13
CRENSHAW CORRIDOR ANALYSIS By: Ivan Gonzalez

CRENSHAW CORRIDOR ANALYSIS By: Ivan Gonzalez. Background - - Expo Line scheduled to open in 2011 - - Opportunities exist for transportation projects to

Embed Size (px)

Citation preview

Page 1: CRENSHAW CORRIDOR ANALYSIS By: Ivan Gonzalez. Background - - Expo Line scheduled to open in 2011 - - Opportunities exist for transportation projects to

CRENSHAW CORRIDOR ANALYSISBy: Ivan Gonzalez

Page 2: CRENSHAW CORRIDOR ANALYSIS By: Ivan Gonzalez. Background - - Expo Line scheduled to open in 2011 - - Opportunities exist for transportation projects to

Background-- Expo Line scheduled to open in 2011-- Opportunities exist for transportation projects to improve access to the Crenshaw Blvd.--There is a focus on making the corridor amenity-rich while respecting the history and character of the neighborhood-- CD 10 (Herb Wesson) has begun analyzing this corridor for potential TOD*

-*(Mid-City Crenshaw Visioning Plan)

Source: ArcGIS Online Map

Madeline Brozen
This appears to be a ArcGIS online generated map. That is fine to use in your presentation - however, you should clearly source that in this side. Also, it'd be good to have a little more background information text.
Page 3: CRENSHAW CORRIDOR ANALYSIS By: Ivan Gonzalez. Background - - Expo Line scheduled to open in 2011 - - Opportunities exist for transportation projects to
Page 4: CRENSHAW CORRIDOR ANALYSIS By: Ivan Gonzalez. Background - - Expo Line scheduled to open in 2011 - - Opportunities exist for transportation projects to

Population Density• Density

Exists at the beginning and end of the corridor

• There exists opportunity for density increases near the Expo Line Stop.

Madeline Brozen
Clean up legend. Add the parks to the legend as well. It would make more sense if the parcels were only under the selected census tracts or the census tracts extended to the boundary of the parcels.
003911869
Need to clean up the map. dont' label unnecessary elements. I would actually not put the parks in the legend as it is obvious. I agree that the parcels need to be clipped to your project area. Also, make the map layout portrait, in order to accommodate to the shape of your focus area.
Page 5: CRENSHAW CORRIDOR ANALYSIS By: Ivan Gonzalez. Background - - Expo Line scheduled to open in 2011 - - Opportunities exist for transportation projects to

Crenshaw Corridor Analysis

-Median Income is lower at areas with higher densities-This map indicates that large share of the communities along the corridor fall within a low to mid income group.-These groups will serve as the basis for my analysis

-This map displays transit dependent groups (under 18 and over 64) over actual ridership-It confirms that there a need for a convenient shuttle

Madeline Brozen
Same issues as previously noted here.
Page 6: CRENSHAW CORRIDOR ANALYSIS By: Ivan Gonzalez. Background - - Expo Line scheduled to open in 2011 - - Opportunities exist for transportation projects to
Page 7: CRENSHAW CORRIDOR ANALYSIS By: Ivan Gonzalez. Background - - Expo Line scheduled to open in 2011 - - Opportunities exist for transportation projects to
Page 8: CRENSHAW CORRIDOR ANALYSIS By: Ivan Gonzalez. Background - - Expo Line scheduled to open in 2011 - - Opportunities exist for transportation projects to

-Hotspot Analysis shows the areas in which a TOD site would be most desirable

- -I placed a greater weight on proximity to local high schools, followed by transit dependence, population density and median income

- -The two ideal sites resulting from the analysis would be at Slauson Ave and Exposition Blvd

- -1/8th mile buffer chosen to show the approximate lot setback for a potential TOD

- -- The Shuttle will run at 15 minute headways on weekdays and 30 minutes on weekends

- - Fares of $.25 will be equitable to transit dependent target group

Crenshaw Corridor Analysis

Page 9: CRENSHAW CORRIDOR ANALYSIS By: Ivan Gonzalez. Background - - Expo Line scheduled to open in 2011 - - Opportunities exist for transportation projects to

Crenshaw Corridor Analysis

Page 10: CRENSHAW CORRIDOR ANALYSIS By: Ivan Gonzalez. Background - - Expo Line scheduled to open in 2011 - - Opportunities exist for transportation projects to

Appendix

Page 11: CRENSHAW CORRIDOR ANALYSIS By: Ivan Gonzalez. Background - - Expo Line scheduled to open in 2011 - - Opportunities exist for transportation projects to

Appendix

Page 12: CRENSHAW CORRIDOR ANALYSIS By: Ivan Gonzalez. Background - - Expo Line scheduled to open in 2011 - - Opportunities exist for transportation projects to

1. MetaData2. Model3. Buffering4. Measurement5. Creating Indices6. Geocoding7. Original Data8. Network Analysis9. Spatial Analysis10. Hotspot Analysis11. And several others (Select by Attributes, Select by Location

Skills Learned

Page 13: CRENSHAW CORRIDOR ANALYSIS By: Ivan Gonzalez. Background - - Expo Line scheduled to open in 2011 - - Opportunities exist for transportation projects to

Questions?Thank you!

CRENSHAW CORRIDOR ANALYSIS