5
CRIS IR TG Meeting Summary 6 th November 2012 Danica Zendulkova TG leader

CRIS IR TG Meeting Summary 6 th November 2012 Danica Zendulkova TG leader

Embed Size (px)

Citation preview

Page 1: CRIS IR TG Meeting Summary 6 th November 2012 Danica Zendulkova TG leader

CRIS IR TG Meeting Summary

6th November 2012Danica Zendulkova TG leader

Page 2: CRIS IR TG Meeting Summary 6 th November 2012 Danica Zendulkova TG leader

Tasks 2011/2012 Summary

• Questionnary about Repository, part of DRIS application

• Data and metadata format comparison (CERIF, DC and MARC)

Page 3: CRIS IR TG Meeting Summary 6 th November 2012 Danica Zendulkova TG leader

What to do 2013/2014

• Vision: relation between CRIS and Repository• Set the example: Repository of CRIS-CERIF publications – Will contain full text of papers from euroCRIS

events (conferences, seminars, meetings)– Linked with DRIS database– Project team: Barbara, Ed, Pablo and Danica

Page 4: CRIS IR TG Meeting Summary 6 th November 2012 Danica Zendulkova TG leader

How to connect CRIS and IR

• Put use cases, case study, technical manuals etc . into euroCRIS webpage

• Divide recommendations for:– Institutional and national systems

• SW vendor´s contribution is welcome• Open access and IPR questions• Technical aspects– Used software (Fedora, dSPACE, ePrints)– (Meta)data conversion, workflow

Page 5: CRIS IR TG Meeting Summary 6 th November 2012 Danica Zendulkova TG leader

Resumé

The possibly ways:• Put the document to the institutional

repository and then CERIFy the metadata• Put the metdata to CERIF database then

convert to repository• Put the ocument directly to the database• Join CERIF database with the file system• Etc...