP WITH THROTTLE FEEDBACK

** EXAC1 ** BUS NAME BSKV MACH C O N S S T A T E S 16120 TUMBES 10.0 2 5395-5411 1906-1910

TR TB TC KA TA VRMAX VRMIN TE 0.020 0.000 0.000 350.0 0.100 5.800 -5.200 2.000

KF TF KC KD KE E1 S(E1) E2 S(E2) 0.061 0.730 0.300 0.500 1.000 5.0000 0.1500 3.8000 0.0500

** DEGOV1 ** BUS NAME BSKV MACH C O N S S T A T E S V A R S I C O N 16120 TUMBES 10.0 2 8151-8162 2802-2807 648-661 336

T1 T2 T3 K T4 T5 T6 TD TMAX TMIN DROOP TE 0.500 0.020 7.200 0.240 -0.018 0.130 0.250 0.035 0.807 0.000 0.073 0.000

ICON(M)=0; DEGOV1 HAS DROOP WITH THROTTLE FEEDBACK

BARRA 26000 [INDECS0110.0]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 26000 INDECS01 10.0 1 3903-3912 251 243 1594

Page 224: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 18/57

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 4.052 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** SEXS ** BUS NAME BSKV MACH C O N S S T A T E S 26000 INDECS01 10.0 1 5412-5417 1911-1912

TA/TB TB K TE EMIN EMAX 0.090 14.000 450.0 0.075 -7.30 6.60

BARRA 26030 [STA.ROSA10.0]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 26030 STA.ROSA 10.0 1 3913-3922 252 244 1595

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 3.789 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXAC1 ** BUS NAME BSKV MACH C O N S S T A T E S 26030 STA.ROSA 10.0 1 5418-5434 1913-1917

TR TB TC KA TA VRMAX VRMIN TE 0.010 0.000 0.000 600.0 0.040 6.300 -5.700 1.200

KF TF KC KD KE E1 S(E1) E2 S(E2) 0.042 2.400 0.170 0.300 1.000 6.3000 0.0600 4.7000 0.0200

** GAST2A ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 26030 STA.ROSA 10.0 1 8163-8193 2808-2820 662-665

W X Y Z ETD TCD TRATE T MAX MIN ECR K3 20.00 2.100 3.000 1.00 0.050 0.200 10.00 0.25 1.01 -0.08 0.020 0.770

A B C TF KF K5 K4 T3 T4 TT T5 5.00 1.00 0.00 0.20 1.000 0.200 0.800 15.00 2.500 450.0 3.30

AF1 BF1 AF2 BF2 CF2 TR K6 TC 700.0 550.0 -0.300 1.300 0.500 1001.0 0.230 1046.0

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 26030 STA.ROSA 10.0 2 3923-3932 253 245 1596

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 3.789 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXAC1 ** BUS NAME BSKV MACH C O N S S T A T E S 26030 STA.ROSA 10.0 2 5435-5451 1918-1922

TR TB TC KA TA VRMAX VRMIN TE 0.010 0.000 0.000 600.0 0.040 6.300 -5.700 1.200

KF TF KC KD KE E1 S(E1) E2 S(E2) 0.042 2.400 0.170 0.300 1.000 6.3000 0.0600 4.7000 0.0200

** GAST2A ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 26030 STA.ROSA 10.0 2 8194-8224 2821-2833 666-669

W X Y Z ETD TCD TRATE T MAX MIN ECR K3 20.00 2.100 3.000 1.00 0.050 0.200 10.00 0.25 1.01 -0.08 0.020 0.770

A B C TF KF K5 K4 T3 T4 TT T5 5.00 1.00 0.00 0.20 1.000 0.200 0.800 15.00 2.500 450.0 3.30

AF1 BF1 AF2 BF2 CF2 TR K6 TC 700.0 550.0 -0.300 1.300 0.500 1001.0 0.230 1046.0

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 26030 STA.ROSA 10.0 3 3933-3942 254 246 1597

Page 225: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 19/57

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 3.345 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXAC1 ** BUS NAME BSKV MACH C O N S S T A T E S 26030 STA.ROSA 10.0 3 5452-5468 1923-1927

TR TB TC KA TA VRMAX VRMIN TE 0.010 0.000 0.000 700.0 0.040 6.300 -5.700 1.200

KF TF KC KD KE E1 S(E1) E2 S(E2) 0.045 2.400 0.170 0.300 1.000 6.3000 0.0600 4.7000 0.0200

** GAST2A ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 26030 STA.ROSA 10.0 3 8225-8255 2834-2846 670-673

W X Y Z ETD TCD TRATE T MAX MIN ECR K3 20.00 4.000 7.000 1.00 0.050 0.200 20.00 0.25 1.01 -0.08 0.020 0.770

A B C TF KF K5 K4 T3 T4 TT T5 5.00 1.00 0.00 0.20 1.000 0.200 0.800 15.00 2.500 450.0 3.30

AF1 BF1 AF2 BF2 CF2 TR K6 TC 700.0 550.0 -0.300 1.300 0.500 1001.0 0.230 1046.0

BARRA 26032 [STA.ROSA13.8]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 26032 STA.ROSA 13.8 1 3943-3952 255 247 1598

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 3.261 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXAC1 ** BUS NAME BSKV MACH C O N S S T A T E S 26032 STA.ROSA 13.8 1 5469-5485 1928-1932

TR TB TC KA TA VRMAX VRMIN TE 0.010 0.000 0.000 600.0 0.050 7.700 -6.900 1.200

KF TF KC KD KE E1 S(E1) E2 S(E2) 0.037 2.000 0.200 0.400 1.000 7.7000 0.0600 5.8000 0.0200

** GAST2A ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 26032 STA.ROSA 13.8 1 8256-8286 2847-2859 674-677

W X Y Z ETD TCD TRATE T MAX MIN ECR K3 20.00 2.000 4.000 1.00 0.020 0.100 51.30 0.06 1.01 -0.08 0.010 0.770

A B C TF KF K5 K4 T3 T4 TT T5 10.00 1.00 0.00 0.10 1.000 0.200 0.800 15.00 2.500 450.0 3.30

AF1 BF1 AF2 BF2 CF2 TR K6 TC 700.0 550.0 -0.300 1.300 0.500 1001.0 0.230 1046.0

BARRA 26034 [STA.ROSA13.8]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 26034 STA.ROSA 13.8 2 3953-3962 256 248 1599

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 3.255 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXAC1 ** BUS NAME BSKV MACH C O N S S T A T E S 26034 STA.ROSA 13.8 2 5486-5502 1933-1937

TR TB TC KA TA VRMAX VRMIN TE 0.010 0.000 0.000 600.0 0.050 7.700 -6.900 1.200

KF TF KC KD KE E1 S(E1) E2 S(E2) 0.037 2.000 0.200 0.400 1.000 7.7000 0.0600 5.8000 0.0200

Page 226: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 20/57

** GAST2A ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 26034 STA.ROSA 13.8 2 8287-8317 2860-2872 678-681

W X Y Z ETD TCD TRATE T MAX MIN ECR K3 20.00 2.000 4.000 1.00 0.020 0.100 51.80 0.06 1.01 -0.08 0.010 0.770

A B C TF KF K5 K4 T3 T4 TT T5 10.00 1.00 0.00 0.10 1.000 0.200 0.800 15.00 2.500 450.0 3.30

AF1 BF1 AF2 BF2 CF2 TR K6 TC 700.0 550.0 -0.300 1.300 0.500 1001.0 0.230 1046.0

BARRA 26064 [SNICOLAS13.8]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 26064 SNICOLAS 13.8 1 3963-3972 257 249 1600

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 3.191 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** IEEET5 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 26064 SNICOLAS 13.8 1 5503-5512 1938-1939 321

TRH KV VRMAX VRMIN TE KE 20.000 0.050 8.300 1.700 0.760 1.000

E1 S(E1) E2 S(E2) KE VAR 3.1800 0.2200 4.2800 0.9500 0.0000

** TGOV5 ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 26064 SNICOLAS 13.8 1 8318-8366 2873-2889 682-688

K T1 T2 T3 UO UC VMAX VMIN T4 K1 18.30 8.000 7.000 0.500 0.100 -0.400 0.9200 0.0000 0.400 0.300

K2 T5 K3 K4 T6 K5 K6 T7 K7 K8 0.000 9.000 0.700 0.000 0.000 0.000 0.000 0.000 0.000 0.000

K9 K10 K11 K12 K13 K14 RMAX RMIN LMAX LMIN-1.000 0.000 0.000 0.000 0.000 5.000 0.0005 -0.0005 0.920 0.000

C1 C2 C3 B CB KI TI TR TR1 CMAX 0.200 0.000 1.000 0.00 150.00 0.0300 100.00 1.000 1.000 0.92

CMIN TD TF TW PSP TMW KL KMW DELTA PE 0.00 0.000 5.000 7.000 1.000 1.000 1.000 0.000 0.000

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 26064 SNICOLAS 13.8 2 3973-3982 258 250 1601

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 3.191 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** IEEET5 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 26064 SNICOLAS 13.8 2 5513-5522 1940-1941 322

TRH KV VRMAX VRMIN TE KE 20.000 0.050 8.300 1.700 0.760 1.000

E1 S(E1) E2 S(E2) KE VAR 3.1800 0.2200 4.2800 0.9500 0.0000

** TGOV5 ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 26064 SNICOLAS 13.8 2 8367-8415 2890-2906 689-695

K T1 T2 T3 UO UC VMAX VMIN T4 K1 18.30 8.000 7.000 0.500 0.100 -0.400 0.9200 0.0000 0.400 0.300

K2 T5 K3 K4 T6 K5 K6 T7 K7 K8 0.000 9.000 0.700 0.000 0.000 0.000 0.000 0.000 0.000 0.000

Page 227: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 21/57

K9 K10 K11 K12 K13 K14 RMAX RMIN LMAX LMIN-1.000 0.000 0.000 0.000 0.000 5.000 0.0005 -0.0005 0.920 0.000

C1 C2 C3 B CB KI TI TR TR1 CMAX 0.200 0.000 1.000 0.00 150.00 0.0300 100.00 1.000 1.000 0.92

CMIN TD TF TW PSP TMW KL KMW DELTA PE 0.00 0.000 5.000 7.000 1.000 1.000 1.000 0.000 0.000

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 26064 SNICOLAS 13.8 3 3983-3992 259 251 1602

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.678 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** IEEET5 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 26064 SNICOLAS 13.8 3 5523-5532 1942-1943 323

TRH KV VRMAX VRMIN TE KE 20.000 0.050 8.300 1.700 0.760 1.000

E1 S(E1) E2 S(E2) KE VAR 3.1800 0.2200 4.2800 0.9500 0.0000

** TGOV5 ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 26064 SNICOLAS 13.8 3 8416-8464 2907-2923 696-702

K T1 T2 T3 UO UC VMAX VMIN T4 K1 18.26 9.000 3.000 0.500 0.100 -0.400 0.9200 0.0000 0.400 0.300

K2 T5 K3 K4 T6 K5 K6 T7 K7 K8 0.000 9.000 0.700 0.000 0.000 0.000 0.000 0.000 0.000 0.000

K9 K10 K11 K12 K13 K14 RMAX RMIN LMAX LMIN-1.000 0.000 0.000 0.000 0.000 5.000 0.0005 -0.0005 0.920 0.000

C1 C2 C3 B CB KI TI TR TR1 CMAX 0.200 0.000 1.000 0.00 150.00 0.0300 100.00 1.000 1.000 0.92

CMIN TD TF TW PSP TMW KL KMW DELTA PE 0.00 0.000 5.000 7.000 1.000 1.000 1.000 0.000 0.000

BARRA 26066 [SNICOLAS4.16]

** EXAC1 ** BUS NAME BSKV MACH C O N S S T A T E S 26066 SNICOLAS 4.16 4 5533-5549 1944-1948

TR TB TC KA TA VRMAX VRMIN TE 0.020 0.000 0.000 250.0 0.100 6.480 -5.830 2.000

KF TF KC KD KE E1 S(E1) E2 S(E2) 0.052 0.550 0.300 0.500 1.000 6.4800 0.1500 4.8600 0.0500

** DEGOV1 ** BUS NAME BSKV MACH C O N S S T A T E S V A R S I C O N 26066 SNICOLAS 4.16 4 8465-8476 2924-2929 703-716 337

T1 T2 T3 K T4 T5 T6 TD TMAX TMIN DROOP TE 0.700 0.020 7.000 0.150 -0.018 0.130 0.250 0.031 0.820 0.000 0.087 0.000

ICON(M)=0; DEGOV1 HAS DROOP WITH THROTTLE FEEDBACK

BARRA 26088 [S.ROSAWE13.8]

** ESAC2A ** BUS NAME BSKV MACH C O N S S T A T E S 26088 S.ROSAWE 13.8 3 5550-5571 1949-1953

TR TB TC KA TA VAMAX VAMIN KB VRMAX VRMIN 0.000 1.000 1.000 400.0 0.020 68.000 -27.700 1.0 27.7 -25.0

Page 228: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 22/57

TE VFEMAX KH KF TF KC KD KE 2.000 7.100 0.000 0.030 1.000 0.170 0.400 1.000

E1 S(E1) E2 S(E2) 6.6000 0.1480 4.5500 0.0220

** GASTWD ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 26088 S.ROSAWE 13.8 3 8477-8508 2930-2943 717-721

DROOP KP KI KD ETD TCD TRATE T MAX MIN ECR K3 0.050 10.00 2.00 0.00 0.040 0.200 120.00 0.06 1.01 -0.08 0.010 0.770

A B C TF KF K5 K4 T3 T4 TT T5 1.00 0.20 1.00 0.20 0.000 0.200 0.800 15.00 2.500 450.0 3.30

AF1 BF1 AF2 BF2 CF2 TR K6 TC TD 700.0 550.0 -0.300 1.300 0.500 1001.0 0.230 1005.0 5.000

BARRA 26092 [VENTANIL16.0]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 26092 VENTANIL 16.0 1 3993-4002 260 252 1603

