    Creating A WIP Job

    Lets put it all together

    Michael Polaczak

    GPS WIP Support

  • 7/31/2019 Creating a WIP JOB

    2/49

    Creating The Discrete Job

  • 7/31/2019 Creating a WIP JOB

    3/49

    Discrete Job Form

    You can search forJobs by all the ways

    To the left or clickNew for a new Job

  • 7/31/2019 Creating a WIP JOB

    4/49

    Lets Create A New Job

    Either enter a jobNumber or let the

    Number be created

    Standard orNon Standard Job

    Enter in the assemblyThe class will defaultOr choose another

    Set the job to releasedAs it is easier when you

    Reproduce as you canDo anything with the joIn Unreleased status

  • 7/31/2019 Creating a WIP JOB

    5/49

    Enter in the quantityThe MRP net defaults

    Click in the Start dateThe Date Popup willappear

  • 7/31/2019 Creating a WIP JOB

    6/49

    Routing Tab

    If you had an alternateRouting, Reference orSerialization Start Op.This would be listed

    Revision is listed andRevision Date

    The Completion Subinventory

    And the locator is populatedOr you can populate it here

  • 7/31/2019 Creating a WIP JOB

    7/49

    Job History

    Job history will showThe remaining qty,Completed, scrappedGood way to see what

    has been completed ona job

    Also the Dates released

    Completed and ClosedDate

  • 7/31/2019 Creating a WIP JOB

    8/49

    Schedule Group and Project Infomation

    If the customer hasProjects installed andThe Project,Task willappear

    .Also with the Unit NumberAnd if the customer isUsing Schedule Groups

  • 7/31/2019 Creating a WIP JOB

    9/49

    Operations Tab

    Operation tab showsThe Dept from therouting And other infobrought over

  • 7/31/2019 Creating a WIP JOB

    10/49

    Cont. Quantities tab

    Wil show the availableQuantity at each stageOf each operation

    There are Diff.Stages a qty can bAt:* Queue

    * Running* To Move* Rejected* Scrapped and* Completed

  • 7/31/2019 Creating a WIP JOB

    11/49

    Different Stages in the Operation

    * In Queue This is always the beginning of the operation. Think of it as theholding pin for each operation. Everything will reside in the holding bin at everyoperation once the prior operation is complete

    * Running Means you are in the middle of the operation.

    * To Move To Move, Reject, or Scrap intraoperation step

    completed at an operation, the system automatically backflushes Operation Pull

    Components and charges resources of an operations completes those assemblies at that

    Operation

    * Rejected The product was rejected at this point in the operation.

    * Scrapped The product was scrapped an will decrement the quantity in that

    operation

    * Completed This is what has been completed at each operation

  • 7/31/2019 Creating a WIP JOB

    12/49

    Cont.. Dates Tab

    Start and completionDates for this operation

    The dates canBe changed butThey have to beConsecutive or

    They changesWill error. AlsoThe changesHave to be inCombination witChanges to the

    Resource datesFrom the resourtab

  • 7/31/2019 Creating a WIP JOB

    13/49

    Operations Components Tab

    Component, operationAnd date required islisted

  • 7/31/2019 Creating a WIP JOB

    14/49

  • 7/31/2019 Creating a WIP JOB

    15/49

    Cont..Supply Tab

    Includes the supply infoFrom the BOM

  • 7/31/2019 Creating a WIP JOB

    16/49

    Cont ATP Tab

    ATP-Available To PromiseFlag shows if theRule is enabled

  • 7/31/2019 Creating a WIP JOB

    17/49

    Resources Tab

    Shows the resources coming from therouting

  • 7/31/2019 Creating a WIP JOB

    18/49

    Cont..Quantities Tab

    Required, Applied and Open Qty

  • 7/31/2019 Creating a WIP JOB

    19/49

    Cont..Scheduling Tab

    Shows the dates associated

  • 7/31/2019 Creating a WIP JOB

    20/49

    Cont..Costing Tab

  • 7/31/2019 Creating a WIP JOB

    21/49

    Lets Move Through The Operations

  • 7/31/2019 Creating a WIP JOB

    22/49

    Move Transactions

  • 7/31/2019 Creating a WIP JOB

    23/49

    Main Move Screen

    At the move screen youCan search for the jobFrom the sales order

    And Line, AssemblyAnd the job its self

    Note: If the job is

    Unreleased the you willGet the error below

  • 7/31/2019 Creating a WIP JOB

    24/49

    Lets Go Back and Set the Job To Release

  • 7/31/2019 Creating a WIP JOB

    25/49

    Discrete Job Form

    Click on the StatusTo bring up the LOVFor the Job StatusAnd change it to atReleased

  • 7/31/2019 Creating a WIP JOB

    26/49

    Back to the Move Screen

    Input the Assembly andBring up the form

    You have a few options:

    Move, Complete orreturn

  • 7/31/2019 Creating a WIP JOB

    27/49

    Moving the Operations

    Upon moving throughOperations you have toPopulate the Sequence

    And the step.The steps are below

    Notice which one hasQty in them. You canOnly move from an op

    With qty in it

  • 7/31/2019 Creating a WIP JOB

    28/49

    Cont

    As from before theSteps come into play.You can Move fromqueue to queue

    Running, To Move,Reject and Scrap

    28_DJ_Move

  • 7/31/2019 Creating a WIP JOB

    29/49

    Move Transaction - Completion

    When doing a completionTransaction the To seq. getsPopulated with the To MoveStep but the from sequence

    You have to populate

  • 7/31/2019 Creating a WIP JOB

    30/49

    Move Transaction - Return

    On a return the from stepwill populate with theTo Move step and is notUpdateable. You will have to

    Populate what step youWant the return to go toWhich operation.

    NOTICE: If you do nothave quantity at the ToMove step it will error. Sobe careful that you havecompleted somecomponents when youdo a return.

    M i l T i

  • 7/31/2019 Creating a WIP JOB

    31/49

    Material Transactions

    Next we want to processAny material transactionsOn the job. Issue theMaterial to the job

    Enter in the job numberOr the Assembly and searchOn the job number

  • 7/31/2019 Creating a WIP JOB

    32/49

    Components Screen

    Only Push Components will showOn the screen that need to be processed Enter in the Subinv, Qty and

    account

  • 7/31/2019 Creating a WIP JOB

    33/49

    Component Issue

    If you do not have enough quantity for yourComponent the following warning will appear.

    If you allow negative inventory you will be able toProceed if not you will have to add inventory

  • 7/31/2019 Creating a WIP JOB

    34/49

    Checking or Changing Org Parameter

    Go to Inventory>Setup>ParametersThe org you logged into will default

    Note the AllowNegatives is checked

    NOTE: Be careful what you change on this

    Screen as it may effect transactions and dataIn the system

    Checking on the Material Transactions

  • 7/31/2019 Creating a WIP JOB

    35/49

    Checking on the Material Transactions

    To view your Material transactions you go to WIP>Material Transactions>View Material TransRemove the first Transaction Date then enter in the Source as Job or ScheduleThen enter in the Job name as the source

    C t

  • 7/31/2019 Creating a WIP JOB

    36/49

    Cont..

    When viewing the material transactionsThe item item will appear,subinv, locator if thereis one.

  • 7/31/2019 Creating a WIP JOB

    37/49

    Cont

    Some important information is the Transaction IdAnd quantity. The Id can be used to track theTransactions in the tables and other forms

    Vi M t i l T ti E

  • 7/31/2019 Creating a WIP JOB

    38/49

    View Material Transactions - Errors

    The job or schedule is shown as well as the job name

    Completion Transactions

  • 7/31/2019 Creating a WIP JOB

    39/49

    Completion Transactions

    To fully complete yourJob you have to completeThe assembly. This isWhere that occurs

    Input the job or search by the assembly

    The Job qty, completeQty and the availableWill populate

    C t

  • 7/31/2019 Creating a WIP JOB

    40/49

    Cont

    The subinventoryWill autofill asWell as the uom

    Input the qty

    NOTE: The availableQuantity and On-hand

    Discrete Job

  • 7/31/2019 Creating a WIP JOB

    41/49

    Discrete Job

    You can go back to theDiscrete Job to checkThe status

    Close Discrete Jobs

  • 7/31/2019 Creating a WIP JOB

    42/49

    Close Discrete Jobs

    To Close the Discrete JobGo to either the Close DiscreteJob (Form) or the SRS

    The Form will let you close aJob one by one.The SRS will let you closeMultiple jobs and is a concurrentprogram

    Close Discrete Job Form

  • 7/31/2019 Creating a WIP JOB

    43/49

    Close Discrete Job Form

    The Form looks just like theDiscrete job form. To Close theJob click on Tools>Close

    Cont

  • 7/31/2019 Creating a WIP JOB

    44/49

    Cont

    The popup for the Report TypeAnd after you click OK the requestWill be processed

    Close Discrete Job

  • 7/31/2019 Creating a WIP JOB

    45/49

    The Close Discrete Job formWill kick off a concurrentRequest. Check to see if itHas passed or failed

    Cont

  • 7/31/2019 Creating a WIP JOB

    46/49

    View the Ouput of the Close Discrete Job

  • 7/31/2019 Creating a WIP JOB

    47/49

    p

    Close Discrete Job SRS

  • 7/31/2019 Creating a WIP JOB

    48/49

  • 7/31/2019 Creating a WIP JOB

    49/49