Upload
ledieu
View
213
Download
0
Embed Size (px)
Citation preview
UP
UP
UP
UP
HL(00)012
STAIR 3
STAIR 4
STAIR 5
GC / D&T Lab1
L03181.6 m²
ResistantMaterial LabWW & PL1
L025116.6 m²
Finishing AreaL033
12.8 m²
Pupil ProjectStore 1L034
12.7 m²
Pupil ProjectStore 2L034
12.3 m²
ResistantMaterial LabWW & PL2
L036113.9 m²
GC / D&T Lab2
L03281.7 m²
External /Internal
Changing 1.2L046
38.6 m²
LargeInstrumentStore 1 & 2
L01039.4 m²
Staff BaseL013
11.3 m²
Rec. ControlL008
9.6 m²
General StoreL007
10.8 m²
MusicClassroom 1
L00683.0 m²
IT ServerMainL002
18.0 m²
Acc WC 1L060
5.5 m²
MusicClassroom 2
L00980.3 m²
EnsemblePractice 1
L01525.3 m²
Small Practice1
L0178.1 m²
Small Practice2
L0188.1 m²
Small Practice3
L0198.1 m²
Small Practice4
L0208.1 m²
Small Practice5
L0148.1 m²
Fitness /Cond. Suite
L05075.0 m²
EnsemblePractice 2
L01627.1 m²
Dance StudioL051
145.2 m² GymnasiumL052
266.0 m²
Games HallL053
646.0 m²
External /Internal
Changing 2L049
30.0 m²
External /Internal
Changing 1.3L047
39.5 m²
D&TTechnician
Base & StoreL027
38.8 m²
Acc. DryChange
L0579.0 m²External
Wood & MetalSt.
L02915.7 m²
IT-1L062
8.5 m²
GC / D&T Lab3
L03785.6 m²
MusicClassroom 3
L01183.6 m²
Cleaner Store2
L0634.2 m²
Acc WC 2L059
3.8 m²
Dept. Base -UnisexL044
34.3 m²
ShowersFemale
L0424.9 m²
Showers MaleL043
4.9 m²
PE Reception(BD)L056
5.6 m²
PlantL001
180.2 m²
D & T Corridor1
L20040.3 m²
CourtyardCorridor 2
L20223.9 m²
External /Internal
Changing 1.1L045
38.4 m²
DISABLEDREFUGE
Acc WC 3L061
4.2 m²
D & T Corridor2
L20149.6 m²
RiserLSR017.9 m²
Mat StoreL054
28.7 m²
Gym / GamesStoreL021
54.8 m²
Dance StoreL058
4.0 m²
Fitness SuiteAccessL050
8.4 m²
SCREEN 3
SCREEN 4
SCREEN 5
External /Internal
Changing 1.4L048
40.1 m²
MachineRoom & Store
L03055.1 m²
SCREEN 15
ResistantMaterial
Laboratory ;Multi-media
L023125.2 m²
GL(00)012
CL(00)010
LL(00)013
AA
BB
C
DD
EE
FF
GG
HH
II
JJ
1
1
2
2
45
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
13
13
14
14
L
N
Q
M
Q1
AG
AG
15
1718
19
20
22
2324
25
27
28
29
30
30
31
31
32
3233
34
34
36
36
35
37
38
38
39
39
40
40
41
41
42
42
43
43
44
44
45
45
47
47
48
48
49
4950
50
51
51
52
54 55
55
56
56
57
57
58
58
59
59
60
60
61
61
T
T
U
V
W
W
X
X
Y
Z
AA
AB
AC
AC
AEAF
AH
AH
AJ
AK
63
AD
AD
S
42a
42a
Ea Ea
14a
14a
62
62
46
46
21
P
25b
25a
16
26
26
74
R
K
38b
38b
38f
38f
BL(00)010
Sprinkler TankHousing
L02494.7 m²
CleanersStore 1L003
3.7 m²
1C(21)005
1C(21)017
1C(21)006
KL(00)013
NL(00)014
PL(00)014
MusicCorridor
L20382.4 m²
ServicesL064
14.4 m²
CourtyardCorridor 3
L20747.0 m²
External &Club Room
StorageL055
44.1 m²Lobby Stair 5
LGLLST056.6 m²
P.E CorridorL204
148.9 m²
CourtyardCorridor 1
L20939.4 m²
Plant AccessLobbyL208
5.1 m²
Access toPlantL206
2.5 m²
Pump HouseL210
30.9 m²
CorridorL205
25.9 m²
GENERAL NOTES:
1. Do not scale from this drawing.2. All dimensions are in millimetres unless noted otherwise.3. The Contractor is responsible for checking all dimensions, levels and co-ordinates on sitebefore commencing the Works.
Fire Strategy4. For general arrangement of the Fire Strategy refer to the L(69) drawing series.5. Different Occupation: The different occupiers of the building (Secondary School, Library,Facilities Management & Community Rooms) will be managed under a single managementregime by the Facilities Management Contractor. The building will have a common fire alarmand detection system, and will operate a common fire evacuation management procedure.