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 3.301 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 26092 VENTANIL 16.0 1 5572-5595 1954-1960

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.005 8.5 1.100 1.500 -1.400 0.000 0.000 0.000

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 99.000 -99.000 0.000 1.000 0.000 7.500 -6.750

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 0.000 0.000 0.000 0.000 0.000 0.000 6.200 0.000 0.200

** GASTWD ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 26092 VENTANIL 16.0 1 8509-8540 2944-2957 722-726

DROOP KP KI KD ETD TCD TRATE T MAX MIN ECR K3 0.060 15.00 2.60 0.00 0.040 0.200 163.70 0.06 1.01 -0.08 0.010 0.770

A B C TF KF K5 K4 T3 T4 TT T5 1.00 0.20 1.00 0.20 0.000 0.200 0.800 15.00 2.500 450.0 3.30

AF1 BF1 AF2 BF2 CF2 TR K6 TC TD 700.0 550.0 -0.300 1.300 0.500 1001.0 0.230 1005.0 5.000

BARRA 26096 [VENTANIL16.0]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 26096 VENTANIL 16.0 2 4003-4012 261 253 1604

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 3.307 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 26096 VENTANIL 16.0 2 5596-5619 1961-1967

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.005 8.5 1.100 1.500 -1.400 0.000 0.000 0.000

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 99.000 -99.000 0.000 1.000 0.000 7.500 -6.750

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 0.000 0.000 0.000 0.000 0.000 0.000 6.200 0.000 0.200

** GASTWD ** BUS NAME BSKV MACH C O N S S T A T E S V A R S

Page 229: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 23/57

26096 VENTANIL 16.0 2 8541-8572 2958-2971 727-731

DROOP KP KI KD ETD TCD TRATE T MAX MIN ECR K3 0.060 15.00 2.60 0.00 0.040 0.200 164.50 0.06 1.01 -0.08 0.010 0.770

A B C TF KF K5 K4 T3 T4 TT T5 1.00 0.20 1.00 0.20 0.000 0.200 0.800 15.00 2.500 450.0 3.30

AF1 BF1 AF2 BF2 CF2 TR K6 TC TD 700.0 550.0 -0.300 1.300 0.500 1001.0 0.230 1005.0 5.000

BARRA 36000 [ANTACS016.60]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 36000 ANTACS01 6.60 1 4013-4022 262 254 1605

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.901 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXAC1 ** BUS NAME BSKV MACH C O N S S T A T E S 36000 ANTACS01 6.60 1 5620-5636 1968-1972

TR TB TC KA TA VRMAX VRMIN TE 0.010 0.000 0.000 400.0 0.050 5.800 -4.900 1.200

KF TF KC KD KE E1 S(E1) E2 S(E2) 0.030 0.700 0.200 0.400 1.000 5.8000 0.0600 4.3000 0.0200

BARRA 36002 [ANTACS026.60]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 36002 ANTACS02 6.60 2 4023-4032 263 255 1606

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.901 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXAC1 ** BUS NAME BSKV MACH C O N S S T A T E S 36002 ANTACS02 6.60 2 5637-5653 1973-1977

TR TB TC KA TA VRMAX VRMIN TE 0.010 0.000 0.000 400.0 0.050 5.800 -4.900 1.200

KF TF KC KD KE E1 S(E1) E2 S(E2) 0.030 0.700 0.200 0.400 1.000 5.8000 0.0600 4.3000 0.0200

BARRA 44040 [COBRIZII69.0]

** EXDC2 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46004 OROYA 2.30 1 5654-5669 1978-1982 324

TR KA TA TB TC VRMAX VRMIN KE TE KF TF1 0.020 125.00 0.150 0.000 0.000 4.200 -3.800 1.000 0.900 0.070 0.750

SWITCH E1 S(E1) E2 S(E2) KE VAR 0.0 2.5000 0.0800 3.3000 0.2700 1.0000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46004 OROYA 2.30 1 8573-8586 2972-2975 732

TG TP UO UC PMAX PMIN SIGMA DELTA 1.200 0.150 0.016 -0.016 0.626 0.000 0.072 0.478

TR TW A11 A13 A21 A23 6.000 0.500 0.500 1.000 1.500 1.000

** EXDC2 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46004 OROYA 2.30 2 5670-5685 1983-1987 325

TR KA TA TB TC VRMAX VRMIN KE TE KF TF1 0.020 125.00 0.150 0.000 0.000 4.200 -3.800 1.000 0.900 0.070 0.750

Page 230: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 24/57

SWITCH E1 S(E1) E2 S(E2) KE VAR 0.0 2.5000 0.0800 3.3000 0.2700 1.0000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46004 OROYA 2.30 2 8587-8600 2976-2979 733

TG TP UO UC PMAX PMIN SIGMA DELTA 1.200 0.150 0.016 -0.016 0.624 0.000 0.082 0.543

TR TW A11 A13 A21 A23 6.000 0.500 0.500 1.000 1.500 1.000

** EXDC2 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46004 OROYA 2.30 3 5686-5701 1988-1992 326

TR KA TA TB TC VRMAX VRMIN KE TE KF TF1 0.020 125.00 0.150 0.000 0.000 4.200 -3.800 1.000 0.900 0.070 0.750

SWITCH E1 S(E1) E2 S(E2) KE VAR 0.0 2.5000 0.0800 3.3000 0.2700 1.0000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46004 OROYA 2.30 3 8601-8614 2980-2983 734

TG TP UO UC PMAX PMIN SIGMA DELTA 1.200 0.150 0.016 -0.016 0.624 0.000 0.082 0.543

TR TW A11 A13 A21 A23 6.000 0.500 0.500 1.000 1.500 1.000

BARRA 46016 [MATUCANA12.5]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 46016 MATUCANA 12.5 1 4033-4042 264 256 1607

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.445 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 46016 MATUCANA 12.5 1 5702-5725 1993-1999

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.010 4.7 5.330 6.000 -5.400 0.100 1.000 0.000

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 5.000 0.500 0.000 1.000 0.000 99.000 -99.000

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 1.000 1.000 5.000 0.000 3.750 0.000 0.000 0.000 0.000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46016 MATUCANA 12.5 1 8615-8628 2984-2987 735

TG TP UO UC PMAX PMIN SIGMA DELTA 1.215 0.100 0.081 -0.061 0.607 0.000 0.036 0.698

TR TW A11 A13 A21 A23 6.000 0.820 0.500 1.300 1.500 1.300

BARRA 46018 [MATUCANA12.5]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 46018 MATUCANA 12.5 2 4043-4052 265 257 1608

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.445 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S

Page 231: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 25/57

46018 MATUCANA 12.5 2 5726-5749 2000-2006

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.010 4.7 5.330 6.000 -5.400 0.100 1.000 0.000

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 5.000 0.500 0.000 1.000 0.000 99.000 -99.000

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 1.000 1.000 5.000 0.000 3.750 0.000 0.000 0.000 0.000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46018 MATUCANA 12.5 2 8629-8642 2988-2991 736

TG TP UO UC PMAX PMIN SIGMA DELTA 1.215 0.100 0.081 -0.061 0.607 0.000 0.036 0.698

TR TW A11 A13 A21 A23 6.000 0.820 0.500 1.300 1.500 1.300

BARRA 46020 [MARCOPAM4.16]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 46022 HUAMPANI 10.0 1 4053-4062 266 258 1609

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.818 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 46022 HUAMPANI 10.0 1 5750-5773 2007-2013

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.010 4.7 5.330 6.000 -5.400 0.100 1.000 0.000

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 5.000 0.500 0.000 1.000 0.000 99.000 -99.000

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 1.000 1.000 5.000 0.000 3.750 0.000 0.000 0.000 0.000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46022 HUAMPANI 10.0 1 8643-8656 2992-2995 737

TG TP UO UC PMAX PMIN SIGMA DELTA 0.150 0.050 0.100 -0.100 0.677 0.000 0.071 0.853

TR TW A11 A13 A21 A23 10.000 1.620 0.500 1.000 1.500 1.000

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 46022 HUAMPANI 10.0 2 4063-4072 267 259 1610

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.871 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 46022 HUAMPANI 10.0 2 5774-5797 2014-2020

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.010 4.7 5.330 6.000 -5.400 0.100 1.000 0.000

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 5.000 0.500 0.000 1.000 0.000 99.000 -99.000

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 1.000 1.000 5.000 0.000 3.750 0.000 0.000 0.000 0.000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46022 HUAMPANI 10.0 2 8657-8670 2996-2999 738

Page 232: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 26/57

TG TP UO UC PMAX PMIN SIGMA DELTA 0.150 0.050 0.100 -0.100 0.649 0.000 0.071 0.853

TR TW A11 A13 A21 A23 10.000 1.620 0.500 1.000 1.500 1.000

BARRA 46032 [MALPASO 6.90]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 46032 MALPASO 6.90 1 4073-4082 268 260 1611

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.533 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 46032 MALPASO 6.90 1 5798-5821 2021-2027

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.010 15.0 6.000 7.200 -6.480 0.030 0.300 0.000

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 6.000 -5.400 0.000 1.000 0.000 99.000 -99.000

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 1.000 1.000 6.000 0.000 4.500 0.000 0.000 0.000 0.000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46032 MALPASO 6.90 1 8671-8684 3000-3003 739

TG TP UO UC PMAX PMIN SIGMA DELTA 0.150 0.050 0.100 -0.100 0.654 0.000 0.040 1.000

TR TW A11 A13 A21 A23 6.000 1.500 0.500 1.000 1.500 1.000

BARRA 46034 [MALPASO 6.90]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 46034 MALPASO 6.90 2 4083-4092 269 261 1612

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.533 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 46034 MALPASO 6.90 2 5822-5845 2028-2034

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.010 15.0 6.000 7.200 -6.480 0.030 0.300 0.000

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 6.000 -5.400 0.000 1.000 0.000 99.000 -99.000

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 1.000 1.000 6.000 0.000 4.500 0.000 0.000 0.000 0.000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46034 MALPASO 6.90 2 8685-8698 3004-3007 740

TG TP UO UC PMAX PMIN SIGMA DELTA 0.150 0.050 0.100 -0.100 0.655 0.000 0.040 1.000

TR TW A11 A13 A21 A23 6.000 1.500 0.500 1.000 1.500 1.000

BARRA 46036 [MALPASO 6.90]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 46036 MALPASO 6.90 3 4093-4102 270 262 1613

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.533 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

Page 233: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 27/57

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 46036 MALPASO 6.90 3 5846-5869 2035-2041

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.010 15.0 6.000 7.200 -6.480 0.030 0.300 0.000

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 6.000 -5.400 0.000 1.000 0.000 99.000 -99.000

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 1.000 1.000 6.000 0.000 4.500 0.000 0.000 0.000 0.000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46036 MALPASO 6.90 3 8699-8712 3008-3011 741

TG TP UO UC PMAX PMIN SIGMA DELTA 0.150 0.050 0.100 -0.100 0.654 0.000 0.040 1.000

TR TW A11 A13 A21 A23 6.000 1.500 0.500 1.000 1.500 1.000

BARRA 46038 [MALPASO 6.90]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 46038 MALPASO 6.90 4 4103-4112 271 263 1614

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.533 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 46038 MALPASO 6.90 4 5870-5893 2042-2048

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.010 15.0 6.000 7.200 -6.480 0.030 0.300 0.000

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 6.000 -5.400 0.000 1.000 0.000 99.000 -99.000

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 1.000 1.000 6.000 0.000 4.500 0.000 0.000 0.000 0.000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46038 MALPASO 6.90 4 8713-8726 3012-3015 742

TG TP UO UC PMAX PMIN SIGMA DELTA 0.150 0.050 0.100 -0.100 0.654 0.000 0.040 1.000

TR TW A11 A13 A21 A23 6.000 1.500 0.500 1.000 1.500 1.000

BARRA 46058 [PACHACHA2.30]

** EXDC2 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46058 PACHACHA 2.30 1 5894-5909 2049-2053 327

TR KA TA TB TC VRMAX VRMIN KE TE KF TF1 0.020 125.00 0.150 0.000 0.000 4.200 -3.800 1.000 0.900 0.070 0.750

SWITCH E1 S(E1) E2 S(E2) KE VAR 0.0 2.5000 0.0800 3.3000 0.2700 1.0000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46058 PACHACHA 2.30 1 8727-8740 3016-3019 743

TG TP UO UC PMAX PMIN SIGMA DELTA 1.200 0.150 0.016 -0.016 0.535 0.000 0.071 0.536

TR TW A11 A13 A21 A23 6.000 0.500 0.500 1.000 1.500 1.000

Page 234: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 28/57

** EXDC2 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46058 PACHACHA 2.30 2 5910-5925 2054-2058 328

TR KA TA TB TC VRMAX VRMIN KE TE KF TF1 0.020 125.00 0.150 0.000 0.000 4.200 -3.800 1.000 0.900 0.070 0.750

SWITCH E1 S(E1) E2 S(E2) KE VAR 0.0 2.5000 0.0800 3.3000 0.2700 1.0000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46058 PACHACHA 2.30 2 8741-8754 3020-3023 744