Safety6. Accessible Entrances: All pupil and staff main entrance doors are designed as accessibleentrances with accessible thresholds.7. Internal doors: All internal doors have a minimum clear width of 850mm, except the followingdoors for which widths are noted where required for escape:- Doors on escape routes in corridors (double doors clear width 1675mm)- Doors into escape stairs (double doors clear width 1675mm)- Final exit doors (double doors clear width as per fire strategy plans)- Store doors- Toilet/changing cubicle doors.8. Lift: Compliance with Standard 4.2.7 is provided by a passenger lift manufactured andinstalled in accordance with BS EN 81-70: 2003. Reaction of lift to fire to be in compliance withBE EN 81-73: 2005. A clear landing at least 1.5 m x 1.5 m in front of any lift entrance door isprovided as shown. Lift system to incorporate the following:- Controls on each level are to be located between 900mm and 1.1m above the landing FFL,and within the lift car on a side wall between 900mm and 1.1m above the car floor and at least400 mm from any corner.- Landing controls on each storey to include tactile call buttons and visual and tactile indicationof the storey level.- Lift doors, handrails and controls are to contrast visually with surrounding surfaces.- Lift to be provided with a signalling system which gives notification that the lift is answering acall made from a landing.- Lifts to be provided with a means of two way communication that allows contact with the lift ifan alarm is activated, together with visual indicators that alarm has been sounded and received.This is to be operable by a person with a hearing impairment.- Automatic lift doors are to have a clear opening width of at least 800mm and be fitted withsensors that will prevent injury from contact with closing doors- Lift car internal dimensions to be at least 1.1m wide by 1.4m deep and contain a horizontalhandrail, of a size and section that is easily gripped, located 900mm above the floor on all wallsexcept the one containing the door.- Mirror to be provided on the wall facing the doors, above handrail height. -Within the lift car storey selector buttons to be tactile and, in lift serving more than 2 storeys,visual and voice indicators of the storey reached are to be provided.- Lifts to be supplied with a system which permits adjustment of the dwell time after which the liftdoors close, once fully opened, to suit the level of use.- The landing controls and lift car controls are to be of a type that do not operate on heat orpressure resulting from a fire.9. Collision with projections: Windows at ground level shall have all opening casements fittedwith a limiting stay to prevent it opening further than 100mm.10. Collision with glazing: All glazing less than 800mm above floor level to be toughened safetyglass in accordance with BS 6262: Part 4: 2005. Large areas of glazing shall be provided withmanifestation as recommended in BS 6262: Part 4: 2005. This shall be in the form of adhesivevinyl applied to the glass.11. Access to manual controls: All controls that are intended for operation by the occupants shallbe installed in positions that allow safe and convenient use:
WindowsAll openable windows that are operable by the occupants to provide natural ventilation shallhave controls for opening positioned at least 350mm from any internal corner, projecting wall orsimilar obstruction and at a height of not more than:1.7m above floor level where access to controls is unobstructed.1.5m above floor level, where access to controls is limited by a fixed obstruction not more than900mm high which projects not more than 600mm in front of the position of the controls (such asfitted furniture).
Where obstruction is greater, a remote means of opening, in an unobstructedlocation, shall be provided. This shall be at not more than 1.0m above floor level, in anunobstructed location, in any room intended specifically for use by a wheelchair user.
Electrical fixturesOutlets and controls of electrical fixtures and systems shall be positioned at least 350mm fromany internal corner, projecting wall or similar obstruction, and at not more than 1.2m above floorlevel.
Light switches shall be positioned at a height of between 900mm and 1.1m above floor level.
Standard switched or unswitched socket outlets and outlets for other services shall bepositioned at least 400mm above floor level. Above an obstruction, such as a worktop, fixturesshall be at least 150mm above the projecting surface.
In accommodation specifically intended for wheelchair users operable controls shall be locatedat a height of not more than 1.0m above floor level.
Where sockets are concealed such as to the rear of built-in appliances, or obstructed by built-infurniture, separate switching shall be provided in an accessible position, to allow appliances tobe isolated.
Sanitary Facilities12. Pupil Toilets:The numbers of sanitary facilities for pupils have been calculated and providedin accordance with:
School Premises (General Requirements and Standards) (Scotland) Regulations 1967WC provisions:Pupil total numbers: 1050 (525 Male, 525 Female)
First 60 Number of appliances = 8 (4x2)Every 30 additional pupils up to 300 Number of appliances = 16 (8x2)Every additional 60 over 300 (to 1050) Number of appliances = 25 (12.5x2)
Total = 49
25 WC appliances for girls25 appliances for boys (1/3 to be WCS = 9 WCS, 16 Urinals)
WHB provisions:Pupil total numbers: 1050 (525 Male, 525 Female)
First 30 Number of WHBs = 4Next 30 Number of WHBs = 4Every 30 additional pupils up to 300 Number of WHBs = 16 (8x2)Every additional 60 over 300 (to 1050) Number of WHBs = 25 (12.5x2)
Total = 49
25 WHBs for girls25 WHBs for boys
BS 6465-1: 2006WC provisions:Pupil total numbers: 1050 (525 Male, 525 Female)
Girls appliances = 1 per 20 pupils or part thereof = 27 WCs
Boys appliances = 1 per 20 pupils or part thereof = 272/3rds to be urinals = 9 WCs, 18
Urinals
WHB provisions:Pupil total numbers: 1050 (525 Male, 525 Female)
1 per WC / Urinal= 27 WHBs for girls= 27 WHBs for boys
13. Staff Toilets: The numbers of sanitary facilities for staff have been calculated and provided inaccordance with the table to Standard 3.12.2:
WC & WHB provisions:Staff total numbers: 150 (75 Male, 75 Female)
From 3.12.2 of the SBSA Technical handbook:Female provision (min) = 4 WCs, 4 WHBsMale provision (min) = 3 WCs, 3 Urinals, 3 WHBs.
AedasAedas Architects LtdFloor 9 Cadogan SquareCadogan StreetGlasgow G2 7HFUnited Kingdom
Aedas Architects
T +44(0)141 2250555F +44(0)141 2487923E [email protected]
original by
project
project number scale
drawing number rev issue status
This drawing is to be read in conjunction with all related drawings. Do not scale from thisdrawing. All dimensions must be checked and verified on site before commencing anywork or producing shop drawings. The originator should be notified immediately of anydiscrepancy.This drawing is copyright and remains the property of Aedas.