TG TP UO UC PMAX PMIN SIGMA DELTA 1.200 0.150 0.016 -0.016 0.535 0.000 0.071 0.536

TR TW A11 A13 A21 A23 6.000 0.500 0.500 1.000 1.500 1.000

** EXDC2 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46058 PACHACHA 2.30 3 5926-5941 2059-2063 329

TR KA TA TB TC VRMAX VRMIN KE TE KF TF1 0.020 125.00 0.150 0.000 0.000 4.200 -3.800 1.000 0.900 0.070 0.750

SWITCH E1 S(E1) E2 S(E2) KE VAR 0.0 2.5000 0.0800 3.3000 0.2700 1.0000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46058 PACHACHA 2.30 3 8755-8768 3024-3027 745

TG TP UO UC PMAX PMIN SIGMA DELTA 1.200 0.150 0.016 -0.016 0.536 0.000 0.071 0.536

TR TW A11 A13 A21 A23 6.000 0.500 0.500 1.000 1.500 1.000

** EXDC2 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46058 PACHACHA 2.30 4 5942-5957 2064-2068 330

TR KA TA TB TC VRMAX VRMIN KE TE KF TF1 0.020 125.00 0.150 0.000 0.000 4.200 -3.800 1.000 0.900 0.070 0.750

SWITCH E1 S(E1) E2 S(E2) KE VAR 0.0 2.5000 0.0800 3.3000 0.2700 1.0000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46058 PACHACHA 2.30 4 8769-8782 3028-3031 746

TG TP UO UC PMAX PMIN SIGMA DELTA 1.200 0.150 0.016 -0.016 0.534 0.000 0.071 0.536

TR TW A11 A13 A21 A23 6.000 0.500 0.500 1.000 1.500 1.000

BARRA 46062 [MOYOPAMP10.0]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 46062 MOYOPAMP 10.0 1 4113-4122 272 264 1615

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.583 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 46062 MOYOPAMP 10.0 1 5958-5981 2069-2075

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.010 4.7 5.330 6.840 -6.160 0.100 1.000 0.000

Page 235: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 29/57

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 5.700 0.000 0.000 1.000 0.000 99.000 -99.000

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 1.000 1.000 5.700 0.000 4.280 0.000 0.000 0.000 0.000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46062 MOYOPAMP 10.0 1 8783-8796 3032-3035 747

TG TP UO UC PMAX PMIN SIGMA DELTA 0.150 0.050 0.100 -0.100 0.459 0.000 0.066 0.803

TR TW A11 A13 A21 A23 7.000 1.010 0.500 1.300 1.500 1.300

BARRA 46064 [MOYOPAMP10.0]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 46064 MOYOPAMP 10.0 2 4123-4132 273 265 1616

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.583 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 46064 MOYOPAMP 10.0 2 5982-6005 2076-2082

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.010 4.7 5.330 6.840 -6.160 0.100 1.000 0.000

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 5.700 0.000 0.000 1.000 0.000 99.000 -99.000

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 1.000 1.000 5.700 0.000 4.280 0.000 0.000 0.000 0.000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46064 MOYOPAMP 10.0 2 8797-8810 3036-3039 748

TG TP UO UC PMAX PMIN SIGMA DELTA 0.150 0.050 0.100 -0.100 0.444 0.000 0.066 0.803

TR TW A11 A13 A21 A23 7.000 1.010 0.500 1.300 1.500 1.300

BARRA 46066 [MOYOPAMP10.0]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 46066 MOYOPAMP 10.0 3 4133-4142 274 266 1617

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.583 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 46066 MOYOPAMP 10.0 3 6006-6029 2083-2089

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.010 4.7 5.330 6.840 -6.160 0.100 1.000 0.000

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 5.700 0.000 0.000 1.000 0.000 99.000 -99.000

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 1.000 1.000 5.700 0.000 4.280 0.000 0.000 0.000 0.000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46066 MOYOPAMP 10.0 3 8811-8824 3040-3043 749

TG TP UO UC PMAX PMIN SIGMA DELTA 0.150 0.050 0.100 -0.100 0.467 0.000 0.066 0.803

Page 236: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 30/57

TR TW A11 A13 A21 A23 7.000 1.010 0.500 1.300 1.500 1.300

BARRA 46068 [AGUAYTIA13.8]

** IEEEST ** BUS NAME BSKV MC C O N S S T A T E S V A R S I C O N S 46068 AGUAYTIA 13.8 1 3320-3336 1409-1415 166-167 152-153

IC BUS A1 A2 A3 A4 A5 A6 T1 T2 3 0 0.0300 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

T3 T4 T5 T6 KS LSMAX LSMIN VCU VCL 0.0000 0.0000 1.5000 1.5000 -0.952 0.0850 -0.0850 0.000 0.000

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 46068 AGUAYTIA 13.8 1 4143-4152 275 267 1618

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 3.617 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXBAS ** BUS NAME BSKV MACH C O N S S T A T E S 46068 AGUAYTIA13.8 1 6030-6050 2090-2096

TR KP KI KA TA TB TC VRMAX VRMIN 0.023 1.000 0.000 354.900 0.010 0.043 0.190 8.330 -6.660

KF TF TF1 TF2 KE TE KC KD 0.029 2.600 0.043 0.190 1.000 0.300 0.200 0.000

E1 S(E1) E2 S(E2) 6.2400 0.1700 8.3300 0.1820

** GAST2A ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 46068 AGUAYTIA 13.8 1 8825-8855 3044-3056 750-753

W X Y Z ETD TCD TRATE T MAX MIN ECR K3 20.00 4.00012.000 1.00 0.040 0.200 86.00 0.06 0.90 -0.08 0.010 0.770

A B C TF KF K5 K4 T3 T4 TT T5 1.00 0.20 1.00 0.20 0.000 0.200 0.800 15.00 2.500 450.0 3.30

AF1 BF1 AF2 BF2 CF2 TR K6 TC 700.0 550.0 -0.300 1.300 0.500 1001.0 0.230 1046.0

BARRA 46070 [AGUAYTIA13.8]

** IEEEST ** BUS NAME BSKV MC C O N S S T A T E S V A R S I C O N S 46070 AGUAYTIA 13.8 2 3337-3353 1416-1422 168-169 154-155

IC BUS A1 A2 A3 A4 A5 A6 T1 T2 3 0 0.0300 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

T3 T4 T5 T6 KS LSMAX LSMIN VCU VCL 0.0000 0.0000 1.5000 1.5000 -0.952 0.0850 -0.0850 0.000 0.000

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 46070 AGUAYTIA 13.8 2 4153-4162 276 268 1619

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 3.617 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXBAS ** BUS NAME BSKV MACH C O N S S T A T E S 46070 AGUAYTIA13.8 2 6051-6071 2097-2103

TR KP KI KA TA TB TC VRMAX VRMIN 0.023 1.000 0.000 354.900 0.010 0.043 0.190 8.330 -6.660

KF TF TF1 TF2 KE TE KC KD 0.029 2.600 0.043 0.190 1.000 0.300 0.200 0.000

E1 S(E1) E2 S(E2)

Page 237: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 31/57

6.2400 0.1700 8.3300 0.1820

** GAST2A ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 46070 AGUAYTIA 13.8 2 8856-8886 3057-3069 754-757

W X Y Z ETD TCD TRATE T MAX MIN ECR K3 20.00 4.00012.000 1.00 0.040 0.200 86.00 0.06 0.90 -0.08 0.010 0.770

A B C TF KF K5 K4 T3 T4 TT T5 1.00 0.20 1.00 0.20 0.000 0.200 0.800 15.00 2.500 450.0 3.30

AF1 BF1 AF2 BF2 CF2 TR K6 TC 700.0 550.0 -0.300 1.300 0.500 1001.0 0.230 1046.0

BARRA 46082 [CALLAHUA6.50]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 46082 CALLAHUA 6.50 1 4163-4172 277 269 1620

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.936 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 46082 CALLAHUA 6.50 1 6072-6095 2104-2110

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.010 4.7 5.330 10.800 -9.720 0.100 1.000 0.000

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 9.000 -0.850 0.000 1.000 0.000 99.000 -99.000

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 1.000 1.000 9.000 0.000 6.750 0.000 0.000 0.000 0.000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46082 CALLAHUA 6.50 1 8887-8900 3070-3073 758

TG TP UO UC PMAX PMIN SIGMA DELTA 0.150 0.050 0.100 -0.100 0.577 0.000 0.039 0.717

TR TW A11 A13 A21 A23 13.000 0.760 0.500 1.300 1.500 1.300

BARRA 46084 [CALLAHUA6.50]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 46084 CALLAHUA 6.50 2 4173-4182 278 270 1621

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.936 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 46084 CALLAHUA 6.50 2 6096-6119 2111-2117

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.010 4.7 5.330 10.800 -9.720 0.100 1.000 0.000

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 9.000 -0.850 0.000 1.000 0.000 99.000 -99.000

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 1.000 1.000 9.000 0.000 6.750 0.000 0.000 0.000 0.000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46084 CALLAHUA 6.50 2 8901-8914 3074-3077 759

TG TP UO UC PMAX PMIN SIGMA DELTA 0.150 0.050 0.100 -0.100 0.577 0.000 0.039 0.717

TR TW A11 A13 A21 A23 13.000 0.760 0.500 1.300 1.500 1.300

Page 238: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 32/57

BARRA 46086 [CALLAHUA6.50]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 46086 CALLAHUA 6.50 3 4183-4192 279 271 1622

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.936 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 46086 CALLAHUA 6.50 3 6120-6143 2118-2124

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.010 4.7 5.330 10.800 -9.720 0.100 1.000 0.000

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 9.000 -0.850 0.000 1.000 0.000 99.000 -99.000

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 1.000 1.000 9.000 0.000 6.750 0.000 0.000 0.000 0.000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46086 CALLAHUA 6.50 3 8915-8928 3078-3081 760

TG TP UO UC PMAX PMIN SIGMA DELTA 0.150 0.050 0.100 -0.100 0.577 0.000 0.039 0.717

TR TW A11 A13 A21 A23 13.000 0.760 0.500 1.300 1.500 1.300

BARRA 46088 [CALLAHUA8.00]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 46088 CALLAHUA 8.00 4 4193-4202 280 272 1623

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.866 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 46088 CALLAHUA 8.00 4 6144-6167 2125-2131

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.010 4.7 5.330 10.800 -9.720 0.100 1.000 0.000

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 9.000 -0.850 0.000 1.000 0.000 99.000 -99.000

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 1.000 1.000 9.000 0.000 6.750 0.000 0.000 0.000 0.000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46088 CALLAHUA 8.00 4 8929-8942 3082-3085 761

TG TP UO UC PMAX PMIN SIGMA DELTA 0.150 0.050 0.100 -0.100 0.622 0.000 0.037 0.562

TR TW A11 A13 A21 A23 10.000 0.560 0.500 1.300 1.500 1.300

BARRA 46090 [RESTITUC13.8]

** PSS2A ** BUS NAME BSKV MAC C O N S S T A T E S V A R S I C O N S 46090 RESTITUC 13.8 1 3354-3370 1423-1438 170-173 156-161

IC1 REMBUS1 IC2 REMBUS2 M N 2 0 3 0 0 0

TW1 TW2 T6 TW3 TW4 T7 KS2 KS3 7.000 0.000 0.020 3.300 0.000 0.020 0.350 0.000

T8 T9 KS1 T1 T2 T3 T4 VSTMAX VSTMIN

Page 239: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 33/57

0.000 1.000 5.000 0.000 0.000 0.000 0.000 0.100 -0.100

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 46090 RESTITUC 13.8 1 4203-4212 281 273 1624

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.055 1.027 120.00 1.300 38.00 1.500 10.00 1.000 0.00065 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 46090 RESTITUC 13.8 1 6168-6191 2132-2138

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.006 7.5 4.000 7.000 -6.300 0.025 0.000 0.025

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 99.000 -99.000 0.000 1.000 0.000 6.150 -5.530

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 0.000 0.000 0.000 0.000 0.000 0.000 1.000 0.000 0.200

** HYGOV ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 46090 RESTITUC 13.8 1 8943-8954 3086-3089 762-763

R-PERM R-TEMP TR TF TG VELM GMAX GMIN TW AT DTURB QNL 0.058 0.500 6.00 0.020 0.750 0.150 0.95 0.00 1.24 1.00 1.50 0.080

BARRA 46092 [RESTITUC13.8]

** PSS2A ** BUS NAME BSKV MAC C O N S S T A T E S V A R S I C O N S 46092 RESTITUC 13.8 2 3371-3387 1439-1454 174-177 162-167

IC1 REMBUS1 IC2 REMBUS2 M N 2 0 3 0 0 0

TW1 TW2 T6 TW3 TW4 T7 KS2 KS3 7.000 0.000 0.020 3.300 0.000 0.020 0.350 0.000

T8 T9 KS1 T1 T2 T3 T4 VSTMAX VSTMIN 0.000 1.000 5.000 0.000 0.000 0.000 0.000 0.100 -0.100

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 46092 RESTITUC 13.8 2 4213-4222 282 274 1625

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.055 1.027 120.00 1.300 38.00 1.500 10.00 1.000 0.00065 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 46092 RESTITUC 13.8 2 6192-6215 2139-2145

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.006 7.5 4.000 7.000 -6.300 0.025 0.000 0.025

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 99.000 -99.000 0.000 1.000 0.000 6.150 -5.530

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 0.000 0.000 0.000 0.000 0.000 0.000 1.000 0.000 0.200

** HYGOV ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 46092 RESTITUC 13.8 2 8955-8966 3090-3093 764-765

R-PERM R-TEMP TR TF TG VELM GMAX GMIN TW AT DTURB QNL 0.058 0.500 6.00 0.020 0.750 0.150 0.92 0.00 1.24 1.00 1.50 0.080

BARRA 46094 [RESTITUC13.8]

** PSS2A ** BUS NAME BSKV MAC C O N S S T A T E S V A R S I C O N S 46094 RESTITUC 13.8 3 3388-3404 1455-1470 178-181 168-173