@A0
date created
client name
school
drawing
computer file plot date
Checked by
As indicated
5
C:\Revit Projects\2008\2008.001185.01 - ElginAcademy\01185-01-A-BUILDING-JH.rvt 28/06/2011 10:05:49
2008.01185.01
GW
L(00)002
RRMarch 2010
Lower Ground Floor General Arrangement
Stewart Milne Construction
The Moray Council PPP
Elgin Academy
GENERAL INFORMATION
THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH THEARCHITECTS GENERAL ARRANGEMENT DRAWINGS L(00)001-014
Construction
Rev Description Date Dr by App byA bracing review 21-03-10 JWC RR
B Revised in accordance with councilrequirements
28-04-10 GW RR
C General Updates of doors & ToiletsLayouts Post CP for Issue with Stage 2Building Warrant
13-07-10 AGR RRD Stage 2 Warrant General Notes added 30-07-10 JSH RR1 Change Issue Status to Construction 21-09-10 AGR RR/JH
2 Alterations to internal layout. Protectedzone at Stair 5 increased to formadditional escape from Courtyard.
31-01-11 JH JH
3 Windows altered/added to achieverequired daylighting levels. Alterations toPlant room external wall. Location ofRecording Studio altered.
14-04-11 JH JH
4 Sprinkler Pump Room shown. Internaldoors updated. Finishing Room altered tosuit bracing as-built position.
22-06-11 JH JH
5 Door handing to Music Store L007altered.
27-06-11 JH JH
UP UP
UP
UP
UP
UP
UP
UP
UP
UP
HL(00)012
AL(00)010
DIS
AB
LED
RE
FU
GE
DISABLEDREFUGE
VOID
STAIR 3
STAIR 2STAIR 1
STAIR 4
STAIR 5
STAIR 6
STAIR 7
STAIR 8
LIFT 1
General Officeand Reception
G00137.5 m²
Admin Assist.OfficeG0058.6 m²
ReprographicsG008
25.8 m²
Secure SQAStoreG0106.9 m²
School HealthRoom & Store
G03114.8 m²
First AidTreatment &
StoreG030
20.5 m²
ModernLanguagesStaff Base
G06923.5 m²
Change / WC/ ShowerUnisexG0339.1 m²
KitchenG109.01189.3 m²
PT Office /meetingRoomG043
16.9 m²
Amb StoreG109.06
RedundantRoom
OfficeG109.05
RedundantRoom
CleanersG109.08
RedundantRoom
Dry StoreG109.09
RedundantRoom
Teaching area/ Vocational
Area andstoreG034
46.7 m²
Staff Base-shared with
SFLG059
30.7 m²
InterlinkingTeaching Area
1 2 3G045
51.3 m²
Kitchen Area /Life Skills
G04047.2 m²
MedicalWaiting Area
G03216.0 m²
CleanersStore 6G1424.7 m²
ModernLanguages
Classroom 1G064
65.0 m²
ModernLanguages
Classroom 2G065
64.9 m²
ModernLanguages
Classroom 4G068
64.6 m²
ModernLanguages
Classroom 5G070
65.3 m²
SocialSubjects
Classroom 2G073
65.0 m²
SocialSubjects
Classroom 3G074
65.0 m²
Calm RoomG0429.9 m²
Changing andStore Female
G0498.8 m²
Changing andStore Male
G0518.8 m²
Cloak RoomG044
11.1 m²
SEN Acc. WCG1325.4 m²
Laundereteand Store
shared SFLG061
15.0 m²
MICASAutistic Room
G04139.9 m²
Large CentralStoreG0617.6 m²
MovementArea - shared
SFLG062
19.9 m²
Sensory Area- shared SFL
G05315.0 m²
ModernLanguages
StoreG067
15.1 m²
ModernLanguages
Classroom 3G066
65.2 m²
SocialSubjects
Classroom 1G072
65.2 m²
Deputy HeadTeacher 2
G07119.5 m²
SocialSubjects
Classroom 4G078
65.0 m²
SocialSubjects
Classroom 5G081
65.0 m²
SocialSubjects
Classroom 6G084
65.0 m²
Acc. WC6G1343.9 m²
CleanersStore 7G1403.5 m²
ModernStudies St.