IC1 REMBUS1 IC2 REMBUS2 M N

Page 240: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 34/57

2 0 3 0 0 0

TW1 TW2 T6 TW3 TW4 T7 KS2 KS3 7.000 0.000 0.020 3.300 0.000 0.020 0.350 0.000

T8 T9 KS1 T1 T2 T3 T4 VSTMAX VSTMIN 0.000 1.000 5.000 0.000 0.000 0.000 0.000 0.100 -0.100

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 46094 RESTITUC 13.8 3 4223-4232 283 275 1626

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.055 1.027 120.00 1.300 38.00 1.500 10.00 1.000 0.00065 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 46094 RESTITUC 13.8 3 6216-6239 2146-2152

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.006 7.5 4.000 7.000 -6.300 0.025 0.000 0.025

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 99.000 -99.000 0.000 1.000 0.000 6.150 -5.530

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 0.000 0.000 0.000 0.000 0.000 0.000 1.000 0.000 0.200

** HYGOV ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 46094 RESTITUC 13.8 3 8967-8978 3094-3097 766-767

R-PERM R-TEMP TR TF TG VELM GMAX GMIN TW AT DTURB QNL 0.058 0.500 6.00 0.020 0.750 0.150 0.94 0.00 1.24 1.00 1.50 0.080

BARRA 46096 [HUINCO 12.5]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 46096 HUINCO 12.5 1 4233-4242 284 276 1627

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.748 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 46096 HUINCO 12.5 1 6240-6263 2153-2159

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.010 4.7 5.330 6.000 -5.400 0.100 1.000 0.000

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 5.000 0.500 0.000 1.000 0.000 99.000 -99.000

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 1.000 1.000 5.000 0.000 3.750 0.000 0.000 0.000 0.000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46096 HUINCO 12.5 1 8979-8992 3098-3101 768

TG TP UO UC PMAX PMIN SIGMA DELTA 1.215 0.100 0.081 -0.061 0.567 0.000 0.016 0.797

TR TW A11 A13 A21 A23 8.000 1.040 0.500 1.300 1.500 1.300

BARRA 46098 [HUINCO 12.5]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 46098 HUINCO 12.5 2 4243-4252 285 277 1628

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.748 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S

Page 241: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 35/57

46098 HUINCO 12.5 2 6264-6287 2160-2166

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.010 4.7 5.330 6.000 -5.400 0.100 1.000 0.000

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 5.000 0.500 0.000 1.000 0.000 99.000 -99.000

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 1.000 1.000 5.000 0.000 3.750 0.000 0.000 0.000 0.000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46098 HUINCO 12.5 2 8993-9006 3102-3105 769

TG TP UO UC PMAX PMIN SIGMA DELTA 1.215 0.100 0.081 -0.061 0.585 0.000 0.016 0.797

TR TW A11 A13 A21 A23 8.000 1.040 0.500 1.300 1.500 1.300

BARRA 46100 [HUINCO 12.5]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 46100 HUINCO 12.5 3 4253-4262 286 278 1629

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.748 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 46100 HUINCO 12.5 3 6288-6311 2167-2173

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.010 4.7 5.330 6.000 -5.400 0.100 1.000 0.000

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 5.000 0.500 0.000 1.000 0.000 99.000 -99.000

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 1.000 1.000 5.000 0.000 3.750 0.000 0.000 0.000 0.000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46100 HUINCO 12.5 3 9007-9020 3106-3109 770

TG TP UO UC PMAX PMIN SIGMA DELTA 1.215 0.100 0.081 -0.061 0.576 0.000 0.016 0.797

TR TW A11 A13 A21 A23 8.000 1.040 0.500 1.300 1.500 1.300

BARRA 46102 [HUINCO 12.5]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 46102 HUINCO 12.5 4 4263-4272 287 279 1630

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.748 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 46102 HUINCO 12.5 4 6312-6335 2174-2180

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.010 4.7 5.330 6.000 -5.400 0.100 1.000 0.000

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 5.000 0.500 0.000 1.000 0.000 99.000 -99.000

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 1.000 1.000 5.000 0.000 3.750 0.000 0.000 0.000 0.000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46102 HUINCO 12.5 4 9021-9034 3110-3113 771

Page 242: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 36/57

TG TP UO UC PMAX PMIN SIGMA DELTA 1.215 0.100 0.081 -0.061 0.576 0.000 0.016 0.797

TR TW A11 A13 A21 A23 8.000 1.040 0.500 1.300 1.500 1.300

BARRA 46104 [YAUPI 13.8]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 46104 YAUPI 13.8 1 4273-4282 288 280 1631

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.143 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 46104 YAUPI 13.8 1 6336-6359 2181-2187

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.010 15.0 6.000 7.200 -6.480 0.030 0.300 0.000

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 6.000 -5.400 0.000 1.000 0.000 99.000 -99.000

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 1.000 1.000 6.000 0.000 4.500 0.000 0.000 0.000 0.000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46104 YAUPI 13.8 1 9035-9048 3114-3117 772

TG TP UO UC PMAX PMIN SIGMA DELTA 0.150 0.050 0.100 -0.100 0.679 0.000 0.034 1.000

TR TW A11 A13 A21 A23 7.000 1.520 0.500 1.300 1.500 1.300

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 46104 YAUPI 13.8 2 4283-4292 289 281 1632

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.143 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 46104 YAUPI 13.8 2 6360-6383 2188-2194

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.010 15.0 6.000 7.200 -6.480 0.030 0.300 0.000

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 6.000 -5.400 0.000 1.000 0.000 99.000 -99.000

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 1.000 1.000 6.000 0.000 4.500 0.000 0.000 0.000 0.000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46104 YAUPI 13.8 2 9049-9062 3118-3121 773

TG TP UO UC PMAX PMIN SIGMA DELTA 0.150 0.050 0.100 -0.100 0.672 0.000 0.034 1.000

TR TW A11 A13 A21 A23 7.000 1.520 0.500 1.300 1.500 1.300

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 46104 YAUPI 13.8 3 4293-4302 290 282 1633

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.143 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

Page 243: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 37/57

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 46104 YAUPI 13.8 3 6384-6407 2195-2201

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.010 15.0 6.000 7.200 -6.480 0.030 0.300 0.000

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 6.000 -5.400 0.000 1.000 0.000 99.000 -99.000

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 1.000 1.000 6.000 0.000 4.500 0.000 0.000 0.000 0.000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46104 YAUPI 13.8 3 9063-9076 3122-3125 774

TG TP UO UC PMAX PMIN SIGMA DELTA 0.150 0.050 0.100 -0.100 0.687 0.000 0.034 1.000

TR TW A11 A13 A21 A23 7.000 1.520 0.500 1.300 1.500 1.300

BARRA 46106 [YAUPI 13.8]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 46106 YAUPI 13.8 4 4303-4312 291 283 1634

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.143 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 46106 YAUPI 13.8 4 6408-6431 2202-2208

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.010 15.0 6.000 7.200 -6.480 0.030 0.300 0.000

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 6.000 -5.400 0.000 1.000 0.000 99.000 -99.000

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 1.000 1.000 6.000 0.000 4.500 0.000 0.000 0.000 0.000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46106 YAUPI 13.8 4 9077-9090 3126-3129 775

TG TP UO UC PMAX PMIN SIGMA DELTA 0.150 0.050 0.100 -0.100 0.682 0.000 0.034 1.000

TR TW A11 A13 A21 A23 7.000 1.520 0.500 1.300 1.500 1.300

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 46106 YAUPI 13.8 5 4313-4322 292 284 1635

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.143 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 46106 YAUPI 13.8 5 6432-6455 2209-2215

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.010 15.0 6.000 7.200 -6.480 0.030 0.300 0.000

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 6.000 -5.400 0.000 1.000 0.000 99.000 -99.000

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 1.000 1.000 6.000 0.000 4.500 0.000 0.000 0.000 0.000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR

Page 244: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 38/57

46106 YAUPI 13.8 5 9091-9104 3130-3133 776

TG TP UO UC PMAX PMIN SIGMA DELTA 0.150 0.050 0.100 -0.100 0.677 0.000 0.034 1.000

TR TW A11 A13 A21 A23 7.000 1.520 0.500 1.300 1.500 1.300

BARRA 46116 [MANTARO 13.8]

* IEE2ST * BUS NAME BSKV MC C O N S S T A T E S V A R S I C O N S 46116 MANTARO 13.8 1 3405-3420 1471-1476 182-185 174-177

I1 BUS I3 BUS K1 K2 T1 T2 T3 T4 T5 3 0 0 0 -3.0000 0.0000 0.0200 0.0000 3.5000 3.5000 1.6700

T6 T7 T8 T9 T10 LSMAX LSMIN VCU VCL 20.0000 0.0000 0.0000 0.0000 0.000 0.0600 -0.0600 0.0000 0.0000

** ESST1A ** BUS NAME BSKV MACH C O N S S T A T E S I C O N S 46116 MANTARO 13.8 1 6456-6473 2216-2220 309-310

UEL VOS TR VIMAX VIMIN TC TB TC1 TB1 KA 1 1 0.045 99.000 -99.000 1.000 20.000 0.000 0.000 694.2

TA VAMAX VAMIN VRMAX VRMIN KC KF TF KLR ILR 0.000 19.266 -19.266 4.550 -3.640 0.000 0.000 1.000 3.900 0.000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46116 MANTARO 13.8 1 9105-9118 3134-3137 777

TG TP UO UC PMAX PMIN SIGMA DELTA 1.215 0.100 0.081 -0.061 0.569 0.000 0.054 0.758

TR TW A11 A13 A21 A23 10.000 1.380 0.500 1.500 1.500 1.500

BARRA 46118 [MANTARO 13.8]

* IEE2ST * BUS NAME BSKV MC C O N S S T A T E S V A R S I C O N S 46118 MANTARO 13.8 2 3421-3436 1477-1482 186-189 178-181

I1 BUS I3 BUS K1 K2 T1 T2 T3 T4 T5 3 0 0 0 -3.0000 0.0000 0.0200 0.0000 3.5000 3.5000 1.6700

T6 T7 T8 T9 T10 LSMAX LSMIN VCU VCL 20.0000 0.0000 0.0000 0.0000 0.000 0.0600 -0.0600 0.0000 0.0000

** ESST1A ** BUS NAME BSKV MACH C O N S S T A T E S I C O N S 46118 MANTARO 13.8 2 6474-6491 2221-2225 311-312

UEL VOS TR VIMAX VIMIN TC TB TC1 TB1 KA 1 1 0.045 99.000 -99.000 1.000 20.000 0.000 0.000 694.2

TA VAMAX VAMIN VRMAX VRMIN KC KF TF KLR ILR 0.000 19.266 -19.266 4.550 -3.640 0.000 0.000 1.000 3.900 0.000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46118 MANTARO 13.8 2 9119-9132 3138-3141 778

TG TP UO UC PMAX PMIN SIGMA DELTA 1.215 0.100 0.081 -0.061 0.565 0.000 0.054 0.758

TR TW A11 A13 A21 A23 10.000 1.380 0.500 1.500 1.500 1.500

BARRA 46120 [MANTARO 13.8]

* IEE2ST * BUS NAME BSKV MC C O N S S T A T E S V A R S I C O N S 46120 MANTARO 13.8 3 3437-3452 1483-1488 190-193 182-185

Page 245: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 39/57

I1 BUS I3 BUS K1 K2 T1 T2 T3 T4 T5 3 0 0 0 -3.0000 0.0000 0.0200 0.0000 3.5000 3.5000 1.6700

T6 T7 T8 T9 T10 LSMAX LSMIN VCU VCL 20.0000 0.0000 0.0000 0.0000 0.000 0.0600 -0.0600 0.0000 0.0000

** ESST1A ** BUS NAME BSKV MACH C O N S S T A T E S I C O N S 46120 MANTARO 13.8 3 6492-6509 2226-2230 313-314

UEL VOS TR VIMAX VIMIN TC TB TC1 TB1 KA 1 1 0.045 99.000 -99.000 1.000 20.000 0.000 0.000 694.2

TA VAMAX VAMIN VRMAX VRMIN KC KF TF KLR ILR 0.000 19.266 -19.266 4.550 -3.640 0.000 0.000 1.000 3.900 0.000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46120 MANTARO 13.8 3 9133-9146 3142-3145 779

TG TP UO UC PMAX PMIN SIGMA DELTA 1.215 0.100 0.081 -0.061 0.560 0.000 0.054 0.758

TR TW A11 A13 A21 A23 10.000 1.380 0.500 1.500 1.500 1.500

BARRA 46122 [MANTARO 13.8]

* IEE2ST * BUS NAME BSKV MC C O N S S T A T E S V A R S I C O N S 46122 MANTARO 13.8 4 3453-3468 1489-1494 194-197 186-189

I1 BUS I3 BUS K1 K2 T1 T2 T3 T4 T5 3 0 0 0 -3.0000 0.0000 0.0200 0.0000 3.5000 3.5000 1.6700

T6 T7 T8 T9 T10 LSMAX LSMIN VCU VCL 20.0000 0.0000 0.0000 0.0000 0.000 0.0600 -0.0600 0.0000 0.0000

** ESST1A ** BUS NAME BSKV MACH C O N S S T A T E S I C O N S 46122 MANTARO 13.8 4 6510-6527 2231-2235 315-316

UEL VOS TR VIMAX VIMIN TC TB TC1 TB1 KA 1 1 0.045 99.000 -99.000 1.000 20.000 0.000 0.000 694.2

TA VAMAX VAMIN VRMAX VRMIN KC KF TF KLR ILR 0.000 19.266 -19.266 4.550 -3.640 0.000 0.000 1.000 3.900 0.000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46122 MANTARO 13.8 4 9147-9160 3146-3149 780

TG TP UO UC PMAX PMIN SIGMA DELTA 1.215 0.100 0.081 -0.061 0.575 0.000 0.054 0.758

TR TW A11 A13 A21 A23 10.000 1.380 0.500 1.500 1.500 1.500

BARRA 46124 [MANTARO 13.8]

* IEE2ST * BUS NAME BSKV MC C O N S S T A T E S V A R S I C O N S 46124 MANTARO 13.8 5 3469-3484 1495-1500 198-201 190-193

I1 BUS I3 BUS K1 K2 T1 T2 T3 T4 T5 2 0 3 0 2.0000 -0.2500 0.0200 0.0200 3.5000 3.5000 0.0000

T6 T7 T8 T9 T10 LSMAX LSMIN VCU VCL 0.0000 0.0000 0.0000 0.0000 0.000 0.0600 -0.0600 0.0000 0.0000

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 46124 MANTARO 13.8 5 4323-4332 293 285 1636

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.225 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

Page 246: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 40/57

** IEEEX1 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46124 MANTARO 13.8 5 6528-6543 2236-2240 331

TR KA TA TB TC VRMAX VRMIN KE TE KF TF1 0.020 1700.00 0.000 0.000 0.000 7.000 -6.000 1.000 1.350 0.115 4.700

SWITCH E1 S(E1) E2 S(E2) KE VAR 0.0 7.0000 0.0000 5.2500 0.0000 1.0000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46124 MANTARO 13.8 5 9161-9174 3150-3153 781

TG TP UO UC PMAX PMIN SIGMA DELTA 1.215 0.100 0.081 -0.061 0.426 0.000 0.054 0.758

TR TW A11 A13 A21 A23 10.000 1.100 0.500 1.500 1.500 1.500

BARRA 46126 [MANTARO 13.8]

* IEE2ST * BUS NAME BSKV MC C O N S S T A T E S V A R S I C O N S 46126 MANTARO 13.8 6 3485-3500 1501-1506 202-205 194-197

I1 BUS I3 BUS K1 K2 T1 T2 T3 T4 T5 2 0 3 0 2.0000 -0.2500 0.0200 0.0200 3.5000 3.5000 0.0000

T6 T7 T8 T9 T10 LSMAX LSMIN VCU VCL 0.0000 0.0000 0.0000 0.0000 0.000 0.0600 -0.0600 0.0000 0.0000

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 46126 MANTARO 13.8 6 4333-4342 294 286 1637

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.225 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** IEEEX1 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46126 MANTARO 13.8 6 6544-6559 2241-2245 332

TR KA TA TB TC VRMAX VRMIN KE TE KF TF1 0.020 1700.00 0.000 0.000 0.000 7.000 -6.000 1.000 1.350 0.115 4.700

SWITCH E1 S(E1) E2 S(E2) KE VAR 0.0 7.0000 0.0000 5.2500 0.0000 1.0000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46126 MANTARO 13.8 6 9175-9188 3154-3157 782

TG TP UO UC PMAX PMIN SIGMA DELTA 1.215 0.100 0.081 -0.061 0.425 0.000 0.054 0.758

TR TW A11 A13 A21 A23 10.000 1.100 0.500 1.500 1.500 1.500

BARRA 46128 [MANTARO 13.8]

* IEE2ST * BUS NAME BSKV MC C O N S S T A T E S V A R S I C O N S 46128 MANTARO 13.8 7 3501-3516 1507-1512 206-209 198-201

I1 BUS I3 BUS K1 K2 T1 T2 T3 T4 T5 2 0 3 0 2.0000 -0.2500 0.0200 0.0200 3.5000 3.5000 0.0000

T6 T7 T8 T9 T10 LSMAX LSMIN VCU VCL 0.0000 0.0000 0.0000 0.0000 0.000 0.0600 -0.0600 0.0000 0.0000

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 46128 MANTARO 13.8 7 4343-4352 295 287 1638

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.225 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

Page 247: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 41/57

** IEEEX1 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46128 MANTARO 13.8 7 6560-6575 2246-2250 333

TR KA TA TB TC VRMAX VRMIN KE TE KF TF1 0.020 1700.00 0.000 0.000 0.000 7.000 -6.000 1.000 1.350 0.115 4.700

SWITCH E1 S(E1) E2 S(E2) KE VAR 0.0 7.0000 0.0000 5.2500 0.0000 1.0000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46128 MANTARO 13.8 7 9189-9202 3158-3161 783

TG TP UO UC PMAX PMIN SIGMA DELTA 1.215 0.100 0.081 -0.061 0.424 0.000 0.054 0.758

TR TW A11 A13 A21 A23 10.000 1.100 0.500 1.500 1.500 1.500

BARRA 46150 [YANANGO 10.0]

** ESST1A ** BUS NAME BSKV MACH C O N S S T A T E S I C O N S 46150 YANANGO 10.0 1 6576-6593 2251-2255 317-318

UEL VOS TR VIMAX VIMIN TC TB TC1 TB1 KA 1 1 0.020 99.000 -99.000 0.100 0.020 1.000 10.000 500.0

TA VAMAX VAMIN VRMAX VRMIN KC KF TF KLR ILR 0.003 6.330 -5.380 6.330 -5.380 0.000 0.000 1.000 0.000 1.000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46150 YANANGO 10.0 1 9203-9216 3162-3165 784

TG TP UO UC PMAX PMIN SIGMA DELTA 0.200 0.050 0.160 -0.160 0.831 0.000 0.061 0.528

TR TW A11 A13 A21 A23 5.000 0.990 0.500 1.000 1.500 1.000

BARRA 46158 [CHIMAY 13.8]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 46158 CHIMAY 13.8 1 4353-4362 296 288 1639

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.858 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 46158 CHIMAY 13.8 1 6594-6617 2256-2262

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.010 6.0 1.200 1.550 -1.400 0.000 0.000 0.000

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 99.000 -99.000 0.000 1.000 0.000 6.650 -5.980

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 0.000 0.000 0.000 0.000 0.000 0.000 6.200 0.000 0.200

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46158 CHIMAY 13.8 1 9217-9230 3166-3169 785

TG TP UO UC PMAX PMIN SIGMA DELTA 0.200 0.050 0.160 -0.160 0.920 0.000 0.055 0.401

TR TW A11 A13 A21 A23 5.000 0.990 0.500 1.000 1.500 1.000

BARRA 46160 [CHIMAY 13.8]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 46160 CHIMAY 13.8 2 4363-4372 297 289 1640

Page 248: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 42/57

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.858 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 46160 CHIMAY 13.8 2 6618-6641 2263-2269

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.010 6.0 1.200 1.550 -1.400 0.000 0.000 0.000

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 99.000 -99.000 0.000 1.000 0.000 6.650 -5.980

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 0.000 0.000 0.000 0.000 0.000 0.000 6.200 0.000 0.200

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46160 CHIMAY 13.8 2 9231-9244 3170-3173 786

TG TP UO UC PMAX PMIN SIGMA DELTA 0.200 0.050 0.160 -0.160 0.920 0.000 0.055 0.401

TR TW A11 A13 A21 A23 5.000 0.990 0.500 1.000 1.500 1.000

BARRA 46212 [HUANCHOR10.0]

** EXAC4 ** BUS NAME BSKV MACH C O N S S T A T E S 46212 HUANCHOR 10.0 1 6642-6651 2270-2272

TR VIMAX VIMIN TC TB KA TA VRMAX VRMIN KC 0.020 0.200 -0.200 1.000 24.000 400.0 0.075 4.000 -3.600 0.200

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46212 HUANCHOR 10.0 1 9245-9258 3174-3177 787

TG TP UO UC PMAX PMIN SIGMA DELTA 0.500 0.050 0.016 -0.016 0.901 0.000 0.067 0.722

TR TW A11 A13 A21 A23 6.000 1.000 0.500 1.000 1.500 1.000

** EXAC4 ** BUS NAME BSKV MACH C O N S S T A T E S 46212 HUANCHOR 10.0 2 6652-6661 2273-2275

TR VIMAX VIMIN TC TB KA TA VRMAX VRMIN KC 0.020 0.200 -0.200 1.000 24.000 400.0 0.075 4.000 -3.600 0.200

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 46212 HUANCHOR 10.0 2 9259-9272 3178-3181 788

TG TP UO UC PMAX PMIN SIGMA DELTA 0.500 0.050 0.016 -0.016 0.901 0.000 0.067 0.722

TR TW A11 A13 A21 A23 6.000 1.000 0.500 1.000 1.500 1.000

BARRA 47142 [MILPO 13.2]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 56012 CYPRUS 10.0 1 4373-4382 298 290 1641

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 3.589 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

BARRA 56028 [ARICOTA211.0]

** EXDC2 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 56028 ARICOTA2 11.0 1 6662-6677 2276-2280 334

Page 249: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 43/57

TR KA TA TB TC VRMAX VRMIN KE TE KF TF1 0.020 125.00 0.150 0.000 0.000 3.940 -3.550 1.000 0.900 0.057 0.700

SWITCH E1 S(E1) E2 S(E2) KE VAR 0.0 2.3300 0.0800 3.1100 0.2700 1.0000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 56028 ARICOTA2 11.0 1 9273-9286 3182-3185 789

TG TP UO UC PMAX PMIN SIGMA DELTA 1.200 0.150 0.016 -0.016 0.723 0.000 0.034 0.395

TR TW A11 A13 A21 A23 9.000 0.500 0.500 1.000 1.500 1.000

BARRA 56034 [ARICOTA111.0]

** EXDC2 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 56034 ARICOTA1 11.0 1 6678-6693 2281-2285 335

TR KA TA TB TC VRMAX VRMIN KE TE KF TF1 0.020 125.00 0.150 0.000 0.000 3.940 -3.550 1.000 0.900 0.057 0.700

SWITCH E1 S(E1) E2 S(E2) KE VAR 0.0 2.3300 0.0800 3.1100 0.2700 1.0000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 56034 ARICOTA1 11.0 1 9287-9300 3186-3189 790

TG TP UO UC PMAX PMIN SIGMA DELTA 1.200 0.150 0.016 -0.016 0.722 0.000 0.047 0.400

TR TW A11 A13 A21 A23 9.000 0.500 0.500 1.000 1.500 1.000

** EXDC2 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 56034 ARICOTA1 11.0 2 6694-6709 2286-2290 336

TR KA TA TB TC VRMAX VRMIN KE TE KF TF1 0.020 125.00 0.150 0.000 0.000 3.940 -3.550 1.000 0.900 0.057 0.700

SWITCH E1 S(E1) E2 S(E2) KE VAR 0.0 2.3300 0.0800 3.1100 0.2700 1.0000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 56034 ARICOTA1 11.0 2 9301-9314 3190-3193 791

TG TP UO UC PMAX PMIN SIGMA DELTA 1.200 0.150 0.016 -0.016 0.722 0.000 0.047 0.400

TR TW A11 A13 A21 A23 9.000 0.500 0.500 1.000 1.500 1.000

BARRA 56044 [CALAN12310.5]

** EXAC1 ** BUS NAME BSKV MACH C O N S S T A T E S 56044 CALAN123 10.5 1 6710-6726 2291-2295

TR TB TC KA TA VRMAX VRMIN TE 0.020 0.000 0.000 350.0 0.100 5.800 -5.200 2.000

KF TF KC KD KE E1 S(E1) E2 S(E2) 0.052 0.650 0.300 0.500 1.000 5.1000 0.1500 3.8000 0.0500

** DEGOV1 ** BUS NAME BSKV MACH C O N S S T A T E S V A R S I C O N 56044 CALAN123 10.5 1 9315-9326 3194-3199 792-805 338

T1 T2 T3 K T4 T5 T6 TD TMAX TMIN DROOP TE 0.500 0.020 7.000 0.220 -0.018 0.130 0.250 0.050 0.807 0.000 0.087 0.000

Page 250: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 44/57

ICON(M)=0; DEGOV1 HAS DROOP WITH THROTTLE FEEDBACK

** EXAC1 ** BUS NAME BSKV MACH C O N S S T A T E S 56044 CALAN123 10.5 2 6727-6743 2296-2300

TR TB TC KA TA VRMAX VRMIN TE 0.020 0.000 0.000 350.0 0.100 5.800 -5.200 2.000

KF TF KC KD KE E1 S(E1) E2 S(E2) 0.052 0.650 0.300 0.500 1.000 5.1000 0.1500 3.8000 0.0500

** DEGOV1 ** BUS NAME BSKV MACH C O N S S T A T E S V A R S I C O N 56044 CALAN123 10.5 2 9327-9338 3200-3205 806-819 339

T1 T2 T3 K T4 T5 T6 TD TMAX TMIN DROOP TE 0.500 0.020 7.000 0.220 -0.018 0.130 0.250 0.050 0.807 0.000 0.087 0.000

ICON(M)=0; DEGOV1 HAS DROOP WITH THROTTLE FEEDBACK

** EXAC1 ** BUS NAME BSKV MACH C O N S S T A T E S 56044 CALAN123 10.5 3 6744-6760 2301-2305

TR TB TC KA TA VRMAX VRMIN TE 0.020 0.000 0.000 350.0 0.100 5.800 -5.200 2.000

KF TF KC KD KE E1 S(E1) E2 S(E2) 0.052 0.650 0.300 0.500 1.000 5.1000 0.1500 3.8000 0.0500

** DEGOV1 ** BUS NAME BSKV MACH C O N S S T A T E S V A R S I C O N 56044 CALAN123 10.5 3 9339-9350 3206-3211 820-833 340