G07910.3 m²
Pupil ToiletsFemaleG095
14.4 m²
ExpressiveArts
ClassroomG091
70.3 m²
Mod LangBreakout
SpaceG1306.1 m²
SocialSubjects
Breakout (BD)G131
18.7 m²
General ArtStudio 1
G11190.3 m²
Kiln RoomG120
10.1 m²
Clay DampStoreG1196.0 m²
Pupil Proj. St1
G11226.6 m²
General ArtStudio 2
G11491.5 m²
Classroom 5G139
52.6 m²
Classroom 4G138
52.1 m²
Classroom 3G039
51.7 m²
PSEC StoreG004
10.2 m²
Classroom 2G038
51.9 m²
Drama Studio3
G10077.9 m²
Drama Studio2
G09978.0 m²
Deputy HeadTeacher 1
G01117.0 m²
Drama BaseG096
17.1 m²
DramaScenery Store
G09723.2 m²
Drama Studio1
G09880.6 m²
Hall / StageStorageG101
27.7 m²
Assembly Hall/ Social /Stage /SeatingG105
349.2 m²
Staff WCG1292.5 m²
Head TeacherG002
25.6 m²
Janitor StoreG016
15.1 m²Delivery Store
G00710.0 m²
Locality TeamStaff Base
G01823.8 m²
WorkspaceG020
53.0 m²IT Hub RoomG128
11.5 m²Janitor Room
G00912.8 m²
Acc. WC4G0197.0 m²
CommunityChild Toilet &
SinkG0265.0 m²
CommunityMeetingRoomG127
57.7 m²
SFL CorridorG210
48.4 m²
ModernLanguagesCorridor 1
G20281.2 m²
SocialSubjects
Corridor 2G203
96.9 m²
Visitor WC F& BabyChangeG0234.3 m²
Visitor WC M& BabyChangeG0224.3 m²
AdminCorridor
G20913.2 m²
Classroom 1G037
50.4 m²
DepartmentalBaseG122
15.7 m²
Chair StoreG108
29.6 m²
Teaching Area1 , 2
G060 / G06358.9 m²
CentralComputing
AreaG055
21.2 m²
Wet/Art/MessyArea shared
SFLG054
14.9 m²
Kitchen AreaLifeSkills
G05225.0 m²
History StoreG079
10.5 m²
CostumeProps Store
G09723.5 m²
DIS
AB
LED
RE
FU
GE
SocialSubjectsCorridorG204
111.9 m²
DISABLED
REFUGE
DIS
ABLE
D
REF
UG
E
DIS
AB
LED
RE
FU
GE
BehaviourSupportCorridor
G20070.2 m²
Acc. WC8G1365.5 m²
Health &WellbeingCorridor
G20142.9 m²
AdminAssistants
G12414.3 m²
BusinessStudies
ComputingSuite 1G121
79.9 m²
Businessstudies Store
G12221.2 m²
BusinessStudies
ComputingSuite 2G126
80.0 m²
General ArtStudio 3
G11592.0 m²
Pupil Proj.St.2
G11615.2 m²
General ArtStudio 4
G11892.0 m²
Art, Design &technology
BaseG113
32.3 m²
RMEClassroom 1
G08765.2 m²
RMEClassroom 2
G08865.0 m²
SocialSubjects &RME Staff
BaseG086
41.1 m²
Geography St.G079
11.2 m²
SocialSubjects
Classroom 7G085
65.0 m²
SocialSubjects
Classroom 8G089
64.3 m²
TechnicianBase
(BS/Comp)G124
19.0 m²
DramaCorridor
G20846.9 m²
Acc. WC7G1354.2 m²
BusinessStudiesCorridor
G20662.7 m²
Art CorridorG205
32.6 m²
WCG109.03
RedundantRoom
SCREEN 1 SCREEN 2
SCREEN 3
SCREEN 5
SCREEN 4
SC
RE
EN
6
SC
RE
EN
7
SC
RE
EN
7
SCREEN 10SCREEN 11
SCREEN 12
SCREEN 14
SCREEN 15
SCREEN 16 SCREEN 17
Quiet AreaG050
14.8 m²
Religious &Moral Ed. St.
G07910.5 m²
IT - 2G0039.0 m²
Dining / SocialSpacesG106
452.6 m²
LIFT 2
GL(00)012
Pupil MaleToiletsG103
17.1 m²
Pupil FemaleToiletsG104
16.9 m²
Folding
Par
tition
Fold
ing
Par
titio
n
CL(00)010
Folding P
artition
Pupil ToiletsMaleG092
14.8 m²
LL(00)013
A
B
C
DD
EE
F
G
HH
II
JJ
1
1
2
2
45
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
13
13
14
14
L
NN
Q
Q
M
Q1
AG
AG
15
1718
19
20
22
2324
25
27
28
29
30
30
31
31
32
3233
34
34
36
36
35
37
38
38
39
39
40
40
41
41
42
42
43
43
44
44
45
45
47
47
48
48
49
4950
50
51
51
52
54 55
55
56
56
57
57
58
58
59
59
60
60
61
61
T
T
U
V
W
W
X
X
Y
Z
AA
ABAC
AE
AF
AH
AH
AJ
AK
63
AD
AD
S
42a
42a
Ea
14a
14a
62
62
46
46
21
P
25b
25a
16
26
26
R
K
BL(00)010
SecureArchive Store
G01716.5 m²
Cold RoomG109.10
RedundantRoom
Pupil MaleToiletsG014
17.0 m²
Pupil FemaleToiletsG013
16.9 m²
1C(21)004
1C(21)013
JL(00)014
DL(00)010
FL(00)011
EL(00)011
ML(00)014
KL(00)013
PL(00)014
NL(00)014
Hand Rail
Fol
ding
Par
titio
n
CleanersStore 5G1413.0 m²
EntranceG216
27.0 m²
1C(21)007
1C(21)008
SFL SENCorridor
G21149.7 m²
Acc WcG1433.9 m²
ServicesG2142.8 m²
PSE CorridorG212
50.4 m²
Project AreaG137
84.9 m²
Plant RoomG0P1
81.7 m²
Admin LobbyG2177.6 m²
ServicesG2133.6 m²
RiserLSR017.9 m²
CirculationCorridor
G20795.1 m²
Acc WcG0574.2 m²
Lobby Stair 6GF
GLST066.4 m²
Lobby stair 5GF
GLST056.5 m²
Lobby Stair 4GF
GLST046.9 m²
Lobby Stair 3GF
GLST036.5 m²
Lobby Stair 2GF
GLST026.5 m²
Lobby Stair 1GF
GLST017.0 m²
Lobby Stair 7GF
GLST0719.8 m²
GENERAL NOTES:
1. Do not scale from this drawing.2. All dimensions are in millimetres unless noted otherwise.3. The Contractor is responsible for checking all dimensions, levels and co-ordinates on sitebefore commencing the Works.
Fire Strategy4. For general arrangement of the Fire Strategy refer to the L(69) drawing series.5. Different Occupation: The different occupiers of the building (Secondary School, Library,Facilities Management & Community Rooms) will be managed under a single managementregime by the Facilities Management Contractor. The building will have a common fire alarmand detection system, and will operate a common fire evacuation management procedure.