T1 T2 T3 K T4 T5 T6 TD TMAX TMIN DROOP TE 0.500 0.020 7.000 0.220 -0.018 0.130 0.250 0.050 0.807 0.000 0.087 0.000

ICON(M)=0; DEGOV1 HAS DROOP WITH THROTTLE FEEDBACK

BARRA 56046 [CALANA4 10.5]

** EXAC1 ** BUS NAME BSKV MACH C O N S S T A T E S 56046 CALANA4 10.5 4 6761-6777 2306-2310

TR TB TC KA TA VRMAX VRMIN TE 0.020 0.000 0.000 350.0 0.100 5.800 -5.200 2.000

KF TF KC KD KE E1 S(E1) E2 S(E2) 0.052 0.650 0.300 0.500 1.000 5.1000 0.1500 3.8000 0.0500

** DEGOV1 ** BUS NAME BSKV MACH C O N S S T A T E S V A R S I C O N 56046 CALANA4 10.5 4 9351-9362 3212-3217 834-847 341

T1 T2 T3 K T4 T5 T6 TD TMAX TMIN DROOP TE 0.500 0.020 7.000 0.220 -0.018 0.130 0.250 0.050 0.816 0.000 0.075 0.000

ICON(M)=0; DEGOV1 HAS DROOP WITH THROTTLE FEEDBACK

BARRA 56048 [MOLLENGD13.8]

** EXAC1 ** BUS NAME BSKV MACH C O N S S T A T E S 56048 MOLLENGD 13.8 1 6778-6794 2311-2315

TR TB TC KA TA VRMAX VRMIN TE 0.020 0.000 0.000 350.0 0.100 7.240 -6.520 2.000

KF TF KC KD KE E1 S(E1) E2 S(E2) 0.054 0.620 0.300 0.500 1.000 7.2400 0.1500 5.4300 0.0500

** DEGOV1 ** BUS NAME BSKV MACH C O N S S T A T E S V A R S I C O N

Page 251: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 45/57

56048 MOLLENGD 13.8 1 9363-9374 3218-3223 848-861 342

T1 T2 T3 K T4 T5 T6 TD TMAX TMIN DROOP TE 0.500 0.020 7.000 0.350 -0.018 0.130 0.250 0.050 0.765 0.000 0.049 0.000

ICON(M)=0; DEGOV1 HAS DROOP WITH THROTTLE FEEDBACK

** EXAC1 ** BUS NAME BSKV MACH C O N S S T A T E S 56048 MOLLENGD 13.8 2 6795-6811 2316-2320

TR TB TC KA TA VRMAX VRMIN TE 0.020 0.000 0.000 350.0 0.100 7.240 -6.520 2.000

KF TF KC KD KE E1 S(E1) E2 S(E2) 0.054 0.620 0.300 0.500 1.000 7.2400 0.1500 5.4300 0.0500

** DEGOV1 ** BUS NAME BSKV MACH C O N S S T A T E S V A R S I C O N 56048 MOLLENGD 13.8 2 9375-9386 3224-3229 862-875 343

T1 T2 T3 K T4 T5 T6 TD TMAX TMIN DROOP TE 0.500 0.020 7.000 0.350 -0.018 0.130 0.250 0.050 0.765 0.000 0.049 0.000

ICON(M)=0; DEGOV1 HAS DROOP WITH THROTTLE FEEDBACK

** EXAC1 ** BUS NAME BSKV MACH C O N S S T A T E S 56048 MOLLENGD 13.8 3 6812-6828 2321-2325

TR TB TC KA TA VRMAX VRMIN TE 0.020 0.000 0.000 350.0 0.100 7.240 -6.520 2.000

KF TF KC KD KE E1 S(E1) E2 S(E2) 0.054 0.620 0.300 0.500 1.000 7.2400 0.1500 5.4300 0.0500

** DEGOV1 ** BUS NAME BSKV MACH C O N S S T A T E S V A R S I C O N 56048 MOLLENGD 13.8 3 9387-9398 3230-3235 876-889 344

T1 T2 T3 K T4 T5 T6 TD TMAX TMIN DROOP TE 0.500 0.020 7.000 0.350 -0.018 0.130 0.250 0.050 0.765 0.000 0.049 0.000

ICON(M)=0; DEGOV1 HAS DROOP WITH THROTTLE FEEDBACK

BARRA 56050 [MOLLETG113.8]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 56050 MOLLETG1 13.8 1 4383-4392 299 291 1642

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.922 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXAC1 ** BUS NAME BSKV MACH C O N S S T A T E S 56050 MOLLETG1 13.8 1 6829-6845 2326-2330

TR TB TC KA TA VRMAX VRMIN TE 0.010 0.000 0.000 400.0 0.050 5.790 -5.210 1.200

KF TF KC KD KE E1 S(E1) E2 S(E2) 0.028 0.700 0.200 0.400 1.000 5.7900 0.0600 4.3400 0.0200

** GAST2A ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 56050 MOLLETG1 13.8 1 9399-9429 3236-3248 890-893

W X Y Z ETD TCD TRATE T MAX MIN ECR K3 25.00 4.00012.000 1.00 0.020 0.100 45.00 0.06 1.01 -0.08 0.010 0.735

A B C TF KF K5 K4 T3 T4 TT T5 10.00 1.00 0.00 0.10 1.000 0.200 0.800 15.00 2.500 450.0 3.30

AF1 BF1 AF2 BF2 CF2 TR K6 TC 700.0 550.0 -0.361 1.361 0.500 1001.0 0.265 1046.0

Page 252: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 46/57

BARRA 56052 [MOLLETG213.8]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 56052 MOLLETG2 13.8 2 4393-4402 300 292 1643

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.922 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXAC1 ** BUS NAME BSKV MACH C O N S S T A T E S 56052 MOLLETG2 13.8 2 6846-6862 2331-2335

TR TB TC KA TA VRMAX VRMIN TE 0.010 0.000 0.000 400.0 0.050 5.790 -5.210 1.200

KF TF KC KD KE E1 S(E1) E2 S(E2) 0.028 0.700 0.200 0.400 1.000 5.7900 0.0600 4.3400 0.0200

** GAST2A ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 56052 MOLLETG2 13.8 2 9430-9460 3249-3261 894-897

W X Y Z ETD TCD TRATE T MAX MIN ECR K3 25.00 4.00012.000 1.00 0.020 0.100 45.00 0.06 1.01 -0.08 0.010 0.735

A B C TF KF K5 K4 T3 T4 TT T5 10.00 1.00 0.00 0.10 1.000 0.200 0.800 15.00 2.500 450.0 3.30

AF1 BF1 AF2 BF2 CF2 TR K6 TC 700.0 550.0 -0.361 1.361 0.500 1001.0 0.265 1046.0

BARRA 56076 [CHILITV25.25]

** EXDC2 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 56076 CHILITV2 5.25 1 6863-6878 2336-2340 337

TR KA TA TB TC VRMAX VRMIN KE TE KF TF1 0.020 125.00 0.150 0.000 0.000 4.150 -3.100 1.000 0.900 0.055 0.800

SWITCH E1 S(E1) E2 S(E2) KE VAR 0.0 2.4400 0.0800 3.2600 0.2700 0.0000

** TGOV5 ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 56076 CHILITV2 5.25 1 9461-9509 3262-3278 898-904

K T1 T2 T3 UO UC VMAX VMIN T4 K1 18.76 1.000 1.700 0.500 0.100 -0.400 0.7600 0.0000 0.400 0.300

K2 T5 K3 K4 T6 K5 K6 T7 K7 K8 0.000 9.000 0.700 0.000 0.000 0.000 0.000 0.000 0.000 0.000

K9 K10 K11 K12 K13 K14 RMAX RMIN LMAX LMIN-1.000 0.000 0.000 0.000 0.000 5.000 0.0005 -0.0005 0.760 0.000

C1 C2 C3 B CB KI TI TR TR1 CMAX 0.200 0.000 1.000 0.00 150.00 0.0300 100.00 1.000 1.000 0.76

CMIN TD TF TW PSP TMW KL KMW DELTA PE 0.00 0.000 5.000 7.000 1.000 1.000 1.000 0.000 0.000

** EXDC2 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 56076 CHILITV2 5.25 2 6879-6894 2341-2345 338

TR KA TA TB TC VRMAX VRMIN KE TE KF TF1 0.020 125.00 0.150 0.000 0.000 6.600 -5.900 1.000 0.900 0.062 0.880

SWITCH E1 S(E1) E2 S(E2) KE VAR 0.0 3.9000 0.0800 5.2000 0.2700 0.0000

** TGOV5 ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 56076 CHILITV2 5.25 2 9510-9558 3279-3295 905-911

Page 253: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 47/57

K T1 T2 T3 UO UC VMAX VMIN T4 K1 22.86 1.000 1.700 0.500 0.100 -0.400 0.9250 0.0000 0.400 0.300

K2 T5 K3 K4 T6 K5 K6 T7 K7 K8 0.000 9.000 0.700 0.000 0.000 0.000 0.000 0.000 0.000 0.000

K9 K10 K11 K12 K13 K14 RMAX RMIN LMAX LMIN-1.000 0.000 0.000 0.000 0.000 5.000 0.0005 -0.0005 0.925 0.000

C1 C2 C3 B CB KI TI TR TR1 CMAX 0.200 0.000 1.000 0.00 150.00 0.0300 100.00 1.000 1.000 0.93

CMIN TD TF TW PSP TMW KL KMW DELTA PE 0.00 0.000 5.000 7.000 1.000 1.000 1.000 0.000 0.000

** FRECHG ** BUS1 NAME1 BSKV MC BUS2 NAME2 BSKV MC C O N S S T A T E S 56084 CHILCF60 5.25 60 56076 CHILITV2 5.25 50 2045-2069 816-825

MBASE1 Z S O R C E 1 X T R A N 1 GENTAP1 11.5 0.00000+J 0.24000 0.00000+J 0.00000 1.00000

MBASE2 Z S O R C E 2 X T R A N 2 GENTAP2 11.5 0.00000+J 0.24000 0.00000+J 0.00000 1.00000

T'D01 T''D01 T''Q01 H1 DAMP1 XD1 XQ1 X'D1 X''D1 XL1 5.000 0.050 0.060 2.00 0.00 1.2000 0.7200 0.3600 0.2400 0.1680

S1(1.0) S1(1.2) 0.1000 0.4000

T'D02 T''D02 T''Q02 H2 DAMP2 XD2 XQ2 X'D2 X''D2 XL2 5.000 0.050 0.060 2.00 0.00 1.2000 0.7200 0.3600 0.2400 0.1680

S2(1.0) S2(1.2) BFR2 0.1000 0.4000 50.00

** EXDC2 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 56076 CHILITV2 5.25 50 6895-6910 2346-2350 339

TR KA TA TB TC VRMAX VRMIN KE TE KF TF1 0.020 200.00 0.100 0.000 0.000 5.500 -4.900 1.000 0.900 0.057 0.850

SWITCH E1 S(E1) E2 S(E2) KE VAR 0.0 3.4200 0.0800 4.5700 0.2000 0.0000

BARRA 56078 [CHILITV310.5]

** EXDC2 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 56078 CHILITV3 10.5 3 6911-6926 2351-2355 340

TR KA TA TB TC VRMAX VRMIN KE TE KF TF1 0.020 125.00 0.150 0.000 0.000 7.500 -6.700 1.000 0.900 0.055 0.800

SWITCH E1 S(E1) E2 S(E2) KE VAR 0.0 4.4000 0.0800 5.9000 0.2700 0.0000

** TGOV5 ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 56078 CHILITV3 10.5 3 9559-9607 3296-3312 912-918

K T1 T2 T3 UO UC VMAX VMIN T4 K1 22.20 18.000 9.000 0.500 0.100 -0.400 0.9000 0.0000 0.400 0.300

K2 T5 K3 K4 T6 K5 K6 T7 K7 K8 0.000 9.000 0.700 0.000 0.000 0.000 0.000 0.000 0.000 0.000

K9 K10 K11 K12 K13 K14 RMAX RMIN LMAX LMIN-1.000 0.000 0.000 0.000 0.000 5.000 0.0005 -0.0005 0.900 0.000

C1 C2 C3 B CB KI TI TR TR1 CMAX 0.200 0.000 1.000 0.00 150.00 0.0300 100.00 1.000 1.000 0.90

CMIN TD TF TW PSP TMW KL KMW DELTA PE 0.00 0.000 5.000 7.000 1.000 1.000 1.000 0.000 0.000

Page 254: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 48/57

BARRA 56080 [CHILINCC13.8]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 56080 CHILINCC 13.8 1 4403-4412 301 293 1644

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 3.662 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXST2 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 56080 CHILINCC 13.8 1 6927-6939 2356-2359 341

TR KA TA VRMAX VRMIN KE TE 0.020 200.0 0.120 1.950 -1.650 1.000 0.500

KF TF KP KI KC EFDMAX KI VAR 0.034 0.770 1.190 1.970 0.200 4.600 0.000

** GAST2A ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 56080 CHILINCC 13.8 1 9608-9638 3313-3325 919-922

W X Y Z ETD TCD TRATE T MAX MIN ECR K3 20.00 4.00012.000 1.00 0.050 0.200 21.50 0.25 1.01 -0.08 0.020 0.770

A B C TF KF K5 K4 T3 T4 TT T5 5.00 1.00 0.00 0.20 1.000 0.200 0.800 15.00 2.500 450.0 3.30

AF1 BF1 AF2 BF2 CF2 TR K6 TC 700.0 550.0 -0.300 1.300 0.500 1001.0 0.230 1046.0

BARRA 56084 [CHILCF605.25]

** FRECHG ** BUS1 NAME1 BSKV MC BUS2 NAME2 BSKV MC C O N S S T A T E S 56084 CHILCF60 5.25 60 56076 CHILITV2 5.25 50 2045-2069 816-825

MBASE1 Z S O R C E 1 X T R A N 1 GENTAP1 11.5 0.00000+J 0.24000 0.00000+J 0.00000 1.00000

MBASE2 Z S O R C E 2 X T R A N 2 GENTAP2 11.5 0.00000+J 0.24000 0.00000+J 0.00000 1.00000

T'D01 T''D01 T''Q01 H1 DAMP1 XD1 XQ1 X'D1 X''D1 XL1 5.000 0.050 0.060 2.00 0.00 1.2000 0.7200 0.3600 0.2400 0.1680

S1(1.0) S1(1.2) 0.1000 0.4000

T'D02 T''D02 T''Q02 H2 DAMP2 XD2 XQ2 X'D2 X''D2 XL2 5.000 0.050 0.060 2.00 0.00 1.2000 0.7200 0.3600 0.2400 0.1680

S2(1.0) S2(1.2) BFR2 0.1000 0.4000 50.00

** EXDC2 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 56084 CHILCF60 5.25 60 6940-6955 2360-2364 342

TR KA TA TB TC VRMAX VRMIN KE TE KF TF1 0.020 200.00 0.100 0.000 0.000 5.500 -4.900 1.000 0.900 0.057 0.850

SWITCH E1 S(E1) E2 S(E2) KE VAR 0.0 3.4200 0.0800 4.5700 0.2000 0.0000

BARRA 56100 [MOQUEGUA4.16]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 56106 ILO2 17.0 1 4413-4422 302 294 1645

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 3.205 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXAC1 ** BUS NAME BSKV MACH C O N S S T A T E S

Page 255: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 49/57

56106 ILO2 17.0 1 6956-6972 2365-2369

TR TB TC KA TA VRMAX VRMIN TE 0.026 0.000 0.000 400.0 0.010 5.100 -4.500 0.630

KF TF KC KD KE E1 S(E1) E2 S(E2) 0.027 0.950 0.000 0.000 1.000 5.1000 0.0370 3.8200 0.0120

** TGOV5 ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 56106 ILO2 17.0 1 9639-9687 3326-3342 923-929

K T1 T2 T3 UO UC VMAX VMIN T4 K1 20.86 85.000 18.000 0.400 0.100 -0.400 0.8072 0.0000 0.070 0.270

K2 T5 K3 K4 T6 K5 K6 T7 K7 K8 0.000 10.000 0.000 0.000 0.240 0.370 0.000 0.300 0.360 0.000

K9 K10 K11 K12 K13 K14 RMAX RMIN LMAX LMIN 0.100 0.000 1.000 0.000 0.000 1.000 0.0005 -0.0005 0.807 0.000

C1 C2 C3 B CB KI TI TR TR1 CMAX 0.200 1.000 1.000 20.86 200.00 0.0200 90.00 60.000 6.000 0.81

CMIN TD TF TW PSP TMW KL KMW DELTA PE 0.00 60.000 25.000 7.000 1.000 1.000 0.000 1.000 0.000

BARRA 56108 [CHILIND110.4]

** EXAC1 ** BUS NAME BSKV MACH C O N S S T A T E S 56108 CHILIND1 10.4 1 6973-6989 2370-2374

TR TB TC KA TA VRMAX VRMIN TE 0.020 0.000 0.000 350.0 0.100 5.280 -4.750 2.000

KF TF KC KD KE E1 S(E1) E2 S(E2) 0.050 0.650 0.300 0.500 1.000 4.5900 0.1500 3.4400 0.0500

** DEGOV1 ** BUS NAME BSKV MACH C O N S S T A T E S V A R S I C O N 56108 CHILIND1 10.4 1 9688-9699 3343-3348 930-943 345

T1 T2 T3 K T4 T5 T6 TD TMAX TMIN DROOP TE 0.500 0.020 7.000 0.110 -0.018 0.130 0.250 0.050 0.770 0.000 0.012 0.000

ICON(M)=0; DEGOV1 HAS DROOP WITH THROTTLE FEEDBACK

BARRA 56110 [CHILIND210.4]

** EXAC1 ** BUS NAME BSKV MACH C O N S S T A T E S 56110 CHILIND2 10.4 2 6990-7006 2375-2379

TR TB TC KA TA VRMAX VRMIN TE 0.020 0.000 0.000 350.0 0.100 5.280 -4.750 2.000

KF TF KC KD KE E1 S(E1) E2 S(E2) 0.050 0.650 0.300 0.500 1.000 4.5900 0.1500 3.4400 0.0500

** DEGOV1 ** BUS NAME BSKV MACH C O N S S T A T E S V A R S I C O N 56110 CHILIND2 10.4 2 9700-9711 3349-3354 944-957 346

T1 T2 T3 K T4 T5 T6 TD TMAX TMIN DROOP TE 0.500 0.020 7.000 0.110 -0.018 0.130 0.250 0.050 0.770 0.000 0.012 0.000

ICON(M)=0; DEGOV1 HAS DROOP WITH THROTTLE FEEDBACK

BARRA 56112 [ILOCATK 4.16]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 56114 ILOTV1 13.8 1 4423-4432 303 295 1646

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.724 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

Page 256: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 50/57

** EXAC4 ** BUS NAME BSKV MACH C O N S S T A T E S 56114 ILOTV1 13.8 1 7007-7016 2380-2382

TR VIMAX VIMIN TC TB KA TA VRMAX VRMIN KC 0.020 0.200 -0.200 1.000 27.000 400.0 0.075 5.240 -4.700 0.200

** TGOV5 ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 56114 ILOTV1 13.8 1 9712-9760 3355-3371 958-964

K T1 T2 T3 UO UC VMAX VMIN T4 K1 11.50 9.000 3.700 0.500 0.100 -0.400 0.3475 0.0000 0.400 0.300

K2 T5 K3 K4 T6 K5 K6 T7 K7 K8 0.000 9.000 0.700 0.000 0.000 0.000 0.000 0.000 0.000 0.000

K9 K10 K11 K12 K13 K14 RMAX RMIN LMAX LMIN-1.000 0.000 0.000 0.000 0.000 5.000 0.0005 -0.0005 0.347 0.000

C1 C2 C3 B CB KI TI TR TR1 CMAX 0.200 0.000 1.000 0.00 150.00 0.0300 100.00 1.000 1.000 0.35

CMIN TD TF TW PSP TMW KL KMW DELTA PE 0.00 0.000 5.000 7.000 1.000 1.000 1.000 0.000 0.000

BARRA 56116 [ILOTV2 13.8]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 56116 ILOTV2 13.8 2 4433-4442 304 296 1647

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.724 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXAC4 ** BUS NAME BSKV MACH C O N S S T A T E S 56116 ILOTV2 13.8 2 7017-7026 2383-2385

TR VIMAX VIMIN TC TB KA TA VRMAX VRMIN KC 0.020 0.200 -0.200 1.000 27.000 400.0 0.075 5.240 -4.700 0.200

** TGOV5 ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 56116 ILOTV2 13.8 2 9761-9809 3372-3388 965-971

K T1 T2 T3 UO UC VMAX VMIN T4 K1 9.35 5.000 3.700 0.500 0.100 -0.400 0.7600 0.0000 0.400 0.300

K2 T5 K3 K4 T6 K5 K6 T7 K7 K8 0.000 9.000 0.700 0.000 0.000 0.000 0.000 0.000 0.000 0.000

K9 K10 K11 K12 K13 K14 RMAX RMIN LMAX LMIN-1.000 0.000 0.000 0.000 0.000 5.000 0.0005 -0.0005 0.760 0.000

C1 C2 C3 B CB KI TI TR TR1 CMAX 0.200 0.000 1.000 0.00 150.00 0.0300 100.00 1.000 1.000 0.76

CMIN TD TF TW PSP TMW KL KMW DELTA PE 0.00 0.000 5.000 7.000 1.000 1.000 1.000 0.000 0.000

BARRA 56118 [ILOTV3 13.8]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 56118 ILOTV3 13.8 3 4443-4452 305 297 1648

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.790 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXAC4 ** BUS NAME BSKV MACH C O N S S T A T E S 56118 ILOTV3 13.8 3 7027-7036 2386-2388

TR VIMAX VIMIN TC TB KA TA VRMAX VRMIN KC 0.020 0.200 -0.200 1.000 25.000 400.0 0.075 5.220 -4.700 0.200

Page 257: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 51/57

** TGOV5 ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 56118 ILOTV3 13.8 3 9810-9858 3389-3405 972-978

K T1 T2 T3 UO UC VMAX VMIN T4 K1 5.42 1.000 0.700 0.500 0.100 -0.400 0.6980 0.0000 0.400 0.300

K2 T5 K3 K4 T6 K5 K6 T7 K7 K8 0.000 9.000 0.700 0.000 0.000 0.000 0.000 0.000 0.000 0.000

K9 K10 K11 K12 K13 K14 RMAX RMIN LMAX LMIN-1.000 0.000 0.000 0.000 0.000 5.000 0.0005 -0.0005 0.698 0.000

C1 C2 C3 B CB KI TI TR TR1 CMAX 0.200 0.000 1.000 0.00 150.00 0.0300 100.00 1.000 1.000 0.70

CMIN TD TF TW PSP TMW KL KMW DELTA PE 0.00 0.000 5.000 7.000 1.000 1.000 1.000 0.000 0.000

BARRA 56120 [ILOTV4 13.8]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 56120 ILOTV4 13.8 4 4453-4462 306 298 1649

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.696 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXAC4 ** BUS NAME BSKV MACH C O N S S T A T E S 56120 ILOTV4 13.8 4 7037-7046 2389-2391

TR VIMAX VIMIN TC TB KA TA VRMAX VRMIN KC 0.020 0.200 -0.200 1.000 26.000 400.0 0.075 5.240 -4.700 0.200

** TGOV5 ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 56120 ILOTV4 13.8 4 9859-9907 3406-3422 979-985

K T1 T2 T3 UO UC VMAX VMIN T4 K1 3.25 0.300 0.700 0.500 0.100 -0.400 0.8200 0.0000 0.400 0.300

K2 T5 K3 K4 T6 K5 K6 T7 K7 K8 0.000 9.000 0.700 0.000 0.000 0.000 0.000 0.000 0.000 0.000

K9 K10 K11 K12 K13 K14 RMAX RMIN LMAX LMIN-1.000 0.000 0.000 0.000 0.000 5.000 0.0005 -0.0005 0.820 0.000

C1 C2 C3 B CB KI TI TR TR1 CMAX 0.200 0.000 1.000 0.00 150.00 0.0300 100.00 1.000 1.000 0.82

CMIN TD TF TW PSP TMW KL KMW DELTA PE 0.00 0.000 5.000 7.000 1.000 1.000 1.000 0.000 0.000

BARRA 56122 [ILOTG1 13.8]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 56122 ILOTG1 13.8 1 4463-4472 307 299 1650

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 3.114 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXAC1 ** BUS NAME BSKV MACH C O N S S T A T E S 56122 ILOTG1 13.8 1 7047-7063 2392-2396

TR TB TC KA TA VRMAX VRMIN TE 0.010 0.000 0.000 400.0 0.050 5.850 -5.270 1.200

KF TF KC KD KE E1 S(E1) E2 S(E2) 0.028 0.700 0.200 0.400 1.000 5.8500 0.0600 4.3900 0.0200

** GAST2A ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 56122 ILOTG1 13.8 1 9908-9938 3423-3435 986-989

W X Y Z ETD TCD TRATE T MAX MIN ECR K3 25.00 4.00016.000 1.00 0.020 0.100 40.00 0.06 1.01 -0.08 0.010 0.770

Page 258: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 52/57

A B C TF KF K5 K4 T3 T4 TT T5 10.00 1.00 0.00 0.10 1.000 0.200 0.800 15.00 2.500 450.0 3.30

AF1 BF1 AF2 BF2 CF2 TR K6 TC 700.0 550.0 -0.300 1.300 0.500 1001.0 0.230 1046.0

BARRA 56124 [ILOTG2 13.8]

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 56124 ILOTG2 13.8 2 4473-4482 308 300 1651

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 3.612 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXAC1 ** BUS NAME BSKV MACH C O N S S T A T E S 56124 ILOTG2 13.8 2 7064-7080 2397-2401

TR TB TC KA TA VRMAX VRMIN TE 0.010 0.000 0.000 1000.0 0.050 6.800 -6.120 1.200

KF TF KC KD KE E1 S(E1) E2 S(E2) 0.053 4.000 0.200 0.400 1.000 6.8000 0.0600 5.1000 0.0200

** GASTWD ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 56124 ILOTG2 13.8 2 9939-9970 3436-3449 990-994

DROOP KP KI KD ETD TCD TRATE T MAX MIN ECR K3 0.050 4.00 0.45 0.00 0.020 0.100 42.50 0.06 1.01 -0.03 0.010 0.910

A B C TF KF K5 K4 T3 T4 TT T5 1.00 0.50 1.00 0.40 0.000 0.200 0.800 15.00 2.500 1800.0 0.30

AF1 BF1 AF2 BF2 CF2 TR K6 TC TD 700.0 550.0 -0.099 1.099 0.100 1001.0 0.090 1005.0 5.000

BARRA 56126 [CHARCAI 4.16]

** IEEEST ** BUS NAME BSKV MC C O N S S T A T E S V A R S I C O N S 56134 CHARCAV 13.8 1 3517-3533 1513-1519 210-211 202-203

IC BUS A1 A2 A3 A4 A5 A6 T1 T2 3 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

T3 T4 T5 T6 KS LSMAX LSMIN VCU VCL 0.0000 0.0000 1.0000 1.0000 -0.500 0.0500 -0.0500 0.000 0.000

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 56134 CHARCAV 13.8 1 4483-4492 309 301 1652