Safety6. Accessible Entrances: All pupil and staff main entrance doors are designed as accessibleentrances with accessible thresholds.7. Internal doors: All internal doors have a minimum clear width of 850mm, except the followingdoors for which widths are noted where required for escape:- Doors on escape routes in corridors (double doors clear width 1675mm)- Doors into escape stairs (double doors clear width 1675mm)- Final exit doors (double doors clear width as per fire strategy plans)- Store doors- Toilet/changing cubicle doors.8. Lift: Compliance with Standard 4.2.7 is provided by a passenger lift manufactured andinstalled in accordance with BS EN 81-70: 2003. Reaction of lift to fire to be in compliance withBE EN 81-73: 2005. A clear landing at least 1.5 m x 1.5 m in front of any lift entrance door isprovided as shown. Lift system to incorporate the following:- Controls on each level are to be located between 900mm and 1.1m above the landing FFL,and within the lift car on a side wall between 900mm and 1.1m above the car floor and at least400 mm from any corner.- Landing controls on each storey to include tactile call buttons and visual and tactile indicationof the storey level.- Lift doors, handrails and controls are to contrast visually with surrounding surfaces.- Lift to be provided with a signalling system which gives notification that the lift is answering acall made from a landing.- Lifts to be provided with a means of two way communication that allows contact with the lift ifan alarm is activated, together with visual indicators that alarm has been sounded and received.This is to be operable by a person with a hearing impairment.- Automatic lift doors are to have a clear opening width of at least 800mm and be fitted withsensors that will prevent injury from contact with closing doors- Lift car internal dimensions to be at least 1.1m wide by 1.4m deep and contain a horizontalhandrail, of a size and section that is easily gripped, located 900mm above the floor on all wallsexcept the one containing the door.- Mirror to be provided on the wall facing the doors, above handrail height. -Within the lift car storey selector buttons to be tactile and, in lift serving more than 2 storeys,visual and voice indicators of the storey reached are to be provided.- Lifts to be supplied with a system which permits adjustment of the dwell time after which the liftdoors close, once fully opened, to suit the level of use.- The landing controls and lift car controls are to be of a type that do not operate on heat orpressure resulting from a fire.9. Collision with projections: Windows at ground level shall have all opening casements fittedwith a limiting stay to prevent it opening further than 100mm.10. Collision with glazing: All glazing less than 800mm above floor level to be toughened safetyglass in accordance with BS 6262: Part 4: 2005. Large areas of glazing shall be provided withmanifestation as recommended in BS 6262: Part 4: 2005. This shall be in the form of adhesivevinyl applied to the glass.11. Access to manual controls: All controls that are intended for operation by the occupants shallbe installed in positions that allow safe and convenient use:
WindowsAll openable windows that are operable by the occupants to provide natural ventilation shallhave controls for opening positioned at least 350mm from any internal corner, projecting wall orsimilar obstruction and at a height of not more than:1.7m above floor level where access to controls is unobstructed.1.5m above floor level, where access to controls is limited by a fixed obstruction not more than900mm high which projects not more than 600mm in front of the position of the controls (such asfitted furniture).
Where obstruction is greater, a remote means of opening, in an unobstructedlocation, shall be provided. This shall be at not more than 1.0m above floor level, in anunobstructed location, in any room intended specifically for use by a wheelchair user.
Electrical fixturesOutlets and controls of electrical fixtures and systems shall be positioned at least 350mm fromany internal corner, projecting wall or similar obstruction, and at not more than 1.2m above floorlevel.
Light switches shall be positioned at a height of between 900mm and 1.1m above floor level.
Standard switched or unswitched socket outlets and outlets for other services shall bepositioned at least 400mm above floor level. Above an obstruction, such as a worktop, fixturesshall be at least 150mm above the projecting surface.
In accommodation specifically intended for wheelchair users operable controls shall be locatedat a height of not more than 1.0m above floor level.
Where sockets are concealed such as to the rear of built-in appliances, or obstructed by built-infurniture, separate switching shall be provided in an accessible position, to allow appliances tobe isolated.
Sanitary Facilities12. Pupil Toilets:The numbers of sanitary facilities for pupils have been calculated and providedin accordance with:
School Premises (General Requirements and Standards) (Scotland) Regulations 1967WC provisions:Pupil total numbers: 1050 (525 Male, 525 Female)
First 60 Number of appliances = 8 (4x2)Every 30 additional pupils up to 300 Number of appliances = 16 (8x2)Every additional 60 over 300 (to 1050) Number of appliances = 25 (12.5x2)
Total = 49
25 WC appliances for girls25 appliances for boys (1/3 to be WCS = 9 WCS, 16 Urinals)
WHB provisions:Pupil total numbers: 1050 (525 Male, 525 Female)
First 30 Number of WHBs = 4Next 30 Number of WHBs = 4Every 30 additional pupils up to 300 Number of WHBs = 16 (8x2)Every additional 60 over 300 (to 1050) Number of WHBs = 25 (12.5x2)
Total = 49
25 WHBs for girls25 WHBs for boys
BS 6465-1: 2006WC provisions:Pupil total numbers: 1050 (525 Male, 525 Female)
Girls appliances = 1 per 20 pupils or part thereof = 27 WCs
Boys appliances = 1 per 20 pupils or part thereof = 272/3rds to be urinals = 9 WCs, 18
Urinals
WHB provisions:Pupil total numbers: 1050 (525 Male, 525 Female)
1 per WC / Urinal= 27 WHBs for girls= 27 WHBs for boys
13. Staff Toilets: The numbers of sanitary facilities for staff have been calculated and provided inaccordance with the table to Standard 3.12.2:
WC & WHB provisions:Staff total numbers: 150 (75 Male, 75 Female)
From 3.12.2 of the SBSA Technical handbook:Female provision (min) = 4 WCs, 4 WHBsMale provision (min) = 3 WCs, 3 Urinals, 3 WHBs.
AedasAedas Architects LtdFloor 9 Cadogan SquareCadogan StreetGlasgow G2 7HFUnited Kingdom
Aedas Architects
T +44(0)141 2250555F +44(0)141 2487923E [email protected]
original by
project
project number scale
drawing number rev issue status
This drawing is to be read in conjunction with all related drawings. Do not scale from thisdrawing. All dimensions must be checked and verified on site before commencing anywork or producing shop drawings. The originator should be notified immediately of anydiscrepancy.This drawing is copyright and remains the property of Aedas.
@A0
date created
client name
school
drawing
computer file plot date
Checked by
As indicated
4
C:\Revit Projects\Elgin\01185-01-A-BUILDING-AGR.rvt 22/06/2011 14:55:51
2008.01185.01
GW
L(00)003
RRMarch 2010
Ground Floor General Arrangement
Stewart Milne Construction
The Moray Council PPP
Elgin Academy
GENERAL INFORMATION
THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH THEARCHITECTS GENERAL ARRANGEMENT DRAWINGS L(00)001-014
Rev Description Date Dr by App by
A Revised in accordance with councilrequirements
28-04-10 GW RR
B General Updates of doors & ToiletsLayouts Post CP for Issue with Stage 2Building Warrant
13-07-10 AGR RRC Stage 2 Warrant General Notes added 30-07-10 JSH RR1 Change Issue Status to Construction 21-09-10 AGR RR/JH
2 Alterations to internal layout. AdditionalDisabled WC added.
31-01-11 JH JH
3 Windows altered/added to achieverequired daylighting levels. Windows toWCs G013 & G104 removed due tobracing clash. Windows in RME Class 1moved to avoid flue position. JanitorsStore altered due to bracing clash.
14-04-11 JH JH
4 Folding partition to Drama Studio 1removed. Internal doors updated.
22-06-11 JH JH
Construction
HL(00)012
AL(00)010
GL(00)012
VOID
VOID
VOID
VOID
LIFT 1
LIFT
STAIR 8
STAIR 1 STAIR 2
STAIR 3
STAIR 4
STAIR 5
STAIR 6
STAIR 7
Pupil ToiletsMaleF083
15.4 m²
Plant ToServe Social
(BD)F090
27.0 m²
Staff ToiletsMaleF070
28.4 m²
Staff ToiletsFemaleF071
28.5 m² English StaffBaseF033
30.9 m² EnglishClassroom 1
F02264.2 m²
Science Lab 2Physics
F04281.4 m²
Plant ToServe Kitchen
F09118.0 m²
EnglishClassroom 3
F02465.0 m²
EnglishClassroom 4
F02565.1 m²
EnglishClassroom 5
F02665.2 m²
EnglishClassroom 6
F02765.2 m²
EnglishClassroom 7
F02865.2 m²
EnglishClassroom 8
F02965.0 m²
IT-4F030
9.0 m²
Fan Cupboard1
F08513.9 m²
Science Lab 3Physics
F04380.7 m²
AdvancedHigher / StaffStudent Base
3 PhysicsF055
30.1 m²
Science Lab 4BiologyF044
80.6 m²
AdvancedHigher / StaffStudent Base
2 BiologyF058
31.1 m²
GreenhouseF045
21.1 m²
Science Lab 6BiologyF053
80.8 m²
Science Lab 5BiologyF051
80.6 m²
Science Lab 7BiologyF054
80.6 m²
AdvancedHigher / StaffStudent Base1 Chemistry
F05230.6 m²
Science Lab 8Chemistry
F05680.0 m²
Science Lab 9Chemistry
F05780.8 m²
Science lab10 Chemistry
F05980.3 m²
TechnicianSupport Area
F09321.1 m²
Science Lab11 Chemistry
F06081.2 m²
ScienceTechnician
Base & StoreF049
97.2 m²
Fan Cupboard2
F08614.5 m²
Pupil ToiletsMaleF066
14.7 m²
Pupil ToiletsFemaleF067
14.3 m²
Acc. WC10F087
3.9 m²
Chemical &Bulk Store
F05010.2 m²
Maths StoreF078
17.2 m²
MathsClassroom 8
F08270.8 m²
MathsClassroom 7
F08166.1 m²
MathsClassroom 6
F08065.5 m²
FoodTechnology 2
F03592.7 m²
StoreF038
18.1 m²
MathsClassroom 5
F07665.0 m²
MathsClassroom 4
F07565.8 m²
MathsClassroom 3
F07465.7 m²
MathsClassroom 2
F07365.7 m²
IT-3F016
9.0 m²
Maths StaffBaseF079
28.6 m²
MathsClassroom 1
F07267.4 m²
Library - ITF002
72.1 m²
Staff RoomF069
106.5 m²
Project/SoundF0688.2 m²
Library / TextSitting Room
F001220.6 m²
LibraryCorridor
F20440.1 m²
ScienceBreakout
F01315.7 m²
SharedInterviewRoom 2
F04811.0 m²
ScienceCorridor 1
F20145.2 m²
English StoreF037
25.2 m²
LibraryReception
F0058.5 m²
GuidanceCorridor
F20580.1 m²
DISABLED
REFUGE
DISAB
LED
REFUG
E
DIS
AB
LED
RE
FU
GE
DISABLEDREFUGE
DIS
AB
LED
RE
FU
GE
DIS
AB
LED
RE
FU
GE
EnglishClassroom 2
F02364.8 m²
Acc. WC9F031
5.5 m²
Science lab 1Physics
F04180.5 m²
ScienceCorridor 2
F202120.4 m²
GuidanceOfficeF017
82.0 m²
Acc. WC12F100
4.2 m²
ServicesF077
4.6 m²
SCREEN 1 SCREEN 2
SCREEN 3
SCREEN 9
SC
RE
EN
9
SC
RE
EN
9
SCREEN 10
TechnicianBaseF040
34.7 m²
DepartmentBaseF039
20.6 m²
FoodTechnology 1
F03495.6 m²
Textile / Multipurpose
F03691.5 m²
SupportWorkersRoomF010
9.9 m²
SharedInterviewRoom 1
F0149.9 m²
InterviewRoom 3
F02115.4 m²
InterviewRoom 2
F02014.1 m²
InterviewRoom 1
F01914.6 m²
Time OutRoomF011
25.9 m²
Pupil ToiletsFemaleF084
15.4 m²
Depute Head3
F01519.2 m²
Social S5/S6F110
86.0 m²SCREEN 13
SCREEN15
CL(00)010
LL(00)013
ML(00)014
A
B
C
DD
EE
FF
GG
HH
II
JJ
1
1
2
2
45
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
13
13
14
14
L
N
Q
MM
Q1
AG
15
1718
19
20
22
2324
25
27
28
29
30
30
31
31
32
3233
34
34
36
35
37
38
38
39
39
40
40
41
41
42
42
43
43
44
44
45
45
47
47
48
48
49
4950
50
51
51
52
54 55
55
56
56
57
57
58
58
59
59
60
60
61
61
T
T
U
V
W
X
X
Y
Z
AA
AB
AC
AE
AF
AH
AH
AJ AK
63
AD
AD
S
42a
42a
Ea Ea
14a
14a
62
62
46
46
21
P P
25b
25a
16
R
K
38b
38b
38f
BL(00)010
TechnicianOfficeF212
10.5 m²
Cleaner 4F2103.0 m²
ConferenceRoomF003
40.6 m²
StoreF007
7.6 m²
VOID
STAIR 9