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.170 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 56134 CHARCAV 13.8 1 7081-7104 2402-2408

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.010 20.0 2.200 5.620 -5.000 0.025 0.000 0.000

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 99.000 -99.000 0.000 1.000 0.000 4.690 -3.600

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 0.000 0.000 0.000 0.000 0.000 0.000 1.000 0.000 0.200

** HYGOV ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 56134 CHARCAV 13.8 1 9971-9982 3450-3453 995-996

R-PERM R-TEMP TR TF TG VELM GMAX GMIN TW AT DTURB QNL 0.024 0.573 5.00 0.020 0.250 0.160 0.88 0.00 0.99 1.00 0.50 0.080

Page 259: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 53/57

BARRA 56136 [CHARCAV 13.8]

** IEEEST ** BUS NAME BSKV MC C O N S S T A T E S V A R S I C O N S 56136 CHARCAV 13.8 2 3534-3550 1520-1526 212-213 204-205

IC BUS A1 A2 A3 A4 A5 A6 T1 T2 3 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

T3 T4 T5 T6 KS LSMAX LSMIN VCU VCL 0.0000 0.0000 1.0000 1.0000 -0.500 0.0500 -0.0500 0.000 0.000

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 56136 CHARCAV 13.8 2 4493-4502 310 302 1653

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.170 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 56136 CHARCAV 13.8 2 7105-7128 2409-2415

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.010 20.0 2.200 5.620 -5.000 0.025 0.000 0.000

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 99.000 -99.000 0.000 1.000 0.000 4.690 -3.600

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 0.000 0.000 0.000 0.000 0.000 0.000 1.000 0.000 0.200

** HYGOV ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 56136 CHARCAV 13.8 2 9983-9994 3454-3457 997-998

R-PERM R-TEMP TR TF TG VELM GMAX GMIN TW AT DTURB QNL 0.024 0.573 5.00 0.020 0.250 0.160 0.88 0.00 0.99 1.00 0.50 0.080

BARRA 56138 [CHARCAV 13.8]

** IEEEST ** BUS NAME BSKV MC C O N S S T A T E S V A R S I C O N S 56138 CHARCAV 13.8 3 3551-3567 1527-1533 214-215 206-207

IC BUS A1 A2 A3 A4 A5 A6 T1 T2 3 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

T3 T4 T5 T6 KS LSMAX LSMIN VCU VCL 0.0000 0.0000 1.0000 1.0000 -0.500 0.0500 -0.0500 0.000 0.000

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 56138 CHARCAV 13.8 3 4503-4512 311 303 1654

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.170 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 56138 CHARCAV 13.8 3 7129-7152 2416-2422

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.010 20.0 2.200 5.620 -5.000 0.025 0.000 0.000

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 99.000 -99.000 0.000 1.000 0.000 4.690 -3.600

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 0.000 0.000 0.000 0.000 0.000 0.000 1.000 0.000 0.200

** HYGOV ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 56138 CHARCAV 13.8 3 9995-10006 3458-3461 999-1000

R-PERM R-TEMP TR TF TG VELM GMAX GMIN TW AT DTURB QNL 0.024 0.573 5.00 0.020 0.250 0.160 0.76 0.00 0.99 1.00 0.50 0.080

Page 260: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 54/57

BARRA 56140 [CHARCAVI5.25]

** EXAC4 ** BUS NAME BSKV MACH C O N S S T A T E S 56140 CHARCAVI 5.25 1 7153-7162 2423-2425

TR VIMAX VIMIN TC TB KA TA VRMAX VRMIN KC 0.020 0.200 -0.200 1.000 24.000 400.0 0.075 5.000 -4.500 0.200

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 56140 CHARCAVI 5.25 1 10007-10020 3462-3465 1001

TG TP UO UC PMAX PMIN SIGMA DELTA 0.500 0.050 0.016 -0.016 0.647 0.000 0.071 0.949

TR TW A11 A13 A21 A23 6.000 1.000 0.500 1.000 1.500 1.000

BARRA 56144 [CHARCAIV5.25]

** EXDC2 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 56144 CHARCAIV 5.25 1 7163-7178 2426-2430 343

TR KA TA TB TC VRMAX VRMIN KE TE KF TF1 0.020 125.00 0.150 0.000 0.000 4.400 -4.000 1.000 0.900 0.070 0.830

SWITCH E1 S(E1) E2 S(E2) KE VAR 0.0 2.6000 0.0800 3.5000 0.2700 1.0000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 56144 CHARCAIV 5.25 1 10021-10034 3466-3469 1002

TG TP UO UC PMAX PMIN SIGMA DELTA 1.200 0.150 0.016 -0.016 0.538 0.000 0.078 0.783

TR TW A11 A13 A21 A23 7.000 1.000 0.500 1.000 1.500 1.000

BARRA 56146 [CHARCAIV5.25]

** EXDC2 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 56146 CHARCAIV 5.25 2 7179-7194 2431-2435 344

TR KA TA TB TC VRMAX VRMIN KE TE KF TF1 0.020 125.00 0.150 0.000 0.000 4.400 -4.000 1.000 0.900 0.070 0.830

SWITCH E1 S(E1) E2 S(E2) KE VAR 0.0 2.6000 0.0800 3.5000 0.2700 1.0000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 56146 CHARCAIV 5.25 2 10035-10048 3470-3473 1003

TG TP UO UC PMAX PMIN SIGMA DELTA 1.200 0.150 0.016 -0.016 0.538 0.000 0.078 0.783

TR TW A11 A13 A21 A23 7.000 1.000 0.500 1.000 1.500 1.000

BARRA 56148 [CHARCAIV5.25]

** EXDC2 ** BUS NAME BSKV MACH C O N S S T A T E S VAR 56148 CHARCAIV 5.25 3 7195-7210 2436-2440 345

TR KA TA TB TC VRMAX VRMIN KE TE KF TF1 0.020 125.00 0.150 0.000 0.000 4.400 -4.000 1.000 0.900 0.070 0.830

SWITCH E1 S(E1) E2 S(E2) KE VAR 0.0 2.6000 0.0800 3.5000 0.2700 1.0000

** IEEEG3 ** BUS NAME BSKV MACH C O N S S T A T E S VAR

Page 261: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 55/57

56148 CHARCAIV 5.25 3 10049-10062 3474-3477 1004

TG TP UO UC PMAX PMIN SIGMA DELTA 1.200 0.150 0.016 -0.016 0.538 0.000 0.078 0.783

TR TW A11 A13 A21 A23 7.000 1.000 0.500 1.000 1.500 1.000

BARRA 66094 [SANGABAN13.8]

** IEEEST ** BUS NAME BSKV MC C O N S S T A T E S V A R S I C O N S 66094 SANGABAN 13.8 1 3568-3584 1534-1540 216-217 208-209

IC BUS A1 A2 A3 A4 A5 A6 T1 T2 3 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

T3 T4 T5 T6 KS LSMAX LSMIN VCU VCL 0.0000 0.0000 1.0000 1.0000 -0.500 0.0500 -0.0500 0.000 0.000

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 66094 SANGABAN 13.8 1 4513-4522 312 304 1655

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.652 1.080 120.00 1.300 38.00 1.500 10.00 1.000 0.00025 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 66094 SANGABAN 13.8 1 7211-7234 2441-2447

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.010 5.0 15.000 5.620 -5.000 1.000 1.260 0.000

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 99.000 -99.000 0.000 1.000 0.000 4.690 -3.600

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 0.000 0.000 0.000 0.000 0.000 0.000 1.000 0.000 0.200

** HYGOV ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 66094 SANGABAN 13.8 1 10063-10074 3478-3481 1005-1006

R-PERM R-TEMP TR TF TG VELM GMAX GMIN TW AT DTURB QNL 0.066 0.328 3.00 0.020 0.750 0.050 0.87 0.00 0.35 1.00 1.50 0.070

BARRA 66096 [SANGABAN13.8]

** IEEEST ** BUS NAME BSKV MC C O N S S T A T E S V A R S I C O N S 66096 SANGABAN 13.8 2 3585-3601 1541-1547 218-219 210-211

IC BUS A1 A2 A3 A4 A5 A6 T1 T2 3 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000

T3 T4 T5 T6 KS LSMAX LSMIN VCU VCL 0.0000 0.0000 1.0000 1.0000 -0.500 0.0500 -0.0500 0.000 0.000

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 66096 SANGABAN 13.8 2 4523-4532 313 305 1656

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.652 1.080 120.00 1.300 38.00 1.500 10.00 1.000 0.00025 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 66096 SANGABAN 13.8 2 7235-7258 2448-2454

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.010 5.0 15.000 5.620 -5.000 1.000 1.260 0.000

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 99.000 -99.000 0.000 1.000 0.000 4.690 -3.600

Page 262: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 56/57

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 0.000 0.000 0.000 0.000 0.000 0.000 1.000 0.000 0.200

** HYGOV ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 66096 SANGABAN 13.8 2 10075-10086 3482-3485 1007-1008

R-PERM R-TEMP TR TF TG VELM GMAX GMIN TW AT DTURB QNL 0.066 0.328 3.00 0.020 0.750 0.050 0.87 0.00 0.35 1.00 1.50 0.070

BARRA 66126 [MACHUPIC13.8]

** IEEEST ** BUS NAME BSKV MC C O N S S T A T E S V A R S I C O N S 66126 MACHUPIC 13.8 1 3602-3618 1548-1554 220-221 212-213

IC BUS A1 A2 A3 A4 A5 A6 T1 T2 3 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0800 0.2000

T3 T4 T5 T6 KS LSMAX LSMIN VCU VCL 0.1000 0.0250 2.5000 2.5000 -0.300 0.0300 -0.0300 0.000 0.000

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 66126 MACHUPIC 13.8 1 4533-4542 314 306 1657

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.936 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 66126 MACHUPIC 13.8 1 7259-7282 2455-2461

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.010 31.0 1.000 99.000 -99.000 0.000 0.000 0.000

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 5.470 -4.930 0.000 1.000 0.000 5.470 -4.930

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

** HYGOV ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 66126 MACHUPIC 13.8 1 10087-10098 3486-3489 1009-1010

R-PERM R-TEMP TR TF TG VELM GMAX GMIN TW AT DTURB QNL 0.056 0.782 5.00 0.020 0.250 0.500 0.92 0.00 2.90 1.00 1.50 0.080

BARRA 66128 [MACHUPIC13.8]

** IEEEST ** BUS NAME BSKV MC C O N S S T A T E S V A R S I C O N S 66128 MACHUPIC 13.8 2 3619-3635 1555-1561 222-223 214-215

IC BUS A1 A2 A3 A4 A5 A6 T1 T2 3 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0800 0.2000

T3 T4 T5 T6 KS LSMAX LSMIN VCU VCL 0.1000 0.0250 2.5000 2.5000 -0.300 0.0300 -0.0300 0.000 0.000

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 66128 MACHUPIC 13.8 2 4543-4552 315 307 1658

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.936 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 66128 MACHUPIC 13.8 2 7283-7306 2462-2468

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.010 31.0 1.000 99.000 -99.000 0.000 0.000 0.000

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 5.470 -4.930 0.000 1.000 0.000 5.470 -4.930

Page 263: CRITERIOS PLANIF-InformeFinal-Julio f - OSINERGMIN -GART · 2003-10-16 · Informe Final RETE-A3/025820 Page 104/117 ... consiste en una cascada de 3 programas (GRARE1, GRARE2, GRARE3)

Informe Final CESI RETE – A3/016512 Pag. 57/57

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

** HYGOV ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 66128 MACHUPIC 13.8 2 10099-10110 3490-3493 1011-1012

R-PERM R-TEMP TR TF TG VELM GMAX GMIN TW AT DTURB QNL 0.056 0.782 5.00 0.020 0.250 0.500 0.92 0.00 2.90 1.00 1.50 0.080

BARRA 66130 [MACHUPIC13.8]

** IEEEST ** BUS NAME BSKV MC C O N S S T A T E S V A R S I C O N S 66130 MACHUPIC 13.8 3 3636-3652 1562-1568 224-225 216-217

IC BUS A1 A2 A3 A4 A5 A6 T1 T2 3 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0800 0.2000

T3 T4 T5 T6 KS LSMAX LSMIN VCU VCL 0.1000 0.0250 2.5000 2.5000 -0.300 0.0300 -0.0300 0.000 0.000

** MAXEX2 ** BUS NAME BSKV MACH C O N S VAR ICON STATE 66130 MACHUPIC 13.8 3 4553-4562 316 308 1659

IFDR IFD1 T1 IFD2 T2 IFD3 T3 IFDDES KMX VLOW 2.936 1.080 120.00 1.280 38.00 1.750 10.00 1.000 0.01000 -0.100

** EXPIC1 ** BUS NAME BSKV MACH C O N S S T A T E S 66130 MACHUPIC 13.8 3 7307-7330 2469-2475

TR KA TA1 VR1 VR2 TA2 TA3 TA4 0.010 31.0 1.000 99.000 -99.000 0.000 0.000 0.000

VRMAX VRMIN KF TF1 TF2 EFDMAX EFDMIN 5.470 -4.930 0.000 1.000 0.000 5.470 -4.930

KE TE E1 SE(E1) E2 SE(E2) KP KI KC 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000

** HYGOV ** BUS NAME BSKV MACH C O N S S T A T E S V A R S 66130 MACHUPIC 13.8 3 10111-10122 3494-3497 1013-1014

R-PERM R-TEMP TR TF TG VELM GMAX GMIN TW AT DTURB QNL 0.056 0.782 5.00 0.020 0.250 0.500 0.92 0.00 2.90 1.00 1.50 0.080