Maths Store 2F047
3.0 m²
VOID
Cleaners 3F032
8.3 m²
Acc WC11F088
4.0 m²
OfficeF004
9.3 m²
Copy RoomF0088.4 m²
KL(00)013
JL(00)014
DL(00)010
EL(00)011
FL(00)011
NL(00)014
PL(00)014
HANDRAIL
HANDRAIL
HANDRAIL
FoodTechnologyCorridor 1
F20864.4 m²
MathsCorridor
F203107.5 m²
FoodTechnologyCorridor 2
F20980.6 m²
Acc WcF214
3.9 m²
EnglishCorridor 1
F20085.1 m²
EnglishCorridor 2
F20798.9 m²
1st floorwalkway
F206129.3 m²
Access toPlantF216
2.7 m²
ServicesF217
0.7 m²
DISABLEDREFUGE
Plant ToServe
Assembly(BD) - FFL2290 above
1st floorF092
119.1 m²
VOID
Deputy HeadTeacher 4
F09518.7 m²
RiserLSR017.9 m²
ServicesF211
2.8 m²
DiscreetWaitingF012
13.3 m²
GENERAL NOTES:
1. Do not scale from this drawing.2. All dimensions are in millimetres unless noted otherwise.3. The Contractor is responsible for checking all dimensions, levels and co-ordinates on sitebefore commencing the Works.
Fire Strategy4. For general arrangement of the Fire Strategy refer to the L(69) drawing series.5. Different Occupation: The different occupiers of the building (Secondary School, Library,Facilities Management & Community Rooms) will be managed under a single managementregime by the Facilities Management Contractor. The building will have a common fire alarmand detection system, and will operate a common fire evacuation management procedure.
Safety6. Accessible Entrances: All pupil and staff main entrance doors are designed as accessibleentrances with accessible thresholds.7. Internal doors: All internal doors have a minimum clear width of 850mm, except the followingdoors for which widths are noted where required for escape:- Doors on escape routes in corridors (double doors clear width 1675mm)- Doors into escape stairs (double doors clear width 1675mm)- Final exit doors (double doors clear width as per fire strategy plans)- Store doors- Toilet/changing cubicle doors.8. Lift: Compliance with Standard 4.2.7 is provided by a passenger lift manufactured andinstalled in accordance with BS EN 81-70: 2003. Reaction of lift to fire to be in compliance withBE EN 81-73: 2005. A clear landing at least 1.5 m x 1.5 m in front of any lift entrance door isprovided as shown. Lift system to incorporate the following:- Controls on each level are to be located between 900mm and 1.1m above the landing FFL,and within the lift car on a side wall between 900mm and 1.1m above the car floor and at least400 mm from any corner.- Landing controls on each storey to include tactile call buttons and visual and tactile indicationof the storey level.- Lift doors, handrails and controls are to contrast visually with surrounding surfaces.- Lift to be provided with a signalling system which gives notification that the lift is answering acall made from a landing.- Lifts to be provided with a means of two way communication that allows contact with the lift ifan alarm is activated, together with visual indicators that alarm has been sounded and received.This is to be operable by a person with a hearing impairment.- Automatic lift doors are to have a clear opening width of at least 800mm and be fitted withsensors that will prevent injury from contact with closing doors- Lift car internal dimensions to be at least 1.1m wide by 1.4m deep and contain a horizontalhandrail, of a size and section that is easily gripped, located 900mm above the floor on all wallsexcept the one containing the door.- Mirror to be provided on the wall facing the doors, above handrail height. -Within the lift car storey selector buttons to be tactile and, in lift serving more than 2 storeys,visual and voice indicators of the storey reached are to be provided.- Lifts to be supplied with a system which permits adjustment of the dwell time after which the liftdoors close, once fully opened, to suit the level of use.- The landing controls and lift car controls are to be of a type that do not operate on heat orpressure resulting from a fire.9. Collision with projections: Windows at ground level shall have all opening casements fittedwith a limiting stay to prevent it opening further than 100mm.10. Collision with glazing: All glazing less than 800mm above floor level to be toughened safetyglass in accordance with BS 6262: Part 4: 2005. Large areas of glazing shall be provided withmanifestation as recommended in BS 6262: Part 4: 2005. This shall be in the form of adhesivevinyl applied to the glass.11. Access to manual controls: All controls that are intended for operation by the occupants shallbe installed in positions that allow safe and convenient use:
WindowsAll openable windows that are operable by the occupants to provide natural ventilation shallhave controls for opening positioned at least 350mm from any internal corner, projecting wall orsimilar obstruction and at a height of not more than:1.7m above floor level where access to controls is unobstructed.1.5m above floor level, where access to controls is limited by a fixed obstruction not more than900mm high which projects not more than 600mm in front of the position of the controls (such asfitted furniture).
Where obstruction is greater, a remote means of opening, in an unobstructedlocation, shall be provided. This shall be at not more than 1.0m above floor level, in anunobstructed location, in any room intended specifically for use by a wheelchair user.
Electrical fixturesOutlets and controls of electrical fixtures and systems shall be positioned at least 350mm fromany internal corner, projecting wall or similar obstruction, and at not more than 1.2m above floorlevel.
Light switches shall be positioned at a height of between 900mm and 1.1m above floor level.
Standard switched or unswitched socket outlets and outlets for other services shall bepositioned at least 400mm above floor level. Above an obstruction, such as a worktop, fixturesshall be at least 150mm above the projecting surface.
In accommodation specifically intended for wheelchair users operable controls shall be locatedat a height of not more than 1.0m above floor level.
Where sockets are concealed such as to the rear of built-in appliances, or obstructed by built-infurniture, separate switching shall be provided in an accessible position, to allow appliances tobe isolated.
Sanitary Facilities12. Pupil Toilets:The numbers of sanitary facilities for pupils have been calculated and providedin accordance with:
School Premises (General Requirements and Standards) (Scotland) Regulations 1967WC provisions:Pupil total numbers: 1050 (525 Male, 525 Female)
First 60 Number of appliances = 8 (4x2)Every 30 additional pupils up to 300 Number of appliances = 16 (8x2)Every additional 60 over 300 (to 1050) Number of appliances = 25 (12.5x2)
Total = 49
25 WC appliances for girls25 appliances for boys (1/3 to be WCS = 9 WCS, 16 Urinals)
WHB provisions:Pupil total numbers: 1050 (525 Male, 525 Female)
First 30 Number of WHBs = 4Next 30 Number of WHBs = 4Every 30 additional pupils up to 300 Number of WHBs = 16 (8x2)Every additional 60 over 300 (to 1050) Number of WHBs = 25 (12.5x2)
Total = 49
25 WHBs for girls25 WHBs for boys
BS 6465-1: 2006WC provisions:Pupil total numbers: 1050 (525 Male, 525 Female)
Girls appliances = 1 per 20 pupils or part thereof = 27 WCs
Boys appliances = 1 per 20 pupils or part thereof = 272/3rds to be urinals = 9 WCs, 18
Urinals
WHB provisions:Pupil total numbers: 1050 (525 Male, 525 Female)
1 per WC / Urinal= 27 WHBs for girls= 27 WHBs for boys
13. Staff Toilets: The numbers of sanitary facilities for staff have been calculated and provided inaccordance with the table to Standard 3.12.2:
WC & WHB provisions:Staff total numbers: 150 (75 Male, 75 Female)
From 3.12.2 of the SBSA Technical handbook:Female provision (min) = 4 WCs, 4 WHBsMale provision (min) = 3 WCs, 3 Urinals, 3 WHBs.
DD
AG
15
29
X
X
AE
AK
16
Plant ToServe library -
FFL 3275above 1st
floorF218
35.9 m²
1100mm Handrailrequired
AedasAedas Architects LtdFloor 9 Cadogan SquareCadogan StreetGlasgow G2 7HFUnited Kingdom
Aedas Architects
T +44(0)141 2250555F +44(0)141 2487923E [email protected]
original by
project
project number scale
drawing number rev issue status
This drawing is to be read in conjunction with all related drawings. Do not scale from thisdrawing. All dimensions must be checked and verified on site before commencing anywork or producing shop drawings. The originator should be notified immediately of anydiscrepancy.This drawing is copyright and remains the property of Aedas.
@A0
date created
client name
school
drawing
computer file plot date
Checked by
As indicated
7
C:\Revit Projects\2008\2008.001185.01 - ElginAcademy\01185-01-A-BUILDING-JH.rvt 25/07/2011 16:52:49
2008.01185.01
GW
L(00)004
RRMarch 2010
First Floor General Arrangement
Stewart Milne Construction
The Moray Council PPP
Elgin Academy
Construction
GENERAL INFORMATION
THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH THEARCHITECTS GENERAL ARRANGEMENT DRAWINGS L(00)001-014
Rev Description Date Dr by App by
A Revised in accordance with councilrequirements
28-04-10 GW RR
B General Updates of doors & ToiletsLayouts Post CP for Issue with Stage 2Building Warrant
13-07-10 AGR RRC Stage 2 Warrant General Notes added 30-07-10 JSH RR1 Change Issue Status to Construction 21-09-10 AGR RR/JH2 Alterations to library layout 25-11-10 GW JH
3 Alterations to internal layout. AdditionalDisabled WC added. Alterations to ventriser locations.
31-01-11 JH JH
4 Windows altered/added to achieverequired daylighting levels
14-04-11 JH JH
5 Door & Half Elevation added for DoorF091, Note added to drawing 1100mmhandrail required in plant room abovedrum
01-06-11 AGR RR
6 Social Space plant room door altered todoor & half. Internal doors updated.
22-06-11 JH JH
7 Ventilation stacks and associatedpartitions removed.
25-07-11 JH JH
1 : 200Plant Room to serve library2